Loading...
HomeMy WebLinkAboutTIC 2019-03-05 Item 4C - Handout Distributed at Meeting - Allentown-Duwamish ProjectsAllentown/Duwamish/Foster Point Projects and Expenditures 1989-2019 1989 Annexed into the City, took over Water District 25 and Fire District 1 1993 King County Metro Sewer Capacity line 1994 EMW Water, served fire flow and water pressure in Allentown 1996 Allentown Water/Sewer/SWM Sewer Phase I 1996 Tukwila Community Center built 1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S 1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place 5 1998 1998 Small Drainage Project Site 5 - 43rd Ave S 1999 1999 Small Drainage Project Site 3 - 5 129th St 2001 Duwamish Improvements Water & SWM Included sidewalks and No Parking, PWTF loan 2002 to 2021 (Valley View spent $1,047,148.70 for a total of $2,115,580.63) 2005 2005 Small Drainage Project Site 1- 45th Ave S 2007 2007 Small Drainage Project Site 2 - S 116th St 2007 2007 Small Drainage Project Site 5 - 47th Ave S 2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II Sidewalks on 42nd Ave S and guardrail on river 2009 Allentown Storm Water Pump Station 2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S. 2011 2010-11 Small Drainage Project Site 6 - 5 122nd St - Pipe Lining 2017 42nd Ave S Roadside Barriers (wood barrier along river) 2017 Overlay and Repair on S 124th St 2014-2016 BNSF Intermodal Access Study 2016-2018 S 119`h St Ped Bridge (repair failing girder tops & non-skid deck) 2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities 2003-2018 Duwamish Hill Preserve 2006-2018 Duwamish Gardens $ 7,500,000.00 W/S/SWM 96-WT01 $ 4,100,000.00 Buildings 500,000.00 Roads 20,000.00 Surface Water 40,000.00 Surface Water 20,000.00 Surface Water $ 1,068,431.93 W/S/SWM 01-WT01 60,000.00 Surface Water 100,000.00 Surface Water 150,000.00 Surface Water $ 2,274,384.47 Water 5,431,368.81 Sewer 01-SW02 1,071,541.38 Surface Water 01-DRO1 $ 8,777,294.66 $ 421,129.00 Surface Water $ 174,636.00 Surface Water $ 94,800.00 Surface Water $ 192,531.95 Roads 91310301 Roads $ 241,000.00 120,000.00 Bridges 50,000.00 Bridges $ 411,000.00 Subtotal $ 23,629,823.54 $ 3,673,915.33 Parks $ 5,611,661.02 Parks Total with Parks $ 32,915,399.89 Future 2020 BRAC grant will be applied for to replace existing 42nd Ave S/Allentown Bridge $ 15,750,000.00 90330109 90630102 W:\Shared Copy Only \GaiI\Allentown Projects 1989-2019 g1022119xls,