HomeMy WebLinkAboutCOW 2019-06-10 Item 4A - Public Hearing - Resolution Adopting 2020-2025 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's rev" w Council review 06/10/19 CK i.of 06/17/19 CK CK ITEM INFORMATION ITEM No. 4.A. & 5.A. STAFF SPONSOR: CYNDY KNIGHTON ORIGINAL AGENDA DATE: 06/10/19 AGENDA ITEM TULE Resolution for Six -Year Transportation Improvement Program (2020-2025) CATEGORY Z Discussion Mt g Date 06/10/19 [11 Motion Mtg Date r, Resolution Ej Ordinance AltgDate El Bid Award Alts Date Z Public Hearing Mtg Date 06/10/19 Other Mtg Date Mtg Date 06/17/19 SPONSOR . Counci 1 Mayor EIHR El DCD EFinance Fire E1TS EiP&R Police PIV Court SPONSOR'S The Transportation Improvement Program (TIP) is updated annually as required by the SUMMARY Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. Council is being asked to approve the Resolution for the 2020-2025 Six -Year Transportation Improvement Program and consider this item at the June 10, 2019 Committee of the Whole with a Public Hearing and subsequent June 17, 2019 Regular Meeting. REVIEWED BY 11 C.O.W. Mtg. 0 CDN Comm 0 Finance Comm. rj Public Safety Comm. Z Trans &Infrastructure Arts Comm. Parks Comm. Planning Comm. DATE: 06/04/19 COMMEFTEE CHAIR: ZAK IDAN RECOMMENDATIONS: SPoNsoR/ADmIN. COMMITTEE Public Works Department Unanimous Approval; Forward to Committee of the Whole Meeting COST IMPACT / FUND SOURCE EXPENDFIURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/10/19 06/17/19 MTG. DATE ATTACHMENTS 06/10/19 Information Memorandum dated 05/31/19 Draft Resolution Draft 2020-2025 TIP Summary 2020-2025 "Draft" Transportation Improvement Program Current Adopted 2019-2024 TIP Minutes from the Transportion & Infrastructure Committee meeting of 06/04/19 06/17/19 9 10 Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATION MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director /IA BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: May 31, 2019 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2020 - 2025) ISSUE Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program for 2020 - 2025. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related projects. The TIP generally lists only those transportation -related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The TIP is scheduled for adoption on June 17, 2019. ANALYSIS The attached spreadsheet is the "Draft" 2020 - 2025 TIP and was created by modifying the 2019 - 2024 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the current CIP. No new projects were added, and five projects were removed because they have either been completed or moved beyond the six -year time frame of the TIP. One project was combined into a larger project: West Valley Highway/Longacres Way Shared Use Pathways has been merged into the larger West Valley Highway project. Deleted: Completed: 40-42nd Avenue S Phase III and 53rd Avenue S. Moved to Beyond: TUC/TOD Pedestrian Improvements; Tukwila Intl Blvd Retrofit; and Multipurpose Trails. FINANCIAL IMPACT None. RECOMMENDATION Council is being asked to approve the Resolution for the 2020 - 2025 Six -Year Transportation Improvement Program and consider this item at the June 10, 2018 Committee of the Whole with a Public Hearing and subsequent June 17, 2019 Regular Meeting. ATTACHMENTS • Draft Resolution • Draft 2020-2025 TIP Summary • 2020 — 2025 "Draft" Transportation Improvement Program • Current Adopted 2019 — 2024 TIP W:\PW Eng\PROJECTS\A- RW & RS Projects\TIP\Info Memo TIP 2020.docx 11 12 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2020- 2025), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 of the Revised Code of Washington, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and has thereafter periodically modified said Transportation Improvement Program by resolution, in compliance with state law; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2020-2025); and WHEREAS, on June 10, 2019, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2020 to 2025, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W:\Legislative Development\TIP 2020-2025 5-14-19 CK:bjs Review and analysis by Barbara Saxton Page 1 of 2 13 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2019. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2020 to 2025 W:\Legislative Development\TIP 2020-2025 5-14-19 CK:bjs Review and analysis by Barbara Saxton Page 2 of 2 14 2019-2024 CIP Sheet DRAFT 2020 - 2025 TIP SUMMARY PROJECT TITLE May 22, 2019 Project Costs in Thousands of Dollars FUNDING SOURCES 2020 2021 2022 2023 2024 2025 TOTAL Federal State/TIB Developer Unsecured City 15 42nd Avenue S Bridge Replacement 1,600 1,250 6,500 6,400 0 0 15,750 12,000 4 46th Avenue Safe Routes to School 0 412 2,125 0 0 0 2,537 2,537 18 ADA Improvements 50 200 200 200 200 200 1,050 17 Annual Bridge Inspections and Repairs 335 405 405 450 450 450 2,495 16 Annual Overlay and Repair Program 1,400 1,400 1,400 1,400 1,400 1,400 8,400 26 APE/Minkler Blvd Intersection 144 1,570 0 0 0 0 1,714 13 BAR over Airport Wy Bridge Seismic Retrofit* 2,614 0 0 0 0 0 2,614 2,614 BNSF Regional Center Access 0 0 0 100 0 0 100 25 Green River Trail 0 74 962 0 0 0 1,036 5 Macadam Road S Complete Streets Project 0 0 497 2,733 0 0 3,230 20 S 140th St Intersection Improvements 0 125 625 0 0 0 750 14 S 144th St Bridge Sidewalks 0 0 216 227 0 0 443 6 S 152nd Street Safe Routes to School 0 0 243 2,584 0 0 2,827 10 Strander Blvd/SW 27th St St Phase III 3,720 38,389 37,889 0 0 0 79,998 13,217 12 West Valley Highway 3,545 0 0 0 0 0 3,545 441 2,326 3,750 0 1,050 2,495 8,400 1,714 0 100 896 140 2,770 460 675 75 443 0 2,827 0 66,278 503 778 TOTAL 13,408 43,825 51,062 14,094 2,050 2,050 126,489 28,272 4,863 PROJECTS REVISED FROM 2019-2024 TIP Modified Deleted/Completed: WVH/Longacres Way Shared Use Pathways 40-42nd Ave S Phase III 53rd Avenue S Deleted/Moved to Beyond: TUC/TOD Pedestrian Improvements Tukwila Intl Blvd Retrofit Multipurpose Trails 73,889 19,465 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over he Duwamish River at the intersection with Interurban Ave S Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement would require preliminary engineer design, right-of-way, and construction phases. The new structure would meet current road and bridge design standards. The replacement structure configuration would be two through lanes, possibly a turn pocket, and include sidewalks. 06/10/19 06/17/19 11 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 BR 1,280,000 0 320,000 1,600,000 P RW 2021 BR 800,000 0 450,000 1,250,000 P CN 2022 BR 9,920,000 0 2,980,000 12,900,000 Totals 12,000,000 0 3,750,000 15,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 1,600,000 250,000 250,000 250,000 0 RW 0 1,000,000 0 0 0 CN 0 0 6,250,000 6,150,000 0 Totals 1,600,000 1,250,000 6,500,000 6,400,000 0 Report Date: May 22, 2019 Page 1 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/10/19 06/17/19 05 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 SRTS 180,000 0 180,000 P RW 2021 0 SRTS 232,000 0 232,000 P CN 2022 0 SRTS 2,125,000 0 2,125,000 Totals 0 2,637,000 0 2,537,000 Expenditure Schedule Phase 1st 2nd 3rd 4th ' 5th & 6th PE 0 180,000 0 0 0 RW 0 232,000 0 0 0 CN 0 0 2,125,000 0 0 Totals 0 412,000 2,125,000 0 0 Report Date: May 22, 2019 Page 2 co tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/10/19 06/17/19 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 1,050,000 1,050,000 Totals 0 0 1,050,000 1,050,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 50,000 200,000 200,000 200,000 i 400,000 Totals 50,000 200,000 200,000 200,000 400,000 Report Date: May 22, 2019 Page 3 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/10/19 06/17/19 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 0 134,000 134,000 P RW 2022 0 0 10,000 10,000 P CN 2023 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0' CN 0 1,570,000 0 0 0 Totals 144,000 1,570,000 0 0 0 Report Date: May 22, 2019 Page 4 N O tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA-03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/10/19 06/17/19 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 2,495,000 2,495,000 Totals 0 0 2,495,000 2,495,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 335,000 405,000 405,000 405,000 i 900,000 Totals 335,000 405,000 405,000 405,000 900,000 Report Date: May 22, 2019 Page 5 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/10/19 06/17/19 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 8,400,000 8,400,000 Totals 0 0 8,400,000 8,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400,000 1,400,000 1,400,000 1,400 000 i 2,800,000 Totals 1,400,000 1,400,000 1,400,000 1,400,000 2,800,000 Report Date: May 22, 2019 Page 6 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/10/19 06/17/19 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 100,000 100,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 100,000 i 0 Totals 0 0 0 100,000 0 Report Date: May 22, 2019 Page 7 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 / 1380(004) TUK-61 Boeing Access Road over Airport Way Seismic Retrofit S Boeing Access Road over Airport Way S Airport Way S to Airport Way S Install seismic protection on the structure. 