HomeMy WebLinkAboutReg 2019-04-15 Item 4C - Public Safety Plan - Contract Amendment #3 for Fire Station 52 with Weinstein AU for $20,950COUNCIL AGENDA SYNOPSIS
ni/ia/s
Meeting Date
Prepared by
Ma or . review
Counczl review
04/15/19
RB
ITE
NFORMATION
ITEM No.
4.C.
STAFF^ SPONSOR: RACHEL BIANCHI
ORIGINAL AGENDA DATE: 4/15/19
` GI NDA ITI I TITLE Amendment to Weinstein Architects & Urban Designers contract #17-068
CATEGORY Discussion
1l12 Date
►1Motion
Date 4/15%19
❑ Resolution
Attg Date
E Ordinance
i1 ttg Date
E Bid Award
Mtg Date
E Public -learin
Mtg Date
❑ Other
Mtg Date 1
Mtg
SPONSOR Council 11Mayor ❑HR ❑DCD CI~inance Fire NTS
❑Pe R ❑Police ❑PW ❑Court
SPONSOR'S Staff is seeking approval on an amendment to Weinstein Architects and Engineering
SUMMARY contract to add services for additional driveway design and an acoustical study. The fees
for these services are within the project budget and staff is not asking for additional
funding for the project.
Rim]: E ED BY C C.O.W. Mtg. C CDN Comm E Finance Comm.
11 Trans &Infrastructure E Arts Comm. 111 Parks Comm.
DATE: 4/ 1 / 19 COMMITTEE CHAIR: ROBERTSON
a Public Safety Comm.
E Planning Comm.
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITS
Mayor's Office
Unanimous Approval; Forward to Consent
COST IMPACT / FUND SOURCE
EXPENDITURP; REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
4/15/19
MTG. DATE
ATTACHMENTS
4/15/19
Informational Memorandum dated 4/29/19
Weinstein Architects & Urban Designers Contract Amendment No. 3
Weinstein Architects& Urban Designers Scope of Services
Project budget
Minutes from the Public Safety Com, meeting of 4/1/ .9
27
28
Allan Ekberg, Mayor
Administrative Services Department - Rachel Bianchi, Deputy CityAdministrator
INFOR ATIO AL E ORA DU
TO: Public Safety Committee
FROM: Rachel Bianchi, Deputy City Administrator
BY: Justine Kim, Senior Project Manager, Shiels Obletz Johnsen, Inc.
CC: Mayor Allan Ekberg
DATE: March 29, 2019
SUBJECT: Public Safety Plan — Fire Station 52
Project No. 90830405, Contract 17-068
Weinstein Architectural Design & Planning Amendment No. 3
ISSUE
Execute contract amendment No. 3 to provide driveway design and acoustical analysis services for
Public Safety Plan - Fire Station 52. These costs are well within the project budget and staff is not
asking for additional budget authority.
BACKGROUND
In April 2017, the Council approved an initial not to exceed contract for design services with Weinstein
AU in the amount of $2,089,717.00. This is well within the combined design budget for the three
stations of $3,275,000.00.
In September 2018, Council approved Amendment No 1. for $395,537.00, making the new contract
amount $2,485,254.00. Amendment No. 1 eliminated FS 54 from Weinstein AU contract. In December
2018, Council approved Amendment No 2 for $383,462.00, for design of the driveway, and the new
contract amount was $2,868,716.
FISCAL IMPACT
Amendment No. 3 is for additional services including acoustical analysis and final driveway design
for Fire Station 52. The amount is well within the project budgets. The following table shows the
original contract amount, the owner's contingency and the total.
Original Contract Amount —
$2,089,717.00
Amendment No. 1
395,537.00
Amendment No. 2
383,462.00
Proposed Amendment No. 3
20,950.00
Owner Contingency (30%)
6,285.00
Total
$2,895,951.00
RECOMMENDATION
Council is being asked to approve Weinstein AU's Amendment No. 3 to Contract No. 17-068 in the
amount of $20,950 and to consider this item at the April 8, 2019 Committee of the Whole and the
April 15, 2019 Regular Council meeting.
