Loading...
HomeMy WebLinkAboutPermit PG14-0040 - ARASHI RAMEN - PLUMBING, GAS PIPING AND GREASE INTERCEPTORARASHI RAMEN 17045 SOTJTHCENTER PY PG1 4-0040 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov PLUMBING/GAS PIPING PERMIT 2623049070 Permit Number: PG14-0040 17045 SOUTHCENTER PKWY Issue Date: 4/3/2014 Permit Expires On: 9/30/2014 Project Name: ARASHI RAMEN Owner: Name: Address: Contact Person: Name: KTM GROUP LLC 223 TAYLOR AVE N #110 C/O METRO PROPERTY SVCS, SEATTLE, WA, 98115 FRANK LEUNG Address: 17605 114 PL SE , RENTON, WA, 98055 Contractor: Name: SKYWAY PLUMBING INC Address: 2811 MILL AVE S , RENTON, WA, 98055 License No: Lender: Name: Address: SKYWAP1910MP ,,, Phone: (425) 633-5541 Phone: (206) 788-7955 Expiration Date: 7/17/2015 DESCRIPTION OF WORK: PLUMBING AND GAS PIPING FOR NEW RESTAURANT INCLUDING INSTALLATION OF A GREASE INTERCEPTOR. Valuation of Work: $7,500.00 Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Fees Collected: $555.51 Current Codes adopted by the City of Tukwila: Internations Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: Permit Center Authorized Signature: 2012 2012 2012 2012 International Fuel Gas Code: WA Cities Electrical Code: WA State Energy Code: 2012 2012 2012 Date: - l— vH I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructor the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: ' Date: Print Name: �r{a i- Y This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Grease interceptor shall be installed per manufacturer's specifications. Every three month the restaurant owner shall completely pump out the interceptor. Businesses that generate small amount of grease may, with the Public Works Director's approval, pump the interceptor on a 6-month schedule. At any time, the City may inspect the interceptor and require service that is more frequent. 2: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 3: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 4: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 5: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 6: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 7: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 8: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 9: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 10: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 11: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 12: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 13: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 14: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 15: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2000 GAS PIPING FINAL 8004 GROUNDWORK 1900 PLUMBING FINAL 9002 ROUGH -IN GAS PIPING 8005 ROUGH -IN PLUMBING 9001 UNDERGROUND CITY OF TUKW . Community Developme..i Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov PlumbingIGax ermit No. K/[14 00(4° Project No. Date Application Accepted: Date Application Expires: (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 70 0 5 S -r146-tec p°v'k„Joi 2(e29-3v4101'01 Floor: - V aNew Tenant: [ Yes ❑.. No PROPERTY OWNER Name: r'j i j.�t L /44 �JL9 k 1 Lc/l C., Address: City: State: Zip: CONTACT PERSON — person receiving all project communication Name: 1 Y IL Lei/.!/l-a I Address: City: State: Zip: Phone: i Fax: J-L— 33—'r4r1 Email: wk.ird lYesj91'd I1414 7 PLUMBING CONTRACTOR INFORMATION Company Name: kyvt)0 pC ,N bill e r. Address: ;go /i1LL 414% 5 City: P_ _ _ L State: �4 Zip: Igo Sr Phone: 7_1v —3 --7 et • 4 Contr Reg No.: Date: 7(1 7/2,1 Tukwila Business License No.: + Valuation of Project (contractor's bid price): $ 7/57, `' D 11�15fa(( �,{Pv✓ vv (i,.J�'fec ow ot:fe41 Scope of Work (please provide detailed information): Suite Number: Building Use (per Int'1 Building Code): Occupancy (per Int'1 Building Code): Utility Purveyor: Water: Sewer: lc $ H:Wpplications\rorms-Applications On Line\2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of plumbing fixtures and) is piping outlets being installed and the