Loading...
HomeMy WebLinkAboutPLANNING 2019-04-11 COMPLETE AGENDA PACKETAllan Ekberg, Mayor Department of Community Development - Jack Pace, Director CHAIR, DENNIS MARTINEZ; VICE -CHAIR, HEIDI WATTERS; COMMISSIONERS, SHARON MANN, MIKE HANSEN, LOUISE STRANDER, KAREN SIMMONS AND DIXIE STARK PLANNING COMMISSION PUBLIC HEARING APRIL 11, 2019 - 6:30 PM TUKWILA CITY HALL COUNCIL CHAMBERS CALL TO ORDER ATTENDANCE ADOPT MINUTES IV. CASE NUMBER: APPLICANT: REQUEST: LOCATION: L18-0056 City of Tukwila Critical Areas Code update City Wide V. DIRECTOR'S REPORT VI. ADJOURN Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1 00 • Website: TukwilaWA.gov City of Tukwila Planning Commission PLANNING COMMISSION (PC) MINUTES Date: March 28, 2019 Time: 6:30 PM Location: Council Chambers Present: Chair Dennis Martinez; Vice Chair Heidi Watters; Commissioners Sharon Mann, Mike Hansen, Karen Simmons and Dixie Stark Absent: Commissioner Louise Strander Staff: Department of Community Development (DCD) Deputy hector Nora Gierloff, and Planning Commission Secretary Wynetta Bivens Adopt Commissioner Stark made a motion to adopt the February 8, 2019 Minutes: minutes. Commissioner Watters seconded the motion. Motionpassed. Chair Martinez opened the public hearing and swore in those wishing to provide testimony. CASE NUMBER: L18-0075 Shoreline Master Pram (SMP) Update APPLICANT: The City of Tukwila and Department of Ecology Nora Gierloff, Deputy Director, DCD, gave the presentation for staff. She provided an overview of the proposed changes. She said two combined changes are being made. 1) Critical Areas Ordinance, for which the review process has started, and 2) Shoreline Regulations, the focus tonight is only on the SMP. These changes are combined because there are often critical areas within the shoreline jurisdiction. Therefore, the changes need to be made concurrently and adopted together. Washington State requires a periodic review of the regulations to make sure they are current with state law and best available science. The review of SMP is due; which provides the opportunity to make sure the statewide regulations arecurrent. Also, some streamlining, and house -keeping changes will be done to make the ordinance more usable and understandable It's been several years since the last updates. She said the City can create the local SNIP, , but it needs to be in alignment with the State goals of the Shoreline Management Act. The Commissioners were asked to think about how the use of shorelines can be maximized for the greatest amount of people, as well as preserving the habitats, the ecological environment and economic possibilities for future generations. The reason why the State has a say what the City is doing along the Green River is because it is considered a shoreline of statewide significance. The City is working jointly with the Department of Ecology on the policy updates and are discussing proposed changes and coordination with them. PROPOSED CHANGES: • Re -write the SMP to streamline history in the document and make additional changes. • Remove the regulations, goals and policies from the SMP since they are in the Comprehensive Plan and Zoning Code. • Update the transition zone map. • Update the references to the Revised Code of Washington and Washington Administrative Code References. • Edit the Zoning Code to be consistent with State regulation. • Housekeeping and consolidate tables. • Allow more flexibility for recreational structures in the buffer. • Adopt King County's trail width standards of 12 ft. with two ft. shoulders on both sides. • Clarify that people can remove invasive species, such as blackberries along the river. 1 Page 2 Public Hearing Minutes March 28, 2019 without obtaining a Substantial Development Permit. • When businesses need to do restoration in the shoreline, they are required to monitor the plantings for survival for five years and replant if they do not survive. • Accept the proposal in the public review draft to allow more flexibility in the levee design. • Allow flexibility for floodwalls. • Double the height incentive to 13.5 ft. • Reslope (lay back) standard is changed to 3:1 for buffer reduction in urban conservancy Background was provided on the process. Commissioner Watters asked staff whether they agreed with the recommendations listed in the consultant's report. Staff confirmed they agreed with everything and have made all the required changes, which are included in the public review draft. However, it was noted some of the optional recommended changes were not made. PUBLIC COMMENTS: Nancy Rogers, Landuse Attorney Law Firm Cairn Cross & Hempelmann, on behalf of Segale Properties, submitted a comment letter at the hearing and walked through the five issues in the letter. She said the updates to the SMP make sense. Segale has an interest in the Green River because they own the Tukwila South property, which is along the Green River and it has been prepared for commercial and residential development. Issues addressed in the comment letter: • Request for clarification on what is a permitted use versus "fill, general", which is listed as a conditional use. Will a Conditional Use Permit be required, or will it be a permitted use under the flood hazard reduction? • Request to not assume that the Flood Control Disict will always require a 15 ft. access road along its levees. • Request to increase the 30% height incentive =td 3 5%, which vvould allow an additional story of commercial or residential construction. • Request to delete the proposed language insection 18.44.050.H referencing improvements regarding specific wildlife. • Recommendation to, delete the proposed language, "the use of the Green River to support salmon and trout' as well as, "Endangered Species Act", from the Shoreline Design Guidelines and substitute the following language in the ordinance recitals, "The City of Tukwila recognizes and celebrates that the Green River and its tributaries support salmon and resident trout, and that the river flows to Puget Sound which is home to salmonids and southern resident orca whales, and the City has designed this SMP update to assure no net loss in ecological function of the river system." Ms. Rogers said that overall, they support the flexibility in the levee types and allowances for floodwalls. Andrea Reay, President/CEO, Seattle Southside Chamber of Commerce, submitted a comment letter at the hearing, in support of implementation of the Lower Green River Corridor Flood Hazard Management Plan. Ms. Reay said they appreciate the update, clarity, consistency and the opportunity to provide feedback on the SMP. They are hopeful that the proposed changes in current and on -going discussions will maximize opportunities and options to develop and preserve both businesses, commerce and habitat. She said she wants the City to know that they want to be and continue to be a collaborative partner in this work and look forward to finding that pragmatic balance that can benefit everyone. Bill Toon, citizen, expressed his concerns regarding the 2.5:1 slope in relationship to his property, which he said is long. He asked for clarification and said it could cause property owners to lose a lot of land. His also said the plans from the City are inconsistent and clear diagrams are needed. 2 Page 3 Public Hearing Minutes March 28, 2019 Chair Martinez said that Mr. Toon brought up a good point regarding the plans. He requested in the future that staff provide 24x36 plans and make them available to the PC as well as the public. There were no additional comments. The public hearing was closed. Nora Gierloff asked Dan Nickel, Consultant from The Watershed Company, to join her during deliberation and to help answer questions. She said that Mr. Nickel has been helping with the SMP re- write. DELIBERATION: Staff requested review of the four policy questions raised in the SMP, listed in the March 28, 2019 staff report to answer questions for clarity and/or for the Commissioners to identify areas where they would like to propose revised language. Staff will incorporate the Commissioners policy directions in the matrix that they will bring back to the Commissioners. The Commissioners were in consensus with the following policy directions: 1. Minimum Levee Profile: Alternative A - to accept the proposal in the review draft to aflow more flexibiln levee design. 2. Additional Flexibility for Floodwalls: - No changes to the proposed language in the staff report. - Commissioner Watters raised the issueof applying some design standards on the floodwalls. 3. Increased Height Incentives:, - Staff suggested lookingat doing something that providesa meaningful incentive for the property ownersand include it in the matrix of comments. Commissioner Martinez wasin support of Ms. Rogers proposed request for a 35% height increase. 4. Resloping Standardr Buffer Reduction in Urban Conservancy (optional change, staff is requesting):' ommissioner Mann suggested revised language to remove the word `require' in Alternative A. Commissioner Stark suggested keeping in mind we want the most flexibility for the property owner and make sure the Language does not make them feel like they are backed into a corner. Commissioner Wa s said a 3:1 standard will increase planting success. Additional item o add to matrix Consider removing the 45 ft. height limit in the shoreline to encourage buildings in lieu of parking lots within the outer 100 ft. of the shoreline jurisdiction. QUESTIONS: Following are some of the questions addressed for the Commissioners: Patio and deck sizes, setbacks, height restrictions, buffer reductions, who has final approval of the SMP, and funding pertaining to private property owners who have land adjacent to the shoreline. There was extensive discussion on public access to the shoreline and regarding who is responsible for safety liability and public access maintenance. There was also discussion regarding the parking lot near the shoreline preventing access to the riverbank. 3 Page 4 Public Hearing Minutes March 28, 2019 Commissioners Mann and Stark were strongly opposed to requiring private property owners to allow the public access to the shoreline via their property. Misty Blair, with the Department of Ecology said that public access is one of the main goals of the Shoreline Management Act. She said it is not required on private residential property, but it is a requirement on public land and commercial or industrial property that, 1) is not water dependent, and 2) can provide access safely. She also stated that public access is a policy required for the whole State of Washington. Commissioner Mann asked staff how they determine a project has satisfactorily met the public access requirements when they approve projects. Ms. Gierloff directed the Commissioners to page 55 of the Zoning Code, section 18.44.080, that addresses public access to the shoreline and provided explanation. Mr. Nickel also commented on this issue. Commissioner Mann also expressed concerns with safety liabilities and responsibility maintaining the public access. Ms. Blair responded to comments on why the language is not more prescriptive regarding where public access is provided on private property. Commissioner Watters said she is in support of the amount of flexibility that the City has expressed they use to address the public access areas. She said being too prescriptive could have unintended consequences for some projects. There was additional discussion and examples raised regarding public;irail access on property within 1,000 ft. Staff are proposing a code change that will address the publ c access concern for the Vietnamese Martyrs Church. Commissioner Hansen said from a policy stand point he thinks it is important to have public access for such things like accessing the river to enjoy suchuses as kayaking. Based on Mr. Toon's comments staff provided some clan icat on on Shoreline residential buffers. Commissioner Stark asked. sev� NEXT STEPS: arifying questions. The public comment per o1 remain open until April 12th. A comment matrix with recommendations to review will be provided at the next meeting. tfwill make requested PC revisions and take the PC recommendation to the City Council. DIRECTOR'S REPORT:. Adjourned: Submitted by: Staff reminded the PC that they will have a special meeting on April The regular PC meeting is on April 25th, on SMP. 8:40 PM ynetta Givens Planning Commission Secretary th on cr cai a eas. 4 Department ofCo unity Develop ent - ack Pace, Director FILE NUMBERS: REQUEST: LOCATION: PUBLIC NOTICE: STAFF: ATTACHMENTS: Allan Ekberg, Mayor STAFF REPORT TO THE PLANNING COMMISSION FOR THE APRIL 11, 2019 HEARING L18-0056 Critical Areas Code Update Review and revise Tukwila's Critical Areas regulations, hold a public hearing and make a recommendation to the City Council. City Wide Notice was published in the Seattle Times and a postcard was mailed to the owners and tenants of all Tukwila parcels on 3/28/19. Proposed amendments were posted on the website and an email notification was sent to the interested parties list on 3/22/19. Information about the update was included in the citywide Stormwater mailer and the September eHazelnut newsletter. An open house was held on 10/9/18. Minnie Dhaliwal, Planning Supervisor A. Proposed TMC 18.45 Critical Areas Code and TMC 18.70 Non- conforming regulations pertaining to the critical areas. B. Edits in underline/strikeout version BACKGROUND All cities in Washington are required to adopt critical areas regulations by the Growth Management Act (GMA) (RCW 36.70A.060). Critical areas, as identified in the GMA include wetlands, frequently flooded areas, streams, geologically hazardous areas (steep slopes), and fish and wildlife habitat conservation areas. In addition, cities are to give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. Cities are required to include the best available science in developing policies and development regulations to protect the functions and values of critical areas (RCW 36.70A.172). All jurisdictions are required to review, evaluate, and, if necessary, revise their critical areas ordinances according to an update schedule provided per RCW 36.70A.130. Tukwila's current sensitive area regulations were adopted eight years ago in 2010. Per GMA the City must periodically consider best available science (BAS) and update its critical areas ordinance. Any deviations from BAS recommendations should be identified, assessed, and explained (WAC 365-195-915). Washington State Department of Ecology oversees critical area updates and provides direction on BAS. Tukwila City Hall * 6200 Sou cente oulevard • Tukwila, A 98188 • 206-433-1800 • Website: TukwilaWA.gov 5 L18-0056 Critical Areas Update PC Staff Report Page 2 Staff had a work session with the Planning Commission on this item on November 8, 2019. The staff report for the November 8, 2018 meeting is available online. Here is the link to staff report. The second work session was held on February 28, 2019 and here is the link to the staff report DISCUSSION Based on the direction from the Planning Commission staff has prepared revisions to the critical areas regulations. See Attachment A and B for the proposed revisions. Summary of the key revisions is included below: etlands 1. Designation: • Reference to State delineation manual removed and replaced with language from WAC 173-22-035, that states identification of wetlands and delineation of their boundaries shall be done in accordance with the approved federal wetland delineation manual and applicable regional supplements. • Five year time limit on wetland reports/delineations established. Generally, any delineation done more than five years ago needs to be revisited as wetlands can change significantly in a five-year period due to changes in hydrology, land uses, and plant species composition. Additionally, approved jurisdictional determinations by the Corps expire after five years. Revisiting a wetland delineation that is five or more years old does not necessarily mean a new wetland delineation needs to be done. It means it may be necessary to revisit the site to determine whether the delineation is still accurate or needs to be redone based on current conditions. 2. Rating: State rating system referenced, which is the Washington State Wetland Rating System for Western Washington (Hruby 2014, Ecology publication No. 14-06-029). To avoid the need for future updates related to rating system versions language added, "or as revised and approved by Ecology". 3. Buffer Widths: Adopt the standard buffer widths recommended by the Department of Ecology; but allow alternate buffer if impact minimization measures are taken AND buffer is replanted 6 L18-0056 Critical Areas Update PC Staff Report Page 3 Category Wetland buffer width (ft), current TMC Wetland buffer width (ft), Ecology 2014, high -intensity land use impact Habitat score <6 Habitat score <6 Habitat score 6-7 Habitat score 6-7 Habitat score 8- 9 Habitat score 8-9 Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Also, 100 feet vegetated corridor between wetland and priority habitats is maintained. Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Also, 100 feet vegetated corridor between wetland and priority habitats is maintained. 100 100 75 150 110 300 225 II 100 100 75 150 110 300 225 III 80 80 60 150 110 300 225 IV 50 50 40 50 40 50 40 Impact minimization measures to qualify for alternate buffers include the following: Disturbance Required Measures to Minimize Impacts Lights • Direct lights away from wetland Noise • Locate activity that generates noise away from wetland • If warranted, enhance existing buffer with native vegetation plantings adjacent to noise source • For activities that generate relatively continuous, potentially disruptive noise, such as certain heavy industry or mining, establish an additional 10' heavily vegetated buffer strip immediately adjacent to the outer wetland buffer Toxic runoff • Route all new, untreated runoff away from wetland while ensuring wetland is not dewatered • Establish covenants limiting use of pesticides within 150 feet of wetland • Apply integrated pest management 7 L18-0056 Critical Areas Update PC Staff Report Page 4 Disturbance Required Measures to Minimize Impacts Stormwater runoff • Retrofit stormwater detention and treatment for roads and existing adjacent development • Prevent channelized flow from lawns that directly enters the buffer • Use Low Intensity Development (LID) techniques where appropriate (for more information refer to the drainage ordinance and manual) Change in regime water • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and new lawns Pets and Disturbance Human • Use privacy fencing OR plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion • Place wetland and its buffer in a separate tract or protect with a conservation easement Dust • Use best management practices to control dust 4. Interrupted Buffer: Establishes an administrative waiver process for an interrupted buffer. a) Defines what qualifies as interrupting the buffer: a public or private road; buildings; or parking lots. The criteria for waiver include: i) The existing legal improvement creates a substantial barrier to the buffer function; ii) The interrupted buffer does not provide additional protection of the critical area from the proposed development; and iii) The interrupted buffer does not provide significant hydrological, water quality and wildlife buffer functions relating to the portion of the buffer adjacent to the critical area. 5. Buffer averaging instead of buffer reduction: Replaces buffer reduction provision with buffer averaging. The total area of the buffer after averaging is equal to the area required without averaging and the buffer at its narrowest point is never less than either 3/4 of the required width or 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater. 6. Alterations: No changes to the exemption level. The existing code provides an exemption for certain wetlands that are under 1,000 square feet. The exemption is from sequencing (showing that the impact cannot be avoided or minimized). Mitigation of the impacts is still required per Ecology. Exempt wetlands have to meet the following criteria: a) habitat score under five; b) are not associated with a riparian habitat or Shorelines of the State; c) are not part of a wetland mosaic, and d) do not contain priority habitat. 8 L18-0056 Critical Areas Update PC Staff Report Page 5 7. Mitigation Standards: Mitigation ratio for buffer impacts is added at 1:1 8. Wetland and buffer mitigation location: The current code prefers off -site mitigation be located within City of Tukwila's boundaries. However State and federal agencies advocate use of alternative mitigation methods such as mitigation banks or in -lieu -fee programs. In order to be consistent with regulations of these agencies the proposed changes allow for purchase of mitigation credit from an in -lieu fee program or bank, if that is the best choice ecologically for a project. Il. atercourses Rating and buffer widths: Ratings nomenclature updated to reflect Washington Department of Fish and Wildlife ratings for simplicity. Type 1, 2, 3, 4 changed to S (Shoreline), F (Fish bearing), NP (Non -fish bearing perennial), Ns (Non -fish bearing seasonal). No change in the buffers of S, F, Ns. The standard buffers of Np could be lowered from 80 feet to 50-65 range with buffer enhancement. Stream Type Wate rcourse �j►Buffer (ft), TNIC S Regulated under Shoreline Master Program F 100 Np Standard buffer 80 Alternate buffer in the range of 50-65 with buffer enhancement Ns 50 2. Buffer averaging vs reduction: Replaces buffer reduction provision with buffer averaging so long as the total area of the buffer after averaging is equal to the area required without averaging and the buffer at its narrowest point is never less than 3/4 of the required width. 3. Interrupted buffer: Establishes an administrative waiver process for an interrupted buffer. a) Defines what qualifies as interrupting the buffer: a public or private road; buildings; or parking lots. The criteria for waiver include: i) The existing legal improvement creates a substantial barrier to the buffer function; ii) The interrupted buffer does not provide additional protection of the critical area from the proposed development; and 9 L18-0056 Critical Areas Update PC Staff Report Page 6 iii) The interrupted buffer does not provide significant hydrological, water quality and wildlife buffer functions relating to the portion of the buffer adjacent to the critical area. III. cue callly (Hazardous re Reference to mapping sources added and protective provisions such as slope vegetation protection and guidelines on erosion control and best management practices included. Fish and it life abit t Conservati n reas a) The city's list of fish and wildlife habitat conservation areas made consistent with GMA definition b) Reference to mapping sources added. c) A requirement for a habitat assessment prepared by a qualified professional to better reflect BAS so that buffers could be based on site specific conditions. V, S ecial azrd Floo Areas Reference added to Special Hazard Flood Areas TMC Chapter 16.52; and floodplain habitat assessment requirements included. VI. ousek ep'in Co a Amen nts Vesting: Language added to clarify that only submittal of a complete building permit vests a project to critical areas code. For instance, if a short plat is approved but homes are not constructed and the code is updated, any future development is subject to the new updated code. An exception added for projects that currently have a preliminary approval but not final approval to be vested until the expiration of the preliminary approval; provided building permits are submitted within one year of the final approval. 2. Expiration of decisions related to critical areas: Five years term limit established for any approvals to be consistent with time limits for permits obtained from the state and federal agencies. 3. Permitted uses changed to permitted activities section 4. Vegetation Protection section that includes tree retention, removal and replacement requirements included: Currently the tree retention, removal and replacement requirements are part of TMC 18.54, the Tree Code. A section is added that covers these subjects so that tree removal, retention and protection in critical areas is all in one place and no cross -code reference is required. Tree protection section is similar to that which exists in 18.54.070 as is applicable to critical areas. 10 L18-0056 Critical Areas Update PC Staff Report Page 7 Non-invasive vegetation retention (except in cases of defective trees) in sensitive areas is in current code. Only change that will be made is clarification that tree retention on steep slopes is also required. Tree Replacement section is similar to what is required in the current shoreline code (TMC 18.44.080). 5. Reorganization: In order to improve the organization and make it easy to implement the code it is reorganized to sequentially address 1. Mitigation sequencing; 2. What is allowed outright/what requires Special Permission approval; 3. Criteria for approving deviations; 4. Mitigation requirements; 5. Monitoring 6. Penalties for unauthorized alterations: Penalties for illegal clearing in critical areas added. 7. Non -conforming provisions: New non -conforming thresholds for development in the wetland and stream buffers established; and tied to incentives for improving the buffer. a) Allow existing buildings to expand vertically to add upper stories in exchange for buffer enhancement b) Allow lateral expansion to the building side that is opposite of critical area up to a maximum of 1000 sq. ft; in exchange for buffer enhancement. Further this option is limited to situations where the buffer width is at least 75 percent of the required buffer. c) Allow lateral expansion along the existing building lines in exchange for buffer enhancement; and limit the sq. ft. of new intrusion into the buffer to less than 50 percent of the current intrusion or 500 sq. ft, whichever is less. Further this option is limited to situations where the buffer width is at least 75 percent of the required buffer. d) Allow enclosing within existing footprint in exchange for buffer enhancement. 8. Inventory update: Add requirement for the applicant to provide surveyed data for maintenance of the City's Critical Areas inventory map RECOMMENDATION Hold the public hearing on the proposed changes and determine whether any additional changes should be added based on public testimony. Staff will return with a comment matrix and revised drafts for the Planning Commission to review and forward to the City Council. 11 12 Page 1 of 32 CHAPTER 18.45 ENVIRON ENTALLY CRITICAL AREAS Sections: 18.45.010 Purpose 18.45.020 Best Available Science 18.45.030 Critical Area Applicability, Maps and Inventories 18.45.040 Critical Areas Special Studies 18.45.050 Interpretation 18.45.060 Procedures 18.45.070 Critical Area Permitted Uses 18.45.080 Wetlands Designations, Ratings and Buffers 18.45.090 Wetland Alterations and Mitigation 18.45.100 Watercourse Designations, Ratings and Buffers 18.45.110 Watercourse Alterations and Mitigation 18.45.120 Areas of Potential Geologic Instability Designations, Ratings and Buffers 18.45.130 Areas of Potential Geologic Instability Uses, Exemptions, Alterations and Mitigation 18.45.140 Abandoned Mine Areas 18.45.150 Fish and Wildlife Habitat Conservation Areas — Designation, Mapping, Uses and Standards 18.45.155 Special Hazard Flood Areas 18.45.160 Critical Area Master Plan Overlay 18.45.170 Critical Areas Tracts and Easements 18.45.180 Exceptions 18.45.190 Appeals 18.45.195 Enforcement and Penalties 18.45.200 Recording Required 18.45.210 Assurance Device 18.45.220 Assessment Relief 18.45.10 Purpose A. The purpose of TMC Chapter 18.45 is to protect the environment, human life and property, designate and classify ecologically critical areas such as regulated wetlands and watercourses and geologically hazardous areas and to protect these areas and their functions while also allowing for reasonable use of public and private property. These regulations are prepared to comply with the Growth Management Act, RCW 36.70A, to apply best available science according to WAC 365-195-900 through 925 and to protect critical areas as defined by WAC 365-190-080. B. Standards are hereby established to meet the following goals of protecting environmentally critical areas: 1. Minimize developmental impacts on the natural functions of these areas. 2. Protect quantity and quality of water resources. 3. Minimize turbidity and pollution of wetlands and fish- bearing waters and maintain wildlife habitat. 4. Prevent erosion and the loss of slope and soil stability caused by the removal of trees, shrubs, and root systems of vegetative cover. 5. Protect the public against avoidable losses, public emergency rescue and relief operations cost, and subsidy cost of public mitigation from landslide, subsidence, erosion and flooding. 6. Protect the community's aesthetic resources and distinctive features of natural lands and wooded hillsides. 7. Balance the private rights of individual property owners with the preservation of environmentally critical areas. 8. Prevent the loss of wetland and watercourse function and acreage and strive for a gain over present conditions. 13 Page 2 of 32 9. Give special consideration to conservation or protection measures necessary to protect or enhance anadromous fisheries. 10. Incorporate the use of best available science in the regulation and protection of critical areas as required by the State Growth Management Act, according to WAC 365-195-900 through 365-195-925 and WAC 365-190-080. (Ord. 2301 §1(part, 2010) 18.45.20 Best Available Science A. Policies, regulations and decisions concerning critical areas shall rely on best available science to protect the functions of these areas and must give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fish and their habitats. B. Nonscientific information may supplement scientific information but is not an adequate substitution for valid and available scientific information. C. Incomplete or unavailable scientific information leading to uncertainty for permitting critical area impacts may require application of effective adaptive management on a case by case basis. Adaptive management relies on scientific methods to evaluate how well regulatory or non -regulatory actions protect critical areas or replace their functions. (Ord. 2301 §1 (part), 2010) 18.45.30 Critical Area Applicability, Maps, and Inventories A. APPLICABILITY —The provisions of TMC Chapter 18.45 shall apply to all land uses and all development activities in a critical area or a critical area buffer as defined in the "Definitions" chapter of this title. The provisions of TMC Chapter apply whether or not a permit or authorization is required within the City of Tukwila. No person, company, agency, or applicant shall alter a critical area or buffer except as consistent with the purposes and requirements of TMC Chapter 18.45. The following are critical areas regulated by TMC Chapter 18.45: 1. Abandoned coal mines; 2. Areas of potential geologic instability: Class 2, 3, 4 areas (as defined in the Definitions chapter of this title and TMC 18.45.120.A); 3. Wetlands; 4. Watercourses; 5. Fish and Wildlife Habitat Conservation Areas; and 6. Special Hazard Flood Areas. B. The Growth Management Act also identifies areas of seismic instability as critical areas. Areas of seismic instability are defined and regulated through the Washington State Building Code. See maps for designated areas of seismic instability. C. The City shall not approve any permit or otherwise issue any authorization to alter the condition of critical area land, water or vegetation or to construct or alter any structure or improvement in, over, or on a critical area or its buffer, without first ensuring compliance with the requirements of TMC Chapter 18.45. D. Approval of a permit or development proposal pursuant to the provisions of TMC Chapter 18.45 does not release the applicant from any obligation to comply with the provisions of TMC Chapter 18.45. E. When TMC Chapter 18.45 imposes greater restrictions or higher standards upon the development or use of land than other laws, ordinances or restrictive covenants, the provisions of TMC Chapter 18.45 shall prevail. F. It is the obligation of the property owner to comply with all relevant provisions of this Code. G. CRITICAL AREAS MAPS AND INVENTORIES 1. The distribution of many critical areas in Tukwila is displayed on the Critical Areas Maps, on file with the Department of Community Development (DCD). These maps are based on site assessment of current conditions and review of the best available scientific data and are hereby adopted by reference. Not all critical areas are shown on the map, it is the applicant's responsibility to verify actual presence or absence of a critical area or critical area buffer based on the definitions in this code. 2. Studies, preliminary inventories and ratings of potential critical areas are on file with the Department of Community Development. 14 Page 3 of 32 3. As new environmental information related to critical areas becomes available, the Director is hereby designated to periodically add new information to the Critical Areas Maps. Removal of any information from the critical area maps is a Type 1 decision. 4. All revisions, updates and reprinting of critical areas maps, inventories, ratings and buffers shall conform to TMC Chapter 18.45. (Ord. 2301 §1 (part), 2010) 18.45.40 Critical Areas Special Studies A. Application Required. An applicant for a development proposal within a parcel that may include a critical area and/or its buffer shall submit those studies as required by the City and specified below to adequately identify and evaluate the critical area and its buffers. 1. A required critical area study shall be prepared by a person with experience and training in the scientific discipline appropriate for the relevant critical area in accordance with WAC 365-195-905(4). A qualified professional must have obtained a B.S. or B.A. or equivalent degree in ecology or related science, environmental studies, fisheries, geotechnical or related field, and two years of related work experience. a. A qualified professional for Fish and Wildlife Habitat Conservation Areas must have a degree in ecology or related sciences and professional experience related to the subject species. b. A qualified professional for wetland critical area studies must be a certified Professional Wetland Scientist or a Wetland Scientist with at least two years of full-time work experience as a wetlands professional, including delineating wetlands using the approved federal manual and applicable regional supplements, preparing wetland reports, conducting functional assessments, and developing and implementing mitigation plans. c. A qualified professional for a geological hazard study must be a professional geotechnical engineer as defined in the Definitions chapter of this title, licensed in the state of Washington. d. A qualified professional for watercourses and frequently flooded areas means a hydrologist, fisheries biologist, engineer or other scientist with experience in preparing watercourse assessments. 2. The critical area study shall use scientifically valid methods and studies in the analysis of critical area data and shall use field reconnaissance and reference the source of science used. The critical area study shall evaluate the proposal and all probable impacts to critical areas in accordance with the provisions of TMC Chapter 18.45. B. Wetland and Watercourse Critical Area Studies. The critical area study shall contain the following information, as applicable: 1. The name and contact information of the applicant, a description of the proposal, and identification of the permit requested; 2. A copy of the site plan for the development proposal showing: critical areas and buffers and the development proposal with dimensions, clearing limits, proposed storm water management plan, and mitigation plan for impacts due to drainage alterations; 3. The dates, names and qualifications of the persons preparing the study and documentation of any fieldwork performed on the site; 4. Identification and characterization of all critical areas, water bodies, and buffers on or adjacent to the proposed project area or potentially impacted by the proposed project as described in the following sections: a. Characterization of wetlands must include: (1) A wetland delineation report that includes methods used, field indicators evaluated and the results. Wetland delineation must be performed in accordance with approved federal wetland delineation manual and current applicable regional supplements. Field data forms are to be included in the report. Data collection points are to be shown on the site plan with their corresponding numbers indicated. After the City of Tukwila confirms the boundaries, they are to be professionally surveyed to the nearest square foot and the site plan modified as necessary to incorporate the survey data. Exact wetland acreage will be calculated after the boundaries have been surveyed. Applicant must submit electronic data at the time of as -built submittal. (2) Cowardin (Classification of Wetlands and Deepwater Habitats of the U.S. — U.S. Department of Interior) classification of the wetland(s). 