ATTACHMENTs
Weinstein AU contract amendment, scope of work and fee
W:12019 Info MemosIWAU Amendment memo.docx
29
30
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number: 17-068(c)
CONTRACT FOR SERVICES
Amendment No. 3
Between the City of Tukwila and Weinstein AU, LLC.
That portion of Contract No. 17-068 between the City of Tukwila and Weinstein AU, LLC.
is hereby amended as follows:
Section 1 Project Desiqnation: The Consultant is retained by the City to perform
Architectural Design and Planning services in connection with the project titled Tukwila Public
Safety Plan, Fire Station 52 site.
Section 2 Scope of Services: The Consultant agrees to perform the services, identified on
Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and
supplies.
Section 3 Duration of Agreement; Time for Performance: This Agreement shall be in full
force and effect for a period commencing upon execution and ending December 31, 2021,
unless sooner terminated under the provisions hereinafter specified. Work under this
Agreement shall commence upon written notice by the City to the Consultant to proceed. The
duration of the contract is now through December 31, 2021, unless modified by supplemental
agreement.
Section 4 Payment: The Consultant shall be paid by the City for completed work and for
services rendered under this Agreement as follows:
Payment for the work provided by the Consultant shall be made as provided on Exhibit "A"
attached hereto, provided that the total amount of payment to the Consultant shall not exceed
$2,889,666 (including estimated expenses) without express written modification of the
Agreement signed by the City. The total amount for this amendment is $20,950. ($5,780 +
$15,170).
All other provisions of the contract shall remain in full force and effect.
Dated this day of , 2019
CITY OF TUKWILA CONTRACTOR
Allan Ekberg, Mayor
ATTEST/AUTHENTICATED
Christy O'Flaherty, MMC, City Clerk
CA Revised December 2016
Printed Name: Edward Weinstein
APPROVED AS TO FORM
Office of the City Attorney
Page 1 of 1
31
32
EXHIBIT A
E
STE 1 A+U
ARCHITECTS + URBAN DESIGNERS
February 14, 2019
Justine Kim
Shiels I Obletz I Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
RE: Tukwila Fire Station 52 —Driveway Design
Dear Justine:
Additional Services Request 21 requests additional fees for the supplementary analysis required by the Tukwila Fire
Department for the design of the driveway at the new Fire Station 52.
Our civil engineering consultant, LPD Engineering, PLLC, collected data, attended meetings, produced exhibits and will
produce an engineering report describing the final driveway design and design process, all at the request of the Tukwila Fire
Department, and above and beyond their contracted scope of services. That work was approved by SOJ via email on 1/23/19
and has been ongoing in order to meet the tight schedule for this project. For a detailed description of the work provided
thus far and that yet to be completed, please refer to LPD's Additional Services Agreement #2, dated February 7, 2019, and
attached to this letter.
Weinstein A+U's fee covers coordination between LPD and the City of Tukwila via phone, email and two extra meetings at
the City's offices.
Fee requested for the above services is as follows:
Task Description
LPD
Civil Engineering
Weinstein A&U
Architectural
Total
Additional Service 21
$12,700.00
$1,200.00
$13,900.00
10% Markups
$1,270.00
$0
$1,270.00
AS 27 subtotals
$13,970.00
$1,200.00
$15,170.00
While LPD has already been released to proceed with this work, please provide formal acceptance of this proposal at your
earliest convenience.
Sincerely,
Emma Nowinski, AlA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU:com T 206 443 8606 F 206 443 1218
33
34
D
engineering p
Proposal for Additional Civil Engineering Services
Additional Services Agreement (ASA #2)
Date: February 7, 2019
1
To: Weinstein A+U
2200 Western Avenue, Suite 301
Seattle, WA 98121
Attn: Emma Nowinski, AlA, Project Manager
From: Marc Servizi, PE1Laurie J. Pfarr, PE, Principal
Project: Tukwila Fire Station 52 - Driveway Design (ASA#2)
EXHIBIT A
1932 First Avenue, Suite 201
Seattle, Washington 98101
P. 206.725.1211
F. 206.973.5344
Ipdengineering.com
Thank you for the opportunity to provide this additional services proposal, which is an amendment to our original
contract dated April 19, 2017 and revised Proposal for Civil Engineering Services dated June 26, 2018. This
proposal is to confirm our understanding of the additional scope of services and compensation for this project. We
look forward to continued work with you on this project.
