HomeMy WebLinkAboutTIC 2019-03-19 Item 2D - Update - BNSF Intermodal Facility Access Project: Schedule and Next StepsCity of Tukwila Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director BY: Hari Ponnekanti, City Engineer CC: Mayor Allan Ekberg DATE: March 15, 2019 SUBJECT: BNSF Intermodal Facility Access Prolect Project No. 99510409 Schedule Update and next steps ISSUE Provide an update on the Burlington Northern Santa Fe (BNSF) Intermodal Access Study. BACKGROUND Burlington Northern Santa Fe (BNSF) owns an Intermodal facility that transports containers from trucks to railroad and vice versa. This facility is located within Tukwila city limits in the Allentown community. The intermodal facility is adjacent to 1-5 and just south of King County International Airport, also known as Boeing Field. BNSF calls this facility the South Seattle Intermodal Facility. The City of Tukwila and BNSF jointly funded an access study to determine a potential new route for truck traffic into the intermodal yard. David Evans Associates began the study in March of 2015. The BNSF access study produced a draft report in November 2016. As part of the study, open houses were held, and community input was collected. The following five alternatives were studied; 1. Airport Way S 4. Gateway Drive - north leg 2. South 112th Street 5. 48th Ave S Bridge 3. South 124th Street The draft study indicated that the 48th Ave S Bridge was the preferred alternative. The study remains in draft form. ANALYSIS The findings from the draft study were provided to the City Council in December 2016 after the first round of open houses and community outreach. The alternatives were presented at the August 17, 2017 Open House, with the preferred alternative identified as 48th Ave South Bridge. The next step was planned to bring these alternatives and funding options to the City Council in the fall of 2017. The original next steps for the BNSF Intermodal Study included these options: - Review and finalize the Preferred Alternative and seek Council adoption - Identify and provide funding for preliminary engineering and design of preferred alternative - Continue public outreach and continue SEPA process The draft access study preferred alternative has not been finalized due to new information regarding the 42nd Ave S/Allentown Bridge, which became the top priority for the neighborhood. This bridge provides one of only three access points into the Allentown neighborhood, and is the sole access point for trucks traveling to and from the BNSF Intermodal yard. In August 2017, the City received the 42nd Ave S Bridge Structural Assessment, by TranTech Engineering LLC, which determined that, "...the existing bridge is both structurally deficient and functionally obsolete." The deficiency rating has resulted in the City being forced to post speed and load restrictions in March 2018. 109 IN: 1PW Eng\OTHER\Cyndy Knighton\TIC Agenda Items \3-19-191BNSF\InfoMemoTIC031519BNSFupdateHP.docx Informational Memo Page 2 The City met with BNSF and informed them of these changes. A grant to replace the existing 42nd Ave S Bridge was applied for through the federal Bridge Replacement Advisory Committee (BRAC) in September 2017 but was unsuccessful. The City's adopted the 2019-2024 Capital Improvement Program, which includes funding for the 42nd Ave S Bridge Replacement Project and the City is currently applying for another BRAC grant in 2019. The 2019 CIP does not include funding for the BNSF Intermodal Facility Access Project until after six years. BNSF informed the City that if the 42nd Ave S/Allentown Bridge failed they would have no good alternative route. BNSF also stated that their trucks cannot negotiate the 90-degree turn along the river near Fire Station 53 and that access up the bridge into Skyway and the Martin Luther King Jr Way corridor is already heavily congested. In addition, the steep grade could pose difficulties for large trucks carrying heavy loads. Also of note, the City has been seeking funds for the Strander Blvd Extension Phase 3 for the last 15 years and those funds have still not materialized for construction. As such, seeking funding to replace an existing failing bridge took priority over the new access point, which would likely compete with the Strander Blvd Project for funds. TIMELINE/ROADMAP - BNSF Intermodal Facility Access Study start date — 3/20/15 - Open Houses — March & August 2016 - BNSF Intermodal Facility Access Study — Draft Alternative Screening Analysis Report 11/28/16 - Open House — Preferred Alternative Outreach — 8/17/17 - 42nd Ave South Bridge Structural Assessment, August 2017 City implements Structural Assessment & begins six-month review of 42nd Ave S Bridge, 2017 City receives notification that 42nd Ave S Bridge did not receive BRAC funding — Dec. 2017 Council adopts Ordinance No. 2566 restricting speeds on 42nd Ave S Bridge — 2/20/18 City Applies for BRAC grant funding for 42nd Ave S Bridge Replacement — March 2019 - GNCC Meeting and Tour of the BNSF South Seattle Intermodal Facility — 3/27/19 BNSF has scheduled a Greater Northern Corridor Coalition (GNCC) meeting for March 27, 2019 and will be offering tours of the BNSF South Seattle Intermodal Facility at 10:00 a.m. for the GNCC meeting attendees. BNSF explains the GNCC as: "The Great Northern Corridor Coalition is a regional cooperative comprised of eight states, numerous ports, BNSF Railway, and other interested stakeholders along the Corridor. The states of Illinois, Wisconsin, Minnesota, North Dakota, Montana, Idaho, Oregon, and Washington have been collaborating for several years to promote region -wide cooperation, in transportation planning and shared infrastructure investment. The Coalition's primary purpose is to promote regional cooperation, planning, and shared project implementation for programs and projects. Its objective, to improve multimodal transportation system management and operations along the corridor, exactly matches the purpose of the Multimodal Corridor Operations and Management (MCOM) Program." Coalition members are largely made up of state transportation departments in the states listed above, as well as various Ports located within those states. The only municipal participant is the town of Connell, Washington. It is the understanding of City staff that it is BNSF's goal to have the preferred alternative, the 48th Ave S Bridge, included on the list of necessary infrastructure investments that the GNCC is developing. Councilmembers are invited to attend the tour on March 27, 2019 and should contact Hari Ponnekanti, Tukwila's Deputy Public Works Director/City Engineer to RSVP. 110 W:APW EngVOTHER VCyndy Knighton\TIC Agenda Items \3-19-19VBNSF\InfoMemoTIC031519BNSFupdateHP.docx Informational Memo Page 3 FINANCIAL IMPACT Project costs for the preferred alternative, 48th Ave S Bridge, are unknown until preliminary engineering is complete. Best available estimates developed in 2017 were approximately $20 million (adding 30% cost growth per year into 2019, the estimate would be $34 million). In general, there are not many outside funding sources (i.e. federal, state funding) for new bridges such as the potential 48th Ave S Bridge Project. RECOMMENDATION Information only. ATTACHMENTS • 42nd Ave S Bridge Structural Assessment, August 2017 • Draft BNSF Intermodal Facility Access Study — Excerpts - Draft Alternative Screening Analysis (full draft report is available upon request) • Draft BNSF Intermodal Facility Access Study — Preferred Alternative Outreach Summary August 2017 Open House Summary • Ordinance No. 2566 — Speed Restrictions on 42nd Ave S Bridge • Great Northern Corridor Coalition Overview and list of partners 111 W:APW EngVOTHER VCyndy Knighton\TIC Agenda Items \3-19-19VBNSF\InfoMemoTIC03 1519BNSFupdateHP.docx The City of Tukwila Public Works August 2017 42nd Avenue South Bridge Structural Assessment ;t it ■ ■ TRANTECH Ungincv. ring LLC 112 Executive Summary The 42nd Avenue South Bridge is a 3-span 280-foot-long bridge built in 1949. The bridge is composed of a 220-foot-long fracture critical steel thru-truss main span with 30-foot- long concrete T-beam approach spans at each end. The existing bridge is both Structurally Deficient and Functionally Obsolete. A three-tier structure assessment has revealed that there are critical structural elements within the 42nd Ave bridge structure that have deteriorated into poor conditions. The examples of these are the short plinth columns at the bridge approaches, truss gusset plates, and main span deck structure. The bridge is currently nearing the end of its service life and requires strengthening, repainting, deck work, a seismic retrofit, and scour protection, if it were to remain in service. The cost of this work would be prohibitively expensive and would exceed the cost of a new bridge. The proposed new structure will have the added advantages of being a redundant concrete bridge with very low life cycle maintenance costs to the Bridge Program or to the City of Tukwila. A cost estimate for the proposed replacement bridge is presented in Appendix C. Furthermore, it is recommended that until the bridge can be replaced, the interim inspection frequency remains at a six-month interval with special attention being paid to the critical structural elements identified in the structural analysis presented here. A monitoring plan has been developed and will be implemented by the City of Tukwila until bridge funding can be secured and the bridge can be replaced. 