HomeMy WebLinkAboutCOW 2019-06-10 Item 4A - Public Hearing - Resolution Adopting 2020-2025 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared by
Mayor's rev" w
Council review
06/10/19
CK
i.of
06/17/19
CK
CK
ITEM INFORMATION
ITEM No.
4.A. &
5.A.
STAFF SPONSOR: CYNDY KNIGHTON
ORIGINAL AGENDA DATE: 06/10/19
AGENDA ITEM TULE Resolution for Six -Year Transportation Improvement Program (2020-2025)
CATEGORY Z Discussion
Mt g Date 06/10/19
[11 Motion
Mtg Date
r, Resolution
Ej Ordinance
AltgDate
El Bid Award
Alts Date
Z Public Hearing
Mtg Date 06/10/19
Other
Mtg Date
Mtg Date 06/17/19
SPONSOR . Counci 1 Mayor EIHR El DCD EFinance Fire E1TS EiP&R Police PIV Court
SPONSOR'S The Transportation Improvement Program (TIP) is updated annually as required by the
SUMMARY Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing
at the local agency level and incorporated into regional and state TIPs. Council is being
asked to approve the Resolution for the 2020-2025 Six -Year Transportation Improvement
Program and consider this item at the June 10, 2019 Committee of the Whole with a Public
Hearing and subsequent June 17, 2019 Regular Meeting.
REVIEWED BY 11 C.O.W. Mtg. 0 CDN Comm 0 Finance Comm. rj Public Safety Comm.
Z Trans &Infrastructure Arts Comm. Parks Comm. Planning Comm.
DATE: 06/04/19 COMMEFTEE CHAIR: ZAK IDAN
RECOMMENDATIONS:
SPoNsoR/ADmIN.
COMMITTEE
Public Works Department
Unanimous Approval; Forward to Committee of the Whole Meeting
COST IMPACT / FUND SOURCE
EXPENDFIURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/10/19
06/17/19
MTG. DATE
ATTACHMENTS
06/10/19
Information Memorandum dated 05/31/19
Draft Resolution
Draft 2020-2025 TIP Summary
2020-2025 "Draft" Transportation Improvement Program
Current Adopted 2019-2024 TIP
Minutes from the Transportion & Infrastructure Committee meeting of 06/04/19
06/17/19
9
10
Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFORMATION MEMORANDUM
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director /IA
BY: Cyndy Knighton, Senior Program Manager
CC: Mayor Ekberg
DATE: May 31, 2019
SUBJECT: Resolution for Six -Year Transportation Improvement Program (2020 - 2025)
ISSUE
Approve a Resolution adopting the annual update of the Six -Year Transportation Improvement Program
for 2020 - 2025.
BACKGROUND
The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code
of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level
and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for
projects competing for grants. Any project submitted for federal grant funding must be included in the
local, regional, and state adopted TIPs. The TIP is a rolling plan showing various funding sources:
grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design
and construction).
Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation -related
projects. The TIP generally lists only those transportation -related projects planned within the next six
years that are deemed regionally significant or that have grant funding awarded or expected. The TIP is
scheduled for adoption on June 17, 2019.
ANALYSIS
The attached spreadsheet is the "Draft" 2020 - 2025 TIP and was created by modifying the 2019 - 2024
TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of
projects is presented in alphabetical order. Prioritization of projects is reflected in the current CIP. No
new projects were added, and five projects were removed because they have either been completed or
moved beyond the six -year time frame of the TIP. One project was combined into a larger project: West
Valley Highway/Longacres Way Shared Use Pathways has been merged into the larger West Valley
Highway project.
Deleted: Completed: 40-42nd Avenue S Phase III and 53rd Avenue S. Moved to Beyond: TUC/TOD
Pedestrian Improvements; Tukwila Intl Blvd Retrofit; and Multipurpose Trails.
FINANCIAL IMPACT
None.
RECOMMENDATION
Council is being asked to approve the Resolution for the 2020 - 2025 Six -Year Transportation
Improvement Program and consider this item at the June 10, 2018 Committee of the Whole with a Public
Hearing and subsequent June 17, 2019 Regular Meeting.
ATTACHMENTS
• Draft Resolution
• Draft 2020-2025 TIP Summary
• 2020 — 2025 "Draft" Transportation Improvement Program
• Current Adopted 2019 — 2024 TIP
W:\PW Eng\PROJECTS\A- RW & RS Projects\TIP\Info Memo TIP 2020.docx
11
12
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2020-
2025), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 of the
Revised Code of Washington, the City Council of the City of Tukwila has previously
adopted a Transportation Improvement Program and has thereafter periodically modified
said Transportation Improvement Program by resolution, in compliance with state law;
and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2020-2025); and
WHEREAS, on June 10, 2019, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2020 to 2025, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington.
