HomeMy WebLinkAboutReg 2019-05-20 Item 4F - Contract Amendment #6 - 53rd Avenue South (South 137th - South 144th) with KPG Inc for $259,770COUNCIL AGENDA SiwoPsis Initials Meeting Date 0 /20 19 Prepared by HH illayor's review Council review 14q ITEM INFORMATION ITEM No. 4.F. Sfik1.1, SPONSOR: HENRY HASH ORIGINAL, AGr.NDA DA 11,.: 05/20/19 AGENDA ITEM TITLE 53rd Avenue South Project (South 137th to South 144th Streets) Construction Management Amendment No. 6 with KPG, Inc. CATEGORY • Discussion Motion Date 05/20/19 E] Resolution Altg Date El Ordinance Mg Date [1] Bid Award Mtg Date [I] Public Hearing Mfg Dale El Other Aftg Date Mtg Date Mtg SPONSOR flcouncil Major DHR LDCD UFinance UFite OTS OP R UPolice Court P SPONSOR'S Amendment No. 6 to Contract No. 15-159 is for additional construction management Summ,\Ry services for the 53rd Avenue South Residential Street Project Due to utility conversion delays, additional time is needed to provide construction management through the end of the project. Council is being asked to approve the construction management Amendment No. 6 with KPG for $259,770.00. REVIEWED BY El C.O.W. Mtg. CDN Comm fl Arts Comm. 0 Finance Comm. rj Parks Comm. 0 Public Safety Comm. El Planning Comm. ZAK IDAN 1 Trans &Infrastructure DATE: 05/07/19 COmmii I EE CHAIR: RECOMMENDATIONS: SPONSOR/ADMIN. CONINIFIThE Public Works Department Majority Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $259,770.00 $9,250,000.00 $0.00 Fund Source: 103 RESIDENTIAL STREET FUND (PG 3, 2019 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 0 20 19 NITG. DATE ATTACHMENTS 05/20/19 Informational Memorandum dated 05/03/19 Page 3, 2019 CIP KPG Amendment No. 6 to ContractNo. 15-159 Minutes from the Transportation & Infrastructure Committee meeting of 0 07 9 87 88 City of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director l',44 BY: Peter Lau, Senior Program Manager CC: Mayor Allan Ekberg DATE: May 3, 2019 SUBJECT: 53rd Avenue South Project (South 137th Street to South 144th Street) Project No. 99110301, Contract No. 15-159 Construction Management Amendment No. 6 with KPG, Inc. ISSUE Approve Amendment No. 6 to Consultant Contract No. 15-159 with KPG, Inc. Allan Ekberg, Mayor BACKGROUND Contract No. 15-159 with KPG provided design and construction management (CM) services for the 53rd Ave S Project. DISCUSSION KPG's Amendment No. 6 will allow the continuation of construction engineering, inspection, and documentation compliance support for the full completion of the 53rd Ave S Project. The construction project is currently anticipated to be completed by June 2019. However, the progress of the utility conversion work will dictate when construction will actually be physically completed. If the slow progress of the utility conversion prohibits the contractor from efficiently completing the construction project, construction will be suspended until the utility conversion work is completed. FISCAL IMPACT The table below shows the project budget and expenditures, with the inclusion of KPG's Amendment No. 6: KPG's fee of $259,770.00 is reasonable for the scope of work provided to complete this challenging project. Design CM Construction Budget Design & ROW (up to Am No. 3) $809,382 $832,000 KPG CM Amendment Nos. 4 & 5 $858,842 870,000 KPG CM Amendment No. 6 259,770 City CM Staff (estimated total) 100,000 SCI Construction Contract w/ sales tax 5,953,250 7,548,000 SCI Change Orders No. 1 to 5 w sales tax 632,017 Construction Contingency 350,000 Total $809,382 $1,218,612 $6,935,267 Grand Total $8,963,261 $9,250,000 The current 2019 CIP project budget is sufficient to cover the cost of KPG's Amendment No. 6 and will leave a construction contingency of $350,000 to cover all future change orders and other additional costs needed to physically complete the 53rd Ave S Project. RECOMMENDATION Council is being asked to approve Amendment No. 6 to Contract No. 15-159 with KPG, Inc. in the amount of $259,770 for a new contract total of $1,774,201.69 for the 53rd Ave S Project and to consider this item on the Consent Agenda at the May 20, 2019 Regular Meeting. Attachments: 2019 CIP, page 3, KPG Amendment No. 6 W:IPW EngIPROJECTS1A- RW & RS Projects153rd Ave S (99110301)ICN Management Memo for KPG Supp #6, gl HH 050319.docx 89 90 JUSTIFICATION: STATUS: M*VNT.