Loading...
HomeMy WebLinkAboutPermit M14-0218 - KOTIS DESIGN - GAS TEXTILE DRYERKOTIS DESIGN 1165 ANDOVER PARK W M14-0218 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 3523049097 Permit Number: 1165 ANDOVER PARK W Issue Date: Permit Expires On: Project Name: KOTIS DESIGN M 14-0218 12/17/2014 6/15/2015 Owner: Name: Address: Contact Person: Name: Address: CWWA SOUTHCENTER 4 LLC PO BOX B-3879 C/0 EQUITY OFFICE MGMT LLC, CHICAGO, WA, 60690 PETER CRELLEY PO BOX 33370 , SEATTLE, WA, 98133 Contractor: Name: PRO -STAFF MECHANICAL INC Address: PO BOX 33370 , SEATTLE, WA, 98133 License No: PROSTMI072NG Lender: Name: Address: Phone: (206) 361-0071 Phone: (206) 361-0071 Expiration Date: DESCRIPTION OF WORK: INSTALL GAS FIRED TEXTILE DRYER Valuation of Work: $6,950.00 Type of Work: NEW Fuel type: GAS Fees Collected: $285.10 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: Date:`d' 4 1- `14 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and • •• . ces governing this work will be complied with, whether specified herein or not. The granti►: of this permit does not state or Ir cal laws regulating constr develop ent permit and agree to Signature. Print Name: This permit shal the work is suspe ecome ull ed o aba PERMIT CONDITIONS: p sume t ctio or the e con.' d f s give authority to violate or cancel the provisions of any other e - ce of work. I am authorized to sign and obtain this ttached to this permit. Date: 12 if the work is not com nced within 180 days for the date of issuance, or if a period of 180 days fr m the last inspection. 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Project No.', .Date ApplicationAccepted..:, Date Application Expires: ' - (For „office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION ' King Co Assessor's Tax No.:3� 2--JO4 I 0 17 Site Address:)) b57 / i tp iE-g_ ?A-�L;, f �-�(.l Suite Number: i j Floor: i Tenant Name: T S 1PC4) A i4 New Tenant: ❑ Yes W..No PROPERTY OWNER Namt.141l✓pt SovinC 4L 4 LL c flkdrusopt s-3579 OhF1G=s 490 City:G j Artl O State; CONTACT PERSON - person receiving all project communication Name: Add �o>c. 3337 c7 City :S>Eae- -t.e State: w A Zip y 13 thrz- i Fai.0L 3Vr 1 omit *.il prSr ArF ivleCi4A“) MECHANICAL,, CONTRACTOR INFORMATION Company Nam I?zo- /-N r- Me-CH-AN►-Ptl. AddreAp 030,c.33370 City: r icu.-; State:IA, Zip9 913:1 Pbtk51,'344-0O?1 Fa , 3 Contr Reg Nosy D j�l41_O7 p pate: nA. / G Tukwila Business Licen .: - c --ti7 Valuation of project (contractor's bid price): $ it, -/_O Describe the scope of work in detail: Ir\S+11, t 4-e ><4-A€ CV" Use: Residential: New Commercial: New Fuel Type: Electric Replacement Replacement Gas iS„ Other: (v%y4r H:\Applications\Forms-Applications 0n Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent 2 Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct I Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor QtY 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: r , f?_ LL 1 I Day Telephone:2 " '4.— 31dd 007 1 Mailing Address:/ , 0 - �%x. 33370 ( .. E/ rr-r- ..C- 1/�/r4 90133 City State Zip AU D AGENT: Date: 743 Alf H:Wpplications\Forms-Applications On Line\201 I Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT I QUANTITY I PAID $411.86 M14-0218 " Address: 1165 ANDOVER PARK W Apn: 3523049097 $285.10 MECHANICAL $274.13 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $186.80 PLAN CHECK FEE R000.322.102.00.00 0.00 $54.83 TECHNOLOGY, FEE $10.97 TECHNOLOGY FEE R000.322.900.04.00 0.00 $10.97 PG14-0182 Address: 1165 ANDOVER PARK W Apn: 3523049097 $126.76 GAS $121.88 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $65.00 PLAN CHECK FEE R000.322.103.00.00 0.00 $24.38 TECHNOLOGY FEE $4.88 