HomeMy WebLinkAboutPermit M14-0218 - KOTIS DESIGN - GAS TEXTILE DRYERKOTIS DESIGN
1165 ANDOVER PARK W
M14-0218
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
3523049097 Permit Number:
1165 ANDOVER PARK W Issue Date:
Permit Expires On:
Project Name: KOTIS DESIGN
M 14-0218
12/17/2014
6/15/2015
Owner:
Name:
Address:
Contact Person:
Name:
Address:
CWWA SOUTHCENTER 4 LLC
PO BOX B-3879 C/0 EQUITY OFFICE
MGMT LLC, CHICAGO, WA, 60690
PETER CRELLEY
PO BOX 33370 , SEATTLE, WA, 98133
Contractor:
Name: PRO -STAFF MECHANICAL INC
Address: PO BOX 33370 , SEATTLE, WA, 98133
License No: PROSTMI072NG
Lender:
Name:
Address:
Phone: (206) 361-0071
Phone: (206) 361-0071
Expiration Date:
DESCRIPTION OF WORK:
INSTALL GAS FIRED TEXTILE DRYER
Valuation of Work: $6,950.00
Type of Work: NEW
Fuel type: GAS
Fees Collected: $285.10
Electrical Service Provided by: PUGET SOUND ENERGY
Water District: TUKWILA
Sewer District: TUKWILA SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2012
2012
2012
2012
2012
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2014
2014
2014
2012
Permit Center Authorized Signature:
Date:`d' 4 1- `14
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and • •• . ces governing this work will be complied with, whether specified herein or not.
The granti►: of this permit does not
state or Ir cal laws regulating constr
develop ent permit and agree to
Signature.
Print Name:
This permit shal
the work is suspe
ecome ull
ed o aba
PERMIT CONDITIONS:
p
sume t
ctio or the
e con.'
d
f
s
give authority to violate or cancel the provisions of any other
e - ce of work. I am authorized to sign and obtain this
ttached to this permit.
Date: 12
if the work is not com nced within 180 days for the date of issuance, or if
a period of 180 days fr
m the last inspection.
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Mechanical Permit No.
Project No.',
.Date ApplicationAccepted..:,
Date Application Expires:
' - (For „office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
'
King Co Assessor's Tax No.:3� 2--JO4 I 0 17
Site Address:)) b57 / i tp iE-g_ ?A-�L;, f �-�(.l Suite Number: i j Floor: i
Tenant Name: T S 1PC4) A i4 New Tenant: ❑ Yes W..No
PROPERTY OWNER
Namt.141l✓pt SovinC 4L 4 LL c
flkdrusopt s-3579 OhF1G=s
490
City:G j Artl O State;
CONTACT PERSON - person receiving all project
communication
Name:
Add
�o>c. 3337 c7
City
:S>Eae- -t.e
State: w A Zip y 13
thrz- i Fai.0L 3Vr 1 omit
*.il prSr ArF ivleCi4A“)
MECHANICAL,, CONTRACTOR INFORMATION
Company Nam
I?zo- /-N r- Me-CH-AN►-Ptl.