113 Table of Contents Page 1. Introduction 1 2. Structural Assessment 2.1 Tier 1 - Bridge Inspections 2 2.2 Tier 2 - Structural Analysis, Piers 2 and 3 Column Damage 3 2.3 Tier 3 - Updated Load Rating Analysis 4 3. Concluding Remarks 4 APPENDICES A Current Inspection Report B Current Load Rating Summary C Bridge Replacement Estimate 114 routes into 1. INTRODUCTION The 42nd Avenue South Bridge is a 3-span 280-foot-long bridge built in 1949. The bridge is composed of a 220-foot-long fracture critical steel thru-truss main span with 30-foot- long concrete T-beam approach spans at each end. The existing bridge is both Structurally Deficient and Functionally Obsolete. The plans for the existing bridge are available under the "Records/Plans" tab in the WSDOT Bridge Inspection Application. The bridge is located within the City of Tukwila on a sharp bend of the Duwamish River that produces turbulent high velocity flows at the truss abutments. These frequent flows have caused scour damage at the bridge abutments and at the north approach roadway. Because the bridge foundation depths are unknown and there is active scour, the City has implemented a scour Plan of Action (POA) for high flow events. Additionally, existing riprap at Pier 2 is either washing away or is falling into a scour hole developing on the river side of the pier. The bridge is the only access for the BNSF intermodal yard located at the end of South 124th Street as other the yard prohibit trucks. As a result, the bridge has been subjected to an unusually high percentage of truck traffic constantly crossing the bridge around the clock. The City of Tukwila has struggled for years to maintain the bridge. Maintenance projects includ a major paint project in the mid-1990's and a significant project to rebuild the north bridge approach after erosion, caused by scour, threatened the existing roadway. This problem is currently resurfacing even after the City installed a sheet pile wall to protect the approach. A dramatic illustration is the sinking of the north approach guardrail posts with a section of the rail currently at almost ground level. There is also the ongoing problem of keeping the bridge clean enough to perform valid inspections. Cleaning the bridge adds significant cost to the already expensive fracture critical inspections as well as adding equipment scheduling complications. In addition to the substructure problems, the deck and floor system are in distress as evidenced by significant loud floor system creaking and deck panel banging under traffic. These problems have been reported by bridge inspectors and Tukwila 1 115 Maintenance for years. These noises cannot be associated with specific damage at this point but are worrisome in a fracture critical bridge subjected to extreme fatigue stresses by the heavy truck traffic. The bridge is currently nearing the end of its service life and would require strengthening, repainting, deck work, a seismic retrofit, and scour protection, if it were to remain in service. The cost of this work would be prohibitively expensive and would exceed the cost of a new bridge. The proposed new structure will have the added advantage of being a redundant concrete bridge with very low life cycle maintenance costs to the Bridge Program and to the City of Tukwila. 2. STRUCTURAL ASSESSMENT The structural assessment activities performed as part of this study have a three-tier approach that is described in detail in the following sections: 2.1 Tier 1 - Bridge Inspections The 42nd Avenue South Bridge has been inspected on an increased frequency (a reduced frequency duration) since 2014. The frequency change started at 12 months and is now set at a six-month interval for Interim Inspections. These inspections focused on monitoring the damaged short concrete plinth columns supporting the approach span girder bearings at piers 2 and 3 and bridge gusset plates. Since 2014, the bridge has also undergone several in-depth and routine bridge inspections with the most recent being in spring of 2017. The observations and data obtained from these inspections has been utilized in a new comprehensive load rating per WSDOT and AASHTO recommended Load Factor Rating requirements that includes gusset plate and Emergency Vehicle (EV) ratings. The new load rating is described in further detail in the following sections. The in-depth and interim inspections, some of which were performed with UBIT special access and after bridge cleaning to ensure a valid inspection, indicate that approximately one third of the truss structure is now in BMS Condition State 3 and that the Substructure Overall Condition rating is at a 4-code because of critical damage to the concrete plinth columns at Piers 2 and 3. Please see Appendix A for the latest Inspection Report. The resulting Sufficiency Rating has dropped in steps as the inspection and analysis has progressed, reaching its current level of 7.56 SD. The new load rating indicates that posting of the bridge for legal loads, single hauling vehicles, and emergency vehicles is necessary. The City is currently implementing the NBIS load posting requirements. 2 116 2.2 Tier 2 - Structural Assessment — Piers 2 and 3 Column Damages The City of Tukwila has initiated a structural evaluation of the short concrete approach span, girder support columns at Piers 2 and 3. The deterioration of these columns was listed as one of the main reasons for the reduction of the Substructure Overall Code to 4 (i.e., Poor Condition) as reported in the 2015 bridge inspection report. This engineering analysis is supporting information to justify the request for bridge replacement funding from the WSDOT administered Local Bridge Program. The results of the structural analyses are summarized below. Eight short plinth columns support the concrete T-beams of approach Spans 1 and 3. The girders sit on a rocker bearing installed on top of each plinth. These bearings are completely frozen by pack rust and deterioration. In addition, the rocker bearings for the truss span at Pier 2 appear have been frozen or locked in the expansion direction for years. Each column has six number seven vertical shear friction bars at their interface with the pier wall. First, the plinth columns were analyzed for temperature and vehicular breaking force induced stresses. These results showed that the demand forces are not large enough to create the observed damage. Next, seismic forces were analyzed and were shown to be large enough to yield the interface of the short columns and the piers . wall as the forces are transferred through the , semi rigid link caused by the frozen _ bearings. This condition is accentuated at the obtuse northwest corner of the Pier 3). The existing bridge design, which includes an extreme skew of 38°, puts these columns at additional risk from seismic events as well as from normal temperature and traffic forces as torque forces are developed and added to the high shear forces. The interface cracking has been documented since 2001 (upper photo) and the cracks are currently opening and starting to spall. In addition, there has been documented evidence for many years of the deterioration of the reinforcing steel as evidenced by rusty leaching. These problems may have been initiated during the April 29, 1965 South Sound Earthquake and were likely compounded by the February 28, 2001 Nisqually earthquake. However, the damage is aggravated daily by the constant truck traffic and seasonally due to normal temperature corner (i.e. Column Plinth 3A at 3 117 forces. This constant cyclical bombardment of Column 3A make it a failure risk for Span 3. Since the rocker bearings located on the plinths are all completely frozen, there is a semi -rigid link allowing these high magnitude forces to be transmitted through Span 3 to the North Abutment, Pier 4. Again, due to the bridge's large skew, a concentration of force is toward the northwest side of the abutment as illustrated by the damage at this location. This concentration of force may play a role in the continued settlement issues of the north bridge approach roadway at the steel sheet pile wall repair mentioned above. 2.3 Tier 3 - Updated Load Rating Analysis A gusset plate load rating update was performed in November 2014 that did not consider the coding changes made during the condition assessments performed in the Spring of 2015. A new comprehensive Load Rating Report was completed in August 2017 as part of the funding analysis as well as to evaluate the bridge for emergency vehicles. The new load rating indicates that the deck and gusset plates have ratings that are below 1.0 with respect to the legal trucks and that the gusset plates control. TranTech has ranked the gusset plates by their criticality and has identified the failure mechanism of each plate. This information will be used to focus the gusset plate inspection during future interim and routine bridge inspections. The rating outcome has further reduced the bridge's capacity and the resulting Sufficiency Rating. A copy of the Summary Sheet from the new load rating is attached in Appendix B. 3. CONCLUDING REMARKS A three-tier structure assessment has revealed that there are critical structural elements of the 42nd Ave bridge structure that have deteriorated to poor conditions. Examples are the short columns at the bridge approaches, truss gusset plates, and main span deck structure. Rehabilitation of this structure would be prohibitively expensive and a bridge replacement is recommended. A cost estimate for this bridge replacement is presented in Appendix C. Furthermore, it is recommended that until the bridge can be replaced, the interim inspection frequency remains at a six-month interval with special attention being paid to the critical structural elements identified in the structural analysis. A monitoring plan has been developed and will be implemented by the City of Tukwila until bridge funding can be secured and the bridge can be replaced. 