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R3726 R000.322.900.04.00 0.00 $4.88 $411.86 Date Paid: Monday, December 08, 2014 Paid By: PRO=STAFF MECHANICAL INC Pay Method: CHECK 14875 Printed: Monday, December 08, 2014 4:13 PM 1 of 1 WSYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit 14414-az-IS PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-367 Permit Inspection Request Line (206) 438-9350 Project: , Pei ( I A Tytx It.esrf bon' „ "Fr (Ati I Address: 4 c id42-Ar tactrl- 4) Date Called: Special Instructions; pA4 Date Wanted: a.m. V (3— N 5pm Reltz: t (A._ & 711-05- .d4te—C Phone No.:2_06_3qc..517 -2—fi pproved per applicable codes. Corrections required prior to approval. MENTS: or -6 1MA-Ai Inspector -Date: Li REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO, PERMIT NO, 1v114 -olt 8 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431- 670 Permit Inspection Request Line (206) 438-9350 Projecr_ ..... ... .. Type of Inspection: i-jj .iiiiiimpellfr -Add7s1s,:,..) S /1/100u 6 j_ ul Date Called: Special Instructions: 6 4-5- li i cek,legi e - D r 2 e fc "Phone Date Wanted; 2,z -/ 5. -Tule P.m. Requester: No: tEIApproved per applicable codes. 0 Corrections required prior to approval. COMMENTS: 1)rov de lectri. (It 1 p,15_0 ik, r 4.#1 1-, / trot) 64 wo rover/ pw r op- ID 'Pr 1--Icy i / fric, , I I v I Inspector Date: - T REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • -Belt width, 122 to 183 cm (48" To 72'7 • Heat chamber length 244 to 610 cm (8' to 20'') or more • CoolSkin'" technology The industry's most efficient, innovative, and affordable high -production textile gas dryer, Sprint 2000 is available in belt widths from 122 to 183 cm (48" to 72"). Not only does it have the highest production capacity in its class, it's also the most energy efficient. Heavy-duty thermal insulation prevents heat from migrating into the workplace, while CoolSkin°' technology leaves the dryer skin cool to the touch. Fast cure rates and high product throughput maximize dryer capacity and minimize per -unit cost. Available in liquid propane (LP) or Natural Gas (NG), the high-performance burners are designed with excess capacity that far exceeds consumption rates under normal operating conditions. Separate blowers control combustion, circulation, and exhaust. A high -volume forced air system quickly brings the chamber to the desired temperature, speeding the start of production. Process temperatures and set temperatures are controlled OTIS irs16)N: GAS p,P� + F LvF Vz,'rr 6,5 ANPov�g.. PAS In/E5-r lti%.-oa. 8 City of Tukwila BUILDING DIVISION digitally. Temperature consistency is ensured by a fuzzy -logic controller, which responds to ambient temperature changes by keeping chamber heat within 1° of target temperature at the thermocouple. A tower light shows when temperatures are within user -set parameters. When readings fall outside those settings, a temperature monitor issues visible and audible alarms. Entry and exit openings are adjustable, and large, crowned rollers ensure positive belt tracking. Digital speed readout makes it easy to duplicate settings. An automatic shutdown sequence keeps the blower and belt running until the chamber has cooled. All equipment from The M&R Companies is built with M&R's unsurpassed attention to detail and commitment to quality, durability, innovation, and design excellence, and is backed by M&R's unparalleled 24-hour access to service, support, and premium parts. It's no wonder M&R is the first name in screen printing equipment. www.mrprint.c®m USk 800-736.6431.Outside USA: +847-967-4461 RECEIVED CITY OF TUKWILA DEC 0 8 2014 PERMIT CENTER STANDARD FEATURES Air.Handling •-Enhanced airflow accelerates'drying/curing • Exhaust blower:evacuates op td.50970 Umin (1800 cfm) • High -`volume circulation blower reduces energy costs • Stainless steel filter slides out for easy cleaning ". •.Three separate dedicated blowers (combustion, circulation &exhaust) Certification • CE & UL compliant: Built tospecificatidns established by the European Committee for Standardization•. (CE): 'and Underwriters Laboratories®(UL) •. CSA Certified and built to meet or'exceed AGA & CGA Control Center: •.Automatic shutdown sequence keepss the,blower and 1,1 belt running until the chamber has cooled ' • Control panel rotates for visibility and access • „Digital' keypad with digital display • Heat efficiency system reduces operating expenses by using outgoing combustion. gas to heat incoming air -• -•Te)nperature monitor issues visible and audible alarms, When readings fall outsrdeuser specked parameters!:. • Tower light indicates when temperatures are within : user=set tolerances OPTIONS Air Handling +;AC variable -speed circulation blower Conveyor System • Conveyor extension' sections are available in 122 cm (48') increments Belt Width Akira(' Length Exhaust Blower System -- 1244to 610 cm,(8'to 20') or mom 244 to 610 cm (8' to 20') or more 61 cm (le) Conveym` System . - Avadable with:conveyor speeds faster thin the. • standard. rates listed Conveyorbelt is made of heat -resistant, Tetlon®coated fiberglass.` • Digital belt speed readout makes it easy to duplicate speed settings • • Driven by a reliable heavy-dutyvariable-speed DC motor Large anadized`aluminum rollers an crowned for positive belt.trecking belt speed: 91: cm (36) per minute Design & Construction • Adjustable entry/exdopenings Aircooled cabinet ensures Jong life for electrical components ; • Beanngs"are'designed far high fipeeds and high temperatures •• • Circuit b•reakers allow easy reset • Exhaust drawer/creosote catcher low-profiledesign makes it easier to.see overthe dryer Modulardesiign and specialized fasteners make it' easy to attach,additional heat chamber units Energy Effecrency •;Burners are designed with excess capacity that ?far exceeds consumption rates under normal operating conditions CaolSkm'" technology leaves the dryer shun job& to High speed -conveyor system for speci• alized graphics` and industrial applications Splitbelt model with independent drives features' • reversible direction arid variable speed=available on models With halt widthsof.152,cm (60°) or more. 122 em (48) - ''152 cm' (601 Romer Width 217 61445.51 , 248 cm (97.5') HeatChamherWidth. .,(100cm(63) , - 191cm.(75"..'.,','`,: Heat Chamber length Expansion Heat Modules 61cm(24)-.:: Standard lnfeed/Outteed length ":; 2• 9 44 cm (96, . /32 to`1097 cm (24' to 36') or more 2')i 50970 Umin (1800°cfm) f4 6 mm(1/4) Gas Input Size , _ ) 2.54 cm (1') LP/Natural Gas Input Pressure " 93`iiim Hg (5 we )., Irryneirlif Mmrittne't _ 300 000 Btu Electrical Requirements 1 1'208/230 V, 3 ph, 22/21 A; :50/60Hi, 5.3 kW t 400V,.3ph, 16A,50Hz 53kW2.. 61 cm,(24'3 Optional Radiant Section' - 208230 V 3 ph 15/17 A 50/60 Hz, 5 kW 1.400V,3ph�:9A;50Hz, 6 244cm(96J 732to i'`Tcm(24'to. 36yormore '30 c (12'); 09701/min11800 efm) it 6ynm(1/4') "; r 30 cm (12'):50970 Vmin (1800 rim) ® 6 rem ▪ Fasf curing rates and highproduct throughput , maximize dryer capacity and minimize, per- unit cost. ▪ Fuziy bgic:controller ensures consistency by`keeping heat '. withal°oftargettemperalureatthethennacoupie . Heavy dutythermal insulation_ pnbvents heatfrom mlgrat)ng into the workplace ' . Pressuii ed vector airknives provide.consistent and unrfarm temperatures throughout the•drying chamber • Process