HomeMy WebLinkAboutCOW 2019-02-25 Item 2C - Powerpoint Presentation Shown at Meeting - Public Safety Plan Disadvantaged Business Enterprise Outreach (Final Version)CITY OF TUKWILA FIRE STATION
LYDIG
CITY OF TUKWILA JUSTICE CENTER
Darling is a passionate professional in
advocating education and development of
all diversified firms in the construction
industry. As Lydig's Diversity Manager, she
keeps current on equal opportunity and
affirmative action regulations for diversity
and inclusion. Darling's background as a
contract administrator has given her the
opportunity to work hand -in -hand with our
subcontractors as an integral part of many
of our major projects. Her commitment to
diversity and inclusion extends to her
committee work including Tabor ioo and
NAMC. She is also part of the AGC of
Washington's DiversityTask Force. Darling
will leverage her knowledge and
experience to ensure opportunities are
provided to, and capitalized by, local and
S/D/WBE firms for the project.
Bow Lake Transfer Station -Tukwila, WA
GC/CM services for this new, LEED Platinum certified 100,596 SF replacement
transfer building for more efficient recycling and garbage handling while the
existing transfer station remained in full operation 24/7.
Cascadia Elementary School and Robert Eagle Staff Middle School - Seattle WA
GC/CM services for a new 92,000 SF elementary school and 3.47,00o SF middle
school. Existing Native American murals were preserved and reinstalled.
Construction was performed concurrently.
Seattle Public Utilities, Landsburg Facilities Chlorination Project - Ravensdale,
WA
GC/CM services for new facilities to convert drinking water treatment system from a
chlorine -gas based process to a safer sodium hypochlorite chlorination process.
Seattle Public Utilities, North Transfer Station - Seattle, WA
GC/CM services for the new 3.87,00o SF replacement transfer station. Constructed in
multiple phases, the project includes space for the community, play area for
children, a sports court and open play field, static exercise stations, and public art.
Port of Seattle, S aTac Airport Centralized Pr -conditioned Air - SeaTac, WA
Project scope included installation of chillers, heaters, and piping throughoutthe
600,000 SF facility while the airport remained fully occupied and operational.
BACKGROUND
2.5 Years Industry Experience
& CEN IFICATIONS
Secretarial Certificate International Business College,
Indiana
National Association of Minority Contractors, Chair -
Education and Membership Committee, Board
Member
Tabor ioo: Membership Committee Member
AGC — Diversity Task Force
EMPLOYMENT HISTORY
Lydig Construction 2002 - Present
I first met Darling at an outreach event she organized for select contractors. I had recently started my contract flooring business and was actively seeking opportunities to network with
reputable general contractors in the Puget Sound region. From our initial phone conversations, I was impressed by Darling's responsiveness and professionalism. But it wasn't until I met her
in person that I got a true sense of what's led to her success as an industry leader; Her energy, warmth, passion, and commitment to everything she takes on. She took the time to learn
about me, my business, and my needs as a start-up business owner. She introduced me to key people within her organization and helped me identify subcontracting opportunities on
upcoming Lydig projects. This led to a significant subcontracting opportunity on a public works project, which allowed me to demonstrate my company's capabilities.
Mike Sarnora, President, IronClad USA
*WSDOT
OSR52o Project - $4.51 Billion
*PORT OF SEATTLE
*projects in the $348 million five-year budget blueprint include:
•sioo million for a new cruise berth (assumes 5o percent tenant cost share)
0$39 million for development of Terminal 91 uplands
0$35 million for berth replacement at Terminal 91
0$3o million for bringing electrical power to the waterfront
*$23 million for Fishermen's Terminal Gateway Building
0$17 million for a Terminal 117 habitat restoration program
*SOUND TRANSIT
*$1.2 Billion for light rail extensions for Lynnwood, Federal Way, and downtown Redmond
2/14;/2019
BNB I [ + r Bid Package 02.41 Demo & Abatement Summary
Number Company
02.41 bockiktic Company
02.41 Ascendent LLC
02.41 Niorthstar pemo{itiOn end Rernadietlon„ LP
02.41 Rhine Demelltion,, L.LC
02.:41 Walker Specialty Construction Intt.
