Loading...
HomeMy WebLinkAboutReg 2019-06-17 Item 5A - Resolution - 2020-2025 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS Initials Meeting Date Prepared by Mayor's rev. w council review 06/10/19 CK 06/17/19 CK ITEM INFORMATION ITEM No. 5.A. STAFF SPONSOR: CYNDY KNIGHTON ORIGINAL AGENDA DATE: 06/10/19 AG FNDA Imm TITLE Resolution for Six -Year Transportation Improvement Program (2020-2025) CATEGoRy II Discussion 06/10/19 Ej Motion Mtg Date Z Resolution Mtg Date 06/17/19 ['Ordinance Altg Date 0 Bid 42pard Altg Date VI Public Hearing 11 Other Mfg Date Mtg Date Aug Date 06/10/19 SPONSOR Counci I Mayor 1114R ODCD Finance Fire On' 0 P&R EPolice ZPIV Dcourt SPONSOR'S The Transportation Improvement Program (TIP) is updated annually as required by the SUMMARY Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. Council is being asked to approve the Resolution for the 2020-2025 Six -Year Transportation Improvement Program and consider this item at the June 10, 2019 Committee of the Whole with a Public Hearing and subsequent June 17, 2019 Regular Meeting. RimiNVIM BY El C.O.W. Mtg. [1] CDN Comm Z Trans &Infrastructure Arts Comm. DATE: 06/04/19 0 Finance El Parks Comm. 0 Public Safety Comm. Comm. D Planning Comm. CHAIR: ZAK IDAN COMMI E1EE RECOMMENDATIONS: SPONSOR/ADMIN. COMMFITHE Public Works Department Unanimous Approval; Forward to Committee of the Whole Meeting COST IMPACT / FUND SOURCE EXPENDITURE REQUIRF.D AMOUNT BUDGETED APPROPRIATION REQUIRED $0.00 $0.00 $0.00 Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 06/10/19 Forward to Regular Meeting 06/17/19 MTG. DATE ATTACHMENTS 06/10/19 Information Memorandum dated 05/31/19 Draft Resolution Draft 2020-2025 TIP Summary 2020-2025 "Draft" Transportation Improvement Program Current Adopted 2019-2024 TIP Minutes from the Transportion & Infrastructure Committee meeting of 06/04/19 06/17/19 Resolution in final form 8 9 90 Washington Resolution No. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2020- 2025), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 of the Revised Code of Washington, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and has thereafter periodically modified said Transportation Improvement Program by resolution, in compliance with state law; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2020-2025); and WHEREAS, on June 10, 2019, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six -Year Transportation Improvement Program for the calendar years 2020 to 2025, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W:\Legislative Development\TIP 2020-2025 5-14-19 CK:bjs Review and analysis by Barbara Saxton Page 1 of 2 91 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2019. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Kathy Hougardy, Council President APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2020 to 2025 W:\Legislative Development\TIP 2020-2025 5-14-19 CK:bjs Review and analysis by Barbara Saxton Page 2 of 2 92 1 Washington State Department of Tronsgurtati Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside m c n o iu 5 . 5 Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 TUK-62 42nd Ave S Bridge Replacement 42nd Ave S over he Duwamish River at the intersection with Interurban Ave S Interurban Ave S to Northern end of bridge Replace the existing 42nd Ave S steel truss bridge. The replacement would require preliminary engineer design, right-of-way, and construction phases. The new structure would meet current road and bridge design standards. The replacement structure configuration would be two through lanes, possibly a turn pocket, and include sidewalks. 06/10/19 06/17/19 11 0.100 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 BR 1,280,000 0 320,000 1,600,000 P RW 2021 BR 800,000 0 450,000 1,250,000 P CN 2022 BR 9,920,000 0 2,980,000 12,900,000 Totals 12,000,000 0 3,750,000 15,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 1,600,000 250,000 250,000 250,000 0 RW 0 1,000,000 0 0 0 CN 0 0 6,250,000 6,150,000 0 Totals 1,600,000 1,250,000 6,500,000 6,400,000 0 Report Date: May 22, 2019 Page 1 T intrtati State Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside -n c o m g m m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing, Adopted', Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type 73 73 a c a 19 WA-11113 46th Avenue Safe Routes to School 46th Avenue S S 150th Street to S 144th Street Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S, including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised crosswalk across S 144th Street with RRFB. 06/10/19 06/17/19 05 0.370 Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 SRTS 180,000 0 180,000 P RW 2021 0 SRTS 232,000 0 232,000 P CN 2022 0 SRTS 2,125,000 0 2,125,000 Totals 0 2,537,000 0 2,537,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 180,000 0 0 0 RW. 0 232,000 0 0 0 CN 0 0 2,125,000 0 0 Totals 0 412,000 2,125,000 0 0 Report Date: May 22. 