15 Page 4 of 32 (3) Hydrogeomorphic classification of the wetland(s). (4) Hydroperiod. (5) Brief landscape assessment of the wetland (identify hydrologic basin/sub-basin; inlets, outlets; surrounding land use; habitat quality and connectivity; ultimate point of discharge; presence of culverts or other constraints to flow; relationship to other wetlands/watercourses adjacent to or potentially impacted by the proposed project). (6) Description of buffer size per this chapter, conditions (topographic considerations, existing vegetation types and density, habitat features, watercourse edges, presence of invasive species, etc.) and functions. (7) Assessment. For proposed wetland filling or proposed projects that will impact buffers the Washington Wetland Classification System (2014 or most current) shall be used as a functional assessment. b. Characterization of the watercourses on site or adjacent areas potentially impacted by the proposed project must include: (1) Description of: flow regime, physical characteristics of streambed, banks, dimensions and bank -full width, stream gradient, stream and buffer vegetation conditions, habitat conditions, and existing modifications. (2) Brief landscape assessment of the watercourse (identify hydrologic basin/sub-basin, and contributing basin area acreage, outlets, surrounding land use, habitat quality and connectivity, ultimate point of discharge, presence of culverts or other constraints to flow, presence of man-made or natural barriers to fish passage, relationship to wetlands or other watercourses adjacent to or potentially impacted by the proposed project, flow regime). (3) Classification of the watercourse under Tukwila's rating system. (4) Description of buffer size per this chapter, conditions (topographic considerations, existing vegetation types and density, habitat features, watercourse edges, presence of invasive species, etc.) and functions. (5) Description of habitat conditions, wildlife/fish use of the watercourse, including sensitive, threatened or endangered species. c. Citation of any literature or other resources utilized in preparation of the report. 5. A statement specifying the accuracy of the study and assumptions used in the study. 6. Determination of the degree of hazard and risk from the proposal both on the site and on adjacent properties. 7. An assessment of the probable cumulative impacts to critical areas, their buffers and other properties resulting from the proposal. 8. A description of reasonable efforts made to apply mitigation sequencing to avoid, minimize and mitigate impacts to critical areas. 9. Plans for adequate mitigation to offset any impacts. 10. Recommendations for maintenance, short-term and long-term monitoring, contingency plans and bonding measures. 11. Any technical information required by the Director to assist in determining compliance with TMC Chapter 18.45. 12. Wetland and Watercourse special studies are valid for five years following the date of the study, unless otherwise determined by the director. C. GEOTECHN!CAL REPORT — 1. A geotechnical report appropriate both to the site conditions and the proposed development shall be required for development in Class 2, Class 3, Class 4 areas, and any areas identified as Coal Mine Hazard Areas. 2. Geotechnical reports for Class 2 areas shall include at a minimum a site evaluation review of available information regarding the site and a surface reconnaissance of the site and adjacent areas potentially impacted by the proposed project. Subsurface exploration of site conditions is at the discretion of the geotechnical consultant. 3. Geotechnical reports for Class 3, Class 4 and Coal Mine Hazard Areas shall include a site evaluation review of available information about the site, a surface reconnaissance of the site and adjacent areas potentially impacted by the proposed project, a feasibility analysis for the use of infiltration on -site and a subsurface exploration of soils and hydrology conditions. Detailed slope stability analysis shall be done if the geotechnical engineer recommends it in Class 3 or Coal Mine Hazard Areas and must be done in Class 4 areas. 16 Page 5 of 32 4. Applicants shall retain a geotechnical engineer to prepare the reports and evaluations required in this subsection. The geotechnical report and completed site evaluation checklist shall be prepared in accordance with the generally accepted geotechnical practices, under the supervision of and signed and stamped by the geotechnical engineer. The report shall be prepared in consultation with the Community Development and Public Works Departments. 5. The opinions and recommendations contained in the report shall be supported by field observations and, where appropriate or applicable, by literature review conducted by the geotechnical engineer which shall include appropriate explorations, such as borings or test pits, and an analysis of soil characteristics conducted by or under the supervision of the engineer in accordance with standards of the American Society of Testing and Materials or other applicable standards. If the evaluation involves geologic evaluations or interpretations, the report shall be reviewed and approved by a geotechnical engineer. D. CRITICAL AREA STUDY - MODIFICATIONS TO REQUIREMENTS — 1. The Director may limit the required geographic area of the critical area study as appropriate if the applicant, with assistance from the City, cannot obtain permission to access properties adjacent to the project area. 2. The Director may allow modifications to the required contents of the study where, in the judgment of a qualified professional, more or less information is required to adequately address the potential critical area impacts and required mitigation. E. REVIEW OF STUDIES — The Department of Community Development will review the information submitted in the critical area study to verify the information, confirm the nature and type of the critical area, and ensure the study is consistent with TMC Chapter 18.45. At the discretion of the Director, critical area studies may undergo peer review, at the expense of the applicant. Public Works Department shall seek a peer review of the geotechnical report on Class 3 and 4 slopes; and peer review on Class 2 slopes may be required at the discretion of the Public Works Director. (Ord. 2368 § 47, 2012; Ord. 2301 §1(part), 2010) 18.45.70 Critical Area Permitted Activities A. General Activities. The following activities are outright permitted subject to the provisions of TMC Chapter 21.04 and of the mitigation requirements of this chapter, if applicable: 1. Maintenance and repair of existing facilities provided no alteration or additional fill materials will be placed or heavy construction equipment used in the critical area or buffer. 2. Site exploration or research that does not include use of heavy equipment or native vegetation removal. 3. Maintenance and repair of essential streets, roads, rights -of -way, or utilities. New fiberoptic utilities within existing improved and paved road are also permitted under this category. 4. Actions to remedy the effects of emergencies that threaten the public health, safety or welfare. 5. Maintenance activities of existing landscaping and gardens in a critical area buffer including, but not limited, to mowing lawns, weeding, harvesting and replanting of garden crops and pruning and planting of vegetation. This provision does not apply to removal of established native trees and shrubs. Excavation, filling, and construction of new landscaping features, such as concrete work, berms and walls, are not covered in this provision. 6. Voluntary native revegetation and/or removal of invasive species that does not include use of heavy equipment or herbicide. B. PERMITTED ACTIVITIES SUBJECT TO ADMINISTRATIVE REVIEW. The following uses may be permitted only after administrative review (Type 2 Special Permission application) and approval by the Director: 1. Maintenance and repair of existing uses and facilities where alteration or additional fill materials will be placed, or heavy construction equipment used. 2. New surface water discharges to critical areas or their buffers from detention facilities, pre -settlement ponds or other surface water management structures may be allowed provided that the discharge meets the clean water standards of RCW 90.48 and WAC 173.200 and 173.201 as amended and does not adversely affect wetland hydrology or watercourse flow. Water quality monitoring may be required as a condition of use. 3. Construction of bioswales and dispersion trenches are the only storm water facilities allowed in wetland or watercourse buffers. Water quality monitoring may be required as a condition of use 4. Enhancement or other mitigation including landscaping with native plants that requires heavy equipment. 17 Page 6 of 32 5. Construction of Essential Utilities if designed to protect the critical area and its buffer against erosion, uncontrolled storm water, restriction of groundwater movement, slides, pollution, habitat disturbance, any loss of flood carrying capacity and storage capacity, and excavation or fill detrimental to the environment. 6. Essential Public Streets, Roads and Rights -of -Way as defined by TMC 18.06.285, provided the following criteria are met: a. Are designed and maintained to prevent erosion and avoid restricting the natural movement of groundwater. b. Are located to conform to the topography so that minimum alteration of natural conditions is necessary. The number of crossings shall be limited to those necessary to provide essential access. c. Are constructed in a way that does not adversely affect the hydrologic quality of the wetland or watercourse and/or its buffer. Where feasible, crossings must allow for combination with other essential utilities. 7. Public/Private Use and Access a. Public and private access shall be limited to trails, boardwalks, covered or uncovered viewing and seating areas, footbridges only if necessary for access to other areas of the property, and displays (such as interpretive signage or kiosks), and must be located in areas that have the lowest sensitivity to human disturbance or alteration. Access features shall be the minimum dimensions necessary to avoid adverse impacts to the critical area. Trails shall be no wider than 5 feet and are only allowed in the outer 25 percent of the buffer, except for allowed wetland or stream crossings. Crossings and trails must be designed to avoid adverse impacts to critical area functions. The Director may require mechanisms to limit or control public access when environmental conditions warrant (such as temporary trail closures during wildlife breeding season or migration season). b. Public access must be specifically developed for interpretive, educational or research purposes by, or in cooperation with, the City or as part of the adopted Tukwila Parks and Open Space Plan. Private footbridges are allowed only for access across a critical area that bisects the property. c. No motorized vehicle is allowed within a critical area or its buffer except as required for necessary maintenance, agricultural management or security. d. Any public access or interpretive displays developed along a critical area and its buffer must, to the extent possible, be connected with a park, recreation or open -space area. e. Vegetative edges, structural barriers, signs or other measures must be provided wherever necessary to protect critical areas and their buffers by limiting access to designated public use or interpretive areas. f. Access trails and footbridges must incorporate design features and materials that protect water quality and allow adequate surface water and groundwater movement. Trails must be built of permeable materials. g. Access trails and footbridges must be located where they do not disturb nesting, breeding and rearing areas and must be designed so that sensitive plant and critical wildlife species are protected. Trails and footbridges must be placed so as to not cause erosion or sedimentation, destabilization of watercourse banks, interference with fish passage or significant removal of native vegetation. Footbridges must be anchored to prevent their movement due to water level or flow fluctuations. Any work in the wetland or stream below the OHWM will require additional federal and state permits. 8. Dredging, Digging or Filling may occur within a critical area or its buffer only with the permission of the Director provided it meets mitigation sequencing requirements and is permitted under TMC 18.45.90 (alteration of wetland) or TMC 18.45.110 (alteration of watercourse); TMC 18.45.100 (areas of geologic instability). Dredging, digging or filling shall only be permitted for flood control, improving water quality and habitat enhancement unless otherwise permitted by TMC 18.45. (Ord. 2301 §1(part), 2010) 18.45.075 Mitigation Sequencing A. Applicants shall demonstrate that reasonable efforts have been examined with the intent to avoid and minimize impacts to critical areas and critical area buffers. When an alteration to a critical area or its required buffer is proposed, such alteration shall be avoided, minimized or compensated for in the following order of preference: 1. Avoiding the impact altogether by not taking a certain action or parts of an action; 2. Minimizing critical area or critical area buffer impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; 18 Page 7 of 32 3. Rectifying the impact byrepairing, rehabilitating 0[restoring the affected environment; 4. Reducing Oreliminating the impact over time hv preservation and maintenance operations during the life Ofthe @ChOO� ' 5. Compensating for the impact hvreplacing, enhancing, O[providing substitute resources Urenvironments; and/or O. Monitoring the impact and taking appropriate corrective measures. 18.45.80 Wetlands Designations, Ratings and Buffers A. NE7IA88JDE8/GAA77ONS. 1. For the purposes OfTK4CChapter 18.45'"wetl8OdS"and "regulated wetlands" are defined inthe Definitions chapter Ofthis title. Awetland boundary iSthe line delineating the outer edge Of3wetland established iO accordance with the approved federal wetland delineation manual and applicable regional supplement. 2. Wetland determinations and delineation Ofwetland boundaries shall b8made by8qualified professional, 8Sdescribed iDTK4CSection 18.45.04O. 3. Wetland determinations and delineation or wetland boundaries must be conducted within no more than five years prior t0the date Ofpermit application. B. NETLA8D RATINGS —Wetlands shall be designated in GCC0RdanCe with the Washington State Wetlands Rating System for Western Washington, (Washington State Department of Ecology, 2014, Publication #Y4'06-029); 0r88otherwise amended bvEcology G3Category (H0l0r/VG8listed below: C. NETIAND BUFFERS — 1. Purpose. The purpose 0fthe buffer area shall b8k)protect the integrity and functions Ofthe wetland area. Any land alteration must be located out of the buffer areas as required by this section. Wetland buffers are intended in general to: G. Minimize impacts of development on properties containing b. Protect wUU8OdG from adverse impacts during development; C Preserve the edge of the wetland and its buffer for its critical habitat value; d. Provide an area to stabilize banks, to absorb overflow during high water events and N allow for slight variation of Gqu@UC Svute0 b0uOd8hGG over time due to hydrologic or climatic effects; H. Reduce erosion and increased surface water runoff; f. Reduce loss {fV[damage tVproperty; g. Intercept fine sediments from surface water runoff and serve k)minimize water quality impacts; and h. Protect the critical area from human and domestic animal disturbances. D. BUFFER REQUIREMENTS— Buffer widths inTable 18.45.O8O'1 have been established inaccordance with the best available science. They are based 0Othe category Ofwetland and the habitat score. 19 Page 8 of 32 Table 18.45.080-1 Wetland Buffer Widths Category Wetland buffer width (ft), Eco oqy 2014, high -intensity land use impact Habitat Habitat Habitat Habitat score Habitat Habitat score 8-9 score <6 score score 6,-7 <6 6-7 score 8-9 Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Also, 100 feet vegetated corridor between wetland and any nearby Priority Habitats is maintained (see footnote 1) Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Also, 100 feet vegetated corridor between wetland and any nearby Priority Habitats is maintained. (see footnote 1) I 100 75 150 110 300 225 II 100 75 150 110 300 225 III 80 60 150 110 300 225 IV 50 40 50 40 50 40 1. A relatively undisturbed, vegetated corridor at least 100 feet wide is protected between the wetland and any nearby Priority Habitats as defined by the Washington State Department of Fish and Wildlife. The corridor must be protected for the entire distance between the wetland and the Priority Habitat by some type of legal protection such as a conservation easement. Presence or absence of a nearby habitat must be confirmed by a qualified biologist. If no option for providing a corridor is available, Table 18.45.080-1 may be used with the required measures in Table 18.45.080-2 alone. Table 18.45.080-2 Required Measures to Minimize Impacts to Wetlands Disturbance Required Measures to Minimize Impacts Lights • Direct lights away from wetland Noise • Locate activity that generates noise away from wetland • If warranted, enhance existing buffer with native vegetation plantings adjacent to noise source • For activities that generate relatively continuous, potentially disruptive noise, such as certain heavy industry or mining, establish an additional 10' heavily vegetated buffer strip immediately adjacent to the outer wetland buffer Toxic runoff • Route all new, untreated runoff away from wetland while ensuring wetland is not dewatered • Establish covenants limiting use of pesticides within 150 feet of wetland • Apply integrated pest management 20 Page 9 of 32 Disturbance Required Measures to Minimize Impacts Stormwater runoff • Retrofit stormwater detention and treatment for roads and existing adjacent development • Prevent channelized flow from lawns that directly enters the buffer • Use Low Intensity Development (LID) techniques where appropriate (for more information refer to the drainage ordinance and manual) Change in water regime • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and new lawns Pets and human disturbance • Use privacy fencing OR plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion • Place wetland and its buffer in a separate tract or protect with a conservation easement Dust • Use best management practices to control dust E. BUFFER SETBACKS — 1. All commercial and industrial buildings shall be set back 15 feet and all other development shall be set back 10 feet from the buffer's edge. The building setbacks shall be measured from the foundation to the buffer's edge. Building plans shall also identify a 20-foot area beyond the buffer setback within which the impacts of development will be reviewed. 2. The Director may waive setback requirements when a site plan demonstrates there will be no impacts to the buffer from construction or occasional maintenance activities (see TMC Figure 18-2) F. VARIATION OF STANDARD WETLAND BUFFER WIDTH- 1. Buffer averaging may be allowed by the Director as a Type 2 permit if the following criteria is met, and so long as the total area of the buffer after averaging is equal to the area required without averaging and the buffer at its narrowest point is never less than either 3/4 of the required width or 75 feet for Category I and II, 50 feet for Category 111, and 25 feet for Category IV, whichever is greater. a. The wetland has significant differences in characteristics that affect its habitat functions, and the buffer is increased adjacent to the higher -functioning area of habitat or more -sensitive portion of the wetland and decreased adjacent to the lower -functioning or less -sensitive portion as demonstrated by a critical areas report from a qualified wetland professional. b. There are no feasible alternatives to the site design that could be accomplished without buffer averaging, and the averaged buffer will not result in degradation of the wetland's functions and values as demonstrated by a critical areas report. c. Compliance with mitigation sequencing requirements. d. Compliance with TMC 18.45 Vegetation Protection and Management section. e. Submittal of buffer enhancement plan, mitigation monitoring and maintenance plan along with financial guarantee in accordance with TMC 18.45. 2. Interrupted Buffer: Waiver for interrupted buffer may be allowed by the Director as a Type 2 permit if it complies with the following: a. The buffer is interrupted by a paved public or private road; legally constructed buildings; or legally approved parking lots. This waiver does not apply to accessory structures such as sheds and garages. b. The existing legal improvement creates a substantial barrier to the buffer function; c. The interrupted buffer does not provide additional protection of the critical area from the proposed development; and d. The interrupted buffer does not provide significant hydrological, water quality and wildlife functions. This waiver does not apply if large trees or other significant native vegetation exists. e. Enhancement of remaining buffer is required if feasible. 3. Buffers for all types of wetlands will be increased when they are determined to be particularly sensitive to disturbance or the proposed development will create unusually adverse impacts. Any increase in the width of the buffer shall be required only after completion of a wetland study by a qualified wetland professional or expert that documents 21 Page 10 of 32 the basis for such increased width. An increase in buffer width may be appropriate when: a. The development proposal has the demonstrated potential for significant adverse impacts upon the wetland that can be mitigated by an increased buffer width; or; b. The area serves as a habitat for endangered, threatened, sensitive or monitor species listed by the federal government or the State. (Ord, 2368 §48, 2012; Ord. 2301 §1 (part), 2010) 18.45.90 Wetlands Uses, Alterations and Mitigation A. No use or development may occur in a wetland or its buffer except as specifically allowed by TMC Chapter 18.45. Any use or development allowed is subject to review and approval by the Director. Where required, a mitigation plan must be developed and must comply with the standards of mitigation required in TMC Chapter 18.45. Where unauthorized alterations occur within a critical area or its buffer, the City will require the applicant to submit a critical area study, that includes mitigation, subject to approval. The applicant shall be responsible for implementing the mitigation and for additional penalties as determined by the Director. In addition, federal and/or state authorization is required for direct impacts to waters of the United States or the State of Washington. B. ALTERATIONS- 1. Alterations to wetlands are discouraged and are limited to the minimum necessary for project feasibility. Requests for alterations must be accompanied by a mitigation plan, are subject to Director approval, and may be approved only if the following findings are made: a. Complies with mitigation sequencing requirements. b. The alteration will not adversely affect water quality; c. The alteration will not adversely affect fish, wildlife, or their habitat; d. The alteration will not have an adverse effect on drainage and/or storm water detention capabilities; e. The alteration will not lead to unstable earth conditions or create an erosion hazard or contribute to scouring actions; f. The alteration will not be materially detrimental to any other property; and g. The alteration will not have adverse effects on any other critical areas. h. Complies with the maintenance and monitoring section. 2. Alterations are not permitted to Category I and II wetlands unless specifically exempted under the provisions of TMC Chapter 18.45. 3. Alterations to Category III and IV wetlands are allowed only where unavoidable and adequate mitigation is carried out in accordance with the standards of this section. 4. Alterations to isolated Category IV wetlands less than 1,000 square feet in size that meet all of the following conditions are allowed where adequate mitigation is carried out in accordance with the standards of this section: a. They are not associated with a riparian corridor, b. They are not associated with shorelines of the state or their associated buffers, c. They are not part of a wetland mosaic; d. They do not contain habitat identified as essential for local populations of priority species identified by the Washington State Department of Fish and Wildlife, and e. They do not score 6 points or greater for habitat in the Western Washington Wetland Rating System. C. MITIGATION STANDARDS. 1. Types of Wetland Mitigation: a. Mitigation for wetlands shall follow the mitigation sequencing steps in this chapter and may include the following types of actions in order of decreasing preference: (1) Restoration: i. Re-establishment. The manipulation of the physical, chemical or biological characteristics of a site with the goal of restoring wetland functions to a former wetland, resulting in a net increase in wetland acres and functions; ii. Rehabilitation. The manipulation of the physical, chemical or biological characteristics of a site with the goal of repairing historic functions and processes of a degraded wetland, resulting in a gain in wetland 22 Page 11 of 32 functions but not acreage; (2) Creation (establishment) The manipulation of the physical, chemical or biological characteristics to develop a wetland on an upland or deepwater site, where a biological wetland did not previously exist; (3) Enhancement. The manipulation of the physical, chemical or biological characteristics to heighten, intensify, or improve specific functions (such as vegetation) or to change the growth stage or composition of the vegetation present, resulting in a change in wetland functions but not in a gain in wetland acreage. (4) A combination of the three types. b. Required mitigation ratios are described in TMC Section 18.45.090.E.1.b.(1). Alternate mitigation ratios may be accepted by the Director upon presentation of justification based on best available science that shows the proposed compensation represents a roughly proportional exchange for the proposed impacts. (1) Alterations are not permitted to Category I or II wetlands unless specifically exempted under the provisions of this program. When alterations are allowed, mitigation ratios for Category I wetlands shall be at a 4:1 for creation or re- establishment, 8:1 for rehabilitation, and 16:1 for enhancement. Mitigation ratios for Category 11 wetlands shall be at 3:1 for creation or re-establishment, 6:1 for rehabilitation and 12:1 for enhancement. Creation or re-establishment shall be contiguous to the wetland, unless an exception is authorized by the Director. For Category 11 estuarine wetlands, re-establishment, creation and enhancement ratios will be decided on a case -by - case basis. (2) Alterations to Category III wetlands are prohibited except where unavoidable and mitigation sequencing in accordance with this chapter has been utilized and where mitigation is carried out in accordance with the standards in the section. Mitigation for any alteration to a Category III wetland must be provided at a ratio of 2:1 for creation or re-establishment, 4:1 for rehabilitation and 8:1 for enhancement alone. (3) Mitigation for alteration to a Category IV wetland will be 1.5:1 for creation or re-establishment, 3:1 for rehabilitation or 6:1 for enhancement. Where only a portion of a Category IV wetland is filled, the potential functionality of the remaining reduced wetland must be considered in mitigation planning. (4) Mitigation for alteration to wetland buffers will be 1:1. c. The following shall be considered the minimum performance standards for approved wetland alterations: (1) Wetland functions improved over those of the original conditions. (2) Hydrologic conditions and hydroperiods are improved over existing conditions and the specific hydrologic performance standards specified in the approved mitigation plan are achieved. (3) Acreage requirements for creation, re- establishment, rehabilitation or enhancement and for proposed wetland classes are met. (4) Vegetation native to the Pacific Northwest is installed and vegetation survival and coverage standards over time are met and maintained. (5) Habitat features are installed, if habitat is one of the functions to be improved. (6) Buffer and bank conditions and functions exceed the original state. d. Maintenance and monitoring of mitigation shall be done by the property owner for a period of no less than five years and for ten years when the mitigation plan includes establishing forested wetland and/or buffers. Maintenance shall be carried out in accordance with the approved mitigation plan. Monitoring reports must be submitted to the City for review with the frequency specified in the approved mitigation plan. D. WETLAND AND BUFFER MITIGATION LOCATION. 1. In instances where portions of a wetland or wetland buffer impacted by development remain after buffer averaging, mitigation for buffer impacts shall be provided on -site, if feasible. Where an essential public road, street or right-of-way or essential public utility cannot avoid buffer alterations, buffer enhancement must be carried out at other locations around the impacted wetland. 2. On -site mitigation for wetland impacts shall be provided, except where the applicant can demonstrate that: a. On -site wetland mitigation is not scientifically feasible due to problems with hydrology, soils, waves or other factors; or b. Mitigation is not practical due to potentially adverse impact from surrounding land uses; or 23 Page 12 of 32 c. Existing functions created at the site of the proposed restoration are significantly greater than lost wetland functions ; or d. Regional goals for flood storage, flood conveyance, habitat or other wetland functions have been established and strongly justify location of mitigation at another site. 3. Purchase of mitigation credits through mitigation banks and in lieu fee programs is preferred over permittee responsible offsite mitigation. 4. The Community Development Director may approve, through a Type 2 decision, the transfer of wetland mitigation to a wetland mitigation bank or in -lieu fee program using the criteria in 3.a. through 3.f. below. Wetland mitigation bank credits shall be determined by the certified mitigation banking or in -lieu fee instrument. a. Off -site mitigation is proposed in a wetland mitigation bank that has been approved by all appropriate agencies, including the Department of Ecology, Corps of Engineers, EPA and certified under state rules; and b. The proposed wetland alteration is within the designated service area of the wetland bank; and c. The applicant provides a justification for the number of credits proposed; and d. The mitigation achieved through the number of credits required meets the intent of TMC Chapter 18.45; and e. The Director bases the decision on a written staff report, evaluating the equivalence of the lost wetland functions with the number of wetland credits required; and f. The applicant provides a copy of the wetland bank ledger demonstrating that the approved number of credits has been removed from the bank. 5. Where off -site mitigation location is proposed it shall comply with the following criteria: a. Mitigation sites located within the Tukwila City limits are preferred b. Mitigation bank or in -lieu fee option is not feasible. c. The proposed mitigation will not alter or increase buffers on adjacent properties without their permission. 6. The Director may approve permittee-responsible offsite mitigation sites outside the city upon finding that: (1) Adequate measures have been taken to ensure the non -development and long-term viability of the mitigation site; and (2) Adequate coordination with the other affected local jurisdiction has occurred. (3) applicants shall select a site in a location where the targeted functions can reasonably be performed and sustained and shall pursue sites in the following order of preference: Sites within the immediate drainage sub -basin; Sites within the next higher drainage sub -basin; and Sites within Green/Duwamish River basin. E. MITIGATION TIMING — Mitigation projects shall be completed prior to activities that will permanently disturb wetlands and either prior to or immediately after activities that will temporarily disturb wetlands. Construction of mitigation projects shall be timed to reduce impacts to existing wildlife, flora and water quality, and shall be completed prior to use or occupancy of the activity or development. The Director may allow activities that permanently disturb wetlands prior to implementation of the mitigation plan under the following circumstances: 1. To allow planting or re -vegetation to occur during optimal weather conditions; 2. To avoid disturbance during critical wildlife periods; or 3. To account for unique site constraints that dictate construction timing or phasing. (Ord. 2301 §1(part), 2010) F. WETLAND MITIGATION PLAN CONTENT. 1. The mitigation plan shall be developed as part of a critical area study by a qualified professional. Wetland and/or buffer alteration or relocation may be allowed only when a mitigation plan clearly demonstrates that the changes would be an improvement of wetland and buffer quantitative and qualitative functions. The plan shall show how water quality, habitat, and hydrology would be improved. 2. The scope and content of a mitigation plan shall be decided on a case -by -case basis taking into account 24 Page 13 of 32 the degree of impact and the extent of the mitigation measures needed. As the impacts to the critical area increase, the mitigation measures to offset these impacts will increase in number and complexity. 3. For wetlands, the format of the mitigation plan should follow that established in Wetland Mitigation in Washington State, Part 2 — Developing Mitigation Plans (Washington Department of Ecology, Corps of Engineers, EPA, March 2006 or as amended). 4. The components of a complete mitigation plan are as follows: a. Baseline information of quantitative data collection or a review and synthesis of existing data for both the project impact zone and the proposed mitigation site. b. Environmental goals and objectives that describe the purposes of the mitigation measures. This should include a description of site selection criteria, identification of target evaluation species and resource functions. c. Performance standards of the specific criteria for fulfilling environmental goals and for beginning remedial action or contingency measures. They may include water quality standards, species richness and diversity targets, habitat diversity indices, or other ecological, geological or hydrological criteria. d. A detailed construction plan of the written specifications and descriptions of mitigation techniques. This plan should include the proposed construction sequence, construction management and tree protection and be accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. e. A monitoring and/or evaluation program that outlines the performance standards and methods for assessing whether those performance standards are achieved during the specified monitoring period, at least 5 years. At a minimum, the monitoring plan should address vegetative cover, survival, and species diversity. Any project that alters the dimensions of a wetland or creates a new wetland shall also monitor wetland hydrology. An outline shall be included that spells out how the monitoring data will be evaluated by agencies that are tracking the mitigation project's progress. f. Contingency plan identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards have not been met.. g. Performance security or other assurance devices as described in TMC Section 18.45.210. 18.45.100 Watercourse Designations, Ratings and Buffers A. WATERCOURSE RATINGS. Watercourse ratings are consistent with the Washington Department of Natural Resources water typing categories (WAC 222-16-030) or as amended, which are based on the existing habitat functions and classified as follows: 1. Type S Watercourse: Watercourses inventoried as Shorelines of the State, under RCW 90.58. These watercourses shall be regulated under TMC Chapter 18.44, Shoreline Overlay. 2. Type F Watercourse: Those watercourses that are known to be used by fish or meet the physical criteria to be potentially used by fish (as established in WAC 222-16-031(3) or as amended) and that have perennial (year-round) or seasonal flows. 3. Type Np Watercourse: Those watercourses that have perennial flows and do not meet the criteria of a Type F stream or have been proven not to contain fish using methods described in the Forest Practices Board Manual Section 13. 