Special 2019-03-25 Item 3A - Public Safety Plan - Contract Amendment #3 for Fire Station 51 to Establish Maximum Allowable Construction Cost (MACC) Not to Exceed $9,587,314
COUNCIL AGENDA SYNOPSIS ------ ---- Meetiq Date 0 25/ 9 Prepared by RB Mayor's review Council kc14 ITEM INFORMATION ITEM No. 4.B. & Spec 3.A. STAFF SPONSOR: RACHEL BIANCHI ORIGINAL AGEND21 DATE: 03/25/19 AGENDA IlENI TITLE Contract Amendment No. 3 to contract #18-001 with Lydig Construction for Fire Station 51 MACC (Maximum Allowable Construction Cost) and associated costs. CA FEGORY 0 Discussion 3/25/19 0 Mallon Date 03/25/19 LI Resolution Mg Date E Ordinance Mtg Date 0 Bich/12yard Altg Date [] Publzr earing AN Date E Other Aftg Date 21/11g Date Mty SPONSOR Cotenczi Mayor 01-1R EDCD Fmance ITtre IITS P&R Police DPW [Court SPONSOR'S The Council is being asked to (1) Approve contract amendment SUMMARY with Lydig Construction for Fire Station 51 to establish not to exceed $9,587,314; (2) Approve sales tax of $968,318 (3) Transfer $1,541,632 from the Justice Center budget the additional costs due to market conditions and the 4 needed, approve the use of the project contingency budget #3 to Contract a MACC with a total contract associated with this to the Fire Station budget priority alternates; and of $893,219. #18-001 cost contract; to cover (4) If RL\ II WED BY El C.O.W. Ivitg. ID CDN Comm [I] Finance Comm. E Arts Comm. LI Parks Comm. & 03/18/19 COMMITTEE CHAIR: Public Safety Comm. • Trans &Infrastructure E Planning Comm, ROBERTSON DATE: 03/04/19 RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Mayor's Office Forward to Committee of the Whole/Special Mtg. COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $9,587,314 for contract $ $ Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 03/25/19 MTG. DATE ATTACHMENTS 03/25/19 Informational Memorandum updated 1 9 Draft Contract Public Safety Plan budget Minutes from the Public Safety (PS) Committee meetings of 3/4 & 3/18 Powerpoint Updated after PS Com. and 6-Year Plan updated after PS 19 20 Allan Ekberg, Mayor Administrative Services Department- Rachel Bianchi, Deputy City Administra or INFOR ATIONAL E ORA DU TO: Public Safety Committee CC: Mayor Allan Ekberg FROM: Rachel Bianchi, Deputy City Administrator DATE: February 28, 2018 — Updated March 13, 2019 SUBJECT: Fire Station 51 MACC ISSUE The Council is being asked to consider allowing the Mayor to execute an amendment to the contract with Lydig Construction to increase it to $9,587,314. While this number has increased since the Public Safety Committee last reviewed the memo, the increase is completely due to the Administration's recommendation of including $312,015 in alternates requested by the Fire Department. While this is above the project budget, savings and a transfer from the Justice Center budget can absorb this increase and the Administration recommends moving forward with this contract amount. BACKGROUND As a part of the Public Safety Plan, the City has been working toward the construction of a new Fire Station 51. Early on, the City chose to use the General Contractor/Construction Management (GCCM), which allows the contractor to join the project early in the design process and inform the City and architects of cost impacts associated with design. City staff have found this to be a very productive delivery model, which has resulted in multiple steps of estimating and checking the budget in real time as decisions are made. The City has an existing contract with Lydig Construction for $435,007, which included pre -construction services and the demolition of the single-family home at the Star Nursery site initially purchased for the new location of Fire Station 54. As a part of the GCCM process, projects develop a MACC, or maximum allowable construction cost. Lydig Construction developed bid packages for all construction services for competitive bidding per State law. Bid packages were advertised and Lydig Construction worked to promote the packages to encourage a high number of bidders, which usually results in a better price for the owner. Due to the recent snow storms, some bid packages were delayed. In addition, addenda were required for some bid packages in order to clarify the services required in order to ensure the best value for the City. At this time, all bid packages have been opened and finalized. The project team also went through an extensive value engineering process to identify other project savings, which amounted to $179,500. As stated above, the costs associated with constructing Fire Station 51 have risen above the budget due to the region's market conditions. As has been previously shared with the Council and well known in the region, the Seattle area construction market is very busy. There are a significant number of private and public projects currently in the pipeline, which result in higher prices across the board. This is further exacerbated by this project being relatively small, resulting in less interest from contractors due to the amount of other work in the region, and a tighter budget. Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 21 Below is a table of the project estimate, final bid amounts and variance, The lightly shaded items indicate items that are already a part of the existing GCCM contract and are formula -driven and tied to the overall construction costs. The Administration's recommended alternates are also included on the table below and will be further discussed later in this memo. Negotiated Support Services includes services such as security and fencing, which are the contractor's responsibility. Also included is the necessary 3% GCCM contingency fee, which is separate from the owner's contingency budget. Both the Contractor's fee and the Specified General Conditions, which covers the contractor's personnel costs, were bid as a part of the original RFP process when the City selected the GCCM for the Fire Station projects. Service Estimate Final Bid -Package Variance Earthwork/Utilities/Asphalt $ 661,444 $ 753,900 $ 92,456 Site Concrete $ 287,922 $ 391,500 $103,578 Concrete and Steel $1,799,575 ($685) Structure, and Enclosure $ 1,798,890 Masonry $ 253,878 $ 310,097 $ 56,219 Glazing Package $ 276,415 $ 298,628 $ 22,213 GWB, Metal Framing and Insulation/Acoustical Ceiling $ 467,883 $ 523,500 $ 55,617 Miscellaneous Package $ 706,056 $ 704,500 ($1,556) Tile, Resilient Flooring and Traffic Coatings $ 35,436 $ 38,500 $ 3,064 Fencing and Gate $ 172,553 $126,447 Enclosures $ 299,000 Landscaping and $ 237,778 $ 24,673 Irrigation $ 262,451 Electrical Contractor $1,026,413 $ 1,235,963 $209,550 Mechanical $1,398,430 $ 1,455,361 $ 56,931 Value Engineering List ($179,500) Alternates $ 312,015 Negotiated Support $ 183,228 Services General Conditions $ 564,599 GCCM Contingency (3%) $ 246,114 GCCM Fee (4.5%) $ 388,568 Contract amount - does not include tax $9,587,314 The table below lists all of the alternates and the estimated cost associated with each one, as well as the final bid price. Alternate Estimate Bid Cost* Fire hydrant in northeast corner of the rear apron $190,000 $83,200 Additional paving for trailer parking $ 60,642 $51,350 Four -fold doors $ 84,228 $81,565 Fume hood for the shop $ 8,434 $18,121 Rough in for new SCBA gear washer $ 25,128 $4,438 Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov * Website: TukwilaWA.gov 22 Underground utilities for fueling station $180i048 $142,812 Remainder Vffueling station (this cost inciudemthe $18g,648 above) $621.970 $333.208 Total alternates: $990.402 $714.095 ° Does not include soft costs such aoVVR8T. In discussion with the Fire Department projecttaann nepneoardaUwao and with their oqPeerneOt. the Administration recommends that the following alternates are included in the base project and the budget above reflects these additions: Alter nate Price Cumulative Total Fire hydrant inthe northeast corner ofrear apron $ 83.200 Four -fold doors $ 81,565 $184.785 RoUOhinfor new 8CBAq8arwasher ` ,$ 4,438 �1O82O3 UOdenqroUOd utilities for fWelinq station $142.812 �312015 |Oaddition, there ioconsensus ornonqthe project team that ifthere are any additional oontnqenoy funds available toward the end ofthe project thatthefirst priorityshould betoadd back inthe additional pav|nq for trailer parking alternate at$51.35O, Currently only the four alternates above are included in the draft contract. All ofthese alternates materially add tothe ability offire fiqhters to provide high- level of service to our community, ensure rapid response times and the ability to maintain firefiqhter health and life oovingequipment. One ofthe latest unexpected expenses that are outside ofthese numbers are the electrical connection scope ofwork with PSE. The existinqsurvey information that the project enqimaerobased the connection strateq , V upon has been proven incorrect due to PSE's inaccurate as -built information. The estimated cost of this additional scope of work ioapproximately $2OO.00O. In total, when tax and contingency are added in, and includinq the four alternates and PSE connection costs identified above, Fire Station 51 is over budget by $1,541,632. As mentioned above, the Justice Center project is currently under budqet by the followinq: Mini-M/\CC savinqe/ $ 990.528 Land acquisition oavinqa: $ 341.809 Total: $1,332,337 |naddition, the Justice Center project corheoana|kovvanceof$75O.OUOforPotenUaUyconta0inohed soils that the Project team does not expect tofully utilize. When the budget was developed there were many unknowns about the soils due tothe project teonn'ainability boaccess the site. Tobeprudent, the team aasiqnedconUngenm/funds inthe event offindinqunsuitable soils. Since that time, the City has been able tocomplete the necessary teoUnq and has identified that the risk ofcontaminated soils ha less than anticipated. The Administration recommends that the City utilize the $1.332.337insovnOafrom the Justice Center project, as well as an additional $200.000 from the Justice Center contaminated soils budget to achieve the budQ*t(je|to for Fire Station 51. One edvmntaqe of hmvinq a proOrom of projects is the ability to move funds from one toanother. The project team does not believe that there are any additional value ongineerinO torqets on Fire 8tmUnn 51 that would not be detrimental to the functionality of the bui|d|nq or the firefighters that work there. In addition. it is the Administration's opinion that the four alternates are important enoUqh to move to the base pro'eot, and the project team is intent on pnasen/inq eDouqh continqencytofund the fifth o|ternate, the additional paving. Pbone:ZO6'4]3'l8OD ° EmaikMaynr@TukwikuVVA.Quv ° VVebsite:TukxxUmVVA.gov 23 RECOMMENDATION The Council is being asked to provide the Mayor the authority for the following: •Move $1,541,632 from the Justice Center budget to the Fire Station 51 budget to cover the additional costs due to market conditions and the four priority alternates. 'To sign a contract with Lydig Construction $9,587,314 for the Fire Station 51 MACC. 'To spend $968,318 in sales tax associated with the contract discussed above. 'If needed, approve the use of the project contingency budget of $893,219. Steve Goldblatt, the Council's Project Management Quality Assurance consultant has reviewed the project status and agrees with this recommendation. ATTACHMENTS AIA Contract between the City and Lydig Construction Public Safety Plan Budget Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov 24 Init. Cu nt 1 Guaranteed Maximum Price Amendment AMENDMENT NO. 3 for the following PROJECT: (Name and address or location) Tukwila Fire Stations 51 and 52 Tukwila WA Note: THIS AMENDMENT IS FOR FIRE STATION 51 ONLY. TM FIRE STATION 52 WILL BE ADDRESSED IN A SUBSEQUENT AMENDMENT WORK RELATED TO FIRE STATION 54, EXCEPT FOR THE DEMOLITION OF THE EXISTING STRUCTURE, WAS DELETED IN THE FIRST AND SECOND AMENDMENTS BETWEEN THE PARTIES. THE OWNER: (Name, legal status and address) City of Tukwila 6200 Southcenter Boulevard Tukwila WA 98188 THE CONSTRUCTION MANAGER: (Name, legal status and address) Lydig Construction 3180 139th Ave SE Suite 110 Bellevue WA 98005 ARTICLE A.1 § A.1.1 Total Contract Cost Pursuant to Section 2.2 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Maximum Allowable Construction Cost (MACC) and Total Contract Cost (TCC) for Fire Station 51. As agreed by the Owner and Construction Manager, the Total Contract Cost is an amount that the Contract Sum shall not exceed. The Total Contract Cost consists of the MACC (including the Construction Cost, Negotiated Support Services, Subcontractor Bonds, and MACC Contingency); the Fixed Fee; the Fixed Amount for Specified General Conditions work; and applicable Washington State sales tax. § A.1.1.1 The Total Contract Cost for Fire Station 51 is guaranteed by the Construction Manager not to exceed Nine Million Five Hundred Eighty -Seven Thousand Three Hundred Fourteen ($ 9,587,314 ), subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Total Contract Cost. Provided below is an itemized statement of the Total Contract Cost organized by its component parts: ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion, The author may also have revised the text of the original AIA standard form, An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 TM-2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A133Tm — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA) Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Al/V) Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 25 Init. Specified General Conditions $564,599 Maximum Allowable Construction Contract (MACC) Construction Total $8,204,805 Negotiated Support Services (NSS) $183,228 Subcontractor Bonds Included MACC Contingency @ 3.0% $246,144 GC/CM Fixed Fee @ 4.5% (Fee is not allowed on the Specified General Conditions, or Preconstruction Allowance) $388,538 TOTAL CONTRACT COST (Excluding WSST) $9,587,314 