quan elow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain / Shower, single head trap Sinks Rain water system - per drain (inside building) Grease interceptor for commercial kitchen (>750 gallon capacity) t Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and/or vent Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Z Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste 3 Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES - Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Print Name: Mailing Address: /r/Psi 3 ( (14 Day Telephone: G — 7gQ — 7g City State Zip 't ate: H:\Applications\Forms-Applications 0n Line\2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh D Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK I ACCOUNT I QUANTITY I PAID $377.50 PG14-0040 Address: 17045 SOUTHCENTER PKWY Apn: 2623049070 $377.50 PLUMBING $377.50 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 $32.50 PERMIT FEE R000.322.100.00.00 $331.00 WATER HEATER FIXTURE FEE TOTAL FEES PAID BY RECEIPT: R1696 R000.322.103.00.00 $14.00 $377.50 Date Paid: Thursday, April 03, 2014 Paid By: BING DENG Pay Method: CREDIT CARD 00123B Printed: Thursday, April 03, 2014 2:03 PM 1 of 1 SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS PermitTRAK ACCOUNT I QUANTITY I PAID > $178.01 PG14-0040 Address: 17005 SOUTHCENTER PKWY Apn: 2623049070 $178.01 GAS $65.00 PERMIT FEE R000.322.100.00.00 $65.00 PLUMBING $90.88 PLAN CHECK FEE R000.322.103.00.00 $90.88 TECHNOLOGY FEE $22.13 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R1494 R000.322.900.04.00 $22.13 $178.01 Date Paid: Monday, March 17, 2014 Paid By: BING D DENG Pay Method: CREDIT CARD 05235B Printed: Monday, March 17, 2014 12:55 PM 1 of 1 SYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project:, TYpe•of Inspection: Address: Date Called: Special Instructions: Date Wanted: 0 !`a Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be v paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit i',--1/1F (/d INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: % 14401.44,7 Atil C Type of Inspection: ,/i4l-i ,4.1_ .." „.., ..?"..- ,..Pe Address: 1 70yc- S( Auf",ft . Date Called: Special Instructions: / Date W nted: a.m Requester: Phone No: ❑ Approved per applicable codes. INCorrections required prior to approval. COMMENTS: ./'1 j A Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. <11 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project)Q n . Type ofInspection: 1 K1 iA (- -- Addrteesss: I-70L1 35a awry Date Called: Plit".ta - i-A S Special Instructions: Date Wanted: a.m. itequesttr: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: (1) 6--r1s sh, it. a` i-..,A ,KS c.) Ci t\.. 1.-Ie LL Al !A /c am ,1 1F A s ✓ao- .,. i 1\is h c as u-.+./i J- s) ri G i-r,--itf ✓P Insp ctor: I TA REINSPECTION FEE RE UIRED. P for to next inspection, fee must be pv,d at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: ; - / /t' { Si",c t '. / .;'Ai Type.of Inspection: i.-2) )C-i j .j _. Address: r .;. / j 1;,.. Date Called: Special Instructions: ' Date Wanted: 0 i a.m. _. Requester: Phone No: DApproved per applicable codes. El Corrections required prior to approval. COMMENTS: Inspector: Date: / REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PG-o 40 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431-2451 (206) 431-3670 Project: ARA t\hEAA r kA/ Ty of Inspection: rocs6 it _TA/ VIJ , Address: 1 9 615 56. jAfk...JAV Date Called: . Special Instructions: Date Wanted: -�� air . p.m. Requester:— hI� Phone No: ' 25 — ("33 — 55-1( Approved per applicable codes. Corrections required prior to approval COMMENTS: lA- a K "PrA-`‘ ` 1 j_ ire .—( ` .i `e ` C-r; ti AC. 'c S 7 U I P. _ . + r +Jfa-oari- -)( Uu - .r w -er L,jOf-Kt nrasvre f TM p p(,"i —proThir ALS f`;,o 3 i 4rD ,d- L i-A c. `JL ' -- i k e t 6 MU C/tpL Pit e ,f '._ JI../ p p o/'_ �'�---� Inspector: Date`f (c- g REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. 