4. Type Ns Watercourse: Those watercourses that have intermittent flows (do not have surface flow during at least some portion of the year) ; do not meet the physical criteria of a Type F watercourse; or have been proven to not support fish using methods described in the Forest Practices Board Manual Section 13. B. WATERCOURSE BUFFERS — Any land alteration must be located out of the buffer areas as required by this section. Watercourse buffers are intended in general to: 1. Minimize long-term impacts of development on properties containing watercourses; 2. Protect the watercourse from adverse impacts during development; 3. Preserve the edge of the watercourse and its buffer for its critical habitat value; 4. Provide shading to maintain stable water temperatures and vegetative cover for additional wildlife habitat; 5. Provide input of organic debris and uptake of nutrients; 6. Provide an area to stabilize banks, to absorb overflow during high water events and to allow for slight variation of aquatic system boundaries over time due to hydrologic or climatic effects; 7. Reduce erosion and increased surface water runoff; 25 Page 14 of 32 8. Reduce loss of, or damage to, property; 9. Intercept fine sediments from surface water runoff and serve to minimize water quality impacts; and 10. Protect the critical area from human and domestic animal disturbance. An undisturbed and high quality critical area or buffer may substitute for the yard setback and landscape requirements of TMC Chapter 18.50 and 18.52. C. WATERCOURSE BUFFER WIDTHS — The following buffer widths, measured from the Ordinary High Water Mark (OHWM), apply to each side of a watercourse. If the OHWM cannot be determined, then the buffer will be measured from the top of bank: 1. Type S Watercourse: Regulated under TMC Chapter 18.44, Shoreline Overlay. 2. Type F Watercourse: 100-foot-wide buffer. 3. Type Np Watercourse: Standard 80-foot-wide buffer; alternate buffer in the 50-65 range allowed with buffer enhancement. 4. Type Ns Watercourse: 50-foot-wide buffer. D. BUFFER SETBACKS — 1 . All commercial and industrial buildings shall be set back 15 feet and all other development shall be set back 10 feet. Building setbacks shall be measured from the foundation to the buffer's edge. Building plans shall also identify a 20-foot area beyond the buffer setback within which the impacts of development will be reviewed. 2. The Director may waive setback requirements when a site plan demonstrates there will be no impacts to the buffer from construction or occasional maintenance activities (see TMC Figure 18-2). E. VARIATION OF STANDARD WATERCOURSE BUFFER WIDTH- 1. Buffer averaging may be allowed by the Director as a Type 2 permit if either of the following (a) or (b) apply, and so long as the total area of the buffer after averaging is equal to the area required without averaging and the buffer at its narrowest point is never less than either 3/ of the required width. a. The watercourse has significant differences in characteristics that affect its habitat functions, and the buffer is increased adjacent to the higher -functioning area of habitat or more -sensitive portion of the wetland and decreased adjacent to the lower -functioning or less -sensitive portion as demonstrated by a critical areas report from a qualified wetland professional. b. There are no feasible alternatives to the site design that could be accomplished without buffer averaging, and the averaged buffer will not result in degradation of the wetland's functions and values as demonstrated by a critical areas report. c. Compliance with mitigation sequencing requirements. d. Compliance with TMC 18.45 Vegetation Protection and Management section. e. Submittal of buffer enhancement plan, mitigation monitoring and maintenance plan along with financial guarantee in accordance with TMC 18.45. 2. Interrupted Buffer: Waiver for interrupted buffer may be allowed by the Director as a Type 2 permit if it complies with the following: a. The buffer is interrupted by a paved public or private road; legally constructed buildings; or legally approved parking lots. This waiver does not apply to accessory structures such as sheds and garages. b. the existing legal improvement creates a substantial barrier to the buffer function; c. The interrupted buffer does not provide additional protection of the critical area from the proposed development; and d. The interrupted buffer does not provide significant hydrological, water quality and wildlife functions. This waiver does not apply if large trees or other significant native vegetation exists. e. Enhancement of remaining buffer is required if feasible. 3. Buffers for all types of watercourses will be increased when they are determined to be particularly sensitive to disturbance or the proposed development will create unusually adverse impacts. Any increase in the width of the buffer shall be required only after completion of a watercourse study by a qualified professional or expert that documents the basis for such increased width. An increase in buffer width may be appropriate when: a. The development proposal has the demonstrated potential for significant adverse impacts upon the watercourse that can be mitigated by an increased buffer width; or 26 Page 15 of 32 b. The area serves as habitat for endangered, threatened, sensitive or monitor species listed by the federal government or the State. (Ord. 2301 §1 (part), 2010) 18.45.110 Watercourse Alterations and Mitigation A. WATERCOURSE ALTERATIONS. No use or development may occur in a watercourse or its buffer except as specifically allowed by TMC Chapter 18.45. Any use or development allowed is subject to the standards of TMC Chapter 18.45. B. ALTERATIONS. Piping, dredging, diverting or rerouting may only occur with the permission of the Director and subject to mitigation sequencing; approved mitigation plan; and the following crietria: 1. Any watercourse alteration shall comply with the standards in current use and the standards of the Washington Department of Fish and Wildlife in the "Water Crossing Design Guidelines" manual (2013 or as amended). 2. Any watercourse alteration shall not cause adverse impacts to fish, confine the channel or floodplain, or adversely affect riparian habitat (including downstream habitat). 3. Maintenance dredging of watercourses shall be allowed only when necessary to protect public safety, structures and fish passage and shall be done as infrequently as possible. Long-term solutions such as stormwater retrofits are preferred over ongoing maintenance dredging. 4. Stormwater runoff shall be detained and infiltrated to preserve the existing hydrology of the watercourse. 5. All construction shall be designed to have the least adverse impact on the watercourse, buffer and surrounding environment. Construction shall minimize sedimentation through implementation of best management practices for erosion control. 6. All watercourse alterations shall be carried out or constructed during periods of low flow, or as specified by the State Department of Fish and Wildlife in accordance with an approved Hydraulic Project Approval (HPA). 7. A watercourse may be rerouted or daylighted as a mitigation measure to improve watercourse function. 8. As a condition of approval, the Director may require water quality monitoring for stormwater discharges to streams, and additional treatment of stormwater if water quality standards are not being met. 9. Permanent piping of any watercourse should be avoided. Relocation of a watercourse or installation of a bridge is preferred to piping. If piping occurs in a watercourse critical area, it shall be limited to the degree necessary for stream crossings for access and shall require approval of the Director. The criteria for approval is: a. Where allowed, piping shall be limited to the shortest length possible as determined by the Director to allow access onto a property. b. Where water is piped for an access point, those driveways or entrances shall be consolidated to serve multiple properties where possible, and to minimize the length of piping. c. Piping shall not create an entry point for road runoff, create downstream scour, or cause erosion or sedimentation d. Water quality must be as good or better for any water exiting the pipe as for the water entering the pipe, and flow must be comparable. C. MITIGATION STANDARDS- 1. The following shall be considered the minimum standards for approved mitigation projects: a. Maintenance or improvement of stream channel habitat and dimensions such that the fisheries habitat functions of the compensatory stream meet or exceed that of the original stream; b. Bank and buffer configuration restored to an enhanced state; c. Channel, bank and buffer areas replanted with native vegetation that improves upon the original condition in species diversity and density; d. Stream channel bed and biofiltration systems equivalent to (in the case of public drainage maintenance projects) and better than (in the case of other kinds of projects) in the original stream; e. Original fish and wildlife habitat enhanced unless technically not feasible. 2. Relocation of a watercourse shall not result in the new critical area or buffer extending beyond the 27 Page 16 of 32 development site and onto adjacent property without the written agreement of the affected property owners. D. MITIGATION TIMING — Department of Community Development -approved plans must have the mitigation construction completed before the existing watercourse can be modified. The Director may allow activities that permanently disturb a watercourse prior to implementation of the mitigation plan under the following circumstances: To allow planting or re -vegetation to occur during optimal weather conditions; or To avoid disturbance during critical wildlife periods; or To account for unique site constraints that dictate construction timing or phasing. E. MITIGATION PLAN CONTENT - All impacts to a water- course that degrade the functions of the watercourse or its buffer shall be avoided. If alteration to the watercourse or buffer is unavoidable, all adverse impacts resulting from a development proposal or alteration shall be mitigated in accordance with an approved mitigation plan as described below. 1. Mitigation plans shall be completed for any proposals of dredging, filling, diverting, piping and rerouting of watercourses or buffer impacts and shall be developed as part of a critical area study by a qualified professional. The plan must show how water quality, treatment, erosion control, pollution reduction, wildlife and fish habitat, and general watercourse quality would be improved. 2. The scope and content of a mitigation plan shall be decided on a case -by -case basis taking into account the degree of impact and extent of mitigation measures needed. As the impacts to the watercourse or its buffer increase, the mitigation plan to offset these impacts will increase in extent and complexity. 3. The components of a complete mitigation plan are as follows: a. Baseline information including existing watercourse conditions such as hydrologic patterns/flow rates, stream gradient, bank full width, stream bed conditions, bank conditions, fish and other wildlife use, in -stream structures, riparian conditions, buffer characteristics, water quality, fish barriers and other relevant information. b. Environmental goals and objectives that describe the purposes of the mitigation measures. This should include a description of site selection criteria, identification of target evaluation species and functions. c. Performance standards for fulfilling envi- ronmental goals and objectives and for triggering remedial action or contingency measures. Performance standards may include water quality standards, species richness and diversity targets, habitat diversity indices, creation of fish habitat, or other ecological, geological or hydrological criteria. d. Detailed construction plan of the written specifications and descriptions of mitigation techniques. This plan should include the proposed construction sequence and construction management, and be accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. e. Monitoring and/or evaluation program that outlines the approach for assessing a completed project. At least five years of monitoring is required. An outline shall be included that spells out how the monitoring data will be evaluated by agencies that are tracking the mitigation project's process. For projects that discharge stormwater to a stream, the Director may require water quality monitoring. f. Contingency plan identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards have not been met. g. Performance security or other assurance devices as described in TMC Section 18.45.210. (rd. 2301 1(part), 2010) 18.45.100 Areas of Potential Geologic Instability Designation, Rating and Buffers A. DESIGNATION — Potential areas of geologic instability include areas of potential erosion and landslide hazards. Areas of potential geologic instability are classified as follows: 1. Class 1 area, which slope is less than 15%; 2. Class 2 areas, which slope is between 15% and 40%, and which are underlain by relatively permeable soils; 3. Class 3 areas, which include areas sloping between 15% and 40%, and which are underlain by relatively impermeable soils or by bedrock, and which also include all areas sloping more steeply than 40%; 28 Page 17 of 32 4. Class 4 areas, which include sloping areas with mappable zones of groundwater seepage, and which also include existing mappable landslide deposits regardless of slope; B. Mapping. 1. The approximate location, extent, and designation of areas of potential geologic instability are depicted in the City's Sensitive Areas Map. Actual boundaries and designations shall be determined by a qualified professional on a site -specific basis. 2. In addition to the City's Sensitive Areas Map, the following publicly available mapping information may be used to determine appropriate designations: a. For historic landslides, areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps published by the U.S. Geological Survey or the WDNR Division of Geology and Earth Resources; b. For potential or historic landslides, those areas mapped by the WDNR (slope stability mapping) as unstable (U or class 3), unstable old slides (UOS or class 4), or unstable recent slides (URS or class 5); c. For soil characteristics, the U.S. Department of Agriculture's Natural Resources Conservation Service (NRCS) Official Soil Survey Data; and d. For general instability, those areas mapped by the NRCS as having a significant limitation for building site development. C. BUFFERS — 1. The buffers for areas of potential geologic instability are intended to: a. Minimize long-term impacts of development on properties containing critical areas; b. Protect critical areas from adverse impacts during development; c. Prevent loading of potentially unstable slope formations; d. Protect slope stability; e. Provide erosion control and attenuation of precipitation surface water and stormwater runoff; and f. Reduce loss of or damage to property. D. Each development proposal containing or threatened by an area of potential geologic instability Class 2 or higher shall be subject to a geotechnical report pursuant to the requirements of TMC Chapter 18.45.040 C, and 18.45.060. The geotechnical report shall analyze and make recommendations on the need for and width of any setbacks or buffers necessary to achieve the goals and requirements of TMC Chapter 18.45. Development proposals shall then include the buffer distances as defined within the geotechnical report. .(Ord. 2368 §49, 2012; Ord. 2301 §1 (part), 2010) 18.45.130 Areas of Potential Geologic Instability Uses, Exemptions, Alterations and Mitigation. A. GENERAL — The uses permitted in the underlying zoning district may be undertaken on sites that contain areas of potential geologic instability subject to the standards of this section and the recommendations of a geotechnical study. B. EXEMPTIONS — The following areas are exempt from regulation as geologically hazardous areas: 1. Temporary stockpiles of topsoil, gravel, beauty bark or other similar landscaping or construction materials; 2. Slopes related to materials used as an engineered pre -load fora building pad; 3. Roadway embankments within right-of-way or road easements; and 4. Slopes retained by approved engineered structures. C. ALTERATIONS — 1. Prior to permitting alteration of an area of potential geologic instability, the applicant must demonstrate one of the following: a. There is no evidence of past instability or earth movement in the vicinity of the proposed development, and where appropriate, quantitative analysis of slope stability indicates no significant risk to the proposed development or surrounding properties; or b. The area of potential geologic instability can be modified or the project can be designed so that any potential impact to the project and surrounding properties is eliminated, slope stability is not decreased, and the increase in surface water discharge or sedimentation shall not decrease slope stability. 29 Page 18 of 32 2. Where any portion of an area of potential geologic instability is cleared for development, a landscaping plan for the site shall include tree replanting with an equal mix of evergreen and deciduous trees, shrubs and groundcovers, preferably native, and approved by the Director. Replacement vegetation shall be sufficient to provide erosion and stabilization protection. 3. Critical facilities shall not be sited within or below an area of potential geologic instability unless there is no practical alternative (demonstrated by the applicant) 4. Land disturbing activities in an area of potential geologic instability shall provide for storm water quality and quantity control, including preparation of a TESC and permanent drainage plan prepared by a professional engineer licensed in WA. 5. Unless otherwise provided or as part of an approved alteration, removal of vegetation from an area of potential geologic instability or its buffer shall be prohibited. When permitted as part of an approved alteration, vegetation removal shall be minimized to the extent practicable. 6. Surface drainage, including downspouts, shall not be directed across the face of an area of potential geologic instability; if drainage must be discharged from the top of a hazard to its toe, it shall be collected above the top and directed to the toe by tight line drain, and provided with an energy dissipative device at the toe for discharge to a swale or other acceptable natural drainage areas. 7. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography (minimize grading/cut & fill to amount necessary). The proposed development shall not result in greater risk or a need for increased buffers on neighboring properties. D. DISCLOSURES, DECLARATIONS AND COVENANTS 1. It shall be the responsibility of the applicant to submit, consistent with the findings of the geotechnical report, structural plans that were prepared and stamped by a structural engineer. The plans and specifications shall be accompanied by a letter from the geotechnical engineer who prepared the geotechnical report stating that in his/her judgment the plans and specifications conform to the recommendations in the geotechnical report, the risk of damage to the proposed development site from soil instability will be minimal subject to the conditions set forth in the report, and the proposed development will not increase the potential for soil movement. 2. Further recommendations signed and sealed by the geotechnical engineer shall be provided should there be additions or exceptions to the original recommendations based on the plans, site conditions or other supporting data. If the geotechnical engineer who reviews the plans and specifications is not the same engineer who prepared the geotechnical report, the new engineer shall, in a letter to the City accompanying the plans and specifications, express his or her agreement or disagreement with the recommendations in the geotechnical report and state that the plans and specifications conform to his or her recommendations. 3. The architect or structural engineer shall submit to the City, with the plans and specifications, a letter or notation on the design drawings at the time of permit application stating that he or she has reviewed the geotechnical report, understands its recommendations, has explained or has had explained to the owner the risks of loss due to slides on the site, and has incorporated into the design the recommendations of the report and established measures to reduce the potential risk of injury or damage that might be caused by any earth movement predicted in the report. 4. The owner shall execute a Critical Areas Covenant and Hold Harmless Agreement running with the land on a form provided by the City. The City will file the completed covenant with the King County Department of Records and Elections at the expense of the applicant or owner. A copy of the recorded covenant will be forwarded to the owner. E. ASSURANCE DEVICES — Whenever the City determines that the public interest would not be served by the issuance of a permit in an area of potential geologic instability without assurance of a means of providing for restoration of areas disturbed by, and repair of property damage caused by, slides arising out of or occurring during construction, the Director may require assurance devices pursuant to TMC Section 18.45.210. F. CONSTRUCTION MONITORING — 1. Where recommended by the geotechnical report, the applicant shall retain a geotechnical engineer to monitor the site during construction. The applicant shall preferably retain the geotechnical engineer who prepared the final geotechnical recommendations and reviewed the plans and specifications. If a different geotechnical engineer is 30 Page 19 of 32 retained by the owner, the new geotechnical engineer shall submit a letter to the City stating whether or not he/she agrees with the opinions and recommendations of the original geotechnical engineer. Further recommendations, signed and sealed by the geotechnical engineer, and supporting data shall be provided should there be exceptions to the original recommendations. 2. The geotechnical engineer shall monitor, during construction, compliance with the recommendations in the geotechnical report, particularly site excavation, shoring, soil support for foundations including piles, sub -drainage installations, soil compaction and any other geotechnical aspects of the construction. Unless otherwise approved by the City, the specific recommendations contained in the soils report must be implemented by the owner. The geotechnical engineer shall make written, dated monitoring reports on the progress of the construction to the City at such timely intervals as shall be specified. Omissions or deviations from the approved plans and specifications shall be immediately reported to the City. The final construction monitoring report shall contain a statement from the geotechnical engineer that based upon his or her professional opinion, site observations and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical-related permit requirements. Occupancy of the project will not be approved until the report has been reviewed and accepted by the Director. G. CONDITIONING AND DENIAL OF USE OR DEVELOPMENTS- 1. Substantial weight shall be given to ensuring continued slope stability and the resulting public health, safety and welfare in determining whether a development should be allowed. 2. The City may impose conditions that address site- work problems which could include, but are not limited to, limiting all excavation and drainage installation to the dryer season, or sequencing activities such as installing erosion control and drainage systems well in advance of construction. A permit will be denied if it is determined by the Director that the development will increase the potential of soil movement that results in an unacceptable risk of damage to the proposed development, its site or adjacent properties. (Ord. 2301 S1(part), 2010) 18.45.140 Abandoned Mine Areas A. Development of a site containing an abandoned mine area may be permitted when a geotechnical report shows that significant risks associated with the abandoned mine workings can be eliminated or mitigated so that the site is safe. Approval shall be obtained from the Director before any building or land -altering permit processes begin. B. Any building setback or land alteration shall be based on the geotechnical report. C. The City may impose conditions that address site -work problems which could include, but are not limited to, limiting all excavation and drainage installation to the dryer season, or sequencing activities such as installing drainage systems or erosion controls well in advance of construction. A permit will be denied if it is determined that the development will increase the potential of soil movement or result in an unacceptable risk of damage to the proposed development or adjacent properties. D. The owner shall execute a Critical Areas Covenant and Hold Harmless Agreement running with the land on a form provided by the City. The City will file the completed covenant with the King County Division of Records and Elections at the expense of the applicant or owner. A copy of the recorded covenant will be forwarded to the owner. (Ord. 2301 §1(part), 2010) 18.45.150 Fish and Wildlife Habitat Conservation Areas Designation, Mapping, Uses and Standards A. DESIGNATION — 1. Fish and wildlife habitat conservation areas include the habitats listed below: a. Areas with which endangered, threatened, and sensitive species have a primary association; b. Habitats and species of local importance, including but not limited to bald eagle habitat, heron rookeries, mudflats and marshes, and areas critical for habitat connectivity; c. Naturally occurring ponds under 20 acres and their submerged aquatic beds that provide fish or wildlife habitat; d. Waters of the State; e. State natural area preserves and natural resource conservation areas; and 31 Page 20 of 32 f. Lakes, ponds, streams, and rivers planted with game fish by a governmental or tribal entity 2. Type S watercourses, including the Green/Duwamish River, are regulated under TMC 18.44 and not under this section. 3. Wetlands and watercourses are addressed under 18.45.080, 18.45.090, 18.45.100 and 18.45.110, and not under this section. B. MAPPING — 1. The approximate location and extent of known fish and wildlife habitat conservation areas are identified by the City's Critical Areas Maps, inventories, open space zones, and Natural Environment Background Report. 2. In addition to the Critical areas Maps, the following maps are to be used as a guide for the City, but do not provide a final habitat area designation: a. Washington State Department of Fish and Wildlife Priority Habitat and Species Maps; b. Anadromous and resident salmonid distribution maps contained in the Habitat Limiting Factors report for the Green/Duwamish and Central Puget Sound Watersheds published by King County and the Washington Conservation Commission; and NOAA Digital Coast for Washington State. C. BUFFERS — 1. Each development proposal on, adjacent to, or with the potential to impact a Fish and Wildlife Habitat Conservation Area other than wetlands and watercourses shall be subject to a habitat assessment report pursuant to the requirements of TMC Chapter 18.45.040.B and 18.45.060. The habitat assessment shall analyze and make recommendations on the need for and width of any setbacks or buffers necessary to achieve the goals and requirements of TMC Chapter 18.45, with specific consideration of Priority Habitats and Species Management Recommendations from the Washington Department of Fish and Wildlife. Recommended buffers shall be no less than 100 feet in width. 2. Buffers may be increased by the Director when an area is determined to be particularly sensitive to the disturbance created by a development. Such a decision will be based on a City review of the report as prepared by a qualified biologist and by a site visit. D. USES AND STANDARDS — Each development proposal on, adjacent, or with the potential to impact a Fish and Wildlife Habitat Conservation Area that is not fully addressed under 18.45.080, 18.45.090, 18.45.100 and 18.45.110 shall be subject to a habitat assessment report pursuant to the requirements of TMC Chapter 18.45.040.B and 18.45.060. The habitat assessment shall analyze potential impacts to Fish and Wildlife Habitat Conservation Areas and make recommendations to minimize such impacts, with specific consideration of Priority Habitats and Species Management Recommendations from the Washington Department of Fish and Wildlife. (rd. 2301 §1("par ), 2010) 18.45.155 Special Hazard Flood Areas A. Regulations governing Special Hazard Flood areas are found in TMC Chapter 16.52, Flood Zone Management and 18.45.155.B. B. Floodplain Habitat Assessment. 1. When development is proposed within a Special Hazard Flood areas, a floodplain habitat assessment shall be prepared pursuant to the requirements of TMC Chapter 18.45.040 B and 18.45.060. 2. The floodplain habitat assessment shall address the effects of the development on federally listed salmon, including, but not limited to the following: a. Impervious surfaces, b. Floodplain storage and conveyance, c. Floodplain and riparian vegetation, and d. Stormwater drainage. 3. If the floodplain habitat assessment concludes that the project is expected to have an adverse effect on listed species as evaluated under the guidance issued for ESA compliance under the National Flood Insurance Program in Puget Sound, the applicant shall mitigate those impacts. Such mitigation shall be consistent with, or in addition to, any mitigation required by critical area regulations in Chapter 18.45 TMC and shall be incorporated into the approved project plans. 4. Activities Exempt from Floodplain Habitat Assessment. A floodplain habitat assessment is not required 32 Page 21 of 32 under the following circumstances: a. Projects that are undergoing or have undergone consultation with the National Marine Fisheries Service under the Endangered Species Act. b. Repair or remodeling of an existing structure, if the repair or remodeling is not a substantial improvement. c. Expansion of an existing structure that is no greater than 10 percent beyond its existing footprint; provided, that the repairs or remodeling is not a substantial improvement, or a repair of substantial damage. This measurement is counted cumulatively from September 22, 2011. If the structure is in the floodway, there shall be no change in the dimensions perpendicular to flow. d. Activities with the sole purpose of creating, restoring, or enhancing natural functions provided the activities do not include structures, grading, fill, or impervious surfaces. e. Development of open space and recreational facilities, such as parks and trails, that do not include structures, fill, impervious surfaces or removal of more than 5 percent of the native vegetation on that portion of the property in the regulatory floodplain. f. Repair to on -site septic systems provided the ground disturbance is the minimum necessary. g. Other minor activities considered to have no effect on listed species, as interpreted using ESA guidance issued by the National Flood Insurance Program in Puget Sound and confirmed through City review of the development proposal. 18.45.158 Vegetation Protection and Management in Critical Areas and their buffers A. Purpose, Objectives and Applicability. 1. The purpose of this section is to: a. Regulate the protection of existing trees and native vegetation in the critical areas including wetlands, watercourses, steep slopes and their buffers; b. Establish requirements for removal of invasive plants at the time of development or re -development of sites; c. Establish requirements for the long-term maintenance of native vegetation to prevent establishment of invasive species and promote ecosystem processes. 2. The City's goal is to: a. Preserve as many existing trees as possible and increase the number of native trees, shrubs and other vegetation in the critical areas because of their importance to a variety of ecosystem functions as listed below: (1) Overhead tree canopy to provide shade for water temperature control and improve water quality, and increase water recharge (2) Habitat for birds, insects and small mammals; (3) Stabilize steep slopes and reduce erosion; (5) Filtering of pollutants and slowing of stormwater prior to it entering the critical area and (6) provide green, natural spaces for the health of the citizens of Tukwila b. In addition, trees and other native vegetation are important for aesthetics. It is the City's goal that unsightly invasive vegetation, such as blackberries, be removed from the critical areas and their buffers and be replaced with native vegetation to promote greater enjoyment of the City's natural areas. c. The City will provide information and technical assistance to property owners for improving vegetation in critical areas and will work collaboratively with local citizen groups to assist property owners in the removal of invasive vegetation and planting of native vegetation, particularly for residential areas. B. Vegetation Retention and Replacement. 1. The tree protection and retention requirements and the vegetation management requirements apply to existing uses as well as new or re -development. 2. Native vegetation in critical areas and their buffers must be protected and maintained. No removal of native vegetation is allowed without prior approval by the City except in cases of emergency where an imminent hazard to public life, safety or property exists. Vegetation may be removed from the buffer as part of an enhancement plan approved by the Director. Enhancements will ensure that slope stability and wetland quality will be maintained or improved. Any temporary disturbance of the buffers shall be replanted with a diverse plant community of native 33 Page 22 of 32 northwest species. 3. Invasive vegetation (blackberry, ivy, laurel, etc.) may be removed without a permit if removal does not utilize heavy equipment or herbicide. Invasive vegetation removal on steep slopes requires prior City Approval 4. Only hazardous or defective trees, as defined in TMC 18.06, may be removed from a critical area if threat posed by the tree is imminent. If the hazard is not obvious, an assessment by a certified professional, as defined in TMC 18.06, may be required by the Director. Dead and hazardous trees should remain standing or be cut and placed within the critical area to the extent practicable to maximize habitat. Tree replacement in accordance with this chapter is required for any hazardous tree removed from a critical area. 5. In the case of development or re -development, as many significant trees and as much native vegetation as possible are to be retained on a site, taking into account the condition and age of the trees. As part of project review, the Director of Community Development or the Board of Architectural Review may require alterations in the arrangement of buildings, parking or other elements of proposed development in order to retain significant vegetation. 6. To protect the ecological functions that trees, and native vegetation provide to critical areas, removal of any significant tree or native vegetation in a critical area or its buffer requires a Critical Area Tree Removal and Vegetation Clearing Permit and is generally only allowed on sites undergoing development or re -development. Only trees that interfere with access and passage on public trails or trees that present an imminent hazard to existing structures or the public may be removed from sites without an issued building permit or Federal approval. Factors that will be considered in approving tree removal include but are not limited to: tree condition and health, age, risks to structures, and potential for root or canopy interference with utilities. 7. Prior to any tree removal or site clearing unless it is part of Special Permission approval for interrupted buffer, buffer averaging or other critical areas deviation, a Type 2 Critical Area Tree Removal and Vegetation Clearing Permit application must be submitted to the Department of Community Development (DCD) containing the following information: a. A vegetation survey on a site plan that shows the diameter, species and location of all significant trees and all existing native vegetation. b. A site plan that shows trees and native vegetation to be retained and trees to be removed and provides a table showing the number of significant trees to be removed and the number of replacement trees required. c. Tree protection zones and other measures to protect any trees or native vegetation that are to be retained for sites undergoing development or re -development. d. Location of the OHWM, stream buffer, wetland, wetland buffer, steep slope or any other critical areas with their buffers. e. A landscape plan that shows diameter, species name, spacing and planting location for any required replacement trees and other proposed vegetation. f. An arborist evaluation justifying the removal of hazardous trees if required by DCD. g. An application fee per the current Land Use Permit Fee resolution. 