4 118 APPENDIX A I Current Inspection Report TRANTECH IEnginPc ring LLC 119 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 1 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Inspector's Signature GDG Cert # G0014 Cert Exp Date 5/12/2021 Co -Inspector's Signature Inspections Performed: 2 — Structural Eval (1657) 27 23 Operating Tons (1552) 2 No Utilities (2675) Freq Hrs Date Rep Type 2 Deck Geometry (1658) 0.77 0.65 Op RF (1553) 1 Bridge Rails (1684) 12 6.0 4/26/2017 Routine — 9 Underclearance (1659) 16 14 Inventory Tons (1555) 0 Transition (1685) 24 6.0 4/26/2017 Fract Crit — 8 Alignment (1661) 0.46 0.39 Inv RF (1556) 0 Guardrails (1686) UW 6 5 Deck Overall (1663) 5 3 Operating Level (1660) 0 Terminals (1687) Special — —, 5 Superstructure (1671) A Open/Closed (1293) 0.00 Asphalt Depth (2610) 24 1.0 2/26/2016 Interim — — 4 Substructure (1676) 8 Waterway (1662) 6.00 Design Curb Ht (2611) ^� — UWI 9 Culvert (1678) U Scour (1680) 40.0 Bridge Rail Ht (2612) Damage 5 Chan/Protection (1677) Soundings Flag (2693) 1949 Year Built (1332) — Safety N Pier/Abut/Prot (1679) N Revise Rating (2688) 0 Year Rebuilt (1336) — Short Span — 4 Drain Cond (7664) Photos Flag (2691) Y Subj to NBIS (2614) In Depth — — 1 Drain Status (7665) Measure Clrnc (2694) Alpha Span Type: Geometric — M Deck Scaling (7666) 6 Sdwk Cond (7673) STrus — — 10 Scaling Pct (7667) 5 Paint Cond (7674) 7 Deck Rutting (7669) 6 Approach Cond (7681) 7 i,— Exposed Rebar (7670) 7 ~ Retaining Wall (7682) Sufficiency Rating 7.56 SD 6 Curb Cond (7672) 9 Pier Prot (7683) High Risk BMS Elements Element Element Description Total Units State 1 State 2 State 3 State 4 12 Concrete Deck 6,816 SF 6,811 0 5 0 35 Concrete Deck Soffit 6,816 SF 6,812 0 4 0 110 Concrete Girder 256 LF 256 0 0 0 113 Steel Stringer 1,100 LF 1,050 0 50 0 126 Steel Thru Truss 440 LF 286 0 154 0 133 Truss Gusset Plates 40 EA 20 0 20 0 152 Steel Floor Beam 332 LF 282 50 0 0 205 Concrete Pile/Column 18 EA 10 0 8 0 212 Concrete Submerged Pier Wall 74 LF 71 3 0 0 215 Concrete Abutment 76 LF 66 0 10 0 234 Concrete Pier Cap/Crossbeam 149 LF 149 0 0 0 266 Concrete Sidewalk & Supports 1,100 SF 1,100 0 0 0 311 Moveable Bearing (roller, sliding, etc) 10 EA 2 0 0 8 313 Fixed Bearing 2 EA 2 0 0 0 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 2 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post BMS Elements (Continued) Element Element Description Total Units State 1 State 2 State 3 State 4 330 Metal Bridge Railing 568 LF 456 100 12 0 340 Metal Pedestrian Railing 284 LF 284 0 0 0 357 Pack Rust 50 EA 46 4 0 0 361 Scour 4 EA 2 2 0 0 362 (Discontinued) Impact Damage 1 EA 1 0 0 0 402 Open Concrete Joint 216 LF 0 0 216 0 408 Steel Sliding Plate 48 LF 0 0 48 0 901 Red Lead Alkyd Paint System 17,000 SF 11,800 4,000 1,000 200 Notes 0 ORIENTATION Beginning of bridge at south abutment (nearest traffic signal at Interurban Ave). 1 FRACTURE CRITICAL INSPECTION This includes visual inspection of truss tension members, bottom chords, floor beams, diagonal and vertical members. See Fracture Critical Report in Files Tab. 3 UBIT 60 UBIT can deploy through both sides of truss. However, the bridge deck is narrow with low portals and sways. Suggest closing the bridge for next UBIT inspection due to the bouncing motion of the UBIT caused by the high volume of truck traffic on the bridge. Also added congestion to main arterial Interurban Ave S from the in inadequate approach distance on 42nd Ave S to south portal of the bridge. TRANSIENTS Activity under Span 3. Garbage accumulated, litter and needles on top of cap 3. 11 EV2 RF = 0.62 EV3RF=0.42 LOAD RATING Gusset Plate at L2U1-East controls. A new load rating has been performed (August 2017) and the bridge requires load posting for AASHTO 2 and 3, SHV 5,6,&7, and EV 2 and 3. The City is in the process of implementing the posting requirements. 12 CONCRETE DECK (SURFACE) Open joints at floorbeam. Exposed aggregate in wheel lines and slight rutting. Moderate scaling, pop -outs and mudball voids scattered throughout surface. Longitudinal cracks concentrated near ends of bridge, some porosity. North bound lane: 4"-6" pavement spall. South bound lane: 6" loose pavement near double yellow line. 35 CONCRETE DECK SOFFIT Diagonal hairline leaching cracks near steel stringers. Deck fillets are spalled in several locations along top flanges of floorbeams. Many short exposed rebar in edge overhangs due to lack of cover and poor consolidation of concrete. Scattered hairline transverse rusty leaching cracks in soffit. Moderate sized pockets of poor consolidation - spans 2-4 thru 2-7. 110 CONCRETE GIRDER Four lines of CIP concrete T-beams in Spans 1 and 3. Webs have hairline vertical and diagonal cracks. 1A - Vertical crack near Pier 2 End diaphragm @ Pier 3 - hairline vertical leaching cracks Span 3 griders are coverd with soot 113 STEEL STRINGER Five lines of stringers (5x220=1100 LF). Square cope at connection to floorbeams, no cracks observed. Rusty top flanges. Mud staining on outside stringers. Rust blisters on a few copes. 121 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 3 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Notes (Continued) 126 STEEL THRU TRUSS GENERAL: See 2017 FCR for detail on fracture critical members. Lower panel points were dry cleaned prior to inspection. Upper panel points and those connecting members are covered in guano droppings, active nests in upper chords and owls nest at L4E. Debris building up in bottom chord. See note #133 Gusset Plates PACK RUST: Pack rust is starting to develop in all built-up members but hasn't reached the point of popping rivet heads. - Up to 1/8" pack rust in seams of tension and compression diagonals. - Pack rust between bottom lateral gusset plates and bottom chord has caused bulging up to 3/8" at most chord joints. - Pack rust between interior cover plates and bottom chord channel has caused warping of cover plate up to 1/4". - Bottom laterals have seam rust and pack rust up to 3/8" along tops of members. - Bottom chords two channel beams from L2 to L8 E&W addition plates riveted to webs, pack rust forming between channel webs and plates distorting up to 1/8" between rivets. - Upper chords seam rust along channel/plate seams throughout. PORTALS & SWAYS: SOUTH PORTAL, U1W-U2E: High load traffic damage to south portal and sway frame. North flange of south portal is bent north 3" over 2 ft length. Bottom flange of sway is pushed up 2" over 8" length. Top flange of sway has a sine -wave shaped crimp, 1" over 7" length. Center of sway is bent 1'-0" to north. -SWAY M1W-M2E: Impact damage to sway, pushed 5" to north with flanges buckled. SWAY M2W-M3E: Minor impact damage. U5W: Paint blister and minor pack rust along edge of top chord. L7W: 2 rusty rivet heads on bottom plate. L7-U7E: Paint failure at SW. L7-L8W: Pack rust on lower chord. L8W: Pack rust 1/8" on bottom plate. L9W-U9W: Pitting up to 1/8" near top of bottom gusset plate. L9W: Gusset plate 7/16" thick. Pack rust 1/8" on bottom plate and 1/4" V.P. 133 STEEL GUSSET PLATES 20 gusset plates per truss line. High bird activity. Bottom lateral gusset plates at bottom chord have pack rust causing bulging up to 3/8" at most chord joints. Interior cover plates at bottom chord channel have pack rust causing warping of cover plate up to 1/4". Interior rivet heads have blistered paint or lack paint, many are heavily rusted. 5LE bottom plate has two deformed rivet heads. 152 STEEL FLOOR BEAM Two skewed end floorbeams and ten transverse floorbeams (2x33.6+10x26.5=332 LF). Dirt and mud at connections to truss. Laminar rust along top flange with minor section loss (<2%). 205 CONCRETE PILE Five concrete piles each at Piers 1 and 4, with cap and backwall. Rough concrete and a few hairline cracks at cap interface. 1C: 10" spall with exposed rebar. 4A, 4B, 4C: Hairline horizontal cracks at about 1 ft. spacing. CONCRETE COLUMNS: 28" tall concrete columns support the sliding plate bearings at Piers 2 & 3. 2A: Horizontal crack at cap interface, exposed rusty rebar, corners are spalled off, NW corner of bearing is unsupported. 2B: Horizontal crack at cap interface, exposed rusty rebar, large spalls in NW corner of bearing is unsupported. 2C: Horizontal crack at cap interface, exposed 4" section of rusty rebar 2D: Hairline crack at cap interface, SE corner is spalled off (18" high by 4" deep) 3A: Horizontal cracks at cap interface 3B: Horizontal cracks at cap interface 3C: 12" of horizontal rebar exposed on south side 3D: Hairline crack at cap interface 212 CONCRETE SUBMERGED PIER WALL Hairline vertical cracks in pier walls. Many 1-1/2" shallow form tie holes in both walls. Pier 2: water abrasion along north face. Pier 3: Three 12" x 12" x 1" deep areas of abrasion in south face. 215 CONCRETE ABUTMENT Both backwalls have a few hairline vertical cracks throughout. Graffiti at face of abutment. Pier 4: gap under backwall from pile 4A through 4D, minor erosion/sloughing. NW wingwall: open diagonal crack above top of cap to ground line (1.75" gap at top) with 2 ft x 8" x 6" deep spall with 5" exposed rebar. NE wingwall: 8" x 6" x 3" deep spall. Two steel plates attached on the east side of north abutment wall at the NE corner bridge rail. MONITOR NOTES 2/25/2016 Pier 2 concrete columns - no change noted. Pier 3 concrete columns - Heavy graffiti on north face of column of all columns and pier cap. Change noted in column 3A; north face - cracks at base along interface with pier cap, full width. Cracks are narrow to open, some new chips and small spalls along crack line. Column is tilted to the north 1.5 degrees. Abutment 4 - west corner at wingwall interface. 2016: Gap is 1.75" at top horizontal face. Concrete piles with transverse cracks - no change 122 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date; 7/27/2017 Program Mgr: Roman G. Peralta Page 4 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Notes (Continued) 234 CONCRETE PIER CAP Hairline vertical cracks in perimeter, tops are covered with mud, moss and transient debris. Pier 2 - spall with exposed rebar NW, north & SE face. Pier-3. Caps have open form tie holes. Pier 4 : 4A, 4B & 4C top of beam cap spall across width of stringer. 266 CONCRETE SIDEWALK & SUPPORTS Surface: Transverse cracks at panel points, open up to 1/8", small spalls starting to form. ACP at south approach to sidewalk is steep (Repair #12316). Vegetation growing along edge next to east truss line. Soffit: Many hairline transverse cracks leaching on underside. Form anchors still in place on soffit along channel web. Supports: Steel knee braces support sidewalk in Span 2. Top clips at truss are separating due to pack rust. 311 MOVEABLE BEARING Rocker Bearings- Truss: Both bearings 2-1A & 2-1 B are tipped 5° expanded, temperature was 44° F. Rocker Bearings - approach spans. Eight skewed steel bearings, each bearing has two hing bars. Bearings are mounted on concrete plinths at Piers 2 and 3. Pack rust between sole plates and hing bars on all bearings. Hing bars at 2A, 2D, 3-1A and 3-1 D, are bulging up to 1/8" from pack rust, all eight bearings are frozen. SEE NOTE 1676 SUBSTRUCTURE - for details on the concrete plinths. 