Loading...
HomeMy WebLinkAboutTIC 2019-05-21 Item 2A - Handout Distributed at Meeting - 1989-2019 McMicken Projects and ExpendituresMcMicken Projects and Expenditures 1989 - 2019 Expenditures 1989 51st Ave S (S 160th St to 5 166th St) $ 560,000 1993 South 160th Street (42nd Ave S to 51st Ave S) 1,100,000 1994 South 160th Street (51st Ave S to 53rd Ave S) 500,000 1994 Slade Way Overlay and Pedestrian Path 50,000 199X 53rd Ave S (Klickitat to Slade Way 450,000 1994 Crystal Springs Park 450,000 199X Crestview Park 650,000 199X Klickitat Drive LTL and raised Pedestrian Path 150,000 Project No. 8610301 S 160th St Improvements 8610302 2000 2000 Small Drainage Program - Loop Drainage - Site 1 (Outfall) 104,067 2000 2000 Small Drainage Program - Loop Drainage - Site 2 (47th Ave S/ S 156th St) 142,500 2001 2001 Small Drainage Program - 54th Ave S 168,572 2003 2003 Small Drainage Program - Loop Drainage Phase 2 190,029 2004 2004 Small Drainage Program - Loop Drainage Phase 3 136,930 2007 2007 Small Drainage Program - S 162nd St 51,114 2014 I-5/Klickitat Dr - Unstable Slope/Elevated Walkway (Grant funded) 286,001 91410406 2016 Crystal Springs Emergency Surface Water Repair 475,924 2016 S 160th St Speed Cushion Pilot Project 47,237 91610410 2017 2017 Small Drainage Project - 48th Ave S 338,646 2019 42nd Avenue S Phase III/Gilliam Creek Culvert Replacement Project 10,537,780 99410303 Majority of 42nd Ave S Phase 111 (from SR-518 to S 160th St), no Gilliam Creek Total $ 16,388,800 W:\Shared Copy Only \Gait\Neighborhood Projects 1989-2019 gl 030619.a0ss