96(4,0 C PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 INSPECTION RECORD Retain a copy with permit Pro`j�ect: Type of Inspection: ( Address: % cO 4 S e PivirwAv Date Called: Special Instructions: Date Wanted: a.m. iRequester: l Phon No: / -5 Ss - Approved per applicable codes. Corrections required prior to approval. COMMENTS: ((1' �5t e ,A e P A J Inspector: r Date REINSPECTION FEE/ EQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspectlon. FILE COPY Calculations of the fixtures for grease interceptor Determine the flow rate (GPM) of the sink: 1. bowl size L" X W' X D" = cubic Inches 2. Convert the capacity from total cubic inches to gallons per minute (GPM) total cubic inches / 231 = GPM 3. Adjust for displacement (displacement takes into consideration the actual useable capacity of the sink) (GPM) X 0.75 = GPM • 3 Compartment Sink, (16" x 20" x 12") X 3 = 11520 cubic inches 11520 cubic inches / 231 = 49.87 GPM 49.87 GPM X 0.75 = 37.40 GPM • Prep Sink, (10" X 14" X 10") = 1400 cubic inches 1400 cubic inches / 231 =6.06 GPM 6.06 GPM X 0.75 = 4.54 GPM • Mop Sink, (20" X 16" X 6") = 640 cubic inches 640 cubic inches / 231 = 2.77 GPM 2.77 GPM X 0.75 = 2.07 GPM Total Sink GPM = 44.01 GPM Base on 2 minute drain period actual drainage load = 24.091 gallons/minutes (GPM) For floor drains take the volume of water produced by the number of hose bibs 1.5-2.0 GPM per 3/4" faucet. 2 Floor Drain each floor drain of 2 GPM per drain = 11.267 GPM Dish washer n c rtec. d ;o -fey ? ufo C-��.zudziL /oterce plvy Packs Per Hr 40GPM Gallon per Rack 1.09GPM Total Gallon Per Hr 43.6 Convert to GPM X Separation Factor (10Min) = 7.267GPM TOTAL ACTUAL DRAINAGE LOAD = 42.625 GPM GREASE INTERCEPTOR CAPACITY REQUIRED 50 GPM CORRECTION LTR# �G w- OOLto REVIEWED FOR CODE COMPLIANCE APPROVED MAR 262014 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAR 2.1 2014 PERMIT CENTER RECEIVED SPECIFICATIONS 1. 4" inlet/outlets Sch. 40. Plain End (No -Hub) 2. Max flow rate: 50 GPM 3. Liquid capacity: 52 Gallons 4. Max grease capacity: 249 lbs. (35 Gallons) 5. Max solids/sediment capacity: 12.5 Gallons 6. Unit weight w/std. covers: 92 lbs. 7. 2,000 Ib. load rated, bolted, gas/water tight composite cover. 8. Maximum operating temperature 190°F continuous. 9. Seamless molded polyethylene tank. NOTES 1. Listed by IAPMO to ASME grease interceptor standard #A112.14.3 and CSA B481.1. 2. Factory installed Built-in flow control. 3. For gravity drainage applications only. Do not use for pressure applications. 4. Seamless high density polyethylene tank. 5. Unit supplied with built-in adapter for up to 3-1/2" of adjustability. Additional riser(s) available for deeper burial depth. 6. Cover placement allows full access to tank for proper maintenance. 7. Vent not required unless per local code. 8. Engineered inlet and outlet diffusers are removable to inspect/clean piping. 9. For on -the -floor or buried applications. 10. Integral air relief / Anti -siphon. 11. Three outlet options for easy rough in. Unit shipped with outlet diffuser in outlet "B". DIFFUSION FLOW TECHNOLOGY I he inlet diffuser splits incoming effluent into two paths that utilize the entire liquid volume of the tank for efficient grease separation. The calibrated openings greatly reduce effluent turbulence. The effluent enters the main chamber without disturbing the existing grease or sediment layers. The integral air relief/anti-siphon in the top of the outlet diffuser allows pressure stabilization within the unit during operation. The bottom of the outlet diffuser allows only effluent which is free of grease to exit the tank. It can easily be attached to any of the three outlets provided to ease jobsite piping layouts. 