313 FIXED BEARING Two pinned shoe bearings at Pier 3, minor rust on edges. 330 METAL BRIDGE RAILING Retrofitted thrie beam has minor traffic scrapes throughout. Rail has loose connection at U5L5 in east truss and rattles under traffic. Curbs cracked open 1/8" over truss floorbeams. Tack welds broken on west rail, widespread. 340 METAL PEDESTRIAN RAILING Rail panel section loose at bottom tube connection to post, east sidewalk north of centerline of the river, between L4 & L5. 357 PACK RUST Seam rust and pack rust - most 1/4" or less on built-up members throughout truss. 361 SCOUR, FIELD Pier 2 is located on the outside of a sharp meander bend in the Duwamish River. Riprap along Pier 2 has a scour scallop, about 8 to 10 feet in diameter at the center of pier, two relic piles are exposed in the scalloped area. During inspection flow increased velocity with the changing tide. The main thalweg flow is near the left bank at Pier 2; back eddies were noted along the center and downstream face of Pier 2. Riprap is scattered and missing along the downstream face of Pier 3. Gravel bar visible upstream of pier 3, right bank to mid channel. Riprap has scatted areas upstream and downstream along both banks. 2015 soundings show 2.5' deepening near Pier 2. Little change to gravel bar forming near Pier 3. SOUNDINGS: are taken from upstream rail at truss panel points: Year LO L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 2015 18.5 30.5 41.5 44.5 40.5 36.0 29.7 28.5 26.5 23.5 16.0 2014 _ 19.0 30.5 39.0 42.0 39.5 34.0 28.5 28.0 26.5 23.5 15.0 2013 18.8 30.2 41.0 42.0 42.0 35.0 30.0 27.5 26.0 23.8 _ 16.0 2007 18.5 30.5 40.0 43.5 43.0 37.5 31.0 28.5 27.0 25.5 15.0 Update soundings every two years or more often if lateral migration is suspected. Monitor riprap at low tide and low flow periods. 362 IMPACT DAMAGE Traffic impact damage to truss south portal and sway members. 402 JOINT FILLER Open joints over floorbeams; most of fabric fill is worn away, allowing mud and water to pump through onto floorbeam top flanges (Repair #12306). 123 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date. 7/27/2017 Program Mgr: Roman G. Peralta Page 5 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Notes (Continued) 408 STEEL SLIDING PLATE Joints are full of dirt. D-spalls and delaminations along edges of both joints. Water leaks through joint onto truss main piers. MEASUREMENTS: are taken at center line of each joint. YEAR TEMP TIME PIER 2 (WEST) PIER 3 (EAST) 2016 62° _ 09:00 1-0" 1-1/2" 2015 48° 09:20 7/8" 1-1/2" 2013 48° 11:00 15/16" 1-3/8" 2011 50° 15:30 15/16" 1-3/8" 2009 65° 10:00 1-0" 1-5/8" 2007 50° 08:00 1-1/2" 1-5/8" 2005 65° 10:00 1-0" 1-3/8" 901 RED LEAD ALKYD PAINT SYSTEM Top coat of paint on top chord has flaked off in many areas. There are a few rust spots where failed paint has exposed bare metal. Seam rust is bleeding through along edges of built-up members. Moss growth on some diagonal/vertical members. 1663 The Deck Overall code was downgraded based on deck and floor system deterioration. The deck panels are non -composite and are loose and banging on the floor system under traffic. In addition, the floor system is creaking and groaning under load. These problems are not revealing themselves in recordable damage but the loose deck panels and lack of continuity was taken into account in a new load rating update. 1676 SUBSTRUCTURE Code reduced to 4 due to condition of concrete plinths under rocker bearings at piers 2 and 3. Pier 2 plinth 2A, and 2B have open cracks at interface with pier cap. All plinths have large spalls with exposed rebar along edges, several are spalled under bearing plates. Pier 3 plinth 3A and 3B have open cracks at interface with pier cap. Several plinths have spalls with exposed rebar. Unknown pile tip elevation of piles supporting Piers 2 & 3. Channel thalweg is near pier 2, riprap is scattered. 1680 SCOUR , OFFICE Scour analysis done in 2014. Since pile tip elevations are not available, the scour code = "U". The channel is centered under L3-East and is slightly aggradating at piers 1, 2 and 3. Calculated contraction scour is 0.6 feet, local pier scour ranges between 6 feet and 13 feet depending on angle of attack. Plans indicate bottom of footing at -7.0, top of rail is estimated per plans at 28.0. 1685 TRANSITION Bridge rail transition at Pier 1 west side is missing approach guard rail. 1686 GUARDRAILS SE Traffic impact damage to approach rail flex beam. NW Approach rail is below standard height at settlement area, 18in to top of rail. 1687 TERMINAL Terminals not slotted. Attenuator is located at NE corner. 2675 NO. OF UTILITIES Two utilities are suspended from east edge under sidewalk: One 12" diameter steel waterline with mechanically restrained joints. One 6" diameter gas pipe. 2694 CLEARANCE Vertical clearance at portals and sway braces 3" from curb: East truss: E-MO - W-MO = 15'-3 1/8" E-M2 - W-M1 = 15'- 0 1/4" E-M3 - W-M2 = 15'-0" E-M4 - W-M3 = 15'-0" E-M5 - W-M4 = 15'-0 7/16" E-M6 - W-M5 = 15'-0 3/8" E-M7 - W-M6 = 15'-1 3/8" E-M8 - W-M7 = 15'-0 1/8" E-M9 - W-M8 = 15'-0 1/8" 7664 DRAINS Drains are plugged throughout. 124 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 6 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Notes (Continued) 7681 APPROACH ROADWAY Longitudinal and transverse cracking in ACP in both approaches. South approach - slight settlement. North approach - settlement at sheet pile wall and in southbound lane for 50 ft north of approach, longitudinal cracks and fault cracks around settled area, approximately 1" settlement. 7682 RETAINING WALL Sheet pile wall to retain NW approach fill, no defects noted. Repairs Repair No Pr R Repair Descriptions Noted Maint Verified 12306 1 B JOINTS SPAN 2: (MAH Revised 4/10/2015) Open Joints: Clean out open joints over floor beams thoroughly and fill with a flexible sealant, priority 1 due to corrosion at top flanges of floorbeams from leaking joints. 3/25/1998 12316 1 B SIDEWALK: North approach - rework the sliding plate expansion joint so it is smooth with sidewalk. Deck - patch spalls near panel points, seal open cracks. 4/12/2007 13469 1 B RAIL: SW transition is missing approach guard rail and terminal. SE guardrail is bent and deformed. NW guardrail has sunk down below acceptable standards. REPAIR - replace missing guard rail and terminal at SW corner, replace damaged rail at SE corner, reset NW rail and posts to bring rail up to standard height. 4/8/2013 13471 1 B PAINT: Paint has failed in many locations on top of top chords of truss. Pack rust is forming in seams of all built-up members. Moist dirt and pigeon guano are trapped in truss panel points and will cause premature paint failure. Algae growing on many members. REPAIR - Thoroughly pressure wash clean truss of all dirt/algae/guano, prepare surface, paint bridge to encapsulate pack rust and protect truss members. Add bird deterrent at all panel points, upper and lower chords. 4/8/2013 13473 1 B EXPANSION JOINT: Steel sliding plate expansion joints allows water and dirt to fall onto top of caps at Piers 2 and 3. The edges around the joints are chipped and spalled. REPAIR - Replace steel sliding plate expansion joints with either a strip seal with steel header or modular joint. 4/8/2013 13474 S S SCOUR: Current scour code is coded "5" which means that foundation is stable for calculated scour depths. Need copy of pile tip elevations from city for bridge file. 4/16/2013 125 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 Agency: TUKWILA CD Date: 7/27/2017 Program Mgr: Roman G. Peralta Page 7 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Repairs (Continued) Repair No Pr R Repair Descriptions Noted Maint Verified 13475 2 B STRUCTURAL SUBSTRUCTURE: (RPH Revised 4/8/13) Concrete columns supporting sliding bearings at Piers 2 and 3 have horizontal cracks at cap interlace, exposed rusty rebar, spalls and delaminations. Pier 2 - Cap has spall, with rusted rebar and open cracks up to .05mm. Pier 3 - heavily abraded at waterline. Pier 4 - columns 4A-C have horizontal cracks. Abutment backwall is undermining along west half. West wing wall has large open crack and spalls. REPAIRS: P2 and P3 bearing columns - recommend design seismic retrofit steel collar and construct around bearing columns, anchored to cap, then fill tight with epoxy. Pier 2 - cap clean exposed rebar and patch spalls, epoxy inject cracks. Pier 3 - clean and patch abraded areas of pier wall Pier 4 - FRP wrap columns 4 A-C. Reinforce west wingwall. Add quarryspall along abutment 4 and under span 3 to retain fill and discourage transient activity. 4/16/2013 13476 2 B SCOUR: (RPH Revised 7/22/2014) Small scour scallops in left bank armor in front of Pier 2. Riprap is sparse and scattered through mudbar in front of Pier 3. Monitor the downstream inside face of Pier 3 at low water. REPAIR - Replace missing riprap along banks and in front of piers. 4/17/2013 13478 1 B SWAY BRACES: Heat straighten south portal and sway E-M3/W--M2. Sway bracing measures 15'-0" three inches from curb. Vertical clearance signs are required for measured clearances less than or equal to 15'-3" Install warning signs at both portals with posted height 3" less than lowest measured clearance. Recommend raising portals and sways due to the high volume of truck traffic and existing damage to sway members. 4/10/2015 13479 2 B BEARINGS: Main span rocker bearings at pier 2 are frozen in expanded position, fixed bearing at pier 3 are offset. Clean and reset main span bearings. Approach span bearings - slide bearing at pier 2 and 3 are corroded - possibly frozen. Replace sliding plates with elastomeric dynamic isolation bearings. 