|MPAcT CITY OPTQKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 53rd Ave S (S137th St'S144th St) Project No. 98110301 Design and construct urban residential street improvements that include curb, gutter, sidewo|k.undergmunding. and illumination. Street will coordinate with Water $1.1m, Sewer $185k, and Surface Water $920k CIP projects. Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. Undergmunding isincluded otthis time. Reduce pavement, shoulder, and drainage work. State T|Bgrant for $2.14Mfor roadway and drainage. See additional pages inEnterprise funds under 53rd Ave S Projects. Seattle City Light is now negotiating a 60/40 underground split and undergrounding costs have been added hoproject. Bond for $2million. FINANCIAL Through Estimated EXPENSES Design Lend(R8N) Const.|wgmt. Construction Undengrnunding TQT/u-EXPENSES 607 167 764 21 47 485 3.239 1,379 e.121 485 2.050 080 3.36e V V n V 0 0 one 204 870 5.289 2.258 9/250 FUND SOURCES UUUUeuVV/G/SWM Awarded TOGrant Seattle City Light Bond City OpocRevenue 259 85 2.049 (1,609) 1.161 1.912 729 1,319 1.254 3e4 428 1.318 O ' Q n O 0 O 2,074 2,341 1.157 2,049 1.029 2019'uou*Capital Improvement Program 3 91 92 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: CONTRACT FOR SERVICES Amendment #6 Between the City of Tukwila and KPG Inc. That portion of Contract No. 15-159 between the City of Tukwila and KPG Inc. is amended as follows; Article 2, Scope of Services, shall be supplemented with the following: The Consultant agrees to provide construction services in accordance with the scope of work included as Exhibit A-6. Article 4, Payment, shall be modified as follows: Payment for work provided by Consultant shall be made as provided on Exhibit B-6, attached hereto, provided that the total amount of payment to the Consultant for this work not exceed $259, 770.00 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $1,774,201.69 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of ,20 CITY OF TUKWILA CONTRACTOR Allan Ekberg, Mayor Printed Name: Nelson Davis,.KPG ATTEST/AUTHENTICATED APPROVED AS TO FORM Christy O'Flaherty, MMC, City Clerk City Attorney Page 1 of 1 93 EXHIBIT A-6 Supplement 6 Additional Construction Management Services Scope of Work March 2019 �;�m^m��-��xax^Va ~^^~v —` ^~`--^^ Project No. 99110901 TUBProject [N0.:0-I2)-1 1^ BACKGROUND This work will provide additional construction management services for the construction contract to complete 53 d Avenue S Roadway Improvements (S 144' Street to 3 1371h Street). These additional services are the result of: • Additional working days added through approved change orders (4Qworking days apprnyed. • Anticipated additional working days for force account work and to allowBCLto complete energization of underground system, and wreckout of aerial system (27 working days estimated). • Weather days (30.5 approved to date, estimate 35 total through physical completion) The original contract duration was 215 Working days, beginning on April 9, 2018 and ending on February 15,2019. An additional 10Sworking days are anticipated based on the change orders and weather days described above, resulting |nacompletion date ofJuly 17,2O19. This supplement is provided to continue construction management and inspection services in accordance with the original authorization and osdetailed below: lL INTRODUCTION The foUpwin8scopoofservices and associated costs are based upon the assumptions outlined below. General Assumptions: � The proposed project team for additional mxocNnQ days will include one part-time project manager, one part-time resident engineer, one part-time documentation control specialist, one full-time inspector, additional part-time inspector for certain work elements, design team, management, and administrative support as required, sub'consu|tantsto provide services for materials testing, and other supporting tasks osdeemed necessary. |tiyanticipated that full-time site observation will berequired for the entire duration ofconstruction. City qfTukwila f31d Ave S Additional Construction Management Services Scope of Work — Supplement 6 Page I of 4 KPG Project #15085 94 EXHIBIT A-6 m The level ofservice b based onadditional project duration ofupto 105working days per the assumptions in the Background section of this scope of work. w KPG field staff will continue to perform day to day public outreach to ensure affected residents are notified in advance of impending contractor activities. The design engineersfrom KPGwill beavailable during construction tnanswer questions during construction and review RAMs,shop drawings, and answer RRs, The engineer ofrecordxi||be available to provide background information on the design should it be necessary. � Services will beperformed /naccordance with the Contract plans & special provisions, VVSDDT Local Agency Guidelines ("iAG^),the VVS0OTConstruction Manual, and the client engineering standards. 