temperature and settemperature are =. displayed an&controhed digitauy • Spnrd 2000 is the most energy -efficient dryer in ifs class Heat Chamber ,:• Burners.a.re avarlable.ferliquid propane-(LP).or_„ natural gas (NG) • Direct -fired bumer is maximum -rated at 300000 Btu '• Double -wall construction Galvanaedsteel rnterio Modular train'simplifres maintenance ,• Sprint2000 has the highest production capacity -in :Is class` Warranty, Semite &.Support 24 hour hotline :rs staffed 365 days a year secs to M&R s Training Center coo year Kilted warrar ;Heat Chamber 4 61 cin(24'J nitrated pie heat module speeds. throughput Additional61 cm (24 )sections are available • COo1ing fan mounted aver caked V-►STI N L. -1183 um (72 ) i.218cm(1095) ),221cro:(87.). 244 to 610 cin (8' to 20') or more:,-- -(:61 cm (247) 93 rem Hg 300�00 Btu :- ,208230 V,3 ph 22/21 A; 50/60ffr 6.3 kW 400V3p1i;16A,50Nz,5.3kW 208230 V 3 ph 19/21A, 50/60 Hz,62 kW 'Shipping Weight a ' 1678kg(3700lb) -- kW '> %400v:3'ph,`11A 50.Hz,62kW ;1860 kg WOO lb) 732 to 1097 cm(24' l0 36) or more; '.93Min Hg(5 wc) } 300 040 Btu , 1 208230 v, 3 ph 2221 A, 50/60 Hz, 5.3 kW _s i 400 V 3`ph;16 11,50 Hz,'53 kW 208230.v, 3 ph, 2123 A, 50/60 Hz, 7.4 kW 400V3 ph 13A,50Hz,=74kW ;2171, kg (4800 lb) ' If incoming voltage differs from the voltage(s) listed in this brochure, calculate amperage accordingly. other electrical configurations are available: Contact The M&R Companies for details. a Measured at the Exhaust Discharge Port Static pressure ' Normal usage varies, but is significantly lower than the stated maximum e Weight applies to models with a 244 cm (96') heat/expansion chamber The M&R Companies M&R • NUARC • AMSCOMATIC The M&R Companies 1 N. 372 Main Street, Glen Ellyn, Moots 60137-3576 USA USA: 800.736-6431 / 630-858-6101 / Fax 6304158.6134.Outside USA: +847-967-4461 / Fax +847-967-0417 MAR Printing EenIpmmm, Inc and its subsidiaries (hereinafter MAR), berme the information in this advertisement to be accurate at publication, though it does not purport to list as manufacturing and specifintian variations, nor does it assume liability resetting from incompleteness or inert warp M&R resales the right to change specifications without notice MAR egiressy disclaims any liability for damages, consequential or incidental from purchase, installation, servicing, aMroroseofany product/service based upon information herein No warranties of matantabiliyorftness for apartiuularpurpose are made or are tobeimplied from the information herein.1 inlonzatiunherein may be reproduced or used in any manner without the prig egress written consent of M&R in each case. Copyright 2005 MR Printing Equipment, Inc. All rights reserved. 000105 as Screen Prill ingyConve or e i eapac arm mati - d: xli n � dowers }eId +edilOn=tfiNiet%jt4tii�_` Sprint 3000 is the latest incarnation of the most innovative and dependable line of gas conveyor dryers in the screen printing industry. For over twenty years, M&R's venerable Sprint Series has been the overwhelming choice of professional screen printers who demand quality, consistency, and efficiency in their equipment and in the output they generate. The new features M&R is introducing in the Sprint 3000 Series include a color touchscreen interface, new high -capacity circulation and exhaust blowers, an integrated roll -down outfeed hood, cleanout access panels on the sides of the burner sections and drone modules to simplify cleaning and maintenance, and a retention -time belt -speed control that makes it easy to duplicate settings and eliminates the need to convert feet per minute into the time substrates will spend in the heat chamber. That in turn results in