02.41 TITAN Earthwork, RC
02,41, tirayhawk Cor etrildion Cumpany,,lnt,
02.41 PCl demucon
02.41 Construction Group International Lit
Company Status
Bidding
Bidding
Bidding
Bidding
Undecided
Bidding
Not bodthng
Undecided
Undecided
Enterprise Type
Other, Small Business Enterprise (SBE)
None
None
None
Smal9 Business Enterprise aBE$
Singh Business EnterpriSBEI
None
None
Other
BNBu
d ,e r s Bid Package 31.0i Earthwork & Utilities Summary
2/14/221,9
Number Company tpm pa ny Steces
31.00 Northwest Construction, inc Undecided
31.00 TITAN Earthwork, LLC Bidding
31,00
31.00
31.00
31..00
31.00
31.00
31,00
31.00
11,00
31.00
;1'1,00
lid moti nteiyn: Contractors, I.nc.. eiddiny
J. R. Hayes Corporation Bedding
Archer Construction, Inc.. Not bidding
Hos Bros. Constrcact ion Inc
treeng Construction CO, inc.
Eruhling„ Inc..
Ceccanti Inc,
SCt infrastructure,. LLC
Northwest Construction, her,
h I,E Cont•trtieti on Inc,
Acrlbs Cpnttrudtion Inc.
Monarch 0nsehoorrent
thed, inc,
C)PK, Inc.
Undecided
Undecided
Undecided
Bidding
Bidding
Not bidding
Badd Ing
Undecided
Bidding
0it9dirnS
U nde=crded
Enterprise "ry'pe
Nome
Small Business Enterprise {SBEI
None
Nome.
Small! Business Enterprise f3B
None
None
None
None
Small Business E'nterpriselSBEI
None
Worr'me Etusinetis Enterr,rise (\NW None
(Dther
Nenel
BEI= t>isd.cly taae t tiir.i
Enterprise 9LTBEi
U./DIG
ProletcqukwIla else Station as 51- Bld Packages:Invited - List All
Prui&ofru Icceilcr•ficA Stat1, 04' 5 1 • &Id Pc&k&geuhucctAd. Usz A11
1,11%711111
[Greg* By
Ilicceepeev acme
Coda !Anus
isiPArkugu&I • karthwurk 11111k
3,40- Site Concrete
51d11auldwe - Guru rete, Structure & Luc Cow re
&Id 11ack1774e , Cour/ etce..Structure & Enelddu12
cP,Id 04 0940403, Cum.:1c Structure 374 re
500f`dukecgcu 01$ riddiaddia, 51,uctu1e & 00113
&,"t1,11,40.G tuructic, SuuCture & kucouccuuuc.
411Pcuck40e•00 - Con, c33203ccuctur3000ruCccuu
• Rackdge 53- Goruc&A,Struelure & tuccmca re
&Id Package 03 - Cunerete, Structure dt 111,1510re
Si," Paclucge• 113 2(2 o'04.Si11,81, & Eueluducv
81d11co5e74e 01 Ccur&c&e, Stfudlufu& Cud,. Iv
0020c114,1111 • Ccouccom, &vv./1,1,1g (cC113,111.c
&id 01 c'. '8 00, 17,411mt.& & kuukuuuc
&id ruekccou c 313cc&se, Corierture 1c4!e1c1e101
,c,&& Put•ke&c• 011 f1/4uf4101.1duct41e rC1410
&Id 1,ac•kage - Cemecate, Sucucture & truluuuru
911 017433 34u Core cute, 03441,9 Ord•ccrcu
• Package - uctuccretecStunture & End., re
&Id PacKwe 0.1 Mawr&
510114,..CutuN1 luituccocy
• 041,54010.
Sic1 Pc&c5494004 11W13, MelaCF•cacnic&c, Cosulalic, accd ACT Euiiircr;
• 121,1101}t, utura111c,ccucCcig, Ouulatue, :cud ACIceiliquu
151/1114,k943cc1” • Miurcullurceducc
• 7015u33111 , coiceellando/d
aid addkagd MU/coll.:Ruud.
90122ck403cculuccellerceoccu
&id Package Micuellareuus
aid addadad - heduelanee.
101 X& kw, in • belicscollarunucu
&id Pmcluvc11,7
$111c10.740 01, 0ic4'c1141uccu
aid •ark•agu = toUcello,ruccuccs.