Description of Additional Services
This proposal is for additional civil engineering services associated with the design of the driveway approach for
Fire Station #52 in Tukwila, Washington. LPD Engineering's civil scope of work for this project, as outlined in
our original contract, encompassed the preparation of SD, DD and civil permit and construction drawings.
The City's Fire Department has requested a supplementary component of civil work for the project involving the
additional services, as listed herein. This requested civil work requires additional coordination, meetings, site
visits, research and preparation of an Engineering Report, all of which are outside of the originally approved
project scope. Therefore, an amended scope of services and corresponding fee for this supplementary work are
provided below.
Additional Scope of Services
This additional services proposal is for the scope of work outlined below.
Driveway Design (SD)
1. Design and Coordination - Work Completed
a) In December 2018, and at the request of 'TFD, LPD prepared plans that included horizontal turning
movements, a proposed road profile, curb profile, and vertical analysis of the fire trucks along the
incoming route that was submitted to the City of Tukwila.
b) LPD attended two (2) additional meetings on January 17 and January 24, 2019, which included a site
exploration with TFD staff and preparation of field reports.
c) LPD conducted research, provided coordination and prepared a revised driveway profile based on
input from TFD.
35
P
D
engineering p
EXHIBIT A
February 7, 2019
Proposal for Additional Civil Engineering Services
Fire Station 52 (ASA #2)
Page 2
d) LPD prepared changes to the SD plans that reflect new vertical driveway alignment.
2. Engineering Report for Fire Department access road, as requested and as scoped by TFD
a) Analysis to include both new and old ladder trucks (Truck standards including dimensions/turning
radius/clearances to be provided by others)
b) Note minimum distances from road to lowest point of ladder truck as well as from the road to front
and back of apparatus for both ladder trucks.
c) Prepare a narrative describing truck clearances of both ladder trucks.
d) Show that all approaches and turns were evaluated from 65th to the fire department access road and
from the fire department access road to 65th. Based upon the provided truck standards and utilizing
Autodesk Vehicle tracking, show that both ladder trucks can navigate the alignment. This will include
four turning movements with tracking shown for inside wheel for two vehicles, which results in 8
profiles.
e) Update plans with new proposed centerline design for the driveway utilizing King County standards
for arterial road intersection approach.
f) Evaluate the effect of the revised longitudinal slope has on the site, the Cowlitz driveway, excavation
and retaining walls due to expanding the vertical curve.
g) Provide PE stamped engineering report.
3. Follow-up Coordination
a) Follow up coordination with TFD after issuance of the report. We have assumed approximately eight
(8) hours for the follow up coordination effort.
Proposed Fee for Additional Services
Our anticipated fee for services is based upon the information that we have at this time. We propose to provide
civil engineering consulting and drafting services on a lump sum basis. Our anticipated maximum fee for this
additional work is as follows.
Additional Task / Deliverable
I. Design and Coordination
Lump Sum Fee
$5,420
2. Engineering Report
$5,970
3. Follow-up
$1,310
Total Additional Compensation
$12,700
Assumptions
• Unless otherwise noted, the same assumptions and exclusions from our Original Contract dated April 19,
2017 and revised Proposal for Civil Engineering Services dated June 26, 2018, apply.
36
EXHIBIT A
February 7, 2019
Proposal for Additional Civil Engineering Services
Fire Station 52 (ASA #2)
Page 3
Thank you again for inviting this proposal. Please notify us if you have any concerns or disagree with any of the
scope, terms, or conditions. We request that you sign and return a copy of this document to confirm that you have
read and agree with the content of this additional services agreement. This proposal constitutes the entire
agreement for ASA #2 between the client and LPD Engineering and supersedes any prior understanding or
representation of any kind preceding the date of this proposal. This proposal will serve as an amendment to our
original Contract dated April 19, 2017 and revised Proposal for Civil Engineering Services dated June 26, 2018
with Weinstein A+U. We look forward to continuing our work with you on this project.