W:\Legislative Development\TIP 2020-2025 5-14-19
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
13
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2019.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2020 to 2025
W:\Legislative Development\TIP 2020-2025 5-14-19
CK:bjs Review and analysis by Barbara Saxton
Page 2 of 2
14
2019-2024
CIP Sheet
DRAFT 2020 - 2025 TIP SUMMARY
PROJECT TITLE
May 22, 2019
Project Costs in Thousands of Dollars FUNDING SOURCES
2020 2021 2022 2023 2024 2025 TOTAL Federal State/TIB Developer Unsecured City
15 42nd Avenue S Bridge Replacement 1,600 1,250 6,500 6,400 0 0 15,750 12,000
4 46th Avenue Safe Routes to School 0 412 2,125 0 0 0 2,537 2,537
18 ADA Improvements 50 200 200 200 200 200 1,050
17 Annual Bridge Inspections and Repairs 335 405 405 450 450 450 2,495
16 Annual Overlay and Repair Program 1,400 1,400 1,400 1,400 1,400 1,400 8,400
26 APE/Minkler Blvd Intersection 144 1,570 0 0 0 0 1,714
13 BAR over Airport Wy Bridge Seismic Retrofit* 2,614 0 0 0 0 0 2,614 2,614
BNSF Regional Center Access 0 0 0 100 0 0 100
25 Green River Trail 0 74 962 0 0 0 1,036
5 Macadam Road S Complete Streets Project 0 0 497 2,733 0 0 3,230
20 S 140th St Intersection Improvements 0 125 625 0 0 0 750
14 S 144th St Bridge Sidewalks 0 0 216 227 0 0 443
6 S 152nd Street Safe Routes to School 0 0 243 2,584 0 0 2,827
10 Strander Blvd/SW 27th St St Phase III 3,720 38,389 37,889 0 0 0 79,998 13,217
12 West Valley Highway 3,545 0 0 0 0 0 3,545 441 2,326
3,750
0
1,050
2,495
8,400
1,714
0
100
896 140
2,770 460
675 75
443 0
2,827 0
66,278 503
778
TOTAL
13,408 43,825 51,062 14,094 2,050 2,050 126,489 28,272 4,863
PROJECTS REVISED FROM 2019-2024 TIP
Modified Deleted/Completed:
WVH/Longacres Way Shared Use Pathways 40-42nd Ave S Phase III
53rd Avenue S
Deleted/Moved to Beyond:
TUC/TOD Pedestrian Improvements
Tukwila Intl Blvd Retrofit
Multipurpose Trails
73,889 19,465
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
TUK-62
42nd Ave S Bridge Replacement
42nd Ave S over he Duwamish River at the intersection with Interurban Ave S
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement would require
preliminary engineer design, right-of-way, and construction phases. The new
structure would meet current road and bridge design standards. The replacement
structure configuration would be two through lanes, possibly a turn pocket, and
include sidewalks.
06/10/19
06/17/19
11
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
BR
1,280,000
0
320,000
1,600,000
P
RW
2021
BR
800,000
0
450,000
1,250,000
P
CN
2022
BR
9,920,000
0
2,980,000
12,900,000
Totals
12,000,000
0
3,750,000
15,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
1,600,000
250,000
250,000
250,000
0
RW
0
1,000,000
0
0
0
CN
0
0
6,250,000
6,150,000
0
Totals
1,600,000
1,250,000
6,500,000
6,400,000
0
Report Date: May 22, 2019
Page 1
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/10/19
06/17/19
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
SRTS
180,000
0
180,000
P
RW
2021
0
SRTS
232,000
0
232,000
P
CN
2022
0
SRTS
2,125,000
0
2,125,000
Totals
0
2,637,000
0
2,537,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th '
5th & 6th
PE
0
180,000
0
0
0
RW
0
232,000
0
0
0
CN
0
0
2,125,000
0
0
Totals
0
412,000
2,125,000
0
0
Report Date: May 22, 2019
Page 2
co
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/10/19
06/17/19
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
1,050,000
1,050,000
Totals
0
0
1,050,000
1,050,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
50,000
200,000
200,000
200,000
i
400,000
Totals
50,000
200,000
200,000
200,000
400,000
Report Date: May 22, 2019
Page 3
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/10/19
06/17/19
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
134,000
0
0
0
0
RW
10,000
0
0
0
0'
CN
0
1,570,000
0
0
0
Totals
144,000
1,570,000
0
0
0
Report Date: May 22, 2019
Page 4
N
O
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/10/19
06/17/19
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
2,495,000
2,495,000
Totals
0
0
2,495,000
2,495,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
405,000
405,000
405,000
i
900,000
Totals
335,000
405,000
405,000
405,000
900,000
Report Date: May 22, 2019
Page 5
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/10/19
06/17/19
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
8,400,000
8,400,000
Totals
0
0
8,400,000
8,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,400,000
1,400,000
1,400 000
i
2,800,000
Totals
1,400,000
1,400,000
1,400,000
1,400,000
2,800,000
Report Date: May 22, 2019
Page 6
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/10/19
06/17/19
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
100,000
100,000
Totals
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
100,000
i
0
Totals
0
0
0
100,000
0
Report Date: May 22, 2019
Page 7
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(004) TUK-61
Boeing Access Road over Airport Way Seismic Retrofit
S Boeing Access Road over Airport Way S
Airport Way S to Airport Way S
Install seismic protection on the structure.