06/10/19 06/17/19 06 0.050 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 STP(BR) 2,613,855 0 0 2,613,855 Totals 2,613,855 0 0 2,613,855 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,614,000 0 0 0 i 0 Totals 2,614,000 0 0 0 0 Report Date: May 22, 2019 Page 8 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-11115 Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and pedestrian plaza. 06/10/19 06/17/19 28 0.140 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2022 STP(E) 896,000 0 140,000 1,036,000 Totals 896,000 0 140,000 1,036,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 74,000 962,000 0 0 Totals 0 74,000 962,000 0 0 Report Date: May 22, 2019 Page 9 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA-11110 Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/10/19 06/17/19 04 0.350 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 Ped/Bike Program 397,000 0 397,000 P RW 2022 0 Ped/Bike Program 100,000 0 100,000 P CN 2023 0 Ped/Bike Program 2,273,000 460,000 2,733,000 Totals 0 2,770,000 460,000 3,230,000 Expenditure Schedule Phase 1st 2nd 3rd 4th ' 5th & 6th PE 0 0 397,000 0 0 RW 0 0 100,000 0 0 CN 0 0 0 2,733,000 0 Totals 0 0 497,000 2,733,000 0 Report Date: May 22, 2019 Page 10 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA-09873 S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection 06/10/19 06/17/19 04 C G P S T W 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 Ped/Bike Program 67,000 8,000 75,000 P RW 2021 0 Ped/Bike Program 40,000 10,000 50,000 P CN 2022 0 Ped/Bike Program 568,000 57,000 625,000 Totals 0 675,000 75,000 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 75,000 0 0 0 RW 0 50,000 0 0 0 CN 0 0 625,000 0 0 Totals 0 125,000 625,000 0 0 Report Date: May 22, 2019 Page 11 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S 06/10/19 06/17/19 28 0.250 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 SRTS 443,000 0 0 443,000 Totals 443,000 0 0 443,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 216,000 227,000 0 Totals 0 0 216,000 227,000 0 Report Date: May 22, 2019 Page 12 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-11112 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. 06/10/19 06/17/19 05 0.300 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 SRTS 243,000 0 243,000 P CN 2023 0 SRTS 2,584,000 0 2,584,000 Totals 0 2,827,000 0 2,827,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 243,000 0 0 CN 0 0 0 2,584,000 0 Totals 0 0 243,000 2,584,000 0 Report Date: May 22, 2019 Page 13 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 / 1276(007) TUK-59 Strander Blvd./SW 27th St Extension Strander Blvd./SW 27th St Extension West Valley Highway to Naches Ave This project is Phase 3 of a multi -phase improvement that will connect Strander Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway widening of two lanes for a portion of the project segment, a separated joint -use trail, a new trail bridge for the Interurban Trail (including new trail connections to Strander Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal serving the Tukwila Station, and storm drainage facilities. Current funding will complete the preliminary engineering and right of way phases. Construction will be funded as part of a future phase. 06/10/19 06/17/19 01 0.300 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 STP 1,730,000 0 270,000 2,000,000 S RW 2020 STP(UL) 1,487,000 0 233,000 1,720,000 S CN 2021 FMSIB 5,000,000 0 0 5,000,000 S CN 2021 Discretionary 5,000,000 0 0 5,000,000 P CN 2021 STP 4,760,000 TIB 12s000,000 0 16,760,000 P CN 2021 TIGER 25,000,000 WSDOT 24,518,000 0 49,518,000 Totals 42,977,000 36,518,000 503,000 79,998,000 Report Date: May 22, 2019 Page 14 W O tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 2,000,000 0 0 0 0 RW 1,720,000 0 0 0 0 CN 0 38,389,000 37 889000 0 0 Totals 3,720,000 38,389,000 37,889,000 0 0 Report Date: May 22, 2019 Page 15 tat Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK-60 West Valley Highway/Longacres Way Shared Use Pathways SR 181 &Longacres Way W end of planned Green River Bridge to Longacres Way Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. Design -only will be completed for future improvements on Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. 