8. Where permitted, significant trees that are removed from critical areas shall be replaced pursuant to the tree replacement requirements shown below, up to a density of 100 trees per acre (including existing trees). The Director may require additional trees or shrubs to be installed to mitigate any potential impact from the loss of this vegetation as a result of new development. Tree Replacement Requirements Diameter* of Tree Removed (*measured at height of 4.5 feet from the ground) Number of Replacement Trees Required 4 6 inches (single trunk); 2 inches (any trunk of a multi -trunk tree) 3 Over 6 - 8 inches 4 Over 8 - 20 inches 6 Over 20 inches 8 9. The property owner is required to ensure the viability and long-term health of vegetation planted for 34 Page 23 of 32 replacement or mitigation through proper care and maintenance for the life of the project Mitigation or restoration projects that fail to meet pre -determined performance standards must be replanted in the next appropriate season for planting or per requirements of approved Mitigation Plan. 10. If all required replacement trees cannot be reasonably accommodated on the site, the applicant shall pay into a tree replacement fund. The fee shall be determined on an annual basis as part of the Fee resolution. 11. Dead or dying trees located within a of a critical area or its buffer shall be left in place as wildlife snags, unless they present a hazard to structures, facilities or the public. Dead or dying trees within developed or landscaped areas shall be replaced 1:1 in the next appropriate season for planting. 12. Topping of trees is prohibited and will be regulated as removal with tree replacement required. 13. Trees may only be pruned to lower their height to prevent interference with an overhead utility line with prior approval by the Director as part of Type 2 critical area tree permit. The pruning must be carried out under the direction of a Qualified Tree Professional or performed by the utility provider under the direction of a Qualified Tree Professional. The crown shall be maintained to at least 2/3 the height of the tree prior to pruning. C. Tree Protection All trees not proposed for removal as part of a project or development shall be protected using Best Management Practices and the standards below. 1. The Critical Root Zones (CRZ) for all trees designated for retention, on site or on adjacent property as applicable, shall be identified on all construction plans, including demolition, grading, civil and landscape site plans. 2. Any roots within the CRZ exposed during construction shall be covered immediately and kept moist with appropriate materials. The City may require a third -party Qualified Tree Professional to review long-term viability of the tree. 3. Physical barriers, such as 6-foot chain link fence or plywood or other approved equivalent, shall be placed around each individual tree or grouping at the CRZ. 4. Minimum distances from the trunk for the physical barriers shall be based on the approximate age of the tree (height and canopy) as follows: a. Young trees (trees which have reached less than 20% of life expectancy): 0.75 per inch of trunk diameter. b. Mature trees (trees which have reached 20-80% of life expectancy): 1 foot per inch of trunk diameter. c. Over mature trees (trees which have reached greater than 80% of life expectancy): 1.5 feet per inch of trunk diameter. 5. Alternative protection methods may be used that provide equal or greater tree protection if approved by the Director. 6. A weatherproof sign shall be installed on the fence or barrier that reads: "TREE PROTECTION ZONE — THIS FENCE SHALL NOT BE REMOVED OR ENCROACHED UPON. No soil disturbance, parking, storage, dumping or burning of materials is allowed within the Critical Root Zone. The value of this tree is $ [insert value of tree as determined by a Qualified Tree Professional here]. Damage to this tree due to construction activity that results in the death or necessary removal of the tree is subject to the Violations section of TMC Chapter 18.54." 7. All tree protection measures installed shall be inspected by the City and, if deemed necessary a Qualified Tree Professional, prior to beginning construction or earth moving. 8. Any branches or limbs that are outside of the CRZ and might be damaged by machinery shall be pruned prior to construction by a Qualified Tree Professional. No construction personnel shall prune affected limbs except under the direct supervision of a Qualified Tree Professional. 9. The CRZ shall be covered with 4 to 6 inches of wood chip mulch. Mulch shall not be placed directly against the trunk. A 6-inch area around the trunk shall be free of mulch. Additional measures, such as fertilization or supplemental water, shall be carried out prior to the start of construction if deemed necessary by the Qualified Tree Professional's report to prepare the trees for the stress of construction activities. 10. No storage of equipment or refuse, parking of vehicles, dumping of materials or chemicals, or placement of permanent heavy structures or items shall occur within the CRZ. 11. No grade changes or soil disturbance, including trenching, shall be allowed within the CRZ. Grade changes within 10 feet of the CRZ shall be approved by the City prior to implementation. 35 Page 24 of 32 12. The applicant is responsible for ensuring that the CRZ of trees on adjacent properties are not impacted by the proposed development. 13. A pre -construction inspection shall be conducted by the City to finalize tree protection actions. 14. Post -construction inspection of protected trees shall be conducted by the City and, if deemed necessary by the City, a Qualified Tree Professional. All corrective or reparative pruning will be conducted by a Qualified Tree Professional. D. Plant Materials Standards For any new development, redevelopment or restoration in a Critical Area, invasive vegetation must be removed, and native vegetation planted and maintained in the Critical Area and its buffer. 1. A planting plan prepared by an approved biologist shall be submitted to the City for approval that shows plant species, size, number, spacing, soil preparation irrigation, and invasive species removal. The requirement for a biologist may be waived by the Director for single family property owners (when planting is being required as mitigation for construction of overwater structures or shoreline stabilization), if the property owner accepts technical assistance from City staff. 2. Invasive vegetation must be removed as part of site preparation and native vegetation planted in the Critical Area and its buffer where impacts occur. 3. Removal of invasive species shall be done by hand or with hand-held power tools. Where not feasible and mechanized equipment is needed, the applicant must obtain permission and permit prior to work being conducted. Removal of invasive vegetation must be conducted so that the slope stability, if applicable, will be maintained. A plan must be submitted indicating how the work will be done and what erosion control and tree protection features will be utilized. Federal and State permits may be required for vegetation removal with mechanized equipment. 4. Removal of invasive vegetation may be phased over several years prior to planting, if such phasing is provided for by a plan approved by the Director to allow for alternative approaches, such as sheet mulching and goat grazing. The method selected shall not destabilize the bank or cause erosion. 5. A combination of native trees, shrubs and groundcovers (including grasses, sedges, rushes and vines) shall be planted. Site conditions, such as topography, exposure, and hydrology shall be taken into account for plant selection. Other species may be approved if there is adequate justification. 6. Non-native trees may be used as street trees in cases where conditions are not appropriate for native trees (for example where there are space or height limitations or conflicts with utilities). 7. Plants shall meet the current American Standard for Nursery Stock (American Nursery and Landscape Association — ANLA). 8. Smaller plant sizes (generally one gallon, bareroot, plugs, or stakes, depending on plant species) are preferred for buffer plantings. Willow stakes must be at least 1/2-inch in diameter. Refer to landscaping chapter TMC 18.52 for plant sizes in required landscape areas. 9. Site preparation and planting of vegetation shall be in accordance with best management practices for ensuring the vegetation's long-term health and survival. Irrigation is required for all plantings for the first three years, unless otherwise approved by Director. Temporary automatic irrigation systems, cisterns, and hand -watering or a combination of types may be approved by Director. 10. Plants may be selected and placed to allow for public and private view corridors with approval by Director. 11. Native vegetation in Critical Areas and their buffers installed in accordance with the preceding standards shall be maintained by the property owner to promote healthy growth and prevent establishment of invasive species. Invasive plants (such as blackberry, ivy, knotweed, bindweed) shall be removed on a regular basis, according to the approved maintenance plan. 12. Critical Areas including steep slopes disturbed by removal of invasive plants or development shall be replanted with native vegetation where necessary to maintain the density shown in Table below. and must be replanted in a timely manner, except where a long-term removal and re -vegetation plan, as approved by the City, is being implemented. 36 Page 25 of 32 Critical Area Buffer Vegetation Planting Densities Table Plant Material Type Planting Density Stakes/cuttings along streambank (willows, red osierbioengineering dogwood) 1 - 2 feet on center or per method Shrubs 3 - 5 feet on center, depending on species Trees 15 — 20 feet on center, depending on species Groundcovers, grasses, sedges, rushes, otherdepending herbaceous plants 1 —1.5 feet on center, on species Native seed mixes 5 - 25 lbs. per acre, depending on species 13. The Department Director, in consultation with the City's environmentalist, may approve the use of shrub planting and installation of willow stakes to be counted toward the tree replacement standard in the buffer if proposed as a measure to control invasive plants and increase buffer function. E. Vegetation Management in Critical Areas The requirements of this section apply to all existing and new development within critical areas. 1. Trees and shrubs may only be pruned for safety, to maintain access corridors and trails by pruning up or on the sides of trees, to maintain clearance for utility lines, and/or for improving shoreline ecological function. No more than 25% may be pruned from a tree within a 36 month period without prior City review. This type of pruning is exempt from any permit requirements. 2. Plant debris from removal of invasive plants or pruning shall be removed from the site and disposed of properly unless on site storage is approved by the Director. 3. Use of pesticides. a. Pesticides (including herbicides, insecticides, and fungicides) shall not be used in the critical area or its buffer except where: (1) Alternatives such as manual removal, biological control, and cultural control are not feasible given the size of the infestation, site characteristics, or the characteristics of the invasive plant species; (2) The use of pesticides has been approved through a comprehensive vegetation or pest management and monitoring plan; (3) The pesticide is applied in accordance with state regulations; (4) The proposed herbicide is approved for aquatic use by the U.S. Environmental Protection Agency; and (5) The use of pesticides in the shoreline jurisdiction is approved in writing by the City and the applicant presents a copy of the Aquatic Pesticide Permit issued by the Department of Ecology or Washington Department of Agriculture. b. Self-contained rodent bait boxes designed to prevent access by other animals are allowed. c. Sports fields, parks, golf courses and other outdoor recreational uses that involve maintenance of extensive areas of turf shall provide and implement an integrated turf management program or integrated pest management plan designed to ensure that water quality in the Critical Area is not adversely impacted. 4. Restoration Project Plantings: Restoration projects may overplant the site as a way to discourage the re-establishment of invasive species. Thinning of vegetation without a separate Type 2 Special Permission or critical area tree permit may be permitted five to ten years after planting if this approach is approved as part of the restoration project's maintenance and monitoring plan and with approval by the City prior to thinning work. F. Maintenance and Monitoring. 1. A five-year monitoring and maintenance plan must be approved by the City prior to permit issuance. The monitoring period will begin when the restoration is accepted by the City and as -built plans have been 37 Page 26 of 32 submitted. 2. Monitoring reports shall be submitted annually for City review up until the end of the monitoring period. Reports shall measure survival rates against project goals and present contingency plans to meet project goals. 3. Mitigation will be complete after project goals have been met and accepted by the City environmentalist. 4. A performance bond or financial security equal to 150% of the cost of labor and materials required for implementation of the planting, maintenance and monitoring shall be submitted prior to City acceptance of project. 18.45.160 Critical Area Master Plan Overlay A. The purpose of this section is to provide an alternative to preservation of existing individual wetlands, watercourses and their buffers in situations where an area -wide plan for alteration and mitigation will result in improvements to water quality, fish and wildlife habitat and hydrology beyond those that would occur through the strict application of the provisions of TMC Chapter 18.45. B. The City Council may designate certain areas as Critical Area Master Plan Overlay Districts for the purpose of allowing and encouraging a comprehensive approach to critical area protection, restoration, enhancement and creation in appropriate circumstances utilizing best available science. Designation of Critical Area Master Plan Overlay Districts shall occur through the Type 5 decision process established by TMC Chapter 18.104. C. Criteria for designating a Critical Area Master Plan Overlay District shall be as follows: 1. The overlay area shall be at least 10 acres. 2. The City Council shall find that preparation and implementation of a Critical Aea Master Plan is likely to result in net improvements in critical area functions when compared to development under the general provisions of TMC Chapter 18.45. D. Within a Critical Area Master Plan Overlay District, only those uses permitted under TMC Sections 18.45.070, 18.45.090 and 18.45.110 shall be allowed within a Category I wetland, or its buffer. E. Within a Critical Area Master Plan Overlay district, the uses permitted under TMC 18.45.070, 18.45.090 and 18.45.110 and other uses as identified by an approved Critical Area Master Plan shall be permitted within Category III and Category IV wetlands and their buffers; and within Type F, Np, and Ns watercourses and their buffers, provided that such uses are allowed by the underlying zoning designation. F. A Critical Area Master Plan shall be prepared under the direction of the Director of Community Development. Consistent with subsection A, the Director may approve development activity within a Critical Area Overlay District for the purpose of allowing and encouraging a comprehensive approach to critical areas protection, creation, and enhancement that results in environmental benefits that may not be otherwise achieved through the application of the requirements of TMC Chapter 18.45. G. The Director shall consider the following factors when determining whether a proposed Critical Areas Overlay and Master Plan results in an overall net benefit to the environment and is consistent with best available science: 1. Whether the Master Plan is consistent with the goals and policies of the Natural Environment Element and the Shorelines Element (if applicable) of the Tukwila Comprehensive Plan. 2. Whether the Master Plan is consistent with the purposes of TMC Chapter 18.45 as stated in TMC Section 18.45.010. 3. Whether the Master Plan includes a Mitigation Plan that incorporates stream or wetland restoration, enhancement or creation meeting or exceeding the requirements of TMC Section18.45.090 and/or TMC Section 18.45.110, as appropriate. 4. Whether proposed alterations or modifications to critical areas and their buffers and/or alternative mitigation results in an overall net benefit to the natural environment and improves critical area functions. 5. Whether the Mitigation Plan gives special consideration to conservation and protection measures necessary to preserve or enhance anadromous fisheries. 6. Mitigation shall occur on -site unless otherwise approved by the Director. The Director may approve off - site mitigation only upon determining that greater protection, restoration or enhancement of critical areas could be achieved at an alternative location within the same watershed. 38 Page 27 of 32 7. Where feasible, mitigation shall occur prior to grading, filling or relocation of wetlands or watercourses. 8. At the discretion of the Director, a proposed Master Plan may undergo peer review, at the expense of the applicant. Peer review, if utilized, shall serve as one source of input to be utilized by the Director in making a final decision on the proposed action. H. A Critical Area Master Plan shall be subject to approval by the Director of Community Development. Such approval shall not be granted until the Master Plan has been evaluated through preparation of an Environmental Impact Statement (EIS) under the requirements of TMC Chapter 21.04. The EIS shall compare the environmental impacts of development under the proposed Master Plan relative to the impacts of development under the standard requirements of TMC Chapter 18.45. The Director shall approve the Critical Area Master Plan only if the evaluation clearly demonstrates overall environmental benefits, giving special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. (Ord. 2301 §1(part), 2010) 18.45.170 Critical Areas Tracts and Easements A. In development proposals for planned residential or mixed use developments, short subdivisions or subdivisions, and boundary line adjustments and binding site plans, applicants shall create critical areas tracts or easements, in lieu of an open space tract, per the standards of the Planned Residential Development District chapter of this title. B. Applicants proposing development involving uses other than those listed in TMC Section 18.45.170A, on parcels containing critical areas or their buffers, may elect to establish a critical areas tract or easement which shall be: 1. If under one ownership, owned and maintained by the ownership; 2. If held in common ownership by multiple owners, maintained collectively; or 3. Dedicated for public use if acceptable to the City or other appropriate public agency. C. A notice shall be placed on the property title or plat map that critical area tracts or easements shall remain undeveloped in perpetuity. (Ord. 2301 §1 (part), 2010) 18.45.180 Exceptions A. REASONABLE USE EXCEPTIONS — 1. If application of TMC Chapter 18.45 would deny all reasonable use of the property containing designated critical areas or their buffers, the property owner or the proponent of a development proposal may apply for a reasonable use exception. 2. Applications for a reasonable use exception shall be a Type 3 decision and shall be processed pursuant to TMC Chapter 18.104. 3. If the applicant demonstrates to the satisfaction of the Hearing Examiner that application of the provisions of TMC Chapter 18.45 would deny all reasonable use of the property, development may be allowed that is consistent with the general purposes of TMC Chapter 18.45 and the public interest. 4. The Hearing Examiner, in granting approval of the reasonable use exception, must determine that: a. There is no feasible on -site alternative to the proposed activities, including reduction in size or density, modifications of setbacks, buffers or other land use restrictions or requirements, phasing of project implementation, change in timing of activities, revision of road and lot layout, and/or related site planning that would allow a reasonable economic use with fewer adverse impacts to the critical area. b. As a result of the proposed development there will be no unreasonable threat to the public health, safety or welfare on or off the development proposal site. c. Alterations permitted shall be the minimum necessary to allow for reasonable use of the property. d. The proposed development is compatible in design, scale and use with other development with similar site constraints in the immediate vicinity of the subject property if such similar sites exist. e. Disturbance of critical areas and their buffers has been minimized to the greatest extent possible. f. All unavoidable impacts are fully mitigated. g. The inability to derive reasonable use of the property is not the result of: 39 Page 28 of 32 (1) a segregation or division of a larger parcel on which a reasonable use was permittable after the effective date of Critical Areas Ordinance No. 1599, June 10, 1991; (2) actions by the owner of the property (or the owner's agents, contractors or others under the owner's control) that occurred after the effective date of the critical areas ordinance provisions that prevents or interferes with the reasonable use of the property; or (3) a violation of the sensitive areas ordinance; h. The Hearing Examiner, when approving a reasonable use exception, may impose conditions, including but not limited to a requirement for submission and implementation of an approved mitigation plan designed to ensure that the development: (1) complies with the standards and policies of the critical areas ordinance to the extent feasible; and (2) does not create a risk of damage to other property or to the public health, safety and welfare. i. Approval of a reasonable use exception shall not eliminate the need for any other permit or approval otherwise required for a project, including but not limited to design review. B. EMERGENCIES — Alterations in response to an emergency that poses an immediate threat to public health, safety or welfare, or that poses an immediate risk of damage to private property may be excepted. Any alteration undertaken as an emergency shall be reported within one business day to the Community Development Department. The Director shall confirm that an emergency exists and determine what, if any, mitigation and conditions shall be required to protect the health, safety, welfare and environment and to repair any damage to the critical area and its required buffers. Emergency work must be approved by the City. If the Director determines that the action taken, or any part thereof, was beyond the scope of an allowed emergency action, then the enforcement provisions of TMC Section 18.45.195 shall apply. (Ord, 2368 §5 , 2012; Ord, 2301 §1(part), 201 ) 18.45.190 Time Limitation, Appeals and Vesting A. Time Limitation: Critical area studies are valid for a period of 5 years. Type 2 Special Permission decision for interrupted buffer, buffer averaging or other alterations shall expire in one year unless the applicant submits a complete building permit or other construction permit within one year. Type 1 tree permit for tree removal within sensitive areas or their buffers shall expire in one year unless an extension is granted by the Director. The Director may grant an extension if: 1. Unforeseen circumstances or conditions necessitate the extension of the permit; and 2. Termination of the permit would result in unreasonable hardship to the applicant; and the applicant is not responsible for the delay; and 3. The extension of the permit will not cause substantial detriment to existing uses, critical areas, or critical area buffers in the immediate vicinity of the subject property. B. Appeals: Any appeal of a final decision made by the Community Development Department, pursuant to TMC Chapter 18.45, shall be an appeal of the underlying permit or approval. Any such appeal shall be processed pursuant to TMC Section 18.108.020 and TMC Chapter 18.116. In considering appeals of decisions or conditions, the following shall be considered: 1. The intent and purposes of the critical areas ordinance; 2. Technical information and reports considered by the Community Development Department; and 3. Findings of the Director, which shall be given substantial weight. C. Vesting: Projects are vested to critical area ordinance in effect at the time a complete building permit is submitted except for short plats, subdivisions and shoreline permits. Short plats or subdivisions are vested at the time complete application is submitted for preliminary plats. For short plats and subdivisions which received preliminary plat approval prior to the adoption of this ordinance, building permits on the lots shall be considered under the critical areas ordinance in effect on the date of the preliminary plat approval provided complete building or construction permits are submitted within one year of the final plat approval. Vesting provisions for shoreline permits are provided in TMC 18.44 40 Page 29 of 32 (Ord. 2301 §1 (part), 2010) 18.45.195 Violations A. VIOLATIONS. The following actions shall be considered a violation of this chapter: 1. To use, construct or demolish a structure or to conduct clearing, earth -moving, construction or other development not authorized under a Special Permission, Reasonable Use or other permit where such permit is required by this chapter. 2. Any work that is not conducted in accordance with the plans, conditions, or other requirements in a permit approved pursuant to this chapter, provided the terms or conditions are stated in the permit or the approved plans. 3. To remove or deface any sign, notice, complaint or order required by or posted in accordance with this chapter. 4. To misrepresent any material fact in any application, plans or other information submitted to obtain any critical area use, buffer reduction or development authorization. 5. To fail to comply with the requirements of this chapter. B. ENFORCEMENT. It shall be the duty of the Community Development Director to enforce this chapter pursuant to the terms and conditions of TMC Chapter 8.45. C. INSPECTION ACCESS. 1. For the purposes of inspection for compliance with the provisions of a permit or this chapter, authorized representatives of the Community Development Director may enter all sites for which a permit has been issued. 2. Upon completion of all requirements of a permit, the applicant shall request a final inspection by contacting the planner of record. The permit process is complete upon final approval by an authorized representative of the Community Development Director. D. PENALTIES. 1. Any violation of any provision of this chapter, or failure to comply with any of the requirements of this chapter, shall be subject to the penalties prescribed in TMC Chapter 8.45, "Enforcement," and shall be imposed pursuant to the procedures and conditions set forth in that chapter. 2. Penalties assessed for violations of the Critical Areas shall be determined by TMC Chapter 8.45.120, Penalties 3. It shall not be a defense to the prosecution for failure to obtain a permit required by this chapter that a contractor, subcontractor, person with responsibility on the site, or person authorizing or directing the work erroneously believed a permit had been issued to the property owner or any other person. 4. Penalties for Tree Removal a. Each unlawfully removed or damaged tree shall constitute a separate violation. b. The amount of the penalty shall be $1,000 per tree or up to the marketable value of each tree removed or damaged as determined by an ISA certified arborist. The Director may elect not to seek penalties or may reduce the penalties if he/she determines the circumstances do not warrant imposition of any or all of the civil penalties. c. Any illegal removal of required trees shall be subject to obtaining a tree permit and replacement with trees that meet or exceed the functional value of the removed trees. In addition, any shrubs and groundcover removed without City approval shall be replaced. d. To replace the tree canopy lost due to the tree removal, additional trees must be planted on - site. Payment may be made into the City's Tree Fund if the number of replacement trees cannot be accommodated on -site. The number of replacement trees required will be based on the size of the tree(s) removed as stated in TMC 18.45.158 B. E. REMEDIAL MEASURES REQUIRED. In addition to penalties provided in TMC Chapter 8.45, the Director may require any person conducting work in violation of this chapter to mitigate the impacts of unauthorized work by 41 Page 30 of 32 carrying out remedial measures. 1. Remedial measures must conform to the policies and guidelines of this chapter. 2. The cost of any remedial measures necessary to correct violation(s) of this chapter shall be borne by the property owner and/or applicant. F. INJUNCTIVE RELIEF. 1. Whenever the City has reasonable cause to believe that any person is violating or threatening to violate the critical areas regulations or any rule or other provisions adopted or issued pursuant to these regulations, it may either before or after the institution of any other action or proceeding authorized by this ordinance, institute a civil action in the name of the City for injunctive relief to restrain the violation or threatened violation. Such action shall be brought in King County Superior Court. 2. The institution of an action for injunctive relief under this section shall not relieve any party to such proceedings from any civil or criminal penalty prescribed for violations of these regulations. G. ABATEMENT. - Any use, structure, development or work that occurs in violation of these regulations, or in violation of any lawful order or requirement of the Director pursuant to this section, shall be deemed to be a public nuisance and may be abated in the manner provided by the Tukwila Municipal Code, Section 8.45.105. (Ord. 2301 §1 (part), 2010) 18.45.200 Recording Required The property owner receiving approval of a use or development permit pursuant to TMC Chapter 18.45 shall record the City -approved site plan, clearly delineating the wetland, watercourse, areas of potential geologic instability or abandoned mine and their buffers designated by TMC Sections 18.45.080, 18.45.090, 18.45.100, 18.45.120, 18.45.140 and 18.45.150 with the King County Division of Records and Elections. The face of the site plan must include a statement that the provisions of TMC Chapter 18.45, as of the effective date of the ordinance from which TMC Chapter 18.45 derives or is thereafter amended, control use and development of the subject property, and provide for any responsibility of the property owner for the maintenance or correction of any latent defects or deficiencies. Additionally, the applicant shall provide data (GPS or survey data) for updating the City's critical area maps. (Ord, 2301 §1 (part), 2010) 18.45.210 Assurance Device A. In appropriate circumstances, such as when mitigation is not completed in advance of the project, the Director may require a letter of credit or other security device acceptable to the City to guarantee performance and maintenance requirements of TMC Chapter 18.45. All assurances shall be on a form approved by the City Attorney and be equal to 150% of the cost of the labor and materials for implementation of the approved mitigation plan. B. When alteration of a critical area is approved, the Director may require an assurance device, on a form approved by the City Attorney, to cover the cost of monitoring and maintenance costs and correction of possible deficiencies for five years. If at the end of five years performance standards are not being achieved, an increase in the security device may be required by the Director. When another agency requires monitoring beyond the City's time period, copies of those monitoring reports shall be provided to the City. C. The assurance device shall be released by the Director upon receipt of written confirmation submitted and confirmed by the City to the Department from the applicant's qualified professional that the mitigation or restoration has met its performance standards and is successfully established. Should the mitigation or restoration meet performance standards and be successfully established in the third or fourth year of monitoring, the City may release the assurance device early. The assurance device may be held for a longer period, if at the end of the monitoring period, the performance standards have not been met or the mitigation has not been successfully established. In such cases, the monitoring period will be extended and the bond held until the standards have been met. D. Release of the security does not absolve the property ownerofresponsibilityformaintenanceorcorrecting latent defects or deficiencies or other duties under law. (Ord, 2301 §1 (part), 2010) 42 Page 31 of 32 18.45.220 Assessment Relief A. FAIR MARKET VALUE — The King County Assessor considers critical area regulations in determining the fair market value of land under RCW 84.34. B. CURRENT USE ASSESSMENT— Established critical area tracts or easements, as defined in the Definitions chapter of this title and provided for in TMC Section 18.45.170, may be classified as open space and owners thereof may qualify for current use taxation under RCW 18.34; provided, such landowners have not received density credits, or setback or lot size adjustments as provided in the Planned Residential Development District chapter of this title. C. SPECIAL ASSESSMENTS — Landowners who qualify under TMC Section 18.45.220 B shall also be exempted from special assessments on the critical area tract or easement to defray the cost of municipal improvements such as sanitary sewers, storm sewers and water mains. (Ord, 2301 §1 (part), 2010) TMC 18.70.050 Nonconforming Structures Where a lawful structure exists at the effective date of adoption of this title that could not be built under the terms of this title by reason of restrictions on area, development area, height, yards or other characteristics of the structure, it may be continued so long as the structure remains otherwise lawful subject to the following provisions: 1. No such structure may be enlarged or altered in such a way that increases its degree of nonconformity. Ordinary maintenance of a nonconforming structure is permitted, pursuant to TMC Section 18.70.060, including but not limited to painting, roof repair and replacement, plumbing, wiring, mechanical equipment repair/replacement and weatherization. These and other alterations, additions or enlargements may be allowed as long as the work done does not extend further into any required yard or violate any other portion of this title. Complete plans shall be required of all work contemplated under this section. 2. Should such structure be destroyed by any means to an extent of more than 50% of its replacement cost at time of destruction, in the judgment of the City's Building Official, it shall not be reconstructed except in conformity with provisions of this title, except that in the LDR zone, structures that are nonconforming in regard to yard setbacks or sensitive area buffers, but were in conformance at the time of construction may be reconstructed to their original dimensions and location on the lot. 3. Should such structure be moved for any reason or any distance whatsoever, it shall thereafter conform to the regulations for the zone in which it is located after it is moved. 4. When a nonconforming structure, or structure and premises in combination, is vacated or abandoned for 24 consecutive months, the structure, or structure and premises in combination, shall thereafter be required to be in conformance with the regulations of the zone in which it is located. Upon request of the owner, the City Council may grant an extension of time beyond the 24 consecutive months. 5. Residential structures and uses located in any single-family or multiple -family residential zoning district and in existence at the time of adoption of this title shall not be deemed nonconforming in terms of bulk, use, or density provisions of this title. Such buildings may be rebuilt after a fire or other natural disaster to their original dimensions and bulk, but may not be changed except as provided in the non -conforming uses section of this chapter. 6. Single-family structures in single- or multiple -family residential zone districts that have legally nonconforming building setbacks, shall be allowed to expand the ground floor only along the existing building line(s), so long as the existing distance from the nearest point of the structure to the property line is not reduced, and the square footage of new intrusion into the setback does not exceed 50% of the square footage of the current intrusion. 