AddreAp 030,c.33370
City: r icu.-; State:IA, Zip9 913:1
Pbtk51,'344-0O?1 Fa , 3
Contr Reg Nosy D j�l41_O7 p pate: nA. / G
Tukwila Business Licen .: - c --ti7
Valuation of project (contractor's bid price): $ it, -/_O
Describe the scope of work in detail:
Ir\S+11, t 4-e ><4-A€ CV"
Use: Residential: New
Commercial: New
Fuel Type: Electric
Replacement
Replacement
Gas iS„ Other:
(v%y4r
H:\Applications\Forms-Applications 0n Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 1 of2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
2
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
I
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type
Qty
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
QtY
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
Signature:
Print Name: r , f?_ LL 1 I Day Telephone:2 " '4.— 31dd 007 1
Mailing Address:/ , 0 - �%x. 33370 ( .. E/ rr-r- ..C- 1/�/r4 90133
City State Zip
AU
D AGENT:
Date: 743 Alf
H:Wpplications\Forms-Applications On Line\201 I Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
ACCOUNT I QUANTITY I PAID
$411.86
M14-0218 " Address: 1165 ANDOVER PARK W Apn: 3523049097 $285.10
MECHANICAL $274.13
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$186.80
PLAN CHECK FEE
R000.322.102.00.00
0.00
$54.83
TECHNOLOGY, FEE $10.97
TECHNOLOGY FEE
R000.322.900.04.00
0.00
$10.97
PG14-0182 Address: 1165 ANDOVER PARK W Apn: 3523049097 $126.76
GAS $121.88
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$65.00
PLAN CHECK FEE
R000.322.103.00.00
0.00
$24.38
TECHNOLOGY FEE $4.88
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R3726
R000.322.900.04.00
0.00
$4.88
$411.86
Date Paid: Monday, December 08, 2014
Paid By: PRO=STAFF MECHANICAL INC
Pay Method: CHECK 14875
Printed: Monday, December 08, 2014 4:13 PM 1 of 1
WSYSTEMS
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
14414-az-IS
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367
Permit Inspection Request Line (206) 438-9350
Project: ,
Pei ( I A
Tytx It.esrf bon' „
"Fr (Ati I
Address:
4 c id42-Ar
tactrl- 4)
Date Called:
Special Instructions;
pA4
Date Wanted: a.m.
V (3— N 5pm
Reltz:
t (A._ & 711-05- .d4te—C
Phone No.:2_06_3qc..517 -2—fi
pproved per applicable codes. Corrections required prior to approval.
MENTS:
or -6 1MA-Ai
Inspector
-Date: Li
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO, PERMIT NO,
1v114 -olt 8
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431- 670
Permit Inspection Request Line (206) 438-9350
Projecr_ ..... ... ..
Type of Inspection:
i-jj .iiiiiimpellfr
-Add7s1s,:,..) S /1/100u 6 j_ ul
Date Called:
Special Instructions:
6 4-5- li i cek,legi e
-
D r 2 e fc
"Phone
Date Wanted;
2,z -/ 5.
-Tule
P.m.
Requester:
No:
tEIApproved per applicable codes. 0 Corrections required prior
to approval.
COMMENTS: 1)rov de lectri. (It 1 p,15_0
ik, r 4.#1 1-,
/
trot) 64 wo rover/ pw r op- ID 'Pr 1--Icy i
/ fric, ,
I I v
I
Inspector
Date:
-
T
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
• -Belt width,
122 to 183 cm
(48" To 72'7
• Heat chamber length
244 to 610 cm (8' to 20'') or more
• CoolSkin'" technology
The industry's most efficient, innovative, and affordable
high -production textile gas dryer, Sprint 2000 is available in belt
widths from 122 to 183 cm (48" to 72"). Not only does it have the
highest production capacity in its class, it's also the most energy
efficient. Heavy-duty thermal insulation prevents heat from
migrating into the workplace, while CoolSkin°' technology leaves
the dryer skin cool to the touch. Fast cure rates and high product
throughput maximize dryer capacity and minimize per -unit cost.
Available in liquid propane (LP) or Natural Gas (NG), the
high-performance burners are designed with excess capacity that
far exceeds consumption rates under normal operating conditions.
Separate blowers control combustion, circulation, and exhaust.
A high -volume forced air system quickly brings the chamber
to the desired temperature, speeding the start of production.
Process temperatures and set temperatures are controlled
OTIS irs16)N:
GAS p,P� + F LvF Vz,'rr
6,5 ANPov�g.. PAS In/E5-r
lti%.-oa. 8
City of Tukwila
BUILDING DIVISION
digitally. Temperature consistency is ensured by a fuzzy -logic
controller, which responds to ambient temperature changes by
keeping chamber heat within 1° of target temperature at the
thermocouple. A tower light shows when temperatures are within
user -set parameters. When readings fall outside those settings, a
temperature monitor issues visible and audible alarms. Entry and
exit openings are adjustable, and large, crowned rollers ensure
positive belt tracking. Digital speed readout makes it easy to
duplicate settings. An automatic shutdown sequence keeps the
blower and belt running until the chamber has cooled.