Sincerely,
LPD Engineering PLLC
(")
L
Laurie J. Pjfarr, P.E. For Weinstein A+U Date
Principal I Owner
Mud Servizi, PE
Sr Project Manager I Senior Civil Engineer
cc: File
Printed Name
37
EXHIBIT A
E STE I A+U
ARCHITECTS + URBAN DESIGNERS.
March 4, 2019
Justine Kim
Shiels j Obletz !Johnsen
101 Yesler Way, Suite 606
Seattle, WA 98104
RE: Tukwila Fire Stations -F552 Acoustical Analysis
Dear Justine:
Additional Services Request 23 requests additional fee to cover the cost of the acoustical analysis required by the City of
Tukwila Department of Community Development as part of the FS52 Conditional Use Permit application. WAU has enlisted
the Greenbusch Group to produce an acoustical reportpredicting the sound levels of all exterior mechanical equipment on
the FS52 site as they reach the property lines. Please refer to the attached Greenbusch proposal for more detail on the scope
of services. WAU fees include coordination of Greenbusch's work.
Fee requested for the above services is as follows:
Task Description
Greenbusch
Acoustical
Consultant
Weinstein A&U
Architectural
Total
Additional Service 23
$4,800.00
$500.00
$5,300.00
10% Markups
$480.00
$0
$480.00
AS 23 subtotals
$5,280.00
$500.00
$5,780.00
As this report will be submitted as part of the CUP for FS52, which has a critical review timeline, we, will be releasing
Greenbusch to proceed with this work immediately. Please provide written confirmation that these fees are acceptable at
your earliest convenience. We understand from previous discussions with the team that the costs incurred for this Additional
Service will be included in our upcoming contract revision.
Sincerely,
Emma Nowinski, AIA
2200 Western Avenue Suite 301, Seattle, WA 98121
WeinsteinAU.com T 206 443 8606 F 206 443 1218
38
T}1 E GREENBUSCH GROUP, INC.
March 1,2D1S
Emma NowiDmki.A|8LEEOAP
We|nste|nA+U
121Stewart Street, Suite 2UO
Seattle, Washington B81O1
Re: New Tukwila Fire Station Building — Fire Station 52
Acoustical Consulting Services
Dear Emma;
Thanks very much for thinking 0fVatnexpand our contributions tothe design Cfthenayv
TuKvv|e Fire Station 52 Project. We are very pleased to have this opportunity to collaborate
with you again on another important project.
SCOPE OF WORK
The following proposal is for scope nfservices 8z conduct on acoustical review of off -site
noise levels from proposed exterior mechanical equipment. Acoustical raV|eVv of any other
portion of the project is specifically EmdVd8d, including but not limited to interior sound
levels from mechanical equipment.
We propose to perform the following work:
1Utilize current mechanical plans and bens of design equipment no|ect|Uno to predict
sound levels at adjacent property boundaries.
2. Develop noise control recommendations if predicted levels exceed regulatory Unn|to
(City of Tukwila).
3. Author draft and final report documenting our analysis for submission to the []hv of
Tukwila.
FEE
The estimated fee for the work described above is $4,800, billed on a fixed -fee basis.
Any work performed in addition to the services described above will be invoiced on an
hourly basis at the following rates for our staff as applicable: Principal, $210 per hour,
Acousticians $75 - $120 per hour, This fee estimate is based on linear design schedules.
Significant delays or interruptions will result in additional design cost and requests for
additional services. Services will be provided in accordance with our existing contract on this
project for mechanical engineering services.
Sincerely;
The Greenbusch Group, Inc.