28" FICY of inlet and outlet- 1 10-1/2" 28-1 /2" ENGINEER SPECIFICATION GUIDE Schier Great Basin'"" grease interceptor model # GB-50 shall 18" be lifetime guaranteed and made in USA of seamless, rotationally - molded High Density Polyethylene. Interceptor shall be furnished Ai' above or below grade installation. Interceptor shall be certified to ASME A112.14.3 (type C) and CSA B481.1, with field adjustable riser system, built-in flow control, built-in test caps and three outlet options. Interceptor flow rate shall be 50 GPM. Interceptor grease capacity shall be 249 lbs. Cover shall provide water/gas-tight seal and have minimum 2,000 lbs load capacity. OPTIONS: • Highway rated cover: 16,000 Ib. capacity. • Teleglide field adjustable risers for extending covers to grade • Male pipe thread connections • 3" Plain end pipe or male pipe thread connections • High water anchor kit • Clamping collar kit PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF SCHIER PRODUCTS. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF SCHIER PRODUCTS IS PROHIBITED. REVIEW FO CODE CQM LIAN APPRO ED MAR 2 6 2014 Outlet "A" ,(Optional) Outlet "C" (Optional) TOP VIEW City of Tukwila BUILDING DIVISION 50--PART NUMBER: 4025-001-XX 0 0 24-1/2" Engineered inlet and outlet diffuser (see description) SECTION "A -A" II: Outlet "B" (Standard) Adjustable adapter MAR.18.2014 TUKWILH IC WORKS A PC4 Iflil_ RECEIVED 1 1 1 CITY OF TUKWILA MAR 1 7 2014 Tie -down point for anchor kit PERMIT CENTER ISOMETRIC VIEW 15-3/4" Invert 28" F#4 DO'4o DESCRIPTION: 50 GPM POLYETHYLENE GREASE INTERCEPTOR DWG BY: N.EBERT DATE:11 /25/2013 REV: 2 ECO: 1035 OUTLET END VIEW SPECIFICATION SHEET Schier Products 9500 Woodend Road Edwardsville, KS 66111 Tel: 800-827-7119 Fax: 800-827-9664 www.schierproducts.com Made in the U.S.A SCHIER PRODUCTS Pioneering Drain Line Purity itgt FILE COPY GREAT BASINTM Pfl*D UCT SELECTIO How does a smaller interceptor 7 outperform a larger interceptor Flow pattern. Gravity grease interceptors are assumed to work according to Stokes Law4 when sized for a minimum of 30 minutes retention time. However, WERF's 2008 report' concluded that retention time alone was insufficient to assure proper separation. The report also identified uncontrolled inlet velocity and turbulence as the primary cause of short circuiting, leading to bypass in traditional gravity designs. REVIEWED FO CODE COMPLIANC APPROVED MAR 26 2014 City of Tukwila BUILDING DIVISION 13 Velocity short circuiting flow pattern of gravity interceptor (based on WERF's 2008 report') CORRECTION LTR# 1 RECEIVED CITY OF TUKWILA MAR 2 1 2014 "PG ILI-- o O .i ■ 0 PERMIT CENTER � USA: 1-800-827-7119 1 international: 1-913-951-3300 I www.schierproducts.com I Catalog 2014 5" typical 7" typical 50% FOG CAPACITY CORE SAMPLE COMPARISON Model GB-250 1,000 Gallon GGI 18.8" actual 12 8" actual 1 grease water solids Gravity Interceptor 750 gallons 638 lbs. grease Great BasinTM GB-75 -- IA gallons 61 lbs. grease Gravity interceptors are considered full when 25% of their wet volume consists of FOG, solids or both. A typical core sample from a gravity interceptor will show less FOG than solids because of periodic short circuiting'. A core sample of a Great BasinTM hydromechanical interceptor has a deeper FOG layer than a gravity interceptor because the design is more efficient and does not suffer from short circuiting. It is common for a Great Basin' interceptor to have a combined FOG / solids layer well over 50% of its wet volume while still maintaining greater than 90% efficiency (see Summary of Great Basin' Performance table on page 16). Gravity Interceptor 1,000 gallons 850 lbs. grease reat;Basin— GB-250 �76 gallons 1)76 IIbts grease NOTE: the above graphics depict the certified capacities of select Great Basin" models vs. typical gravity interceptors, and should not be used for sizing cross reference. See pages 17-18 for sizing recommendations. Grease capacities for gravity units shown above based o 5% 'ule with 50/50 FOG to solids"ratio. USA: 1-800-827-7119 I international: 1-913-951-3300 I www.schierproducts.com I Made in the USA 14 ONS No changes s afl belmade to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: Mechanical Orgectrical ❑ Plumbing ❑ Gas Piping Ciiy of Tukwila ! ; t..'