06/10/19 06/17/19 28 0.170 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 TIB 50,000 50,000 100,000 S CN 2020 CMAQ 441,000 TIB 2,276,000 728,000 3,445,000 Totals 441,000 2,326,000 778,000 3,545,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 3,445,000 0 0 0 0 Totals 3,545,000 0 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 59,370,855 47,653,000 19,465,000 126,488,855 Report Date: May 22, 2019 Page 16 W N tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA-07745 40-42 Ave S (S 160 St - S 131 PL) S 160th Street to S 131st Place Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments 06/25/18 07/02/18 1938 04 C G O P S TW DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2019 0 0 3,000,000 3,000,000 P CN 2024 0 0 4,360,000 4,360,000 Totals 0 0 7,360,000 7,360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 3,000,000 0 0 0 4,360,000 Totals 3,000,000 0 0 0 4,360,000 Report Date: May 21, 2019 Page 1 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 08 WA-11101 42nd Ave S Bridge Replacement 42nd Ave S Interurban Avenue S to North Bridge Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700 06/25/18 07/02/18 1938 11 C G P S T W 0.060 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 BR 1554,000 0 546,000 2,100,000 P RW 2021 BR 740,000 0 260,000 1,000,000 P CN 2022 BR 10,206,000 0 2,444,000 12,650,000 Totals 12,500,000 0 3,250,000 15,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 1,600,000 0 250 000 250000 RW 0 0 1,000,000 0 0 CN 0 0 250,000 6,250 000 6,150,000 Totals 0 1,600,000 1,250,000 6,500,000 6,400,000 Report Date: May 21, 2019 Page 2 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/25/18 07/02/18 1938 05 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 SRTS 180,057 0 180,057 P RW 2019 0 SRTS 232,000 0 232,000 P CN 2020 0 SRTS 2,124,668 0 2,124,668 Totals 0 2,636,725 0 2,536,725 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 180,057 0 0 0 0 RW 232,000 0 0 0 0 CN 0 2,124,668 0 0 0 Totals 412,057 2,124,668 0 0 0 Report Date: May 21, 2019 Page 3 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA-06601 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. 06/25/18 07/02/18 1938 04 C G O P S TW 0.420 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2019 0 TIB 2,274,365 2,714,849 4,989,214 Totals 0 2,274,365 2,714,849 4,989,214 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 4,101,249 250,000 0 0 0 Totals 4,101,249 250,000 0 0 0 Report Date: May 21, 2019 Page 4 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 405 Americans with Disabilities Act (ADA) Improvements Various locations \\\\\ \ to '\ \ \\ Design and construct ADA compliant upgrades to City infrastructure in conjunction with a Citydeveloped plan. 06/25/18 07/02/18 1938 06 No Funding \ \N\\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds `1 tlalo4,tiund Cod State Funds Local Funds Total Funds S ALL 2019 \ 0 \\ 0 1,200,000 1,200,000 Totals 0 K �OO000' 0 1,200,000 1,200,000 Expenditure Schedule \\\\ Phase 1st 2nd 3rd \\4th \ 5th ALL 200,000 200,000 200,000 000 \\\\\\\\\�\\\p\\\\\ „ 400,000 Totals 200,000 200,000 200,000 \J 00,000 4 Report Date: May 21, 2019 Page 5 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 46 \\\\� \ Andover Park E/Minkler Blvd Intersection Andover Park E \\\ Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/25/18 07/02/18 1938 03 C G O P S TW No Funding , \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds �` ��a and Cod State Funds Local Funds Total Funds P PE 2020 0 \\ 0 134,000 134,000 P RW 2020 0 --, " 0 10,000 10,000 P CN 2021 0 \�\\\�\\1\\\ \\\\\\\\\\\\\\\\ 0 1,570,000 1,570,000 Totals 0 O\\\\\\ \ O 0 1,714,000 1,714,000 Expenditure Schedule \ \ \x. Phase 1st 2nd 3rd 4t}a%th & 6th PE 0 134,000 0 \\\\\Q\\\\\\\\ 0\ RW 0 10,000 0 N0 CN 0 0 1,570,000 I' 0 Totals 0 144,000 1,570,000 0 \ 0 Report Date: May 21, 2019 Page 6 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number /4. E. Begin & End Termini F. Project Description \ �\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 731 Annual Bridge Inspections and Repairs Various City Street to \ \ Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance \ 06/25/18 07/02/18 1938 06 No Funding , \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds `1 '\ o4�tiund Cod I o a State Funds Local Funds Total Funds S ALL 2019 \ 0 \\ 0 2,300,000 2,300,000 Totals 0-�"\ 1/41/4 0 2,300,000 2,300,000 Expenditure Schedule\" 1\\\ Phase 1st 2nd 3rd 1/44th \ 5th ALL 335,000 335,000 405,000000 \\\\\\\\\\\\\\\\\ ', 820,000 Totals 335,000 335,000 405,000 \\05,0001/4\ 82-�\ Report Date: May 21, 2019 :I Page 7 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. D. Project Title \ E. Road Name or Number E. Begin & End