9 The franchise utilities will provide field inspection for all work surrounding the construction or relocation of their utility systems not constructed by the Clients Contractor, if necessary. Client/Field Office: The Contractor will provide a field office as required by the contract documents. The Consultant's field'staff shall have access to the field office. Ill. SCOPE OF WORK The objective and purpose of this Construction Management Services Agreement is for the Consultant to successfully deliver the construction of the Project tothe client by ensuring that the improvements are constructed |naccordance with the approved Plans and Specifications, asmay beamended ar.revised, that all of the required Project documentation is accounted for, and ultimately that the client receives successful review byT|Batthe end ofthe Project. TASK 1—MANAGEMENT/COORDINATION/ADMINISTRATION No additional funds are requested for this task. We have been able tomitigate the longer contract duration and can continue to provide the services described in the original scope of work within the previously authorized budget. TASK 2 — DESIGN SUPPORT No additional funds are requested for this task. We have been able to mitigate the longer contract duration and can continue to provide the services described in the original scope of work within the previously authorized budget. TASK 3—P8ECQ@STRUC00NSERVICES Work is complete, no additional funds are requested for this task. City of Tukwila £F»Ave S Additional Construction Management Services Scope pfWork —Supplement 6 Page 2 of 4 KPG Project #15085 95 TASK 4—CONSTRUCTION OBSERVATION Construction Observation services will continue in accorclance with the original scope of work. Additional observation time is required to achieve physical completion due to longer contract duration: 4.5The Consultant shall provide the services of one full-time inspector with necessary oversight, engineering, and administrative support for an additional 105 working days as described in the Background section ofthis scope ofwork. Part-time inspection /santicipated for certain remaining work elements. The budget is based on 40 hours/week full-time inspection and 20 hours/week part- time inspection for up to 105 working days associated with change order and weather days. Deliverables m Daily Construction Reports with project photos — submitted on a weekly basis p Punch List, Certificate ofSubstantial Completion *Rgv|exvtest reports for compliance TASK 5—CONSTRUCTION SERVICES —/OFFICE Construction Office services will continue inaccordance with the original scope ofwork, Additional time is required to achieve physical completion due tolonger contractduration: S.S'The Consultant shall provide the services of one part-time resident engineer and one part-time documentation specialist with necessary oversight, engineering, and administrative support for an additional 105 working days as described in the Background section of this scope of work. The budget is based on 16 hours/week part-time resident engineer and JO hours/week part-time documentation specialist, Deliverables *Submittal log *RA Log w Completed Record ofMaterial for Material Certification *[hanQeOrdor(s) mChange Management Log ~RF|Lng *Minor Change Order(s) *Force Account Records *Record drawings inelectronic and hard copy format TASK G—SURVEY fkK8ATERIAlTESTNG No additional funds are requested for this task We have been able to mitigate the longer contract duration and can continue to provide the services described in the original scope of work within the previously authorized budget. City qfTukwila 53" Ave Additional Construction ManagementJervices Scope of Work —Supplement 6 Page 3 of 4 KPG Pr��#��s 96 EXHIBIT A-6 TASK 7'ADDITIONAL SERVICES Additional services requested by the client, will be performed only when authorized by the client. Authorization to perform additional services will be in writing, specifying the work to be performed, and basis of payment. Items such as Community Outreach.