All equipment from The M&R Companies is built with M&R's
unsurpassed attention to detail and commitment to quality,
durability, innovation, and design excellence, and is backed by M&R's
unparalleled 24-hour access to service, support, and premium parts.
It's no wonder M&R is the first name in screen printing equipment.
www.mrprint.c®m
USk 800-736.6431.Outside USA: +847-967-4461
RECEIVED
CITY OF TUKWILA
DEC 0 8 2014
PERMIT CENTER
STANDARD FEATURES
Air.Handling
•-Enhanced airflow accelerates'drying/curing
• Exhaust blower:evacuates op td.50970 Umin (1800 cfm)
• High -`volume circulation blower reduces energy costs
• Stainless steel filter slides out for easy cleaning ".
•.Three separate dedicated blowers (combustion,
circulation &exhaust)
Certification
• CE & UL compliant: Built tospecificatidns established
by the European Committee for Standardization•. (CE):
'and Underwriters Laboratories®(UL)
•. CSA Certified and built to meet or'exceed AGA & CGA
Control Center:
•.Automatic shutdown sequence keepss the,blower and
1,1 belt running until the chamber has cooled '
• Control panel rotates for visibility and access
• „Digital' keypad with digital display
• Heat efficiency system reduces operating expenses by
using outgoing combustion. gas to heat incoming air
-• -•Te)nperature monitor issues visible and audible alarms, When readings fall outsrdeuser specked parameters!:.
• Tower light indicates when temperatures are within
: user=set tolerances
OPTIONS
Air Handling
+;AC variable -speed circulation blower
Conveyor System
• Conveyor extension' sections are available in 122 cm
(48') increments
Belt Width
Akira(' Length
Exhaust Blower System --
1244to 610 cm,(8'to 20') or mom 244 to 610 cm (8' to 20') or more
61 cm (le)
Conveym` System . -
Avadable with:conveyor speeds faster thin the.
•
standard. rates listed
Conveyorbelt is made of heat -resistant,
Tetlon®coated fiberglass.`
• Digital belt speed readout makes it easy to duplicate
speed settings
• • Driven by a reliable heavy-dutyvariable-speed DC motor
Large anadized`aluminum rollers an crowned for
positive belt.trecking
belt speed: 91: cm (36) per minute
Design & Construction
• Adjustable entry/exdopenings
Aircooled cabinet ensures Jong life for electrical
components ;
• Beanngs"are'designed far high fipeeds and high
temperatures
•• • Circuit b•reakers allow easy reset
• Exhaust drawer/creosote catcher
low-profiledesign makes it easier to.see overthe dryer
Modulardesiign and specialized fasteners make it'
easy to attach,additional heat chamber units
Energy Effecrency
•;Burners are designed with excess capacity that
?far exceeds consumption rates under normal
operating conditions
CaolSkm'" technology leaves the dryer shun job& to
High speed -conveyor system for speci• alized graphics`
and industrial applications
Splitbelt model with independent drives features'
• reversible direction arid variable speed=available on
models With halt widthsof.152,cm (60°) or more.
122 em (48) - ''152 cm' (601
Romer Width 217 61445.51 , 248 cm (97.5')
HeatChamherWidth. .,(100cm(63) , - 191cm.(75"..'.,','`,:
Heat Chamber length
Expansion Heat Modules
61cm(24)-.::
Standard lnfeed/Outteed length ":; 2• 9
44 cm (96, .
/32 to`1097 cm (24' to 36') or more
2')i 50970 Umin (1800°cfm) f4 6 mm(1/4)
Gas Input Size , _ ) 2.54 cm (1')
LP/Natural Gas Input Pressure " 93`iiim Hg (5 we ).,
Irryneirlif Mmrittne't _ 300 000 Btu
Electrical Requirements 1 1'208/230 V, 3 ph, 22/21 A; :50/60Hi, 5.3 kW
t 400V,.3ph, 16A,50Hz 53kW2..