4Id /1,u,kupe151,, cullucellaueduc
aid "111040201- Mlucellaneaus
1114 P.:Rage 197 hclisuellocueecos
&id Fc3ulc40u17 Mictellurteccuu
31604,c54e0T - Mucc1Ioutuud
81611://141,01, neticcullarzeducc,
111641..1=4,M 111-ca,03'lliu1c R.I.& 1.1 1111111 65411.0
114!1&1uili3111104,1,174&Id druffir 1e38iv;
31/1• 11urk40e 1 culducdping & I rriotidu
Aid Package 1E1= isecci &dui, & I 17103,,101"I
&Id •PAukNe 11,221,4i
&id 11ackage 11 - 11ecCric04
& ccuc,ccuu c&rueel
Salinas Couutni&tiou 1ric
Carom& Steel, III,
M1330:121 1311 1100918,1 WIN
Me. C1ty 51c20t Mel&I onci rtudficqc Int *dee& 3118514ec itAy Cludictc¢..1m,1
Cuutum Cocucretu rd./A.0,4,4 Cuu
c/uprcoccBuildioa SouciAlcu,
nriouUy 41,311 hur
futility Accecu Inc
lrt'30112 Meet Met&
Madedu Meted, 11f.
preciucc&I Ccoodccark, Cu/
PracuiCicuu Pvuoul erc&c, ocuL1.1.•
.%c1,11,1•11C10c&cruct1uo 14
Atio& Cldhcic1/u 031.0022,,,kied & (.1c:env, 1,1C
chg addid,lint Sydtell&,,
C117KM toed& scomaccdf& ic1cd.
St q,ckicarr, LLE
CI and DMA/din, Inc..
4c,duk Curcky,ACcucu
Todurukur LIcatheru Mau/
EC Couctcuu.11,
u.d 01,11101.4111ff.
ADASignoco coudicctal,ccII
11.01cu1d1,1l'iP,, I u1
042104,474(00
ping
Pcciiding Speclult1, r&u211cuce016411W11q
334113 Waal Door Cumpany
Ciudueunduan Carnparc&c.outvccutuillue
1:PittAnillg COTIpiIny
Pear& futhicusdu rin41139113/18cc cCuvirecommucc)
PArtfIcc rid*, 0,10f
Sh Curley C9KIRM
Supenor Edo, CuI.
Taketerm Chkururc,,oup1Lc 1
15015umtec &other, (001u
04 Nrf, Sof dy [Audi,/ Scuuciallieu 1
1131, Tod/ LIOI',31.2 7411c
Mutt, Codli113ulu1, 1muuud1Cuuccuoccticu&
VuCley Hour rud111W111,,,
(c1rec2Lac1d11,101 Ill
Lupc&Valle, And 1 ,nd,r,,k,
eulluccPleculc
Su &lane ElevIr1c,11,
92124 De, Uned
903:1111 11&cU1ced
4019e41 cA“epted
1982111 Adcerded
30022 addaddid
3$22 Declioed
9012 DucuCiuud
UM& 1121ne4!