(except as completed on a day today basis by the inspector and resident engineer as described herein), Public Meetings, Ribbon Cutting Ceremony, claims analysis, additional surveying, services during shutdown periods of nmn'xxVrWnA days, and services for extended working days are examples of possible additional services. This fee is based on 340 working days (two weeks prior to construction, 215 working day contract, 105 additional days per this supplement, and two weeks for closeout, 8 hour days), additional extension of days will be approximately $3,000 per day. City qfTukwila BmAve J Additional Construction Management Services Scope of Work —Supplement 6 Page 4 of 4 KPG Project #15085 97 EXHIBIT B-6 HOUR AND FEE ESTIMATE Project: City of Tukwila TIB No. 8-1-116(012)-1 53rd Ave S Tukwila # 99110301 Supplement No. 6 KPG No. 15085 Additional Construction Management Services Nto.. Interdisciplinary Design Task Description Project Manager $ 166.00 Project Engineer $ 140.00 Resident Engineer $ 125.00 Senior Inspector $ 128.00 Const Inspector $ 92.00 Const Technician $ 77.00 Doc Control Admln S 77.0D Senior Admin 5 115.00 Budget Task 1 - Mena ement/Coordinallon/AdminIstration No Additional Budget Required Reimbursable expenses - no additional required Task Totals 0 0 0 0 0 0 0 0 Task 2 - Design Support during Construction No Additional Budget Required Reimbursable expenses - no additional Task Total uired a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ Task 3 - Preconstruction Services No Additional Budget Required Reimbursable expenses - no additional required Task Total Task 4 - Construction Observation 4.5 Construction observation (addl 90 days) Reimbursable expenses - no additional required Task Total 1 21 0 0 Task 5 - Construction Services - Office 5,27 Construction office services (add! 90 days) Reimbursable expenses - no additional required Task Total I 84 I 21 84 0 0 42 42 42 0 0 42 42 336 0 0 840 840 0 0 0 420 420 0 0 0 0 0 0 0 0 0 0 420 0 0 42 Task 6 - Survey 8 Material Testin No Additional Budget Required 0 42 0 336 0 0 0 0 0 0 0 420 0 42 0 $ 160.776 $ 160,776 $ 98,994 5 98,994 Reimbursable expenses - no additional required Task Total 0 0 Total Hours 105, 84 0 378 0 0 840 420 0 0 0 0 420 42 $ Total Budget: $ 259,770 City of Tukwila 53rd Ave S Additional Construction Management Services Budget Estimate - Supplement 6 Page 1 of 1 KPG Project 15085 March 2019 98 City of Tukwila City Council Transportation & Infrastructure Committee TRANSPORTATION & INFRASTRUCTURE COMMITTEE Meeting Minutes May 7, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Zak Idan, Chair; Kate Kruller, Kathy Hougardy Staff: David Cline, Henry Hash, Hari Ponnekanti, Gail Labanara, Han Kirkland, Susan Murrietta, Peter Lau, Scott Bates, Laurel Humphrey CALL TO ORDER: Committee Chair Idan called the meeting to order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Bid Award: 2019 Overlay and Repair Program Staff is seeking Council approval of a construction contraccontract th Tucci & Sons, Inc. in the total amount of $1,286,764.50 for the 2019 Overlay and'Repair ogram. Construction will include pavement repairs and an asphalt overlay at seven locations citywide. The contract total includes bid additive "D" in the amount of $74,848„00 for the overlay of S. 124th St. at 50th Place South. Councilmember Kruller asked if the ADA'mproverents on Interurban Avenue South near the bike path will benefit bicyclists, and staff confirmed that tom` bicycle ramp will be widened. Chair Idan noted that the City should have a broader conversation about expanding funding for the Overlay program. MAJORITY APPROVAL.FORWARD TO MAY 20, 2019 REGULAR CONSENT AGENDA. B. Contract Amendment: 2019 Overlay and Repair Program Staff is seeking Council,,approval of Amendment No. 2 to Contract No. 18-199 with KPG, Inc. in the amount of $179,57 to provide construction management services for the 2019 Overlay and Repair Program. With phis amendment the contract will be extended until December 31, 20.19" tid the total will be 0,308.00. MAJORITY