61 cm,(24'3 Optional Radiant Section' - 208230 V 3 ph 15/17 A 50/60 Hz, 5 kW
1.400V,3ph�:9A;50Hz, 6
244cm(96J
732to i'`Tcm(24'to. 36yormore
'30 c (12'); 09701/min11800 efm) it 6ynm(1/4') "; r 30 cm (12'):50970 Vmin (1800 rim) ® 6 rem
▪ Fasf curing rates and highproduct throughput ,
maximize dryer capacity and minimize, per- unit cost.
▪ Fuziy bgic:controller ensures consistency by`keeping heat
'. withal°oftargettemperalureatthethennacoupie .
Heavy dutythermal insulation_ pnbvents heatfrom
mlgrat)ng into the workplace '
. Pressuii ed vector airknives provide.consistent and
unrfarm temperatures throughout the•drying chamber
• Process temperature and settemperature are
=. displayed an&controhed digitauy
• Spnrd 2000 is the most energy -efficient dryer in ifs class
Heat Chamber
,:• Burners.a.re avarlable.ferliquid propane-(LP).or_„
natural gas (NG)
• Direct -fired bumer is maximum -rated at 300000 Btu
'• Double -wall construction
Galvanaedsteel rnterio
Modular train'simplifres maintenance ,•
Sprint2000 has the highest production capacity -in
:Is class`
Warranty, Semite &.Support
24 hour hotline :rs staffed 365 days a year
secs to M&R s Training Center
coo year Kilted warrar
;Heat Chamber
4 61 cin(24'J nitrated pie heat module speeds.
throughput
Additional61 cm (24 )sections are available
• COo1ing fan mounted aver caked
V-►STI N L.
-1183 um (72 )
i.218cm(1095)
),221cro:(87.).
244 to 610 cin (8' to 20') or more:,--
-(:61 cm (247)
93 rem Hg
300�00 Btu :-
,208230 V,3 ph 22/21 A; 50/60ffr 6.3 kW
400V3p1i;16A,50Nz,5.3kW
208230 V 3 ph 19/21A, 50/60 Hz,62 kW
'Shipping Weight a ' 1678kg(3700lb) --
kW '> %400v:3'ph,`11A 50.Hz,62kW
;1860 kg WOO lb)
732 to 1097 cm(24' l0 36) or more;
'.93Min Hg(5 wc)
} 300 040 Btu ,
1 208230 v, 3 ph 2221 A, 50/60 Hz, 5.3 kW
_s i 400 V 3`ph;16 11,50 Hz,'53 kW
208230.v, 3 ph, 2123 A, 50/60 Hz, 7.4 kW
400V3 ph 13A,50Hz,=74kW
;2171, kg (4800 lb)
' If incoming voltage differs from the voltage(s) listed in this brochure, calculate amperage accordingly. other electrical configurations are available: Contact The M&R Companies for details.
a Measured at the Exhaust Discharge Port
Static pressure
' Normal usage varies, but is significantly lower than the stated maximum
e Weight applies to models with a 244 cm (96') heat/expansion chamber
The M&R Companies
M&R • NUARC • AMSCOMATIC
The M&R Companies 1 N. 372 Main Street, Glen Ellyn, Moots 60137-3576 USA
USA: 800.736-6431 / 630-858-6101 / Fax 6304158.6134.Outside USA: +847-967-4461 / Fax +847-967-0417
MAR Printing EenIpmmm, Inc and its subsidiaries (hereinafter MAR), berme the information in this advertisement to be accurate at publication, though it does not purport to list as manufacturing and specifintian variations, nor does
it assume liability resetting from incompleteness or inert warp M&R resales the right to change specifications without notice MAR egiressy disclaims any liability for damages, consequential or incidental from purchase, installation,
servicing, aMroroseofany product/service based upon information herein No warranties of matantabiliyorftness for apartiuularpurpose are made or are tobeimplied from the information herein.1 inlonzatiunherein may be reproduced
or used in any manner without the prig egress written consent of M&R in each case. Copyright 2005 MR Printing Equipment, Inc. All rights reserved. 000105
as Screen Prill ingyConve or e
i eapac arm mati - d: xli n � dowers
}eId +edilOn=tfiNiet%jt4tii�_`
Sprint 3000 is the latest incarnation of the most innovative and
dependable line of gas conveyor dryers in the screen printing industry.