Termini F. Project Description \\ B. STIP ID \ \ \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program \ 733 \\ 06/25/18 07/02/18 1938 06 C G O P S TW No Funding , \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds `1 '\ o4\tiund Cod o a State Funds Local Funds Total Funds S ALL 2019 \\ 0 \\ 0 10,870,000 10,870,000 Totals 0 ��\\000"\ 0 10,870,000 10,870,000 Expenditure Schedule \" \\\ Phase 1st 2nd 3rd \\4th \ 5th ALL 1,730,000 1,740,000 1,800,000 \k000 \\\\\\\\\\\\p\\\\\ 3,850,000 Totals 1,730,000 1,740,000 1,800,000 \850,000 \\\\\ 3'8 Report Date: May 21, 2019 :I Page 8 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number /4. E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 , 40 BNSF Regional Center Access New Facility to \ \ Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/25/18 07/02/18 1938 08 EIS No Funding , \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds `1 �\ o4�tiund Cod o a State Funds Local Funds Total Funds P PE 2024 \ 0 \\ 0 100,000 100,000 Totals 0-�"\ 1/41/4 0 100,000 100,000 Expenditure Schedule\" 1\\\ Phase 1st 2nd 3rd 1/44th \ 5th PE 0 0 0 \ 0 \\\\\\\\\�\\\p\\\\\ -, 100,000 Totals 0 0 0 \\ 0 \\\\\\� 1\* Report Date: May 21, 2019 I Page 9 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \ E. Begin & End Termini F. Project Description \ �\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 \,117 Boeing Access Road over Airport Way Bridge Seismic Retrofit Boeing Access Road to \ \ Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to allow it to withstand earthquake forces. 06/25/18 07/02/18 1938 47 0.100 No Funding , \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds `1 o4�tiund Cod State Funds Local Funds Total Funds S PE 2019 BR0\\ \ 0 0 370,000 S CN 2019 BR 2,611,000 -,�" \\ 0 0 2,611,000 Totals 2,981,000 \\\\\\`\ ,:\\\ 0 0 2,981,000 Expenditure Schedule \ \,\\\\ \\ Phase 1st 2nd 3rd 4th ,,, 5th & 6th PE 370,000 0 0 \\\I\\� 0 \\\\\-\\ I CN 0 2,611,000 0 \\\\\Q\\\\\\\\ 0\ Totals 370,000 2,611,000 0 \\ \ 0 Report Date: May 21, 2019 Page 10 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 415 Green River Trail Green River Trail \\\\\ Christensen Road to Green River '\\ \ \\ Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved \\\\\\ trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, ands pedestrian plaza. 06/25/18 07/02/18 1938 28 0.140 DCE No Funding \ \ -i \\\\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fund St ads oc State Funds Local Funds Total Funds P CN 2021 STP(E) 89,140 \ 0 139,860 1,036,000 Totals 896,140 0 139,860 1,036,000 Expenditure Schedule\ Phase 1st 2nd 3rd ''4th \ 5th & 6 CN 0 0 1,036,000 \ 0 \\\\\\\\h.. Totals 0 0 1,036,000 �pppp� \\\\\\\\\\\ \\\\ 0 II ���2p II Report Date: May 21, 2019 Page 11 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 \ 110 Macadam Rd S Complete Streets Project Macadam Road \\\\\ S 150th Street to S 144th Street '' \ \\ Design and construction of a complete street on Macadam Road. Road widening A\\\\\ and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/25/18 07/02/18 1938 04 0.350 DCE No Funding \\ -N '‘\ .\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fund St a oc State Funds Local Funds Total Funds P PE 2019 '- 0 Pede*---.�� \�\\\\\\\O 397,369 0 397,369 P RW 2019 0 PeeProgram \\ 100,000 0 100,000 P CN 2020 0 Pe` \e Program j �' '--\\272,947 460,000 2,732,947 Totals 0 \ ` \\\\\\\ 0 316 460,000 3,230,316 Expenditure Schedule \ \\\ Phase 1st 2nd 3rd 4th� h & 6th PE 397,369 0 0 \\\\\\\\\\\\\\0 \ "0 RW 100,000 0 0 . \-0 CN 0 2,732,947 0 0' \ \"0 Totals 497,369 2,732,947 0 0 \ 0 Report Date: May 21, 2019 Page 12 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number F. BeginEnd Termini \\ F. Project Description \ \ mature ID = Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 783 Multipurpose Trails to \ Wide array of necessary trail improvements to existing trail system infrastructure \ 06/25/18 \\ 07/02/18 1938 28 CE No Funding .