7. In wetlands, watercourses and their buffers, existing structures that do not meet the requirements of the Critical Areas Overlay District chapter of this title may be remodeled, reconstructed or replaced, provided that: 43 Page 32 of 32 a. The new construction does not further intrude into or adversely impact an undeveloped sensitive area or the required buffer except where interrupted buffer waiver has been granted by the Director. However legally constructed buildings other than accessory structures may: i) Expand vertically to add upper stories in exchange for buffer enhancement; and no significant tree is removed. ii) Expand laterally along the building side that is opposite of critical area up to a maximum of 1000 sq. ft; provided that expansion is outside 75 percent of the required buffer; buffer enhancement is proposed; and no significant tree is removed. iii) Expand laterally along the existing building lines in exchange for buffer enhancement; provided the expansion into the buffer is less than 50 percent of the current encroachment or 500 sq. ft, whichever is less. Further under this option expansion is outside 75 percent of the required buffer; and no significant tree is removed. iv) Enclose within existing footprint in exchange for buffer enhancement; and no significant tree is removed. b. The new construction does not threaten the public health, safety or welfare; and c. The structure otherwise meets the requirements of this chapter. 8. In areas of potential geologic instability, coal mine hazard areas, and buffers, as defined in the Sensitive Areas Overlay District chapter of this title, existing structures may be remodeled, reconstructed or replaced, provided that: a. The new construction is subject to the geotechnical report requirements and standards of TMC Sections 18.45.120B and 18.45.120C; b. The new construction does not threaten the public health, safety or welfare; c. The new construction does not increase the potential for soil erosion or result in unacceptable risk or damage to existing or potential development or to neighboring properties; and d. The structure otherwise meets the requirements of this chapter. 44 Page 1 of 41 Sections: 18.45.010 Purpose 18.45.020 Best Available Science 18.45.030 Sensitive Critical Area Applicability, Maps and Inventories 18.45.040 t+ Critical Areas Special Studies 18.45.050 Interpretation 18.45.060 Procedures 18.45.070 ' Critical Area Permitted Uses 18.45.080 Wetlands Designations, Ratings and Buffers 18.45.090 Wetland Alterations and Mitigation 18.45.100 Watercourse Designations, Ratings and Buffers 18.45.110 Watercourse Alterations and Mitigation 18.45.120 Areas of Potential Geologic Instability Designations, Ratings and Buffers 18.45.130 Areas of Potential Geologic Instability Uses, Exemptions, Alterations and Mitigation 18.45.140 Abandoned Mine Areas 18.45.150 Fish and Wildlife Habitat Conservation Areas — Designation, Mapping, Uses and Standards 18.45.155 Special Hazard Flood Areas 18.45.160 Critical Area Master Plan Overlay 18.45.170 SensitiveCritical Areas Tracts and Easements 18.45.180 Exceptions 18.45.190 Appeals 18.45.195 Enforcement and Penalties 18.45.200 Recording Required 18.45.210 Assurance Device 18.45.220 Assessment Relief 18.45.10 Purpose A. The purpose of TMC Chapter 18.45 is to protect the environment, human life and property, designate and classify ecologically sensitivecritical areas such as regulated wetlands and watercourses and geologically hazardous areas and to protect these areas and their functions while also allowing for reasonable use of public and private property. These regulations are prepared to comply with the Growth Management Act, RCW 36.70A, to apply best available science according to WAC 365-195-900 through 925 and to protect critical areas as defined by WAC 365- 190-080. B. Standards are hereby established to meet the following goals of protecting environmentally sensitivecritical areas: 1. Minimize developmental impacts on the natural functions of these areas. 2. Protect quantity and quality of water resources. 3. Minimize turbidity and pollution of wetlands and fish- bearing waters and maintain wildlife habitat. 4. Prevent erosion and the loss of slope and soil stability caused by the removal of trees, shrubs, and root systems of vegetative cover. 5. Protect the public against avoidable losses, public emergency rescue and relief operations cost, and subsidy cost of public mitigation from landslide, subsidence, erosion and flooding. 6. Protect the community's aesthetic resources and distinctive features of natural lands and wooded hillsides. 45 Page 2 of 41 7. Balance the private rights0fiOdividual property owners with the preservation of environmentally sensidvoChUCa|8re8S. 8. Prevent the |OSs of wetland and watercourse function and acreage, and strive for ogain over present conditions. 9. Give special consideration h3conservation Or protection mS8SUr8S necessary to protect or enhance una' d0mounfinhohes. 10. Incorporate the use of best available science in the regulation and protection of Psonsitivocritical areas usrequired bvthe State Growth Management Act, according UoVYAC3O5'195'9OOthrough 3O5'195'925and VYAC 385'190'080. 18.45.20 Best Available Science A. Policies, regulations and decisions concerning sensitivccritical areas shall rely on bestavailable science 03 protect the functions of these 8man and must give 8p8oiu| consideration to ConGemudnn or pmUaod0n measures necessary tOpreserve Orenhance 8n8d000uSfish and their habitats. B. Nonscientific inh]nn8UOn may supplement SCi8nUfiC infOnn8U0n, but is not an adequate substitution for valid and available scientific information. C. Incomplete 0runavailable scientific information leading tOuncertainty for permitting S6ns§vgCriUCg| area impacts may require application of effective adaptive management on a case by case basis. Adaptive management relies Onscientific methods tOevaluate how well regulatory Ornon-regulatory actions protect SfRs4veCri1iCa|areas nrreplace their functions. (Oni23DY§i(purt),20Y0) 18.45.30 Critical Area Applicability, Maps, and Inventories A. APPLICABILITY— The provisions of TIVIC Chapter 18.45 shall apply to all land uses and all development activities in 8 oencidvoChUC3| area 0r8sens"CrihCa| area buffer as defined in the ''DgfiniUOnS" chapter of this title. The provisions nfTIVICChapter 1845 apply whether or not 8 permit or 8uUlOhz8UOO is required within the City of Tukwila. NO person, DO0p8Oy, 8g8ncy, Or applicant Sh8U alter 3 sensidvochUC3| area or buffer except as consistent with the purposes and requirements OfTK8CChapter 10.45.The following are SonsitivnChdCa|areas regulated byTIVICChapter 1M.45: 1. Abandoned coal mineS� . 2. Areas of ooteOd8| geologic instability: C|8SS 2' 3' 4 areas (as defined in the Definitions chapter of this title and TK4C 1845120.A); 3. YVet|8ndS� ' 4. VV8teKQunS8S; 5. Fish and Wildlife Habitat Conservation Areas; and ��0. Special Hazard Flood Areas. B-. DTh8 Growth Management Act also identifies frequently flooded areas and _arS8S of seismic instability as cnnC@| areas. Regulations governing frequently flooded orosare found inTNC Chapter 1A52.Flood Zone Management. Areas Of seismic instability are defined and regulated through the Washington State Building Code. See maps for desiqn8ted areas ofseismic instability. CTh8 City ShGU not approve any permit or otherwise issue any authorization 03 8|VB[ the C0OdihOO Of sansihvnohhCm|area land, water Orvegetation Ork)construct Uralter any structure Orimprovement in, over, OrOn 8o8noidvnChUC8|area 0[its buffer, without first ensuring compliance with the requirements OfTIVICChapter 18.45. D. App[0V8| of permit or development p0pOS8| pursuant 03 the provisions Of TW1C Chapter 18.45 dO8S not r8|88S8 the applicant from any obligation k)comply with the provisions OfTIVIC Chapter 18.45. E. When TK4CChapter 1845 imposes greater restrictions U[higher standards upon the development O[use Page 3 of 41 of land than other laws, ordinances [xrestrictive covenants, the provisions 0f TMC Chapter 18.45shall prevail. F. It is the obligation Ofthe property owner k}comply with all relevant i k08UfMhisCUd8. G. SEWSIVA4ECRIRCAL AREAS MAPS AND INVENTORIES 1 The distribution Ofmany aenniUvoCridC3| 8r88S in Tukwila is displayed On the &-*sitwe_-Critical Areas Maps, On fi|S with the Department OfCommunity Development (DCD). These maps are based On site assessment nfcurrent conditions and review ofthe best available scientific data and are hereby adopted byreference. Not all sensitive ar acritical areas are shown on the map, it is the applicant's responsibility to verify actual presence or absence of a critical area or critical area buffer based on the definitions in this code. 2. Studies, preliminary inventories and ratings Ofpotential sensitive omocritioa| areas are 0Ofile with the Department ofCommunity Development. 3. A8new environmental information related t0ge%&we-8FeaCriUC8|areas becomes available, the Director is hereby designated to periodically add new information tothe Sonsid»n AreaCritico|Aman Maps. Removal of any information from the sensitive areacritical area maps is a Type 1 decision. 4 Regardless ofwhether a -sensitive area is shown on the sensitive areas map, the motuo| pvasanra or absence ofthe feotum:defined inthe code o:sensitive areas shall govern. The Director may require adjacent to the applicant's Sito.based on the definitions of sensitive areas inthis code, 5,4,All revisions, updates and reprinting 0fsensitive amnChhC8|areas maps, inventories, ratings and buffers shall conform tnTK4CChapter 18.45. (Ord. 2301§1/parV, 2010) 18.45.40 CriticalAr8as Special Studies A. Application Required. An applicant for a development proposal within a parcel that may include 8conoidvnorooriUC8|area and/or its buffer shall submit those studies aSrequired bythe City and specified below tOadequately identify and evaluate the se4s#*E+a+eaCri1iCa|area and its buffers. 1. A required sensitive areacritical area study shall be prepared by a person with experience and training inthe scientific discipline appropriate for the relevant SEps§*e—a*gacridC8|area inaccordance with VYAC385'195' 905(4).Aqu8|ifi8dp0fSSSiUn8|nluSth8vSObt8inSd8B.G.OrB.A.OrSquiv8|8ntd8grS8inSCO|OgyOr[8|8tSdSSiSnS8, engineering, environmental studies, fisheries, geOt8chnic8|Orrelated field, and two years Ofrelated work experience. 8. Aqu8|ifi8d professional for Fish and Wildlife Habitat C0OS8m8UOO A[88S must have 8 d8g[88 in ecology or related sciences and professional experience related 03the subject species. b. Aqualified professional for wetland CCncitivC 3roCrihC8|area studies must bSGcertified Professional Wetland Scientist Or8 U8OdGCi8OUSt with 8tleast two years Offull-time work experience as a wetlands professional, including delineating wetlands using the state orapproved federal manual and applicable r8qi0n@|supplements, preparing wetland reports, conducting functional assessments, and developing and implementing mitigation plans. C. A qU8|iD8d pKdeSSiOOG| for 8 g80|OgiCG| hazard study must be G p0feSSiOO8| gSot8ChOiC8| engineer as defined in the Definitions chapter of this UU8. licensed in the state Of Washington. d. A qualified professional for watercourses and frequently flooded areas means a hydrologist, g9CA0giSt, fisheries biO|OqiSt. engineer Orother scientist with SxpS[iSOC8 in preparing N0tSPC0unS8 8SSSSSnl8OtS. 2. The sensitive oroeChtioa| area Study Sh3|| use scientifically valid methods and studies in the 3n8|ySi3 Of s9nSitivCor OC[ihC8|area data and shall use field reconnaissance and reference the source Ofscience used. The :onsihvooroucriUC8| area study shall 8v8|u8t8 the p0pOS3| and all probable impacts tOSe%&f+�oriUCa| 8rn3S inaccordance with the provisions OfTMCChapter 18.45. B. Wetland and Watercourse nsiUvo AomaCriUca|Anea Studies. The sensitive ur000riUca| area study shall contain the following information, 8S applicable: 1. The name and contact information Ofthe applicant, 8 d8SCricdiOO of the p0pOS8|' and id8OhfiC@hOD of the permit requested; 2. Acopy 0f the site plan for the development proposal showing: sensitive Jr0ochdoa|areas and buffers and the d8YO|Op08Ot p0pOS3| with dinl8OSiUOS' d8GhOg limits, proposed S03nn water nl8O8g808Ot p|8O' and mitigation plan for impacts due hJdrainage alterations; 47 Page 4 of 41 3. The dates, names and qualifications of the persons preparing the study and documentation of any fieldwork performed on the site; 4. Identification and characterization of all con five areacritical areas, water bodies, and buffers on or adjacent to the proposed project area or potentially impacted by the proposed project as described in the following sections: a. Characterization of wetlands must include: (1) A wetland delineation report that includes methods used, field indicators evaluated and the results. Wetland delineation must be performed in accordance with approved federal wetland delineation manual and current applicable regional supplements. Field data forms are to be included in the report. Data collection points are to be shown on the site plan with their corresponding numbers indicated. After the City of Tukwila confirms the boundaries, they are to be professionally surveyed to the nearest square foot and the site plan modified as necessary to incorporate the survey data. Exact wetland acreage will be calculated after the boundaries have been surveyed. Applicant must submit electronic data at the time of as -built submittal. (2) Cowardin (Classification of Wetlands and Deepwater Habitats of the U.S. — U.S. Department of Interior) classification of the wetland(s). (3) Hydrogeomorphic classification of the wetland(s). (4) Hydroperiod. (5) Brief landscape assessment of the wetland (identify hydrologic basin/sub-basin; inlets, outlets; surrounding land use; habitat quality and connectivity; ultimate point of discharge; presence of culverts or other constraints to flow; relationship to other wetlands/watercourses adjacent to or potentially impacted by the proposed project). (6) Description of buffer size per this chapter, conditions (topographic considerations, existing vegetation types and density, habitat features, watercourse edges, presence of invasive species, etc.) and functions. (7) Functional aAssessment. For proposed wetland filling or proposed projects that will impact buffers the Washington Wetland Classification System (2014 or most current) shall be used as a functional assessment. b. Characterization of the watercourses on site or adjacent areas potentially impacted by the proposed project to the site must include: (1) Description of: flow regime, physical characteristics of streambed, banks, dimensions and bank -full width, stream gradient, stream and buffer vegetation conditions, habitat conditions, and existing modifications. (2) Brief landscape assessment of the wa- tercourse (identify hydrologic basin/sub-basin, and contributing basin area acreage, outlets, surrounding land use, habitat quality and connectivity, ultimate point of discharge, presence of culverts or other constraints to flow, presence of man-made or natural barriers to fish passage, relationship to wetlands or other watercourses adjacent to or potentially impacted by the proposed project, flow regime). (3) Classification of the watercourse under Tukwila's rating system. (4) Description of buffer size per this chapter, conditions (topographic considerations, existing vegetation types and density, habitat features, watercourse edges, presence of invasive species, etc.) and functions. (5) Description of habitat conditions, wildlife/fish use of the watercourse, including sensitive, threatened or endangered species. c. Citation of any literature or other resources utilized in preparation of the report. 5. A statement specifying the accuracy of the study and assumptions used in the study. Page 5 of 41 6. Determination of the degree of hazard and risk from the proposal both on the site and on adjacent properties. 7. An assessment of the probable cumulative impacts to sensitive ar-acritical areas, their buffers and other properties resulting from the proposal. 8. A description of reasonable efforts made to apply mitigation sequencing to avoid, minimize and mitigate impacts to sensitive ar acritical areas. 9. Plans for adequate mitigation to offset any impacts. 10. Recommendations for maintenance, short-term and long-term monitoring, contingency plans and bonding measures. 11. Any technical information required by the Director to assist in determining compliance with TMC Chapter 18.45. 44:12. Wetland and Watercourse special studies are valid for five years following the date of the study, unless otherwise determined by the director. C. GEOTECHNICAL REPORT- 1. A geotechnical report appropriate both to the site conditions and the proposed development shall be required for development in Class 2, Class 3, Class 4 areas, and any areas identified as Coal Mine Hazard Areas, unless waived pursuant to TMC Section 18.45.040 E. 2. Geotechnical reports for Class 2 areas shall include at a minimum a site evaluation review of available information regarding the site and a surface reconnaissance of the site and adjacent areas potentially impacted by the proposed project. Subsurface exploration of site conditions is at the discretion of the geotechnical consultant. 3. Geotechnical reports for Class 3, Class 4 and Coal Mine Hazard Areas shall include a site evaluation review of available information about the site, a surface reconnaissance of the site and adjacent areas potentially impacted by the proposed project, a feasibility analysis for the use of infiltration on -site and a subsurface exploration of soils and hydrology conditions. Detailed slope stability analysis shall be done if the geotechnical engineer recommends it in Class 3 or Coal Mine Hazard Areas, and must be done in Class 4 areas. 4. Applicants shall retain a geotechnical engineer to prepare the reports and evaluations required in this subsection. The geotechnical report and completed site evaluation checklist shall be prepared in accordance with the generally accepted geotechnical practices, under the supervision of and signed and stamped by the geotechnical engineer. The report shall be prepared in consultation with the Community Development and Public Works Departments. 5. The opinions and recommendations contained in the report shall be supported by field observations and, where appropriate or applicable, by literature review conducted by the geotechnical engineer which shall include appropriate explorations, such as borings or test pits, and an analysis of soil characteristics conducted by or under the supervision of the engineer in accordance with standards of the American Society of Testing and Materials or other applicable standards. If the evaluation involves geologic evaluations or interpretations, the report shall be reviewed and approved by a geotechnical engineer._ D. SENSITIVE /IRE/%CRITICAL AREA STUDY- MODIFICATIONS TO REQUIREMENTS — a. 1.The Director may limit the required geographic area of the sensitive areacritical area study as appropriate if tThe applicant, with assistance from the City, cannot obtain permission to access properties adjacent to the project area; or_ 2.The Director may allow modifications to the required contents of the study where, in the judgment of a qualified professional, more or less information is required to adequately address the potential sensitive areacritical area impacts and required mitigation. 1. A wetland has been classified and delineated, or the Ordinary High Water Mark (OHWM) has been determined in watercourses and confirmed by the Cty within the last two years, in accordance with the requirements of this chapter, 49 Page 6 of 41 2. The classification and location of wetland boundaries or OHVVK8 have been confirmed bvthe City, and the proposed development or en8nn will ovn'd all impacts to the censidv8eveo(o). 3. There is nubstanUm| evidence there will be no detrimental impact tothe CenSiUvoareas nrbuffers, F—.E. REVIEW QFSTUDIES — The Department ofCommunity Development will review the information submitted inthe Pensitivc ar acritical area study to verify the information, confirm the nature and type of the sen.sitivc e*»-aChUc3|area, and ensure the study iSconsistent with TMCChapter 1845. At the discretion Ofthe Director, sensitive areacritical area studies may undergo peer review, at the expense of the applicant. Public Works Department shall seek a peer review 0fthe q8O0aChniC3|report 0nClass 3and 4slopes; and peer review onClass 2 slopes may berequired mt the discretion ofthe Public Works Director, (0ni2308§ 47,20/2;Oni2201§1(pad),2010) application and shall bnliberally construed toserve the purposes ofTMCChapter 10/45. and dimensions of all sensitive areas and bufforiz nn f�e site shall be indiGated on the pla A, does not 1. pursuant to TK4C Section 18�15.O10 E. | by the Oeoa�mgrtnfa :ens�vo anaa a�enaUon in 0bnenm -sensitive area conditions. B. The applicant shall grant the City the rightofonndnuousentryuponponpernckicohonbceme critical area conditions. C. Sensitive areas study and geo&*ohnice/report: D. The appliGant shall submit the Felevant study as requiFed in T-MG SeGfion 21.04.140 and T-MC Chap 49.45 E. It is intended that SenniUwe areas studies and information beutilized byapplicants inpreparation of their p0p0Sa|o and therefore Sh8|| be undertaken early in the design stages OfG project, F. Planned residential development permit: Any new residential Subdivision nrmultiple family residential p0p0S8| that includes 8 wetland or watercourse or its buffer On the She may apply for 8planned residential development permit and meet the requirements of the Planned Residential Development District chapter nfthis title. G. Denial 0fuse Drdevelopment: Ause ordevelopment will be denied if the Director determines the applicant cannot ensure that potential dangers and costs tnfuture inhabitants nfthe development, adjacent properties, and Tukwila are minimized and mitigated b)anacceptable level. H. prennnstrucUonmeeting: The department representatives will be required h3attend pre construction meetings prior hoany work on the &4&7 i Construction monitoring: The specialistclualified professional(s) of record shall be retained to monitor the site during construction. J. Qn'ci0u identification: The Director may require the boundary between a sensitive aneachUca|omo and its buffer and any development or use to be p8nnon8nUy identified with fencing. and/or with a woOd, plastic or metal sign mounted on a treated wood, concrete or metal post. Sign -size will bGdetermined 8t the time of permitting; howover, the minimum size Shall be 10 x 12 inches. |tshall bo permanently affixed h]the post bybolts and the wording shall be as follows: Page 7 of 41 K, "Protection efthis natural area isinyour care, Alteration, dumping ordisturbanooinoruhibhodpunsuantto TMC Chapter 18.15. Please call the City of Tukwila at 206 431 3670 for more information." 18.45.70 Critical Area Permitted - � eActivities A. General UsesAc k/dies. The uses et forth in this entire sochon, including subsections A, through D. and the The following activities are outright permitted subject to the provisions of TMC Chapter 21.04 and ofthe mitigation requirements ofKNC Chapter 18,15thischaptor, if applicable: 1. Maintenance and repair Of existing uses and facilities provided no alteration or additional 8U materials will be placed Orheavy construction equipment used inthe cal area orbuffer. %. Site exploration or research that does not include use of heavy equipment ornative vnqotation n8mOva|N0nUectmcUvaeducation and research. a72�Passive recreation and open space, 473. Maintenance and repair 0fessential streets, roads, hghts-0f-way'0rutilities. New fibe0ptiCutilities within existing improved and paved road are also permitted under this category. 54.Actions k)remedy the effects nfemergencies that threaten the public health, safety n[welfare. 5. Maintenance activities of existing landscaping and gardens in 8 S6*n�&e—E*8acri1iC8| area buffer induding, but not |imi1Sd, to mowing |8wnS' weeding, harvesting and replanting of garden C0pS and pruning and planting of vegetation. The This provision does not apply to namnvo| of established native trees and shrubs in not . Excavation, filling, and construction 0fnew landscaping features, such 8Sconcrete work, berms and walls, are not covered in this provision O. Voluntary native r8veget8UOn and/or removal of invasive Sp8CiSS that does not include use of heavy equipment Orherbicide. B. PERMITTED USES ACTIVITIES SUBJECT TO ADMINISTRATIVE REVIEW. The following uses may bSpermitted only after administrative review (Type 2Special Permission application) and approval bythe Director: 1. Maintenance and repair Of existing VG8S and facilities where alteration Oradditional fill materials will be placed O[heavy construction equipment used. 2. New surface water discharges tOSensid\naroaCridco|areas Ortheir buffers from detention facilities, pre - settlement pOndS Orother surface water management structures may be 3||OvvSd provided that the discharge meets the clean water standards OfRCVV8O.48and VYAC173.2OOand 1732O18Samended, and does not adversely affect vv8MGnd hydrU|0qy or watercourse flow watercourse habitat and watercourse flow conditions relative to the existing rate. Water quality monitoring may be required 8S8condition Ofuse. 3. Construction of Bbioswales3nddiSp8rsiOntrenohesoutfaUs3rStheOn|ystVnnw0t8rfaC|id8S3UOw8din wetland U[watercourse buffers. Water quality monitoring may b8required 8S8condition 0fuse 4. Enhancement Or other mitigation including landscaping with native plants that requires heavy equipment-.. 5. Construction ofEssential Utilities ifdesigned to-. J. E5sCnhJ| uU|iho: must be constructed to minimize, or where possible avoid, disturbance of the sensitive omoohtioo|area and its buffer. All construction must be designed to protect the sensitive 3reacritical area and its buffer against erosion, uOCOOt0U8d storm water, restriction of groundwater nlOY808OL S|id8S' pOUudOO' habitat disturbance, any |OGS of flood carrying C8p3Citx and Sh}0g8 S8p3Citv. and 8xC3v8d0n or fill detrimental to the 8OVi0O08OL L Upon completion of installation of n_sonUn| utilities, -sensitive omoohUoa| areas and their buffers 51 Page 8 of 41 newly planted vegetation is established. In addition, mitigation to offset impacts to sensitive areacritical areas or reduce the number of crossings. 6. Essential Public Streets, Roads and Rights -of -Way as defined by TMC 18.06.285, provided the following criteria are met: For construction of new essential public streets, roads and rights of way, as defined by TMC S-ction 18.06.285, where avoidance of sensitive arcacritical areas is not possible, impacts to the sensitive a. Essential public streets, roads and rights of way, as defined by TMC Section 18.06.285, must beAre designed and maintained to prevent erosion and avoid restricting the natural movement of groundwater. b. Are located to conform to the topography so that minimum alteration of natural conditions is necessary. The number of crossings shall be limited to those necessary to provide essential access. c. Essential public streets, roads and rights of way, as defined by TMC Section 18.06.285, must be Are constructed in a way that does not adversely affect the hydrologic quality of the wetland or watercourse and/or its buffer. Where feasible, crossings must allow for combination with other essential utilities. d. Upon completion of construction, the area affected must be restored to an appropriate grade, established, at least 5 years. In addition, mitigation to offset impacts to sensitive arcacritical areas or their buffers must be carried out in accordance with the standards and mitigation ratios set forth in this chapter. 7. Public/Private Use and Access a. Public and private access shall be limited to trails, boardwalks, covered or uncovered viewing and seating areas, footbridges only if necessary for access to other areas of the property, and displays (such as interpretive signage or kiosks), and must be located in areas that have the lowest sensitivity to human disturbance or alteration. Access features shall be the minimum dimensions necessary to avoid adverse impacts to the arcacritical area. Trails shall be no wider than 5 feet and are only allowed in the outer half 25 percent of the buffer, except for allowed wetland or stream crossings. For proposed wetland or watercourse crossings or trails, an assessment of impacts to wet land/watercourse and buffer function (especially where the sensitive areacriticat minor crossings, such as foot bridges or stepping stones, for access to contiguous property. Crossings and trails must be designed to avoid adverse impacts to sensitive areacritical area functions. The Director may require mechanisms to limit or control public access when environmental conditions warrant (such as temporary trail closures during wildlife breeding season or migration season). b. Public access must be specifically developed for interpretive, educational or research purposes by, or in cooperation with, the City or as part of the adopted Tukwila Parks and Open Space Plan. Private footbridges are allowed only for access across a sensitive arcacritical area that bisects the property. c. No motorized vehicle is allowed within a sensitive ar °critical area or its buffer except as required for necessary maintenance, agricultural management or security. d. Any public access or interpretive displays developed along a sensitive ar critical area and its buffer must, to the extent possible, be connected with a park, recreation or open -space area. e. Vegetative edges, structural barriers, signs or other measures must be provided wherever necessary to protect sensitive arcacritical areas and their buffers by limiting access to designated public use or interpretive areas. f. Access trails and footbridges must incorporate design features and materials that protect water quality and allow adequate surface water and groundwater movement. Trails must be built of permeable materials. g. Access trails and footbridges must be located where they do not disturb nesting, breeding and rearing areas and must be designed so that sensitive plant and critical wildlife species are protected. Trails and footbridges must be placed so as to not cause erosion or sedimentation, destabilization of watercourse banks, interference with fish passage or significant removal of native vegetation. Footbridges must be anchored to prevent their movement due to water level or flow fluctuations. Any work in the wetland or stream below the OHWM will Page 9 of 41 require additional federal and state permits. 8. Dredging, Digging or Filling may occur within a critical area or its buffer only with the permission of the Director provided it meets mitigation sequencinq requirements and is permitted under TIVIC 18.45�90 (G|t8n3UOn of wetland) OrTK1C 18.45110 (a|t8ngd0n of watercourse); TK4C 1845.100 (areas Ofq8O|0qiC instability). Dmdging, digqinq orfi||inq shall only be permitted for flood control, impmvnq water quality and habitat enhancement unless otherwise permitted byTINC1845. a. Dredging, digging or filling within a -sensitive or critical or D or its buffer may occur only with the /1\ Uses permitted by TMC Sections 18.45.0RO.18.45.09O.18.45110.18.4§13U; &8 Maintenance ofanexisting watercourse; /3J Enhancement or nesh>nedon of habitat in nnnfnnnono8 with on approved mitigation plan identified inasensitive amaohdca|area study; with, the City; /5) Flood control mwater quality enhancement bvthe City; /O\ Maintenance of existing water quality controls, for normal maintenance needs and for any Uivnr»ion, mmudng, piping orother alteration permitted by TKJC Chapter 18.45; b. Any dredging, digging nrfilling shall be performed in a manner that will minimize sedimentation n the water. Every effort :11 k- -,,4^ +- perferm suGh work at the time of year when the irnp@Gt Gan belleesseried. G. Upon Gempletion of GonskyetieR, the area affeGted must be Festered to aR appropriate grade, replaRted aGG0rd!Rg to a plaR approved by the DireGtor, arid provided with Gare URN ReWly plaRted vegetat'GR established. Removal of Hazardous . Only hazardous trees, as defined in Chapter 18.00395' may be removed from a sensitive areaGrltiGal area. IR Gases where the hazard is RGt obvious, aR aSS8SSFneRt by aR 8rb0iSt certified by the |ntCmotk/no| Society of Arbohats may be required by the Director. Tree replaGeMeRt !R aGGGFdaRGe with TMG Chapter 19.54 is required for aRy hazardous tree removed from a :onsidvo or uohtico�or a. D ad tmn-.Anyother vegetation /d odnrliving) may not be removed, un|ono {-.--Permitted Uses Subject ho Exception Approval. Other usoo may be permitted upon receiving o reasonable use exception pursuant h]TMCSection 1045.18O,Ause permitted through G reasonable use exception shall conform k)the procedures ofTK8C Chapter 18.45and bennnsisVant with the underlying znning, D. Uses allowed under o Sensitive Area Mun0ar Plan prepared and approved under the provisions of TN\C Section 18.45,160. 18.45.075 Mitoation Sequencinq A. A0V|iCoOtG Sh8U demonstrate that ne8SOD8b|e effOd3 have been examined with the intent to avoid and minimize impacts tocritical areas and critical area buffers. When analteration 0}ocritical area Orits required buffer isproposed, such alteration shall be avoided, minimized or compensated for in the following order of preference: 1. Avoidinq the impact altoqether by not takinq a certain action or parts of an action; 2. Minimizinq critical area or critical area buffer impacts by |imiUnq the deqree or maqnitud* of the action and its im0|ementadOn, by u3in0 appropriate t8dlnn|OOy, nrbytaking affirmative s0a0S to avoid or reduce impacts; l ReCdfyinqthe impact byr808ihnq. nehabi|ih8hnO Orr8S0o,inOthe affected environment; 4. Reducinq or eliminatinq the impact over time by preservation and maintenance operations durinq the life of the action-, 53 Page 10 of 41 5. CompnnsaUnq for the impact bymplacnq.enhamcinq.orpnovidinqsubstitute resources nrenvironments; and/or 0. MOn80hnqthe impact and taking appropriate corrective measures. 18.45.80 Wetlands Designations, Ratings and Buffers A. NE7IA0DDES/GNA77O0S. 1. For the purposes of TMC Chapter 18.45, "wetlands" and "regulated wetlands" are defined inthe Definitions chapter 0fthis title. Awetland boundary i8the line delineating the outer edge 0f8wetland established /EcolngyPublication #g594)and consistent with the 1987Corps ofEngineoraVVetlendDe|ineaUon[NanuaAn accordance with the approved federal wetland delineation manual and applicable reqional supplement. 2. Wetland determinations and delineation of wetland boundaries shall be made by3qualified professional, as described in TMC Section 18.45.040. 3. Wetland determinations and delineation or wetland boundaries must be conducted within no more than five years Prior h}the date Ofpermit application. 3 Wetland areas withiR the City of Tukwila haVe GeFtaiR Ghara08F'StiGs and fURGtieRs and have beeR Improving water quality; Maintaining hydrologic functions (reducing p ak flows dccr asingerosion, groundwater recharge, flood storage); and Providing habitat for plants, mammals, fish, birds, and amphibians. B. 0ETLA8DRATIVGS— VVSU8ndS Sh8U be designated in 8cSVnd8nCe with the Washington State VVeU8ndS Rating System for Western VV8ShiOgh3O' (Washington State Department OfEcology, August 2004. Publication #O4 OO 0252014. Publication # 14'OO'O20),nrGsotherwise amended byEcology 3GCategory |'||'U|'Or|V8Slisted below: 1. Category | wetlands arc those that: i\mpmsnntu unique orrare wn|ondtype; o,ii)arc more son:ihvo to disturbance than most wetlands; or iii\ are relatively undisturbed and contain ecological attributes that arc listed by Washington Department of Ecology and potentially found in Tukwila are Category 1: o.—EstuohnoRc|u8vC|yundi:\u/bodostuuhno*oUondc(d000waterddo|hzbhatswith orange offresh brackish marine water chemistry and daily tidal cycles, salt and brackish marshes, intertidal mudflats, bays, Sounds, and coastal hvCnS)� '' b. Wetlands that perform many function-, well ogd—score at | Washington Wetlands Rating System. 