econstruction Services NTE Limit, as previously agreed to by the parties, is: Thousand Dollars ($150,000) A.1.1.3 The Total Contract Cost is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.) Alternate 1' — Fire Hydrant at NE Corner of Rear Apron Alternate 3 — Four Fold Doors Alternate 5 — Rough -in for SCBA Parts Washer Alternate 6 - Underground Fueling components Subtotal $83,200.00 $81,565.00 $4,438.00 $142,812,00 $312,015.00 4 Allowances included in the Total Contract Cost, if any: allowance and state exclusions, if any, the allowance price.) ter Price BP 06 — GWB, Metal Framing, Insulation and Acoustical Framing ($15,000) (deduction) Allowance for targeted savings to replace APC-2 ceiling with an alternative acoustical ceiling product; If targeted savings are not achieved, the difference will be compensated by change order. BP 09- Fencing & Gate Enclosures Allowance for all automation work associated with Spec Section 323119 — Motorized Gat BP 11- Electrical Allowance for all work associated Alerting ith Spec Section 285005 — Fire Station § A.1.1.5 Assumptions, if any, on which the Total Contract Cost is based: $40,000 $60,000 See Attachment A, incorporated by this reference, for a list of Assumption, Clarifications, and Exclusions, and a list of Accepted Value Engineering Options. § A.1.1.6 The Total Contract Cost is based upon the following General Conditions: AIA Document A201 — 2007, General Conditions of the Contract for Construction, as modified (Table deleted) § A.1.1.7 The Total Contract Cost is based upon the following Specifications: (Either list the Specifications' here, or refer to an exhibit attached to this Agreement) AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law, This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 26 Init. Weinstein A+U, Tukwila Fire Station 51, Bid Set December 20, 2018 Section Title Date Pages 00 01 10 Table of Contents 12/20/2018 4 01 1100 Summary of Work 12/20/2018 3 01 1150 Delegated Design and Deferred Submittals 12/20/2018 3 0120 00 Price and Payment Procedures 12/20/2018 5 0121-00 Allowances 12/20/2018 2 01 23 00 Alternates 12/20/2018 4 0130 00 Administrative Requirements 12/20/2018 8 01 40 00 Quality Requirements 12/20/2018 5 01 42 00 References 12/20/2018 2 0145 54 Building Envelope Air Barrier Testing 12/20/2018 4 0150 00 Temporary Facilities and Controls 12/20/2018 4 0157 13 Temporary Erosion and Sediment Control 12/20/2018 7 0160 00 Product Requirements 12/20/2018 5 0160 01 Substitution Request Form 12/20/2018 2 0177 00 Closeout Procedures 12/20/2018 7 0191 13 General Commissioning Requirements 12/20/2018 9 0310 00 Concrete Forming and Accessories 12/20/2018 5 03 20 00 Concrete Reinforcement 12/20/2018 5 03 30 00 Cast -in -Place Concrete 12/20/2018 20 03`35 43 Polished Concrete Finishing 12/20/2018 7 04 22 00 Concrete Unit Masonry 12/20/2018 11 042613 Masonry Veneer 12/20/2018 12 05 12 00 Structural Steel Framing 12/20/2018 8 05 12 13 Architecturally Exposed Structural Steel Framing (AESS) 12/20/2018 8 05 2100 Steel Joist Framing 12/20/2018 6 05 3100 Steel Decking ; 12/20/2018 6 05 40 00 Cold Formed Metal Framing 12/20/2018 7 05 50 00 Metal Fabrications 12/20/2018 13 05 51 13 Metal Pan Stairs 12/20/2018 10 05 52 13 Pipe and Tube Railings 12/20/2018 7 06 10 53 Miscellaneous Rough Carpentry 12/20/2018 4 0616 43 Gypsum Sheathing 12/20/2018 4 06 20 23 Interior Finish Carpentry 12/20/2018 4 06 41 16 Architectural Wood Casework 12/20/2018 9 07 11 13 Bituminous Dampproofing 12/20/2018 3 07 18 00 Traffic Coatings 12/20/2018 6 0719 00 Water Repellents 12/20/2018 5 07 2100 Thermal Insulation 12/20/2018 6 07;21 19 Foamed -In -Place Insulation 12/20/2018 3 07 25 00 Weather Resistant, Barriers 12/20/2018 5 07 4213.13 Metal Wall Panels 12/20/2018 7 07 46 46 Fiber -Cement Siding 12/20/2018 5 07 54 23 Thermoplastic-Polyolefin (TP0) Roofing 12/20/2018 12 AIA Document A1331" — 2009 Exhibit A. Copyright© 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA"' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAi9 Document, or any portion of it, may result in severe civil and criminal; penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 3 27 Init. 07 62 00 Sheet Metal Flashing and Trim 12/20/2018 12 07 72 00 Roof Accessories 12/20/2018 7 07 84 13 Penetration Firestopping 12/20/2018 6 07 92 00 Joint Sealants 12/20/2018 9 0811 13 Hollow Metal Doors and Frames 12/20/2018 10 08 1416 Flush Wood Doors 12/20/2018 6 08 31 13 Access Doors and Frames 12/20/2018 4 08 36 13 Sectional Doors 12/20/2018 10 08 3713 Four -Fold Doors (ALTERNATE) 12/20/2018 4 08 41 13 Aluminum -Framed Entrances and Storefronts 12/20/2018 11 08 54 13 Fiberglass Windows 12/20/2018 6 08 7100 Finish Hardware 12/20/2018 18 08 80 00 - Glazing 12/20/2018 11 08 83 00 Mirrors 12/20/2018 4 08 91 19 Fixed Louvers 12/20/2018 6 09 22 16 Non -Structural Metal Framing 12/20/2018 6 09 29 00 Gypsum Board 12/20/2018 9 09 3013 Ceramic; Tiling 12/20/2018 7 09 51 13 Acoustical Panel Ceilings 12/20/2018 9 09 54 26 Linear Wood Ceilings 12/20/2018 8 09 65 13 " Resilient Base and Accessories 12/20/2018 4 09 65 66 Resilient Athletic Flooring 12/20/2018 4 09 84 36 Sound -Absorbing Ceiling Units 12/20/2018 4 09 91 13 '; Exterior Painting 12/20/2018 9 09 9123 Interior Painting 12/20/2018 10 09 96 00 High Performance Coatings 12/20/2018 6 101100 Visual Display Boards 12/20/2018 6 10 14 19 Dimensional Letter Signage 12/20/2018 5 1014 23,16 Room Identification Panel Signage 12/20/2018 4 102123, Cubicle Curtains and Track 12/20/2018 3 10 26 00 Wall and Door Protection 12/20/2018 5 10 28 00 Toilet and Bath Accessories 12/20/2018 5 1044 13 Fire Protection Cabinets 12/20/2018 4 10 44 16 Fire Extinguishers 12/20/2018 3 10 7516 Ground -Set Flagpoles 12/20/2018 4 11 31 00 Residential Appliances 12/20/2018 7 12 24 13 Roller Window Shades 12/20/2018 7 12 36 16 Metal Countertops 12/20/2018 3 12 36 23.13 Plastic -Laminate -Clad Countertops 12/20/2018 5 12 36 61.19 Quartz Agglomerate Countertops 12/20/2018 4 12 48 13 ' Entrance Floor Mats 12/20/2018 3 12 93 00 ' Site Furnishings 12/20/2018 9 2105 00 Common Work Results for Fire Suppression Systems 12/20/2018 11 2110 00 Fire Suppression 12/20/2018 10 21 13 16 Preaction Double Interlock Fire Suppression 12/20/2018 5 22 05 00 Common Work Plumbing 12/20/2018 12 22 07 00 Plumbing Insulation 12/20/2018 5 22 08 00 Commissioning of Plumbing 12/20/2018 3 22 10 00 Domestic Water Piping 12/20/2018 9 AIA-Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects, All rights reserved. WARNING: This Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distr bution of this AIA`' Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 28 [nit. / 221123 Domestic Water Pumps 18 Z 221316 Sanitary Waste and Vent Piping 12/20/2018 6 �224200 Plumbing Fixtures 12/20/2018 4 ^226100 Compressed Air I2/20/2018 3 230500 Common Work HVAC 12/20/2018 I] 230548 Vibration Isolation 12/20/2018 8 230593 Balancing 12/20y2018 3 230700 HVAC|nou|adon 12/20/2018 5 2308/00 Commissioning ofHVAC 12/20/2018 9 2308�23 a/Cpntro|s8[NS 12/20/20I8 34 231123 .��.� ��Natural Gas Piping I2/20/2018 3 Diesel Vehicle Fuel System 12/20/2018 4 23�2300 Refrigeration Piping I2/20/2018 5 �233100 Air Distribution 12/20/2018 10 ^233400 HvAC Fans and Equipment 13/20/2018 18 35 Automatic Emergency Vehicle Exhaust System I2/20/2018 3 �260500' ` {Common Work Results for Electrical 12/20/2018 g 2605I9' Low-VoltageCable and Te,min=6is 12/28/2018 3 �260526 Grounding and Bonding for �Electrical Sysnems 12/20/20I8 S 60529 Hangers and Supports for Electrical Systems 12/20/2018 4 33 Raceway and Boxes for Electrical Systems 12/20/2018 G 260534 ,.� Raceways and Boxes for C_........^_...~~,'^^..`s 12/20/20I8 3 �260543 Underground 12/20/2018 G Z6O553/�.'!'�.''� Identification for Electrical Systems 12/20/2018 5 260573 Power Systems Protective Device Study 12/20/2018 ] 2608(00 Electrical Systems Commissioning 12/20/2018 3 260323 UAhdnnControl 12/20/2018 3 2624�16 pane[boar6s 12/20/2018 5 262726 .,' Wiring Devices 12/20/2018 6 262816 Enclosed Switches and Circuit Breakers 12/20/2018 4 262913 Motor Cpntno| 12/30/2018 5 2632I3 Engine Generator 22/20/2018 11 265100 ` Lighting 12/2 O1D 5 2715�00 Data and Telephone Cabling System 12/20/2018 3 274133 Television Distribution System 12/20/2018 3 281301 Security Access System 1/17/2010 4 282300 Video Surveillance System 12/20/2018 4 283111 Fire Alarm System 12/20/2018 14 285005 Fire Station Alerting 12/20/2018 7 3110'00 Site Preparation 12/20/2018 IO 312200 Earthwork 12/20/2018 15 314133 Trench Safety 12/20/2018 1 321216 Asphalt Paving 12/20/2018 5 321313 Concrete Paving 12/20/2018 5 AIA Document A 13311 — 2009 Exhibit A. Copyright Q 1991, 2003 and 2009 by The American Institute of Architects. A I I rights reserved. WARNING: This A I A" Document is protected by U.S. Copyright Law and I ntern a ti on a I Treaties, Una uthorized rep rod uction or distribution of th is A I A" Docu in ent, or any portion of it, may result in severe civil and criminal penalties, and will be prosectited to the maximum extent possible tinder the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 29 mu` 32I343 Pervious Concret Paving I2/20/2018 9 _321723 Pavement Markings 12/20/2018 5 �3I3119 Motorized Gates 12/20/2018 13 �328400 Planting Irrigation 12/20/2018 29 329200 Turf and Grasses 12/20/2018 lZ 329300 Planting 12/20/20I8 38 33I000 Water Utilities 12/20/20I8 6 333000 Sanitary Sewer I2/20/20I8 3 334000 Storm Drainage IZ/ZO/ZOlD 5 § A.1.1.8 The Total Contract Cost is based upon the following Drawings: (E, ither list the Di-mvings here, or reftr to an exhibit attached to this Agreement) Weinstein A+U, Tukwila Fire Station 5 1, Revised Bid Set January 17, 2019 Number Title '- Date �G001 ^������ ^ �C8VER3HEET 1/17/2019 G101 LAND USE CODE DIAGRAMS 1/17/2019 G201��� .����BUILDING CODE SUMMARY 1/17/20I9 G202 BUILDING CODE DIAGRAMS I/17/2019 GsQo ACCESSIBILITY DIAGRAMS 1/17/30I9 'Topographic Spmey��',�^� �'�su0vEY 12/13/2017 �CO.o���� COVER SHEET 12/20/2018 lC10� ,�����TESC & DEMOLITIONPLAN 12/20/2028 tC1.1 '�r �� 7ESCDET7\ILS I2/20/2018 �C12`��{� .����TESCmOTES 12/20/2018 �C2'0' . ^.��/'''/''^'��� GRADING & DRAINAGE PLAN 12/20/2018 .OA��'�'�'��/- GRADING & DRAINAGE PLAN 13/20/2018 C2'I GRADING & DRAINAGE NOTES QDETAILS 12/20/2018 [2J2 GRADING i&'DRAINAGE NOTES& DETAILS 12/20/2018 C2.3 GRADING 8DRAINAGE NOTES &DETA|LS 12/202018 �E3.01����'���'`x'''` PAVING /& HORIZONTAL CONTROL PLAN 12/20/2018 `C3,O4 PAVING & HORIZONTAL CONTROL PLAN 12/20/2018 c31 PAVING & HORIZONTAL CONTROL NOTES & DETAILS //���'�� 12/20/2018 B.2 PAVINGJ& HORIZONTAL CONTROL NOTES 8^ DETAILS 12/20/2018 C3=[ `�����DETAILS PAVING & HORIZONTAL CONTROL NOTES & 12/20/2018 C44' -'' SEWER PLAN I2/20/20I8 C4���'/^� SEWER PLAN 12/20/2018 C4.1 SEWER NOTES &DETAILS 12/20/2018 C4.2 SEWER PROFILE 1I/20/2018 C5.0 COVER SHEET 'WATER 12/20/I018 ^c5.2 WATER PLAN AND PROFILE 12/20/2018 c6.14 /� WATER PLAN AND PROFILE 12/20/2018 C6.2' ,' WATER PLAN AND PROFILE 12/20/2018 B.2A WATER PLAN AND PROFILE 12/20/2018 C5i3A WATER PLAN AND PROFILE 12/20/2018 C5.4 WATER NOTES &DETAILS 12/20/2018 C5.5 WATER NOTES &DETA|LS 12/20/2018 T501 SIGNAL MODIFICATION PLAN I2/20/2018 AIA Document 33 T� �� Institute of Architects. All rights reserved.mmm� / 30 Init. TS02 WIRING DIAGRAM 12/20/2018 L101 SITE MATERIALS AND LAYOUT PLAN 12/20/2018 L101,A SITE MATERIALS AND LAYOUT PLAN - ALTERNATE 12/20/2018 L111 SITE MATERIALS AND LAYOUT PLAN ENLARGEMENT 12/20/2018 L111.A SITE MATERIALS AND LAYOUT PLAN ENLARGEMENT -ALTERNATE 12/20/2018 L211 SITE DETAILS 12/20/2018 L212 SITE DETAILS 12/20/2018 L301 IRRIGATION PLAN 12/20/2018 L301.A IRRIGATION PLAN - ALTERNATE 12/20/2018 L311 IRRIGATION DETAILS 12/20/2018 L401 PLANTING PLAN 12/20/2018 L401.A PLANTING PLAN - ALTERNATE 12/20/2018 L402 PLANT SCHEDULE 12/20/2018 L402.A PLANT SCHEDULE - ALTERNATE 12/20/2018 L411 PLANTING DETAILS 12/20/2018 A001 BASE ARCHITECTURAL FULL SITE PLAN 1/17/2019 A001.A ALT ARCHITECTURAL FULL SITE PLAN 1/17/2019 A002 BASE ARCHITECTURAL SITE PLAN 1/17/2019 A002.A ALT ARCHITECTURAL SITE PLAN 1/17/2019 A003 SITE DETAILS- SITE DETAILS 1/17/2019 A004 SITE DETAILS - ARCH SCREEN 1/17/2019 A005 SITE DETAILS - ARCH SCREEN 1/17/2019 A006 SITE DETAILS - ARCH SCREEN 1/17/2019 A101 FLOOR PLAN LEVEL 1 1/17/2019 A101.1 SLAB PLAN LEVEL 1 1/17/2019 A101N ENLARGED FLOOR PLAN LEVEL 1 NORTH 1/17/2019 A101S ENLARGED FLOOR PLAN LEVEL 1 SOUTH 1/17/2019 A102 MECH PLATFORM & LOWER ROOF PLAN 1/17/2019 A102.1 SLAB PLAN MECH PLATFORM 1/17/2019 A103 UPPER ROOF PLAN 1/17/2019 A104.A UTILITY ENCLOSURE 1/17/2019 A105.A UTILITY ENCLOSU RE 1/17/2019 A201 RCP LEVEL 1 ; 1/17/2019 A202 - RCP MECH PLATFORM & APP BAY 1/17/2019 A203 OWSJ LAYOUT LOW ROOF 1/17/2019 A204 OWSJ LAYOUT UPPER ROOF 1/17/2019 A301 EXTERIOR ELEVATIONS 1/17/2019 A311 BUILDING SECTIONS 1/17/2019 A321 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A322 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A323 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A324 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A325 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A326 ENLARGED PLAN; ELEV & WALL SECTION 1/17/2019 A327 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A328 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A329 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A330 ENLARGED PLAN, ELEV & WALL SECTION 1/17/2019 A401 EXTERIOR VERTICAL ASSEMBLIES 1/17/2019 A402 EXTERIOR HORIZONTAL ASSEMBLIES 1/17/2019 A411 EXTERIOR WINDOW & LOUVER SCHEDULE 1/17/2019 AIA Document A1331 — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: ThisAlA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible tinder the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 7 31 Init. A412 INTERIOR WINDOW SCHEDULE 1/17/2019 A42I PLAN DETAILS 1/I7/0I9 A421.A ALTFOUR-FOLD DOOR DETAILS 1/17/2019 /4422 PLAN DETAILS 1/17/2019 A423 PLAN DETAILS 1/17/2019 A424 PLAN DETAILS ROOF N1ECHSCREEN 1/17/20I9 A450 EXTERIOR CLADDING LAYOUT 1/17/2019 A451 SECTION DETAILS 1/17/20I9 A453 SECTION DETAILS 1/I7/20I9 A453�'' �`�.u�SECTION DETAILS COURTYARD 1/17/2019 A454 SECTION DETAILS APPBAY 1/17/2019 4455 SECTION DETAILS APPBAY 1/17/2019 A456 SECTION DETAILS DOUBLE HEIGHT BRICK I/17/2019 �4457 SECTION DETAILS 1/17/2019 �8460 OPENING DETAILS 1/17/20I9 A461 OPENING DETAILS 1/17/2019 �A462���� OPENING DETAILS 1/17/2019 �A463 OPENING DETAILS 1/17/2019 /A501 STAIR IPLANS &SECTIONS 1/17/2019 A611 '��,;�� INTERIOR ELEVATIONS BATHROOMS 1/17/2014 14612.''