HomeMy WebLinkAboutPS 2019-04-01 Item 2B - Public Safety Plan - Contract Amendment #4 for Justice Center Water Main Replacement Design with DLR Group1906
Administrative Services Department- Rachel Bianchi, Deputy CityAdministrator
INFOR ATIONAL E ORANDU
Allan Ekberg, Mayor
TO: Public Safety Committee
FROM: Rachel Bianchi, Deputy City Administrator
BY: Justine Kim, Senior Program Manager. Shiels Obletz Johnsen
CC: Mayor Allan Ekberg
DATE: March 29, 2019
SUBJECT: Public Safety Plan — Justice Center
Project Number 91630501, Contract 17-157
DLR Group, Amendment No. 4
ISSUE
Approve Amendment No. 4 with DLR Group, Inc.
BACKGROUND
The City of Tukwila hired DLR Group Inc. to perform architectural design and planning services
for the Justice Center as part of the Tukwila Public Safety Plan. Their original contract amount
was $2,146,084. Amendment No. 1 was for 953,830 due to the increase in the building's
construction cost estimate. Amendment No. 2 added the SEPA checklist for $21,395 and
Amendment No. 3 added SEPA-related arborist services, archeological/cultural resources and
contaminated soils remediation services for $18,920, bringing the new not -to -exceed contract
amount to $3,140,229.
ANALYSIS
Amendment No. 4 is for additional services and fees for King County Water District 125 water
main replacement design and additional procurement, delivery and installation support for
Furniture, Fixture, and Equipment (FF&E). These are anticipated expenditures and are included in
the Council approved project budget.
FISCAL IMPACT
DLR Group, Inc. has provided a cost of $29,475 to perform the additional services in Amendment
No. 4. The total contract amount will now be $3,169,704. The Project Management Quality
Assurance (PMQA) consultant has reviewed these documents and provided his concurrence.
A. Original Contract Amount
$2,146,084.00
B. Amendment No. 1 — Budget Design & Property Conditions
$953,830.00
C. Amendment No. 2 — SEPA checklist, ADA Counseling
$21,395.00
D. Amendment No. 3 — Arborist/SEPA/Contaminated soils
$18,920.00
E. Amendment No. 4 — Water main replacement/FF&E
$29,475.00
New Contract Amount
$3,169,704.00
RECOMMENDATION
Council is being asked to approve Amendment No. 4 for $29,475.00 to DLR Groups' Contract No. 17-
157 and to consider this item at the April 8, 2019 Committee of the Whole and subsequent April 15,
2019 Regular Council.
ATTACHMENTS
DLR Group, Inc. Amendment No. 4, Council Monthly Budget Report Summary
W12019 Info Memos\DLR Memo.docx
13
14
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number: 17-157(d)
CONTRACT FOR SERVICES
Amendment No. 4
Between the City of Tukwila and DLR Group, Inc.
That portion of Contract No. 17-157 between the City of Tukwila and DLR Group, Inc. is
hereby amended as follows:
Section 1 Proiect Designation: The Consultant is retained by the City to perform
Architectural Design and Planning services in connection with the project titled Tukwila
Public Safety Plan.
Section 2 Scope of Services: The Consultant agrees to perform the services, identified
on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment
and supplies.
Section 4 Payment. The Consultant shall be paid by the City for completed work and for
services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be made as provided on Exhibit "A"
attached hereto, provided that the total amount of payment to the Consultant shall not
exceed $3,169,704 (including estimated expenses) without express written modification of
the Agreement signed by the City. The total fee for the additional services related to
Amendment No. 4 will be $29,475. ($11,000 + $18,475)
All other provisions of the contract shall remain in full force and effect.
Dated this
day of 2019
CITY OF TUKWILA CONSULTANT
Allan Ekberg, Mayor Erica Loynd, Principal
CA Revised December 2016
Page 1 of 1
15
16
an
Architecture Engineering Planning Interiors
51University Street, Suite 600
Seattle, WA 98101
Justine Kim
8hie|aOb|etzJohnsen
101Yeo| bOb
Seattle, WA 98104
Project Name: City 0fTukwila Justice Center
DLRGroup Project No.: 73q7158-00
Re: Design Services Proposal — Additional Services #4
Dear Justine:
This letter will serve as our proposal for design work of the approved scope for the
new water line atTukwila International Boulevard (YD'125)for City nfTukwila
Justice Center in Tukwila, WA. We appreciate the opportunity to continue to develop
this project ondenaOreitnneetsthe requirements ofthe City and utilities. The
proposal from KPFF, the civil engineer, provides detailed description of the agreed
scope,
Additionally, iOthis proposal, wewould like to reallocate budgetalready
with Additional Service #02 for SEPA and code review. This additional service
included Karen Braitmayer to review the accessibility requirements for the Design
Review Board for the Justice Center. These funds have been closed and will not be
fully used. However, the effort bySwift Company associated with the planning
comments and review have exceeded the anticipated scope. Therefore, we are
proposing reallocating the [n[nain|Ug $6,500.00 from KarenBca|trnaye/o proposal to
Swift Company for the additional efforts they have provided to resolve the multiple
rounds ofpermitting comments and additional meetings tnclarify scope and
intentions.
