ISSUE
Tukwila is undertaking a required periodic review of its Shoreline Master Program and Zoning
Code Shoreline Overlay for consistency with State law and Best Available Science (BAS).
BACKGROUND
The Green/Duwamish River in Tukwila is categorized as a Shoreline of the State. In response to
the State Shoreline Management Act (SMA) and Federal requirements, Tukwila has adopted
three documents related to the river — the Shoreline Master Program (SMP), Shoreline Element
in the City's Comprehensive Plan, and zoning regulations in TMC Chapter 18.44 Shoreline
Overlay.
Most construction, grading or clearing within 200 feet landward of the ordinary high water
mark (OHWM) requires a Shoreline Substantial Development Permit which is reviewed by the
Washington State Department of Ecology after issuance by the City. The City's shoreline
development regulations balance economic interests, flood control, and residential
development with enhancement and stewardship of the ecological functions of the river.
The City of Tukwila completed a comprehensive update to its Shoreline Master Program in
2009, with additional revisions made in 2011. Washington state law requires jurisdictions to
periodically review and update their SMPs every eight years for compliance with changes to the
SMA and Department of Ecology guidelines and legislative rules.
Staff briefed the Committee on 6/12/18 about state funding for this update, the scope of work
and the public participation plan. Since then we have done a city-wide mailing, put information
about this ongoing work in the September 2018 eHazelnut, included a flyer in the last water bill,
sent updates to an email interest group, held an open house on 10/9/18, held a Planning
Commission work session on 10/25/18 and worked with our consultant and DOE reviewer on a
public review draft. The update is due on June 30, 2019.
43
INFORMATIONAL MEMO
Page 2
DISCUSSION
This periodic update will focus on:
• Reviewing relevant legislative updates since 2009 and incorporating any applicable
amendments per the Gap Analysis Report (available on the Shoreline Management page
of the City website http://www.tukwilawa.gov/departments/community-
development/shoreline-management/ ).
• Ensuring consistency with recently adopted regulations for critical areas and flood hazard
areas.
• Streamlining and eliminating duplication in the documents.
• Addressing a limited number of policy questions.
This periodic update will not:
• Re-evaluate the ecological baseline which was established as part of the 2009
comprehensive update.
• Extensively assess no net loss criteria other than to ensure that proposed amendments do
not result in degradation of the baseline condition.
• Change shoreline jurisdiction or environment designations.
Streamlining/Eliminating Duplication
The current SMP includes policies and regulations that were subsequently adopted into the
Comprehensive Plan and Zoning Code. This duplication has given rise to inconsistencies and
requires duplicate amendments whenever changes are made. The proposal is to create a multi-
part SMP that spans these documents and includes the Shoreline Element and Chapter 18.44 by
reference without repeating policy or regulation language.
The current Chapter 18.44 Shoreline Overlay duplicates the environmental regulations found in
Chapter 18.45 Sensitive Area Ordinance for sensitive areas within the shoreline jurisdiction.
After discussion with our DOE reviewer the proposal is to eliminate this duplication and add
additional language about applicability and limitations. This does mean that adoption of the
environmental regulation update will need to occur simultaneously with the adoption of the
shoreline update.
Another proposal is to combine the shoreline use matrix and narrative list of uses into a single
table for clarity. Similarly the narrative discussion of shoreline buffers has been put into a table.
Policy Questions
Additional Flexibility for Levee Profile
The current SMP contains a minimum levee profile with a mid -slope bench that is required
throughout the City. In practice this has not always been the chosen solution for a given
Z:\Council Agenda Items\DCD\2-12-19\CDN 2-12-19 Shoreline Update Memo.docx
44
INFORMATIONAL MEMO
Page 3
location and has required a shoreline variance even for designs with better environmental
performance. The proposal is to retain the minimum levee profile as an example but allow
flexibility to address site conditions and environmental opportunities without the variance
process as long as criteria such as an overall 2.5:1 slope (red line below) and native plantings
are met.
Typical Shoreline Buffer in Lev Are as-W dtt
2*
ntertance Easeraerr
Reconfigured Levee
vegetated Eench
— Willows
Existing l vee
or hreary Nigh
plater INark
ONWM
econtl tired Slope everagcs ,5.1 «lih trench
Minimum Levee r fi le
Not To Scale
Additional Flexibility for Floodwalls
This update is happening alongside a discussion about flood protection measures in the Lower
Green River Corridor Flood Hazard Management Plan. There are multiple alternatives under
consideration including the question of whether future levees should be built to protect against
500 year rather than 100 year flood events. This could require levees to be between 3.5 and 5.5
feet higher, which requires between 20 and 30 additional feet of width with a front and back
slope of at least 2.5:1 or adding 3.5 to 5.5 feet of height to a flood wall configuration without
the need for an additional 20 to 30 feet of width.
The current Flood Control District access road standard is 15', not the 10' built into our current
buffer calculation so the total width of the levee footprint could increase by up to 35 feet.
Allowing an alternative flood wall configuration to substitute for the back slope, especially
where site constraints exist, would reduce the width needed and lessen the impact on adjacent
property owners. Levees are so expensive to build and the consequences of a levee failure are
so significant that the need to allow site specific design solutions may be desirable to reach life
safety and economic goals.