�'�''/' INTERIOR ELEVATIONS KITCHEN 1/17/2019 '4613���` ��INTERIOR ELEVATIONS I/17/2019 �86I4�' INTERIOR ELEVATIONS 1/17/2019 /\615 INTERIOR ELEVATIONS APPBAY 1/17/2019 �A616��� '�INTERIOR ELEVATIONS APPBAY I/17/2019 �A617 INTERIOR ELEVATIONS 1/17/2019 `4$18 INTERIOR ELEVATIONS 1/17/2028 �A619 - INTERIOR ELEVATIONS 1/17/2019 A701INTERIOR .VERTICAL ASSEMBLIES 1/17/20I9 A702 TYP INTERIOR DETAILS 1/17/20I9 �A703�^,. ` INTERIOR DETAILS 1/17/2029 �4704 INTERIOR DETAILS 1/17/2019 -A705 ' INTERIOR DETAILS 1/17/2019 �A721 MILLWORK DETAILS 1/17/2019 f\722~ ' MILLWORK DETAILS I/17/2019 4901` '� FINISH SCHEDULE 1/17/2019 A91I DOOR SCHEDULE 1/17/2019 A921 05NAGESCHEDVLE 1/17/2013 8101 GENERAL STRUCTURAL NOTES 12/20/2018 8102 STATEMENT OFSPECIAL INSPECTIONS 12/20/2018 S201'�� '. FOUNDATION PLAN I2/20/2018 I202``��-,.-�� LOW ROOF/ MEZZANINE FRAMING PLAN 12/20/2018 S203 HIGH ROOF FRAMING PLAN 12/20y2018 S30I CONCRETE DETAILS 12/20/2018 S382 FOUNDATION DETAILS 12/20/2018 S401 TYPICAL STEEL DETAILS 12/20/2018 'S402 TYPICAL STEEL DETAILS 12/20/2018 5403 ' DETAILS 12/20/2018 S501 LIGHT GAUGE FRAMING DETAILS 12/20/2818 K4001 A8BREVS.,LEGEND, NOTES &INDEX 12/20/2018 rNOOZ MECHANICAL SCHEDULES I2/20/2018 M803 rNECHxN|CALSCHEDVLE3 12/20/2018 mx w 1991, 2003 arid 2009 by The American Institute ofArchitects.All wp / 32 Init. M004 MECHANICAL SCHEDULES 12/20/2018 M101 MECHANICAL SITE PLAN 12/20/2018 M101.A MECHANICAL SITE PLAN 12/20/2018 M201 MECHANICAL FOUNDATION PLAN 12/20/2018 M301 FIRE PROTECTION ABBREVS., LEGEND, NOTES, & INDEX 12/20/2018 M302 FIRE PROTECTION FLOOR PLAN 12/20/2018 M401 LEVEL 1 PLUMBING PLAN 12/20/2018 M402 MECH PLATFORM AND LOWER ROOF PLUMBING PLAN 12/20/2018 M501 LEVEL 1 HVAC PLAN 12/20/2018 M502 MECH PLATFORM AND LOWER ROOF HVAC PLAN 12/20/2018 M601 LEVEL 1 PIPING PLAN 12/20/2018 M602 MECH PLATFORM AND LOWER ROOF PIPING PLAN 12/20/2018 M701 MECHANICAL ROOF PLAN 12/20/2018 M801 MECHANICAL LARGE SCALE PLANS 12/20/2018 M802 MECHANICAL DIAGRAMS 12/20/2018 M804 MECHANICAL SECTIONS 12/20/2018 M805 MECHANICAL SECTIONS 12/20/2018 M806 MECHANICAL SECTIONS 12/20/2018 M807 MECHANICAL SECT IONS 12/20/2018 M901 MECHANICAL DETAILS 12/20/2018 M902 MECHANICAL DETAILS 12/20/2018 M903 MECHANICAL DETAILS 12/20/2018 M904 MECHANICAL DETAILS 12/20/2018 M905 MECHANICAL DETAILS 12/20/2018 E100 ONE LINE DIAGRAM LIGHTING FIXTURE SCHEDULE, LEGEND 1/17/2019 E101 SITE PLAN - ELECTRICAL 1/17/2019 E101A SITE PLAN -ALTERNATE- ELECTRICAL 1/17/2019 E201 FIRST FLOOR - LIGHTING 1/17/2019 E202 MECHANICAL PLATFORM & LOWER ROOF LIGHTING 1/17/2019 E301 FIRST FLOOR - POWER 1/17/2019 E302 MECHANICAL PLATFORM & LOWER ROOF POWER 1/17/2019 E303 UPPER ROOF PLAN - POWER 1/17/2019 E401 FIRST FLOOR - COMMUNICATIONS 1/17/2019 E402 MECHANICAL PLATFORM & LOWER ROOF COMMUNICATIONS 1/17/2019 E501 FLOOR PLAN - FIRE ALARM/SECURITY/CLOCK 1/17/2019 E502 MECHANICAL PLATFORM & LOWER ROOF FIRE ALARM/SECURITY/CLOCK 1/17/2019 E601 FIRST FLOOR ALERTING SYSTEM 1/17/2019 E602 MECHANICAL PLATFORM & LOWER ROOF ALERTING SYSTEM 1/17/2019 E701 DETAILS 1/17/2019 E801 PANEL SCHEDULES 1/17/2019 § A.1."1.9 The Total Contract Cost is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) TFS51 Geotechnical Engineering Design Report by Hart Crowser — July 20, 2017 AIA DocumentA1331' —2009 Exhibit A. Copyright© 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA'9 Document, or any 9 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AlA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 06/30/2019, and is not for resale. User Notes: (1903780162) 33 Init. ARTICLE A.2 § A.2.1 Substantial Completion Dates anticipated date of Substantial Completion for Fire Station 51 established by this Amendment: May 19, 2020 The anticipated date of Substantial Completio To be established in a subsequent amendment. A.2.2 Physical Complt on Dates or Fire Station 52 established by this Amendment: The anticipated date of Physical Completion for Fire Station 51 established by this Amendment: ay 19, 2020 The anticipated date of Phy To be established in a cal Completion for Fire Station 52 established by this Amendment: subsequent amendment. § A.2.3 Final Completion Dates The anticipa d date of Final Completion for Fire Station 51 established by this Amendment: une 23, 2020 The anticipated date of Final Completion for Fire Station 52 established by this Amendment: To be established in a subsequent a endment. § A.2.4 Construction Schedule Construction Manager's Construction Schedule for Fire Station 51, current as of the date of this Guaranteed Maximum Price Amendment, is attached as Attachment B, and incorporated herein. ARTICLE A.3 Key Personnel The following named key personnel shall remain assigned for the duration of the Project unless otherwise agreed to in writing by Owner: Project Manager: Project Superintendent: Project Engineer: Kiel Lunsford Torn Pitman Weston Blackburn OWNER (Signature) CONSTRUCTION MANAGER (Signature; (Printed name and title) (Printed name and title) AIA Document A1331M — 2009 Exhibit A. -Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA' Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document; or any 10 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:04:49 ET on 03/13/2019 under Order No.2264341377 which expires on 08/30/2019, and is not for resale. User Notes: (1903780162) 34 35 36 Rachel Bianchi Superintendent Deputy City Administrator City of Tukwila 6200Sou1hcenter Boulevard Tukwila, WA. g8lG8 RE: Tukwila Fire Station #51 Total Construction Cost (TCC) Budget, Dear Rachel, LycligConstruction, Inc. bpleased to submit this Total Construction Cost (TCC)proposal for the Tukwila Fire Station #51 Project. The proposed amount is Nine Million Five Hundred Eighty Seven Thousand Three Hundred and Fourteen Dollars and Zero Cents. ($9,587,314I0)excluding Washington State Sales Tax. Attached hereto is the breakdown of the proposal as well as additional supporting documents for theT[[. Contract Documents: " Specification list isattached. " Drawing list isattached. Assumptions, Clarifications and Exclusions: Please see the following clarifications, and exclusions that we have based our proposal on: 1, All clarifications and scope modifications described in Addenda 01 through addenda 08 shall be incorporated into the project documents, 2. 8P-01—Earthwork & Utilities was revised significantly inAddendum O8,`which heavily modified specification sections 3llQ0Vand 31220U toassume abalanced site, Unit prices were added to this bid package for import and export as required to complete the scope of work, Costs for import / export from the site, beyond the balanced base scope, are to be considered an owner cost' and are not to be considered G[[Kx contingency cost for any reason. 3. All work associated with the PSEElectric Service Connection (Options lfk21are not included in the T[[amount. All costs associated with PSEElectric Service Connections are tobeconsidered an owner cost, are not to be considered GCCM contingency items for any reason, and will be addressed with achange order tothe project. Exclusions: " Building permit and fees perGC[M Matrix. " Special Inspections per G[[MMatrix. " Utility company fees and charges per G[CK4Matrix. " Commissioning ovthohty. 11 Page �18,0139thAve S E,' Ste 1n»bmDevue WA 98um5 4,25,885,31141wmOydig,com 37 ~ Professional Liability (E&O) insurance coverage, • City, County,State, PUQand PSErequirements. ° Utility Connection fees and assessments per GC[MMatrix. • Gas /kWater Meters. • All owner soft costs and FF&E • Any costs associated with Owner moves. • Washington State Sales Tax. = Import/Export ofearthwork materials per item #2above, • Work associated with the pSE Electric Service Connection (Option l &Optinn 2) per item #J above, ° Costs exceeding our .allowances included inthe Bid Packages, See listing ofAllowances below. • For the alerting system, all back -end connection, setup charges, etc. are excluded. Programming, software nrother setup required in order tofacilitate the function ofthe alerting system are excluded. Nooffsite work orfunction is included in this contract. Listing of Allowances included in GMP Amount: 8P0G—GVVB,Metal Framing, insulation and Acoustical Framing: " Allowance for targeted savings to replace APC-2 ceiling with an alternative acoustical ceiling product. |ftargeted savings are not achieved, the difference will becompensated byrhange ordec<$l5'O0O.0p> (Reduction of$1S'O00) 8pO9—Fencing OkGate Enclosures " Allowance for all automation work associated with specification section 323119 — Motorized Gates: $48'080.00 8P 11 — Electrical " Allowance for all work associated with specification section 285005 — Fire Station Alerting: $6O'OOOI0 " Allowance for targeted savings for lighting VEchanges. |ftargeted savings are not achieved, the difference will hecompensated bychange order: <$O.O80.QO>(Reduction of$8'000 Listing nfAccepted Value Engineering Options: 2|Pm ° All mockups shall bein-place in lieu ofany freestanding mockup requirements. • Caulking ofexterior concrete tpbeclarified toexist only where specifically shown on landscape paving drawings. = Specified interior stud protective coating tobechanged from G6OtoG4O, • 4[P'21nDayroom1O48tobechanged toA[P'1 (Allowance) ~ Specified cement fiber board shall be replaced with4EPspan prestige corrugated metal panel orsimilar |nstandard manufacturer colors. • Perforated privacysoeeningmaterialsarenottobeinc|uded. • Fencing height to shall be reduced to 7'-0' at security and architectural fences. • Security Fence construction to be changed from Wireworks Plus to 2'' vinyl coated black chain link with top rail only and lower tension wire, • Mechanical Screening post spacing shall be extended from 5''O^to8'~O"uc • South 'gate operation change from cantilever gate tne swinging style gate with architectural fencing, gc 38 *2oX45,331* 1 ww=1ycfipx:)m • An allowance of $40,000 has been included for automation associated with the Motorized Gates (Specification Section 32]119). • Specified topsoil depth is to be reduced from 18" to 12" at general planting areas, and 6" at Eco'Lawnand Urban Meadow Areas, ° Target light fixture savings of$ODOO- " Specification section 2605 79pa,agmph 2.1[ prohibits aluminum wire, Revise spec section 2605l9paragraph 2,1[toallow aluminum wire. Selected Alternates: Alternates Accepted by the City of Tukwila include the following amounting to $312,015.00 as indicated in the TCC breakdown: * Alternate 1—Fire Hydrant atNECorner ofRear Apron: ��200,0U w Alternate 3—Four Fold Doors: $81,56500 • Alternate 5—Rough-in for S[BAParts Washer: $4,43EiOO ° Alternate G—Underground Fueling Components: $142'81Z.0O Thank you for the opportunity to provide this proposal; we look forward to the coordination and implementation of this project. If you have any questions, please feel free to contact me. Lyclig Construction, Inc. Kie|Lunsford Project Manager Attachments: 1� T[[Pricing Breakdown 1 Specification List 3. Drawing List 4. Geotechnica|Report 5' Bid Package Results 6 Negotiated Support Services Detailed Breakdown 7. Addpndal'8 O. [PK4Schedule 3|Pagc �J0m\'Oth4*t_SE, SIC, 110Ge I��1,X,Ay8(x)"5 39 40 ATTACHMENT B 42 Tukwilla Fire Station 51 Or lust Tukwilla Fire Station 51 A2430 NTP A2120 Mobilize on site A1000 SOG Completion A1010 Structure Topping Off A1030 Roof Dry In A1020 Building Dry In A1040 Permanent Power A1050 Equipment Start Up A1060 Start of Commissioning A1070 Substantial Completion A1080 Final Completion d Pack A9590 BP-04 Bid Date - Masonry A9630 BP-08 Bid Date - Flooring A9650 BP-10 Bid Date - Landscaping & Irrigation A9580 BP-03 Bid Date - Concrete, Steel Structure & Enclosure A9600 BP-05 Bid Date - Glazing A9610 BP-06 Bid Date - GWB, Metal Framing, Insul &ACT A9570 BP-02 Bid Date - Site Concrete A9620 BP-07 Bid Date - Misc A9640 BP-09 Bid Date - Fencing & Gate Enclosures A9660 BP-11 Bid Date- Electrical A9560 BP-01 Bid Date - Earthwork & Utilities A9670 MCCM/MASC Agreement A9680 BP-01 Contract Negotiations - Earthwork & Utilities A9690 BP-02 Contract Negotiations - Site Utilities A9700 BP-03 Contract Negotiations - Concrete, Steel Structure 15 A9710 BP-04 Contract Negotiations - Masonry 15 A9720 BP-05 Contract Negotiations - Glazing 15 A9730 BP-06 Contract Negotiations - GWB, Metal Framing, Inst. 15 A9740 BP-07 Contract Negotiations - Misc 15 A9750 BP-08 Contract Negotiations - Flooring 15 A9760 BP-09 Contract Negotiations - Fencing & Gate Enclosures 15 A9770 BP-10 Contract Negotiations - Landscaping & Irrigation 15 A9780 BP-11 Contract Negotiations - Electrical 15 A9790 MCCM/MASC Contract Negotiations 15 Submission 29 A9010 BP-03 - 031000 - Concrete Framing and Accessories 0 A9011 BP-03 - 032000 - Concrete Reinforcing 0 A9012 BP-03 - 033000 - Cast -In -Place Concrete 0 A9013 BP-03 - 051200 - Structural Steel Framing 0 A9014 BP-03 - 051213 - Architecturally Exposed Structural Steel 0 A9015 BP-03 - 052100 - Steel Joist Framing 0 A9016 BP-03 - 053100 - Steel Decking 0 A9017 BP-03 - 055000 - Metal Fabrications 0 A9018 BP-03 - 055113 - Metal Pan Stairs 0 A9020 BP-03 - 072100 - Thermal Insulation 0 A9005 BP-01 - 331100 - Water Utilities 0 A9006 BP-01 - 333000 - Sanitary Sewer A9007 BP-01 - 334000 - Storm Drainage A9000 BP-01 - 311000 - Site Preparation A9001 BP-01 - 312200 - Earthwork A9002 BP-01 - 314133 - Trench Safety bn 3431 343 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 --- 0 Apr-22-19* 5 Apr-24-19 0 0 0 0 0 Dec-02-19 O Jan-28-20 O Jan-28-20* 0 62 Feb-14-19 