more user-friendly operation and greater precision in achieving optimal curing and drying. Sprint 3000's color touchscreen interface displays real-time dryer performance data, including dryer temperature, dryer temperature history, heat -chamber retention time and output from the included temperature probe, which can be used to track substrate temperature as it passes through the dryer. It also includes Job RecallTm, which allows operators to store operational parameters under operator -chosen alphanumeric names —and recall those named settings later for similar substrate/ink combinations. And to help keep Sprint 3000 operating at peak performance, M&R's Maintenance .Minder"' System alerts operators when scheduled maintenance is due. Available in liquid propane (LP) or Natural Gas (NG) versions, all Sprint 3000 dryers utilize exceptionally efficient high-performanceberners with ample capacity. The burner system includes its own combustion air blower, allowing precise metering of the air -to -fuel mixture to achieve optimum efficiency. There are also separate blowers for circulation and exhaust, each designed for maximum efficiency on a wide range of inks and substrates. A high -volume forced air system quickly brings the conveyor dryer chamber to the desired temperature, speeding the start of production. Process temperatures and set temperatures are controlled digitally. Temperature consistency is ensured by a fuzzy -logic controller, which responds to ambient temperature changes by keeping chamber heat within 1° of target temperature at the thermocouple. A tower light shows when temperatures are within user -set parameters. When readings fall outside those settings, a temperature monitor issues visible and audible alarms. An automatic shutdown sequence keeps the blower and belt running until the chamber has cooled, minimizing or eliminating the need to monitor conveyor dryer shutdown. The entry and exit openings are adjustable to fit a wide range of substrates, and large belt rollers are machined with a slight crown to ensure positive belt tracking. Dryers in the Sprint 3000 line are available in a wide variety of configurations, belt widths, and chamber lengths. Sprint 3000 dryers have the highest production capacity in their class and are the most energy efficient. Heavy-duty thermal insulation prevents heat from migrating from the conveyor dryer chamber into the workplace, while CoolSkin'a' technology leaves the dryer skin cool to the touch. Fast cure rates and high product throughput maximize dryer capacity and minimize per - unit cost The Sprint 3000 Series"is simply the industry's most efficient, innovative, and affordable line of high -production gas screen printing conveyor dryers, and Sprint 3000 gas conveyor dryers, are ready .to tackle, .. the produCtio'n challenges of the next;:twenty yeara. Www.nirp [nt1Con1 storeinnrprint.corn STANDARD FEATURES MR HANDLING -. •. Enhanced airfloWacceleratesdrymg/curing ; '. •High -volume circulation blower reduces energy costs ,• Stainless steel filters slide out for easy cleaning • Three separate dedicated blowers (combustion, circulation & exhaust) «•••••• CERTIFICATION le Bulltto meet "or exceed CSA standards . • CE & U€ compliant: Built to specifications established by the European Committee for Standardization, (CE)'and Underwriters Laboratories* (UL), , CONTROL CENTER • Automatic shutdown sequence keeps the blower:and belt running until the conveyer dryer chamber has cooled • Color touchscreen interface. with Retention -Time belt speed control • Graphic display tracks dryer temperature in real time • Job Recall'" allows operators to store Operational parameters