06/10/19
06/17/19
06
0.050
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2020
STP(BR)
2,613,855
0
0
2,613,855
Totals
2,613,855
0
0
2,613,855
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,614,000
0
0
0
i
0
Totals
2,614,000
0
0
0
0
Report Date: May 22, 2019
Page 8
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-11115
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved
trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
06/10/19
06/17/19
28
0.140
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2022
STP(E)
896,000
0
140,000
1,036,000
Totals
896,000
0
140,000
1,036,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
74,000
962,000
0
0
Totals
0
74,000
962,000
0
0
Report Date: May 22, 2019
Page 9
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/10/19
06/17/19
04
0.350
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
397,000
0
397,000
P
RW
2022
0
Ped/Bike Program
100,000
0
100,000
P
CN
2023
0
Ped/Bike Program
2,273,000
460,000
2,733,000
Totals
0
2,770,000
460,000
3,230,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th '
5th & 6th
PE
0
0
397,000
0
0
RW
0
0
100,000
0
0
CN
0
0
0
2,733,000
0
Totals
0
0
497,000
2,733,000
0
Report Date: May 22, 2019
Page 10
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/10/19
06/17/19
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
Ped/Bike Program
67,000
8,000
75,000
P
RW
2021
0
Ped/Bike Program
40,000
10,000
50,000
P
CN
2022
0
Ped/Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
50,000
0
0
0
CN
0
0
625,000
0
0
Totals
0
125,000
625,000
0
0
Report Date: May 22, 2019
Page 11
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/10/19
06/17/19
28
0.250
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
SRTS
443,000
0
0
443,000
Totals
443,000
0
0
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
216,000
227,000
0
Totals
0
0
216,000
227,000
0
Report Date: May 22, 2019
Page 12
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/10/19
06/17/19
05
0.300
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
243,000
0
243,000
P
CN
2023
0
SRTS
2,584,000
0
2,584,000
Totals
0
2,827,000
0
2,827,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
243,000
0
0
CN
0
0
0
2,584,000
0
Totals
0
0
243,000
2,584,000
0
Report Date: May 22, 2019
Page 13
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
/ 1276(007) TUK-59
Strander Blvd./SW 27th St Extension
Strander Blvd./SW 27th St Extension
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal
serving the Tukwila Station, and storm drainage facilities. Current funding will
complete the preliminary engineering and right of way phases. Construction will be
funded as part of a future phase.
06/10/19
06/17/19
01
0.300
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2020
STP
1,730,000
0
270,000
2,000,000
S
RW
2020
STP(UL)
1,487,000
0
233,000
1,720,000
S
CN
2021
FMSIB
5,000,000
0
0
5,000,000
S
CN
2021
Discretionary
5,000,000
0
0
5,000,000
P
CN
2021
STP
4,760,000
TIB
12s000,000
0
16,760,000
P
CN
2021
TIGER
25,000,000
WSDOT
24,518,000
0
49,518,000
Totals
42,977,000
36,518,000
503,000
79,998,000
Report Date: May 22, 2019
Page 14
W
O
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
2,000,000
0
0
0
0
RW
1,720,000
0
0
0
0
CN
0
38,389,000
37 889000
0
0
Totals
3,720,000
38,389,000
37,889,000
0
0
Report Date: May 22, 2019 Page 15
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
TUK-60
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 &Longacres Way
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway.
Design -only will be completed for future improvements on Longacres Way between
SR 181 to the Tukwila Sound Transit Link Station.