0µ Feb-14719* 0'Feb-14-19* 0'Feb-14-19* 0'Feb-19-19* 0'Feb-20-19* 0'Feb-20-19* O Feb-20-19* O Feb-28-19* 0'Feb-28-19* 0 Feb-28-19* O Mar-07-19* O Mar-11-19* Apr-30-19 Jul-19-19 Aug-16-19 Oct-08-19 Nov-05-19 May-19-20 Jun-23-20 May-10-19 15 15 Apr-22-19* 15 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 15 Apr-22-19* 29 Apr-02-19 0 Apr-02-19 0 Apr-02-19 O Apr-02-19 0 Apr-02-19 0 Apr-02-19 0 Apr-02-19 0 Apr-02-19_. O Apr-02-19 O Apr-02-19 0 Apr-02-19 0 Apr-03-19 0 0 Apr-03-19 O 0' Apr-03-19 O 0 Apr-04-19 0 0 Apr-04-19 0 Apr-04-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-10-19 May-13-19 52 1 242 222 185 165 147 106 106 3 -5 0 -5 -4 -5 5 5 -7 -5 -25 10 -47 -48 -49 -52 -47 -48 -42 -52 -44 -47 -42 -40 2 5 0 5 24 24 14 14 19 24 131 0 0 0 4 4 Februar1y2 t Mar-11-19, Bid Due Dates BP-04 Bid Date - Masonry BP-08 Bid Date - Flooring Data Date: Jan-29-19 2019,. l J,uae2tl my 20 ♦ NTP obilize on site SOG Completion BP-10 Bid Date - Landscaping & Irrigation I May-10-19, Bid Package Contracting t BP-03 Bid Date - Concrete, Steel Structure & Enclosure t BP-05 Rd Date - Glazing t BP-06 Rd Date - GWB, Metal Frami ig, Insul &ACT t BP-02 Efd Date - Site Concrete t 3P-07 Bid Date - Misc LBP-09 Bid Date - Fencing & 3ate Enclosures t BP-11 Bid Date - Electrical t BP-01 Bid Date - Ear hwork & Utilities t MCCM/MASCAg' pment I May-10-19, Bid Package Signup 4►111.1 BP-01 Contract Negotiations - Earthwork & Utilities Structure Ti BP-02 Contract Negotiations - Site Utilities BP-03 Contract Negotiations - Concrete, Steel Structure & Enclosure BP-04 Contract Negotiations - Masonry BP-05 Contract Negotiations - Glazing BP-06 Contract Negotiations - GWB, Metal Framing, Insul & ACT BP-07 Contract Negotiations - Misc BP-08 Contract Negotiations - Flooring BP-09 Contract Negotiations - Fencing & Gate Enclosures BP-10 Contract Negotiations - Landscaping & Irrigation BP-11 Contract Negotiations - Electrical '*"® MCCM/MASC Contract Negotiations May-13-19, Submission BP-03 - 031000 - Concrete Framing and Accessories j1 BP-03 - 032000 - Con Crete Reinforc ng 4 BP-03 - 033000 - Cas -In-Place Concrete BP-03 - 051200 - Structural Steel Framing BP-03 - 051213 - Architecturally Exp sed Structural Steel Framing (AESS) BP-03 - 052100 - Steel Joist Framing BP-03 - 053100 - Steel Decking BP-03 - 055000 - Metal Fabrications BP-03 - 055113 - Metal Pan Stairs BP-03 - 072100 - Thermal Insulation BP-01 - 331100 - Water Utilities BP-01 - 333000 - Sanitary Sewer BP-01 - 334000 - Sto'm Drainage BP-01 - 311000 - Site Preparation BP-01 - 312200 - Earthwork BP-01 - 314133 - Trench Safety Actual Work Critical Rema Remaining Work • • Milestone ping Work /v Summary Page 1 of 12 Lydig Construction - Tukwila Fire Station #51 Tukwilla Fire Station 51 Data Date: Jan-29-19 Activity ID Activity Nary Original Duration aamainincg i uration Start, , .. Finish Total - Janudry2019 ., (��. 'Fehr uairy 2019 : March 2019 Apia2P19 May,201,9,, I .. ,. June2019 4my201 ,,, j August2o1a Fioat 30 , 06.....13 `20, =27 03 1Q 17 24 U3 1p. ,17 24 : 31 07 I, 14., . 21 8 1 05 12 ; 1g ' ;26 .. 02 : 09 ' t6 23 3t 47 ..., <14 , 21 28 04 A9003 BP-01 - 321216 -Asphalt Paving A9004 BP-01 321723 - Pavement Markings A9008 BP-02 - 321313 - Concrete Paving 0 0 0 0 0 0 Apr-04-19 4 Apr-04-19 4 May-13-19 22 BP-01 - 321216 -Asphalt BP-01 - 321723 Pavement Paving Marki gs BP-02 - 321313 - Concrete Paving A9009 BP-02 - 321343 - Pervious Rigid Paving 0 0 May-13-19 22 BP-02 - 321343 - Pervious Rigid Paving A9019 BP-03 - 055213 - Pipe and tube Railings 0 0 May-13-19 142 BP-03 - 055213 - Pipe and tube Railings A9021 BP-03 - 074213.13 - Formed Metal Wall Panels A9022 BP-03 - 074646 - Fiber Cement Siding -3` A9023 BP-03 - 075423 - Thermoplastic-Pilyolefin (TPO) Roofing A9024 BP-03 - 076200 - Sheet Metal Flashing and Trim A9025 BP-03 - 077200 - Roof Accessories A9026 BP-03 - 079200 - Joint Sealants { A9027 BP-03 - 081113 - Hollow Metal Doors and Frames A9028 BP-03 - 081416 - Flush Wood Doors A9029 BP-03 - 087100 - Finish Hardware A9030 BP-03 - 089119 - Fixed Louvers 0 0 May-13-19 117 0 0 May-13-19 117 0 0 May-13-19 72 0 0 May-13-19 72 0 0 May-13-19 72 0 0 May-13-19 87 0 0 May-13-19 57 0 0 May-13-19 57 0 0 May-13-19 57 0 0 May-13-19 17 BP-03 B B"-03 B"-03 B"-03 B"-03 r : r :" r : : - 074213.13 - Fcrmed -03 - 074646 - Fiber - 075423 - Thermoplastic-Pilyolefin - 076200 - Shee - 077200 - Roof - 079200 - Joint -03 - 081113 - Hollow 03 - 081416 - Flush -03 - 087100 - Finish -03 - 089119 - Fixed Metal Cement Metal Accessories Sealan Metal Wood Hardware Louvers Wall Panels Siding (TPO) Flashing and Trim s Doors and Frames Doors Roofing A9031 BP-04 - 042200 - Concrete Unit Masonry0 0 May-13-19 77 Y "'-04 - 042200 - Concrete Ur it Masonry A9032 BP-04 - 042613 - Masonry Veneer 0 0 May-13-19 77 : "-04 - 042613 F Masonry Veneer A9033 BP-04 - 071900 - Water Repellents 0 0 May-13-19 252 : "-04 - 071900 - Wate • Repe lents A9034 BP-04 - 072100 - Thermal Insulation 0 0 May-13-19 252 : "-04 - 072100 - Thermal Insulation A9035 BP-04 - 079200 - Joint Sealants 0 0 May-13-19 93 : "-04 - 079200 -Joint Sealan s A9036 BP-05 - 079200 - Joint Sealants 0 0 May-13-19 98 : "-05 - 079200 - Joint Sealan s A9037 BP-05 - 084113 - Aluminum Framed Entrances and Store 0 0 May-13-19 57 : "-05 - C84113 - Alumi ium Framed Entrances and Storefront A9038 BP-05 - 085413 - Fiberglass Windows and Doors 0 0 May-13-19 57 : " 05 - C85413 - Fiberglass Windows and Doors A9039 BP-05 - 088000 - Glazing 0 0 May-13-19 67 : -05 - C88000 - Glazing A9040 BP-06 - 054000 - Cold Formed Metal Framing 0 0 May-13-19 22 : -06 - C 54000 - Cold 'armed Metal Framing A9041 BP-06 - 061643 - Gypsum Sheathing 0 0 May-13-19 52 Aftt B -06 - C 61643 - Gyps am Sheathing A9042 BP-06 - 072100 - Thermal Insulation 0 0 May-13-19 98 -' B -06 - C 72100 - Thermal Insulation A9043 BP-06 - 072119 - Foamed -In -Place Insulation 0 0 May-13-19 98 -' B -06 - C72119 - Foamed -In -Place Insulation A9044 BP-06 - 072500 - Weather Resistant Barriers 0 0 May-13-19 57 -it B -06 - C72500 - Weat-rer Resistant Barriers A9045 BP-06 - 078413 - Penetration Firestopping 0 0 May-13-19 67 -" B -06 - C78413 - Pene ration Firestopping A9046 BP-06 - 079200 - Joint Sealants 0 0 May-13-19 67 -' B -06 - C 79200 - Joint Sealan s A9047 BP-06 - 092216 - Non -Structural Metal Framing 0 0 May-13-19 62 -' B -06 - C 92216 - Non-Structu al Metal Framing A9048 BP-06 - 092900 - Gypsum Board 0 0 May-13-19 98 111 B -06 - C92900 - Gyps am Board A9049 BP-06 - 095113 - Acoustical Pand Ceings 0 0 May-13-19 103 -it B -06 - C95113 - Acoustical Panel Ceings A9050 BP-06 - 095426 - Linear Wood Ceilings 0 0 May-13-19 93 j -' B -06 - C 95426 - Linea' Wooc Ceilings .. A9051 BP-06 - 098436 - Sound -Absorbing Ceiling Units 0 0 May-13-19 93 -ot B -06 - C 98436 - Sound -Absorbing Ceiling Units A9052 BP-07 - 061053 - Miscellaneous Rough Carpentry 0 0 May-13-19 82 -' B -07 - C 61053 - Miscellaneous Rough Carpentry A9053 BP-07 - 062023 - Interior Finish Carpentry 0 0 May-13-19 82 -'f B -07 - C62023 - Interi r Finis 9 Carpentry A9054 BP-07 - 064116- Architectural wood Casework 0 0 May-13-19 12 -it B -07- C64116 - Architectural wood Casework - - A9055 BP-07 - 071113 - Bituminous Dampproofing 0 0 May-13-19 292 A9056 BP-07 - 079200 - Joint Sealants 0 0 May-13-19 67 -y B -et B -07 - C -07 - C 71113 79200 Bitum - Joint nous Campproofing Sealan s A9057 BP-07 - 083100 -Access Doors and Frames 0 0 May-13-19 82 -" B -07 - C 83100 -Access Doo s and Frames A9058 BP-07 - 083613 - Sectional Doors 0 0 May-13-19 67 A9059 BP-07 - 083713 - Four -Fold Doors (ALTERNATE) 0 0 May-13-19 67 } A9060 BP-07 - 088300 - Mirrors 0 0 May-13-19 62 B B -" B -07 - C83613 -07 - C83713 -07 - C88300 - Secti - Four -Fold - Mirro nal Doors D s pors (ALTERNATE) A9061 BP-07 - 099113 - Exterior Painting 0 0 May-13-19 78 -''t B -07 - C 99113 - Exterior Paining A9062 BP-07 - 099123 - Interior Painting 0 0 May-13-19 78 -011 B -07 - C99123 - Interi r Painting A9063 BP-07 - 099600 - High Performance Coatings 0 0 May-13-19 73 -it B -07 - C99600 - High 'erformance Coatings A9064 BP-07 - 101100 - Visual Display Units 0 0 May-13-19 57 -" B -07 - 101100 - Visua Display Units A9065 BP-07 - 101419 - Dimensional Letter Signage 0 0 May-13-19 202 -f B -07 - 101419 - Dime isional Letter Signage A9066 BP-07 - 101423.16 - Room -Identification Panel Signage 0 0 May-13-19 217 -' B -07 - 101423.16 - Room -Identification Panel Signage A9067 BP-07 - 102123 - Cubicle Curtains and Track 0 0 May-13-19 139 -'f B -07 - 102123 - Cubicle Curtains and Track A9068 BP-07 - 102600 - Wall and Door Protection 0 0 May-13-19 72 -it B -07 - 102600 - Wall and Door Protection A - A9069 BP-07 - 102800 - Toilet and Bath Accessories 0 0 May-13-19 72 T B -07 - 102800 - Toilet and Bath Accessories A9070 BP-07 - 104413 - Fire Protection Cabinets 0 0 May-13-19 42 -' B -07 - 104413 - Fire Protection Cabinets A9071 BP-07 - 104416 - Fire Extinguishers 0 0 May-13-19 72 -'f B -07 - 104416 - Fire E xtingui>hers A9072 BP-07 - 107516 - Ground -Set Flagpoles 0 0 May-13-19 130 -', B -07 - 107516 - Grou id -Set Flagpoles A9073 BP-07 - 113100 - Residential Appliances 0 0 May-13-19 92 -it B -07 - 113100 - Residential Appliances Page 2 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work v v Summary ._ vf. Remaining Work • • Milestone Tukwilla Fire Station 51 Data Date: Jan-29-19 Activity ID ActiVity Name . Original Duration Remaining Du tton Start . Finish .Total January 2019 (. 'Fehr uary20 ,9 March 2019 Apra t 19 j ay.2t71 # . June 2019 July2019 . August 201g :Float . 30 06 ., °1 .. 0 27 03 1(t.. Si .. t33, pp` .1Q. 17 4 -24 J , 31 - t}T 14 tt' 1 8 .jj. 46 12 .19 . 6 .. i ##. 49. . 16 3. 30 f 07 14 °21 28 , 04 A9074 BP-07 - 122413 - Roller Window Shades 0 0 May-13-19 72 -it BP-07 - 122413 - Rolle Windcw Shades A9075 BP-07 - 123616 - Metal Countertops 0 0 May-13-19 122 -ot BP-07 - 123616 - Metal Countertops A9076 BP-07 - 123623.13 - Plastic -Laminate -Clad Countertops 0 0 May-13-19 122 -Pt BP-07 - 123623.13 - PI„stic-Laminate-Clad Co ntertops A9077 BP-07 - 123661.19 - Quartz Agglomerate Countertops 0 0 May-13-19 122 -Pt BP-07 - 123661.19 - Q artz Agglomerate Con ertoas A9078 BP-07 - 129300 - Site Furnishings 0 0 May-13-19 97 -'t BP-07 - 129300 - Site 'urnishi-igs A9079 BP-07 - 211000 - Fire Suppression 0 0 May-13-19 27 -it BP-07 - 211000 - Fire-uppression A9080 BP-07 - 211316 - Preaction Double interlock Fire Suppre: 0 0 May-13-19 27 -ot BP-07 - 211316 - Prea.tion De uble interlock Fi e SL ppression A9081 BP-07 - 321723 - Pavement Markings (Onsite) 0 0 May-13-19 182 1., BP-07 - 221723 - Pave ent Markings (Onsite) A9082 BP-08 - 033543 - Polished Concrete Finishing 0 0 May-13-19 202 -'f BP-08 - C33543 - Polls ed Concrete Finishing A9083 BP-08 - 071800 - Traffic Coatings 0 0 May-13-19 212 -i t BP-08 - C71800 - Traffi Coatings A9084 BP-08 - 093013 - Ceramic Tling 0 0 May-13-19 127 -"t BP-08 - C93013 - Cera is Tilirg A9085 BP-08 - 096513 - Resilient Base and Accessories 0 0 May-13-19 152 -"t BP-08 - C 96513 - Resilient Bale and Accessor es A9086 BP-08 - 096566 - Resilient Athletic Flooring 0 0 May-13-19 202 -ot BP-08 - C 96566 - Resili-nt Ath etic Fieoring A9087 BP-08 - 124813 - Entrance Floor Mats 0 0 May-13-19 207 -Pt BP-08 - 124813 - Entra ce Fie or Mats A9088 BP-09 - 323111 - Gate Operators and Hardware 0 0 May-13-19 112 -i't BP-09 - 223111 Gate O perat rs anc Hardwa e A9089 BP-09 - 323113 - Chain Link Fencing and Gates 0 0 May-13-19 117 -'t BP-09 - 223113 - Chai Link Fencing and Gates A9090 BP-09 - 323119 - Decorative Metal Security Fences and I 0 0 May-13-19 102 -'t BP-09 - 223119 - Deco ative Metal Security Fe ces and Gates A9091 BP-10 - 328400 - Planting and Irrigation 0 0 May-13-19 112 -l't BP-10 - 2 28400 - Planti g and Irrigati n A9092 BP-10 - 329200 - Turf and Grasses 0 0 May-13-19 122 -mot BP-10 - 229200 - Turf . nd Gressel A9093 BP-10 - 329300 - Planting 0 0 May-13-19 122 -i't BP-10 - 229300 - Planti g a A9094 MCCM - 078413 - Penetration Firestopping A9095 MCCM - 079200 - Joint Sealants A9096 MCCM - 220500 - Common Work Results for Plumbing A9097 MCCM - 220700 - Plumbing Insulation A9098 MCCM - 220800 - Commissioning of Plumbing A9099 MCCM - 221000 - Domestic Water Ripng A9100 MCCM - 221123 - Domestic Water Pumps A9101 MCCM - 221316 - Sanitary Waste and Vent Piping A9102 MCCM - 224200 - Plumbing Fixtures A9103 MCCM - 226100 - Compressed Air A9104 MCCM - 230500 - Common Work Results for HVAC A9105 MCCM - 230548 Vibration Isolation A9106 MCCM - 230593 - Balancing A9107 MCCM - 230700 - HVAC Insulation A9108 MCCM - 230800 - Commissioning of HVAC A9109 MCCM - 230923 - Controls A9110 MCCM - 231123 - Natural Gas Piping A9111 MCCM - 231223 - Diesel Vehicle Fuel System A9112 MCCM - 232300 - Refrigeration Piping A9113 MCCM - 233100 -Air Distribution A9114 MCCM - 233400 - HVAC Fans and Equipment A9115 MCCM - 233520 Automatic Emergency Vehicle Exhaust A9116 BP-11 - 078413 - Penetration Firestopping A9117 BP-11 - 079200 - Joint Sealants A9118 BP-11 - 260500 - Common work Results for Electrical A9119 BP-11 - 260519- Low -Voltage Cable and Terminations A9120 BP-11 - 260526 - Grounding and Bonding for Electrical Sy A9121 BP-11 - 260529 - Hangers and Supports for Electrical Sy: . A9122 BP-11 - 260534- Raceways and Boxes for Electrical Sysi A9123 BP-11 - 260543 - Underground Raceways A9124 BP-11 - 260553 - Identification for Electrical Systems A9125 BP-11 - 260573 - Power Systems Protective Device Study A9126 BP-11 - 260800 - Electrical Systems Commissioning A9127 BP-11 - 260923 - Lighting Control A9128 BP-11 - 262416- Panelboards A9129 BP-11 - 262726- Wiring Devices A9130 BP-11 - 262816- Enclosed Switches and Circuit Breakers A9131 BP-11 - 262913 - Motor Control 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 277 0 0 May-13-19 267 0 0 May-13-19 277 0 0 May-13-19 267 0 0 May-13-19 257 0 0 May-13-19 267 0 0 May-13-19 247 0 0 May-13-19 262 0 0 May-13-19 277 0 0 May-13-19 262 0 0 May-13-19 277 0 0 May-13-19 267 0 0 May-13-19 277 0 0 May-13-19 247 0 