--N. \\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federn�nds . , We Fund Cod State Funds Local Funds Total Funds P ALL 2024 0 150,000 150,000 Totals \ 0 \ 0 150,000 150,000 Expenditure Schedule \ ,,,,,,,--N. ,, _ Phase 1st 2nd 3rd _-‘th 5tfi ALL 0 0 0 '\: OL IP 50,000 Totals 0 0 0\\\ 0 \\\\\\� 150 WO Report Date: May 21, 2019 Page 13 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 73 S 140th St Intersection Improvements \\\\ S 140th Street . \\\ Tukwila International Blvd to Design and construct a new traffic signal at the S 140th Street/Tukwila International Blvd intersection 06/25/18 07/02/18 1938 04 C G P S T W 0.100 DCE Yes Funding \ "\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds\J St ono J I Cod State Funds Local Funds Total Funds P PE 2021 0 Peda�\,"�. d ��� ��o \ \ppp�� 67,000 8,000 75,000 P RW 2021 0 Pe Program o \\\` �p \\\\,\\\\\\\\\\ 40,000 10,000 50,000 P CN 2022 0 Pee Program, 1 � \ \\\\\\\�pppp�Q\\\\\\\\ 568,000 57,000 625,000 Totals 0 \ ,, \ 5,000 75,000 750,000 Expenditure Schedule \N,. Phase 1st 2nd 3rd 4th\\\\ I h & 6th PE 0 0 75,000 \\\\Q \I\\Io RW 0 0 50,000 �\\\\\\\\`0 \� \ \ \\ 0 CN 0 0 0 625,000' " \ f 0 Totals 0 0 125,000 625,000 \\���' \ 0 Report Date: May 21, 2019 Page 14 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Number F. BeginEnd Termini F. Project Description \ mature ID = 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 , 78 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S \ \ Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S \ 06/25/18 \\ 07/02/18 1938 28 0.250 No Funding .--N. " \\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federn�nds �O , - Cod State Funds Local Funds Total Funds P PE 2019 SRTS 1� ������Fund es _ AVVV\� 0 27,000 200,000 P CN 2019 SRTS 1 ,000 N \ 0 163,000 1,210,000 Totals 1,220 000 \ \��\ 0 190,000 1,410,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 0 p 5th & PE 200,000 0 0 \ 0��� O 0 CN 0 1,210,000 0 0 Totals 200 000 1,210,000 0 \\\\\\\\\0 \\,1 Report Date: May 21, 2019 Page 15 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 \ 414 S 144th Street Bridge Sidewalks S 144th Street \\\\\ 51st Avenue S to 53rd Avenue S '\\ \ \\ Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include \\\\\\ widening the existing 3-foot sidewalks to 6-feet with a barrier to separate vehicles and pedestrians 06/25/18 07/02/18 1938 05 0.100 DCE No Funding \ \ -i \'\\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fund St a oc State Funds Local Funds Total Funds P PE 2019 0 PedW�- .� ,;\\\\O 416,000 27,000 443,000 Totals 0 \\\\\\\\ j \\� 416,000 27,000 443,000 Expenditure Schedule\ Phase 1st 2nd 3rd ''4th \\ 5th & 6 PE 443,000 0 0 0 \ \\\\\\\\\. Totals 443,000 0 0 �pppp� \\\\\\\\\\\\\\\ 0 %I ��� p \\\\\J Report Date: May 21, 2019 Page 16 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number \\\\ A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 412 S 152nd Street Safe Routes to School S 152nd Street \\\\\ Tukwila International Blvd to 42nd Avenue S '\\ \ \\ Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parkinglane on north side of street. 06/25/18 07/02/18 1938 05 0.300 No Funding \ \\ Status Phase Phase Start Year (YYYY) Federal Fund Code FederaiPunds �` �-a and Cod State Funds Local Funds Total Funds P PE 2019 0 243,000 0 243,000 P CN 2020 0 �' '- o \ \ 2,583,356 0 2,583,356 Totals 0 \\ ��\p \\\\\ 2,826,356 0 2,826,356 Expenditure Schedule \ \\\\\ \\ Phase 1st 2nd 3rd 4th \ 5th & 6th PE 243,000 0 0\ 0 CN 0 2,583,356 0��� 0\ Totals 243,000 2,583,356 0 \\ \N0 Report Date: May 21, 2019 Page 17 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. C. Project Title \ \ \ D. Road Name or Number F. Project Description \ B. STIP ID hurelD Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 / 1276(007) Strander Blvd./SW 27th St Extension Strander Blvd./SW 27th St Extension West Valley Highway to Naches Ave \\ This project is Phase 3 of a multi -phase improvement that will connect Strander Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway widening of two lanes fora portion of the project segment, a separated joint -use trail, a new trail bridge for the Interurban Trail (including new trail connections to Strander Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal serving the Tukwila Station, and storm drainage facilities. Current funding will complete the preliminary engineering and right of way phases. Construction will be funded as part of a future phase. \ \\\ V' 59 -. \\ -� N 01 0.300 DCE Yes Funding \ .. ,. \\\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State F� ode ' ate Funds Local Funds Total Funds S RW 2019 STP(UL) 1,254,250 195,750 1,450,000 Totals 1,254,250 195,750 1,450,000 Expenditure Schedule Phase ALL Totals Report Date: May 21, 2019 1st 1,450,000 1,450,000 2nd 0 0 3rd 0 0 4th 0 0 \J & 6th .it \� 0 Page 18 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ E. Road Name or Number \\ E. Begin & End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) \\\\\ Andover Park W to E City Limits Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. N, 06/25/18 \\ 07/02/18 1938 28 0.750 CE Yes Funding \ \--N \\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fund St a oc State Funds Local Funds Total Funds P ALL 2023 STP(E) 3,41i7000 \ 0 850,000 4,250,000 Totals 3,400 000 0 850,000 4,250,000 Expenditure Schedule\ Phase 1st 2nd 3rd ''4th \ 5th & 6 ALL 0 0 0 \\ 0 \\\\Q\\\\\\\\ 4,270 Totals 0 0 0\ 0 4\ Report Date: May 21, 2019 Page 19 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number \\\\ A. PINIProject No. B. STIP ID D. Project Title \ \ \ D. Road Name or Number \ E. Begin &End Termini F. Project Description \ \\\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 418 Tukwila International Boulevard Retrofit \ Tukwila International Blvd\\ \ Southcenter Blvd to S 116th Way Design and planning of retrofit to Tukwila International Blvd to implement complete streets, improve pedestrian and vehicular safety, and reduce regional pass -through traffic. 06/25/18 07/02/18 1938 15 C G O P S T W 2.400 No Funding -� \�\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun' . Sta ,,��� , „tate Funds Local Funds Total Funds P PE 2019 0 0 100,000 100,000 Totals 0 \\\ \\\\Q\\\\\\\ 0 100,000 100,000 Expenditure Schedule \N \�\ Phase 1st 2nd 3rd 4th4\ \\\\\\�\\\\\\\p 5th & 6th PE 100,000 0 0 \\\\\\\\O \\\\\ 0 \\\\\\ Totals 100,000 0 0 \\ 0 \ 1 Report Date: May 21, 2019 Page 20 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. D. Project Title \ \ \ D. Road Name or Number E. Begin &End Termini F. Project Description \ \\\ B. STIP ID \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety and capacity improvements at the S 156th St intersection. \ 779 \\ 06/25/18 07/02/18 1938 03 C G O P S TW 0.500 CE No Funding .--N��\ Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Fun' . Sta ,,���� �o�tate Funds Local Funds Total Funds S PE 2019 0 \IB o��„ 280,820 37,180 318,000 S CN 2020 0 NIB j\ \, 1,872,740 679,161 2,551,901 Totals 053,560 716,341 2,869,901 Expenditure Schedule -\N \\ Phase 1st 2nd 3rd 4th\\th & 6th PE 318,000 0 0 \\ 0 \\ CN 0 2,551,901 0 -\�\ \P \\0 Totals 318,000 2,551,901 0 \ \ 0 Report Date: May 21, 2019 Page 21 tat Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2019 to 2024 N Outside Functional Class Priority Number A. PINIProject No. B. STIP ID D. Project Title \ \ \ D. Road Name or Number \ \\ E. Begin &End Termini F. Project Description \\ mature ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 60 West Valley Highway/Longacres Way Shared Use Pathways SR 181 &Longacres Way W end of planned Green River Bridge to Longacres Way \ Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. \ Design -only will be completed for future improvements on Longacres Way between \. SR 181 to the Tukwila Sound Transit Link Station. \\ \\\\ 28 0.170 DCE No Funding -\\ 0 Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds Staff \�\te Funds Local Funds Total Funds S PE 2019 CMAQ 186,840 �� 0 29,160 216,000 S CN 2019 CMAQ 441,063\ \„ \\\\\Q\\\\\\\\ 0 �o 68,836 509,899 Totals 627,903 \ � 00 97,996 725,899 Expenditure Schedule \\ Phase 1st 2nd 3rd 4th nth&6th$ II ALL 725,899 0 0��X \ \N0 Totals 725,899 0 0 \ 0 Federal Funds Funds \\ a Fun Total Funds Grand Totals for Tukwila Report Date: May 21, 2019 22,879,293 13,65 2 32• 0\96 69,042,411 Page 22 City of Tukwila City Council Transportation & Infrastructure Committee TRANSPORTATION & INFRASTRUCTURE COMMITTEE Meeting Minutes June 4, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Kate Kruller, Acting Chair; Thomas McLeod, Kathy Hougardy Staff: David Cline, Henry Hash, Hari Ponnekanti, Han Kirkland, Mike Perfetti, Cyndy Knighton, Brandon Miles, and Gail Labanara Guests: Kevin Stamey (Wave), Stuart Bennion (BergerAbam, now WSP) CALL TO ORDER: Acting Committee Chair Kruller called the meeting to order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Grant Amendment: Riverton Creek Flapgate Removal Project Staff is seeking Council approval of Amendment No. 2 to the 18-083 grant agreement with the Washington State Recreation and Conservation Office (RCO) for the Riverton Creek Flapgate Removal Project. Amendment No. 2 includes $100,000 in additional funding from the RCO, which was requested through WRIA 9 to accommodate design changes resulting from Salmon Recovery Funding Board comments on the preliminary design. Sponsor match will come from Cooperative Watershed Management funding from the King County Flood Control District as well as 2019-2020 Surface Water Utility revenue. The overall CIP budget will be increased due to this additional funding. UNANIMOUS APPROVAL. FORWARD TO JUNE 17, 2019 REGULAR CONSENT AGENDA. B. Resolution: Chinook