HomeMy WebLinkAboutTIC 2019-01-23 Item 2A - Final Acceptance - Major Maintenance of 3 Bridges with Razz ConstructionAllan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFOR ATIONAL E ORANDU
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director
BY: Steve Carstens, Senior Program Manager
CC: Mayor Ekberg
DATE: January 18, 2019
SUBJECT: Major Maintenance of Three Bridges (Grady Way, Beacon Avenue, Frank Zepp)
Project No. 91510406, 91510407, and 91510408, Contract No. 17-118
Contract Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of the payment and performance bonds.
BACKGROUND
The Notice to Proceed for Contract Number 17-118 with Razz Construction, Inc. was issued on July 11,
2017. This construction project consisted of work on three separate bridges, Beacon Ave Bridge, Frank
Zepp Bridge, and Grady Way Bridge. All three projects had seismic retrofits and major rehabilitation work.
DISCUSSION
The construction project was physically completed on June 8, 2018. There were no contract disputes or
claims on the project. The project was completed on time and under budget. Since the physical
completion date, staff has been waiting for all administrative obligations and payment verification items
to come through before accepting the work as complete.
FINANCIAL IMPACT
The original construction budget (including contingency) for the Major Maintenance of Three Bridges
project was $3,092,301.00. The final cost for the repair on the three bridges, including all change orders,
was $2,642,339.81. The project funding was secured through the Federal Bridge Replacement Advisory
Committee (BRAC) grant at 100% for construction. The final project expenditures are as follows:
Original Construction Contract Amount
Change Order Costs (8.5%) + Under -runs
Total Contract Amount
Expenses
$2,688,958.00
(46,618.19)
$2,642,339.81
Grant
62,642,339.81
RECOMMENDATION
Council is being asked to formally accept the Major Maintenance of Three Bridges Project with Razz
Construction, Inc. in the amount of $2,642,339.81 and authorize the release of the performance bond
subject to standard claim and lien release procedures, and to consider this item on the Consent Agenda
at the February 4, 2019 Regular Council Meeting.
ATTACHMENTS
• Notice of Completion, Contract #17-118
• Final Contractor Voucher Certificate
• Vicinity Maps
VV:IPVV Eng1PROJECTSIA- RW & RS Projects\Major Maintenance an 3 Bridges (91510406)1Closeounproject closeout info memo.docx 1
Date: 12/18/18
El Original
gRevised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 602504498
Name & Mailing Address of Public Agency
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
UBI Number:179000208
1
Department Use Only
Assigned to:
Date Assigned:
Notice is hereby given relative to the completion of contract or project described below
Project Name
Major Maintenance of Three Bridges (91510406-08)
Contract Number
17-118
Job Order Contracting
0 Yes 'No
Description of Work Done/Include Jobsite Address(es)
Three Bridge Locations: Beacon Avenue S. SW Grady Way S 180th Street Tukwila, WA. Preform maintenance on all
3 bridges at each location to include deck repair, seismic work, and site work.
Federally funded transportation project? g Yes 0 No (if yes, provide Contract Bond Statement below)
Contractor's Name
Razz Construction, Inc
E-mail Address
yvettem@razzconstruction.ccd
Affidavit ID*
820074
Contractor Address
4055 HAMMER DR BELLINGHAM, WA, 98226
Te
360-752-0011
ephone #
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
[7:1 Retainage Bond Contract/Payment bond (valid for federally funded transportation projects)
Name: Merchants Bonding Company (Mutual) Bond Number: 54213507
Date Contract Awarded
6/19/2017
Date Work Commenced
9/27/2018
Date Work Completed
6/8/2018
Date Work Accepted
12/20/18
Were Subcontracters used on this project? If so, please complete Addendum A. Aes 11,1 No
Affidavit ID* - No L&I release will be granted until all affidavits are listed.