55114 DeccUned
966140 Ciee1l41ed
981154 Cudlioced
981141 Deul•Coed
&lcbc, 040311
9840 0.111Cu&u,
921(4 Pnupouud
91153c3 11,•01 Pcbc,61,16
95114.11 1m/1°401
911115c•I41108 Pc -wove{
404104 Proposed,
98211. Accepted
9893.2 0e.,1•Cued
98225 DucCiued
9$512 11/uCiucc0
9$418. 0uclieu"3
901111 Are,ep11d
1111100• 4e1ep111
9$1/72 45ee,831141
980414 1),&11c3ci
09716 Deauced
9/11.151 De&linc&I
Urgui Curdiccod
11135111. 05u111u4
83C;74 III I'd
9$711 1Joarned
92.7111 Nudicced
911216 Der1ined
111133 DodUcced
98125 Duulided
913252 Prupoued.
1140 21070.88
944%
92017 111ecC1e0
USW& 03rAcced
9910.1 02O1ad
%WM Ar,upIgue
183103 Accepted
*Events attended by BNBuilders & Lydig Construction, Inc
*Regional Contracting Forum 10.9.18
*Darling Nava represented BNB for the 1:1 Session w/subcontractors/suppliers/consultants
*10 signed up for the session & total of 11 more stopped by the table in between sessions
*Lydig had a 1:1 session and represented by Jeremiah Gilliam & Anna Dinh
°
ession
N. kw,'
Regional Contracting Forum
October 9, 2018
ONEOE1ONi Networking 'Sessions
McCaw Hall at Seattle Center 1:3" Floor)
32.1 Mercer Street
Seattle, WA 987109
Please arrive by 1230 p.m. to allow adequate time for set up. We will provide 'Lea cards for our table,
but we ask that you bring your own linen with company namellogc„
Time Butlriess Name
1 00-1i10 p,,rn. tittAitty
1 a5-1:25 p.m. helaterials Testing & Consulting, Inc.
130-1140 p.m, T.el list ic Teehnologv Se EViteS
3.145-1:755 p..m. t Industrial Source
2;00-2;10 p.ITh Tangible Re:sults, Training Group
2:15-225 p.m. Dragos Construction
230-27.40 p.m, T & T TRAFFIC CONTROL RC,
2:45-2SS p.m. Shin e OR Signs ,& 6raphi,
3:00-1:10 p.m. unearth
3:15-325 p.m„ Ott Duty Services, inc
BNB
BNBuMitf5
Tivi15„ C
Business Neme
L.,30",6,-
RL
CITY OF TUKWILA JUSTICE CENTER
SUBCONTRACTOR CONTACT UST
cope of ork Normally
Performed Telephone Number
.1; -736•
iwL
Point of Contact
7
, nif
j14L- ,
S)4t,N -.Y)1 il`'eef!. ,43,441--.4 x"; 1".14 0,/
4 '445°
8 6i21.Q.1 ' `.rr,:,..5t,,,,L) -- ' "). ,°'1,,,,'
,t, p„.4,,, -To,k4,5 P.,343ks,-."1"3.1, 3,, :°,03 c'Si° 0,t,°-.,/-
,n
,.)-t V'i,7 Cff C
:54,0. ,17,1 3334,7
,
k. \
i0:3242,124.
Act
•
aEtr %yea" 1: tros.
on
Regional Contracting Forum
October 9, 2018
ONE-ON-ONE Networking Sessions
McCaw Hall at Seattle Center (3' Floor)
321 Mercer Street
Seattle, WA 98109
Please arrive by 12:30 p.m. to allow adequate time for set up. We will provide tent cards for your table,
but we ask that you bring your own linen with company name/logo,
Lydig Construction
Time Business Name
1:00-1:10 p.m. Ebony Office Interiors
1:15-1:25 p.m. Gardner Bay Consulting, LLC
1:30-1:40 p.m. BRPH
1:45-1:55 p.m. Gudmundson Painting Co.
2:00-2:10 p.m. Shine On Signs & Graphics, Inc.
2:15-2:25 p.m. Materials Testing & Consulting, Inc,
2:30-2:40 p.m. Dragon Construction
2:45-2:55 p.m. Auburn Mechanical
3:00-3:10 p.m. Talon Engineering Inc,
3:15-3:25 p.m. DACO Corporation
❖National Association of Minority Contractors
❖General Monthly Meeting every first Thursday of each month (6pm-8pm)
❖Mini -Outreach for Prime presenting that evening to have z:s session
❖General Monthly Meeting every last Saturday of each month (loam-zzpm)
❖Monthly meeting every first Friday of each month (7:3oam - 9am)
•3 PTAC (Washington Procurement Technical Center) JV Economic Alliance Northwest
❖ Association of General Contractors (Chaired Diversity Task Force)
❖ OMWBE (Office of Minority Women Business Services)
❖ WEBS (Department of Enterprise Services)
❖ Monthly updates through email of upcoming events
❖ Utilize their organization spreading the bid announcements & outreach events for BNB & Lydig
External Partnership Events
• Regional Contracting Forum October 9, 2018 (All Day)
Alliance Northwest March 7, 2019 (All Day)
• In the next few weeks - UPCOMING EVENTS
Lydig Construction Inc — Outreach Event
• February 20 & 21, 2019
• Location: Fire Station #51
• Time: 4pm-5pm
B N Builders
National Association of Minority Contractors
+ General Monthly Meeting March 7, 2019 ® 6pm-8pm
Mini -Outreach 53opm-6pm
is*.iis`tkft*tkettie
'itikiNEkAtIt
LOCATION: Gty of Tulcvvb, Fire Stn 3- 444 Andover Park E, litkeirkt, WA 98188
TIME: 4,00pre Si0Orten
CONTACT: DadieR Nava, Outreach Cuottlirtatec 206,618 8586
Lydig Construction, as General
Contractor, will be present to discuss
future opyartunities, network, and
share more information about these
exciting proiects.