06/10/19
06/17/19
28
0.170
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2020
0
TIB
50,000
50,000
100,000
S
CN
2020
CMAQ
441,000
TIB
2,276,000
728,000
3,445,000
Totals
441,000
2,326,000
778,000
3,545,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
CN
3,445,000
0
0
0
0
Totals
3,545,000
0
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
59,370,855
47,653,000
19,465,000
126,488,855
Report Date: May 22, 2019
Page 16
W
N
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-07745
40-42 Ave S (S 160 St - S 131 PL)
S 160th Street to S 131st Place
Design and construct street improvements, underground aerial utilities, drainage,
sidewalks, bike facilities, and driveway adjustments
06/25/18
07/02/18
1938
04
C G O P S
TW
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2019
0
0
3,000,000
3,000,000
P
CN
2024
0
0
4,360,000
4,360,000
Totals
0
0
7,360,000
7,360,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
3,000,000
0
0
0
4,360,000
Totals
3,000,000
0
0
0
4,360,000
Report Date: May 21, 2019
Page 1
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
08
WA-11101
42nd Ave S Bridge Replacement
42nd Ave S
Interurban Avenue S to North Bridge
Design and construct a replacement structure for the existing S 42nd Ave bridge. 8109700
06/25/18
07/02/18
1938
11
C G P S T
W
0.060
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
BR
1554,000
0
546,000
2,100,000
P
RW
2021
BR
740,000
0
260,000
1,000,000
P
CN
2022
BR
10,206,000
0
2,444,000
12,650,000
Totals
12,500,000
0
3,250,000
15,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
1,600,000
0
250 000
250000
RW
0
0
1,000,000
0
0
CN
0
0
250,000
6,250 000
6,150,000
Totals
0
1,600,000
1,250,000
6,500,000
6,400,000
Report Date: May 21, 2019
Page 2
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/25/18
07/02/18
1938
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2019
0
SRTS
180,057
0
180,057
P
RW
2019
0
SRTS
232,000
0
232,000
P
CN
2020
0
SRTS
2,124,668
0
2,124,668
Totals
0
2,636,725
0
2,536,725
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
180,057
0
0
0
0
RW
232,000
0
0
0
0
CN
0
2,124,668
0
0
0
Totals
412,057
2,124,668
0
0
0
Report Date: May 21, 2019
Page 3
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk , illumination and undergrounding. Street portion will coordinate with Water,
Surface Water and Sewer capital improvement program projects.
06/25/18
07/02/18
1938
04
C G O P S
TW
0.420
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2019
0
TIB
2,274,365
2,714,849
4,989,214
Totals
0
2,274,365
2,714,849
4,989,214
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
4,101,249
250,000
0
0
0
Totals
4,101,249
250,000
0
0
0
Report Date: May 21, 2019
Page 4
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
405
Americans with Disabilities Act (ADA) Improvements
Various locations \\\\\ \
to '\ \ \\
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a Citydeveloped plan.
06/25/18
07/02/18
1938
06
No
Funding \ \N\\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds `1 tlalo4,tiund Cod
State Funds
Local Funds
Total Funds
S
ALL
2019
\ 0 \\
0
1,200,000
1,200,000
Totals
0 K �OO000'
0
1,200,000
1,200,000
Expenditure Schedule
\\\\
Phase
1st
2nd
3rd
\\4th \
5th
ALL
200,000
200,000
200,000
000
\\\\\\\\\�\\\p\\\\\
„
400,000
Totals
200,000
200,000
200,000
\J 00,000
4
Report Date: May 21, 2019
Page 5
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
46
\\\\� \
Andover Park E/Minkler Blvd Intersection
Andover Park E
\\\
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
06/25/18
07/02/18
1938
03
C G O P S
TW
No
Funding , \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds �`
��a and Cod
State Funds
Local Funds
Total Funds
P
PE
2020
0
\\
0
134,000
134,000
P
RW
2020
0
--, "
0
10,000
10,000
P
CN
2021
0
\�\\\�\\1\\\
\\\\\\\\\\\\\\\\
0
1,570,000
1,570,000
Totals
0
O\\\\\\ \
O
0
1,714,000
1,714,000
Expenditure Schedule
\ \ \x.
Phase
1st
2nd
3rd
4t}a%th
& 6th
PE
0
134,000
0
\\\\\Q\\\\\\\\ 0\
RW
0
10,000
0
N0
CN
0
0
1,570,000
I'
0
Totals
0
144,000
1,570,000
0
\ 0
Report Date: May 21, 2019
Page 6
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number /4.
E. Begin & End Termini
F. Project Description \ �\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
731
Annual Bridge Inspections and Repairs
Various City Street
to \ \
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance \
06/25/18
07/02/18
1938
06
No
Funding , \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds `1
'\
o4�tiund Cod I
o a
State Funds
Local Funds
Total Funds
S
ALL
2019
\ 0 \\
0
2,300,000
2,300,000
Totals
0-�"\
1/41/4 0
2,300,000
2,300,000
Expenditure Schedule\"
1\\\
Phase
1st
2nd
3rd
1/44th \ 5th
ALL
335,000
335,000
405,000000
\\\\\\\\\\\\\\\\\ ',
820,000
Totals
335,000
335,000
405,000
\\05,0001/4\
82-�\
Report Date: May 21, 2019
:I
Page 7
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No.
D. Project Title \
E. Road Name or Number
E. Begin & End Termini
F. Project Description \\
B. STIP ID
\ \
\\
mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
\
733
\\
06/25/18
07/02/18
1938
06
C G O P S
TW
No
Funding , \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds `1
'\
o4\tiund Cod
o a
State Funds
Local Funds
Total Funds
S
ALL
2019
\\ 0 \\
0
10,870,000
10,870,000
Totals
0 ��\\000"\
0
10,870,000
10,870,000
Expenditure Schedule
\"
\\\
Phase
1st
2nd
3rd
\\4th \
5th
ALL
1,730,000
1,740,000
1,800,000
\k000
\\\\\\\\\\\\p\\\\\
3,850,000
Totals
1,730,000
1,740,000
1,800,000
\850,000
\\\\\
3'8
Report Date: May 21, 2019
:I
Page 8
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number /4.