4/10/2015 13480 2 B DECK SOFFIT - widespread honeycombed areas, spalls with exposed rebar east side of soffit. SURFACE - worn to aggregate, spalling along joints. Patches of light scaling. REPAIR: Chip any delamintaed concrete from exposed rebar, clean and seal exposed bar and patch spalls. Sack honeycombed areas throughout soffit. Shotblast deck surface, patch spalled areas and apply epoxy overlay. 4/10/2015 Inspections Performed and Resources Required Report Type Date Freq Has Insp CertNo Coinsp Routine 4/26/2017 12 6.0 ZZ G1414 TTT Fracture Critical 4/26/2017 24 6.0 ZZ G1414 TTT Resources Hours Min Pref Max Freq Date Need Date Override Notes Note UBIT 6.00 SDOT UBIT 60 USED 126 Status: Released CD Guid: 4305b7a6-8599-4765-87ce-c492bac836bd BRIDGE INSPECTION REPORT Printed On: 8/17/2017 CD Date: 7/27/2017 Agency: TUKWILA Program Mgr: Roman G. Peralta Page 8 of 8 Br. No. TUKWILA-14 SID 08109700 Carrying 42ND AVE SO Intersecting DUWAMISH RIVER Br. Name 42ND AVENUE SOUTH BR Route On 01037 Mile Post 1.04 Route Under Mile Post Inspections Performed and Resources Required (Continued) Report Type Flagging 6.00 Interim Resources Hours Special Equipment Equipment Resources UBIT Flagging Informational Hours 4.00 4.00 Date Freq Hrs lnsp CertNo Coinsp Note LOCAL AGENCY Flagging provided by City of Tukwila - contact Steve Carstens at 206-431-2446 2/26/2016 24 1.0 MAH G1103 BLR Inspect short concrete columns supporting bearings at piers 2 and 3. See Monitor Note 695 for details Min Pref Max Freq Date Need Date Override Notes Bring ladder to reach columns and bearings. 4/26/2017 24 6.0 ZZ G1414 TTT Min Pref Max Freq Date Need Date Override Notes 7/27/2017 GDG G0014 SDOT UBIT-60 USED Flagging provided by City of Tukwila - contact Steve Carstens 206-431-2446. Updated load rating information with 2017 rating results. Downgraded Deck Overall to account for loose deck panels and floor system noise under traffic. These issues have were noted in inspections since 2014 were not noted. This change was made with the concurrance of the previous bridge inspector. 127 L 1.0Z/LZ/L :ete0 Plea laluo0 PQ9E9oegZ61,o-eoL9-g9L17-66g9-9oLOS0Eb:p!n0 ele01opuo0 WSBIS Local Agency Inventory Report 0 t O a. U) C c I U) 0 w I!f W a. CU 4D Ial 122° 16' 49.00" Range 47° 29' 23.10" W O Twnshp Section N 0 .03 MI N OF INTERURBAN AV U County Cost Owner E z' Structure ID M N 0 TUKWILA-14 0 N N E E Sufficiency Rating: rn 2 N N c m Il ° 0 N N CO CO Median O v y -( z� o ` = v z O AO 2 Nay Ctl Code m 3 N LRHP N HAER O O NRHP w- �V O Z O OPC Q g o Temp — Para Z — 0 'E! Z Toll Co - 0 >a ,0 � o N Legg O Leg t °' r _.— O Z DUWAMISH RIVER N tat S Flared Z r+ Skew rn on 3 y co Co 0 co) 3 ° JO 0 M E� E3 i� on m z N� J N 0 N O rn S R Speed Limitl Detour N c v 0 c v m v =U� 0 N O N 0 NTN u O FLH STRAH BHS Z N O NHS m aat LL NBI Bridge O O Y on at E ern `'50 is 0 0 0 N O 0 N I-e 0 0 E z' at Service Level 0 0 Hwy Class N On Under rn N O U S S 0 0 5 v w Fed Aid Project No Border Structure ID Border Pct Border State Cd O s- -cF c � mo 2 810 ii c NFU Od E off za oO m E < N E c 1O Z�m =�v f rn� O ro no O N ro a O N N 0 O CO 0 0 N d m Prop Imp } pi Cost Calc S a ri and W > N LO ID M U 0 m U N 3 s-o O� E� N J Work Meth Type Work Piers In Watr Strmbd Anabrn Strmbd Stablty Wtrwy Obstr Substr Stablty Strmbd Malrl Scour Hist Flood Control Flood Pln Inlr Water Type W ar 7 o 0 M • �a 3a a 0 a SHV a � SHV 6 SHV w 6 0 m 0 co 0 co Co 0 SHV 4 NRL Type 3-3 Type 3S2 O m 07 0 Type 3 J te Rw 0 0 U a 0) m rn rn E 0 N N t• 0( 10 at c a a c m E a Fracture Critical Underwater 128 APPENDIX B I Current Load Rating Summary TRANTECH 'Engineering LLC 129 BRIDGE RATING SUMMARY Bridge Name: 42ND AVENUE SOUTH BR Bridge Number: TUKWILA-14 Span Types: Steel Through Truss Bridge & Approach Slabs Bridge Length: 280' (220' Truss - 2x30' Approach Slab) Design Load: HS20-44 Rated By: VP Checked By: KN Date: 8/1/2017 rq Inspection Report Date 4/26/2017 Substructure Condition 4 Rating Method LFR Deck Condition 6 Overlay Thickness 0"/Truss & 2"/Approach Superstructure Condition 5 Truck RF (INV) RF (OPR) Controlling Point AASHTO-1 AASHTO-2 AASHTO-3 NRL OL-1 OL-2 NBI Rating 0.72 0.54 0.50 0.44 0.39 0.20 1.21 0.90 0.84 0.73 0.65 0.34 Yielding in member L2U1 Yielding in member L2U 1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 RF Controlling Point Inventory (HS-20) Operating (HS-20) 0.39 Yielding in member L2U1 0.65 Yielding in member L2U1 Remarks: Bridge requires posting. The single unit and FAST Act vehicles rating factors are: Operating Rating S U4 (GVW = 54 K) SU5 (GVW = 62 K) SU6 (GVW = 69.5 K) SU7 (GVW = 77.5 K) EV2 (GVW = 57.5 K) EV3 (GVW = 86.0 K) RF 1.11 0.98 0.88 0.81 0.62 0,42 Ton 29.97 30.38 30.58 31.39 17.83 18.06 Controlling Point Yielding in member L2U1 Yielding in member L2U I Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U1 Yielding in member L2U 1 130 APPENDIX C I Bridge Replacement Estimate TRANTECH LI 'Engineering LLC 131 City of Tukwila -Tukwila 14-42nd Avenue Bridge Replacement Cost Estimate August 1, 2017 285 foot simple span with angled bearings. STD. ITEM ITEM DESCRIPTION MEAS. UNIT QUANTITY UNIT PRICE COST 130 REMOVING ASPHALT CONCRETE SIDEWALK SY 10 $ 150 $ 1,500 170 REMOVING GUARDRAIL LF 40 $ 25 $ 1,000 1085 QUARRY SPALLS CY 500 $ 40 $ 20,000 4006 STRUCTURE EXCAVATION CLASS A INCL. HAUL CY 200 $ 150 $ 30,000 4010 SPECIAL EXCAVATION CY 100 $ 200 $ 20,000 4013 SHORING OR EXTRA EXCAVATION CLASS A - SHAFT LS 1 $ 25,000 $ 25,000 4007 SOIL EXCAVATION FOR SHAFT INCL HAUL CY 450 $ 450 $ 202,500 4008 FURNISH AND PLACE TEMP CASING FOR 60" DIAM SHAFT LF 600 $ 200 $ 120,000 FURNISH PERM CASING FOR 60" DIAM SHAFT LF 600 $ 450 $ 270,000 PLACING PERM CASING FOR 60" DIAM SHAFT EA 6 $ 3,000 $ 18,000 CONC CL 4000P FOR SHAFT CY 450 $ 300 $ 135,000 ST REINF BAR FOR SHAFT LBS 540,000 $ 1.70 $ 918,000 CSL ACCESS TUBES LF 600 $ 15 $ 9,000 REMOVING SHAFT OBSTRUCTIONS LS 1 $ 100,000 $ 100,000 REMOVING EXISTING BRIDGE SUPERSTRUCTURE LS 1 $ 300,000 $ 300,000 REMOVING EXISTING BRIDGE FOUNDATION LS 1 $ 300,000 $ 300,000 REMOVING EXISTING BRIDGE APPROACHES LS 1 $ 100,000 $ 100,000 TEMPORARY DETOUR BRIDGE LS 1 $ 1,250,000 $ 1,250,000 PRESTRESSED CONCRETE GIRDERS, WATER XING WITH PILING LF 1,750 $ 300 $ 525,000 BRIDGE APPROACH SLAB SY 280 $ 250 $ 70,000 REINFORCED CONC RETAINING WALL SF 2,000 $ 90 $ 180,000 CONC CL 4000 FOR BRIDGE CY 550 $ 575 $ 316,250 STRUCTURAL SURVEYING LS 1 $ 30,000 $ 30,000 4438 EXPANSION JOINT SYSTEM COMPRESSION SEAL - SUPERSTRUCT. LF 160 100 $ 16,000 4339 EXPANSION JOINT SYSTEM STRIP SEAL LF 160 800 $ 128,000 4410 BRIDGE RAILING LF 600 120 $ 72,000 6403 ESA LEAD DAYS 280 120 $ 33,600 6416 SEEDING, FERTILIZING, AND MULCHING LS 1 3,000 $ 3,000 6455 BIODEGRADABLE EROSION CONTROL BLANKET SY 250 4 $ 1,000 6470 STREET CLEANING HR 120 200 $ 24,000 6471 INLET PROTECTION EA 6 100 $ 600 6488 EROSION CONTROL AND WATER POLLUTION PREVENTION LS 1 2,000 $ 2,000 6630 HIGH VISIBILITY FENCE 1 LF 300 4 $ 1,200 6806 PAINT LINE LF - 5 $ - 6869 PEDESTRIAN TRAFFIC CONTROL LS 1 10,000 $ 10,000 6899 BRIDGE MOUNTED SIGN EA 2 1,000 $ _ 2,000 6903 TEMPORARY ILLUMINATION SYSTEM LS 1 10,000 $ 10,000 6913 PORTABLE TEMPORARY TRAFFIC CONTROL SIGNAL LS 1 30,000 $ 30,000 6971 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 100,000 $ 100,000 6974 TRAFFIC CONTROL SUPERVISOR LS 1 10,000 $ 10,000 6982 CONSTRUCTION SIGNS CLASS A SF 200 20 $ 4,000 7003 TYPE B PROGRESS SCHEDULE LS 1 5,000 $ 5,000 7052 BRIDGE END SIDEWALK RAMP EA _ 2 1,000 $ _ 2,000 7400 TRAINING HR 500 20 $ 10,000 7480 ROADSIDE CLEANUP EST 1 10,000 $ 10,000 7500 FIELD OFFICE BUILDING LS 1 20,000 $ 20,000 7570 HEALTH AND SAFETY PLAN LS 1 10,000 $ 10,000 7736 SPCC PLAN LS 1 2,000 $ 2,000 APPROACH ft15 % OF BRIDGE COST LS 1 817,148 $ 817,148 WILDLIFE MANAGEMENT LS 1 5,000 $ 5,000 SUBTOTAL $ 6,269,798 CONTINGENCY (15%) $ 940,470 MOBILIZATION $ 626,980 $ 626,980 RIGHT OF WAY COSTS $ 500,000 PRELIMINARY ENGINEERING (25% CONSTRUCTION COST) $ 1,567,449 CONSTRUCTION MANAGEMENT (18% CONSTRUCTION COST) $ 1,128,564 INFLATION FACTOR (5%/YEAR BASED ON PROJECTED AD DATE) $ 1,351,181 TOTAL $ 12,384,440 PE Costs (approximately 25% of Total) (Soils, Environmental, Desig Docuemnts, Plan Preparation, etc.) Right of Way Costs (Purchases, Reoloation and Construction Easement) Construction Costs (Environmental mitigation, approach costs (15%), structure costs, etc) Construction engineering (18%) contingency (15%) Mobilization (10%) Inflation Factor (5% per year based on project Ad Date below) Total Rehabilitatlan/Replacein-vnl/Preventative Maitnenance Project Costs $ 1,567,449 $ 500,000 $ 6,269,798 $ 1,128,564 $ 940,470 $ 626,980 $ 1,351,181 $ 12,384,440 132 BNSF RAILWAY INTERMODAL FACILITY ACCESS STUDY ALTERNATIVE SCREENING ANALYSIS REPORT Prepared for: City of Tukwila Public Works Department 6300 Southcenter Boulevard Tukwila, WA 98005 Prepared by: David Evans and Associates, Inc. 14432 SE Eastgate Way Bellevue, WA 98007 November 28, 2016 133 EXECUTIVE SUMMARY This Alternative Screening Analysis Report for the City of Tukwila was prepared by David Evans and Associates, Inc. to evaluate alternative access to the Burlington Northern Santa Fe (BNSF) Railway intermodal facility in Tukwila, Washington. This facility is also known as South Seattle Yard. BNSF Railway also sponsored this study, The existing access to the intermodal facility uses 42nd Avenue 5 and 5 124th Street. 