2019 Page 2 V7Washington State � Department of flansportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside -n c m c w m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing'', Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/10/19 06/17/19 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 1,050,000 1,050,000 Totals 0 0 1,050,000 1,050,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 50,000 200,000 200,000 200,000 400,000 Totals 50,000 200,000 200,000 200,000 400,000 Report Date: May 22, 2019 Page 3 Wi Washington State Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description - G. Structure ID a m 2 m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-07746 Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal 06/10/19 06/17/19 03 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 0 134,000 134,000 P RW 2022 0 0 10,000 10,000 P CN 2023 0 0 1,570,000 1,570,000 Totals 0 0 1,714,000 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 1,570,000 0 0 0 Totals 144,000 1,570,000 0 0 0 Report Date: May 22, 2019 Page 4 Ink WWashington State i Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside -,i a n T. d o . E. Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type Xi A a c o. 14 WA-03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance 06/10/19 06/17/19 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 2,495,000 2,495,000 Totals 0 0 2,495,000 2,495,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 335,000 405,000 405,000 405,000 900,000 Totals 335,000 405,000 405,000 405,000 900,000 Report Date: May 22, 2019 Page 5 V7Washington State A; Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside m c n m o ill m m m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA-03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/10/19 06/17/19 06 C G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2020 0 0 8,400,000 8,400,000 Totals 0 0 8,400,000 8,400,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,400,000 1,400,000 1,400,000 1,400,000 2,800,000 Totals 1,400,000 1,400,000 1,400,000 1,400,000 2,800,000 Report Date: May 22, 2019 Page 6 7 Agency: Tukwila County: King MPO/RTPO: PSRC Q Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID a i m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allentown. 06/10/19 06/17/19 08 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 0 100,000 100,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 100,000 0 Totals 0 0 0 100,000 0 Report Date: May 22, 2019 Page 7 0 Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside oc c ° H m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 /1380(004) TUK-61 Boeing Access Road over Airport Way Seismic Retrofit S Boeing Access Road over Airport Way S Airport Way S to Airport Way S Install seismic protection on the structure. 06/10/19 06/17/19 06 0.050 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2020 STP(BR) 2,613,855 0 0 2,613,855 Totals 2,613,855 0 0 2,613,855 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,614,000 0 0 0 0 Totals 2,614,000 0 0 0 0 Report Date: May 22, 2019 Page 8 Washington State WAY Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA-11115 Green River Trail Green River Trail Christensen Road to Green River Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and pedestrian plaza. 06/10/19 06/17/19 28 0.140 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2022 STP(E) 896,000 0 140,000 1,036,000 Totals 896,000 0 140,000 1,036,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 74,000 962,000 0 0 Totals 0 74,000 962,000 0 0 Report Date: May 22, 2019 Page 9 Ilk T Washington State �, Department of Wans Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA-11110 Macadam Rd S Complete Streets Project Macadam Road S 150th Street to S 144th Street Design and construction of a complete street on Macadam Road. Road widening and rechannetization to add 5-foot bike lanes and 5-foot sidewalks on both sides of the roadway. Includes illumination, curb, and storm drainage. 06/10/19 06/17/19 04 0.350 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 Ped/Bike Program 397,000 0 397,000 P RW 2022 0 Ped/Bike Program 100,000 0 100,000 P CN 2023 0 Ped/Bike Program 2,273,000 460,000 2,733,000 Totals 0 2,770,000 460,000 3,230,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 397,000 0 0 RW 0 0 100,000 0 0 CN 0 0 0 2,733,000 0 Totals 0 0 497,000 2,733,000 0 Report Date: May 22, 2019 Page 10 `/i ington State rtttttt or ltianspo►tation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Priority Number 5 m 0 ss -o 'o 5. 