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
, 40
BNSF Regional Center Access
New Facility
to \ \
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/25/18
07/02/18
1938
08
EIS
No
Funding , \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds `1
�\
o4�tiund Cod
o a
State Funds
Local Funds
Total Funds
P
PE
2024
\ 0 \\
0
100,000
100,000
Totals
0-�"\
1/41/4 0
100,000
100,000
Expenditure Schedule\"
1\\\
Phase
1st
2nd
3rd
1/44th \
5th
PE
0
0
0
\
0
\\\\\\\\\�\\\p\\\\\ -,
100,000
Totals
0
0
0
\\
0
\\\\\\�
1\*
Report Date: May 21, 2019
I
Page 9
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \
E. Begin & End Termini
F. Project Description \ �\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
\,117
Boeing Access Road over Airport Way Bridge Seismic Retrofit
Boeing Access Road
to \ \
Provide seismic modifications to the Boeing Access Road over Airport Way Bridge to
allow it to withstand earthquake forces.
06/25/18
07/02/18
1938
47
0.100
No
Funding , \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds `1
o4�tiund Cod
State Funds
Local Funds
Total Funds
S
PE
2019
BR0\\
\
0
0
370,000
S
CN
2019
BR
2,611,000
-,�"
\\
0
0
2,611,000
Totals
2,981,000
\\\\\\`\
,:\\\
0
0
2,981,000
Expenditure Schedule
\ \,\\\\ \\
Phase
1st
2nd
3rd
4th ,,,
5th & 6th
PE
370,000
0
0
\\\I\\� 0
\\\\\-\\
I
CN
0
2,611,000
0
\\\\\Q\\\\\\\\ 0\
Totals
370,000
2,611,000
0
\\
\ 0
Report Date: May 21, 2019
Page 10
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
415
Green River Trail
Green River Trail \\\\\
Christensen Road to Green River '\\ \ \\
Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved \\\\\\
trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, ands
pedestrian plaza.
06/25/18
07/02/18
1938
28
0.140
DCE
No
Funding \ \ -i \\\\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fund
St ads oc
State Funds
Local Funds
Total Funds
P
CN
2021
STP(E)
89,140
\
0
139,860
1,036,000
Totals
896,140
0
139,860
1,036,000
Expenditure Schedule\
Phase
1st
2nd
3rd
''4th \
5th & 6
CN
0
0
1,036,000
\
0
\\\\\\\\h..
Totals
0
0
1,036,000
�pppp�
\\\\\\\\\\\
\\\\
0
II
���2p
II
Report Date: May 21, 2019
Page 11
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
\ 110
Macadam Rd S Complete Streets Project
Macadam Road \\\\\
S 150th Street to S 144th Street '' \ \\
Design and construction of a complete street on Macadam Road. Road widening A\\\\\
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/25/18
07/02/18
1938
04
0.350
DCE
No
Funding \\ -N '‘\ .\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fund
St a oc
State Funds
Local Funds
Total Funds
P
PE
2019
'-
0
Pede*---.��
\�\\\\\\\O 397,369
0
397,369
P
RW
2019
0
PeeProgram
\\ 100,000
0
100,000
P
CN
2020
0
Pe` \e Program j
�' '--\\272,947
460,000
2,732,947
Totals
0
\ `
\\\\\\\ 0 316
460,000
3,230,316
Expenditure Schedule
\ \\\
Phase
1st
2nd
3rd
4th�
h & 6th
PE
397,369
0
0
\\\\\\\\\\\\\\0
\
"0
RW
100,000
0
0
.
\-0
CN
0
2,732,947
0
0'
\
\"0
Totals
497,369
2,732,947
0
0
\ 0
Report Date: May 21, 2019
Page 12
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
F. BeginEnd Termini \\
F. Project Description \ \ mature ID
=
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
783
Multipurpose Trails
to \
Wide array of necessary trail improvements to existing trail system infrastructure \
06/25/18
\\
07/02/18
1938
28
CE
No
Funding .--N. \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federn�nds . , We Fund Cod
State Funds
Local Funds
Total Funds
P
ALL
2024
0
150,000
150,000
Totals
\ 0
\ 0
150,000
150,000
Expenditure Schedule
\
,,,,,,,--N.
,, _
Phase
1st
2nd
3rd
_-‘th
5tfi
ALL
0
0
0
'\:
OL
IP 50,000
Totals
0
0
0\\\
0
\\\\\\�
150 WO
Report Date: May 21, 2019
Page 13
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
73
S 140th St Intersection Improvements \\\\
S 140th Street .
