HomeMy WebLinkAboutTIC 2019-03-05 Item 4C - Handout Distributed at Meeting - Allentown-Duwamish ProjectsAllentown/Duwamish/Foster Point Projects and Expenditures 1989-2019
1989 Annexed into the City, took over Water District 25 and Fire District 1
1993 King County Metro Sewer Capacity line
1994 EMW Water, served fire flow and water pressure in Allentown
1996 Allentown Water/Sewer/SWM Sewer Phase I
1996 Tukwila Community Center built
1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S
1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place 5
1998 1998 Small Drainage Project Site 5 - 43rd Ave S
1999 1999 Small Drainage Project Site 3 - 5 129th St
2001 Duwamish Improvements Water & SWM
Included sidewalks and No Parking, PWTF loan 2002 to 2021
(Valley View spent $1,047,148.70 for a total of $2,115,580.63)
2005 2005 Small Drainage Project Site 1- 45th Ave S
2007 2007 Small Drainage Project Site 2 - S 116th St
2007 2007 Small Drainage Project Site 5 - 47th Ave S
2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II
Sidewalks on 42nd Ave S and guardrail on river
2009 Allentown Storm Water Pump Station
2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S.
2011 2010-11 Small Drainage Project Site 6 - 5 122nd St - Pipe Lining
2017 42nd Ave S Roadside Barriers (wood barrier along river)
2017 Overlay and Repair on S 124th St
2014-2016 BNSF Intermodal Access Study
2016-2018 S 119`h St Ped Bridge (repair failing girder tops & non-skid deck)
2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities
2003-2018 Duwamish Hill Preserve
2006-2018 Duwamish Gardens
$ 7,500,000.00 W/S/SWM 96-WT01
$ 4,100,000.00 Buildings
500,000.00 Roads
20,000.00 Surface Water
40,000.00 Surface Water
20,000.00 Surface Water
$ 1,068,431.93 W/S/SWM 01-WT01
60,000.00 Surface Water
100,000.00 Surface Water
150,000.00 Surface Water
$ 2,274,384.47 Water
5,431,368.81 Sewer 01-SW02
1,071,541.38 Surface Water 01-DRO1
$ 8,777,294.66
$ 421,129.00 Surface Water
$ 174,636.00 Surface Water
$ 94,800.00 Surface Water
$ 192,531.95 Roads 91310301
Roads
$ 241,000.00
120,000.00 Bridges
50,000.00 Bridges
$ 411,000.00
Subtotal $ 23,629,823.54
$ 3,673,915.33 Parks
$ 5,611,661.02 Parks
Total with Parks $ 32,915,399.89
Future
2020 BRAC grant will be applied for to replace existing 42nd Ave S/Allentown Bridge $ 15,750,000.00
90330109
90630102
W:\Shared Copy Only \GaiI\Allentown Projects 1989-2019 g1022119xls,