This will beanet zero add tothis proposal. These funds were already invoiced and
were to bnadeductive line item tQthis proposal, therefore will not be added tofuture
invoices.
The scope of services provided in the additional services include the following:
KPFF $10l00
Addition toSwift Company scope $ 6,500
Reduction toKaren Braitmeyerscope inAdditional Service #O3 500)
1O96OLRGroup consultant mark-up (NTEvalue) $ 1.000
Total additional service (NTE) $11,000
Seattle and locations worldwide
Justine Kim
March 1S'2O1O
Page
Should the City request additional documentatVn, public hearings, or detailed
response outside the identified review process for the design team, an amendment
for additional service may be required.
The total fee for the additional design services described above |onot to exceed
value of eleven thousand dollars and zero cents ($11,000.00).
Thank you for the opportunity toprovide this proposalfo additional services, and we
look forward to our continued partnership with City of Tukwila.
QLR Group
Erica Loynd
Principal
Encl: Consultant proposal
cc:
Ethan Bernau
18
EXHIBIT A
1601 Fifth Avenue, Suite 1600 Seattle. WA 98101 206.622.5822 kpff.corn
AGREEMENT FOR PROFESSIONAL SERVICES
DATE: March 12, 2019
JOB NUMBER: 1700643
CLIENT: DLR Group
PROJECT NAME: Tukwila Justice Center
RE: Additional Service #3 — KCWD 125 Water Main Replacement
SCOPE OF SERVICES
As requested, we submit this additional service proposal to prepare plans for approximately
415 linear feet of eight inch water main replacement along Tukwila International Boulevard. The
water main will be owned and operated by King County Water District 125 (KCWD 125).
KPFF will design the main replacement per KCWD 125 standards and document demolition of
the existing main. Our deliverable will include plan and profile views of the water main in
addition to details, as needed.
Per our previous coordination with the City of Tukwila and KCWD 125, we assume the
proposed water main will be eight inch ductile iron located behind the curb and below the
sidewalk. Clearances to trees and other utilities will be coordinated with KCWD 125 and the
City of Tukwila.
SCHEDULE
We estimate the design and documentation of the water main will be complete within three
weeks after Notice -to -Proceed is received.
FEE
We propose to accomplish the above scope of work for a lump -sum fee of $10,000 in
accordance with our current contract with DLR Group:
Offered By (KPFF, Inc.)
(Signature)
Michael Herseth, PE, Civil Engineer
(Print Name/Title)
Accepted by (DLR Group)
(Signature)
(Print Name/Title)
Page 1 of 1
19
�K�U��
��G0oup
Architecture Engineering Planning Interiors
51University Street, Suite 600
Seattle, WA 98101
Justine Kim
Shiehs Obletz Johnsen
1O1Yee|erWay Suite bO0
Seattle, WA 98104
PCity QfTukwila Justice Center
DLRGroup Project No.: 73'17158-00
Re: Design Services Proposal — Additional Services #5
Dear Justine:
Following discussions with Ethan Bernau, this letter will serve as our proposal for
ongoing support ofFurniture, Fixture, and installation after
selection k;complete. The base scope ofservices included iSthe design and layout
ofthe FFEthroughout the building tnprovide adetailed order that |nprovided tothe
owner to coordinate directly with the manufacturer. The ongoing process once the
package |sidentified 1stypically provided byamember Ofthe agency for
procurement and delivery ofthe product tothe job site.
DLRGroup iapleased to participate in this coordination which would include the
following additional tasks (all times are nrntp):
l. Review ofthe Purchase Order the client and dealers and Final
confirmation ofpurchase with the client and dealer.
a. This |sresolved over the course ofmultiple phone calls throughout the
purchasing process.
2. Tracking Ofthe product during production and manufacturing.
a. This provides tracking of the product and coordination Ofdelays that may
occur. This may occur with some ofthe products inthe order, not the
overall order.