Adam C.Jenkins, PE
Principal
pa
toll free: 855.476.2074 1900Ni Nickerson ��Suite 201 Seattle, WA 98119
39
40
City of Tukwila - Facilities Plan
TOTAL PROJECT
MONTHLY Budget Report
(REVISED Budgets; D-20 Plan Adopted by Council)
Life to Date Costs
as of ftlarch 19, 2019 (reconciled w/aceig dint Mar 13, 2019 (H)
COUNCIL REPORTING SUMMARY -
JUSTICE CENTER
AJE Services (both Design & CA)
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Casts (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Contingency for Site Contamination (soils,harnat)
Land Acquisition
Contingency for Land Acquisition
Original Itrulget
$ 700,000
5 38,738,678
5 2,112,639
5 1,815,875
$ 6,507,731
$ -
$ 14,133,295
S 1,250,000
Rage Trarofert
2 ,875
$ -
$ (11,315)
$ 210,000
5 266,721
$ (1,656,239)
$ 750,000
$ (81,042)
S 300 000
Current Rodger
3,500,000
$ 700,000
$ 38,727,363
$ 2,322,639
$ 2,082,596
S 4,851,492
$ 750,000
$ 14,052,253
S I 550,000
Committed Midget
3,141,729
$ 205,980
$ 563,671
$ 562,398
5 1,967,303
$ -
$ -
5 13,708,596
$ 906,784
Life to Date Carty
Remain 'At Committed
Remaining Budget
Cott at Completion
5 2,180,300
$ 205,980
$ 414,037
$ 264,705
$ 939,219
S -
$ -
5 13,679,370
S 906,784
$ 961,429
$ -0
5 149,634
5 297,693
$ 1,028,084
$ -
$ -
$ 29,227
$ -
5 358,271
494,020
5 38,163,692
$ 1,760,241
$ 115,293
$ 4,851,492
$ 750,000
$ 343,657
$ 643,216
$ -
-
0 .
-
S -
-
S -
_
S _
TOTAL
5 68,536,343
S -
S 68,536,343
5 21,056,461
S 18,590,395
S 2,466,066
S 47,479.882
5 -
COUNCIL REPORTING SUMMARY -
FIRE STATION I
S
Services (both Design & CA)
Land Acquisition
Permi(s/Fees
Construction (Pre -Con, Coast & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Original Budget
1,070,000
$ -
5 234,000
$ 9,396,000
S 931,000
S 526,000
$ 1,116,000
Iludget Trarnfin.
222,781
S -
S -
S -
$ -
S -
5 (222,781)
Current Rodger
1,292,781
S -
$ 234,000
S 9,396,000
5 931,000
5 526,000
S 893,219
Committed Thodgel
Life ro Date Corn
Rernaireg CollIllaffed Remaining Rodger
Corr orA/E Complaion
,236,572
-
$ 02,042
S 165,000
133,726
S 345,077
S -S
776, 25
-
$ 92,042
99,273
5 81,733
0 134,551
-
460,447
-
5 10,000
5 65,727
S 51,993
S 210,526
S -
S 56,209
S -
$ 131,958
$ 9,231,000
$ 797,274
$ 180,923
$ 893,219
5-
S -
$ _
S -
$ -
$ -
S -
TOTAL
S 13,273,000
$ -
S 13,273,000
5 1,982,416
S 1,183,724
S 798,693
S 11,290,583
S -
COUNCIL REPORTING SUAL1LIRY -
FIRE STATION S2
Original Budget Ruder rtansfitrs
Currenr Midget °manilla Budget
tile ro Date Corti
Rentairo'g Committed Remaining nudger
Cow ta Completion
A/E Services (both Design & C A)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
S 1,415,000
S 16,000
5 353,000
$ 13,298,000
5 1,398,000
$ 787,000
$ 1,343,000
S 234,222
$ 9,160
5 -
5 456,500
S (9,160)
3 -
$ (40,722)
S 1,649,222
3 25,160
S 353,000
$ 13,754,500
$ 1,388,840
S 787,000
S 1.302,278
5 1,580,863
$ 25,157
S 72,688
$ 137,500
$ 393,815
5 532,289
S -
$ 339,878
$ 17,157
5 12,511
5 -
5 16,258
5 207,609
S -
$ 1,240,985
S 8,000
5 60,177
5 137,500
5 377,557
5 324,680
$ -
5 68,359
$ 3
S 280,312
$ 13,617,000
$ 995,025
$ 254,711
$ 1,302,278
$ -
S -
$ _
$ ,,
5 -
$ .
5 .