0 May-13-19 267 0 0 May-13-19 227 0 0 May-13-19 267 0 0 May-13-19 262 0 0 May-13-19 237 0 0 May-13-19 237 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 277 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 267 0 0 May-13-19 277 0 0 May-13-19 277 0 0 May-13-19 131 0 0 May-13-19 237 0 0 May-13-19 262 0 0 May-13-19 237 0 0 May-13-19 237 M M M li, M li, M M M M li, M M M M M li, M M M M M li, M M M M li, BP-11 BP-11 BP-11 BP-11 110 BP-11 li, BP-11 BP-11 BP-11 BP-11 BP-11 li, BP-11 BP-11 BP-11 BP-11 li, BP-11 li, BP-11 3CM - 3CM - 3CM - 3CM - 3CM - 2CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - 3CM - - 078413 - 079200 - 260500 - 260519 - 260526 - 260529 - 260534 - 260543 - 260553 - 260573 - 260800 - 260923 - 262416 - 262726 - 262816 - 262913 378412 J7920C 22050C 22070C 22080C 22100C 221123 22131E 22420C 22610C 23050C 23054E 230592 23070C 23080C 230922 231123 231222 23230C 23310C 23340C 23352C - Pen: - Join 1 - Co - Plu - Co - Do - Dom-stic - Sani - Plu - Co - Co - Vibr. - Bala - HVA - Co - Con l - Natu - Dies - Refr -Air II - HVA - Auto - Penal - Joint - Com - Low- - Grou - Hang - Race - Unde - Identi - Powe - Elect - Lighti - Paneboards - Wirin - Enclo - Moto tration Sealants on Work bing Insulation issioning -stic Water W ary Waste bing Fixtures .ressed on Work Lion Is cing Insulation issioning ols al Gas -I Vehic .eratioa stribut Fans atic Emergency ation .ealants on wo'k oltageCable ding aid -rs anc ays aid ground ication Systems cal Sys,tems g Con Devices ed Switches Control Firestcpping Results of Rpng ater Pumps and Air Results lation of Piping le Fuel Piping on and Equipment Firestopping Results Bonding Supports Boxes Raceways for Electrical Protective rol fcr Plumbing Vent fcr HVAC System Vehic for and Teminations for for for Ele Sy.tema Commissioning and Ciro 'Iumbing Piing VAC e Ex' EI•ctric Eectrbal El ctrical trical D•vice it Breakers -oust System al Systems Systems Systems Study Page 3 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work v v Summary ._ vf. Remaining Work • • Milestone Tukwilla Fire Station 51 Data Date: Jan-29-19 Act City ID Act ityNarne , Original rrra) a TinFinish Tots , January 2019 'Fehr uary20 , - . March 2019 :, APr 2019 . ^1ay,201,9 , June 20,9 .... July2019 ,, ;Aagust 201a A9132 A9133 A9134 A9135 A9136 A9137 A9138 A9139 BP-11 - 263213 - Engine Generators BP-11 - 265100 - Lighting BP-11 - 271500 - Data and Telephone Distribution System BP-11 - 274133 - Television Distribution System BP-11 - 281301 - Security Access System BP-11 - 282300 - Video Surveilance BP-11 - 283111 - Fre Alarm System BP-11 - 285005 - Fire Station Alerting Duration, 0 0 0 0 0 0 0 0 . Duration 0 0 0 0 0 0 0 0 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 ; , baf 227 101 257 257 257 257 257 237 �0 06 20 03 :10 .in2 i 03 ', 10figmezmn 07 14 , 8 05 ' BP-11 BP-11 BP-11 BP-11 BP-11 BP-11 BP-11 BP-11 19 - 263213 - 265100 - 271500 - 274133 - 281301 - 282300 - 283111 - 2:5005 ._ ' -26 - ' '0 - Engine - Lighting - Data - Telev - Security - Video F're Aarm - Fire Station 09 Generators and Telephone sion Distribution Access Surveiance System Alerting ` 16 System Distrit Syste 30 ut on System ° 07 ', . 14 28 -44 25 Review 130? 130 Mar-05-19 Sep-06-19 190 A9195 BP-07 - 071113 - Bituminous Dampproofing 5 5 Mar-05-19 Mar-11-19 55 _> BP-07 - 071113 - luminous Dampproofing A9150 BP-03 - 031000 - Concrete Framing and Accessories 5 5 Apr-02-19 Apr-08-19 5 A9151 BP-03 - 032000 - Concrete Reinforcing 5 5 Apr-02-19 Apr-08-19 0 _ BP-03 - 031000 BP-03 - 032000 - Concrete Framing - Concrete Reinforcing and Accessories A9152 BP-03 - 033000 - Cast -In -Place Concrete 5 5 Apr-02-19 Apr-08-19 5 _ BP-03 - 033000 - Cast -In -Place Conc rete A9153 BP-03 - 051200 - Structural Steel Framing 5 5 Apr-02-19 Apr-08-19 24 ---- BP-03 - 051200 - Structural Steel Framing A9154 BP-03 - 051213 -Architecturally Exposed Structural Steel 5 5 Apr-02-19 Apr-08-19 24 BP-03 - 051213 - Architectura ly Exposed St r uctura Steel Framing (AESS) A9155 BP-03 - 052100 - Steel Joist Framing 5 5 Apr-02-19 Apr-08-19 14 -= BP-03 - 052100 - Steel Joist Framing A9156 BP-03 - 053100 - Steel Decking 5 5 Apr-02-19 Apr-08-19 14 BP-03 - 053100 - Steel Deckirg A9157 BP-03 - 055000 - Metal Fabrications 5 5 Apr-02-19 Apr-08-19 19 _ BP-03 - 055000 - Metal Fabrications A9158 BP-03 - 055113 - Metal Pan Stairs 5 5 Apr-02-19 Apr-08-19 24 ---- BP-03 - 055113 - Metal Pan Stairs A9160 BP-03 - 072100 - Thermal Insulation 5 5 Apr-02-19 Apr-08-19 131 w--- BP-03 - 072100 - Thermal Insulation A9145 BP-01 - 331100 - Water Utilities A9146 BP-01 - 333000 - Sanitary Sewer 5 5 Apr-03-19 Apr-09-19 0 5 5 Apr-03-19 Apr-09-19 0 BP-01 - 33110 BP-01 - 33300 - Water Utilities - Sanitary Sewer A9147 BP-01 - 334000 - Storm Drainage 5 5 Apr-03-19 Apr-09-19 0 BP-01 - 33400) - Storm Drainage A9140 BP-01 311000 - Site Preparation 5 5 Apr-04-19 Apr-10-19 4 BP-01 - 311000 - Site Preparation A9141 BP-01 - 312200 - Earthwork 5 5 Apr-04-19 Apr-10-19 4 BP-01 - 3122 0 - Earthwork A9142 BP-01 - 314133 - Trench Safety 5 5 Apr-04-19 Apr-10-19 4 BP-01 - 314133 - Trench Safety A9143 BP-01 - 321216 -Asphalt Paving 5 5 Apr-04-19 Apr-10-19 4 BP-01 - 3212 6 -Asphalt Paving A9144 BP-01 - 321723 - Pavement Markings 5 5 Apr-04-19 Apr-10-19 4 BP-01 - 321723 - Pavement Markirgs A9167 BP-03 - 081113 - Hollow Metal Doors and Frames 5 5 May-13-19 May-17-19 57 BP-03 - 081113 - Hollow k etal Doors and ramps A9168 BP-03 - 081416 - Flush Wood Doors 5 5 May-13-19 May-17-19 57 BP-03 - 08 416 - Flush wood Doors A9169 BP-03 087100 - Finish Hardware 5 5 May-13-19 May-17-19 57 BP-03 - 08 100 - Finish Hardware A9198 BP-07 - 083613 - Sectional Doors 5 5 May-13-19 May-17-19 67 A9199 BP-07 - 083713 - Four -Fold Doors (ALTERNATE) 5 5 May-13-19 May-17-19 67 A9234 MCCM - 078413 - Penetration Firestopping 5 5 May-13-19 May-17-19 267 BP-07 BP-C7 MCCM - 083613 - 083713 - 07 - Sectional - Four 413 - -Fold Penetration Doors Doo Firestoppin s (ALTE ' NA? E) A9235 MCCM - 079200 - Joint Sealants 5 5 May-13-19 May-17-19 267 MCC M - 07 )200 - Joint Sealants £ A9236 MCCM - 220500 - Common Work Results for Plumbing 5 5 May-13-19 May-17-19 277 A9237 MCCM - 220700 - Plumbing Insulation 5 5 May-13-19 May-17-19 267 A9238 MCCM - 220800 - Commissioning of Plumbing 5 5 May-13-19 May-17-19 277 A9239 MCCM - 221000 - Domestic Water Ppng 5 5 May-13-19 May-17-19 267 A9240 MCCM - 221123 - Domestic Water Pumps 5 5 May-13-19 May-17-19 257 - A9241 MCCM - 221316 - Sanitary Waste and Vent Piping 5 5 May-13-19 May-17-19 267 A9242 MCCM - 224200 - Plumbing Fixtures 5 5 May-13-19 May-17-19 247 MCC M - 22 M - 22 M - 22 M - 22 - 22 M - 22 M - 221200 )500 - )700 - )800 - 000 - 123 - 316 - - 3ommon Plumbing 3ommi:sioning Domes Domes 3anitar Plumbing Work Insulation ic Water ic Water i Waste Fixtures Resuts of Plun.ing Rphg Pumps and Ve for Plumbing t Pip ng A9243 MCCM - 226100 - Compressed Air 5 5 May-13-19 May-17-19 262 MCC M - 22 100 - 3ompressed Air A9244 MCCM - 230500 - Common Work Results for HVAC 5 5 May-13-19 May-17-19 277 A9245 MCCM - 230548 - Vibration Isolation 5 5 May-13-19 May-17-19 262 A9246 MCCM - 230593 - Balancing 5 5 May-13-19 May-17-19 277 MCC M - 23 M - 23 M - 23 )500 - )548 - )593 - 3ommon ✓ibration 3alanciig Work Isolation Resu is for HVAC A9247 MCCM - 230700 - HVAC Insulation 5 5 May-13-19 May-17-19 267 MCC M - 23 )700 - -IVAC Insulation A9248 MCCM - 230800 - Commissioning of HVAC 5 5 May-13-19 May-17-19 277 MCC M - 23 )800 - 3ommi:sioning of HVAI A9249 MCCM - 230923 - Controls 5 5 May-13-19 May-17-19 247 A9250 MCCM - 231123 - Natural Gas Piping 5 5 May-13-19 May-17-19 267 A9251 MCCM - 231223 - Diesel Vehicle Fuel System 5 5 May-13-19 May-17-19 227 MCC M - 23 M - 23 M - 23 )923 - 123 - 223 - controls Natural Diesel Gas Piping Vehicle Fuel Sys em A9252 MCCM - 232300 - Refrigeration Piping 5 5 May-13-19 May-17-19 267 MCC M - 23 2300 - 3efrige'ation Piping A9253 MCCM - 233100 -Air Distribution 5 5 May-13-19 May-17-19 262 A9254 MCCM - 233400 - HVAC Fans and Equipment 5 5 May-13-19 May-17-19 237 A9255 MCCM - 233520 - Automatic Emergency Vehicle Exhaust 5 5 May-13-19 May-17-19 237 A9256 BP-11 - 078413 - Penetration Firestopping 5 5 May-13-19 May-17-19 267 MCC M - 23100 M - 23 M - 23 1 - 078413 -Air 3400 - 3520 - - Penetration Dist -IVAC Automatic ibution Fans and Emergency Firestopping Equip ent ehicle Exhaust System A9257 BP-11 - 079200 - Joint Sealants 5 5 May-13-19 May-17-19 267 BP-1 1 - 079200 J pint Sealants A9258 BP-11 - 260500 - Common work Results for Electrical 5 5 May-13-19 May-17-19 277 BP-1 1 - 260)00 - Common work Results for Electrical Page 4 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work y v Summary ._ vf. Remaining Work • • Milestone Tukwiila Fire Station 51 Data Date: Jan-29-19 AcC rityID , .AdtMty Melee :Or al emaiiihcg Start , , Finish , Total January 2019 . February 2010 - , : March 200 :, Apr 019 ; , , May.201,,0 , ,. June 20,9 July 2010 ,,, ;August 201a �s> A9259 A9260 A9261 A9262 A9263 A9264 A9265 A9266 A9267 A9268 A9269 A9270 A9271 A9272 A9273 A9274 A9275 A9276 A9277 A9278 A9279 A9161 A9162 A9163 A9164 A9165 A9166 A9176 A9177 A9178 A9179 A9171 A9172 A9173 A9174 A9175 A9148 A9149 A9180 A9181 A9182 A9183 A9184 A9185 A9186 A9187 A9188 A9159 A9192 A9193 A9194 A9197 A9215 A9216 A9217 A9224 A9225 A9226 BP-11- 260519-Low-Voltage Cable and Terminations BP-11 - 260526 - Grounding and Bonding for Electrical Sy BP-11 - 260529 - Hangers and Supports for Electrical Sy: BP-11 - 260534 - Raceways and Boxes for Electrical Sysl BP-11 - 260543 - Underground Raceways BP-11 - 260553 - Identification for Electrical Systems BP-11 - 260573 - Power Systems Protective Device Study BP-11 - 260800 - Electrical Systems Commissioning BP-11 - 260923 - Lighting Control BP-11 - 262416 - Panelboards BP-11 - 262726 - Wiring Devices BP-11 - 262816 - Enclosed Switches and Circuit Breakers BP-11 - 262913 - Motor Control BP-11 - 263213 - Engine Generators BP-11 - 265100 - Lighting BP-11 - 271500 - Data and Telephone Distribution System BP-11 - 274133 - Television Distribution System BP-11 - 281301 - Security Access System BP-11 - 282300 - Video Surveilance BP-11 - 283111 - Fire Alarm System BP-11 - 285005 - Fire Station Alerting BP-03 - 074213.13 - Formed Metal Wall Panels BP-03 - 074646 - Fiber Cement Siding BP-03 - 075423 - Thermoplastic-Pilyolefin (TPO) Roofing BP-03 - 076200 - Sheet Metal Flashing and Trim BP-03 - 077200 - Roof Accessories BP-03 - 079200 - Joint Sealants BP-05 - 079200 - Joint Sealants BP-05 - 084113 - Aluminum Framed Entrances and Store BP-05 - 085413 - Fiberglass Windows and Doors BP-05 - 088000 - Glazing BP-04 - 042200 - Concrete Unit Masonry BP-04 - 042613 - Masonry Veneer BP-04 - 071900 - Water Repellents BP-04 - 072100 - Thermal Insulation BP-04 - 079200 - Joint Sealants BP-02 - 321313 - Concrete Paving BP-02 - 321343 - Pervious Rigid Paving BP-06 - 054000 - Cold Formed Metal Framing BP-06 - 061643 - Gypsum Sheathing BP-06 - 072100 - Thermal Insulation BP-06 - 072119 - Foamed -In -Place Insulation BP-06 - 072500 - Weather Resistant Barriers BP-06 - 078413 - Penetration Firestopping BP-06 - 079200 - Joint Sealants BP-06 - 092216 - Non -Structural Metal Framing BP-06 - 092900 - Gypsum Board BP-03 - 055213 - Pipe and tube Railings BP-07 - 061053 - Miscellaneous Rough Carpentry BP-07 - 062023 - Interior Finish Carpentry BP-07 - 064116 - Architectural wood Casework BP-07 - 083100 -Access Doors and Frames BP-07 - 123616 - Metal Countertops BP-07 - 123623.13 - Plastic -Laminate -Clad Countertops BP-07 - 123661.19 - Quartz Agglomerate Countertops BP-08 - 093013 - Ceramic Tiling BP-08 - 096513 - Resilient Base and Accessories BP-08 096566 - Resilient Athletic Flooring Duration 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 Dur9tttrr 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5' 5' 5 5 5 5 5 5 5 5' 5 5' 5 5 5 5 5 5 5' 5 5 5 . , '_' May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-13-19 May-20-19 May-20-19 May-20-19 May-20-19 May-20-19 May-20-19 May-27-19 May-27-19 May-27-19 May-27-19 Jun-03-19 Jun-03-19 Jun-03-19 Jun-03-19 Jun-03-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-10-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-17-19 Jun-24-19 Jun-24-19 Jun-24-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-17-19 May-24-19 May-24-19 May-24-19 May-24-19 May-24-19 May-24-19 May-31-19 May-31-19 May-31-19 May-31-19 Jun-07-19 Jun-07-19 Jun-07-19 Jun-07-19 Jun-07-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-14-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-21-19 Jun-28-19 Jun-28-19 Jun-28-19 Ffcat 267 267 267 267 267 267 277 277 131 237 262 237 237 227 101 257 257 257 257 257 237 117 117 72 72 72 87 98 57 57 67 77 77 252 252 93 22 22 22 52 98 98 57 67 67 62 98 142 82 82 12 82 122 122 122 127 152 202 e o 0 in 003. 10 4 03..iG},,.111511=61111 67 " " 14, .,.. s 06 =' :: tcJ BP BP-1 .:: -26 1-260519-Low-Vol 1 - 260526 Q2 - C 09 rounding ` 16 age Cable and 23 and Bondin4 Boxes Electrical Protective Commissi and ors lone D bution System ting Metal Siding Flashing ;essories Sealants - Concrete - Masonry - Water - Therma - Joint - 321313 - 321343 - 054000 - 061643 - 072100 - 072119 - 072500 - 076413 - 079200 - 092216 - 092900 BP-03 BP-07 BP-07 13P-07 BP-07 BP-07 BP-07 BP-07 30 Terminations for Electrical for Electrical or Ele Systems Device Circu stribution "System Wall and Framed Windows Fepellerts Sealants - C - Fervious - Cold - Gypsurr - Thermal - Foamed - Weathe - Fenetration - Joint - Non-Structu - Gypsurr - 055213 - 061053 - 063023 - 064116 - 080100 - 123616 - 123623.13 - 123661.19 BP-C8 BP-C8 BP-C8 ° 07. trical Systems S ning t Breakers System Panels n (TPO) Trin Entrances and Unit Veneer Insulation oncrets Fo Sealants - Pipe - Miscellaneous - Interi - Architectural -Access - Metal - 093013 - 098513 - 098566 . 