5 124th Street is also a residential collector street serving the community of Allentown. Several residential homes with driveways are located on S 124th Street, as is the Tukwila Community Center which houses an aquatic center, meeting rooms, classes and activities for all ages, and playground and ball fields. This study did not create new alternatives but used alternatives that were developed by previous studies. A total of five alternatives were studied: Airport Way S, 5 112th Street, S 124th Street, Gateway Drive — North Leg, and 48th Avenue S. Several desktop researches were performed as part of this study. These researches included critical and sensitive areas, fish and wildlife, water resources, hazardous materials, geological and soils, and cultural and historical resources. A scored screening matrix was developed collaboratively between the City of Tukwila, BNSF Railway, and David Evans and Associates, Inc. The matrix was presented to Tukwila City Council as well as to the public for their feedback on the screening matrix criteria. The public was allowed to provide feedback via an on-line open house and an in -person open house. Representatives from Tukwila, BNSF Railway, and David Evans and Associates, Inc. met to score each alternative using a numerical scoring system from 1 to 9. The score for each criteria was added, and the lowest score is the preferred alternative. Based on the scoring result, the 48th Avenue 5 alternative is the preferred alternative. P:UITUlfA00000013108001NFa10870RoporisENSF!nlarmada!Access Screening summary_2011Y•1128.docx City of Tukwila 1 Alternative Screening Analysis BNSF Interrnodal Facility Access November 28, 2016 134 Figure 1 shows the project study area. The following provides a description for each alternative. Figure 1— Project Study Area 1 Agortawn Superego � �. I,Eniel ...,. r L JI. Rainier Valley • t sbatarr R /. - - 1 , 48th Avenue S ExtenOon Aftemative P:111TUKA000000,1810600,INF010670Rapats19NSF Intarmada!ACC855 Screening summary_2016-7128.diMx City of Tukwila BNSF Intermodal Facility Access 3 Alternative Screening Analysis November 28, 2016 135 Preferred Alternative Outreach Summary BNSF Access Study DRAFT — September 5, 2017 Background In 2016, the Tukwila community provided input on the screening criteria that was used to develop the BNSF Access Study report. The City identified a preferred alternative route and shared it with the community at an open house on August 17, 2017. Summary The City of Tukwila hosted an in -person open house at the Tukwila Community Center on August 17, 2017. The in -person house accompanied an online open house, which included the same information as the in -person open house and was available from August 15 - 28, 2017. Notifications The project team advertised the in -person and online open houses in early August 2017. Notifications included the following: • Postcard sent to the Allentown and Duwamish neighborhoods • Emails to the City's project listsery o Listsery includes community members, business and property owners, other interested parties • Flier emailed as attachment to Allentown and Duwamish neighborhood listservs by neighborhood leaders • Facebook and Twitter posts on the City's social media accounts Attendance and visitor statistics • In -person open house attendance: 42 • In -person comment forms completed: 20 • Online open house visitors: 32 • Online surveys completed: 12 • Overall number of participants: 74 Engagement Methods In -Person Open House The City gathered shared information about the preferred alternative and other considered alternatives during an open house at the Tukwila Community Center on August 17, 2017, from 5:30 p.m. to 7:30 p.m. Participants viewed informational boards that described the project purpose, schedule, alternative and preferred routes, screening criteria and environmental process. Project staff were on hand to answer questions. Participants contributed comments via comment cards. Comments received at the open house are shown in Appendix 1 and summarized below. Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 136 In -person open house participants give feedback on comment cards. Online Open House In order to reach Tukwila businesses and residents who were unable to attend the in -person open house, the City advertised an online open house, available 24 hours a day, seven days a week, starting August 15 and ending August 28. The online open house included the same information as at the in - person open house and a survey that gathered specific feedback in a similar fashion to the comment boxes at the in -person open house. Comments received through the online open house are shown in Appendices 2 and summarized below. Feedback Overview Several themes emerged from the input received through 32 comments and surveys: • Those who supported the preferred alternative (15) stated a number of reasons for their support, including moving the truck route to a commercial street and away from residences, access/proximity to I-5 and current residential impacts on 124th. • All residents who said they live along or near the current access route who participated (4) supported moving the truck access route to another street. • Those who opposed the preferred alternative (4) stated increased traffic, business impacts and residential impacts as reasons for their opposition. • Several participants urged the City to study or investigate cost (4) and traffic (3). Several participants also expressed interest in potential environmental impacts (3). Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 137 Next Steps All feedback presented here is being provided to the project team for consideration. The study and proposed route will be presented to City Council in the fall of 2017. One participant requested specific follow up regarding business impacts on 48th Ave S: Quinn Closson, 360-607-8178, qclosson@pape.com. Appendices 1. Comments gathered at in -person open house 2. Online comments 3. Notifications Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 138 Appendix 1: Comments Gathered at In -person Open House Note: comments are verbatim as written. Commenters were asked if they live, work or visit Tukwila. Live Work Visit Name Email Comment (verbatim) x Phillip Camball Phillameball@hotmail.com Anything except 48th Ave S. Minimum public $, maximum private funding. x Angela Steel angelasb13@hotmail.com I prefer the 48th Ave S option as the least impactful to residential properties in Allentown and Duwamish. This option keeps semis on existing truck routes w/out creating new roads through environmentally critical areas or private property. *Also need noise wall along edge of railyard. [unknown] [unknown] My first choice BNSF move out completely. Second choice I prefer 48th Ave S. Build wall to control noise and shaking control. x Mary Fertakis [unknown] Thanks for all the work that has been done on this. The grid was particularly helpful - very concrete information and easy to understand. The original study in 1990 shows that the 48th st option was the least expensive and made the most sense. It is the same in 2017. Seems pretty clear that this is still the direction to go. x x David Shumate David@propeldesigns.com The 48th Ave and Bridge looks like the best one! x x Sean Albert seanalbert2001@hotmail.com I think the preferred 48th ave south route is by far the best alternative!! Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 139 x Patty Cokus pcokus@hotmail.com I agree wholeheartedly with the preffered study route where it impacts all identified impact criteria the least and is the least expensive. Thank you for working on this and advocating for community input and gathering feedback. The preferred route makes the most sense for all. x [Illegible] [unknown] I think the preferred option makes the most sense of those presented. It takes the traffic completely off residential streets and on to a commercial street that already accomodates semi - truck traffic. x Lucia Nilo Itannilo@hotmail.com I hope this project gets look at seriously as I really enjoy my home at 124th - but the vibration of the trucks in and out 24-7 is really bad and nuisance. It shakes our house especially when sleeping - the NO -Build option: S 124th should not be an option. x Wilfredo Nilo wznilo@gmail.com We live by 124th ave which is active for semi -trucker. Since we moved here from September 2016 we felt a massive vibration everytime those truckets pass by. We live in a brand new home and it created major cracks in aour garage. We worried whats gonna happen next. x Oscar Uceda o.uceda@yahoo.com We would like to support the prefer alternative for the trucks route coming in and out of the BNSF Railroad Yard facility in Allentown. Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 140 x x Becky [Illegible] becarosep@aim.com Concern the increase in traffic from now and 20 years down the road on the 48th ave purposal. What effects it will have on the businesses on 48th (widening roads etc) Residents being impacted by not being able to get access to the businesses they already go to. x Morgan Llewellyn mllewellyn@ccim.net I'm wonderng how the project will be funded particularly in light of the right away acquisitions required by the preferred route. It appears the northern route would have the least impact on residential AND commercial businesses. x Todd Jones rain1916@comcast.net I stronly oppose Gateway Drive option and 124th st options. I do like the 48th st option or others to the north. x Hanice Ludington shofarJCL@gmail.com My preference is Airport Way s x [Illegible] [Illegible] The road should go out the north end. I live on 51st (across the street from the flat bed trucks, and am concerned about where the railroad will put the road inside this yard. Will trucks have to be removed and trailers [illegible]? And if so, where will they go? It is close to our homes, your moving one road to another. x Linda McLeod sam.linda.mcleod@gmail.com No on Gateway Dr. Divides BECU campuses, has many employees + customers x [unknown] [unknown] Airport SO. (BEST) [sic] Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 141 x I live in 122nd st. I hope the 124th s st. would be closed as enterence of BNSF or trucks facility. The impact to our Edna edna0801@gmail.com home and neighborhood is Derr[illegible] terrible, the house vibrates each time; lots of noise; and traffic gets crowded. 48th st is great alternative for the BNSB enterence. Steven steve@xmrine.com We'd like to see a traffic impact study done on inerurban and exit 156 off 1-5. Please go to fife and see the issues they have and avoid that happening to us. Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 142 Appendix 2: Comments from Online Open House Note: comments are verbatim as written. Comment 1. Will all trucks no longer use 124th st ? 