For over twenty years, M&R's venerable Sprint Series has been the
overwhelming choice of professional screen printers who demand quality,
consistency, and efficiency in their equipment and in the output they
generate. The new features M&R is introducing in the Sprint 3000 Series
include a color touchscreen interface, new high -capacity circulation and
exhaust blowers, an integrated roll -down outfeed hood, cleanout access
panels on the sides of the burner sections and drone modules to simplify
cleaning and maintenance, and a retention -time belt -speed control that
makes it easy to duplicate settings and eliminates the need to convert
feet per minute into the time substrates will spend in the heat chamber.
That in turn results in more user-friendly operation and greater precision
in achieving optimal curing and drying. Sprint 3000's color touchscreen
interface displays real-time dryer performance data, including dryer
temperature, dryer temperature history, heat -chamber retention time and
output from the included temperature probe, which can be used to track
substrate temperature as it passes through the dryer. It also includes Job
RecallTm, which allows operators to store operational parameters under
operator -chosen alphanumeric names —and recall those named settings
later for similar substrate/ink combinations. And to help keep Sprint 3000
operating at peak performance, M&R's Maintenance .Minder"' System
alerts operators when scheduled maintenance is due.
Available in liquid propane (LP) or Natural Gas (NG) versions, all Sprint
3000 dryers utilize exceptionally efficient high-performanceberners
with ample capacity. The burner system includes its own combustion air
blower, allowing precise metering of the air -to -fuel mixture to achieve
optimum efficiency. There are also separate blowers for circulation
and exhaust, each designed for maximum efficiency on a wide range of
inks and substrates. A high -volume forced air system quickly brings the
conveyor dryer chamber to the desired temperature, speeding the start
of production. Process temperatures and set temperatures are controlled
digitally. Temperature consistency is ensured by a fuzzy -logic controller,
which responds to ambient temperature changes by keeping chamber
heat within 1° of target temperature at the thermocouple. A tower light
shows when temperatures are within user -set parameters. When readings
fall outside those settings, a temperature monitor issues visible and
audible alarms. An automatic shutdown sequence keeps the blower and
belt running until the chamber has cooled, minimizing or eliminating the
need to monitor conveyor dryer shutdown. The entry and exit openings
are adjustable to fit a wide range of substrates, and large belt rollers are
machined with a slight crown to ensure positive belt tracking.
Dryers in the Sprint 3000 line are available in a wide variety of
configurations, belt widths, and chamber lengths. Sprint 3000 dryers have
the highest production capacity in their class and are the most energy
efficient. Heavy-duty thermal insulation prevents heat from migrating
from the conveyor dryer chamber into the workplace, while CoolSkin'a'
technology leaves the dryer skin cool to the touch. Fast cure rates and
high product throughput maximize dryer capacity and minimize per -
unit cost The Sprint 3000 Series"is simply the industry's most efficient,
innovative, and affordable line of high -production gas screen printing
conveyor dryers, and Sprint 3000 gas conveyor dryers, are ready .to tackle, ..
the produCtio'n challenges of the next;:twenty yeara.
Www.nirp [nt1Con1
storeinnrprint.corn
STANDARD FEATURES
MR HANDLING -.
•. Enhanced airfloWacceleratesdrymg/curing ; '.
•High -volume circulation blower reduces energy costs
,• Stainless steel filters slide out for easy cleaning
• Three separate dedicated blowers (combustion, circulation
& exhaust)
«•••••• CERTIFICATION
le Bulltto meet "or exceed CSA standards .