14 Systems Systerrs udy Roofing Doc Masonry Pavir Ric med Sheathing Insulation -In -Place Resistant Board - Plastic - Quartz 2 and Storefron rs g id Paving Metal Framing Insulation Barriers Firestopping al Metal Framinc and tube Railings Rough r Finish Carpentry wood Casework Doors and Frames Countertops -Laminate -Cad Agglomerate - Ceramic Tiling - Resilient Base - Fesilient Athleti1 04 I Carpentry Countertops Coun and Accessories Floor . erto ng os BP-1 1 - 260529 - I -angers and Supports :: BP-1 BP-1 BP-1 BP-1 1 - 260534 1 - 260543 1 - 260553 1 - 260573 - Faceways - L - Identification - Power nderground and Raceways for Systems BP-1 1 - 260300 - Oectricsl Systems --_-- - :: BP-1 BP-1 BP-1 1 - 260923 1 - 262416 1 - 262726 - Lghting - Panelboards - Wiring Cevices Contro BP-1 1 - 262516 - enclosed Switches BP-1 1 - 262913 - N otor C)ntrol BP-1 BP-1 BP-1 1 - 263213 1 - 265100 1 - 271500 - engine - Lghting - Cata Genera and Telep BP-1 1 - 274133 - Televisicn Distr :: BP-1 BP-1 BP-1 BP-1 1 - 281 1 - 282300 1 - 283111 1 - 285005 301 Security - Vdeo - Fie - F Surveilance Alar re Station Access n System Ala BP-03 BP-03 - 074213.13 - 074646 - Fiber - Forrred Cement , = BP-03 - 075423 - Thermoplastic-Pilyolef BP-03 BP-03 - 076200 - 077200 - Sheet - Roof Metal Ac BP-03 - 079200 BP-05 BP-05 - Joint - 079200 - 084113 Sealants - Joint - Aluminum BP-05 - 085413 - Fiberglass BP-05 - 088000 - Glazing BP-04 BP-C4 BP-C4 - 042200 - 042613 - 071900 BP-04 - 072100 BP-04 - 079200 BP-06 BP-06 BP-06 BP-06 BP-06 BP-06 BP-06 BP-06 1.13M Page 5 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work y v Summary ._ vf. Remaining Work • • Milestone Tukwilla Fire Station 51 Data Date: Jan-29-19 Activity ID, , , _ ,ActFrt.Narne - Original rrra)nkig Start Finish Tct i , Jan ry zt112 'Fehr ry 2tf t - . March 1 " AP 019 1ay,2t71,& , .. ne 019 .... July 2019 ,, ;August 2019 Duratio bt ration :. Fto e r 06 ' 2rt 03 ., 14 03 .. 10 A9227 BP-08 - 124813 - Entrance Floor Mats 5 5 Jun-24-19 Jun-28-19 207 A9208 BP-07 - 102600 - Wall and Door Protection 5 5 Jul-01-19 Jul-05-19 72 (17 ' : 05 1 .„ -260 09 ` 16 30 isiiiiiBP-! Pil"BP-: 07.. : - 12 14 : 2$'.t34 : ntrance Floor 0..00 - Wall an. Mats Door ' 'rot,: tion 25 A9209 BP-07 - 102800 - Toilet and Bath Accessories 5 5 Jul-01-19 Jul-05-19 72 O.:00 - Toilet a . Bath cc ssories A9210 BP-07 104413 - Fire Protection Cabinets 5 5 Jul-01-19 Jul-05-19 42 ,f A9211 BP-07 - 104416 - Fire Extinguishers 5 5 Jul-01-19 Jul-05-19 72 A9214 BP-07 - 122413 - Roller Window Shades 5 5 Jul-01-19 Jul-05-19 72 j - A9189 BP-06 - 095113 - Acoustical Panel Ceings 5 5 Jul-08-19 Jul-12-19 103 Nw BP : - BP-: BP-: M 0, 13 - Fire Pro - 0, 16 - Fire Exti 2. 13 - Roller -:. - 095113 action ------ guish indow ousti•al Cab --- rs .ha Panel nets es Cel'n; ------ s A9190 BP-06 - 095426 - Linear Wood Ceilings 5 5' Jul-08-19 Jul-12 19 93 : :. - 095426 - near oo. Ceilings A9191 BP-06 - 098436 - Sound -Absorbing Ceiling Units 5 5 Jul-08-19 Jul-12-19 93 A9207 BP-07 - 102123 - Cubicle Curtains and Track 5 5 Jul-08-19 Jul-12-19 139 A9196 BP-07 - 079200 - Joint Sealants 5 5 Jul-15-19 Jul-19-19 67 A9200 BP-07 088300 -Mirrors 5 5 Jul-15-19 Jul-19-19 62;617----BP-07 A9205 BP-07 101419 - Dimensional Letter Signage 5 5 Jul-15-19 Jul-19-19 202 : "-t. : "-: miiiii 11.117 - 098436 - 'ound-' - 102123 - : BP-07 - 07•'00 - 08:c00 BP-07 - 101 ubicle - Joint - 19 - : bso urt.ins irro ime Bing Ceili and .ealants s sional Lo g Uni rack ter Si. A9206 BP-07 - 101423.16 - Room -Identification Panel Signage 5 5 Jul-15-19 Jul-19-19 217 A9170 BP-03 - 089119 - Fixed Louvers 5 5 Jul-22-19 Jul-26-19 17 A9204 BP-07 - 101100 - Visual Display Units 5 5 Jul-22-19 Jul-26-19 57 _ = BP-07 - 101 = BP- :c _=> BP- I 23.16 - 08.119 - 101 - R 00 om-Ident Fixed L. Visual D icatio vers splay A9219 BP-07 211000 - Fire Suppression 5 5 Jul-22-19 Jul-26-19 27 BP-: - 211:00 Fire Su..ressi A9220 BP-07 - 211316 - Preaction Double interlock Fire Suppre: 5 5 Jul-22-19 Jul-26-19 27 A9222 BP-08 - 033543 - Polished Concrete Finishing 5 5 Jul-22-19 Jul-26-19 202 A9223 BP-08 - 071800 - Traffic Coatings 5 5' Jul-22-19 Jul-26-19 212 A9201 BP-07 - 099113 - Exterior Painting 5 5 Aug-05-19 Aug-09-19 78 -- BP-: BP-:: = BP-:: - 211 - 03 "543 - 071:00 a 16 B"-07 Preactio Polishe. Traffic coating" - 09.113 Dou. Conc - A9202 BP-07 - 099123 - Interior Painting 5 5 Aug-05-19 Aug-09-19 78 B"-07 - 09.123 - I A9203 BP-07 - 099600 - High Performance Coatings 5 5 Aug-05-19 Aug-09-19 73 A9228 BP-09 - 323111 - Gate Operators and Hardware 5 5 Aug-05-19 Aug-09-19 112 A9229 BP-09 - 323113 - Chain Link Fencing and Gates 5 5 Aug-05-19 Aug-09-19 117 kii NIZ.. B"-07 B"-09 B"-09 - 09•.00 - 32 - 32 - A9230 BP-09 - 323119 - Decorative Metal Security Fences and l 5 5 Aug-05-19 Aug-09-19 102 B"-09 - 32 119 A9212 BP-07 107516 - Ground -Set Flagpoles 5 5 Aug-12-19 Aug-16-19 130 BP-. - 10 A9213 BP-07- 113100- Residential Applbnces 5 5 Aug-12-19 Aug-16-19 92 A9231 BP-10 328400 - Planting and Irrigation 5 5 Aug-26-19 Aug-30-19 112 A9232 BP-10 329200 - Turf and Grasses 5 5 Aug-26-19 Aug-30-19 122 % BP-: - 11 A9233 BP-10 - 329300 - Planting 5 5 Aug-26-19 Aug-30-19 122 A9218 BP-07 129300 - Site Furnishings 5 5 Sep-02-19 Sep-06-19 97 A9221 BP-07 - 321723 - Pavement Markings (Onsite) 5 5 Sep-02-19 Sep-06-19 182 Approval 135 135 Mar-12-19 Sep-20-19 190 Procurement/Fabrication 150° 150 Mar-26-19 Oct-25-19 165 A9475 BP-07 - 071113 - Bituminous Dampproofing 10 10 Mar-26-19 Apr-08-19 55 - === BP-07 - 071113 Bituminous Dampproofing A9430 BP-03 - 031000 - Concrete Framing and Accessories 15 15 Apr-23-19 May-13-19 5 =- - , - _ BP-03 - 031000 - Concrete Framing and Accessories A9431 BP-03 - 032000 - Concrete Reinforcing 20 20 Apr-23-19 May-20-19 0 - BP-03 - 032000 - Concrete Reinforcing A9432 BP-03 - 033000 - Cast -In -Place Concrete 15 15 Apr-23-19 May-13-19 5 - B 03 033000 - Cast -In -Place Concrete A9434 BP-03 - 051213 -Architecturally Exposed Structural Steel 40 40 Apr-23-19 Jun-17-19 24 _ _ - iii BP 03 051213 -Architect rally Exposed Structural Ste -I Framing (AES A9435 BP-03 - 052100 - Steel Joist Framing 50 50 Apr-23-19 Jul-01-19 14 - BP-03 - 0521:0 Steel Joist Framing A9436 BP-03 - 053100 - Steel Decking 50 50 Apr-23-19 Jul-01-19 14 --- ---- --- --- _ BP-03 - 0531:0 - Steel Decking A9437 BP-03 - 055000 - Metal Fabrications 40 40 Apr-23-19 Jun-17-19 266 BP-03 - 055000 - Metal Fa. ri.ations A9438 BP-03 - 055113 - Metal Pan Stairs 40 40 Apr-23-19 Jun-17-19 24 „_ BP-03 - 055113 - Metal Pa S airs A9440 BP-03 - 072100 - Thermal Insulation 10 10 Apr-23-19 May-06-19 131 BP-03 - 0'2100 - Thermal Insulation A9425 BP-01 - 331100 - Water Utilities 5 5 Apr-24-19 Apr-30-19 0 BP-01 - 331100 - Water Utilities A9426 BP-01 - 333000 - Sanitary Sewer 5 5 Apr-24-19 Apr-30-19 0 ■_ BP-01 - 333000 - Sanitary Sewer A9427 BP-01 - 334000 - Storm Drainage 5 5 Apr-24-19 Apr-30-19 0 BP-01 - 334000 - Storm Drainage A9420 BP-01 - 311000 - Site Preparation 5 5 Apr-25-19 May-01-19 4 - BP-01 - 31100 i - Site Preparation A9421 BP-01 - 312200 - Earthwork 5 5 Apr-25-19 May-01-19 4 BP-01 - 31220 r - Earthwork A9422 BP-01 - 314133 - Trench Safety 5 5 Apr-25-19 May-01-19 4 BP-01 - 31413 0 - Trench Safety A9423 BP-01 - 321216 -Asphalt Paving 5 5 Apr-25-19 May-01-19 4 _ BP-01 - 32121 . -Asphalt Paving A9424 BP-01 - 321723 - Pavement Markings 5 5 Apr-25-19 May-01-19 4 BP-01 - 32172; - Pavement Markings A9433 BP-03 - 051200 - Structural Steel Framing 40 40 Apr-30-19 Jun-24-19 19 i---= - - BP-03 - 051200 - St u.tural Steel Framing A9447 BP-03 081113 - Hollow Metal Doors and Frames 40 40 Jun-03-19 Jul-26-19 57 BP-03 - 081113 Hollow Metal D. A9448 BP-03 081416 - Flush Wood Doors 40 40 Jun-03-19 Jul-26-19 57 - - - ---- •- BP-03 - 081416 Flush Wood D. A9449 BP-03 - 087100 - Finish Hardware 40 40 Jun-03-19 Jul-26-19 57 = = = BP-03 - 087100 Finish Hardwa A9478 BP-07 - 083613 - Sectional Doors 30 30 Jun-03-19 Jul-12-19 67 _ , _ _, _ L - 083613 - Sectional D..rs Page 6 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work v v Summary ._ vf. Remaining Work • • Milestone Tukwiila Fire Station 51 Data Date: Jan-29-19 ActivityID... Activty.Name Originat Duraton lemait*ig' . Duration tart Finish Total January2t119 (. `February2et9 arch2U19 �1i Apr: g19 ay.201`t . June2019 Lily 20 j August2(f19 ��U2 Float 24 � a13 .10 17 4 1` 67 14 :' �1 .12 Y9.' � 26 09 16 . 2 3fi . Q7 ..,14 t �� � 2$� .t34 A9479 BP-07 - 083713 - Four -Fold Doors (ALTERNATE) 30 30 Jun-03-19 Jul-12-19 67 = BP-C(7 - 083713 - Four -Fold Doors (ALTERNA A9514 MCCM - 078413 - Penetration Firestopping 10 10 Jun-03-19 Jun-14-19 267 = MCCM - 078413 - Penetration Firestopping A9515 MCCM - 079200 - Joint Sealants 10 10 Jun-03-19 Jun-14-19 267 MCCM - 079200 - Joint Sealants: A9516 MCCM - 220500 - Common Work Results for Plumbing 0 0 Jun-03-19 Jun-03-19 277 I MCCM - 220500 - Common Work Results fir Plumbing A9517 MCCM - 220700 - Plumbing Insulation 10 10 Jun-03-19 Jun-14-19 267 -- MCCM - 220700 - Plumbing lnsu4ation A9518 MCCM - 220800 - Commissioning of Plumbing 0 0 Jun-03-19 Jun-03-19 277 I MCCM - 220800 Commissioning of Plurrbir*g A9519 MCCM - 221000- Domestic Water Ripng 10 10 Jun-03-19 Jun-14-19 267 = MCCM- 221000- Domestic Wa:r Rpng A9520 MCCM - 221123 - Domestic Water Pumps 20 20 Jun-03-19 Jun-28-19 257 f ._---- MCCM - 221123 - Domestic Water Pumps A9521 MCCM - 221316 - Sanitary Waste and Vent Piping 10 10 Jun-03-19 Jun-14-19 267 MCCM - 221316 - Sanitary W ast. and Vent Piping A9522 MCCM - 224200 - Plumbing Fixtures 30 30 Jun-03-19 Jul-12-19 247 MCCM - 224200 - Plumbing Fixtures A9523 MCCM - 226100 - Compressed Air 15 15 Jun-03-19 Jun-21-19 262 _- ; MCCM - 226100 - Compressed Air A9524 MCCM - 230500 - Common Work Results for HVAC 0 0 Jun-03-19 Jun-03-19 277 I MCCM - 2305001 Common Work Results fir HVAC A9525 MCCM - 230548 - Vibration Isolation 15 15 Jun-03-19 Jun-21-19 262 = MCCM - 230548 - Vibration Isolation A9526 MCCM - 230593 - Balancing 0 0 Jun-03-19 Jun-03-19 277 I MCCM - 230593 ; Balancing A9527 MCCM - 230700 - HVAC Insulation 10 10 Jun-03-19 Jun-14-19 267 -- MCCM - 230700 - HVAC Insulation A9528 MCCM - 230800 - Commissioning of HVAC 0 0 Jun-03-19 Jun-03-19 277 I MCCM - 230800 Commissioning of HVAC 1 A9529 MCCM - 230923 - Controls 30 30 Jun-03-19 Jul-12-19 247 > ->_ MCCM - 230923 - Controls A9530 MCCM - 231123 - Natural Gas Piping 10 10 Jun-03-19 Jun-14-19 267 MCCM - 231123 - Natural Gas Piping A9531 MCCM - 231223 - Diesel Vehicle Fuel System 50 50 Jun-03-19 Aug-09-19 227 MCCM - 231223 - A9532 MCCM - 232300 - Refrigeration Piping 10 10 Jun-03-19 Jun-14-19 267 =- MCCM - 232300 - Refrigeration f'.iping A9533 MCCM-233100-Air Distribution 15 15 Jun-03-19 Jun-21-19 262 ;MCCM -233100-Air Disttibution A9534 MCCM - 233400 - HVAC Fans and Equipment 40 40 Jun-03-19 Jul-26-19 237 i .:-_. , _ MCCM - 23340C - HVAC Fans al - A9535 MCCM - 233520 -Automatic Emergency Vehicle Exhaust 40 40 Jun-03-19 Jul-26-19 237 MCCM-23352C -Automatic Emi A9536 BP-11 - 078413 - Penetration Firestopping 10 10 Jun-03-19 Jun-14-19 267 =- BP-11 - 078413 - Penetration Firestopping A9537 BP-11 - 079200 - Joint Sealants 10 10 Jun-03-19 Jun-14-19 267 -- BP-11 - 079200 - Joint Sealants A9538 BP-11 - 260500 - Common work Results for Electrical 0 0 Jun-03-19 Jun-03-19 277 I BP-11 - 260500 - Common work Results for Electrical A9539 BP-11 - 260519- Low -Voltage Cable and Terminations 10 10 Jun-03-19 Jun-14-19 267 BP-11 - 260519- Low -Voltage Calle and Terminations A9540 BP-11 - 260526 - Grounding and Bonding for Electrical St 10 10 Jun-03-19 Jun-14-19 267 BP-11 - 260526 - Grounding and :Bonding for Electrical Systems A9541 BP-11 - 260529 - Hangers and Supports for Electrical Sy: 10 10 Jun-03-19 Jun-14-19 267 = BP-11 - 260529 - Hangers anc Supports for Electrical Systems A9542 BP-11 - 260534- Raceways and Boxes for Electrical Sys) 10 10 Jun-03-19 Jun-14-19 267 -, BP-11 - 260534- Raceways and iBoxes for Electrical Systems A9543 BP-11 - 260543 - Underground Raceways 10 10 Jun-03-19 Jun-14-19 267 _ BP-11 - 260543 - Underground Raceways A9544 BP-11 - 260553 - Identification for Electrical Systems 10 10 Jun-03-19 Jun-14-19 267 m- BP-11 - 260553 - Identification for, Electrical Systems A9545 BP-11 - 260573 - Power Systems Protective Device Study 0 0 Jun-03-19 Jun-03-19 277 A9546 BP-11 - 260800 - Electrical Systems Commissioning 0 0 Jun-03-19 Jun-03-19 277 I BP-11 - 260573 - I BP-11 - 260800 - Power Systems Protective:Device Electrical Systems Commissioning Study A9547 BP-11 - 260923 - Lighting Control 30 30 Jun-03-19 Jul-12-19 131 _ ,.,- ;_ _ _- BP-1: - 260923 - Lighting Con rol A9548 BP-11 - 262416- Panelboards 40 40 Jun-03-19 Jul-26-19 237 i -. --„ ,. i. ,--= BP-11 - 262416 - Panelboards A9549 BP-11 - 262726 - Wiring Devices 15 15 Jun-03-19 Jun-21-19 262 - -_ Y- ; BP-11 - 262726 - Wiring 4evices A9550 BP-11 - 262816 - Enclosed Switches and Circuit Breakers 40 40 Jun-03-19 Jul-26-19 237 -•_--� BP-11 - 262816 - Enclosed Switc A9551 BP-11 - 262913 - Motor Control 40 40 Jun-03-19 Jul-26-19 237 - BP-11 - 262913 - Motor Control A9552 BP-11 - 263213 -Engine Generators 50 50 Jun-03-19 Aug-09-19 227 . F< _, F „ .._ .,. BP-11 - 263213 - E A9553 BP-11 - 265100 - Lighting 60 60 Jun-03-19Aug-23-19 101 BP-1 A9554 BP-11 - 271500 - Data and Telephone Distribution System 20 20 Jun-03-19 Jun-28-19 257 -==-__= BP-11 - 271500 - data and Telephone Distrit ution System A9555 BP-11 - 274133 - Television Distribution System 20 20 Jun-03-19 Jun-28-19 257 _- BP-11 - 274133 - Television Distribution Systam A9556 BP-11 - 281301 - Security Access System 20 20 Jun-03-19 Jun-28-19 257 BP-11 - 281301 - Security Access System A9557 BP-11 - 282300 - Video Surveilance 20 20 Jun-03-19 Jun-28-19 257 -_- BP-11 - 282300 - video Surveilance A9558 BP-11 - 283111 - Fre Alarm System 20 20 Jun-03-19 Jun-28-19 257 _ BP-11 - 283111 - FM Alarm System A9559 BP-11 - 285005- Fire Station Alerting 40 40 Jun-03-19 Jul-26-19 237 - F _. BP-11 - 285005 - Fire Station Ale A9441 BP-03 - 074213.13 - Formed Metal Wall Panels 15 15 Jun-10-19 Jun-28-19 117 BP-03 - 074213.13j- Formed Metal Wall Panels A9442 BP-03 - 074646 - Fiber Cement Siding 15 15 Jun-10-19 Jun-28-19 117 BP-03 - 074646 - P,iber Cement Siding A9443 BP-03 - 075423 - Thermoplastic-Pilyolefin (TPO) Roofing 15 15 Jun-10-19 Jun-28-19 72 ;Y- BP-03 - 075423 - Thermoplastic-Pilyolefin (TA)) Roofing A9444 BP-03 - 076200 - Sheet Metal Flashing and Trim 15 15 Jun-10-19 Jun-28-19 72 _ BP-03 - 076200 - Sheet Metal Flashing and -rim A9445 BP-03 - 077200 - Roof Accessories 15 15 Jun-10-19 Jun-28-19 72 BP-03 - 077200 - f#oof Accessories A9446 BP-03 - 079200 - Joint Sealants 10 10 Jun-10-19 Jun-21-19 87 , BP-0 3 - 079200 - Joint Seelants A9456 BP-05 - 079200 - Joint Sealants 10 10 Jun-17-19 Jun-28-19 98 _-_. BP-05 - 079200 - J;oint Sealants A9457 BP-05 - 084113 - Aluminum Framed Entrances and Store 30 30 Jun-17-19 Jul-26-19 57 _> BP-05 - 084113 - Aluminum Fran A9458 BP-05 - 085413 - Fiberglass Windows and Doors 30 30 Jun-17-19 Jul-26-19 57 - - - = = BP-05 - 085413 - Fiberglass Win A9459 BP-05 - 088000 - Glazing 20 20 Jun-17-19 Jul-12-19 67 _ BP-0,5 - 088000 - Glazing A9451 BP-04 - 042200 - Concrete Unit Masonry 20 20 Jun-24-19 Jul-19-19 77 - f._. _ , , _ . ,. mr BP-04 - 042200 - Cons eta Unit Masonr Page 7 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work y v Summary ._ vf. Remaining Work • • Milestone Tukwiila Fire Station 51 Data Date: Jan-29-19 Activ yip Actluiiy hfame {}riginal 8mairtrrig Start .. Finish Totals January 2219 I .; Februar1r2019 March 2U19 Apr l 019 j May.201t# . I " .. June2019 '°. July 2019 . August 2019 Duration Dur tion Float 30 {}6 + 1 20 , 7 : 03 10 . f7.. . 