2. Will there be entry and exit capability from 50th PL S/129th street? we must have the capability to enter and exit from 50th PL S/129th street. Please make sure this option available. Thanks for your consideration How much will this cost? What about an option to improve the 42nd st. bridge by the community center and do some mitigation on the streets that the trucks drive down, such as widening the shoulders of the street, side walks and maybe even some sort of sound barrier? How is this project prioritized compared to needs in other neighborhoods such as sidewalks and road repair? I am an employee of BECU and believe that the 48th Ave So. preferred option is by far the best choice. Not only from a cost perspective but also from a life safety, employee/member environment and the disruption of multiple businesses/residential and land/building value standpoint. The 48th Ave So. option already houses a street with truck yard access and would be a much easier way to execute on this initiative. While I know this still impacts some, it is the reasonable choice and should be adopted. I am not only a Tukwila resident but also a Tukwila business owner that would be greatly affected by the "preferred" route of 48th AVE S. The overall impact on the businesses along this route would be devastating. People are already frustrated with the current amount of big trucks coming along 48th. We are already lacking suitable gas stations in Tukwila. Please don't make them impossible to get to. Tukwila is a growing city and the north side (Airport way) of it is already industrial. Interurban Ave is an incredibly popular thoroughfare for many people going south/north and the 2 gas stations on 48th Ave services more than half of those people. Please reconsider 112th or Airport way as the better alternative that will impact our growing city the least amount. Thank you. I am very happy that the city is analyzing other options for the truck route into the BNSF yard. The current route is not sustainable. My family prefers the 48th Av S option since it uses an existing commercial street and is least impactful to residential communities and the environment. I would like you to heavily factor in the environmental impacts the other two northerly options would have on wetlands and existing greenspaces.Will the Airport Way option impede future Light rail/Sounder station location planning efforts? How will the different entrance options impact yard operations? Currently, the BNSF yard is very noisy 24/7 with back up beepers. Will these operations shift or diminish with the varying options? Can the city proceed with pursuing the noise wall installation along the railyard boundary? I think this will make a significant improvement to the quality of life in Duwamish and Allentown. thank you I represent The Pape' Group, Inc. who owns the Ditch Witch dealership on 48th Ave, South. I understand there will be significant traffic impact during construction. I don't think we're overly concerned about that. However, I'd like a little more information on the traffic study or estimates on additional traffic impact on 48th Ave. South after completion of the project. Also, will there be any improvements done to the 48th Ave road itself? Finally, is there something I'm missing that you think we should be concerned about as a business right on 48th Ave? Thanks, Quinn Closson 360-607-8178 qclosson@pape.com Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 143 I wish that this 124th St. access be change to a different access ASAP because we moved here in a new home development last year 2016 of Sept. which we are not aware about this 124th St. right beside our house is the major access for truckers. We encountered 24-7 of a massive vibration like an earthquake multiple times everyday and we felt scary that our house may collapse one of this day. So far we had a multiple long cracks in our garage and hopefully will not affect the foundation. We live right by the stop sign where those truckers heading out from BNSF gate and also for coming in. That really distract us everyday. There's a time when some of the truck driver lost their focus on the stop sign especially in the evening and they made an emergency brakes and it shakes the ground so bad and it vibrates our house also. I Believe that 48th Ave S is the best alternatives route for the truckers. I work at BECU. The Gateway alternative would have a negative impact on our members who come into our Tukwila Financial Center to conduct their personal business (primarily retail banking, trust services, and investment services). We are about to engage on a Gateway campus upgrade and a truck route cutting through the middle of it would have a negative impact on our employee experience and may have a negative impact on our ability to recruit and retain employees. Given the existing land use abutting most of your preferred alternative (gas stations, commercial, etc.). I can see the potential noise downside for a hotel (but it's already next To 1-5 and a busy off ramp so marginal impact seems moderate). I would like to avoid having another bridge over the river and prefer this option: S 112th Street Thank you. Thank you for considering all options and explaining the reasoning. What timeframe are you looking at for construction of the new bridge and roadway. What impact will there be on the existing Interurban Bike/Walking Trail both during construction and upon completion. Will traffic studies be done to work on minimalizing impact at the intersection for traffic on Interurban and from the off ramp on 15? This route makes the most sense as it is a quick, direct route off of 1-5, drives through a commercial area only and does not affect the public's experience of their greenspace, except for a small segment of the bike trail. I fully support this preferred route. What are the costs? How it will be funded? Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 144 Appendix 3: Notifications Social media 1 5I City of Tukwila - Government Au1 ust 9 ai 3.34pm 1[+ Join us fora BNSF Access Study Project Open House on August 17, 2017 The City of Tukwila has identified 48th Ave S as the preferred route to access the BNSF Railway intermodal Facility in Allentown_ Before the route is formally decided. we're holding an Open House and online forum to talk to you about the route that we selected based on the criteria you helped us shape. BNSF Access Study Project Open House Thursday, August 17, 2017 5:30 - 7:30 p.m. Tuk7Nila Community Center 2424 42nd Ave S, Tukwila. WA 98168 Can't make it to the open house? Share your thoughts onlinet Now through August 28, 2017, you can share your thoughts at https:!!TuKBNSFAccess.Participate.Oniine All information from the Open House will be online. Translation options are available. Email us at AccessStudy@fulcwilawa.gov tukwilawa.gov or call 206-433-0179 with any questions. 0 CITY OF TUKW1LA BNSF Access Study Project .11 S ER L 1i Like 3 • Comment 114 Orr of TLAwL Ila, nlr nhadl Yir. /.r 1 .1 Lire pYlMi,d lase to •Lona IFrt • 9ii.ar'-I•enrinSd.l FscM.. MW,4E..P Dglorq 4t nYIEF ,. baler, da{Id.d, wr'rerholehrt bl op.e. rb.ye l.d fyu,ral6 ratIh 4'ru /b1..t lrrt4 rhrr .rr arkGed baud an rhr uKrru 1a+knhirsrt usshpr #.Yw and .Garl.rl.+n a.. est piFw' d 1lr...r1.. r4re6.: I. Off.. Worm TerlyQgl, nllµar 1.J, /01 t r r+. Catrrlrw ruly IC II OW Ywi i1 f ire S. r,rp.a., mai JAW pkrcr a#djyr&om i.rFi4lrgi red oArrnohrrmart, a..A a r enwonerentel proem mesaxer W4lrr Might! biro Metro N ow rhroup.h , an', ICI can duce Your Nrprahaa Rfr/' WO mew lITI411114NArSr. l.Av . 4.4010 ▪ .01rl1.7hP, Er11 CIF CIpmig Fr malty. µ.. rr,.w.a r.r�•Y'�414 +,'� Share Facebook post published August 9, 2017. Top Comments F Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 145 CVCity of TukCw€Fa 0 @CityofTukwola ' Aug 9 Join us for a BNSF Access Study Project Open House on August 47, 2017 CITY OF TUKWILA BNSF Access Study Project I .19 Tweet published August 9, 2017. Postcard T1*p Cary or T. domds hat ia..nrAgq doh Afire 5 PI the rrrstmad ratter 701}114 trr4 ni,13 Iradray lrltYEpT i" 5aoliy nAliwdorn galore ike,mb ain/mair elninciro. W eir holding an c prn Haim and amine Fpier* tp sak to you allow fir■ maim Elsa Pro- interred haood an hlrr trvtarra you hrolpad us dupe im irr in rlorminion an _ related allcrri=re roil BNerr Maude Ths.r p. 17, 200 5 9p 7'JQp.m Ti(lMkl olmeeiei ie Cl�.rri t o Red £ 5. T.11.0114 W 91114A Jrf4 Tpreari.J indr, ygre aubWr rmr prefrlrra eats ngtrsrt eor.M and the rmore pnanin ,,proms. 4A* IAprr rcrtAa.ghts ▪ fin4Mr ve+ NUM rrmo h August 11, 2 17, ego UM 5Irarc74)ui 11141111.43 40l! -0 as. `iT.14i115F.+ccr53, �1+liripale y]r II i JLu MgPrRaFhrk* 'MI. M.' 414.44.44 win 44, olinr nvinopPori wirkawo Pert bmatrisk 3nvrl LIS. azirlSt. ' :.--Yrrmra pa er off -1133 0179. CITY OF TUKWILA BNSF Access Study Project The City has identified 48th Ave 5 as the preferred route to access the BNSF yard in Allentown. Before the route is formally decided, we're holding an open house and online forum to talk to you about the route that we selected based on the criteria you helped us shape. Review and comment on the preferred alternative route: 1. In person Thursday, August 17, 2017 5:30 - 7:30 p.m. Tukwila Community Center 1242442nd Ave 5, Tukwila, WA 98168 Meet project stuff, learn about the preferred alternative route and environmental process, and shore your thoughts. 2. Online Now through August 28, you can share your thoughts online] Visit TukBNSFAccess.Participate.Online Ali information from the in -person event will be online. Translation options are available. Questions? Email us at AccessStudy@tukwilawa.gov or call 206-433-0179. One side of a postcard sent to the Allentown and Duwamish neighborhoods. Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 146 CITY OF TUKWILA BNSF Access Study Project Public Works Administration 6300 Southcenter Blvd. Tukwila, WA MISS Review and comment on the preferred alternative route, 48th Ave 5 In person Thursday, August 17, 2017 5:30 to 7:30 p.m. Tukwila Community Center Online TukB NS FAccess. Pa rtici pa te.O n I i ne Reverse of a postcard sent to the Allentown and Duwamish neighborhoods. Emails Tukwila BNSF Access Study — Preferred Alternative Outreach Summary DRAFT 147 City of Tukwila Washington Ordinance No. D,5(o7 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING NEW REGULATIONS TO ACCURATELY DEFINE THE PORTION OF 42ND AVENUE SOUTH BETWEEN 124TH STREET SOUTH AND INTERURBAN AVENUE SOUTH WHERE THE SPEED LIMIT IS TO BE REDUCED FROM 25 MPH TO 15 MPH FOR AASHTO TYPE 1, 2. AND 3 TRUCKS ONLY; REPEALING ORDINANCE NO. 1801, AS CODIFIED AT TUKWILA MUNICIPAL CODE SECTION 9,16.060; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, American Association of State Highway Officials (AASHTO) defines a Type 1 truck as a three -axle truck limited to 25 tons; and WHEREAS, AASHTO defines a Type 2 truck as a three -axle truck with a two -axle single trailer limited to 36 tons; and WHEREAS, AASHTO defines a Type 3 truck as a three -axle truck with two, double - axle trailers limited to 40 tons; and WHEREAS, Title 23 Code of Federal Regulations (CFR) subpart c, National Bridge Inspection Standards (NBIS) Section 650.313 (c) states: "Post or restrict the bridge in accordance with the AASHTO Manual or in accordance with State law, when the maximum unrestricted legal loads or State routine permit loads exceed that allowed under the operating rating or equivalent rating factor"; and WHEREAS, AASHTO Manual for Bridge Evaluation grid Edition 2011 — with 2016 Interim Revisions, Section 6A.8.1 and Section 6B.7.2, states, "When the maximum legal load under state law exceeds the safe load capacity of a bridge, restrictive posting shall be required"; and WHEREAS, the bridge crossing the Duwamish River on 42nd Avenue South, also known as Tukwila-14, structure ID 08109700, has been determined to require a restriction to the legal truck loads for AASHTO truck Type 3, which includes a reduction to the speed limit from 25 MPH to 15 MPH for all AASHTO truck types; and W: Word ProcessinglOrdinances1Speed limit reduction for AASHTO Type 1.2,3 trucks 2-12-18.doc SC:bjs Page 1 of 3 148 WHEREAS, RCW 46.61.415 authorizes the City to alter speed limits on the basis of engineering and traffic investigations; and WHEREAS, an engineering investigation was conducted In the form of a load rating analysis of 42nd Avenue South between South 124th Street and Interurban Avenue South; and WHEREAS, based upon the load rating analysis, the City has determined that 15 miles per hour is a reasonable and safe maximum limit for AASHTO Type 1, 2, and 3 trucks traveling on 42r'd Avenue South between South 124th Street and Interurban Avenue South; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Repealer. Ordinance No 1801, as codified at TMC Section 9.16.060, "South 124th Street, 42nd Avenue South. and 50t'' Place South," is hereby repealed. Section 2. TMC Section 9.16.060 Reenacted. Tukwila Municipal Code Section 9.16.060 is hereby reenacted to read as follows: 9.16.060 South 124th Street, 42nd Avenue South, and 50th Place South A 25 MPH speed limit is established on certain collector arterials as follows: 1 South 124th Street from 42nd Avenue South to 50th Place South. 2. 42nd Avenue South from Interurban Avenue to South 115th Street; except that Type 1, Type 2, and Type 3 trucks, as defined by the American Association of State Highway Officials (AASHTO), shall be restricted to a maximum speed of 15 MPH. 3. 50th Place South from South 124th Street to the east City limit. Section 3. Signs to be Posted. The Public Works Department is hereby directed to post appropriate speed limit signs reflecting the speed limits established in Section 2 of this ordinance. Section 4. Corrections by City Clerk or Code Reviser. Upon approval of the City Attorney, the City Clerk and the code reviser are authorized to make necessary corrections to this ordinance, including the correction of clerical errors; references to other local, state or federal laws, codes, rules, or regulations; or ordinance numbering and section/subsection numbering. Section 5. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. W. Word Processing\Ordinances\Speed limit reduction for AASHTO Type 1.2.3 trucks 2-12-18.doc SC:his Page 2 of 3 149 Section 6. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCILIQF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this g..O' day of i—e bJ I. cLi , 20118. ATTEST/AUTHENTICATED: d : .,_. ' Ii MMC, Cie Christy O I erty, City keac Verna Seal, Mayor Pro Tempore APPROVED AS TO FORM BY: Filed with the City Clerk: - H-Le Passed by the City Council: Published: Effective Date: H� Rachel B. Turpin, City Attorney Ordinance Number: a_4j t.,k7 W: Word Processing\Ordinances\Speed limit reduction forAASHTO Type 1,2,3 trucks 2-12-18.doc SC'bjs Page 3 of 3 150 City of Tukwila Public Notice of ❑rdinance Adoption for Ordinance 2566. On February 20, 2018 the City Council of the City of Tukwila, Washington, adopted the following ordinance, the main points of which are summarized by title as follows: Ordinance 2566: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING NEW REGULATIONS TO ACCURATELY DEFINE THE PORTION OF 42ND AVENUE SOUTH BETWEEN 124TH STREET SOUTH AN❑ INTERURBAN AVENUE SOUTH WHERE THE SPEE❑ LIMIT IS TO BE REDUCED FROM 25 MPH TO 15 MPH FOR AASHTO TYPE 1, 2, AND 3 TRUCKS ONLY, REPEALING ORDINANCE NO. 1801, AS CODIFIED AT TUKWILA MUNICIPAL CODE SECTION 9.16.060, PROVIDING FOR SEVERABILITY, AND ESTABLISHING AN EFFECTIVE DATE. The full text of this ordinance will be provided upon request. Christy ❑'Flaherty, MMC, City Clerk Published Seattle Times: February 26, 2018 151 THE CORRIDOR Overview Stretching from Chicago to ports on the Pacific Northwest, the Great Northern Corridor is an east -west artery of commerce that supports the economic vitality of more than 38 million Americans across eight North Central and Pacific Northwestern states. Thousands of manufacturers, ranchers, farmers, miners, timber and lumber businesses and energy producers rely on the Corridors multimodal transportation options. The unifying thread and primary focus of this Corridor is the rail network stretching from the Great Lakes to the Pacific Northwest, and other logistics infrastructure such as highways, ports, and terminals. Every day, Americans across this system work together to produce and deliver vital products for their neighbors and the world, such as factory workers in Illinois making tractors for farmers in Montana to grow wheat that longshoremen in Washington load onto ships for ultimate delivery to dinner tables in Japan. 152 THE CORRIDOR History In the late 1800s when railroad magnate James Hill created the Great Northern Railway Company, the northern United States from the Great Lakes to the Pacific Ocean was untapped territory, holding the promise of entrepreneurial dreams unfulfilled. As an example of that entrepreneurial spirit, the Great Northern Railway was constructed and was the only transcontinental railroad built without using federal dollars or donations of federally owned land. It has maintained that spirit for over 100 years because its history and operations are rooted in solid economic principles and performance. The Great Northern merged with other railroads, and, over time, became a key element of the BNSF Railway Company as we know it today. GREAT NORTHERN General questions or inquiries can CORRIDOR COALITION be sent to our _aniversoiex orts gloha! 153 THE CORRIDOR Location & Map The Great Northern Corridor is a strategic link in the supply chain spanning the northern United States, from the Pacific Northwest to the Midwest, and reaching key southern points in Canada. The Corridor includes 3,331 rail route miles traversing eight states providing consumers, manufacturers, industries and farmers with critical access to the nation's vast rail and highway network, vital multimodal connections and the global marketplace. 154 THEE CORRIDOR Facts The Great Northern Corridor is an integral part of r= rail network connecting the Corridor to the national rail system, North American markets and the Global marketplace. Vital Connect: ones Links eight States and three Canadian Provinces to the global marketplace Serves an area where more than 38 million people live and work Supports regional businesses and approximately 12.5 million jobs Intersects or parallels 20 major cross continent Interstate and US Highways Connects the Northern Tier to the nation's extensive rail network and economic centers throughout North America Links 37 short line railroads and their customers to the national rail network and the global marketplace 155 Connects to eleven ocean, river and lake ports, and two inland ports The Great Northern Corridor is the foundation of the supply chain for raw materials and finished goods that support major U.S. industries and consumer markets. On the Move Carried 278 million tons of freight in 2014 Supported 51 million tons of agricultural exports Moved 964,000 units of consumer goods from ships to logistics parks and distribution centers throughout the country Moved 91 million tons of construction materials, building products, manufactured goods, and energy related products to construction sites, consumers, factories, and refineries Removed over 10 million long -haul trucks from the nation's highways Supports an area with wind energy generation potential of over two million megawatts With the recent boom in wind energy projects along the Corridor, growing agricultural exports and consumer product demands, and Bakken Shale crude oil drilling and distribution activities in the region, transportation needs are anticipated to increase significantly over the foreseeable future. GREAT NORTHERN CORRIDOR COALITION General questions or inquiries can be sent to c + 1 =; ,a. 156 rn Corridor Description: ork U U= c` m L L t0 E V 1 C $4 a F U U E c L o C: L 1 t ( o Z Z Z u. P J Northern Corridor Overview Cry 0 0 0 0 .0 U7 -6 m 0 L 0) ..,. Co m C :4—A co 0 0 L O -0 • 0 el- el- co wi -12 c (1) RI CD 45 Q Q •L E .� .i a) 000cf c 008 ooo oQ fT 3 - 2 Z � P I � .0 73 2 2 z o�§ gy m 0 0 •- 00 al r• <ooa;r-,� 22 11 Q •U O O� co L_ O � Q I• ll cn �u o> O co O (6 tuo U L.9 _1 > a- 8 ..st— N- C) .� 0 0 0 0 0 0 2 CD N 2 ▪ 1 L L 0 0 0 0 0 0 00 a alZ0_a0�0� N d-- Ni m 4 Lri Lo N oo rn o r-I r-I r-I r-I r-I r-I r—i ri N P Port of Northern Montana Port of Everett Port of Seattle