ALL TRADES WELCOME!
LYNG
gn,
g ,
ggg
ggg
tts.24, Ott,,,,,,tt P4.20 ,t2
wt,rxvt ctitt,ma
WM ...I
20. tittt, nett 1 tttttetett20 /2t,212,-24
S-4,1011,tt, ,titt2t,141,
Gwtt4i.„faxt SiNtet, ct 41:1
tettUlt
inq
1,22ttrt t 2f2tit
201:42,tt,
C e110VS Atett, Sttlyttf
5,30 CC 22,ott tR,
ftttaVItt, 'ttt,ttt tta t
1ktftt, tttmt, a2,222 tt,t 2,22,2 t2, tt,,,ttor 2.2
2,21,,21,2,,,t2,21t1t,21
, 4 ,rett ttt,
43o Coo410‘,e,,,r2W,,
Ozervm,ov ,rwc,oCe,n,
T,U40,,,Y4
t4ok RoAr,,4 tan, 0,1 tv
Sooport
K,Ww‘Y,S,T
Weliot4
.*Aste^14
44-4"4,44,4,noatv
A4J)itv
A.4,21.,4,14 re:
Pkttn,
OVAse
'▪ Ova
P uTe,)aut S4c,,.„.ew Grot,,9
'z'kv A,,,mxrAir
Rowflev**sx,41,0,g4
*Vt., 16,4*,,V
Raa Cbriarx*,r,
4,1,44"4 et,
arso,-4*
Tswohusessz„zuz s,sos*so
s,frztszszzRass-szosasisism
MAW Par m*00E4105
**ri**,fl
4.,
Cza mit VNAmt
Avigkri ArrouriC 4 mu eiwt
Cartrsoolooks
dt
X'
Ole*
1
I*** *woo* soloodoct to to, Poslormod Os SCA, *irlOo
iloc****,* Av000tt Ammo*
:14,1 Zs,i*
o',14
4.4.44
1
1
1
1
1
1
* **
, 6
Repor ing
A erto izsatiori p ari t
ppri ice uti
Apprentice Utilization Plan
List the prime and all subcontractors scheduled to work on this project, and indicate the estimated number of hours to be performed by journey level and
apprentice workers for each. Apprentice utilization must equal or exceed 15% of the total labor hours.
Estimated information
Prime Contractor and all Sub -contractors
Journey
Labor Hours
Apprentice
Labor Hours
Total Labor
Hours for
Project
Apprentice
Percentage
Number of
Apprentices
TOTALS:
0
0
0
#DIVIO!
Apprenticeship Utilization Require
SAMPL
BE Partic pation Percentages
SAMPLE Project WMBE Inclusion Percentages
UPDATED: DD/MM/YYYY
Bid
roup #
Bid
Package
RO El P
1
6
7
RO El P
4
5
RO P
RO P
4
4
Bid Package
Description
NSS Items
Electrical
Building
Chlorination
Sitework
Fire Suppression
Demo/Abatement
Antenna
Mechanical
Landscaping
Totals
Budget
$ 73,000
$ 443,405,00
$ 446,975,00
$ 814,096,00
$ 378,385.00
$ 105,950,00
97,435,00
$ 175,000,00
$ 367,000.00
$ 367,000,00
$ 188,329.00
$ 188,329,00
1
Estimated
Construction budget
w/out NSS
WMBE Value
71,469.00
71,469.00
1,030,652.00
378,761.20
405,869.30
27,497.50
218,524.00
39,987.00
22,487.00
17,500.00
80,740.00
80,740.00
56,498.70
56,498.70
1,279,346.70
S
5,101,234.00
25.08%
WMBE %
16%
16%
25%
30%
24%
0,0040
NOVNI4Ntal
.1%0k (11' 414
27%
11%
tarIVA
23%
MOM
22%
22%
30%
30%
23%
EO°5 MODS
Paid to Date
22,17025
22,17C425
936688.82
211,9'73.51
492,387,50
8
44,697.50
187,631..31.