Contract Amount
Additions ( + )
Reductions ( - )
Sub -Total
Sales Tax Rate
0
(If various rates apply, please send a breakdown)
Sales Tax Amount
Comments:
2,688,958.00
$ 228,663.16
$ 275,281.35
$ 2,642,339.81
0
TOTAL $ 2,642,339.81
Liquidated Damages $ 0.00
NOTE: These two totals must be e
Amount Disbursed $ 2,642,339.81
Amount Retained $ 0.00
ual
TOTAL $ 2,642,339.81
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name: Diane Jaber
Email Address: Diane.jaber@tukwilawa.gov
Department of Revenue
Public Works Section
(360) 704-5650
PWC@dorwagov
Washington State Department of
Labor & Industries
Contract Release
(855) 545-8163, option # 4
ContractRelease@LNI.VVA.GOV
Title: Fiscal Specialist
Phone Number: 206.433.1871
Employment Security
Department
Registration, Inquiry,
Standards 8, Coordination
Unit
(360) 902-9450
publicworks@esd.wa.gov
REV 31 0020e (10/26/15) F215-038-000 10-2014
2
Addendum A: PleuscListuD-SobcnorructormumdGnb-dermBelnw
This addendum can hosubmitted iuother formats.
Provide known affidavits at this time. NvL&lrelease will u,granted until all affiuuvibare listed.
Subcontractor's Name:
DB[Number: (Required)
AffiduvitD|0*
ALLIANCE STEEL ERECTORS INC
602533619
799420
Altus Traffic MonogomontLLC
602632446
802839
AMAYAELECTR|C
800088108
802782
APPLY-A+L|NELLC
600553941
776672
BaylerConsulting, LLC
003150057
810470
FORD CRANE INC
601050656
783485
HARLOVVCONSTRUCTION CO INC
001762818
787484
JO8G|TESTUD WELDING INC
602320327
701044
MyERG&SONS CONSTRUCTION LP
003042475
781480
PACER STEEL INC
602463812
787580
PENHALLC0MPANY
601258537
810658
PUGET PAVING & CONST INC
800403309
787711
Ralph's Concrete Pumping
578085430
787664
REBARINTERNATIONAL INC
000481702
776100
OAL|NAGSAWING &. SEALING INC
601717158
787895
SEx-T4CSWEEPING SERVICE
001785583
789285
Structural Radar Imaging, Inc.
002327560
807238
TWISTED METAL LLC
602847101
819150
-
For tax assistance or to request this document ivan alternate format, please cal|l-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service 6ycalling 7ll.
3
Final Contract
Voucher Certificate
Contractor
Rau Construction, Inc.
Street Address
4055)Harnmer Drive
Cr
ti
glrain
Star
IVA
Zip
98226
Date
9/17/18
ity Project Numbers
1510407:91510406,91510408
Federal -Aid project Ntitnber
DHOS•1320(004), DII1i-1288(005), RHOS•1274(009)
Contract Title
Major Maintenance on 3 Bridges — Construction
Date Work Physically Completed
G/14/18
Final Amount
$1,792,819.62 — Frank Zepp
$ 219,450.00 — Grady Way
$ 629,952.96 — Beacon Avenue
Contractors Certification
I, the undersigned. having first been duly sworn, certify that I am authorized to sign for the claimant; that In connection
with the work performed and to the best of my knowledge no loan, gratuity or gift In any form whatsoever has been
extended to any employee of the City of Tukwila nor have I rented or purchased any equipment or materials from any
employee of the City of Tukwila; I further certify that the attached final estimate is a true and correct statement showing all
the monies due me from the City of Tukwila for work performed and material furnished under ills contract; that f have
carefully examined said final estimate and understand the same and that I hereby release the City of Tukwila from any
and all claims of whets ,; + s i vrhlch I may have, arising out of the performance o1 said contract, which are not set
forth In said esti
X 9-
Prin
ntre Name
clay of 20 ar
Notary Public in and for the State of
Residing at
Owner Certification
certify the attached Gn r1 estimate to be based upon actual
oasur onle, x'd to a true and correct.
n} In Proje
A
nistrator
Approved Date
Ptt{afio Wont& i?irector
Vicinity Map
Project Site
Grady Way Bridge
Tukwila, WA
01
Westfield South 'seer
sdcee omplex
rf
Vicinity Map
Project Site
Frank Zepp Bridge
Tukwila, WA
0)
tied :_- St
Mil nary
Center.
Vicinity Map
Beacon Ave S Bridge
Project Site
eacon Ave S Bridge
Tukwila, WA