3 A. PIN/Project No. B. STIR ID C. Project Title D 3 c -. m 3 = 0 El 3 a xi n o D. Road Name or Number m n a `� F. m N E. Begin & End Termini 6. -o0 3 = -4 o -4 c m u F. Project Description G. Structure ID 0 a o 0 aus a. 14 WA-09873 06/10/19 06/17/19 04 CO P S T 0.100 DCE Yes W S 140th St Intersection Improvements S 140th Street Tukwila International Blvd to Design and construct a new traffic signal at the S 1401h Street/Tukwila International Blvd intersection Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 Ped/Bike Program 67,000 8,000 75,000 P RW 2021 0 Ped/Bike Program 40,000 10,000 50,000 P CN 2022 0 Ped/Bike Program 568,000 57,000 625,000 Totals 0 675,000 75,000 750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 75,000 0 0 0 RW 0 50,000 0 0 0 CN 0 0 625,000 0 0 Totals 0 125,000 625,000 0 0 Report Date: May 22, 2019 Page 11 *7Washington State 1 Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number Hearing 3 -a m A. PIN/Project No. B. STIP ID > 2 m _c -i C. Project Title e c o c m11. D. Road Name or Number E. Begin & End Termini D o_ v° 3 a �, 1 "` 0 r = m c F. Project Description G. Structure ID m a + 0 v N m N t° S `� N C 17 WA03782 06/10/19 06/17/19 28 0.250 No S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 SRTS 443,000 0 0 443,000 Totals 443,000 0 0 443,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 216,000 227,000 0 Totals 0 0 216,000 227,000 0 Report Date: May 22, 2019 Page 12 Washington State T% Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA-11112 S 152nd Street Safe Routes to School S 152nd Street Tukwila International Blvd to 42nd Avenue S Design and construct curb, gutter and sidewalks on both sides including widening pavement width by 3 feet to construct on -street parking lane on north side of street. 06/10/19 06/17/19 05 0.300 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 0 SRTS 243,000 0 243,000 P CN 2023 0 SRTS 2,584,000 0 2,584,000 Totals 0 2,827,000 0 2,827,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 243,000 0 0 CN 0 0 0 2,584,000 0 Totals 0 0 243,000 2,584,000 0 Report Date: May 22, 2019 Page 13 Washington State V/ Department al? Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m . Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type gj 5 a;m a 16 / 1276(007) TUK-59 Strander Blvd./SW 27th St Extension Strander Blvd./SW 27th St Extension West Valley Highway to Naches Ave This project is Phase 3 of a multi -phase improvement that will connect Strander Blvd./SW 27th St between West Valley Hwy in Tukwila and Oakesdale Ave in Renton. This project will complete the design, right-of-way and construction phases for the roadway segment between West Valley Hwy and Naches Ave. Project components include a railroad bridge for the Union Pacific RR to provide grade separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway widening of two lanes for a portion of the project segment, a separated joint -use trail, a new trail bridge for the Interurban Trail (including new trail connections to Strander Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal serving the Tukwila Station, and storm drainage facilities. Current funding will complete the preliminary engineering and right of way phases. Construction will be funded as part of a future phase. 06/10/19 06/17/19 01 0.300 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 STP 1,730,000 0 270,000 2,000,000 S RW 2020 STP(UL) 1,487,000 0 233,000 1,720,000 S CN 2021 FMSIB 5,000,000 0 0 5,000,000 S CN 2021 Discretionary 5,000,000 0 0 5,000,000 P CN 2021 STP 4,760,000 TIB 12,000,000 0 16,760,000 P CN 2021 TIGER 25,000,000 WSDOT 24,518,000 0 49,518,000 Totals 42,977,000 36,518,000 503,000 79,998,000 Report Date: May 22, 2019 Page 14 �� Washington State WI Department of Transpo Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 2,000,000 0 0 0 0 RW 1,720,000 0 0 0 0 CN 0 38,389,000 37,889,000 0 0 Totals 3,720,000 38,389,000 37,869,000 0 0 Report Date: May 22, 2019 Page 15 Washington State �w Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2020 to 2025 N Outside -n c n 0 o, 0 m m Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID 0 d m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK-60 West Valley Highway/Longacres Way Shared Use Pathways SR 181 & Longacres Way W end of planned Green River Bridge to Longacres Way Improvements will be completed on SR 181 from the west end of the planned Green River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated shared use path with a 5 ft. landscaped buffer strip on the west side of the highway. Design -only will be completed for future improvements on Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. 06/10/19 06/17/19 28 0.170 DCE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2020 0 TIB 50,000 50,000 100,000 S CN 2020 CMAQ 441,000 TIB 2,276,000 728,000 3,445,000 Totals 441,000 2,326,000 778,000 3,545,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 3,445,000 0 0 0 0 Totals 3,545,000 0 0 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 59,370,855 47,653,000 19,465,000 126,488,855 Report Date: May 22, 2019 Page 16