24 03 10 17 24 31 ti7 "' ,,14 21 2t# 0 - 12 t 09 ` 16 23 30 ` ` 07 ', ". 14 t " 28' 04 A9452 BP-04 - 042613 - Masonry Veneer 20 20 Jun-24-19 Jul-19-19 77 BP-04 - 042613 - Mas. ry Veneer A9453 BP-04 - 071900 - Water Repellents 10 10 Jun-24-19 Jul-05-19 252 BP-04 - $71900 - Water Repellents A9454 BP-04 - 072100 - Thermal Insulation 10 10 Jun-24-19 Jul-05-19 252 BP-04 - .79100 - Thermal Insulation A9455 BP-04 - 079200 - Joint Sealants 10 10 Jun-24-19 Jul-05-19 93 ' - , BP-04 - 179200 - Joint Sealants A9428 BP-02 - 321313 - Concrete Paving 15 15 Jul-01-19 Jul-19-19 22 f - - - - BP 02 321313 Conc ete Paving A9429 BP-02 - 321343 - Pervious Rigid Paving 15 15 Jul-01-19 Jul-19-19 22 BP-02 - 321343 - Pervi.us Rigid Paving A9460 BP-06 - 054000 - Cold Formed Metal Framing 15 15 Jul-01-19 Jul-19-19 22 BP-06 - 054000 - Cold ormed Metal F A9461 BP-06 061643 - Gypsum Sheathing 10 10 Jul-01-19 Jul-12 19 52 B" •. - 061643 - Gypsum Sh athing A9462 BP-06 - 072100 - Thermal Insulation 10 10 Jul-01-19 Jul-12-19 98 = B •. - 072100 - Thermal Ins latioh A9463 BP-06 - 072119 - Foamed -In -Place Insulation 10 10 Jul-01-19 Jul-12-19 98 __. B' I. - 072119 - Foamed -In- lace; Insulation A9464 BP-06 - 072500 - Weather Resistant Barriers 15 15 Jul-01-19 Jul-19-19 57 A9465 BP-06 078413 - Penetration Firestopping 5 5 Jul 01 19 Jul-05-19 67 A9466 BP-06 079200 - Joint Sealants 5 5 Jul 01 19 Jul-05-19 67 l __ __._ ____ _ BP-06 - ., BP-06 - 1 BP-06 - 072500 - Weat 13 - Penetration Firesto,,pin • 00 - Joint Sealants er Resistant B. A9467 BP-06 - 092216 - Non -Structural Metal Framing 15 15 Jul-01-19 Jul-19-19 62 BP-06 - 092216 - Non .trucjtural Metal ' A9468 BP-06 - 092900 - Gypsum Board 10 10 Jul-01-19 Jul-12-19 98 B' I. - 092900 - Gypsum Bo rd A9439 BP-03 - 055213 - Pipe and tube Railings 40 40 Jul-08-19 Aug-30-19 142 A9472 BP-07 - 061053 - Miscellaneous Rough Carpentry 5 5 Jul 08 19 Jul-12-19 97 B" . 061053 Miscellaneo s Rough Carpe A9473 BP-07 - 062023 - Interior Finish Carpentry 40 40 Jul-08-19 Aug-30-19 122 A9474 BP-07 - 064116 - Architectural wood Casework 60 60 Jul-08-19 Sep-27-19 12 A9477 BP-07 - 083100 -Access Doors and Frames 15 15 Jul-08-19 Jul-26-19 111 =• BP-07 - 083100 Access Doors A9495 BP-07 - 123616 - Metal Countertops 40 40 Jul-08-19 Aug-30-19 122 f A9496 BP-07 123623.13 - Plastic -Laminate -Clad Countertops 40 40 Jul-08-19 Aug-30-19 122A9497 BP-07 123661.19 Quartz Agglomerate Countertops 40 40 Jul-08-19 Aug-30-19 122 A9504 BP-08 - 093013 - Ceramic Tling 40 40 Jul-15-19 Sep-06-19 127 MINIMIO A9505 BP-08 - 096513 - Resilient Base and Accessories 15 15 Jul-15-19 Aug-02-19 152 A9506 BP-08 - 096566 - Resilient Athletic Flooring 40 40 Jul-15-19 Sep-06-19 202 A9507 BP-08 - 124813 - Entrance Floor Mats 40 40 Jul-15-19 Sep-06-19 207 A9488 BP-07 - 102600 - Wall and Door Protection 20 20 Jul-22-19 Aug-16-19 141 LBP-07 - 10. A9489 BP-07 - 102800 - Toilet and Bath Accessories 20 20 Jul-22-19 Aug-16-19 222 BP-07 - 10- A9490 BP-07 - 104413 - Fire Protection Cabinets 20 20 Jul-22-19 Aug-16-19 42 A9491 BP-07 - 104416 - Fire Extinguishers 20 20 Jul-22-19 Aug-16-19 146 BP-07 - 10 A9494 BP-07 - 122413 - Roller Window Shades 50 50 Jul-22-19 Sep-27-19112 f - ------ i A9469 BP-06 - 095113 - Acoustical Panel Ceings 15 15 Jul-29-19 Aug-16-19 103 - BP-06 - 09' A9470 BP-06 - 095426 - Linear Wood Ceilings 25 25 Jul-29-19 Aug-30-19 93 A9471 BP-06 - 098436 - Sound -Absorbing Ceiling Units 25 25 Jul-29-19 Aug-30-19 93 A9487 BP-07 - 102123 - Cubicle Curtains and Track 20 20 Jul-29-19 Aug-23-19 139 = BP-t A9476 BP-07 - 079200 - Joint Sealants 10 10 Aug-05-19 Aug-16-19 67 BP-07 - 07• A9480 BP-07 - 088300 - Mirrors 20 20 Aug-05-19 Aug-30-19 157 — -_ A9485 BP-07 - 101419 - Dimensional Letter Signage 30 30 Aug-05-19 Sep-13-19 202 - A9486 BP-07 - 101423.16 - Room -Identification Panel Signage 15 15 Aug-05-19 Aug-23-19 217 BP-� A9450 BP-03 - 089119 - Fixed Louvers 25 25 Aug-12-19 Sep-13-19 17 =- A9484 BP-07 - 101100 - Visual Display Units 20 20 Aug-12-19 Sep-06-19 207 A9499 BP-07 - 211000 - Fire Suppression 15 15 Aug-12-19 Aug-30-19 27 A9500 BP-07 - 211316 - Preaction Double interlock Fire Suppre: 15 15 Aug-12-19 Aug-30-19 27 A9502 BP-08 - 033543 - Polished Concrete Finishing 25 25 Aug-12-19 Sep-13-19 202 r A9503 BP-08 - 071800 - Traffic Coatings 15 15 Aug-12-19 Aug-30-19 212 A9481 BP-07 - 099113 - Exterior Painting 15 15 Aug-26-19 Sep-13-19 78 A9482 BP-07 - 099123 - Interior Painting 15 15 Aug-26-19 Sep-13-19 78 A9483 BP-07 - 099600 - High Performance Coatings 20 20 Aug-26-19 Sep-20-19 73 - A9508 BP-09 - 323111 - Gate Operators and Hardware 30 30 Aug-26-19 Oct-04-19 112 A9509 BP-09 - 323113 - Chain Link Fencing and Gates 15 15 Aug-26-19 Sep-13-19 117 A9510 BP-09 - 323119 - Decorative Metal Security Fences and t 40 40 Aug-26-19 Oct-18-19 102 A9492 BP-07 - 107516 - Ground -Set Flagpoles 15 15 Sep-02-19 Sep-20-19 130 A9493 BP-07- 113100- Residential Appliances 40 40 Sep-02-19 Oct-25-19 92 A9511 BP-10 - 328400 - Planting and Irrigation 15 15 Sep-16-19 Oct-04-19 112 A9512 BP-10 - 329200 - Turf and Grasses 15 15 Sep-16-19 Oct-04-19 122 A9513 BP-10 - 329300 - Planting 15 15 Sep-16-19 Oct-04-19 122 A9498 BP-07 - 129300 - Site Furnishings 20 20 Sep-23-19 Oct-18-19 97 Page 8 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work v v Summary ._ vf. Remaining Work • • Milestone Tukwilla Fire Station 51 Data Date: Jan-29-19 ty ID, y Manna A9501 BP-07 - 321723 - Pavement Markings (Onsite) Foundation / SOG A1530 Install under footing MEP A1540 A1550 A2140 A2150 A2540 A2550 A2210_. A2160 A2170 A2180 A2560 A2190 A2200 Excavate for footings Form, Place, Finish Footings Form, Place, Finish Stem walls Install Balance of MEP underground Install Waterproofing & Insulation Install 1st Course of CMU Back fill at foundation and grade Install Cap Break Install Vapor barrier SOG Edge form Install Reinforcing Original Duration Remaining Duration: Start 15 15 Sep-23-19 Finish Oct-11-19 49 May-09-19 5 5. May-09-19 ay-16-19 15. May-21-19 10 10 Jun-11-19 10 10 Jun-11-19 3 3Jun-25-19 3 3 Jun-28-19 2 Jul-03-19 2 Jul-05-19 2'Jul-09-19 2 2 2. 1. 2. Place and Finish SOG 1st pour 2 Place and Finish SOG 2nd Pour 2 Superstructure 46 A1560 Erect Structural Steel and decking 20 A1570 Place and Finish SOMD 5 A1580 Frame Exterior Walls A2220 Install Exterior Sheathing (From Grid A/3 counter clockwic A1590 Survey Project Limits and Building A1600 Install TESC measures A1610 Cut Building pad to subgrade A2270 Demo / Install North Site Entrance 5 0 A2130 Install Site utilities ( Activities to be detailed with Subcontre A2280 Demo / Install South Site Entrance A2440 Install Sidewalks / Hardscapes A2290 Grade New Drive & Parking areas A2300 Install new curbs A3010 Install Security Fencing A2310 Install Heavy Duty concrete drives A3020 Install Arch Screen & Security Gate A2320 Install Pervious Concrete A2860 Install Railings A2930 Install Flag Pole A2970 Install Site Furnishings A3030 Install Irrigation A2330 Landscaping A2980 Striping Roofing A1620 Install MEP penetrations at roof A1630 Install Roofing System low roof A1720 Install Roofing System High Roof A1640 Set Roof Top Mechanical Equipment Weather Barrier Skin A1650 Install exterior weather barrier (From Grid A/3 counter do A1660 Install Flashing ( From Grid A/3 counter clockwise arounc A1670 Install exterior Insulation @ Brick Veneer (Counter clocks A1730 Install Exterior Insulation @ Metal Panel Siding ( Counter A1740 Install Exterior Insulation @ FGC rainscreen ( Counter ck Facade A1680 Install Brick veneer (From Grid A/3 counter clockwise arc A2230 Install Exterior Windows and Doors (From Grid A/3 count 1'Jul-11-19 2' Jul-12-19 2! Jul-16-19 2 Jul-18-19 46 ` Jul-22-19 20 Jul-22-19 5 Aug-19-19 15 Aug-21-19 10 Sep-11-19 1 Apr-29-19 1 May-01-19 5. 5 May-02-19 15 15 Jul-22-19 60 60 Aug-12-19 15 15 Nov-04-19 15 15 Dec-11-19 5 5 Jan-01-20 10 10 Jan-08-20 10 15 10 5 5 2 5 10 15 5 Jul-19-19 May-15-19 .. May-20-19 Jun-10-19 Jun-24-19 Jun-24-19 Jun-27-19 Jul-02-19 Jul-04-19 Jul-08-19 Jul-10-19 Jul-11-19 Jul-15-19 Total Float Jul-17-19 Jul-19-19 Sep-24-19 Aug-16-19 Aug-23-19 Sep-10-19 Sep-24-19 Apr-29-19 May-01-19 May-08-19 Aug-09-19 Nov-01-19 Nov-22-19 Dec-31-19 Jan-07-20 Jan-21-20 10 Jan-08-20 Jan-21-20 15 Jan-22-20 Feb-11-20 10 Jan-22-20 Feb-04-20 5 Feb-12-20 Feb-18-20 182 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 10 0 0 0 10 January Fabruary,2l March 2019 Aprit 2019 ay.2019 une 2019 July 2018 August 2019 5 Feb-19-20 Feb-25-20 2 Feb-19-20 Feb-20-20 5'Feb-19-20 Feb-25-20 10 Feb-26-20 Mar-10-20 15 Mar-11-20 Mar-31-20 5 Apr-01-20 Apr-07-20 4 5 15 10 10 35 10 10 10 5 5 41 Aug-26-19 Oct-22-19 5 Aug-26-19 Aug-30-19 15 Sep-18-19 Oct-08-19 10 Sep-25-19 Oct-08-19_. 10 Oct-09-19 Oct-22-19 35 Sep-25-19 Nov-12-19 10 Sep-25-19 Oct-08-19 10 Oct-09-19 Oct-22-19 10 Oct-23-19 Nov-05-19 5 Nov-06-19 Nov-12-19 5 Nov-06-19 Nov-12-19 33 33 Oct-23-19 25 25 Oct-23-19 10 10 Oct-23-19 Dec-10-19 Nov-26-19 Nov-05-19 0 0 22 22 22 10 10 10 35 10 35 10 20 23 10 10 10 10 61 27 15 15 68 18 10 10 10 20 20 a 10 16 0 24 14 28, listall under footing MEP Excavate for footings Form, PIaFe, Finish Footings Form, Place, Place, Finish Stem walls ns�ll Balance of MEP underground stall Waterproofing & Insulation Install 1st Course of CMU Back fill at foundation and grade Install Cap Break Install Vapor barrier SOG Edge form Install Reinforcing Place and Finish SOG 1 s Jul-19-19, Foundation / Place and Finish SOG V Etect Struc Plac SOG t pour 2nd Pour Surv=_y Project Limits and Building Install TESC measures Cut Building pad to subgrade Demo Iris all Nort IEEE Actual Work Critical Rema Remaining Work • • Milestone ping Work /v Summary Page 9 of 12 Lydig Construction - Tukwila Fire Station #51 Tukwiila Fire Station 51 Data Date: Jan-29-19 t ct v ty 10 Activ ty hiatus . Original 'Dyfaton ema(ning Start Finish Total Yantrary 2019 . February 2Ut9 , March 2U19 Apra 2019 j ay.2019 . J,une2019 '. July 20f9 . j August 2(f 19 Duration „ ' Fkrat 30 06°,. 13 20 ' 27 03 ' 10 17 .l24 . 08 10.: 17 24 31 07 14 21' 28 -09 12 19 6 ii2 09` 16 23 30 ` ` 07 ', . 14 1 28' ' --04 A2570 Install Storefront 10 10 Oct-23-19 A1690 Install Metal Panel Siding (From GridA/3 counter clockwi: 10 10 Nov-27-19 A1700 Install Fiberboard Rainscreen ( From Grid A/3 counter ck 10 10 Nov-27-19 Nov-05-19 16 Dec-10-19 10 Dec-10-19 10 3j zj was k A1800 Install Pre Framing overhead HVAC / Mech A1880 Install Pre Framing overhead Plumbing A1890 Install Pre Framing overhead Electrical A1900 Install Pre Framing overhead Sprinkler A1810 Frame walls, Soffits and ceilings (Starting from North to S A1860 Install Hollow Metal / Door frames A1820 Electrical R.I. At Framing (From North to South) A1910 Plumbing R.I. At Framing (From North to South) A2070 HVAC / Mech R.I. @ Framing (From North to South) A2450 Fire Sprinkler R.I. @ Framing ( From North to South) A1830 All Cover Inspections Complete A1840 Hang GWB A1850 Tape GWB A2880 Install Access Doors A1920 Paint GWB A1930 Install Ceiling Grid / ceiling systems A2000 Install Electrical Trim @ GWB A2060 Paint exposed structure ceilings A2460 Install Mech Trim @ GWB A2470 Install Plumbing Trim A1940 Electrical R.I. at Grid / Ceiling systems A2500 Mech R.I. at grid / Ceiling systems A2510 Fire Sprinkler R.I. at grid / ceiling systems A2480 Complete Electrical Trim at Exposed ceilings A2490 Complete Mech Trim at Exposed Ceilings A1950 All ceiling grid / ceiling system cover inspections Complete A1960 Install Ceiling tile A1970 Grind / Finish Floors all areas A1980 Install Casework / Lockers A1990 Install Floor at Phys Training A2110 Install Epoxy Flooring (Rooms126,128 and 136) A2940 Install Kitchen Cabinets A1870 Install Doors and Hardware A2890 Install Visual Display Units A2900 Install Cubicle Curtain A2910 Install Wall and Door Protection A2960 Install Roller Shades A3000 Install Resilient Base A2950 Install Appliances A2920 Place Fire Extinguishers A2520 Final Cleaning . 