\\\
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/25/18
07/02/18
1938
04
C G P S T
W
0.100
DCE
Yes
Funding \ "\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds\J
St ono J I Cod
State Funds
Local Funds
Total Funds
P
PE
2021
0
Peda�\,"�.
d ���
��o
\ \ppp�� 67,000
8,000
75,000
P
RW
2021
0
Pe Program
o \\\` �p \\\\,\\\\\\\\\\ 40,000
10,000
50,000
P
CN
2022
0
Pee Program, 1
�
\ \\\\\\\�pppp�Q\\\\\\\\ 568,000
57,000
625,000
Totals
0
\ ,,
\ 5,000
75,000
750,000
Expenditure Schedule
\N,.
Phase
1st
2nd
3rd
4th\\\\
I h & 6th
PE
0
0
75,000
\\\\Q
\I\\Io
RW
0
0
50,000
�\\\\\\\\`0
\�
\
\ \\ 0
CN
0
0
0
625,000'
"
\ f 0
Totals
0
0
125,000
625,000
\\���' \ 0
Report Date: May 21, 2019
Page 14
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
C. Project Title
D. Road Name or Number
F. BeginEnd Termini
F. Project Description \ mature ID
=
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
, 78
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S \ \
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S \
06/25/18
\\
07/02/18
1938
28
0.250
No
Funding .--N. " \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federn�nds �O , - Cod
State Funds
Local Funds
Total Funds
P
PE
2019
SRTS
1�
������Fund
es
_ AVVV\�
0
27,000
200,000
P
CN
2019
SRTS
1 ,000
N
\ 0
163,000
1,210,000
Totals
1,220 000
\
\��\ 0
190,000
1,410,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
0
p
5th &
PE
200,000
0
0
\
0���
O 0
CN
0
1,210,000
0
0
Totals
200 000
1,210,000
0
\\\\\\\\\0
\\,1
Report Date: May 21, 2019
Page 15
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
\ 414
S 144th Street Bridge Sidewalks
S 144th Street \\\\\
51st Avenue S to 53rd Avenue S '\\ \ \\
Design of pedestrian improvements to the S 144th Street Bridge over 1-5 to include \\\\\\
widening the existing 3-foot sidewalks to 6-feet with a barrier to separate vehicles
and pedestrians
06/25/18
07/02/18
1938
05
0.100
DCE
No
Funding \ \ -i \'\\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fund
St a
oc
State Funds
Local Funds
Total Funds
P
PE
2019
0
PedW�-
.�
,;\\\\O 416,000
27,000
443,000
Totals
0
\\\\\\\\
j \\� 416,000
27,000
443,000
Expenditure Schedule\
Phase
1st
2nd
3rd
''4th \\
5th & 6
PE
443,000
0
0
0
\
\\\\\\\\\.
Totals
443,000
0
0
�pppp�
\\\\\\\\\\\\\\\ 0
%I
���
p \\\\\J
Report Date: May 21, 2019
Page 16
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
\\\\
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
412
S 152nd Street Safe Routes to School
S 152nd Street \\\\\
Tukwila International Blvd to 42nd Avenue S '\\ \ \\
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parkinglane on north side of street.
06/25/18
07/02/18
1938
05
0.300
No
Funding \ \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
FederaiPunds �`
�-a and Cod
State Funds
Local Funds
Total Funds
P
PE
2019
0
243,000
0
243,000
P
CN
2020
0
�' '-
o
\
\ 2,583,356
0
2,583,356
Totals
0
\\
��\p \\\\\ 2,826,356
0
2,826,356
Expenditure Schedule
\ \\\\\ \\
Phase
1st
2nd
3rd
4th \
5th & 6th
PE
243,000
0
0\
0
CN
0
2,583,356
0���
0\
Totals
243,000
2,583,356
0
\\ \N0
Report Date: May 21, 2019
Page 17
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No.
C. Project Title \ \ \
D. Road Name or Number
F. Project Description \
B. STIP ID
hurelD
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
/ 1276(007)
Strander Blvd./SW 27th St Extension
Strander Blvd./SW 27th St Extension
West Valley Highway to Naches Ave \\
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway
widening of two lanes fora portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal
serving the Tukwila Station, and storm drainage facilities. Current funding will
complete the preliminary engineering and right of way phases. Construction will be
funded as part of a future phase.