under operator -chosen alphanumeric names -and. recall those" named settings later for.similer substrate/ink combinations • LCD touchscreen monitor displays keyOperationalinfsireation like heat chamber temperature and retention time -and gives, operators complete control of all dryer settings - • Maintenance Minder', system alerts operators when scheduled maintenance is due • Temperature monitor issues visible and audible alarms wl)e readings fall autside user -specified parameters • Touchscreen provides easy, direct access to alarm lists, service data, and all screen printing conveyer dryer functions , • Totver light indicates when temperatures are within " user -set tolerances OPTIONS CONVEYOR SYSTEM +'Conveyor dryer belt is made of heat resistant, Teflon® -coated fiberglass • Driven by a reliable, heavy-duty, variable -speed DC motor • Largo anodized aluminum rollers are crowned for positive belt tracking.: DESIGN & CONSTRUCTION • Conveyor dryer belt is made of heat -resistant, Teflon* -coated fiberglass ' •'. Driven by a reliable, heavy-duty, variable -speed DC motor; Large anodized aluminum rollers are crowned for positive' belt tracking ENERGY EFFICIENCY * Burners are designed with excess capacity that far exceeds consumption rates under normal operating conditions Controller ensures consistency by keeping dryer chamber heat within 1°oftarget temperatureatthe thermocouple .. • CoolSkin'". technology leaves the conveyor dryer skin cool to the •`,:Fast curing Yates and high product throughput maximize `conveyor dryer capacity and minimize per -unit cost + Heavy-duty thermal insulation prevents heat froni migrating from the conveyer dryer into the workplace Pressurized vector air knives provide consistent and uniform, r, temperatures throughout the drying chamber �i Process temperature and set temperature are displayed and controlled digitally, • Sprint 3000 models are the most energy -efficient gas screen printing conveyor dryers in their class I HEAT CHAMBER • BumerS **reliable for liquid propane (LP) or natural gas (NG) • Double -wall construction •'Galvanized steel'intermr • Modular gas train simplifies maintenance PRODUCTIV11 Y,; - . •; Sprint 3000 Models have the highest production' capacity of any gas screen, printing conveyor dryer in theirclass -, ', WARRANTY, SERVICE & SUPPORT + 24-hour hotline is staffed 365 days a year • Access to M&R's Training Center , • Paris supplies are available Online at store.mrprintcom • Two-year limited warranty AIR HANDLING • AC variable -speed circulation blower CONVEYOR SYSTEM • Conveyor dryer extension sections are available in 122 cm (48") increments SPECIFICATIONS Belt Width " . ;122.cin (481:.:,; Ramer 'neutMaximum' t 300:000 Burner Width )222cm,(8751 Electrical Requirements' Electrical requirements ter pi cm (24") Optional Radiant Section Exhaust Blower Size Exhaust System Capacity CO 6 mm (1/4") Static Pressure Expansion Heat Modules.. -: Gas Input Size Heat Chamber Length , Heat Chamber Width LP/Natural Gas Input Pressure L Overall Length' . Shipping Weight' Standardlnfeed/Outfeed Length *; Reduced -speed conveyer drive system allowsbelt speed as low as approximately 30 cm (12" )per minute: Split -belt conveyor with independent drives and variable ° ,speed ---available on models with belt widths of 183"em (72') .4. or more ' 208/230 V, 3 ph', 22/21A, 50/60 Hz, 5,2 kW t 380/41510;3p10.168 501z52kW 208/230V, ph,_15/17 A 50/6q Hz, 5 kW4- 380/415 V 3 ph 9 Aw50 Hi 5 kW 30crn(12)- 09701/min,(1800 cfm), 61 cm (24") 2.54 cm (1'). 244-610+cm (8' =20- 160 cm (631; 93'lniq kg.