• CE & U€ compliant: Built to specifications established by the
European Committee for Standardization, (CE)'and Underwriters
Laboratories* (UL), ,
CONTROL CENTER
• Automatic shutdown sequence keeps the blower:and belt
running until the conveyer dryer chamber has cooled
• Color touchscreen interface. with Retention -Time belt
speed control
• Graphic display tracks dryer temperature in real time
• Job Recall'" allows operators to store Operational parameters
under operator -chosen alphanumeric names -and. recall those"
named settings later for.similer substrate/ink combinations
• LCD touchscreen monitor displays keyOperationalinfsireation
like heat chamber temperature and retention time -and gives,
operators complete control of all dryer settings - • Maintenance Minder', system alerts operators when scheduled
maintenance is due
• Temperature monitor issues visible and audible alarms wl)e
readings fall autside user -specified parameters
• Touchscreen provides easy, direct access to alarm lists, service
data, and all screen printing conveyer dryer functions ,
• Totver light indicates when temperatures are within "
user -set tolerances
OPTIONS
CONVEYOR SYSTEM
+'Conveyor dryer belt is made of heat resistant,
Teflon® -coated fiberglass
• Driven by a reliable, heavy-duty, variable -speed DC motor
• Largo anodized aluminum rollers are crowned for positive
belt tracking.:
DESIGN & CONSTRUCTION
• Conveyor dryer belt is made of heat -resistant, Teflon* -coated
fiberglass '
•'. Driven by a reliable, heavy-duty, variable -speed DC motor;
Large anodized aluminum rollers are crowned for positive'
belt tracking
ENERGY EFFICIENCY
* Burners are designed with excess capacity that far exceeds
consumption rates under normal operating conditions
Controller ensures consistency by keeping dryer chamber heat
within 1°oftarget temperatureatthe thermocouple ..
• CoolSkin'". technology leaves the conveyor dryer skin cool to the
•`,:Fast curing Yates and high product throughput maximize
`conveyor dryer capacity and minimize per -unit cost
+ Heavy-duty thermal insulation prevents heat froni migrating
from the conveyer dryer into the workplace
Pressurized vector air knives provide consistent and uniform, r,
temperatures throughout the drying chamber
�i Process temperature and set temperature are displayed and
controlled digitally,
• Sprint 3000 models are the most energy -efficient gas screen
printing conveyor dryers in their class I
HEAT CHAMBER •
BumerS **reliable for liquid propane (LP) or natural gas (NG)
• Double -wall construction
•'Galvanized steel'intermr
• Modular gas train simplifies maintenance
PRODUCTIV11 Y,; - .
•; Sprint 3000 Models have the highest production' capacity of any
gas screen, printing conveyor dryer in theirclass
-, ', WARRANTY, SERVICE & SUPPORT
+ 24-hour hotline is staffed 365 days a year
• Access to M&R's Training Center ,
• Paris supplies are available Online at store.mrprintcom
• Two-year limited warranty
AIR HANDLING
• AC variable -speed circulation blower
CONVEYOR SYSTEM
• Conveyor dryer extension sections are available in 122 cm (48")
increments
SPECIFICATIONS
Belt Width " . ;122.cin (481:.:,;
Ramer 'neutMaximum' t 300:000
Burner Width )222cm,(8751
Electrical Requirements'
Electrical requirements ter pi cm (24")
Optional Radiant Section
Exhaust Blower Size
Exhaust System Capacity CO
6 mm (1/4") Static Pressure
Expansion Heat Modules.. -:
Gas Input Size
Heat Chamber Length ,
Heat Chamber Width
LP/Natural Gas Input Pressure
L Overall Length' .
Shipping Weight'
Standardlnfeed/Outfeed Length
*; Reduced -speed conveyer drive system allowsbelt speed as low
as approximately 30 cm (12" )per minute:
Split -belt conveyor with independent drives and variable °
,speed ---available on models with belt widths of 183"em (72') .4.
or more '
208/230 V, 3 ph', 22/21A, 50/60 Hz, 5,2 kW
t 380/41510;3p10.168 501z52kW
208/230V, ph,_15/17 A 50/6q Hz, 5 kW4-
380/415 V 3 ph 9 Aw50 Hi 5 kW
30crn(12)-
09701/min,(1800 cfm),
61 cm (24")
2.54 cm (1').
244-610+cm (8' =20-
160 cm (631;
93'lniq kg.(5` w.c.)
32 410§rthi (24 36')
678 kd (3700Ib)
I:244"cm(9s)_
If incoming voltage differs from the voltage(s) listed in this brochure, calculate amperage accordingly.
Other electrical configurations are available: Contact the M&R Companies for details.