APPROVAL. FORWARD TO MAY 20, 2019 REGULAR CONSENT AGENDA. C. ContractAmendment: 53rd Avenue South Project Staff is seeking Council approval of Amendment No. 6 to Contract No. 15-159 with KPG, Inc. in the amountof $259,770 for the 53rd Avenue South Project. This amendment will support the full completion of the project, anticipated by June 2019. It is possible that utility conversion work will interfere with the construction completion. The current project budget can cover the amendment and leaves a contingency of $350,000. Speed cushions will be installed within the next couple of weeks. Councilmember Kruller inquired about a strategy to plan for more budget at the outset of projects as she has seen in the City of Seattle. Staff noted that contingency funding varies by project, and that utility undergrounding presents unknown risks and problems. Councilmember Kruller mentioned that it is common for cities to experience delays and other issues with Seattle City Light and it would be good to work toward solutions. 99 Transportation & Infrastructure Committee Minutes May 7, 2019 Staff noted that this could be a policy issue and/or on the Council's legislative agenda. Staff also noted that Tukwila has one staff and one business representative on Seattle City Light's Review Panel. Chair Idan asked if staff could quantify the cost incurred by Seattle City Light related delays and staff will provide that information. Councilmember Kruller said she appreciated staff's response to the resident who was unhappy with work occurring on the weekend without notification. MAJORITY APPROVAL. FORWARD TO MAY 20, 2019 REGULAR CONSENT AGENDA. D. Change Order: 42" Avenue South Phase III & Gilliam Creek Culvert Staff is seeking Council approval of Change Order No. 4 with Active Construction, Inc. in the amount of $1,050,000 to resolve all claims and disputes for the 42nd Avenue South Phase III Project. This project encountered schedule delays and cost overruns due to issues with excessive ground water interference during excavation, changes andconflicts for Seattle City Light facilities, design issues, contract inefficiencies, and other utility onflicts. Change Order No. 3 was negotiated to resolve outstanding disputes through May 2018 and avoided potential clams and legal fees, but unanticipated issues resulted in more costly delays. Change Order No. 4 was extensively negotiated and agreed to by both parties. It will reduce the 14% mark- up rate established in CO No. 3 to 12.5%, enable City staff to continue cooperative work with ACI, requires physical completion of the project within six weeks after utility conversion work is done, and resolves all outstanding claims and disputes with agreement for no future legal action. The current project budget is sufficient to cover the cost of Change Order No. 4 and leaves a $349,593.00 contingency. Chair !clan mentioned the importance of the construction schedule. MAJORITY APPROVAL. FORWARD TO MAY 20, 2019REGULAR CONSENT AGENDA. E. Waste Management Contract Status Update Staff updated the Committee on the ongoin negotiations with Waste Management. The current contract will expire on October 31, 2019 but has a provision for up to two 2-year extensions, which�taff recommends pursuingdue to the favorable rates. The contract extension proposal wilt be brought to the next Committee meeting. Terms will include a 5% rate increase and 10%utilityax increase forcommercial customers and trash collection at the bus stops along Tukwila International Boulevard. The rates will still be comparatively favorable with thesencreases, which are due to the changes to the international recycling market and the impacts to roads by the heavy trucks. Councilmember Kruller expressed concerns about impacts to the business community. Councilmember Hougardy said that it will be important to consider the history of the issue when the contract is next bid, and that messaging to the business community should include the information about the rate compared with other Cities. Councilmember Kruller suggested reaching out to the Chamber. Waste Management will also be messaging the community about the increase. Chair !clan suggested that the Council would benefit from education on pavement conditions citywide. DISCUSSION ONLY. III. SCATBd/RTC There was no report. 100