650,000
S 19,260,000
S 2,742,311
$ 593,412
S 2,148,899
S 16,517,689
S -
COUNCIL REPORTING SUILIIARY -
FIRE STATION 5,1
ALE Services (both DesignCA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Coast & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Original Budget
150,000
S 902,668
$ 20,000
$ 230,000
$ 50,000
5 107,500
$ 41,832
Midget transfers
5 (7,000)
$ 39,206
S -
5 (5,610)
$ 1,875
5 -
5 (28,471)
Current Midget
5 143,000
S 941,874
$ 20,000
$ 224,390
$ 51,875
S 107,500
$ 13,361
COMIllitred nudger
132,995
$ 941,875
S 1,517
$ 106,700
$ 33,802
$ 106,665
S -
Wet° Date Co.
IRelflaIllq Commirted
Remaining Hinkel
Cent 111 Completion
1,495
$ 933,775
1,517
S 67,856
22,798
86,066
-
5 1,500
$ 8,100
$ -
$ 38,844
$ 11,004
S 20,599
$ -
10,005
$ (1)
$ 18,483
$ 117,690
S 18,073
5 835
$ 13,361
_
_
-
-
-
-
-
TOTAL
S 1,502,000
$ -
1,502,000
S 1,323,554
S 1,243,507
80,047
S 178,446
5 -
COUNCIL REPORTING SUMMARY -
row(' WORKS
Services (both Design CA)
Land Acquisition
Permits/Foes
Construction (Pre -Con, Coast & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Orighnd il.,dger
767,305
S 22,000,046
110,000
5 4,950,000
529,036
5 668,426
975,107
ihnig, rr,,,..fi,,
S 15,000
$ 3,386,413
$ (20,000)
S (1,895,000)
$ (416,293)
S (348,426)
S (721,694)
,,,,,,,,, 'Maga
782,385
5 25,386,459
$ 90,000
$ 3,055,000
$ 112,743
$ 320,000
$ 253,413
".."'d n.dg,
We. Date Com
Remain it Committed
Remaining nudge COO at Comploion
318,882
S 25,358,693
S -
5 -
S 65,643
S 279,832
5 -S
92,014
S 25,344,993
$ -
S -
S 50,471
$ 139,845
-
S 226,868
S 13,700
$ -
$ -
$ 15,172
$ 139,987
$ -
$ 463,503
S 27,766
5 90,000
$ 3,055,000
S 47,100
$ 40,168
S 253,413
4, Vi 4,
-
$ 30,000,000
S 26,023,050
S 25,627,323
S 395,727
S 3,976,950
S -
42
City of Tukwila
City Council Public Safety Committee
PUBLIC SAFETY COMMITTEE
Meeting Minutes
April 1, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall
Councilmembers: Dennis Robertson, Chair; Kate Kruller (by phone)
Staff: David Cline, Rachel Bianchi, Bruce Linton, Jay Wittwer, Laurel Humphrey
Guests: Justine Kim & Ethan Bernau, Shiels Obletz Johnsen
CALL TO ORDER: Chair Robertson called the meeting to order at 5:30 p.m.
I. ANNOUNCEMENT
II. BUSINESS AGENDA
A. Contract Amendment: Public Safety Plan - Station 52
Staff is seeking Council approval of amendment No. 3 to the contract with Weinstein AU, LLC in
the amount of $20,950.00 to provide driveway design and acoustical analysis services for Fire
Station 52. The amount is within the project budget approved by Council. MAJORITY
APPROVAL. FORWARD TO APRIL 16, 2019 REGULAR CONSENT AGENDA.
B. Contract Amendment: Public Safety Plan - Justice Center
Staff is seeking Council approval of amendment No. 4 to the contract with DLR Group, Inc in the
amount of $29,475.00. The amendment will provide additional services and fees for King
County Water District 125 water main replacement design and additional procurement, delivery
and installation support for Furniture, Fixture & Equipment (FF&E). These are anticipated
expenses and within the project budget approved by Council. MAJORITY APPROVAL.
FORWARD TO APRIL 16, 2019 REGULAR CONSENT AGENDA.
III. MISCELLANEOUS
Adjourned 5:32 p.m.
Committee Chair Approval
Summary by LH