Measured at the Exhaust Discharge Port
The M&R companies
M&R • NUARC • AMSCOMATIC
152 cm (601
300000 Btu
253 cm (99.51
208/230 0, 3: ph, 22/21 A, 50/60 Hz, 5:2 kW
380/415 V, 3 ph 16 A,: 50 Hz, 5.21W :
208/230 V; 3 ph, 19/21 A 50/60 Hz .t 211y
380/415 VV3 ph, 11A, 50 Hz, 61 kW. 9' -
•-30 cm (12")
50970 i/niio'(1800 cfm),:
61 cm (24") -
2.54 cm (1")
244-610+cm (8'-20+7
191 cm (75').
.93 elm Hg
732 1091 cm (24 361 1860 kg (4100,Ib) •
244 cm (96')
HEAT CHAMBER
• 61 cm (24") infrared pro heat module speeds throughput •
•Additional 61 cm (24") conveyor dryer sections are available
183.cm (72')
300 000 Btu
283 cm (111:5")
208/230:6, 3 ph; 32/31 A, 50/60 Hz, 7.1 kW
380/415V3ph, 19A,50Hz, 7110�
208/230 V,.3 ph, 21/23 A, 50/60 Hz, 7,4 kW
380/415-V,3ph 13A50Hz 74kW
30 em (12")Y
509701/min (1800.cfm)
61 cm (24")
2.54.cnt (1")
2447:610+cm (8'-20+')
221.cni (871
93 min Hg (5" w.c,)
732 1097 cm (24' — 36')
2I77 kg"(4800 lb) ;
244 mid
'Normal usage varies, but is significantly lower than the stated maximum
'Weight applies to models with a 244 cm (96") heat/expansion chamber
The M&R Companies 1N372 Main Street, Glen Ellyn, Illinois 60137.3576 USA
USA: 800-736-6431 / 630-858-6101 / Fax: 630.858.6134.Outside USA: +1.847-967.4461 / Fax: +1-847-967.0417
MAR Printing Equipment, Inc. and its subsidiaries (hereinafter MAR), believe the information In this advertisement to be accurate at publication, though it does not purport to Ilst all manufacturing and specification variations, nor does
it assume liability resulting from incompleteness or inaccuracy. M&R reserves the right to change specifications without notice. MAR expressly disclaims any liability for damages, consequential or incidental, Tram purchase, installation,
servicing, and/or use of any product/service based upon Information herein. No warranties of merchantability or fitness fora particular purpose are made or are to be implied from the information herein. No information herein may be reproduced
or used in any manner without the prior, express written consent of MAR in each case. Copyright 2014 MAR Printing Equipment, Inc. All rights reserved. 20141107
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M14-0218 DATE: 12/08/14
PROJECT NAME: KOTIS DESIGN
SITE ADDRESS: 1165 ANDOVER PARK W
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
AT 1,-tmC D--4-111
Building Division
Public Works
'61-
Fire Prevention
Structural
Planning Division
Permit Coordinator
n
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 12/09/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
n
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
Approved with Conditions
Denied
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
vv)te or p Y0
DUE DATE: 01/06/15
.44
n
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
PRO STAFF MECHANICAL INC
Page 1 of 2
44111114 Washington State Department of
Labor & Industries
PRO STAFF MECHANICAL INC
Owner or tradesperson
ALMO, LEONARD LEE
Principals
ALMO, LEONARD LEE, PRESIDENT
ALMO, PENNY H, VICE PRESIDENT
Doing business as
PRO STAFF MECHANICAL INC
WA UBI No.
601 038 859
PO BOX 33370
SEATTLE, WA98133
206-361-0071
KING County
Business type
Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
PROSTMI072NG
Effective — expiration
08/07/1993— 07/02/2016
Bond
DEVELOPERS SURETY & INDEM CO
Bond account no.
799707C
$12,000.00
Received by L&I Effective date
01/26/2009 01/14/2009
Expiration date
Until Canceled
Bond history
Insurance
American Economy Insurance Co
Policy no.
26CC006951
$1,000,000.00
Received by L&I Effective date
06/23/2014 06/30/2014
Expiration date
06/30/2015
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601038859&LIC=PROSTMI072NG&SAW= 12/17/2014