Increased Incentives
A proposal is to provide increased building height incentives for property owners who provide
shoreline buffer restoration or shoreline public access above that required by code. Currently
the 15% height increase allowed on properties that restore shoreline buffers or build shoreline
public access amenities only results in a 6.75 feet building height increase, not enough for an
Z:\Council Agenda Items\DCD\2-12-19\CDN 2-12-19 Shoreline Update Memo.docx
45
INFORMATIONAL MEMO
Page 4
additional story, so developers have not used the provision. Changing to a 13.5 foot increase
may be a more appealing incentive to encourage buffer restoration or public access.
RECOMMENDATION
Information only. The next step is for the Planning Commission to hold a public hearing on the
Shoreline update and then send a recommended draft to the City Council for review and
adoption.
ATTACHMENTS
A. Shoreline Update Public Participation Plan
Z:\Council Agenda Items\DCD\2-12-19\CDN 2-12-19 Shoreline Update Memo.docx
46
TUKWILA Shoreline Master Program Periodic Review:
Public Participation Plan
Introcuction
The City of Tukwila is undertaking a periodic review of its Shoreline Master Program (SMP), as required
by the Washington State Shoreline Management Act (SMA), RCW 90.58.080(4). The SMA requires each
SMP be reviewed and revised, if needed, on an eight -year schedule established by the Legislature. The
review ensures the SMP stays current with changes in laws and rules, remains consistent with other
Tukwila plans and regulations, and is responsive to changed circumstances, new information and
improved data.
The purpose of this Public Participation Plan is to describe how Tukwila will encourage early and
continuous public input throughout the SMP review process, including the steps that Tukwila will take to
provide opportunities for public engagement and public comment, as well as Tukwila contact
information and web addresses.
1.0 Pualic Jarticipation Goals
• Provide interested parties with timely information, an understanding of the process, and
multiple opportunities to review and comment on proposed amendments to the SMP.
• Actively solicit information from citizens, property owners and stakeholders about their
concerns, questions and priorities for the Periodic Review process.
• Encourage interested parties to informally review and comment on proposed changes to the
SMP throughout the process and provide those comments to decision makers.
• Provide forums for formal public input at project milestones prior to decision -making by local
officials.
• Consult and consider recommendations from neighboring jurisdictions, federal and state
agencies, and Native American tribes.
2.0 Pualic Partici
Nation Op
aortunities
Tukwila is committed to providing multiple opportunities for public participation throughout the process
and will use a variety of communication tools to inform the public and encourage their participation,
including the following:
2.1. Website
Tukwila's website will include a Periodic Review webpage where interested parties can access status
updates, draft documents, official notices, minutes and other project information. The webpage will be
the primary repository of all information related to the Periodic Review process, including draft
documents, official notices, a Frequently Asked Questions section, and other project information. The
page will include who to contact for more information and an email link for questions and comments.
2.2 Notice mailing list
A postcard will be mailed to all property owners and tenants within the 200 foot shoreline jurisdiction
notifying them of the upcoming SMP review and inviting them to join an email list of interested parties.
Attachment A
47
The list will be maintained by the Department of Community Development (DCD) and will be used to
notify interested parties regarding Periodic Review progress and participation opportunities, including
the open house.
2.3 Open House
Tukwila will initiate the Periodic Review with a community open house. Public comments
received during the Open House will be posted on the Periodic Review webpage.2.4
Comment
All documents under consideration will be available on the Periodic Review webpage and available for
review at DCD. Interested parties will be encouraged to provide comments by letter or email. All
comments will be compiled and provided to the City Council and Planning Commission.
2.5 Planning Commission
The Planning Commission will hold a public hearing and interested parties are encouraged to attend and
provide comments. Official notices will be published as established by Tukwila code.
2.6 News media
The local news media will be kept up-to-date on the Periodic Review process and receive copies of all
official notices.
3.0 List of stakeholders
Tukwila will reach out to the following stakeholders:
Washington Department of Ecology
Washington Department of Fish and Wildlife
U.S. Army Corps of Engineers
Boeing Company
La Pianta
Muckleshoot Tribe
BECU
City of Kent
City of Seattle
City of SeaTac
City of Renton
City of Burien
King County
Mid -Sound Fisheries Enhancement Group
All property owners and tenants within the 200 foot shoreline jurisdiction
4.0 Puolic Comment Perioc
s anc Hearings
The Planning Commission will conduct a public comment period and at least one public hearing to solicit
input on the Periodic Review. The Tukwila City Council will hold one public hearing before final adoption.
Tukwila will coordinate with the Department of Ecology on public notification of comment periods and
hearings to take advantage of Ecology's optional SMP amendment process that allows for a combined
state -local comment period (WAC 173-26-104).
48
Public notice of all hearings will state who is holding the comment period and/or hearing, the date and
time, and the location of any public hearing. Notices will be published per official policy and comply with
all other legal requirements such as the Americans with Disabilities Act. A notice will be sent to the
email list (2.2, above) and the Department of Ecology.
5.0 Public Partici
nation Timeline
The following is a general timeline including anticipated public participation opportunities. Tukwila will
coordinate with the Department of Ecology throughout the process. A detailed timeline will be posted
on the Periodic Review webpage.
June Work Plan and Public Participation Plan Presented to Council
July All City Mailing in Stormwater Bills
September Postcard Notice Mailing to property owners
Public Comment Period on Scope of Update
October Open House
January Planning Commission Hearing
Public Comment Period on Draft Revisions
March City Council Committee Review of Draft Ordinances
City Council Public Hearing
May Final Ordinances Presented to Council
49