Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019-02-14 Bid Tabulations - South 140th Street Intersection Improvements (Pedestrian Crossings)
City of Tukwila S 140th St Intersection Improvements (S. 141st St RRFB Pedestrian Crossings) Certified Bid Tab February 14, 2019 Engineers Estimate ��`'�`°�f t'ts ���z;, 4 �'����� � ��s , Axum Transportation Sys Titan Bid Item Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Unit Cost Total Cost Unit Cost Total Cost Total Cost BASE BID: Tukwila International Blvd & S 141st St RRFB Pedestrian Crossings 1 Unexpected Site Changes 1 1 FA LS $10,000.00 $5,000.00 $10,000.00 $5,000.00 $ 10,000.00 $ 2,500.00 $ 10,000.00 $ 2,500.00 $ 500.00 $ 10,000.00 $ 2,350.00 $ 288.00 $ 10,000.00 $ 2,350.00 $ 288.00 $ 10,000.00 $ 4,500.00 $ 500.00 $ 10,000.00 $ 4,500.00 $ 500.00 $ 10,000.00 $ 7,500.00 $ 1,000.00 $ 10,000.00 $ 7,500.00 $ 1,000.00 2 ADA Feature Surveying 3 SPCC Plan 1 LS $1,000.00 $1,000.00 $ 500.00 4 Mobilization 1 LS $25,000.00 $25,000.00 $ 20,000.00 $ 20,000.00 $ 11,000.00 $ 56,000.00 $ 19,000.00 $ 56,000.00 $ 19,000.00 $ 27,000.00 $ 36,000.00 $ 27,000.00 $ 36,000.00 $ 23,764.00 $ 18,601.00 $ 23,764.00 $ 18,601.00 5 Project Temporary Traffic Control 1 LS $35,000.00 $35,000.00 $ 11,000.00 6 Clearing and Grubbing 1 LS $3,000.00 $3,000.00 $ 2,500.00 $ 2,500.00 $ 4,620.00 $ 4,620.00 $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 7 Cement Conc. Sidewalk Removal Incl. Haul 190 170 SY LF $55.00 $25.00 $10,450.00 $4,250.00 $ 50.00 $ 15.00 $ 9,500.00 $ 2,550.00 $ 2,400.00 $ 29.75 $ 17.50 $ 158.00 $ 5,652.50 $ 2,975.00 $ 4,740.00 $ 31.00 $ 25.00 $ 80.00 $ 5,890.00 $ 4,250.00 $ 2,400.00 $ 40.00 $ 12.00 $ 150.00 $ 7,600.00 $ 2,040.00 $ 4,500.00 8 Cement Conc. Curb Removal Incl. Haul 9 Roadway Excavation Incl. Haul 30 CY $47.00 $1,410.00 $ 80.00 10 Crushed Surfacing Top Course 60 TON $48.00 $2,880.00 $ 75.00 $ 4,500.00 $ 12,500.00 $ 2,500.00 $ 54.00 $ 311.00 $ 362.00 $ 3,240.00 $ 15,550.00 $ 724.00 $ 60.00 $ 265.00 $ 750.00 $ 3,600.00 $ 13,250.00 $ 1,500.00 $ 110.00 $ 200.00 $ 300.00 $ 6,600.00 $ 10,000.00 $ 600.00 11 HMA Cl. 1/2 In. PG 64-22 50 2 TON EA $130.00 $800.00 $6,500.00 $1,600.00 $ 250.00 $ 1,250.00 12 Adjust Catch Basin to Grade 13 Erosion/Water Pollution Control 1 LS $1,000.00 $1,000.00 $ 5,000.00 $ 5,000.00 $ 750.00 $ 400.00 $ 500.00 $ 400.00 $ 2,250.00 $ 5,250.00 $ 6,000.00 $ 2,800.00 $ 2,000.00 $ 11,250.00 $ 12,000.00 $ 7,000.00 $ 35,000.00 $ 35,000.00 $ 2,500.00 $ 3,800.00 $ 3,000.00 $ 1,300.00 $ 1,500.00 $ 1,750.00 $ 1,400.00 $ 479.00 $ 25.50 $ 3.50 $ 113.00 $ 127.00 $ 26.00 $ 50.35 $ 50.40 $ 17.00 $ 2.15 $ 92.65 $ 2,216.70 $ 74.00 $ 41,950.00 $ 41,950.00 $ 317.00 $ 5.25 $ 27.00 $ 3.25 $ 675.00 $ 75.00 $ 135.00 $ 479.00 $ 382.50 $ 280.00 $ 1,130.00 $ 1,016.00 $ 390.00 $ 7,552.50 $ 12,096.00 $ 1,360.00 $ 430.00 $ 13,897.50 $ 8,866.80 $ 10,360.00 $ 41,950.00 $ 41,950.00 $ 1,585.00 $ 1,995.00 $ 810.00 $ 4,225.00 $ 675.00 $ 1,875.00 $ 945.00 $ 2,500.00 $ 70.00 $ 10.00 $ 100.00 $ 100.00 $ 25.00 $ 55.00 $ 55.00 $ 10.00 $ 5.00 $ 70.00 $ 2,500.00 $ 100.00 $ 49,000.00 $ 49,000.00 $ 1,000.00 $ 4.00 $ 20.00 $ 3.00 $ 500.00 $ 50.00 $ 100.00 $ 2,500.00 $ 1,050.00 $ 800.00 $ 1,000.00 $ 800.00 $ 375.00 $ 8,250.00 $ 13,200.00 $ 800.00 $ 1,000.00 $ 10,500.00 $ 10,000.00 $ 14,000.00 $ 49,000.00 $ 49,000.00 $ 5,000.00 $ 1,520.00 $ 600.00 $ 3,900.00 $ 500.00 $ 1,250.00 $ 700.00 $ 500.00 $ 50.00 $ 10.00 $ 100.00 $ 100.00 $ 25.00 $ 60.00 $ 70.00 $ 40.00 $ 5.00 $ 100.00 $ 5,000.00 $ 50.00 $ 50,125.00 $ 50,017.00 $ 500.00 $ 20.00 $ 85.00 $ 5.00 $ 500.00 $ 50.00 $ 150.00 $ 500.00 $ 750.00 $ 800.00 $ 1,000.00 $ 800.00 $ 375.00 $ 9,000.00 $ 16,800.00 $ 3,200.00 $ 1,000.00 $ 15,000.00 $ 20,000.00 $ 7,000.00 $ 50,125.00 $ 50,017.00 $ 2,500.00 $ 7,600.00 $ 2,550.00 $ 6,500.00 $ 500.00 $ 1,250.00 $ 1,050.00 14 Inlet Protection 15 80 EA LF $100.00 $8.00 $1,500.00 $640.00 $ 50.00 $ 5.00 15 High Visibility Silt Fence 16 Topsoil Type A 10 8 CY CY $60.00 $60.00 $600.00 $480.00 $ 50.00 $ 50.00 17 Bark or Wood Chip Mulch 18 PS Cotoneaster dammeri 'Eichholz'/ Eichholz Cotoneaster; 1 Gal. Cont. 15 150 EA LF $25.00 $25.00 $375.00 $3,750.00 $ 150.00 $ 35.00 19 Cement Conc. Type 410C Curb 20 Cement Conc. Traffic Curb and Gutter 240 80 200 150 LF LF LF SY $30.00 $10.00 $4.00 $40.00 $7,200.00 $800.00 $800.00 $6,000.00 $ 25.00 $ 35.00 $ 10.00 $ 75.00 21 Cement Con. Extruded Curb, Type 6 22 Curb Paint 23 Cement Conc. Sidewalk 24 Cement Conc. Curb Ramp 4 140 EA SF $2,200.00 $50.00 $8,800.00 $7,000.00 $ 3,000.00 $ 50.00 25 Detectable Warning Surface 26 Rectangular Rapid Flashing Beacon (RRFB) System at S 141st Street & TIB Intersection 1 1 5 380 30 1300 1 25 LS LS EA SF EA LF LS SF $29,000.00 $29,000.00 $250.00 $10.00 $90.00 $3.50 $2,000.00 $50.00 $29,000.00 $29,000.00 $1,250.00 $3,800.00 $2,700.00 $4,550.00 $2,000.00 $1,250.00 $ 35,000.00 $ 35,000.00 $ 500.00 $ 10.00 $ 100.00 $ 1.00 $ 1,500.00 $ 70.00 27 Rectangular Rapid Flashing Beacon (RRFB) System South of S 141st Street & TIB Intersection 28 Permanent Signing 29 Thermoplastic Crosswalk Line 30 Thermoplastic Plastic Yield Line Symbol 31 Plastic Wide Line 32 Remove Pavement Markings 33 Non -Skid Surface Treatment 34 Tubular Marker 7 EA $150.00 $1,050.00 $ 200.00 CALCULATED CONSTRUCTION BID $219,635.00 $ 221,300.00 $ 279,389.80 $ 287,635.00 $ 295,522.00 ACTUAL CONSTRUCTION BIDS °$`,' ,}t,{=4t`1;{s��3 $ 279,389.80 $ 287,635.00 $ 295,522.00 • No Errors in Contractor Bid Proposals. The Unit Prices shown are what was included in the Engineer's Estimate read at bid opening. Certified by Scott Bates, Traffic Engineering Coordinator Date 2/14/2019 1 of 1