2. Category U wetlands am di#5cu|t, though not impossible, toreplace and provide high levels ofsome fURGtiORS. These Wetlands OGGLIr ME)Fe GOMMoRly thaR Categ9FY I WOIands, but Still Reed a relatively high level 0 Tukwila are Category ||wetlands: o. The vvoUJnd in documented as regionally significant wutcrfnvv| or shorebird or as by the State Department ofFish and Wildlife. b. Wetlands that perform functions well. VVSU8ndn scoring between 51 69puintu (out of 100) OnthO questions related tothe functions precent, 3. Category III wetlands have amoderate level of functions (scores between 30and 50 points). VVoUonds scoring between 305O points generally have been disturbed in some ways and arc often less diverse ormore Page 11of41 isolated from other natural resources in the landscape than Category II wetlands. heavily disturbed. While these are wetlands that should be able to be replaced or improved, they still need protection some important functions. Any disturbance of these wetlands will be considered on a case by case basis. C. WETLAND BUFFERS — 5-1. Purpose. A buffer ara shall be established adjacent to designated wetland areas. The purpose of the buffer area shall be to protect the integrity and functions of the wetland area. Any land alteration must be located out of the buffer areas as required by this section. Wetland buffers are intended in general to: a. Minimize long-term impacts of development on properties containing wetlands; b. Protect wetlands from adverse impacts during development; c. Preserve the edge of the wetland and its buffer for its critical habitat value; d. Provide an area to stabilize banks, to absorb overflow during high water events and to allow for slight variation of aquatic system boundaries over time due to hydrologic or climatic effects; e. Reduce erosion and increased surface water runoff; f. Reduce loss of or damage to property; g. Intercept fine sediments from surface water runoff and serve to minimize water quality impacts; and h. Protect the sensitive ar acritical area from human and domestic animal disturbances. An undisturbed sensitive area or buffer may substitute for the yard setback and landscape 18.50 and 18.52. BUFFER REQUIREMENTS — Buffer widths in Table 18.45.080-1 have been established in accordance with the best available science. They are based on the category of wetland and the habitat score. The following standard buffers shall be established from the wetland edge: a. Category I and II Wetland: 100 foot buffer. b. Category III Wetland: 80 foot buffer. c. Category IV Wetland: 50 foot buffer. Table 18.45.080-1 Wetland Buffer Widths 55 Page 12 of 41 Cmteqmry Wetland buffer width (ft.EsoUo-qv 2014, hiqh-imtemsitV|amd use impact Habitat score Habitat score Habitat score Habitat score 6-7 Habitat score Habitat score 8-9 <6 <6 6-7 8-9 Standard Buffer Alternate Buffer if impact Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Standard Buffer Alternate Buffer if impact minimization measures taken AND buffer is replanted. Also, 100 feet minimization measures taken AND buffer is Also, 1OOfeet replanted vnqetated vmqphated corridor corridor between between wetland and any wetland and nearby Priority any nearby Habitats is Priority Habitats is maintained (see footnote 1\ maintained. (see footnote 1) 1 100 75 150 110 300 225 0 100 75 150 110 300 225 U| 80 68 150 110 300 225 8/ 50 40 50 48 50 40 (1)�Arelatively undisturbed, vegetated corridor 8t least 10]feet wide is protected between the wetland and any nearby Priority Habitats as defined by the Washington State Department of Fish and Wildlife, The corridor must b8protected for the entire distance between the wetland and the Priority Habitat by some type of|ecla| protection such as conservation easement. Presence or absence of 8 nearby habitat must be confirmed by qualified biU|OgiSL If no option for providing 8 corridor is 8vGi|8b|e. Tab|e10.45.O0O'1 may beused with the required measures inTable 1845.O8O'2alone. Table 18.45.080-2 Reouired Measures to Minimize Impacts to Wetlands Disturbance Required Measures bzMinimize Impacts Lights w Direct lights away from wetland Noise w Locate activity that qen8ratesnoise away from wetland * |fwarranted, enhance exindnqbuffer with native veqet3tion0|anUn0s ° adjacent tOnoise source For activities that clenonai8relatively continuous, potentially disruptive noise, such as certain heavy industry ormininq. establish an additional 10' heavily yeg8t8tedbuffer strip immediately adjacent tOthe outer wetland buffer Toxic runoff 0 Route all new, untreated runoff away from wetland while ensuring wetland is * * nOtdewa0ored Establish covenants limiting use Ofpesticides within 15Ofeet 0fwetland Apply integrated pest management Page 13 of 41 Disturbance Required Measures to Minimize Impacts Stormwater runoff • Retrofit stormwater detention and treatment for roads and existing adjacent • development Prevent channelized flow from lawns that directly enters the buffer • Use Low Intensity Development (LID) techniques where appropriate (for more information refer to the drainage ordinance and manual' Change in water regime • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and new lawns Pets and human disturbance • • Use privacy fencing OR plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion Place wetland and its buffer in a separate tract or protect with a conservation easement Dust • Use best mana ementpractices to control dust E. BUFFER SETBACKS — 1. All commercial and industrial buildings shall be set back 15 feet and all other development shall be set back 10 feet from the buffer's edge. The building setbacks shall be measured from the foundation to the buffer's edge. Building plans shall also identify a 20-foot area beyond the buffer setback within which the impacts of development will be reviewed. 2.The Director may waive setback requirements when a site plan demonstrates there will be no impacts to the buffer from construction or occasional maintenance activities (see TMC Figure 18-2). F. VARIATION OF STANDARD WETLAND BUFFER WIDTH — 7 The Director may red ice the standard wetland buffers only where the buffer conditions are currently degraded (due to existing development within the prescribed buffer width, the presence of significant amount of invasive vegetation that impairs buffer function, enhanced and the buffer docs not contain slopes 15% or greater. Where a buffer has a variable planted setback from the top of the slope is maintained. Further, a geotechnical review of thc proposed buffer enhancement plan must determine thc buffer enhancement can be implemented without destabilizing the slope. The approved buffer width shall not result in greater than a 50% reduction in width. 1. Buffer reduction with enhancementaveraginq may be allowed by the Director as a Type 2 permit if the following criteria is met, and so long as the total area of the buffer after averaging is equal to the area required without averaging and the buffer at its narrowest point is never less than either % of the required width or 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater. with an approved buffer enhancement plan prepared by a qualified wetland biologist, if: Additional protection to wetlands will be provided through the implementation of a buffer enhancement plan; The existing condition of the buffer is degraded; and Buffer enhancement includes, but is not limited to Planting vegetation that would incr ase value for fish or hydrology; Enhancement of wildlife habitat by in corporating structures that are likely to be used by wildlife, including wood duck boxes, bat boxes, snags, root wads/stumps, birdhouses and heron nesting areas; or Removing non native plant species and noxious weeds from the buffer ar and replanting the 57 Page 14 of 41 area subject ho2/c.(1)above, a. The wetland has si0nifiC8ntdiff8renC8S in Ch8raCtehShCS that affect KS habitat functions, and the buffer is increased adjacent to the hiOhmr-f ncdnning area of habitat or more -sensitive portion of the wetland and decreased adjacent hothe lower -functioning orless-sensitive portion osdemonstrated byacritical areas report from aqualified wetland professional. h. There are no feasible alternatives k)the site d9Siqn that could be accomplished without buffer averaging, and the averaged buffer will not result in degradation of the wetland's functions and values as demonstrated bv3critical areas report. C.Compliance with mibqod0nS8qV8nCinUrequirements. d.Compliance with TMC18.45V8getaUOnProtection and Manaqementsection. 8. Submittal Vfbuffer enhancement p|8n, m0qaUOn m0nik)hnO and maintenance plan 8|0nq with financial Ouar3nteeinaccordance with TMC10.45. 2. Interrupted Buffer: Waiver for interrupted buffer may be allowed by the Director as a Type 2 permit if it complies with the following: U The buffer ininterrupted bvmpaved public orprivate road; legally constructed bui|dinqn�orlegally approved paddnQlots. This waiver does not apply Naccessory structures such 83sheds and qomgnn. i) The existinq leqal improvement creates a substantial barrier to the buffer function; |i\ The interrupted buffer does not provide additional protection ofthe critical area from the proposed development; and iii) The interrupted buffer does not provide significant hydroloqical, water quality and wildlife functions3his waiver does not apply if large trees or other significant native vegetation exists, iv) Enhancement 0fr8mainiOqbuffer iSrequired iffeasible. �3]Buffers for all types Ufwetlands will b9increased when they are determined k]b8particularly sensitive to disturbance or the proposed development will create unusually adverse impacts. Any increase in the width of the buffer shall be required only after completion of w8U@Od study by 8 qualified w8UGOdS Sp9Ci8|iSt p0foSSi0O8| or expert that documents the basis for such increased width. An increase in buffer width may be appropriate when: 8. The development proposal has the demonstrated potential for significant adverse impacts upon the wetland that can b8mitigated by3nincreased buffer width; or; b. The area S8m8S as 8 habitat for 8Od8Og8[8d' thn8Gt8OSd' S8OSiUv8 or nO0Oi03[ Sp8CiSS listed by the f8d8[8| government U[the State. 2-4]Every noosonob|o effort shall be made to maintain the existing viable native plant life inthe buffers. Enhancements will ensurethat slope stability and wetland quality will be maintained or improved. Any dicUarbznoo ef the buffeFs for wetlands shal' be replanted with a diverse plant GE)MMURity of native nei4hwest SpeGieS tha are appropriate for the specific site 0SdotCrminCdbvthe Director. If the vegetation must bCremoved, 0rbecause 0f the alterations ef the landSGape the vegetat'9R beG9Fnes damaged oF dies, then the appliGant fer a PeFmit MuS nap|ao8 existing vegetation along wetlands with comparable specimens, approved by the Director, which will restore buffer functions within five y orc The Director shall require :ubcCquCntcorrective ado44., and !G"rrn monitoring of the PFGjeGt if adverse impacts tnregulated wetlands nrtheir buffers are identified. (Drd2308§48,28Y2;Ord. 2301§Y(pac0,20YN 18/45.90 Wetlands Uses, Alterations and Mitigation Page 15 of 41 buffer except as specifically allowed bvTMC Chapter 18.45. Any use or development allowed issubject V3review and approval by the Director. VVhSn8 required, 8 mitigation plan must b8developed and must comply with the standards of mitigation required in TMC Chapter 18.45. Where unauthorized alterations occur within a critical area or its buffer, the City will require the applicant to submit a nhdoo| area ntudy, that includes mitiqadnn, subject to approval. The applicant Sh8U be responsible for imp|8m8nUnq the mitigation and for additional penalties as determined bythe Director. |naddition, federal and/or state authorization isrequired for direct impacts tnwaters nf the United States 0rthe State OfWashington. B. AL7ERATIQN8- 1. A|t8r8UOnS to vv8U8ndS are discouraged and are limited 0Jthe minimum necessary for project fe8Sibi|ity. Requests for alterations must be accompanied by mitigation plan, are subject to Director approval, and may be approved only if the following findings are made: G. Complies with miUg3dVnS8quenCingrequirements. b. The 3|t8n8UOn will not 8dv808|y affect water quality; C. The a|UanaUnn will not adversely affect fish' wi|d|ifn. Ortheir habitat; d. The alteration will not have an adverse effect on drainage and/or storm water detention capabilities; o. The alteration will not lead to unstable earth COOditi0OS O[create 8O 8K}SOO hazard or contribute to scouring 8Cb0nS; t The alteration will not bomaterially detrimental k) any other property; and g. The alteration will not have adverse effects 0nany other sensitive 8re3ChiiC8|areas. (-,h. Complies with the maintenance and monitoring section. 2. A|her3UOO8 are not permitted to Category | and || wetlands uO|8sS Sp8CifiCoUy exempted under the provisions OfTK8CChapter 1845. 3. Alterations to Category III and lVwetlands are allowed onlywhere unavoidable and adequate mitigation i8carried out inaccordance with the standards Ofthis section. 4. Alterations to isolated Category IV wetlands less than 1.000 square feet in size that meet all of the fo||mminq conditions are 8UOwSd, t~|, vvhSn8 d8qUat8 mitigation is carried out in accordance with the standards OfTNCSection 18.45.O9DhiSsection. o. Ttheyare not associated with 8riparian corridor, b. They are not aSSOCi818d with ShOrS|iO8S of the state or their GSSOCi@18d buffers, c. Tth8yare not part Of8wetland mosaic, d. They, do not COOt8iO habitat identified as 8SS8OU8| for |0Ca| pOpu|ad0OS Of priority Sp8Ci8S identified by the VV8ShiOgtOO State Department OfFish and VYi|d|ife`8Od a-.e. They do not score 20 6 points or greater for habitat in the Western Washington Wetland Rating System. C. Mitigation plans Sh8|| be completed for any proposals for dredging, filling, alterations and relocation gf wetland habitat allowed inTK1CChapter 1#.45. Q. MITIGATION SEQUENCING Applicants Sho|| demonstrate that reasonable efforts have hH8n the following order of : 1. Avoiding the impact altogether by not taking certain action exparts efonaction; 2. Minimizing wetland and wetland buffer impacts by limiting the degree or magnitude of the action and its implementation, by using appropriate technology, or by taking affirmative steps to avoid or reduce impacts; quality; 4 Reducing or eliminatingthe impact over time by preservation and maintenance operations during 5 Compensating for the impact by replacing, 9n hamcing, or providing substitute resources or 6. Monitoring the impact and taking appropriate oonauUvem.asums. 59 Page 16 of 41 1. The mitigation plan shall be developed as part of a sensitive ar a study by a special+st approved by demonstrates that the changes would be an improvement of wetland and buffer quantitative and qualitative 2. The scope and content of a mitigation plan shall be decided on a case by case basis taking into account the degree of impact and the extent of the mitigation m surcs needed. As the impacts to the sensitive arga EPA, March 2006 or as amended). '1. The components of a complete mitigation plan arc as follows: a. Baseline information of quantitative data collection or a review and synthesis of existing data for both the project impact zone and the proposed mitigation site. b. Environmental goals and objectives that describe the purposes of the mitigation measures. This should include a description of site selection criteria, identification of target evaluation species and resourco func c. Performance standards of the specific criteria for fulfilling environmental goals and for beginning This plan should include the proposed construction sequence, and construction management, and tree protection e. A monitoring and/or evaluation program that outlines the approach for assessing a completed project for the specified monitoring period, at I ast 5 years. An outline shall be included that spells out how the monitoring data will be evaluated by agencies that are tracking the mitigation project's progress. f. Contingency plan identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards have not been met. C. MITIGATION STANDARDS. 1) Types of Wetland Mitigation: a) Mitigation for wetlands shall follow the mitigation sequencing steps in this chapter and may include the following types of actions in order of decreasing preference: 1. Restoration: a. Re-establishment. The manipulation of the physical, chemical or biological characteristics of a site with the goal of restoring wetland functions to a former wetland, resulting in a net increase in wetland acres and functions; b. Rehabilitation. The manipulation of the physical, chemical or biological characteristics of a site with the goal of repairing historic functions and processes of a degraded wetland, resulting in a gain in wetland functions but not acreage; 2. Creation (establishment).The manipulation of the physical, chemical or biological characteristics to develop a wetland on an upland or deepwater site, where a biological wetland did not previously exist; 3. Enhancement. The manipulation of the physical, chemical or biological characteristics to heighten, intensify, or improve specific functions (such as vegetation) or to change the growth stage or composition of the vegetation present, resulting in a change in wetland functions but not in a gain in wetland acreage. 4. A combination of the three types. b) Required mitigation ratios are described in TMC Section 18.45.090.E.1.b.(1). Alternate mitigation ratios Page 17 of 41 may be accepted by the Director upon presentation of justification based on best available science that shows the proposed compensation represents a roughly proportional exchange for the proposed impacts. 1. Alterations are not permitted to Category I or II wetlands unless specifically exempted under the provisions of this program. When alterations are allowed, mitigation ratios for Category I wetlands shall be at a 4:1 for creation or re- establishment, 8:1 for rehabilitation, and 16:1 for enhancement. Mitigation ratios for Category II wetlands shall be at 3:1 for creation or re- establishment, 6:1 for rehabilitation and 12:1 for enhancement. Creation or re-establishment shall be contiguous to the wetland, unless an exception is authorized by the Director. For Category II estuarine wetlands, re-establishment, creation and enhancement ratios will be decided on a case -by -case basis. 2. Alterations to Category III wetlands are prohibited except where unavoidable and mitigation sequencing in accordance with this chapter has been utilized and where mitigation is carried out in accordance with the standards in the section. Mitigation for any alteration to a Category III wetland must be provided at a ratio of 2:1 for creation or re-establishment, 4:1 for rehabilitation and 8:1 for enhancement alone. g. Performance security or other assurance devices as described in TMC Section 18.15.210. 3. Mitigation for alteration to a Category IV wetland will be 1.5:1 for creation or re-establishment, 3:1 for rehabilitation or 6:1 for enhancement. Where only a portion of a Category IV wetland is filled, the potential functionality of the remaining reduced wetland must be considered in mitigation planning. 3=4. Mitigation for alteration to wetland buffers will be 1:1. 2) The following shall be considered the minimum performance standards for approved wetland alterations: a. Wetland functions improved over those of the original conditions. b. Hydrologic conditions and hydroperiods are improved over existing conditions and the specific hydrologic performance standards specified in the approved mitigation plan are achieved. c. Acreage requirements for creation, re- establishment, rehabilitation or enhancement and for proposed wetland classes are met. d. Vegetation native to the Pacific Northwest is installed and vegetation survival and coverage standards over time are met and maintained. e. Habitat features are installed, if habitat is one of the functions to be improved. f. Buffer and bank conditions and functions exceed the original state. 3)Maintenance and monitoring of mitigation shall be done by the property owner for a period of no less than five years and for ten years when the mitigation plan includes establishing forested wetland and/or buffers. Maintenance shall be carried out in accordance with the approved mitigation plan. Monitoring reports must be submitted to the City for review with the frequency specified in the approved mitigation plan. mitigation to a wetland mitigation bank using the criteria in 4.a. through 4.f. below. The Director must determine at *rove the number of wetland mitigation bank credits required to meet the mitigation ratios established in TMC Chapter 18.45. Off site mitigation is proposed in a wetland mitigation bank that has been approved by all appropriate agencies, The proposed wetland alteration is within the designated service area of the wetland bank; and The applicant provides a justification for the number of credits pr I_ ed; and The mitigation achieved through the number of credits required meets the intent of TMC Chapter 18.45; and 61 Page 18 of 41 has boon removed from the bank, D. NE7IANDAND BUFFER MITIGATION LOCATION. 1. In instances where portions of a wetland or wetland buffer impacted by development remain after buffer averaging, mitigation for buffer impacts shall be provided on -site, if feasible. Where an essential public road, street or [ight'0f-vvuyoressential public ud|ih/ Cannot ovoid reducing a buffer by more than 50%a|terations. 8d&ke� buffer enhancement must be carried out at other locations around the impacted wetland. 2. On -site mitigation for wetland impacts shall bo provided, except where the applicant can demonstrate o. On -site wetland mitigation in not scientifically fpoSib|O duo to pmb|0nS with hydrology, soils, waves or other factors; or b. Mitigation is not practical due to potentially adverse impact from surrounding land uses; or o. Existing functions created at the site of the proposed restoration are significantly greater than lost wetland functions . or ' d. Regional goals for flood storage, flood conveyance, habitat or other wetland functions have been established and strongly justify location of mitigation at another site. 3. Purchase of mitigation credits through mitigation banks and in lieu fee programs is preferred over permittmeresponsible offsite mitigation. 4. The Community Development Director may approve, through a Type 2 decision, the transfer of wetland mitigation to a wetland mitigation bank or in -lieu fee program using the ch&aha in 3.a. through 31 below, Wetland mitigation bank credits shall be determined by the certified midqGtiOnbanking Orin-lieu fee inStnument' a.Off-site mitigation in proposed in a wetland mitigation bank that has been approved by all appropriate 80enCi83, indudin0 the Department of ECo|00y, Corps of Engineers, EPA and certified under state rules; and UThe proposed wetland alteration is within the designated service area 0fthe wetland bank; and c. The applicant provides a justification for the number of credits proposed; and d. The mitigation achieved through the number ofcredits required meets the intent OfTKXC Chapter 10.45; and e3ho Director bases the decision onawritten staff report, ev8|uaUnq the 9qVivo|onDo of the lost wetland functions with the number Ufwetland credits required; and fThe applicant provides a copy of the wetland bank ledger demonstrating that the approved number of credits has been removed from the bank. 5.Where off -site mitigation location is proposed it shall comply with the followinq criteria� a.MitigatioOsites located within the Tukwila City limits 8repreferred, b.K8iUqadnnbank orin-lieu fee option isnot feasible. C.The proposed mitigation will not alter Vrincrease buffers onadjacent properties without their permission. L H8wever.t 0Jh8Director may approve offsite mitigation sites outside the city upon finding that: UAU8qu3V3 088Su[8S have been taken to 8OSU[8 the OOO'd8v8|0p08OtGOd |OOg-t80n viability of the 0iUg8UOn site; and 0Ad8qu3V8coordination with the other affected local jurisdiction has occurred. �iLCiUnso|8cdng nsib|goffsite mitigation sites, applicants shall select 8site iO @ location where the targeted functions can rR8SOn3b|y be performed and sustained and Sh8U pursue sites inthe following order 0fpreference: Sites within the immediate drainage SUb'b8Sin; Sites within the next higher drainage Sub'b8SiO;and Sites within Gr88n/DUw3miShRiver basin. Page 19 of 41 E. MITIGATION TIMING — Mitigation projects shall be completed prior to activities that will permanently disturb wetlands and either prior to or immediately after activities that will temporarily disturb wetlands. Construction of mitigation projects shall be timed to reduce impacts to existing wildlife, flora and water quality, and shall be completed prior to use or occupancy of the activity or development. The Director may allow activities that permanently disturb wetlands prior to implementation of the mitigation plan under the following circumstances: 1. To allow planting or re -vegetation to occur during optimal weather conditions; 2. To avoid disturbance during critical wildlife periods; or 3. To account for unique site constraints that dictate construction timing or phasing. (Ord, 2301 §1 (part), 2010) F. WETLAND MITIGATION PLAN CONTENT. 1. The mitigation plan shall be developed as part of a critical area study by a qualified professional. Wetland and/or buffer alteration or relocation may be allowed only when a mitigation plan clearly demonstrates that the changes would be an improvement of wetland and buffer quantitative and qualitative functions. The plan shall show how water quality, habitat, and hydrology would be improved. 2. The scope and content of a mitigation plan shall be decided on a case -by -case basis taking into account the degree of impact and the extent of the mitigation measures needed. As the impacts to the critical area increase, the mitigation measures to offset these impacts will increase in number and complexity. 3. For wetlands, the format of the mitigation plan should follow that established in Wetland Mitigation in Washington State, Part 2 — Developing Mitigation Plans (Washington Department of Ecology, Corps of Engineers, EPA, March 2006 or as amended). 4. The components of a complete mitigation plan are as follows: a. Baseline information of quantitative data collection or a review and synthesis of existing data for both the project impact zone and the proposed mitigation site. b. Environmental goals and objectives that describe the purposes of the mitigation measures. This should include a description of site selection criteria, identification of target evaluation species and resource functions. c. Performance standards of the specific criteria for fulfilling environmental goals and for beginning remedial action or contingency measures. They may include water quality standards, species richness and diversity targets, habitat diversity indices, or other ecological, geological or hydrological criteria. d. A detailed construction plan of the written specifications and descriptions of mitigation techniques. This plan should include the proposed construction sequence, construction management and tree protection and be accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. e. A monitoring and/or evaluation program that outlines the performance standards and methods for assessing whether those performance standards are achieved during the specified monitoring period, at least 5 years. At a minimum, the monitoring plan should address vegetative cover, survival, and species diversity. Any project that alters the dimensions of a wetland or creates a new wetland shall also monitor wetland hydrology. An outline shall be included that spells out how the monitoring data will be evaluated by agencies that are tracking the mitigation project's progress. f. Contingency plan identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards have not been met.. q. Performance security or other assurance devices as described in TMC Section 18.45.210. 18.45.100 Watercourse Designations, Ratings and Buffers A. WATERCOURSE RATINGS. Watercourse ratings are consistent with the Washington Department of Natural Resources water typing categories (noted in parentheses after each categoryWAC 222-16-030) or as amended, which are based on the existing habitat functions and are-ratclassified as follows: 1. Type 1 (S) Watercourse: Watercourses inventoried as Shorelines of the State, under RCW 90.58. These watercourses shall be regulated under TMC Chapter 18.44, Shoreline Overlay. 2. Type_ 2 (F) Watercourse: Those watercourses that are known to be used by fish or meet 63 Page 20 of 41 the physical criteria to be potentially used by fish (as established in WAC 222-16-031(3) or as amended) and that have perennial (year-round) or seasonal flows. 3. Type 3-(Np) Watercourse: Those watercourses that have perennial flows and do not meet the criteria of a Type F stream or have been proven not to contain fish using methods described in the Forest Practices Board Manual Section 13. 4. Type /1 (Ns) Watercourse: Those watercourses that have intermittent flows (do not have surface flow during at least some portion of the year) .• ,..do not meet the physical criteria of a Type F watercourse; or have been proven to not support fish using methods described in the Forest Practices Board Manual Section 13. B. WATERCOURSE BUFFERS — Any land alteration must be located out of the buffer areas as required by this section. Watercourse buffers are intended in general to: 1. Minimize long-term impacts of development on properties containing watercourses; 2. Protect the watercourse from adverse impacts during development; 3. Preserve the edge of the watercourse and its buffer for its critical habitat value; 4. Provide shading to maintain stable water temperatures and vegetative cover for additional wildlife habitat; 5. Provide input of organic debris and uptake of nutrients; 6. Provide an area to stabilize banks, to absorb overflow during high water events and to allow for slight variation of aquatic system boundaries over time due to hydrologic or climatic effects; 7. Reduce erosion and increased surface water runoff; 8. Reduce loss of, or damage to, property; 9. Intercept fine sediments from surface water runoff and serve to minimize water quality impacts; and 10. Protect the sensitive ar ocritical area from human and domestic animal disturbance. An undisturbed and high quality sensitive areacritical area or buffer may substitute for the yard setback and landscape requirements of TMC Chapter 18.50 and 18.52. C. WATERCOURSE BUFFER WIDTHS — The following buffer widths, measured from the Ordinary High Water Mark (OHWM), apply to each side of a watercourse. If the OHWM cannot be determined, then the buffer will be measured from the top of bank: 1. Type 1--(S) Watercourse: Regulated under TMC Chapter 18.44, Shoreline Overlay. 2. Type 2 (F) Watercourse: 100-foot-wide buffer. 3. Type 3-(Np) Watercourse: Standard 80-foot-wide buffer:; alternate buffer in the 50-65 range allowed with buffer enhancement. 4. Type A (Ns) Watercourse: 50-foot-wide buffer. D. BUFFER SETBACKS — 1. All commercial and industrial buildings shall be set back 15 feet and all other development shall be set back 10 feet. Building setbacks shall be measured from the foundation to the buffer's edge. Building plans shall also identify a 20-foot area beyond the buffer setback within which the impacts of development will be reviewed. 2. The Director may waive setback requirements when a site plan demonstrates there will be no impacts to the buffer from construction or occasional maintenance activities (see TMC Figure 18-2). E. VARIATION OF STANDARD WATERCOURSE BUFFER WIDTH — provided the remaining buffer is enhanced in accordance with an approved buffer enhancement plan, prepared by �0 Page 21 of 41 enhancement can boimplemented without destabilizing the slope. The approved buffer width shall not result in greater than a5O% reduction inwidth. Any buffer reduction proposal must demonstrate 0zthe Satisfaction ofthe u. The buffer is vegetated and includes on on site buffer enhancement plan prepared bva qualified if there is no signifiGant vegetation iR the buffer, a buffer may be redUGed only if an OR Site bUffeF least five years 0OOhOhnqwill bCrequired. 1 Buffer averaqing may be allowed by the Director on a TvVo 2 permit if either of the foUowinq (o) or (b) app|y. and 30 |onq as the total area of the buffer after gv8raqinq is equal to the area n8qUinBd without averaging and the buffer atits narrowest point isnever less than either 1/4ufthe required width, a. The watercourse has significant differences in chGn]Ct8hSUCS that affect its habitat functions, and the buffer isincreased adjacent hothe higher -functioning amaofhebitatormnre'oensidvoportionofthewnMmnd and decreased adjacent hothe lower -functioning orless-sensitive portion aSdemonstrated byacritical areas report from qualified wetland professional. b.There are no feasible alternatives to the site desiqn that could be accomplished without buffer averaging, and the averaged buffer will not result in degradation of the wetland's functions and values as demonstrated by@critical areas report. C.Compliance with midq@ti0nsequencing requirements. d. Compliance with TMC 10.45 Vegetation Protection and Management section. 8.Submittal Ofbuffer enhancement plan, mitigation monitoring and maintenance plan along with financial Ouan]nhae|naccordance with TK8C18.45. 2. Interrupted Buffer: Waiver for interrupted buffer may beallowed bythe Director as8Type 2 permit if it complies with the followinq: i) The buffer isinterrupted by3paved public O[private road; leq3|lyconstructed buildings; Or |eqa|ly approved parking lots. This waiver does not apply to accessory structures such as sheds and O@raqes. ii) The exisdmlIeq@|improvement creates 8substantial barrier 03the buffer function; iii) The interrupted buffer does not provide additional protection of the ChdC8| area from the proposed development; and iv) The interrupted buffer does not provide SiOnificant hydm|OOica|, water quality and wildlife functions.This waiver does not apply if large trees or other siqnificant native vegetation exists, v)Enhancement ofremaining buffer iSrequired iffeasible. 2. IBuffers for all types of watercourses will beincreased when they are determined tob8particularly sensitive 65 Page 22 of 41 to disturbance or the proposed development will create unusually adverse impacts. Any increase in the width of the buffer shall be required only after completion of a watercourse study by a qualified +atist professional or expert that documents the basis for such increased width. An increase in buffer width may be appropriate when: a. The development proposal has the demonstrated potential for significant adverse impacts upon the watercourse that can be mitigated by an increased buffer width; or b. The area serves as habitat for endangered, threatened, sensitive or monitor species listed by the federal government or the State. plan approved by the Director. Enhancements will ensure that slope stability and watercourse quality will be community of native northwest species that are appropriate for the specific site as determined by the Director. If the dies, then the applicant for a permit must replace existing vegetation along watercourses with comparable specimens, approved by the Director, that will restore buffer functions within five years. 4. The Director shall require subsequent corrective actions and long term monitoring of the project if adverse impacts to regulated watercourses or their buffers are identified. (Ord, 2301 §1 (part), 2010) 18.45.110 Watercourse Alterations and Mitigation A. WATERCOURSE ALTERATIONS. No use or development may occur in a watercourse or its buffer except as specifically allowed by TMC Chapter 18.45. Any use or development allowed is subject to the standards of TMC Chapter 18.45. B. ALTERATIONS. Piping, dredging, Ddiverting or rerouting may only occur with the permission of the Director and subject to mitigation sequencing; an4 approved mitigation plan; and the following crietria:: 1 'tat, or is necessary for the life cycle or spawning of salmonids, shall not be rerouted unless it can be shown that the habitat will be improved for the benefit of the species.Any watercourse alteration shall comply with the standards in current use and the standards of the Washington Department of Fish and Wildlife in the "Water Crossing Design Guidelines" manual (2013 or as amended). 2 Any watercourse alteration shall not cause adverse impacts to fish, confine the channel or floodplain, or adversely affect riparian habitat (including downstream habitat). 3 1 Maintenance dredging of watercourses shall be allowed only when necessary to protect public safety structures and fish oassaae and shall be done as infreauently as oossible. Lona-term solutions such as stormwater retrofits are oreferred aver onaoina maintenance dredaina.: 4 2 watercourse. 5 At construction shall be designed to have the least adverse impact on the watercourse, buffer and surrounding environment. Construction shall minimize sedimentation through implementation of best management practices for erosion control. 6 All watercourse alterations shall be carried out or constructed during periods of low flow, or as specified by the State Department of Fish and Wildlife in accordance with an approved Hydraulic Project Approval (HPA). 3 Stormwater runoff shall be detained and infiltrated to preserve the existing hydrology of the 47 A watercourse may be rerouted or day -lighted as a mitigation measure to improve watercourse function. 