3. Coordination of delivery and installation including on site delivery oversight.
o. This involves two people on site during the move inand delivery tOensure
items are installed or brought into the correct locations.
4. Punch list review Vfall products throughout.
a. This involves two people Vnsite after the items are all installed topunch
all the equipment and ensure it works appropriately, is not damaged, and
iuaccurate tothe order. This |s additional tothe building punch 8S|twill
happen at a later stage of the construction after the building is officially
complete.
�@ttk? and locations worldwide
�
'
20
EXHIBIT A
Justine Kim
March 19, 2019
Page 2
The scope of services provided in the additional services include the following:
DLR Group $18,113
—2% Reimbursables (limited for site visits) 362
Total additional service (NTE) $18,475
Should the City request additional documentation or detailed response outside the
identified review process for the design team, an amendment for additional service
may be required.
The total fee for the additional design services described above a lump sum fee of
eighteen thousand four hundred seventy five dollars and zero cents
($18,475.00).
Thank you for the opportunity to provide this proposal for additional services, and we
look forward to our continued partnership with City of Tukwila.
Sincerely,
DLR Group
Erica Loynd
Principal
Encl: none
cc:
Ethan Bernau
22
City of Tukwila - Facilities Plan
TOTAL PROJECT
MONTHLY Budget Report
(REVISED Budgets; D-20 Plan Adopted by Council)
Life to Date Costs
• n(Mnnrle 19 sae Ir,:r•,n,r;r!„/,,,i,,,•�(o rr,r,r n,r e / x
COUNCIL REPORTING SW MIA P -
JUSTIC'F. CENTEROriginal
Nudger
!lodger l-r,nxfi•n
Corneal Rinker
Com,nirled nudge,
Life m Mee Cans
Remain g Committed Remaining Runtel
OM al C n,rplerinn
A/EService s(bothDesign&CA)
Permits/Fees
Construction (Pre -Con, Contt & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Contingency for Site Contamination (soils,haanat)
Land Acquisition
Contingency for Land Acquisition
$ 3,278,125
$ 700,000
5 38,738,678
$ 2,112,639
$ 1,815,875
$ 6,507,731
$ -
$ 14,133,295
$ 1,250,000
3 221,875
$ -
$ (11,315)
$ 210,000
$ 266,721
$ (1,656,239)
$ 750,000
$ (81,042)
$ 300,000
S 3,500,000
5 700,000
5 38,727,363
$ 2,322,639
$ 2,082,596
$ 4,851,492
$ 750,000
$ 14,052,253
$ 1,550,000
$ 3,141,729
$ 205,980
$ 563,671
$ 562,398
$ 1,967,303
$ -
$ -
$ 13,708,596
$ 906,784
$ 2,180,300
$ 205,980
$ 414,037
$ 264,705
$ 939,219
$ -
$ -
S 13,679,370
: 5 906,784
$ 961,429
$ -
$ 149,634
$ 297,693
$ 1,028,084
5 -
1 $ -
I $ 29,227
I S -
$ 358,271
$ 494,020
$ 38,163,692
$ 1,760,241
$ 115,293
$ 4,851,492
$ 750,000
$ 343,657
$ 643,216
$ -
$ -
$ -
$
$ -
$
$ -
S -
S
""- TOTAL"
S 68,536,343
5 -
S 68,536,343
$ 21,056,461
$ 18,590,395
$ 2,466,066
S 47,479,882
$ -
COUNCIL REPORTING SL41L11,IRP-
FIRE .CT1T1(1N5f Original
Midge,Midget ,dge, Trainfe,
Current Rinker Conm,irred Manger
Li/e ron,uec nr
Reminneg i,mum9red
Rem nming limiter
c ar ar Completion
A/E Services (both Design & CA)
Land Acquisition
Permlts/Fees
Construction (Pre -Con, Coast & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