\
\\\
V'
59
-. \\
-�
N
01
0.300
DCE
Yes
Funding \ .. ,. \\\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State F� ode ' ate Funds
Local Funds
Total Funds
S
RW
2019
STP(UL)
1,254,250
195,750
1,450,000
Totals
1,254,250
195,750
1,450,000
Expenditure Schedule
Phase
ALL
Totals
Report Date: May 21, 2019
1st
1,450,000
1,450,000
2nd
0
0
3rd
0
0
4th
0
0
\J & 6th .it
\� 0
Page 18
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
E. Road Name or Number \\
E. Begin & End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
772
TUC/TOD Pedestrian Improvements
Baker Blvd (if extended) \\\\\
Andover Park W to E City Limits
Construct bike/pedestrian connection between the Tukwila Urban Center (TUC) and
Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented
Development (TOD) area. N,
06/25/18
\\
07/02/18
1938
28
0.750
CE
Yes
Funding \ \--N \\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fund
St a oc
State Funds
Local Funds
Total Funds
P
ALL
2023
STP(E)
3,41i7000
\
0
850,000
4,250,000
Totals
3,400 000
0
850,000
4,250,000
Expenditure Schedule\
Phase
1st
2nd
3rd
''4th \
5th & 6
ALL
0
0
0
\\
0
\\\\Q\\\\\\\\ 4,270
Totals
0
0
0\
0
4\
Report Date: May 21, 2019
Page 19
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
\\\\
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
D. Road Name or Number \
E. Begin &End Termini
F. Project Description \ \\\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
418
Tukwila International Boulevard Retrofit \
Tukwila International Blvd\\ \
Southcenter Blvd to S 116th Way
Design and planning of retrofit to Tukwila International Blvd to implement complete
streets, improve pedestrian and vehicular safety, and reduce regional pass -through
traffic.
06/25/18
07/02/18
1938
15
C G O P S
T W
2.400
No
Funding
-� \�\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun'
.
Sta ,,���
,
„tate Funds
Local Funds
Total Funds
P
PE
2019
0
0
100,000
100,000
Totals
0
\\\
\\\\Q\\\\\\\
0
100,000
100,000
Expenditure Schedule
\N \�\
Phase
1st
2nd
3rd
4th4\
\\\\\\�\\\\\\\p 5th & 6th
PE
100,000
0
0
\\\\\\\\O
\\\\\ 0
\\\\\\
Totals
100,000
0
0
\\ 0
\ 1
Report Date: May 21, 2019
Page 20
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No.
D. Project Title \ \ \
D. Road Name or Number
E. Begin &End Termini
F. Project Description \ \\\
B. STIP ID
\\
mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
West Valley Highway
SR 181/West Valley Highway
1-405 to Strander Blvd
Design and construct completion of 7 lane sections of West Valley Highway with
sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety
and capacity improvements at the S 156th St intersection.
\
779
\\
06/25/18
07/02/18
1938
03
C G O P S
TW
0.500
CE
No
Funding .--N��\
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Fun'
.
Sta ,,����
�o�tate Funds
Local Funds
Total Funds
S
PE
2019
0
\IB o��„
280,820
37,180
318,000
S
CN
2020
0
NIB j\ \, 1,872,740
679,161
2,551,901
Totals
053,560
716,341
2,869,901
Expenditure Schedule
-\N \\
Phase
1st
2nd
3rd
4th\\th
& 6th
PE
318,000
0
0
\\ 0
\\
CN
0
2,551,901
0
-\�\
\P \\0
Totals
318,000
2,551,901
0
\ \ 0
Report Date: May 21, 2019
Page 21
tat
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2019 to 2024
N Outside
Functional
Class
Priority Number
A. PINIProject No. B. STIP ID
D. Project Title \ \ \
D. Road Name or Number \ \\
E. Begin &End Termini
F. Project Description \\ mature ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
60
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 &Longacres Way
W end of planned Green River Bridge to Longacres Way \
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. \
Design -only will be completed for future improvements on Longacres Way between \.
SR 181 to the Tukwila Sound Transit Link Station. \\
\\\\
28
0.170
DCE
No
Funding -\\ 0
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
Staff
\�\te Funds
Local Funds
Total Funds
S
PE
2019
CMAQ
186,840
��
0
29,160
216,000
S
CN
2019
CMAQ
441,063\
\„ \\\\\Q\\\\\\\\ 0
�o
68,836
509,899
Totals
627,903
\
� 00
97,996
725,899
Expenditure Schedule
\\
Phase
1st
2nd
3rd
4th
nth&6th$ II
ALL
725,899
0
0��X
\ \N0
Totals
725,899
0
0
\ 0
Federal Funds
Funds \\
a Fun
Total Funds
Grand Totals for Tukwila
Report Date: May 21, 2019
22,879,293
13,65 2
32• 0\96
69,042,411
Page 22
City of Tukwila
City Council Transportation & Infrastructure Committee
TRANSPORTATION & INFRASTRUCTURE COMMITTEE
Meeting Minutes
June 4, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall
Councilmembers: Kate Kruller, Acting Chair; Thomas McLeod, Kathy Hougardy
Staff: David Cline, Henry Hash, Hari Ponnekanti, Han Kirkland, Mike Perfetti, Cyndy
Knighton, Brandon Miles, and Gail Labanara
Guests: Kevin Stamey (Wave), Stuart Bennion (BergerAbam, now WSP)
CALL TO ORDER: Acting Committee Chair Kruller called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Grant Amendment: Riverton Creek Flapgate Removal Project
Staff is seeking Council approval of Amendment No. 2 to the 18-083 grant agreement with the
Washington State Recreation and Conservation Office (RCO) for the Riverton Creek Flapgate
Removal Project. Amendment No. 2 includes $100,000 in additional funding from the RCO, which
was requested through WRIA 9 to accommodate design changes resulting from Salmon Recovery
Funding Board comments on the preliminary design. Sponsor match will come from Cooperative
Watershed Management funding from the King County Flood Control District as well as 2019-2020
Surface Water Utility revenue. The overall CIP budget will be increased due to this additional
funding. UNANIMOUS APPROVAL. FORWARD TO JUNE 17, 2019 REGULAR CONSENT AGENDA.