%f , DIVISION 3" To point of LEGEND VTR= Vent through roof WC= Toilet or Water Closet HS= Hand Sink FD= Floor Drain FS= Floor Sink PS= Prep Sink 3CS= 3 Compartment Sink POC= Point of Connection CO= Clean Out nnection (PQC) egoolow VTR --„ f Grease lnt rce tor ;..,.. FD ►► 2 t et /% CO brit' Y, Pipe- pe- 5e i "-t o 6vess&c I r'l Clwte Y 1+ o tr 'fit v► A a 1494 ►1 ra�vi P2p... 2: HS .. CO FS Drat h FILE COPY Permit No.Yefild,,,M2110 Plan review approval is subjedle an t and omissions. f : 76r nze ±rcc ..ai on of any adopted , : orordinance. Recent ni approved Field t + f • admowtedged BY pe1K 2414 (z ° / COHS HS RECEIVp MAR 18 2014 TUKVvaL - PUBLIC WORKS RECEIVED CITY OF TUKWILA MAR 1 7 2014 City OfItiktida BUILDING DIVISION FITTING / PARTS SCHEDULE REVIEWED FOR CODE COMPLIANCE APPROVED MAR 2 6 2014 City of Tukwila BUILDING DIVISION ten IS ERMIT CENTER LEGEND PD= Pot drop system CT= Clean Table WC= Toilet or Water Closet HS= Hand Sink FD= Floor Drain FS= Floor Sink PS= Prep Sink 3CS= 3 Compartment Sink POC= Point of Connection CO= Clean Out HW= HOT WATER CW= COLD WATER 3/4" 1/2" 1/2 WC HS 3CS HS MS 3/4" 3�4 `F.•h`1 "VIP 3"® PLUMBING PLAN VIEW SCALE: NOT TO SCALE HS 1/2 WC 3/4° CT PS DW 2 PD HS HS REVIEWED FOR CODE COMPLIANCE APPROVED MAR 2 6 2014 City of Tukwila BUILDING DIVISION RECEIVED OF TUKWILA MAR 1 7 2014 PERMIT CENTER LEGEND VTR= Vent through roof WC= Toilet or Water Closet HS= Hand Sink FD= Floor Drain FS= Floor Sink PS= Prep Sink 3CS= 3 Compartment Sink POC= Point of Connection CO= Clean Out HS MS FD 3' TO POC HS WC HS WC CO o 1=`1 Omni JFD HS co FS HS 3CS PS FS PLUMBING PLAN VIEW SCALE: NOT TO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED MAR 2 6 2014 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAR 1 7 2014 PERMIT CENTER LEGEND PD= CT= WC= HS= FD= FS= PS= 3CS= POC= CO= Pot drop system Clean Table Toilet or Water Closet Hand Sink Floor Drain Floor Sink Prep Sink 3 Compartment Sink Point of Connection Clean Out Service /-(ete r A/ey0 Gas I PtL HW= HOT WATER CW= COLD WATER f rr 112 c s CtulPrr-l�AJT Li S T 57ock Po7 4.24-N A3 GfRNr-/2 knek mn ke ) /f' vo o e7r-t IS 2_ 7,S KAJ 7aeyer te9meriatit R441e) /g000 Bra /3s, KA) 1-La T 6712IPOLE C Amet ea.2 Pale) 6oi o00 ,g7 ( //?s1 ki) C l Glydt di;-)64L o00 R /4 e wester Heofev C�7� 75 7c, /00 R7 3/4" REVIEWED FOR CODE COMPLIANCE APPROVED APR 0 3 2014 City of Tukwila BUILDING DIVISION 1/2" HS 3CS 1 /2" HS /2" MS 3/4" cx, WC HS 1/2 •, WC 3/4" PS CT DW A —/2 HS 3/4' 3/4" HS 3/4 3/4 34„ 3/4i (3/ PLUMBING PLAN VIEW ICJA:VIT VINO SCALE: NOT TO SCALE 3 `To7h-L R7 ( 79 , /o o �Tr4 4„ CORRECTION LTR# RECEIVED CITY OF TUKWILA MAR 2 8 2014 PERMIT CENTER 6' %row Serrviee /Icier e act � Z i/t'cb r 70�� Gras �� - �' Py .I^�r✓rce l�'te�,cv �n .e�11y»e°1,t REVIEWED FOR CODE COMPLIANCE APPROVED APR n 3 2014 City of Tukwila BUILDING DIVISION F. 3/gi HP /4 4 D s/y send;mac lx%TEie FR = Trye r- FCT GiXIPPLE P = Po? Pt4TE Trcwl Sewie,— f etor- l -,,2„ BIAeL /rcvr RECEIVED CITY OF TUKWILA MAR 2.8 2014 PERMIT CENTER City of Tukwila Department of Community Development March 28, 2014 FRANK LEUNG 17605 114 PL SE RENTON, WA 98055 RE: Correction Letter #2 PLUMBING/GAS PIPING Permit Application Number PG14-0040 ARASHI RAMEN - 17005 SOUTHCENTER PY Dear FRANK LEUNG, Jim Haggerton, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • The scope of work states that gas piping is part of this submittal. Gas piping plans were not included in the submitted plan set. Please provide gas piping plans. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. PG14-0040 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Department of Community Development March 20, 2014 FRANK LEUNG 17605 114 PL SE RENTON, WA 98055 RE: Correction Letter # 1 PLUMBING/GAS PIPING Permit Application Number PG14-0040 ARASHI RAMEN - 17005 SOUTHCENTER PY Dear FRANK LEUNG, Jim Haggerton, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (BUILDING REVIEW NOTES) 1. Provide calculations of the fixtures to show this grease interceptor is sized for the fixtures served. Include manufacturers sizing table. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. PG14-0040 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG14-0040 PROJECT NAME: ARASHI RAMEN SITE ADDRESS: 17045 SOUTHCENTER PKWY DATE: 03/28/14 Original Plan Submittal X Response to Correction Letter # 2 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: ANIJC t6'0111Lt Building Division 1111 Public Works Fire Prevention Structural Planning Division Permit Coordinator a PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 04/01/14 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) Notation: DUE DATE: 04/29/14 Approved with Conditions JAI Denied (ie. Zoning Issues) REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG14-0040 DATE: 03/21/14 PROJECT NAME: ARASHI RAMEN SITE ADDRESS: 17045 SOUTHCENTER PKWY Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: A Cant Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator II PRELIMINARY REVIEW: Not Applicable (no approval/review required) REVIEWER'S INITIALS: DATE: 03/25/14 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required DUE DATE: 04/22/14 Approved with Conditions 0 Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only 2_ �U p CORRECTION LETTER MAILED: �7 1 9 Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG14-0040 PROJECT NAME: ARASHI RAMEN DATE: 03/17/2014 SITE ADDRESS: 1745 SOUTHCENTER PY X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: VrZ uilding Division 419-121c Works Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) REVIEWER'S INITIALS: DATE: 03/18/14 Structural Review Required DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required n (corrections entered in Reviews) DUE DATE: 04/15/14 Approved with Conditions n Denied (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 3?"0"1 Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: l2 ( /2-o ) C}.. Plan Check/Permit Number: .4247 /If - pD 0 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: AK 5 H J , A /'1 E/r\i/ Project Address: /7O P S 5 /t ✓ Py Contact Person: rre K tau Summary of Revision: .,c v-� .� Prevh_ e4� f('c. %-1l rvvt L 7%X (Cio �vlp3a/ ; <Yeza�. 5 S:7,eat' 'l Gt2 Xv-fa, K./ 5 e /Feet _ (14t Sh€.e 70 atirlzil /&jp.o ,'- 7✓.v .l w,// nI/,_ -time 1,,T S.ev✓i. Phone Number: 2,5"- 3 3 - MAR 21 2OV PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of rev, Received at the City of Tukwila Permit Center by: Entered in TRAKiT on C:\Users\jennifer-m\Desktop\Revision Submittal Form.doc City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: / Zf/ 2fl/% Plan ChecldPermit Number: PG 14-0040 ❑ Response to Incomplete Letter # • Response to Correction Letter # 2 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Arashi Ramen Project Address: 17045 Southcenter Pkwy Contact Person: -FYq, yt l ltiv`4 Summary of Revision: Phone Number: tf'25"-- 3 CS'-4-/ RECEIVED CITYOFTu,(wILA MA 28 2014 Sheet Number(s): PERMIT CENTER "Cloud" or highlight all areas of revision including date of revisio Received at the City of Tukwila Permit Center by: 1— Entered in TRAKiT on \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: SKYWAY PLUMBING INC Page 1 of 2 0 Washington State Department of Labor & Industries SKYWAY PLUMBING INC Owner or tradesperson DENG, ZHEN SEN Principals DENG, ZHEN SEN Doing business as SKYWAY PLUMBING INC WA UBI No. 602 938 272 PO BOX 4154 RENTON, WA98057 206-788-7955 KING County Business type Corporation Governing persons ZHEN DENG License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties PLUMBING License no. SKYWAPI910MP Effective — expiration 07/17/2009 — 07/17/2015 Bond Platte River Ins Co Bond account no. 41232311 Active. Meets current requirements. $6,000.00 Received by L&I Effective date 07/07/2011 07/14/2011 Insurance Contractors Bonding & Insuranc $1,000,000.00 Policy no. C11 SI3498 Received by L&I Effective date 06/03/2013 07/14/2012 Expiration date 07/14/2014 Savings No savings accounts during the previous 6 year period. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602938272&LIC=SKYWAPI910MP&SAW= 04/03/2014