$ 1,070,000
$ -
$ 234,000
$ 9,396,000
$ 931,000
$ 526,000
$ 1,116,000
$ 222,781
$ -
$ -
$ -
$ -
$ -
$ (222,781)
$ 1,292,781
$ -
$ 234,0,00
$ 9,396,000
$ 931,000
$ 526,000
$ 893,219
$ 1,236,572
$ -
$ 102,042
S 165,000
$ 133,726
$ 345,077
$ -
$ 776,125
$ -
! $ 92,042
I $ 99,273
1 $ 81,733
S 134,551
$ -
$ 460,447
5 -
I $ 10,000
i $ 65,727
$ 51,993
$ 210,526
S -
$ 56,209
$ -
S 131,958
$ 9,231,000
$ 797,274
$ 180,923
$ 893,219
$
$ -
$ -
S -
$ -
5
$ -
"., TOTAL :%
5 13,273,000
$ -
$ 13,273,000
5 1,982,416
5 1,183,724
$ 798,693
S 11,290,583
$ -
COUNCIL REPORTING SUMSlIRI' -
FIRE ST-I TfON 52
Original I6rdgel
!linger l'raiDli,
Curren, N,dg.a
Committed 0,,dgr,
Up in Dale Cagy
Rerouin'g Committed
Remaining Budget ('o,t or Cnmprerinn
A/E Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
$ 1,415,000
$ 16,000
$ 353,000
$ 13,298,000
$ 1,398,000
$ 787,000
$ 1,343,000
$ 234,222
$ 9,160
S -
$ 456,500
$ (9,160)
$ -
$ (40,722)
$ 1,649,222
$ 25,160
$ 353,000
$ 13,754,500
$ 1,388,840
$ 787,000
$ 1,302,278
$ 1,580,863
$ 25,157
$ 72,688
$ 137,500
$ 393,815
$ 532,289
5 -
$ 339,878
$ 17,157
$ 12,511
$ -
$ 16,258
$ 207,609
S -
$ 1,240,985
$ 8,000
$ 60,177
$ 137,500
$ 377,557
, $ 324,680
1 $ -
$ 68,359
$ 3
$ 280,312
$ 13,617,000
$ 995,025
$ 254,711
S 1,302,278
$ -
$ -
$
$ -
$ -
S
$ -
..,
5 18,610,000
$ 650,000
$ 19,260,000
5 2,742,311
S 593,412
S 2,148,899
S 16,517,689
$ -
COUNCI RF_P(1RTLVGSlI,1Ll11Rf-
FIRE S T I7'10N 54
Original Rnd.e(
g g
Midget %r,m.ren
f
Current !loner
g
Communed r,
L' m Ram en
f
Ren ,aim:e ebnrmrimed
R.•mrnl„in t nn,rger
ci,rr ar (nm plain',
A/E Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Contt & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction& Project)
$ 150,000
$ 902,668
$ 20,000
$ 230,000
$ 50,000
$ 107,500
$ 41,832
5 (7,000)
S 39,206
$ -
5 (5,610)
$ 1,875
$ -
$ (28,471)
$ 143,000
$ 941,874
5 20,000
$ 224,390
$ 51,875
$ 107,500
$ 13,361
$ 132,995
$ 941,875
$ 1,517
$ 106,700
$ 33,802
$ 106,665
$ -
$ 131,495
$ 933,775
$ 1,517
S 67,856
$ 22,798
$ 86,066
$ -
$ 1,500
S 8,100
S -
5 38,844
$ 11,004
$ 20,599
5 -
$ 10,005
5 (I)
$ 18,483
$ 117,690
$ 18,073
$ 835
5 13,361
S
5
$
$ -
$
$ -
$ -
. TOTAL
S 1,502,000
$ -
$ 1,502,000
$ 1,323,554
S 1,243,507
$ 80,047
$ 178,446
$ -
.�' C(JIILIC%/. REP(IR7'/;REPORTINGUe1LIL,IR1'- Original Ringer
PUBLIC 'FORKS
nudger r,,o1•ry
Current Badger
Committed nudger
Life in Dare Con
Rnnaink CommineJ Remaining !lodge(
('Mum ('mmplei,n,
A/E Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
5 767,385
$ 22,000,046
$ 110,000
$ 4,950,000
$ 529,036
S 668,426
$ 975,107
$ 15,000
$ 3,386,413
$ (20,000)
$ (1,895,000)
$ (416,293)
$ (348,426)
$ (721,694)
S 782,385
$ 25,386,459
$ 90,000
$ 3,055,000
$ 112,743
$ 320,000
$ 253,413
$ 318,882
$ 25,358,693
$ -
$ -
$ 65,643
$ 279,832
S -
$ 92,014
$ 25,344,993
$ -
5 -
$ 50,471
$ 139,845
$ -
$ 226,868
$ 13,700
$ -
$ -
$ 15,172
$ 139,987
$ -
$ 463,503
$ 27,766
$ 90,000
$ 3,055,000
$ 47,100
$ 40,168
$ 253,413
$
$ -
5 -
5 -
$ -
$ -
$ -
. ." . TOTAL "
$ 30,000,000
$ -
$ 30,000,000
$ 26,023,050
S 25,627,323
$ 395,727
$ 3,976950
S -