B. Resolution: Chinook Wind Revised Grant Application
Staff is seeking Council approval of an amended Resolution that would authorize a revised grant
application to the Washington State Recreation and Conservation office for the Chinook Wind
Project. The previously adopted Resolution No. 1943 did not include RCO's most current
authorizing language and they are requiring that applicants agree to the new language. The
proposed Resolution also includes authorization to submit a Parks acquisition grant to RCO. If
successful, the 50% match of $157,200 will come from budgeted Surface Water funds or other
identified grant sources. The City match will be within the current CIP budget of $165,000.
UNANIMOUS APPROVAL. FORWARD TO JUNE 17, 2019 REGULAR CONSENT AGENDA.
C. Ordinance: Astound Broadband, LLC Franchise Extension
Staff is seeking Council approval of an Ordinance that would extend the franchise term with
Astound Broadband, LLC (dba Wave), for an additional year through August 11, 2020. In a letter to
the City, Wave requested an additional five-year term, but the current franchise ordinance only
allows for a one-year extension for negotiations of the franchise. UNANIMOUS APPROVAL.
FORWARD TO JUNE 10, 2019 COMMITTEE OF THE WHOLE.
D. Resolution: Adopting 2020 - 2025 Transportation Improvement Program
Staff is seeking Council approval of a Resolution to adopt the annual update of the Six -Year
Transportation Improvement Program (TIP) for 2020 - 2025 The TIP is a compilation of
transportation projects planned within the next six years that are deemed regionally significant or
55
Transportation & Infrastructure Committee Minutes June 4, 2019
that have grant funding prospects. This is a fluid document that can be modified as needed after
the adoption. This update includes no new projects, but the West Valley Highway/Longacres Way
Shared Use Pathways Project has been merged into the larger West Valley Highway Project. 40-42nd
Avenue South Phase III and 53rd Avenue South were deleted due to completion. TUC/TOD
Pedestrian Improvements, Tukwila International Boulevard Retrofit, and Multipurpose Trails were
moved beyond 2025. UNANIMOUS APPROVAL. FORWARD TO JUNE 10, 2019 COMMITTEE OF THE
WHOLE.
E. Strander Boulevard Value Engineering Results
Staff updated the Committee on the Strander Boulevard Extension Phase 3 Project, which is
currently at 30% design. Due to the increasing complexity and cost estimates, WSDOT and TIB
recommended a Value Engineering (VE) study. Three options were identified by the consultant: 1)
continue with current design of four -lane road, 2) design a two-lane road, or 3) stop work
completely and refund grant funds. The City has funding from the Surface Transportation Program
(STP) via Puget Sound Regional Council, the Federal FASTLANE program, and the Washington State
Freight Mobility Strategic Investment Board (FMSIB) that must be obligated or relinquished by
varying deadlines. Staff recommends proceeding with the two-lane road design as determined by
the VE consultant, and returning the unused funds to FASTLANE, STP, and FMSIB or apply for a time
extension. Once the design alternative is chosen, the City will be positioned to reapply for grant
funding. If the two-lane road option is chosen, the City of Renton expressed a desire to create a
Phase 4, which would include adding the two remaining road lanes at a later time. Committee
members discussed the information. Councilmembers Kruller and Hougardy expressed support for
Option 2, while Councilmember McLeod stated no recommendation at this time. FORWARD TO
JUNE 10, 2019 COMMITTEE OF THE WHOLE.
III. SCATBd/RTC
Councilmember Hougardy attends SCATBd and RTC and reported on both at Council.
IV. MISCELLANEOUS
Thorndyke Neighborhood
Staff distributed a list of capital investments in the Thorndyke neighborhood, totaling $13 million since
1989. Kate asked for clarification of how the nine neighborhoods were defined. Staff will provide the
Committee members with a neighborhood map that was developed as part of the Cottage Housing
ordinance. The neighborhood investment reports will be shared with the whole Council.
Solid Waste
Staff will be meeting with the Chamber of Commerce on Monday, June 10, 2019 to discuss the utility tax
rate increase. An incremental increase will be proposed; Councilmembers emphasized the importance
of messaging and ensuring that the City is actively listening to our residents.
V. ANNOUNCEMENTS
The Transportation & Infrastructure Committee Meeting adjourned 6:57 p.m.
Committee Chair Approval
,
Minutes by HK, Reviewed by GL
56