64,394.85
16,950,00
12,944.85
$ 25,4300.00
77,14017
$ 77,140,17
56,498.70
56,498.70
$ 1,312,649,86
Attainable
Goals
5%
111E2111
22%
17%
30%
10%
17%
25%
13%
/4%
21%
21%
30%
30%
11%
NOTES
SEE NSS NTACC MGHUG'NFIED
oiviwBE LI•stirigs arid NSS
Lq3.1 Marne
Contad Nam.
PIRIPMETER SECURITY GfaXP
ayEAVAST CONSTRUCT iiPt INC
EO.Elar.ba EIACCYL,
ftcy1M317 VaailaIGREN
232a 772- iN2
a Ea Yai.310.
Eanna Add..
aftY airaaaaa•MY,RaytiaTC.R,SECURairaaakfaMM,aaat
'AMNESTY aaiPaa'al..CY:ka
CERT IFICATION
Us
Us
cm I
3232
1.?1,
PP
alma L daMM1E,
111L111
1111
111
1'11 gva,
t.inaatans aymma au4aaryant maly0 and acamaaayl2peszlam
PP tic
;:!th
Cfikl,S•apeay - nem! Iva ccPAPPPFran yoyi =km -ad Se h.a3aa,
:1111 11.klee .1.11,132d,76,1,,,,WK, • we pymiaaaammUy wkl32 yecamilyMmarm,e,Mammi aMmal. fame pmaknat ay, C..4yamy
MUTED MG Mit. iYal (M1i p MiTt. laym•M,1,44
Sam; saw ta..0"BU war
1Maa Kra,
S,10„, faa,aBai IMa Naga HaMiLaCOM
KSINIZE
MATTLE SWKIP NY; INC irm.yMeM aMa.a
8, *el ES 5
...3a4 .W27
may., am maaama, army aLma.
S SKIP
alaa VA: OaN 11.1,0K mamdaamami km, 0, ,,,a
mon Lael
.
205-72 I' -3572 •!Mal
T E. TIRAf 11C CON TROLI taMaY Tracy[
Taki,'Y f 'MI MAN
2.Y.C. aSayal aa IR 4a yf REIMAN LI SYMa ",1AI LC DM
SiaLlkelVif1t,
1a3-23:14,717
man Larsamaaarg@maataysmar.m4 amea
ML
Emma a", kyymy.
*mai:, Para,. amarbm•mxi
Mmyr, Raw
aaa.M:•:May..ma,symMay
Sa33 IlSoco P mpaimeaaMaaN baYa gaMayms..
aNB aDvarrmenuMvevtimils
Ma, Yer,my,-,,,a If amy
1,11.111,11.7k1,1,0th aammaM
I I mayrymma ammy au:a kr MA,
Veimt maam, y %may, .mm Lyda
,-locPtcp'-c-32N3,3315
1 NM,
.13-a aaat maytayem,Mm', E.P. We. 6.
',nava aaa thay krmatia ta. [iv
rmammays
T may LT, Iyart NSS ma.1 suma, may
ix, amt. m5Krma33y.M1LI Wymk
rya... pass M3 thiy ',431armatam3
maacmyy iiyide
11141,111.111..h.av traileas
Taay may by mat al MSS aad mmrry. may
mat al amt.M.ay,•.may HP. %Va&
1.12111. .111.111111,171117,..1.1.111. Om.
lamamm
T h.a a Ma ba molar. ff
mar.a. arm ma bar,
samiMay iman
a
Conversation Emails between BNB & Darling
••• Seattle Vocational Tech
❖ ANEW/PACE (Pre -Apprenticeship Construction Education a program of ANEW)
••• Youth Build
❖ Cement Masons (JATC Pre -Apprenticeship)
❖ TRAC — Trades Related Apprenticeship Coaching
•'• Ironworkers Boot Camp
➢ For upcoming graduation schedules 2019. Coordination with Sisto Pina, Mia Navarro & Nichelle Page,
to visit Foster High School for opportunities regarding Pre -Apprenticeship Program.