(5` w.c.) 32 410§rthi (24 36') 678 kd (3700Ib) I:244"cm(9s)_ If incoming voltage differs from the voltage(s) listed in this brochure, calculate amperage accordingly. Other electrical configurations are available: Contact the M&R Companies for details. Measured at the Exhaust Discharge Port The M&R companies M&R • NUARC • AMSCOMATIC 152 cm (601 300000 Btu 253 cm (99.51 208/230 0, 3: ph, 22/21 A, 50/60 Hz, 5:2 kW 380/415 V, 3 ph 16 A,: 50 Hz, 5.21W : 208/230 V; 3 ph, 19/21 A 50/60 Hz .t 211y 380/415 VV3 ph, 11A, 50 Hz, 61 kW. 9' - •-30 cm (12") 50970 i/niio'(1800 cfm),: 61 cm (24") - 2.54 cm (1") 244-610+cm (8'-20+7 191 cm (75'). .93 elm Hg 732 1091 cm (24 361 1860 kg (4100,Ib) • 244 cm (96') HEAT CHAMBER • 61 cm (24") infrared pro heat module speeds throughput • •Additional 61 cm (24") conveyor dryer sections are available 183.cm (72') 300 000 Btu 283 cm (111:5") 208/230:6, 3 ph; 32/31 A, 50/60 Hz, 7.1 kW 380/415V3ph, 19A,50Hz, 7110� 208/230 V,.3 ph, 21/23 A, 50/60 Hz, 7,4 kW 380/415-V,3ph 13A50Hz 74kW 30 em (12")Y 509701/min (1800.cfm) 61 cm (24") 2.54.cnt (1") 2447:610+cm (8'-20+') 221.cni (871 93 min Hg (5" w.c,) 732 1097 cm (24' — 36') 2I77 kg"(4800 lb) ; 244 mid 'Normal usage varies, but is significantly lower than the stated maximum 'Weight applies to models with a 244 cm (96") heat/expansion chamber The M&R Companies 1N372 Main Street, Glen Ellyn, Illinois 60137.3576 USA USA: 800-736-6431 / 630-858-6101 / Fax: 630.858.6134.Outside USA: +1.847-967.4461 / Fax: +1-847-967.0417 MAR Printing Equipment, Inc. and its subsidiaries (hereinafter MAR), believe the information In this advertisement to be accurate at publication, though it does not purport to Ilst all manufacturing and specification variations, nor does it assume liability resulting from incompleteness or inaccuracy. M&R reserves the right to change specifications without notice. MAR expressly disclaims any liability for damages, consequential or incidental, Tram purchase, installation, servicing, and/or use of any product/service based upon Information herein. No warranties of merchantability or fitness fora particular purpose are made or are to be implied from the information herein. No information herein may be reproduced or used in any manner without the prior, express written consent of MAR in each case. Copyright 2014 MAR Printing Equipment, Inc. All rights reserved. 20141107 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M14-0218 DATE: 12/08/14 PROJECT NAME: KOTIS DESIGN SITE ADDRESS: 1165 ANDOVER PARK W X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AT 1,-tmC D--4-111 Building Division Public Works '61- Fire Prevention Structural Planning Division Permit Coordinator n PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 12/09/14 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: vv)te or p Y0 DUE DATE: 01/06/15 .44 n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PRO STAFF MECHANICAL INC Page 1 of 2 44111114 Washington State Department of Labor & Industries PRO STAFF MECHANICAL INC Owner or tradesperson ALMO, LEONARD LEE Principals ALMO, LEONARD LEE, PRESIDENT ALMO, PENNY H, VICE PRESIDENT Doing business as PRO STAFF MECHANICAL INC WA UBI No. 601 038 859 PO BOX 33370 SEATTLE, WA98133 206-361-0071 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. PROSTMI072NG Effective — expiration 08/07/1993— 07/02/2016 Bond DEVELOPERS SURETY & INDEM CO Bond account no. 799707C $12,000.00 Received by L&I Effective date 01/26/2009 01/14/2009 Expiration date Until Canceled Bond history Insurance American Economy Insurance Co Policy no. 26CC006951 $1,000,000.00 Received by L&I Effective date 06/23/2014 06/30/2014 Expiration date 06/30/2015 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601038859&LIC=PROSTMI072NG&SAW= 12/17/2014