8 As a condition of approval, the Director may require water quality monitoring for stormwater Page 23 of 41 discharges to Str880S' and additional treatment Ofst0Onw8te[if water quality standards are not being met. 59 Permanent piping 0fany watercourse should be avoided. Relocation of watercourse or installation of bridge is preferred to piping. If piping occurs in a watercourse nonnbivn er ohUca| area, it shall be limited to fequirements the deqree necessary for stream crossings for access and shall require approval of the Director. The criteria for approval is: a. Piping of Type 1 S watercourses shall not be b� Piping may be allowed in watercourses if it is necessary for access purposes. In all watenmursoo, hmust Ue demonstrated that the piping will not cause adverse impacts to fish, confine the channel or800dp|ain. orooha an mnUv point for mad run off, create downstream scouring, cause erosion or sedimentation, i g , J I hall be performed pursuant to the f0IlGWiRg appliGable stand _/1\. The conveyance system shall bedesigned tocomply with the standards incurrent use and and Wildlife in the "Design of Read Gulveqs for Fish Passage" MaRYal (2003 or as amended). (2a4-). Where allowed, piping shall be limited to the shortest length possible as determined by the Director 0oallow access onto eproperty. b) VVh8n2 water is piped for an 8CCSSS point, those driveways or entrances shall be C0nSO|id8tSd to SemS multiple properties vvhSr8 pOSSib|8' and to minimize the length Of piping. o\ Piping shall not create an entry point for rood runoff, create downstream soour, or cause erosion or sedimentation d When required by the Director, watercourses under drivable nurfzoon nhoU be contained in an arch culvert using oversize orsuper span culverts for rebuilding of oahuombod. Thooz shall be provided with GheGk dams to redUGe flows, and shall be replanted and enhaRGed aGGoFdiRg to a plan approved bythe Director. d\ All watercourse nn3aaingo Sho|| be de Signed to accommodate fish paaSage, unless technically not feasible. e)d) Water quality must b8@Sgood 0[better for any water exiting the pipe 8Sfor the water entering the pipe, and flow must becomparable. o. All unnctruudon shall be designed to have the |Qo-.tadverse impact nnthe watercourse, buffer and surrounding environment. f. All piping er ether alteFatieRs shall be Garried Gut OF GeRStrUGted duFing perieds of lew flow, or as specified by the State Department Of Fish and Wildlife in 8CcOndanC8 with an approved Hydraulics PormitHydrouUcPmient Appmva|(MP8). g. OR properties being developed oF redeveloped, or when stFeam GFossiRgs in pub!;G oF pFivate- hghinofway are being vnp|ooad, existing culverts that carry fi:hbeahng watercourses n/those that could bear upgraded to meet the standards in the VVDFVVmanual "Design OfRoad Culverts for Fish Passage" (2003 or as updated) if technically feasible. C. MITIGATION PLAN CONTENT. All impacts ho@water course that degrade the functions 0fthe watercourse. cxits buffRr shall be avoided. If alteration to the watercourse or buffer is un3v0id3ble. all 8dvCoC impact. - resulting plan 8ndescribed below. 1 Mitigation plans shall be completed for any proposals of dnadging, fiUing, diwerting, piping and 67 Page 24 of 41 rerouting ofwatercourses orbuffer impacts and shall bo developed aspart ofasensitive area study bvospecialist approved by the Director. The plan must show how water quality, tneohnont, amskm nontrd, pollution reducUnn, wildlife and fish habitat, and general waterGouFse quality would beimpreved. the degree of impact and extent of mitigation measures needed. As the impacts to the watercourse Or its buffer increase, the mitigation plan huoffset these impacts will increase inextent and complexity. 3 The components of e complete mitigation plan are as follows: o. Baseline information including existing vvotorcnuoo conditions such as hydrologic patterns/flow Fates, stream gFadieRt, bank full width, stream bed baRk Gend'fiens, fish and ether wildlife use, !R stream struGtijFes, riparian GeRditiens,- by#er GhaFaGteFiGt'GS, water quality, fish barriers and other relevant information, b. Environmental goals and objectives that describe the purposes of the mitigation measures. This should include o description of site :n|n:hnn critcriz, identification oftarget evaluation species and functions. action orcontingency m sure-,. Pcdhrmonno standards may include water quality StundorUs, species richness and diversity targets, habitat diversity indices, cr UonOffish habitat, orother ecological, geological orhydrological oh0aha. This plan should include the proposed construction sequence and construction monagemnnt, and be accompanied by detailed site diagrams and bluep,"Is that are an 'RtegFal FequiFement of aRy de_1Y1e_lAp ....... ­nnnni o. Monitoring and/or ovo|un8On program that outlines the approach for a°.oSsing a completed project. At least five Vears of monitoring is reguired. An outline shall be included that spells out how the monitoring data will be evaluated by agenGieS that are traGkiRg the mitigation prejeGt'S pF9G_8S_'. PGF PFOjeGtS that disGhaFg-e sh}rmweUarhnostream, the Director may require water quality monitoring. f. GOntingeRGY plan identifying potential GeyFses ef aGtion and any GerreGtive measures to be taken when monitoring or evaluation indicates project performance standards have not been met. g. Performance -security nrother assurance devices oSdescribed inT[NCSection 18.15.21O. g�.M/TIGATIgN STANDARDS- 1 The Washington "Stream -.here Program, Washington Department of Ecology, US Fish and Wildlife 8e,ving' Washington Department of Fish and VVi|d|ifn, 2004 Or as amended) shall be used GS QCStAvJi|ob|V Science for the development of watercourse and buffer mitigation technique&7 21 The h>||OwiOg Sh8|| be C0OSidSP8d the 0iOi0unl standards for approved Stn88ma|teratiOnS0iUqGd0n projects: 8. Maintenance or improvement Ofstream channel habitat and dimensions such that the fisheries habitat functions Ufthe compensatory stream reach meet 0[exceed that 0fthe original stream; b. Bank and buffer configuration n2Sh}red to an enhanced state; C. Channel, bank and buffer areas replanted with native vegetation that improves upOn the original condition inspecies diversity and density; d. Stream channel bed and biOfi|h8dOn systems equivalent 03 (in the c3S8 Of public drainage 03iOV3n3OCS projects) and better than (in the C8Se of other kinds of projects) in the OhgiO8| St[880 (in the case Of other kinds ofprojects); 8. Original fish and wildlife habitat 8Oh8OC8d uO|SSS technically not feasible. 32 Relocation Of8watercourse shall not result inthe new SEmsi§ve @neaCriUoo|area Orbuffer extending beyond the development site and On0D adjacent property without the written agreement of the affected property UvvO8nS. E—.Q.MIT7GAT7O/V TIMING — Department Of Community Development -approved plans must have the mitigation construction completed before the existing watercourse can be modified. The Director may 8Umw 8StiYiUOS that p8nn8n8nUy disturb 8watercourse prior U}implementation Ofthe mitigation plan under the following circumstances: Page 25 of 41 To allow planting Or to occur during optimal weather conditions; or To avoid disturbance during critical wildlife periods; or TO account for unique site constraints that dictate construction timing or phasing. E. MITIGATION PLAN CONTENT. All impacts to a water- course 1hatdeqrade the functions of the watercourse or its buffer shall be avoided. If alteration to the watercourse or buffer is unavoidable, all adverse impacts resultinq from g development p0pOS8| or alteration Sh8U be miUqat8d in accordance with an approved miUA8tiOn plan 83 described below. 1. Mitiqation plans shall be completed for any proposals of dredqinq, fillinq, divertinq, pipinq and reroutinq of watercourses or buffer impacts and shall be developed as part of a critical area study by 8 qualified professional. The plan mVS1 show how water quality, treatment, erosion COnt0|, pollution nuduCUOn, wildlife and fish h8bitgt, and q9n8n8| woh3rCVVnS8 quality would be improved. 2. The scope and content 0famiUg3UOnplan shall bedecided 0n8C3S8'by'CaSebasis h8kin0into account the deqnae ofimpact and extent ofmitigation measures needed. As the impacts to the watercourse or its buffer increase, the mitigation plan b]offset these impacts will increase inextent and complexity. 3. The components 0f8complete mitigation plan are 8Sfollows: a. Baseline information including existing watercourse conditions such as hvdm|oqic patterns/flow n]03S. stream Or8di8nt, bank full width. stream bed COndi1iVnS, bank conditions, fish and other wildlife use, in -stream otmctures, riparian conditions, buffer characteristics, water quality, fish barriers and other relevant information. b. Environmental UU8|S and 0bi8CUv8S that describe the purposes of the mihqaUOn measures. This should include a description of site selection criteria, identification of target evaluation species and functions. C. Performance standards for fu|O||inq8nvi' 0nmenC3|VV8|Sand objectives and for thqq8hnqremedial action or contingency measures. Performance standards may include water quality standards, species richness and diversity targets, habitat diversity indices, creation of fish habitat, or other ecoloqical, qeological or hVdroloqical ohtnho. d. Detailed construction plan of the written specifications and descriptions of mitigation techniques. This plan should include the proposed construction sequence and construction management, and be accompanied by detailed site diaqrams and blueprints that are an inteqral requirement of any development proposal. e. MnniO3hnqand/or evaluation prOqnGmthat outlines the approach for anoessinqocompleted project. At least five years of monitorinq is required, An outline shall be included that spells out how the monitorinq data will beevaluated byaqencieothat are traokinq the miUqaUnn0rOi8nt'sprocess. For projects that disch8nlesU}rmwaher to o stream, the Director may n8qVim water quality monihohnq. t COnUOq8nCy plan identifying 0O03OU8| courses of action and any corrective measures to be taken when monitorinq or evaluation indicates project performance standards have not been met. O. Performance security Urother assurance devices GSdescribed iOTK8CSection 18.4521O. KJmi 2301 §Y(pa/V 2010 18.45.100 Areas of Potential Geologic Instability Designation, Rating and Buffers A. DESIGNATION — PV0onU8| areas ofOeO|OOiC instability include areas of pUh3nU8| erosion and landslide hazards. Areas Ofpotential geologic instability are classified 8Sfollows: 1. C|8SS 1 area, where landslide potential islow, and which slope iSless than 15%; 2. C|8SS 2 808S. where landslide potential is modemte, which slope is between 15%and 4O%. and which are uOd8[|8iO bvrelatively permeable soils; 3. C|8SS 3 808G. where landslide potential is high, which include areas sloping between 15% and 4OY6.and which are underlain byrelatively impermeable soils Orbybedrock, and which also include all areas sloping more steeply than 4O%; 4. Class 4 areas, where landslide potential is very high, which include sloping areas with mappable zones 69 Page 26 of 41 of groundwater S8Op8gB' and which also include existing mappable landslide deposits regardless Ofslope; B. MappiMq. 1. The approximate location, extent, and d88iqn8d0n 0fareas Ofpotential qeO|VOic instability are depicted in the Qh/s Sensitive Areas Map, Actual boundaries and designations shall be determined bvoqualified professional Onasite-specific basis. 2. In addition VDthe Qty'S Sensitive Areas Map. 1h8fOUmwinq publicly available m8ppinq information may bnused hudetermine appropriate designations: o. For historic landslides, areas designated as quaternary slumps, earthflows, mudflows, or landslides on maps published by the U.S. Geoloqical Survey or the WDNR Division of Geoloqy and Earth Resources, b. FVrpot8nU8|OrhiStOhC|andS|id8S.thOS8an3aSm8p0edbyVh9VVDNR(S|O08St3bi|itymapVinn)aSVn3tgb|8(UVr class 3), unstable old slides (UOG nrclass 4). or unstable recent slides (UR8 or class 5); C. For soil characteristics, the U.S. Department of Aqriculture's Natural Resources Conservation Service (NRCS) Official Soil Survey Data; and d� For general instability, those areas mapped bythe NRCSaSh8vinq asignificant limitation for bui|dinqsite development. C� 8UFFE0S- 571. The buffers for 8rS8S Of potential g8O|OgiC instability are intended to: a. Minimize long-term impacts of development on properties containing sensitive areacritical areas; b. Protect Sf**s&-f�CridC8|areas from adverse impacts during development; C. Prevent loading of potentially unstable S|Op8 f0r08U0nS; d. Protect slope stability; 8. Provide erosion control and attenuation of pre- cipitation surface water and stormwater runoff; and L Reduce loss nfnrdamage 0nproperty. UNC Section 18.50and 10.52, development proposal containing Orthreatened bv Gnarea Of potential geologic instability Class 2[x higher shall be subject to 8 g8OteChOicQ| report pursuant to the requirements Of TIVIC Chapter 10.45.040 C' and 1845.060. The geot8chnic8| report shall analyze and make recommendations on the need for and width of any setbacks or buffers O8C8SS8ry 03 achieve the gO8|S and r8quinB08OtS Of TK4C Chapter 1845. D8m8|Op08Ot proposals shall then include the buffer distances 8Gdefined within the geot8ChniS8|report. C,EJSufferS may be increased by the Director when an 3rJ is determined to be particularly sensitive to the disturbance created by a development. Such a decision will be based on a City review of the report as prepared byaqua|ifiadOaoteohnioa| engineer and byasite \isit. (On!23V8§49,2012;Ord. 23OY§Y(nord,20/N 18.45.130 Areas of Potential Geologic Instability Uses, Exemptions, Alterations and Mitigation. A. GENERAL — The uses permitted iOthe underlying zoning district may b8undertaken OOsites that contain areas Of pVt8nU@| g8O|VgiC instability SVN8ct to the standards of this section and the recommendations of geOt8ChniC8|StUdy. B. EXEMPTIONS — The following areas are exempt from regulation as geologically hazardous areas: 1. Temporary stockpiles of topsoil, gnGv8|, beauty bark Orother similar landscaping or construction 03t8h8|S� ' 2. Slopes related UJ m8t8h8|S used as an engineered pre -load for a building pad; permit may be re graded without application 8fTIVIC Chapter 18A5under 3n approved permit; 43]7O8Uw8y embankments within right-of-way or 08d easements; and 5.4 Slopes retained bvapproved engineered structures. C. ALTERATIONS— Page 27 of 41 demonstrate one of the following: a. There is no evidence of past instability or earth movement in the vicinity of the proposed development, and where appropriate, quantitative analysis of slope stability indicates no significant risk to the proposed development or surrounding properties; or b. The area of potential geologic instability can be modified or the project can be designed so that any potential impact to the project and surrounding properties is eliminated, slope stability is not decreased, and the increase in surface water discharge or sedimentation shall not decrease slope stability. 2. Where any portion of an area of potential geologic instability is cleared for development, a landscaping plan for the site shall include tree replanting with an equal mix of evergreen and deciduous trees, shrubs and groundcovers, preferably native, and approved by the Director. Replacement vegetation shall be sufficient to provide erosion and stabilization protection. 3. Critical facilities shall not be sited within or below an area of potential geoloqic instability unless there is no practical alternative (demonstrated by the applicant) 4. Land disturbing activities in an area of potential geoloqic instability shall provide for storm water quality and quantity control, including preparation of a TESC and permanent drainage plan prepared by a professional engineer licensed in WA. 5. Unless otherwise provided or as part of an approved alteration, removal of vegetation from an area of potential geoloqic instability or its buffer shall be prohibited. When permitted as part of an approved alteration, vegetation removal shall be minimized to the extent practicable 6. Surface drainage, including downspouts, shall not be directed across the face of an area of potential geologic instability; if drainage must be discharged from the top of a hazard to its toe, it shall be collected above the top and directed to the toe by tight line drain, and provided with an energy dissipative device at the toe for discharge to a swale or other acceptable natural drainage areas 7. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography (minimize grading/cut & fill to amount necessary) The proposed development shall not result in greater risk or a need for increased buffers on neighboring properties D. DISCLOSURES, DECLARATIONS AND COVENANTS 1. It shall be the responsibility of the applicant to submit, consistent with the findings of the geotechnical report, structural plans that were prepared and stamped by a structural engineer. The plans and specifications shall be accompanied by a letter from the geotechnical engineer who prepared the geotechnical report stating that in his/her judgment the plans and specifications conform to the recommendations in the geotechnical report, the risk of damage to the proposed development site from soil instability will be minimal subject to the conditions set forth in the report, and the proposed development will not increase the potential for soil movement. 2. Further recommendations signed and sealed by the geotechnical engineer shall be provided should there be additions or exceptions to the original recommendations based on the plans, site conditions or other supporting data. If the geotechnical engineer who reviews the plans and specifications is not the same engineer who prepared the geotechnical report, the new engineer shall, in a letter to the City accompanying the plans and specifications, express his or her agreement or disagreement with the recommendations in the geotechnical report and state that the plans and specifications conform to his or her recommendations. 3. The architect or structural engineer shall submit to the City, with the plans and specifications, a letter or notation on the design drawings at the time of permit application stating that he or she has reviewed the geotechnical report, understands its recommendations, has explained or has had explained to the owner the risks of loss due to slides on the site, and has incorporated into the design the recommendations of the report and established measures to reduce the potential risk of injury or damage that might be caused by any earth movement predicted in the report. 4. The owner shall execute a ®hc+°°a® Fe Critical Areas Covenant and Hold Harmless Agreement running with the land on a form provided by the City. The City will file the completed covenant with the King County 71 Page 28 of 41 Department of Records and Elections at the expense of the applicant or owner. A copy of the recorded covenant will be forwarded to the owner. E. ASSURANCE DEVICES — Whenever the City determines that the public interest would not be served by the issuance of a permit in an area of potential geologic instability without assurance of a means of providing for restoration of areas disturbed by, and repair of property damage caused by, slides arising out of or occurring during construction, the Director may require assurance devices pursuant to TMC Section 18.45.210. F. CONSTRUCTION MONITORING — 1. Where recommended by the geotechnical report, the applicant shall retain a geotechnical engineer to monitor the site during construction. The applicant shall preferably retain the geotechnical engineer who prepared the final geotechnical recommendations and reviewed the plans and specifications. If a different geotechnical engineer is retained by the owner, the new geotechnical engineer shall submit a letter to the City stating whether or not he/she agrees with the opinions and recommendations of the original geotechnical engineer. Further recommendations, signed and sealed by the geotechnical engineer, and supporting data shall be provided should there be exceptions to the original recommendations. 2. The geotechnical engineer shall monitor, during construction, compliance with the recommendations in the geotechnical report, particularly site excavation, shoring, soil support for foundations including piles, subdrainage installations, soil compaction and any other geotechnical aspects of the construction. Unless otherwise approved by the City, the specific recommendations contained in the soils report must be implemented by the owner. The geotechnical engineer shall make written, dated monitoring reports on the progress of the construction to the City at such timely intervals as shall be specified. Omissions or deviations from the approved plans and specifications shall be immediately reported to the City. The final construction monitoring report shall contain a statement from the geotechnical engineer that based upon his or her professional opinion, site observations and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical-related permit requirements. Occupancy of the project will not be approved until the report has been reviewed and accepted by the Director. G. CONDITIONING AND DENIAL OF USE OR DEVELOPMENTS- 1. Substantial weight shall be given to ensuring continued slope stability and the resulting public health, safety and welfare in determining whether a development should be allowed. 2. The City may impose conditions that address site- work problems which could include, but are not limited to, limiting all excavation and drainage installation to the dryer season, or sequencing activities such as installing erosion control and drainage systems well in advance of construction. A permit will be denied if it is determined by the Director that the development will increase the potential of soil movement that results in an unacceptable risk of damage to the proposed development, its site or adjacent properties. (Ord. 2301 .§1 (pard, 2010) 18.45.140 Abandoned Mine Areas A. Development of a site containing an abandoned mine area may be permitted when a geotechnical report shows that significant risks associated with the abandoned mine workings can be eliminated or mitigated so that the site is safe. Approval shall be obtained from the Director before any building or land -altering permit processes begin. B. Any building setback or land alteration shall be based on the geotechnical report. C. The City may impose conditions that address site -work problems which could include, but are not limited to, limiting all excavation and drainage installation to the dryer season, or sequencing activities such as installing drainage systems or erosion controls well in advance of construction. A permit will be denied if it is determined that the development will increase the potential of soil movement or result in an unacceptable risk of damage to the proposed development or adjacent properties. D. The owner shall execute a Sensitive Ar aCritical Areas Covenant and Hold Harmless Agreement running with the land on a form provided by the City. The City will file the completed covenant with the King County Division of Records and Elections at the expense of the applicant or owner. A copy of the recorded covenant will be forwarded to the owner. Page 29 of 41 18.45.150 Fish and Wildlife Habitat Conservation Areas Designation, Mapping, UsesGOd Standards A, DESIGNATION — 1. Fish and wildlife habitat conservation areas include the habitats listed below: 8. Areas with which endangered, threatened, and sensitive species have 8primary association; b. Habitats and species of local importance, including but not limited to bald eagle habitat, heron rookeries, mudflats and marshes, and areas critical for habitat connectivity; o. Commercial and recreational shellfish amas� ' d. Kelp and eelgrassbeds; n. K8udflatsand morshos� ' Naturally occurring ponds under 20 acres and their submerged aquatic beds that provide fish 0wildlife habitat; eU. Waters Ofthe State; e. State natural area preserves and natural resource conservation areas; and h-.f.Lakes, ponds, streams, and rivers planted with qame fish by8VVvemm8nta|0rtribal entity i Areas critical for habitat connectivity, 2. Type 8watercourses, including the Gn8en8]uwamiShRiver, are regulated under TIVIC1O.44and not under this section. 3. Wetlands and watercourses are addressed under 1B.45DO0.1B.45.O8O.1O.45.1OOand 104511O.and not under this section, B. MAPPING — 1. The approximate location and extent of known fish and wildlife habitat conservation areas are identified bythe Cib/8 SennidvoAr aCritical Areas Maps, inventories, open space zones, and Natural Environment Background Report. The City designates 1.2.5.5. 7.and 0above onknown fish and wildlife habitats within its current limits. 2. Fish and wildlife habitat GORServation areas Gorrelate GIE)Sely with the areas ideRtified as regulated watercourses and wetlands and their buffers in Tukwila. The Gre*n/Duwamiuh River is recognized as the most SigRifiGarit fish arid wildlife habitat GE)rridor, as well as eff GhaRRel habitat areas GFeated iR the river to impmve salmoR habitat (ShE)WR GR the Sensitive Areas Map) 4R the Shereline jurisdiGtiGR. Gilliam Greek, RiVeFtE)R Greek, Southgate Creek, Johnson Creek, and Hamm Creek (in the north PAA\O|| provide S%|m0niU habitat, In addition, the Native GFE)Wth Pr9teGtiGn Area 'R the Tukwila Seyth pr9jeGt area prevides aR iMpOrtaRt upland wildlife habitat GE)Fridor. Tukwila Pond and its associated wetlands also meet the definition ofa fish and wildlife habitat for waterfowl and other birds during all seasons of the year -.—In addition to the SenSitive AreaCritical areas Maps, the following maps are to be used as 3 guide for the City, but do not provide 8 fiO8| habitat area d8SigO8U0O: 8. VV8ShiOgtOO State Department 0fFish and Wildlife PhOhh/ Habitat and Species K48pS; b. An8d0mOU3 and resident S3|mOnid distribution maps contained in the Habitat Limiting Factors reports for the Green/Duwamish and Central Puqet Sound Watersheds published by Kinq County and the Washington Conservation Commission; and Washington SbtcNOAA Digital Coastal for VV8ShinqtOn 8tateOnd Coastal Zone Management Program, C. DUFFERG-- - 1. Each development proposal on, adi8C8ntto, orwith the potential 03impact aFish and Wildlife Habitat COnS8mHbOO Areas shall have buffers no |CSS than 1OOfeet in width. Sother than w8t|GOdS and w8t9nCUurSHS ShGU besubject 8]ahabitat assessment report pursuant to the requirements of TIVIC Chapter 18.45.040.B and 10A5.00O.The habitat assessment shall analyze and make recommendations 0Othe need for and width Ofany setbacks or buffers necessary to achieve the qoals and requirements of TIVIC Chapter 18.45, with specific consideration of Priority Habitats and Species M8n3qnmont Recommendations from the Washington Department of Fish and Wildlife. R6COnlm8Oded bShGU have buffers shall be O0less than 100feet iOwidth.-- 1 . Buffer reductions approved for an underlying wetland or watercourse shall also apply to the related Conservation Area, 2. Buffers may be increased by the Director when an area is determined to be particularly sensitive tO the disturbance created by8development. Such adecision will bebased on3City review 0fthe report as 73 Page 30 of 41 prepared byaqualified biologist and byasite visit, A"-�D.USES AND STANDARDS Fish and wildlife habitat conservation areas will beregulated through TK8CChapter 18.44. Shoreline Overlay District, and the regulations inTK4C Chapter related to wet!—@nds and waterGouFses. No |u:o regulations apply specifically toConservation Areas. Each U8v8|OVmnnt proposal On. adjacent, or with the pVt8nU8| to impact Fish and Wildlife Habitat Conservation Area that isnot fully addressed under 1O45.O8O.18.45.O90. 1O.45.1OOand 1845.11Oshall be subject tV8habitat assessment report pursuant tOthe requirements OfTIVICChapter 18.45.O4U.Band 18.45D6O. The habitat assessment shall analyze potential impacts tnFish and Wildlife Habitat Conservation Areas and make recommendations to minimize such impacts, with specific consideration of Priority Habitats and Species Manaq8ment Recommendations from the Washington Department OfFish and Wildlife. (Ord, 2301§1/punU, 2010) 18.45.155 Special Hazard Flood Areas A. Roqu|atinns qoveminq Special Hazard Flood 8[83S are found in TK8C Chapter 18.52, HOOd Z0O8 Management and 18.451558. B. Floodplain Habitat ASSeSSm8n1, 1. When development is proposed within a Special Hazard Flood areas-, a floodplain habitat assessment shall be prepared pursuant to the requirements of TIVIC Chapter 18,45.040 B and 18.45.060. 2. The flondnkainhabitat assessment shall address the effects of the development on federally listed salmon, including. but not limited hJthe following: 8. Impervious surfaces, b. F|VOdp|Ginstorage and conveyance, C. F|oodp|ainand riparian vegetation, and d, G0ormwaterdroinaqe. 3 If the floodplain habitat assessment concludes that the project is expected to have an adverse effect on listed species as evaluated under the guidance issued for ESA compliance under the National Flood Insurance P0qram in PVq8tG0und. the applicant shall mitigate those impacts. Such mitigation shall be consistent with, or in addition to, any mitigation required by critical area requlations in Chapter 18.45 TIVIC and shall b9incorporated into the approved project plans. 4. Activities Exempt from F|nOdp|8inHabitat Assessment, AflOOdp|8iOhabitat assessment iSnot required under the foUUwinqcircumstances: 8. Projects that are underqoinq or have undergone consultation with the National Marine Fisheries Service under the Endangered Species Act. b. Repair Orremodeling Of8nexisting structure, ifthe repair O[remodeling iSnot asubstantial improvement. c. Expansion OfanmdStinOstructure that isnOqreaterthan 1Opercent beyond its exisUnOfootprint; provided, that the repairs or nG0Od8|ing is not 8 Subst8OU8| improvement, Or G repair Of substantial d3m3qe. This measurement iScounted cumulatively from September 22. 2011. If the structure is in thHfl00dwmy. there ShGU be On change in the dimensions perpendicular to d. ASUviU8S with the 8o|6 purpose Ofcne8Un0. r9sk}hnO, nrenh3ncinq natural functions provided the activities do not include structures, qrading, fill, or impervious surfaces. Page 31 of 41 6. Development ofopen space and recreational fao|itims, such an parks and troi|s. that do not include Structures, fill, impervious 3udaC83 or removal of more than 5 percent of the native vegetation onthat portion nfthe property inthe requ|a0oryMoodp|ain. t Repair to on -site septic systems provided the qround disturbance is the minimum necessary. q. Other minor activities considered to have noeffect on listed speoien, as interpreted uninq EGA gUidgnC8 iSSU9d by the National Flood |nSUn8nCS P0q,8m in PUq8t Sound and confirmed through City review nfthe development proposal, 18.45.158 Vegetation Protection and Management in Critical Areas and their buffers A.Purpose, Objectives and Applicability. 1Th8purpose Ofthis section is to: a. Regulate the protection of exindnq trees and native vegetation in the uhdca| areas including wmUandn, watercourses, steep slopes and their buffers; b.Establish requirements for removal Ofinvasive plants aithe time Ofdevelopment Vrre-development 0fsites; c Establish requirements for the long-term maintenance ofnative vegetation to prevent establishment ofinvasive species and promote ecosystem processes. 2.The Cit/sgoal isto: G. Preserve as many existing be8S as possible and increase the number Of native tre8S. shrubs and other vecletation in the critical areas because of their importance to a variety of ecosystem functions as listed below: (1)Overhead tree canopy b3provide shade for water temperature control and improve water quality, and increase water recharge (2) Habitat for birds, insects and small mammals; (3)Stabilize steep slopes and reduce erosion; (5) Filterinq of pollutants and slowinq of stormwater prior to it entering the critical area and (5)provide green, natural spaces for the health 0fthe citizens OfTukwila U. In 8ddiUVn, trees and other native v8cletadonare important for aesthetics. It is the Qty'S qOa| that unsightly invasive vegetation, such as N@Ckbe[rieS, be removed from the C[idC8| areas and their buffers and be replaced with native vegetation tOpromote greater enjoyment Ofthe City'Snatural areas. c. The City will provide information and technical assistance to property owners for improvinq vegetation in critical 8nB8S and will work COU8bo[3tive|ywi1h |OC8| Cidz8O O0u0S to assist property owners in the n8mOv@| of invasive veqetation and plantinq of native veqetation, particularly for residential areas. - B.VeqetetionRetention and Replacement. 1. The tree protection and retention requirements and the vegetation management requirements apply to existing uses aSwell GSnew Orre-dev8|OVm9OL 2. N8dveveOo1oUUn in critical areas and their buffers must be protected and maintained. No mmUv3| of native vegetation iSallowed without prior approval bythe City except incases Ofemergency where @nimminent hazard to public life, safety or property exists. Veqetation may be removed from the buffer as part of an enhancement plan approved bythe Director. Enhancements will ensure that slope stability and wetland quality will be maintained or improved, Any temporary disturbance of the buffers shall be replanted with a diverse plant community Ufnative northwest species. 3. |nv8Siv8voqotaUOn (blackberry, ivy. laurel, etc.) may be removed without a permit if removal does not utilize 75 Page 32 of 41 4. Only hazardous or defective treos, as defined in TIVIC 18.00, may be removed from e ohUno| area if threat posed by the tree in imminent. If the hazard is not obvinun, an assessment by a certified professional, an defined in TIVIC 18.00. may berequired by the Director. Dead and hazardous trees should remain standinq or be cut and placed within the critical area 10the extent practicable to maximize habitat, Tree replacement in accordance with this chapter isrequired for any hazardous tree removed from acritical area. 5. In the case of development or re -development, as many significant trees and as much native vegetation as possible are to be retained on a site, takinq into account the condition and aqe of the trees. ASpart Ofproject reviow. the Director of Community Development Or the Board Of Architectural Review may require alterations in the arranqement of buildinqs, parkinq or other elements of proposed development in order to retain siqnificant veqetation. *. TO pnOt6Ci the 8cV|OOiC8| functions that trees, and native v8qet@d0n provide to ChdC8| 8o38s. removal of any Si0nifiConttree Ornative v8qet8UVnin8critical area nrits buffer requires 8Critical Area Tree Removal and V8Q8t8dOn Clearing Permit and is generally only allowed on ni0oo underqoinq development orro'devo|npmenL Only trees that interfere with access and passage onpublic trails ortrees that present animminent hazard UJexistinqstructures nrthe public maybe removed from sites without an issued building permit or Federal approval. Factors that will beconsidered inapproving tree removal include but are not limited to: tree condition and health, age, risks tostructures, and potential for root or canopy interference with utilities, 7.Priortoany tree removal or site clearing unless bis part ofSpecial Permission approval for interrupted buffer, buffer averacling or other critical areas deviation, a Type 2 Critical Area Tree Removal and Veqetation Clearing Permit application must be submitted to the Department of Community Development (DC[) containing the following information: a. Avmqetadon survey on o site plan that shown the diameter, species and location of all significant trees and all existing native vegetation. b.Asite plan that shows trees and native veqetation to be retained and trees to be removed and provides a table showing the number nfsiqnifioont trees 0oberemoved and the number nfreplacement trees required. C.Tree protection zones and other measures 03protect any trees O,native veqet3d0nthat are 1Vb8retained for sites undergoing development orro'dowa|o0menL d. Location of the OHWM, stream buffer, wetland, wetland buffer, steep slope or any other critical areas with their buffers, S. A landscape plan that shows diametor, species nome. S0acinq and p|onUnU location for any required replacement trees and other proposed vGq8i8ti0D. f. An arborist evaluation justifying the removal of hazardous trees if required by DCD. q.AUapplication fee per the current Land Use Permit Fee resolution. 8.VYh8n8 pe[nnitted, siqnifiC8Ottn88S that are R)nOOved from ChbC8| areas 8h8U be n8p|8Ced pursuant to the tree replacement requirements shown below, up to G density of 100tmes per acre (inC|Udinq oxistinq trees). The Director may require 8ddiU0D8| trees or shrubs to be iOS18UeU to nOidq8te any p0tBOdG| impact from the |OSS of this v8g8t8U0D ao8result Ufnew development. Tree Replacement Requirements Diameter* nfTree Removed (°meosured Number of Replacement Trees atheightu|4.5feet from the Umund) Required 4Ginches (ainq|etrunk); 3' 2inches (any trunk ofomulti-trunk tree) Over 8inchos 4- Over 8 20inohoa 8- Over 20inches 8- 9.The Property owner is required toensure the viability and long-term health of vegetation planted for replacement or mihqoUon through proper care and maintenance for the life of the project MiticlaUon or restoration projects that fail Page 33 of 41 to meet pre -determined performance standards must be nap|onhad in the next appropriate season for planting or per requirements Ofapproved K8iti0aUUnPlan. 1O,|fall required replacement trees cannot be reasonably accommodated on the site, the applicant shall pay into atree replacement fund. The fee shall bedetermined onanannual basis aopart ofthe Fee resolution. 11.D88dOrdVinq trees located within aOf8critical area 0rits buffer shall b8left inplace 8uwildlife Snaq3.unless they present a hazard to ntmcturen, facilities or the public. Dead or dying trees within developed or landscaped areas shall bareplaced 1:1 inthe next appropriate season for planting. 12Topping of trees is prohibited and will be rnOu|ahad an removal with tree replacement required. 