HomeMy WebLinkAboutTIC 2019-04-16 Item 2C - Handout Distributed at Meeting - 1989-2019 Tukwila Hill Projects and ExpendituresTukwila Hill Projects and Expenditures 1989 - 2019
1990
1991
1999
2000
2000
2000
2001
2001
2002
2002
1989-2003
2003-2015
2004-2007
2007
2008
2012
2017
2005-2017
North Hill Reservoir and Pump Station - 57th Ave S
S 150th St (Macadam Rd to 55th Ave S)
1999 Small Drainage Program - 53rd Ave S Drainage Improvements
2000 Small Drainage Program - 58th Ave S/59th Ave S Alley
2000 Small Drainage Program - 56th Ave S/ S 147th St
2000 Small Drainage Program - 53rd Ave S/S 139th St
2001 Small Drainage Program - Macadam Road Stairs
2001 Small Drainage Program - S 138th St
2002 Small Drainage Program - 57th Ave S
2002 Small Drainage Program - 65th Ave S
Interurban Ave S Bridge Widening & Trail Bridge
Fort Dent Park (from CIP Park page, 32)
Macadam Winter Garden
2007 Small Drainage Program
2008 Small Drainage Program
2012 Small Drainage Program
2017 Small Drainage Program
- 65th Ave S
- S 149th St & S 150th St
- S142ndSt
- 58th Ave S
Interurban Ave S (S 144rd St to Fort Dent)
2018 2018 Overlay & Repair - Southcenter Blvd
2018 Grady Way Bridge Seismic Repairs
2015-2019 53rd Ave S Road, Water, Sewer, & SWM
$ 3,800,000
8710301
15,000
150,000
15,000
15,000
15,000
25,000
15,000
25,000
1,887,000
2,017,000
424,000
20,000
175,000
75,000
104,000
12,934,588
750,000
354,214
9,250,000 2019 Budget
$ 32,065,802
W:\9hared Copy Only \GaII\Nelghborhood Projects 1989-2019 g1030619.x1sx