Wind Revised Grant Application Staff is seeking Council approval of an amended Resolution that would authorize a revised grant application to the Washington State Recreation and Conservation office for the Chinook Wind Project. The previously adopted Resolution No. 1943 did not include RCO's most current authorizing language and they are requiring that applicants agree to the new language. The proposed Resolution also includes authorization to submit a Parks acquisition grant to RCO. If successful, the 50% match of $157,200 will come from budgeted Surface Water funds or other identified grant sources. The City match will be within the current CIP budget of $165,000. UNANIMOUS APPROVAL. FORWARD TO JUNE 17, 2019 REGULAR CONSENT AGENDA. C. Ordinance: Astound Broadband, LLC Franchise Extension Staff is seeking Council approval of an Ordinance that would extend the franchise term with Astound Broadband, LLC (dba Wave), for an additional year through August 11, 2020. In a letter to the City, Wave requested an additional five-year term, but the current franchise ordinance only allows for a one-year extension for negotiations of the franchise. UNANIMOUS APPROVAL. FORWARD TO JUNE 10, 2019 COMMITTEE OF THE WHOLE. D. Resolution: Adopting 2020 - 2025 Transportation Improvement Program Staff is seeking Council approval of a Resolution to adopt the annual update of the Six -Year Transportation Improvement Program (TIP) for 2020 - 2025 The TIP is a compilation of transportation projects planned within the next six years that are deemed regionally significant or 55 Transportation & Infrastructure Committee Minutes June 4, 2019 that have grant funding prospects. This is a fluid document that can be modified as needed after the adoption. This update includes no new projects, but the West Valley Highway/Longacres Way Shared Use Pathways Project has been merged into the larger West Valley Highway Project. 40-42nd Avenue South Phase III and 53rd Avenue South were deleted due to completion. TUC/TOD Pedestrian Improvements, Tukwila International Boulevard Retrofit, and Multipurpose Trails were moved beyond 2025. UNANIMOUS APPROVAL. FORWARD TO JUNE 10, 2019 COMMITTEE OF THE WHOLE. E. Strander Boulevard Value Engineering Results Staff updated the Committee on the Strander Boulevard Extension Phase 3 Project, which is currently at 30% design. Due to the increasing complexity and cost estimates, WSDOT and TIB recommended a Value Engineering (VE) study. Three options were identified by the consultant: 1) continue with current design of four -lane road, 2) design a two-lane road, or 3) stop work completely and refund grant funds. The City has funding from the Surface Transportation Program (STP) via Puget Sound Regional Council, the Federal FASTLANE program, and the Washington State Freight Mobility Strategic Investment Board (FMSIB) that must be obligated or relinquished by varying deadlines. Staff recommends proceeding with the two-lane road design as determined by the VE consultant, and returning the unused funds to FASTLANE, STP, and FMSIB or apply for a time extension. Once the design alternative is chosen, the City will be positioned to reapply for grant funding. If the two-lane road option is chosen, the City of Renton expressed a desire to create a Phase 4, which would include adding the two remaining road lanes at a later time. Committee members discussed the information. Councilmembers Kruller and Hougardy expressed support for Option 2, while Councilmember McLeod stated no recommendation at this time. FORWARD TO JUNE 10, 2019 COMMITTEE OF THE WHOLE. III. SCATBd/RTC Councilmember Hougardy attends SCATBd and RTC and reported on both at Council. IV. MISCELLANEOUS Thorndyke Neighborhood Staff distributed a list of capital investments in the Thorndyke neighborhood, totaling $13 million since 1989. Kate asked for clarification of how the nine neighborhoods were defined. Staff will provide the Committee members with a neighborhood map that was developed as part of the Cottage Housing ordinance. The neighborhood investment reports will be shared with the whole Council. Solid Waste Staff will be meeting with the Chamber of Commerce on Monday, June 10, 2019 to discuss the utility tax rate increase. An incremental increase will be proposed; Councilmembers emphasized the importance of messaging and ensuring that the City is actively listening to our residents. V. ANNOUNCEMENTS The Transportation & Infrastructure Committee Meeting adjourned 6:57 p.m. Committee Chair Approval , Minutes by HK, Reviewed by GL 56