13Tr8Hs may only be pruned to lower their h8iVhtto prevent interference with an overhead uU|i1V line with prior approval by the Director as part of Type 2 critical area tree permit. The pruninq must be carried out under the direction of a Qualified Tree Professional or performed by the utility provider under the direction of a Qualified Tree Professional. The crown shall b8maintained 10atleast 2/3the height 0fthe tree prior 0Jpruning. CTree Protection All trees not proposed for removal aSpart [f a project ordevelopment shall b8protected using Best Management Practices and the standards below, 1.The Critical Root Zones (CRZ)for all trees d83iqn8tedfor retention, Unsite Or0nadjacent property aSapplicable, shall be identified on all construction plans, includinq demolition, grading, civil and landscape site plans. 2. Any n]Ot5 within the CRZ exposed Uuhnq construction Sh8U be covered immediately and kept moist with appropriate materials. The City may require a third -party Qualified Tree Professional to review long-term viability of the J. Physical barriers, such as 6-foot chain link fence or plywood Orother approved equivalent, shall be placed around each individual tree orqmupinQatthe CRZ. 4. Minimum distances from the bunk for the Physical barriers ShgU be based On the approximate age of the h88 (height and canopy) asfollows: n,Young trees (trees which have reached less than 2O%nflife expmntancv:U.75per inch oftrunk diameter. b. Mature trees (trees which have reached 2O'8OY6Oflife 8xp8ct8ncy):1foot per inch 0ftrunk diameter. o. Over mature trees (trees which have reached greater than 80% of life expectancy): 1.5 foot per inch of trunk diameter. 5. AJhumaUwa protection methods may be used that provide equal or qr8ater tree protection if approved by the Director. 0.Aweatherproof SiVOshall b8installed 0nthe fence 0rbarrier that reads: "TREE PROTECTION ZONE — THIS FENCE SHALL NOT BE REMOVED OR ENCROACHED UPON. NV soil disturbaDC8, pa[hing, st0G]q8. dumping 0[bu0iOq of materials is allowed within the Critical Root Zone. The value 0f this tree is $ [insert value of tree an determined by a Qualified Tn88 Professional here]. Damage to this tree due 03 construction activity that n3Su|CS in the death or n8CHSS8ry removal of the tree is Subi8Ci to the Vi0|81iUOS S8CtiOO Of TMC Chapter 18.54." 7. All tree protection measures installed shall be inspected by the City and, if deemed necessary a Qualified Tree Professional, prior 0ob8qiOniDqconstruction 0rearth moving. 8. Any branches or limbs that are outside of the CRZ and miqht be d8maqed by machinery nhoU be pruned prior to construction by8Qualified Tree P0f8SSi0n8i No construction personnel ShGU prune affected limbs except under the direct supervision Of3Qualified Tree Professional. 9. The CRZ shall be covered with 4 to 6 inches of wood chip mulch. Mulch shall not be placed directly aOain5tthe trunk, A0'inCharea around the trunk shall be free Ofmulch, Additional measures, such @Sfertilization O[supplemental w3t8r, shall be carried out prior to the start of construction if deemed necessary by the Qualified Tree Professional's report tOprepare the trees for the stress ofconstruction activities. 10. No stOnaO8 of equipment or mfuSe, parkin0 of vehicles, dumping of materials or chemicals, or placement of permanent heavy structures Dritems shall occur within the CRZ. 11. No grade changes or SOi| diS1u[b8OC8, indudinq tr8DChing. Sh8|| be 8||OwHd within the CRZ. Grade Ch8OqeS within 10feet ofthe CRZ shall boapproved bythe City prior hoimplementation. 77 Page 34 of 41 12,The applicant isresponsible for mnsuhnq that the CRZoftrees onadjacent properties are not impacted bythe proposed development. 13. A pre -construction inspection shall be conducted by the City to finalize tree protection actions. 14, Post -construction inspection of protected trees shall be conducted by the City and, if deemed necessary by the Qty. 8 Qualified Tree Professional. All COrr8CUv8 Or n8p8rgUv8 p0ninq will be conducted by e Qualified Tn88 Professional. D. Plant Materials Standards For any new development, redevelopment Or n8st0n9U0n in a ChUc8| Area, invasive vegetation must be removed, and native vegetation planted and maintained in the Critical Area and its buffer. 1.Ap|anUnq plan prepared by an approved bioloqist shall be submitted to the City for approval that shows plant npmcies, size, number, sVacinq, soil preparation irrigaUon, and invasive species removal. The requirement for abio|ogist may be waived by the Director for single family property owners (when p|onUnq is beinq required an miUO8UOn for construction OfOvenm8ierstructures Or shoreline st8bi|iz8UVn), if the property Owner accepts technical assistance from City staff. 2. Invasive vegetation must be removed as part 0fsite preparation and native vegetation planted in the Critical Area and its buffer where impacts occur. I. Removal of invasive species ShgU be done by hand or with hand-held power tools. Where not feasible and mechanized equipment is needed, the 3VV|iCani must obtain permission and permit prior to work b8inq conducted. Removal of invasive veqetaUon must be conducted no that the slope stabi|itv, if applicable, will be maintained. Ap|an must be submitted indiCGdnq how the work will be done and what erosion COn10| and tree protection features will be utilized. Federal and State permits may be required for vegetation removal with mechanized equipment. 4. Removal of invasive veqetation may be phased over several years prior to planting, if such phasing is provided for by 8 plan approved by the Din8CiOr to 3UOw for alternative 8pV08ch8S. such as sheet mulching and qVat qnazinQ. The method selected shall not destabilize the bank orcause erosion. 5.Acombination 0fnative trees, shrubs and q0undCOv80(inC|udin0qnBSSeS.Sedqe3.rushes and vines) shall be planted. Site oondi1ionn, such an h»poOnuphy, exponuna, and hvdm|oqy shall be taken into account for plant selection. Other species may beapproved ifthere iSadequate iuSdfiC8dOn. O'Non-native trees may beused @ostreet trees incases where conditions are not appropriate for native trees (for example where there are space or height limitations or conflicts with utilities). 7.P|8ntS Sh8U meet the current American S\3Od8[d for Nursery Gk)Ck (American Nursery and Landscape AsoociaUon—ANLA). 8'Smaller plant sizes (q8nenB||yone gallon, b8r80Ot.p|uqS.0[stakes, deVendiOq0nplant species) are preferred for buffer p|3nUngn. Willow stakes must beatleast 1/2'innhindiameter. Refer 10landscaping chapter TIVIC18.52for plant sizes in required landscape areas. 9.Site preparation and planting Ofvegetation shall b8iOaccordance with best m8O808meDt practices for 8nguhnq the v8qetudon'n |onO-term health and survival. |niqatiUn is required for all p|8ntinO» for the first three years. unless otherwise approved by Director. Temporary automatic irriqation systems, cisterns, and hand -watering or a combination nftypes may beapproved byDirector. 10' Plants may be selected and placed k}allow for public and private view corridors with aVpn}v8| by Director. 11.Native v3V818UOOiOCritical Areas and their buffers installed inaccordance with the p[SC8diOqstandards shall be maintained by the property owner to promote healthy growth and prevent establishment Of invasive species, Invasive plants (such as blackberry, ivy, knotweed, bindweed) shall be removed on a regular basis, accordinq tothe approved maintenance plan. 12.Critical Areas including steep slopes disturbed byremoval ofinvasive plants ordevelopment shall bereplanted with native veqoba1ion where necessary to maintain the density shown in Table below, and must be replanted in a timely manner, except vvhen9 a|OnO'tennremoval and m've0oC8dOn p|an, as approved by the Q1y, is beinq implemented. Page 35 of 41 Critical Area Buffer VeqmtmtionPlanting Densities Table Plant Material Type Planting Density Stakoo/cuttinOs a|onq 1 2feet nncenter urper steambonk (wiUowo, red uoinrbinmnqineeringm*thnd dogwood) Shrubs 3'5feet oncenter, depending on species Trees 15-20feet oncenter, depending onspecies Gmundcuvers. qrasses. 1-1.5feet nncenter, spdqno, mshes, other herbaceous depending nnspecies plants Native seed mixes 5'25|bu.per acre, depending on species 13The Department Director, in consultation with the Chvs environmentalist, may approve the use of shrub planting and installation ofwillow stakes Uzbecounted toward the tree replacement standard inthe buffer ifproposed aSameasure h}control invasive plants and increase buffer function. E. Vegetation Management in ChUce| Areas The requirements of this nmobon apply to all existing and new development within CriUC8| 8r88S. I.Trees and shrubs may only be pruned for safety, to maintain access corridors and trails by pruning up or on the sides 0ftrees, k)maintain clearance for utility lines, and/or for imp0vinqshoreline 8CV|OqiC2|function. NOmore than 25%may b8pruned from 3tree within a55month period without prior City review. This type Ufpruning iSexempt from any permit requirements. 2.P|8ntdebris from removal Vfinvasive plants Orpruninqshall b8removed from the site and disposed Ofproperly unless onsite storage isapproved bythe Director. 3.USe0fpesticides. G. Pesticides (including h8/bidd8S, inSeCdddSS. andfunqidd8S) shall not be used inthe critical area or its buffer except where: (1) Alternatives such as 0gnu8| ,e0Uv3i biological DOnhV[ and cultural control are not feasible given the size of the infestation, site characteristics, or the characteristics of the invasive plant species; (2) The use of pesticides has been approved through G comprehensive vegetation or pest management and nlOnitO[inqp|3O; (3)The pesticide inapplied inaccordance with state regulations; (4) The proposed herbicide is approved for aquatic use by the U.S. Environmental Protection Agency; and (5) The use of pesticides in the shoreline jurisdiction is approved in writinq by the City and the applicant presents a copy of the Aquatic Pesticide Permit issued by the Department of Ecology or Washington Department of Agriculture. b. Self-contained rodent bait boxes desiqned to prevent access by other animals are allowed. C. Sports fields, porkn, qn|foourson and other outdoor recreational uses that involve maintenance of extensive areas Ufturf shall provide and implement 8nintegrated turf management program 0[integrated pest management p|8D desiqned to ensure that water quality in the Critical Area is not adversely impacted. 4.R8Sk)[8dOO Project Plantings: R8S0D[3U0n 00i8ctS may 0ver0|3Dt the site as 8 way to discourage the re- establishment of invasive species. Thinninq of vegetation without a separate Type 2 Special Permission or critical area tree permit may be permitted five to ten y8onS after planting if this approach is approved as part of the noStVraU0n p0iSCt'Smaintenance and monitoring plan and with approval bvthe City prior tOthinning work. F. Maintenance and Monitoring. 1. Afive-year monib]hnq and maintenance plan must be approved by the City prior h}permit issuance. The 79 Page 36 of 41 2. Monitoring reports shall be submitted annually for City review up until the end of the monitoring period. Reports shall measure survival rates against project goals and present contingency plans to meet project goals. 3. Mitigation will be complete after project goals have been met and accepted by the City environmentalist. 4. A performance bond or financial security equal to 150% of the cost of labor and materials required for implementation of the planting, maintenance and monitoring shall be submitted prior to City acceptance of project. 18.45.160 Critical Area Master Plan Overlay A. The purpose of this section is to provide an alternative to preservation of existing individual wetlands, watercourses and their buffers in situations where an area -wide plan for alteration and mitigation will result in improvements to water quality, fish and wildlife habitat and hydrology beyond those that would occur through the strict application of the provisions of TMC Chapter 18.45. B. The City Council may designate certain areas as S®nsi iye pie Critical Area Master Plan Overlay Districts for the purpose of allowing and encouraging a comprehensive approach to se si i`j acritical area protection, restoration, enhancement and creation in appropriate circumstances utilizing best available science. Designation of Sensitive AreaCritical Area Master Plan Overlay Districts shall occur through the Type 5 decision process established by TMC Chapter 18.104. C. Criteria for designating a itiv Critical Area Master Plan Overlay District shall be as follows: 1. The overlay area shall be at least 10 acres. 2. The City Council shall -find that preparation and implementation of a Critical Aea Master Plan is likely to result in net improvements in sensitive aroocritical area functions when compared to development under the general provisions of TMC Chapter 18.45. D. Within a S eaCritical Area Master Plan Overlay District, only those uses permitted under TMC Sections 18.45.070, 18.45.090 and 18.45.110 shall be allowed within a Category I wetland, a Type 1 (S) watercourse, or their its buffers. E. Within a Sent°+;,°®®r®aCritical Area Master Plan Overlay district, the uses permitted under TMC 18.45.070, 18.45.090 and 18.45.110 and other uses as identified by an approved itiv -AF Critical Area Master Plan shall be permitted within Category III and Category IV wetlands and their buffers; and within Type 2, {FL) 3 (Npl) and 4 {Ns} watercourses and their buffers, provided that such uses are allowed by the underlying zoning designation. F. A Sensitive Ar °Critical Area Master Plan shall be prepared under the direction of the Director of Community Development. Consistent with subsection A, the Director may approve development activity within a sate e °Critical Area Overlay District for the purpose of allowing and encouraging a comprehensive approach to senciti c ar-acritical areas protection, creation, and enhancement that results in environmental benefits that may not be otherwise achieved through the application of the requirements of TMC Chapter 18.45. G. The Director shall consider the following factors when determining whether a proposed AreaCritical Areas Overlay and Master Plan results in an overall net benefit to the environment and is consistent with best available science: 1. Whether the Master Plan is consistent with the goals and policies of the Natural Environment Element and the Shorelines Element (if applicable) of the Tukwila Comprehensive Plan. 2. Whether the Master Plan is consistent with the purposes of TMC Chapter 18.45 as stated in TMC Section 18.45.010. 3. Whether the Master Plan includes a Mitigation Plan that incorporates stream or wetland restoration, enhancement or creation meeting or exceeding the requirements of TMC Section 18.45.090 and/or TMC Section 18.45.110 , as appropriate. 4. Whether proposed alterations or modifications to sensitive areacritical areas and their buffers and/or alternative mitigation results in an overall net benefit to the natural environment and improves sensitive aroacritical Page 37 of 41 area functions. 5. Whether the Mitigation Plan gives special con—sideration to conservation and protection measures necessary to preserve or enhance anadromous fisheries. 6. Mitigation shall occur on -site unless otherwise approved by the Director. The Director may approve off - site mitigation only upon determining that greater protection, restoration or enhancement of s' ' areacritical areas could be achieved at an alternative location within the same watershed. 7. Where feasible, mitigation shall occur prior to grading, filling or relocation of wetlands or watercourses. 8. At the discretion of the Director, a proposed Master Plan may undergo peer review, at the expense of the applicant. Peer review, if utilized, shall serve as one source of input to be utilized by the Director in making a final decision on the proposed action. H. A Sensitive AreaCritical Area Master Plan shall be subject to approval by the Director of Community Development. Such approval shall not be granted until the Master Plan has been evaluated through preparation of an Environmental Impact Statement (EIS) under the requirements of TMC Chapter 21.04. The EIS shall compare the environmental impacts of development under the proposed Master Plan relative to the impacts of development under the standard requirements of TMC Chapter 18.45. The Director shall approve the Critical AreaSensitivc Arca Master Plan only if the evaluation clearly demonstrates overall environmental benefits, giving special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. (Ord. 2301 §1 (part), 2010) 18.45.170 Critical Area s Tracts and Easements A. In development proposals for planned residential or mixed use developments, short subdivisions or subdivisions, and boundary line adjustments and binding site plans, applicants shall create sensitive ar acritical areas tracts or easements, in lieu of an open space tract, per the standards of the Planned Residential Development District chapter of this title. B. Applicants proposing development involving uses other than those listed in TMC Section 18.45.170A, on parcels containing sensitive arcacritical areas or their buffers, may elect to establish a sensitive ar acritical areas tract or easement which shall be: 1. If under one ownership, owned and maintained by the ownership; 2. If held in common ownership by multiple owners, maintained collectively; or 3. Dedicated for public use if acceptable to the City or other appropriate public agency. C. A notice shall be placed on the property title or plat map that sensitive arcacritical area tracts or easements shall remain undeveloped in perpetuity. (Ord. 2301 §1 (part), 2010) 18.45.180 Exceptions A. REASONABLE USE EXCEPTIONS — 1 . If application of TMC Chapter 18.45 would deny all reasonable use of the property containing wetlands, watercourses, designated critical areas or their buffers, the property owner or the proponent of a development proposal may apply for a reasonable use exception. 2. Applications for a reasonable use exception shall be a Type 3 decision and shall be processed pursuant to TMC Chapter 18.104. 3. If the applicant demonstrates to the satisfaction of the Hearing Examiner that application of the provisions of TMC Chapter 18.45 would deny all reasonable use of the property, development may be allowed that is consistent with the general purposes of TMC Chapter 18.45 and the public interest. 4. The Hearing Examiner, in granting approval of the reasonable use exception, must determine that: a. There is no feasible on -site alternative to the proposed activities, including reduction in size or density, modifications of setbacks, buffers or other land use restrictions or requirements, phasing of project implementation, change in timing of activities, revision of road and lot layout, and/or related site planning that would allow a reasonable economic use with fewer adverse impacts to the °+°„e feacritical area. b. As a result of the proposed development there will be no unreasonable threat to the public health, safety or welfare on or off the development proposal site. c. Alterations permitted shall be the minimum necessary to allow for reasonable use of the property. 81 Page 38 of 41 A. d. The proposed development is compatible in design, scale and use with other development with similar site constraints in the immediate vicinity of the subject property if such similar sites exist. o. Disturbance of sensitive areamitina|oreon end thoir buffmrs has been minimized by locating the greatest extent possible. e7[All unavoidable impacts are fully mitigated. �o]'ho inability to derive rm8sUnob|o use of the property iSnot the result of: /1\ 8 S8gn2g8UOn or division of larger parcel On which 8 re8SOn8b|8 use was p8rmitt3b|e after the effective date OfSE*n&��ChdCa|Areas Ordinance No. 159S.June 1O.1991; (2) actions by the owner ofthe property (or the owner's agents, contractors or others under the owner's control) that occurred after the 8ffeCUv8 date of the Eens&&�ChUCa| areas ordinance provisions that prevents orinterferes with the reasonable use ofthe property; or (3) 8viO|8UOn_OMh8_S8nSiUv8_8n88Sordinance; eh. The Hearing Examiner. when approving o moSon8b|o use exception, may impose conditions, including but not limited to a requirement for submission and implementation of an approved mitigation p|8O designed to 8nSun3 that the development: (1) complies with the standards and policies of the nonsihwa orucridco| areas ordinance to the extent feasible; and (2) does not create a risk of damage to other property or to the public health, safety and welfare. 4-.iAop0v8| of 8 r8GS0nab|8 use 8xC8pUOn shall not eliminate the need for any other permit or approval otherwise required for 8project, indudingbutnCk|inlit8d03d8Signr8vie*. B. EMERGENCIES —Alterations in response to an emergency that poses an immediate threat to public health, 88f8tv Or wS|t8n2. Or that pOSS8 an immediate risk of d8nl8gS to private property may be excepted. Any G|tS[GtiOn undertaken as an emergency shall be reported within one business day to the Community Development Department. The Director shall confirm that an emergency exists and determine what, if any, nOiUg8UOn and conditions Sh8|| be required to protect the health, safety, welfare and environment and to repair any damage to the sensitive ornuCritiCa| area and its required buffers. Emergency work must be approved by the City. If the Director determines that the action taken, Orany part thereof, was beyond the scope of an allowed emergency action, then the enforcement provisions ofTIVICSection 1045.195shall apply. (O/d236V§80 20Y2;Ord, 230Y§1 (part), 2016) 18.45.190 Time Limitation, Appeals and Vestinq A. Time Limitation: ChUoa| area studies are valid for V period of years. Type 2 Special Permission decision for interrupted buffer, buffer averaging or other alterations shall expire in one year unless the applicant submits o complete bui|dinq permit orother construction permit within one year. Type 1tree permit for tree removal within sensitive areas U[their buffers shall expire in one year unless Gnextension is granted by the Director, The Director may grant 8n extension if: 1. Unforeseen circumstances or conditions necessitate the extension of the permit; and 2. Termination Ofthe permit would result iOunreasonable hardship 03the applicant; and the applicant iS not responsible for the delay; and 3. The extension Ofthe permit will not cause substantial detriment h3existing uses, critical areas, or critical area buffers inthe immediate vicinity Ofthe subject property, B. Appeals: Any 8pp88| of 8 final decision made by the Community Development Department, pursuant k)TINCChapter 10.45'shall be an 8pp88| of the underlying permit U[approval. Any such appeal shall b8processed pursuant h}TIVICSection 18.108.020 and TIVICChapter 18.110. In considering appeals of decisions or conditions, the following shall be considered: 1. The intent and purposes Ufthe sensitive 3rOoCriho8|areas ordinance; 2. Technical information and reports considered hvthe Community Development Department; and Page 39 of 41 3. Findings of the Director, which shall be given substantial weight. C. Vesting: Projects are vested to critical area ordinance in effect at the time a complete building permit is submitted except for short plats, subdivisions and shoreline permits. Short plats or subdivisions are vested at the time complete application is submitted for preliminary plats. For short plats and subdivisions which received preliminary plat approval prior to the adoption of this ordinance, building permits on the lots shall be considered under the critical areas ordinance in effect on the date of the preliminary plat approval provided complete building or construction permits are submitted within one year of the final plat approval. Vesting provisions for shoreline permits are provided in TMC 18.44 (Ord. 2301 §1 (part), 2010) 18.45.195 Violations A. VIOLATIONS. The following actions shall be considered a violation of this chapter: 1. To use, construct or demolish a structure or to conduct clearing, earth -moving, construction or other de- velopment not authorized under a Special Permission, Rea- sonable Use or other permit where such permit is required by this chapter. 2. Any work that is not conducted in accordance with the plans, conditions, or other requirements in a permit approved pursuant to this chapter, provided the terms or conditions are stated in the permit or the approved plans. 3. To remove or deface any sign, notice, complaint or order required by or posted in accordance with this chapter. 4. To misrepresent any material fact in any application, plans or other information submitted to obtain any se i e acritical area use, buffer reduction or development authorization. 5. To fail to comply with the requirements of this chapter. B. ENFORCEMENT. It shall be the duty of the Community Development Director to enforce this chapter pursuant to the terms and conditions of TMC Chapter 8.45. C. INSPECTION ACCESS. 1. For the purposes of inspection for compliance with the provisions of a permit or this chapter, authorized representatives of the Community Development Director may enter all sites for which a permit has been issued. 2. Upon completion of all requirements of a permit, the applicant shall request a final inspection by contacting the planner of record. The permit process is complete upon final approval by an authorized representative of the Community Development Director. D. PENALTIES. 1. Any violation of any provision of this chapter, or failure to comply with any of the requirements of this chapter, shall be subject to the penalties prescribed in TMC Chapter 8.45, "Enforcement," and shall be imposed pursuant to the procedures and conditions set forth in that chapter. 2. Penalties assessed for violations of the Critical Areas shall be determined by TMC Chapter 8.45.120, Penalties 83 Page 40 of 41 1|tshall not boedefense to the prosecution for failure toobtain 8permit required bvthis chapter that 8 contractor, subcontractor, person with responsibility On the site, or person authorizing [vdirecting the work erroneously believed apermit had been issued Vuthe property owner orany other person. 4. Penalties for Tree Removal a. Each unlawfully removed or damaged tree shall constitute a anpenyto violation. U.The amount 0fthe penalty shall b8$1.00Oper tree 0rupt0the marketable value Ofeach tree removed or damaged as determined by an |GAnnrtified arborisL The Director may elect not 0x seek penalties ormay reduce the p8na|U8S if he/She determines the cirCVmS1gnCS3 do not warrant imposition of any Or all of the civil penalties. c. Any illegal removal of required trees shall be subject to obtaining a tree permit and replacement with trees that meet or exceed the functional value of the removed trees. In addition, any shrubs and qroundcover removed without City approval shall b8replaced. d.Toreplace the tree canopy lost due to the tree removal, additional trees must be planted on -site. Payment may be made into the Qiy'S Tree Fund if the number Of replacement trees cannot be 8CCOmmOd8t8d on - site. The number of replacement tn88S required will be based on the size of the irSS/nJ removed as stated inTMC 1845.15013� E. REMEDIAL MEASURES REQUIRED. In addition 0openalties provided inTMCChapter 8.45.the Director may require any person conducting work in violation of this chapter to mitigate the impacts of unauthorized work by carrying out nBmSdiG| measures. 1. Remedial mS8SurS8 must conform to the policies and guidelines 0fthis chapter. 2. The nn8t of any remedial measures necessary to onnoctvio|ad0n/G\ of this chapter Dh8U be bn08 bythe property owner and/or applicant. F. INJUNCTIVE RELIEF. 1. Whenever the City has reasonable cause tObelieve that any person iSviolating 0rthreatening 0Jviolate the sensitive oroonhUca| areas nagu|odnn3 nrany rule Orother provisions adopted or issued pursuant to these regulations, it may either before or after the institution of any other action or proceeding authorized by this ordinance, institute 3civil action iOthe name Ofthe City for injunctive relief tOrestrain the violation O[threatened violation. Such action shall bebrought inKing County Superior Court. 2. The institution of an 8CUOO for injunctive relief under this section Sh8U not n3|i8v8 any p8dv 03 such proceedings from any civil or criminal penalty prescribed for viO|8UOnS Of these regulations. G. ABATEMENT. ' Any use, structure, development O[work that occurs iOviolation 0fthese regulations, O[iO viO|8U0O of any lawful order O[requirement Ofthe Director pursuant 03this section, shall b8deemed 03b88public nuisance and may b8abated inthe manner provided by the Tukwila Municipal COd8, 88SUOn 8.45]05. 18/5.200 Recording Required The property owner receiving approval Of8use O[development permit pursuant hJTMCChapter 10/45shall v8COu1 the City -approved Site plan, clearly delineating the wetland, watercourse, areas Ofpotential g8V|OgiC instability orabandoned mine and their buffers designated by TMC G8cUOnS 18.45.000' 18.45.080' 18.45.100, 18.45.120' 18.45.140 and 1845.150 with the King County Division of Records and Elections. The face of the site plan must include a statement that the provisions 0fTK4C Chapter 1M.45'GSOfthe effective date Ofthe ordinance from which TW1CChapter 10.45derives OriSthereafter amended, control use and development Ofthe subject property, and provide for any responsibility Of the property owner for the maintenance Or QOneCU0n of any latent defects or deficiencies. Addid0naUy, the applicant shall provide data (GPS or survey data) for updatinq the City's critical area maps, (Dni230Y§1(parV' 2018) 18/45.210 Assurance Device Page 41of41 Director may require a letter of credit or other security device acceptable to the City to guarantee performance and maintenance requirements of TMC Chapter 18.45. All assurances shall be on a form approved by the City Attorney and be equal to 150% of the cost of the labor and materials for implementation of the approved mitigation plan. B. When alteration of a sensitive areacritical area is approved, the Director may require an assurance device, on a form approved by the City Attorney, to cover the cost of monitoring and maintenance costs and correction of possible deficiencies for five years. In the event that more than five years monitoring and maintenance is required, . If at the end of five years performance standards are not being achieved, an increase in the security device may be required by the Director. When another agency requires monitoring beyond the City's time period, copies of those monitoring reports shall be provided to the City. C. The assurance device shall be released by the Director upon receipt of written confirmation submitted and confirmed by the City to the Department from the applicant's qualified professional that the mitigation or restoration has met its performance standards and is successfully established. Should the mitigation or restoration meet performance standards and be successfully established in the third or fourth year of monitoring, the City may release the assurance device early. The assurance device may be held for a longer period, if at the end of the monitoring period, the performance standards have not been met or the mitigation has not been successfully established. In such cases, the monitoring period will be extended and the bond held until the standards have been met. D. Release of the security does not absolve the property ownerofresponsibilityformaintenanceorcorrecting latent defects or deficiencies or other duties under law. (Ord, 2301 §1 (part), 2010) 18.45.220 Assessment Relief A. FAIR MARKET VALUE — The King County Assessor considers sensitive areacritical area regulations in determining the fair market value of land under RCW 84.34. B. CURRENT USE ASSESSMENT — Established sensitive areacritical area tracts or easements, as defined in the Definitions chapter of this title and provided for in TMC Section 18.45.170, may be classified as open space and owners thereof may qualify for current use taxation under RCW 18.34; provided, such landowners have not received density credits, or setback or lot size adjustments as provided in the Planned Residential Development District chapter of this title. C. SPECIAL ASSESSMENTS — Landowners who qualify under TMC Section 18.45.220 B shall also be exempted from special assessments on the sensitive or acritical area tract or easement to defray the cost of municipal improvements such as sanitary sewers, storm sewers and water mains. (Ord. 2301 §1 (part), 2010) 85 T C 18.70.050 onconfor n tructures Where a lawful structure exists at the effective date of adoption of this title that could not be built under the terms of this title by reason of restrictions on area, development area, height, yards or other characteristics of the structure, it may be continued so long as the structure remains otherwise lawful subject to the following provisions: 1. No such structure may be enlarged or altered in such a way that increases its degree of nonconformity. Ordinary maintenance of a nonconforming structure is permitted, pursuant to TMC Section 18.70.060, including but not limited to painting, roof repair and replacement, plumbing, wiring, mechanical equipment repair/replacement and weatherization. These and other alterations, additions or enlargements may be allowed as long as the work done does not extend further into any required yard or violate any other portion of this title. Complete plans shall be required of all work contemplated under this section. 2. Should such structure be destroyed by any means to an extent of more than 50% of its replacement cost at time of destruction, in the judgment of the City's Building Official, it shall not be reconstructed except in conformity with provisions of this title, except that in the LDR zone, structures that are nonconforming in regard to yard setbacks or sensitive area buffers, but were in conformance at the time of construction may be reconstructed to their original dimensions and location on the lot. 3. Should such structure be moved for any reason or any distance whatsoever, it shall thereafter conform to the regulations for the zone in which it is located after it is moved. 4. When a nonconforming structure, or structure and premises in combination, is vacated or abandoned for 24 consecutive months, the structure, or structure and premises in combination, shall thereafter be required to be in conformance with the regulations of the zone in which it is located. Upon request of the owner, the City Council may grant an extension of time beyond the 24 consecutive months. 5. Residential structures and uses located in any single-family or multiple -family residential zoning district and in existence at the time of adoption of this title shall not be deemed nonconforming in terms of bulk, use, or density provisions of this title. Such buildings may be rebuilt after a fire or other natural disaster to their original dimensions and bulk, but may not be changed except as provided in the non -conforming uses section of this chapter. 6. Single-family structures in single- or multiple -family residential zone districts that have legally nonconforming building setbacks, shall be allowed to expand the ground floor only along the existing building line(s), so long as the existing distance from the nearest point of the structure to the property line is not reduced, and the square footage of new intrusion into the setback does not exceed 50% of the square footage of the current intrusion. 7. In wetlands, watercourses and their buffers, existing structures that do not meet the requirements of the Critical Areas Overlay District chapter of this title may be remodeled, reconstructed or replaced, provided that: a. The new construction does not further intrude into or adversely impact an undeveloped sensitive area or the required buffer except where interrupted buffer waiver has been granted by the Director. However legally constructed buildings other than accessory structures may: i) Expand vertically to add upper stories in exchange for buffer enhancement; and no significant tree is removed. ii) Expand laterally along the building side that is opposite of critical area up to a maximum of 1000 sq. ft; provided that expansion is outside 75 percent of the required buffer; buffer enhancement is proposed and no significant tree is removed. 86 iii) Expand laterally along the existing building lines in exchange for buffer enhancement; provided the expansion into the buffer is less than 50 percent of the current encroachment or 500 sq. ft, whichever is less. Further under this option expansion is outside 75 percent of the required buffer; and no significant tree is removed. iv) Enclose within existing footprint in exchange for buffer enhancement; and no significant tree is removed. b. The new construction does not threaten the public health, safety or welfare; and c. The structure otherwise meets the requirements of this chapter. 8. In areas of potential geologic instability, coal mine hazard areas, and buffers, as defined in the Sensitive Areas Overlay District chapter of this title, existing structures may be remodeled, reconstructed or replaced, provided that: a. The new construction is subject to the geotechnical report requirements and standards of TMC Sections 18.45.120B and 18.45.120C; b. The new construction does not threaten the public health, safety or welfare; c. The new construction does not increase the potential for soil erosion or result in unacceptable risk or damage to existing or potential development or to neighboring properties; and d. The structure otherwise meets the requirements of this chapter. the nonconforming structure 87