15 15 Sep-11-19 Oct-01-19 10 10 Sep-25-19 Oct-08 19 15 15 Sep-25-19 Oct-15-19 5 5 Sep-25-19 Oct-01-19 15 15 Oct-16-19 Nov-05-19 5 5 Oct-18-19 Oct-24-19 20 20 Oct-30-19 Nov-26-19 20 20 Oct-30-19 Nov-26-19 5 5 Nov-06-19 Nov-12-19 5 5 Nov-06-19 Nov-12-19 1 1 Nov-27-19 Nov-27-19 10__ 10 Nov-28-19 Dec-11-19____ 15 15 Dec-12-19 Jan-01-20 2 2 Dec-12-19 Dec-13-19 5 5 Jan-02-20 Jan-08-20 3 3 Jan-09-20 Jan-13-20 15 15 Jan-09-20 Jan-29-20 10 10 Jan-09-20 Jan-22-20 15 15 Jan-09-20 Jan-29-20 5 5 Jan-09-20 Jan-15-20 10 10 Jan-14-20 Jan-27-20 10 10 Jan-14-20 Jan-27-20 10 10 Jan-14-20 Jan-27-20 8 8 Jan-16-20 Jan-27-20 8 8 Jan-16-20 Jan-27-20 1 1 Jan-28-20 Jan-28-20 5 5 Jan-29-20 Feb-04-20 10 10 Feb-05-20 Feb-18-20 15 15 Feb-19-20 Mar-10-20 5 5 Feb-19-20 Feb-25-20 6 6 Feb-19-20 Feb-26-20 10 10 Feb-19-20 Mar-03-20 5 5 Feb-27-20 Mar-04-20 3 3 Feb-27-20 Mar-02-20 3 3 Feb-27-20 Mar-02-20 5 5 Feb-27-20 Mar-04-20 5 5 Feb-27-20 Mar-04-20 5 5 Feb-27-20 Mar-04-20 5 5 Mar-04-20 Mar-10-20 1 1 Mar-05-20 Mar-05-20 10 10 Mar-11-20 Mar-24-20 0 5 0 10 0 3 0 0 10 10 0 0 0 13 0 0 4 9 4 14 0 0 0 9 19 0 0 0 0 85 3 0 4 6 6 3 4 4 0 3 0 Specialty Construction Area Finishes 157 157;Aug-21-19 Apr-07-20 40 A2080 MDF & IDF Patch Cable Completion 10 10 Jan-09-20 Jan-22-20 89 ti A2090 Install Of WAP's 5 5 Jan-23-20 Jan-29-20 89 A2640 Install Pre Framing overhead HVAC / Mech 15 15 Sep-11-19 Oct-01 19 7 A2660 Install Pre Framing overhead Plumbing 10 10 Sep-25-19 Oct-08-19 12 A2670 Install Pre Framing overhead Electrical 15 15 Sep-25-19 Oct-15-19 7 A2650 Install Pre Framing overhead Sprinkler 5 5 Sep-25-19 Oct-01-19 17 A2680 Frame walls, Soffits and ceilings (Starting from North to S 15 15 Oct-16-19 Nov-05-19 7 A2690 Install Hollow Metal / Door frames 5 5 Oct-18-19 Oct-24-19 10 A2700 Electrical R.I. At Framing (From North to South) 20 20 Oct-30-19 Nov-26-19 7 A2710 Plumbing R.I. At Framing (From North to South) 20 20 Oct-30-19 Nov-26-19 7 Page 10 of 12 Lydig Construction - Tukwila Fire Station #51 Actual Work ® Critical Remaining Work y v Summary ._ vf. Remaining Work • • Milestone A2720 HVAC / Mech R.I. @ Framing (From North to South) A2730 Fire Sprinkler R.I. @ Framing ( From North to South) A2740 All Cover Inspections Complete A2750 Hang GWB A2580 Install Sectional Doors A2760 Tape GWB A2870 Install Access Doors A2770 Paint Walb & Ceilings A2590 Install Nederman System A2630 Install Overhead Lights / Ceiling Fans A2780 HVACTrimOut A2850 Plumbing Trim Out A2610 Install Epoxy Wainscot A2620 Install Rubber Base A2600 Striping A2990 Install Traffic Coatings A2790 Set HVAC Units 5 5 Nov-06-19 Nov-12-19 17 5 5 Nov-06-19 Nov-12-19 17 1 1 Nov-27-19 Nov-27-19 7 10 10 Nov-28-19 Dec-11-19 7 5 5 Dec-11-19 Dec-17-19 20 15 15 Dec-12-19 Jan-01-20 7 2 2 Jan-02-20 Jan-03-20 7 5 5 Jan-06-20 Jan-10-20 7 5 5 Jan-13-20 Jan-17-20 31 2 2 Jan-13-20 Jan-14-20 34 5 5 Jan-13-20 Jan-17-20 26 5 5 Jan-20-20 Jan-24-20 26 3 3 Jan-27-20 Jan-29-20 26 1 1 Jan-30-20 Jan-30-20 26 2 Jan-31-20 Feb-03-20 26 5 Jan-13-20 Jan-17-20 5 5 Jan-20-20 Jan-24-20 A2800 HVAC Rough -in 5 5 Jan-27-20 Jan-31-20 A2810 Sprinkler Rough -in 5 5 Feb-03-20 Feb-07-20 A2820 Plumbing Rough -in 5 5 Feb-10-20 Feb-14-20 A2830 Electrical Rough -in 5 5 Feb-17-20 Feb-21-20 A2840 Install Lighting 5 5 Feb-24-20 Feb-28-20 A2530 Grind & Polish Res room Floors A2010 Install Wall Tile A2020 Install casework / counters A2030 Install Plumbing Fixtures A2240 MEP trim A2250 Install toilet accessories A2380 Final Cleaning A2370 Pour Housekeeping Pads A2260 Frame Walls A2340 Hang Green Board A2350 Tape GWB A2360 Paint Walb A2040 Install Main Electrical Gear A2050 Perm Power to building Commissioning A1100 Bump Start Equipment A1110 Point to Point Testing A1120 Manufacturer Start Up Verifications A1130 Graphic Completion A1140 TAB Report - Preliminary A1150 TAB Adjustmenls and Corrections A1160 TAB Report - Final A1710 Fuel Station A1200 Emergency Power / Generator A1170 Electronic Safety & Security A1190 Lighting A1210 CxAgent Sign Off Inspections A1220 Plumbing A1240 Fire Sprinkler A1250 Electrical 7 7 7 7 7 an-15-20 34 15 15 Feb-19-20 Mar-10-20 10 5 5 Mar-11-20 Mar-17-20 10 5 5 Mar-18-20 Mar-24-20 10 3 3 Mar-18-20 Mar-20-20 12 5 5 Mar-25-20 Mar-31-20 10 5 5 Apr-01-20 Apr-07-20 10 1 1 1 Aug-26-19 3 3 Aug-27-19 1 1 Aug-30-19 15 5 61 5 10 10 10 5 10 10 15 Nov-04-19 5 Nov-25-19 61 Jan-28-20 5 Jan-28-20 10 Jan-30-20 10 Feb-06-20 10 Feb-13-20 5 Mar-25-20 10 Apr-01-20 10 Apr-08-20 5 Feb-19-20 5 5 Feb-26-20 20 20 Mar-04-20 5 5 Mar-04-20 5 5 Apr-01-20 20 20 Apr-01-20 Apr-28-20 18 5 5 Apr-01-20 Apr-07-20 28 5 5 Apr-01-20 Apr-07-20 23 5 5 Apr-01-20 Apr-07-20 23 2 Aug-21-19 Aug-22-19 95 1'Aug-23-19 Aug-23-19 95 Aug-26-19 95 Aug-29 19 95 Aug-30-19 95 Nov-22-19 50 Nov-29-19 50 Apr-21-20 45 Feb-03-20 19 Feb-1220___ 19 Feb-19-20 19 Feb-26-20__ 19 Mar-31-20 0 Apr-14-20 Apr-21-20 Feb-25-20 Mar-03-20 55 Mar-31-20 55 Mar-10-20 70 Apr-07-20 55 0 Data Date: Jan-29-19 Pour Friar Actual Work Critical Remaining Work /v Summary Remaining Work • • Milestone Page 11 of 12 Lydig Construction - Tukwila Fire Station #51 Tukwilla Fire Station 51 Act' A1310 Landscaping A1320 Public Works - Street Improvements A1260 Fire Alarm A1230 Mechanical (HVAC) A1300 Building Department Final Inspection Punch List A1330 Punch List Creation A1340 Punch List Completion Finish 5 5 Apr-01-20 Apr-07-20 28 5 5 Apr-01-20 Apr-07-20 28 5 5 Apr-08-20 Apr-14-20 23 5 5 Apr-15-20 Apr-21-20 18 5__ 5 Apr-22-20 Apr-28-20 18 30 30'Apr-22-20 Jun-02-20 0 5 5 Apr-22-20 Apr-28-20__ 0 15 15 Apr-29-20 May-19-20 0 A1350 Punch List Back Check 5 5 May-20-20 May-26-20 0 A1360 Punch List Sign Off 5 5 May-27-20 Jun-02-20 0 Owner Move In Activities 15 15 Jun-03-20 Jun-23-20 0 A2100 Furniture Move & Set Up 15 15 Jun-03-20 Jun-23-20 0 February 2019 2019 Actual Work Critical Remaining Work // Summary Remaining Work • • Milestone March 19 Data Date: Jan-29-19 Apt 2019 Page 12 of 12 May 2019 e2019 July 2019 August 2019 Lydig Construction - Tukwila Fire Station #51 City of Tukwila - Facilities Plan TOTAL PROJECT (1ri,inulfh,dger lf,ntget/Yin+,+/i•rs t"v.rcnt t:n<1,rr ("nnnuiued 5,875, 7,733 MONTHLY Budget Report (REVISED Budgets; D-20 Plan Adopted by Council) Life to Date Costs as of February 25, 2019 (reconciled wiaccig lhru Fed 15, 2019 GL) Renr'n'g t'onuuiue,/' Re»+un r„ 11nd„fet G,v at Completion 1,679,170: 1,720,241°5` 145,293' $ 4s61,492 $ 750,000 $ 343,657 651,038 $ COE. it REPORT FIRE SF1 TIO.V 51 urr,ln.rntmr;er 9,3 (1 $31,000$ 576,000 116,000. :8. 712 Re, COUNCIL REPORT/VG SC FIRE .S'T I TIO.V 1:,415,IX}4 87, 43 Current /1,, /,,cr 4, 456,500 (9,160) $ (40,722) $ :I 302,27 8,449 . S ,878 25,157 $ 17,15 60,177 $ 7,500 $ 9 7,387' S74 7 773 $ 7 COIN(' REI'OR TI E I RE ST-I TION 54 936,264 ' $ 20,000 $ 2301000 :$ 51,875 $ 107.500, $ 7 ;237,897 co, PM Cantingenc I' n Original(/ 1,;et 11mket/rant/,r, I'incur Budget 767,38 :4,950,000 :-$:. 529,036" 668426 , .$ 975,107 $ 743 253,4 f'na� Re,,min',, (',,,nn+itte,! Berm/, in_e Isa//s I 426,7 56 City of Tukwila City Council Public Safety Committee PUBLIC SAFETY COMMITTEE Meeting Minutes March 4, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Dennis Robertson, Chair; Kate Kruller, Zak Idan Staff: David Cline, Bruce Linton, Jay Wittwer, Peggy McCarthy, Aaron Williams, Rachel Bianchi, Laurel Humphrey Guests: Justine Kim, Shiels Obletz Johnsen; Steve Goldblatt, Public Safety Plan Program Management Quality Assurance Consultant CALL TO ORDER: Chair Robertson called the meeting to order at 5:30 p.m. I. ANNOUNCEMENT II. BUSINESS AGENDA A. Public Safety Plan: Justice Center Mini-MACC and Fire Station 51 MACC Staff briefed the Committee on the bid process status for the Justice Center mini-MACC and Fire Station 51 MACC. Both projects are on schedule and market conditions continue to cause budget stress. Part of the General Contractor/Construction Management (GC/CM) process involves the development of a MACC (Maximum Allowable Construction Cost). The GC/CM manages the MACC bid process and promotes the packages to encourage a high number of bidders, usually resulting in better prices. The Justice Center project is being split into two MACCs to allow for the early work to be completed while other project tasks are finished up. This first "mini-MACC" includes demolition and abatement of the remaining buildings, foundations/structure and waterproofing, earthwork and utilities, certain allowances, and formula -driven fees associated with the GC/CM contract. This mini-MACC came in under budget by $843,003, but many large bid packages remain. The majority of the cost savings were due to high initial estimates because of contamination fears that did not prove to be true. The total under budget to date is $1,184,812. The MACC for Fire Station 51 includes all the construction costs, but there are unknowns associated with electricity delivery and one remaining bid package for earthwork, scheduled to open on March 8, 2019. Fire Station 51 is over budget by $1.1 million with what the City knows to date, although the project team is working on value engineering solutions to reduce the amount. Possible options to address the budget include contingency funds and Justice Center savings. Final numbers will be available by the March 18 Committee meeting. Staff will present a recommendation, and the Committee will be asked to discuss and develop a recommendation on the MACC contract amendments as well as the Fire Station 51 alternatives requested by firefighters, estimated at $990,402. These items will then move forward to the March 25, 2019 Committee of the Whole with a Special Meeting to follow in the event the Council is ready to take action. 57 Public Safety Committee Minutes March 4, 2019 Committee members discussed the bid results and asked clarifying questions. Chair Robertson asked staff to be prepared with an updated 6-year financial plan so that Council can view these decisions in context of the larger budget issues. He asked that the March 18, 2019 agenda be kept free of all other issues so the Committee can fully discuss these MACCs. RETURN TO COMMITTEE. III. MISCELLANEOUS Adjourned 6:18 p.m. Committee Chair Approval Summary by LH 58 City of Tukwila City Council Public Safety Committee PUBLIC SAFETY COMMITTEE Meeting Minutes March 18, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Dennis Robertson, Chair; Kate Kruller, Zak Idan Staff: David Cline, Rachel Bianchi, Bruce Linton, Kimberly Walden, Jay Wittwer, Peggy McCarthy, Vicky Carlsen Guests: Justine Kim, Shiels Obletz Johnsen; Steve Goldblatt, Public Safety Plan Program Management Quality Assurance Consultant CALL TO ORDER: Chair Robertson called the meeting to order at 5:30 p.m. I. ANNOUNCEMENT II. BUSINESS AGENDA A. Public Safety Plan: Justice Center Mini-MACC and Fire Station 51 MACC Staff updated the Committee on the Justice Center Mini-MACC and Fire Station 51 MACC. The Justice Center is under the adopted budget by $1,332,337. The increase from the previous meeting is due to an additional $147,525 from project soft costs that was not calculated into the original presentation. All of the bidding is complete for Fire Station 51. The project is over budget by $1,541,632. This includes four alternates that total $312,015, which include: fire hydrant at the rear apron, bi- fold doors, SCBA parts washer rough in and the underground utility work that needs to be done to support a future fuel -filling station. The Administration recommends moving $1,541,632 from the Justice Center budget to the Fire Station 51 project by utilizing the Justice Center savings of $1,332,337, and the remaining from the contaminated soils allowance in the Justice Center budget. When the Justice Center budget was created, the City was not able to have access to the property for necessary tests, so a large allowance was created for contaminated soils in the event of a worst -case scenario. Now that the necessary testing is complete the project team does not believe it will need as much as was originally budgeted for that line item. The Administration recommends moving forward with both projects. Committee members discussed concerns, which included the overall status of the City's budget. Staff indicated that the City is in a better position than what the adopted 2019/2020 budget forecasted and will update the six -year plan for the Committee of the Whole discussion on this issue. 59 Public Safety Committee Minutes March 18, 2019 Councilmember Kruller raised concerns regarding the variance from original budget for the Public Safety Plan and requested a chart showing the difference between the original and amended budgets. She also raised concerns over not having enough information to make a decision at this time and recommended forwarding to full Council without a Committee recommendation. Councilmember Idan asked questions regarding: (1) Is it appropriate to move money between different projects in the Public Safety Program? (Staff and Legal have stated it is) (2) Did the Fire Fighters agree with the Alternates chosen? (staff said the Union President participated in the discussion and agree with the choices) (3) Why wasn't the error in the location of the street power caught sooner? (staff said initial information used was as -built drawing that wasn't correct) Councilmember Idan agreed that it would be better to wait until all of the project were bid so that a decision could be made in total. Chair Robertson was comfortable with the Administration recommendation but cautioned that he believes the full Public Safety Program will be over budget because: (1) Only 30% of the Justice Center (the mini-MACC) has been bid and it is the not the part that FS51 went over on. (2) FS52 is more expensive than FS51 and it has not been bid at all yet so it will likely go over by more than 1.5million. He believes the Finance Committee should begin identifying how to find additional funds. The Committee members and staff discussed the costs/problems associated with waiting on the decisions until sometime in August when the City has full bids (MACCS) for both Fire Stations and the Justice Center. Besides the dollar costs associated with delays, FS51 and the Justice Center would have to be rebid because the bids are only good for 60 days. Also, the dry part of 2019 would be missed. The Committee decided to forward the item to the Committee of the Whole without a recommendation so that the entire Council could discuss and ultimately make a recommendation. FORWARD TO MARCH 25, 2019 COMMITTEE OF THE WHOLE. III. MISCELLANEOUS Adjourned 6:35 p.m. Committee Chair Approval Summary by RB 60