HomeMy WebLinkAboutRes 1961 - 2020-2025 Transportation Improvement ProgramResolution No.
City of Tukwila
Washington
CVO
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2020-
2025), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 of the
Revised Code of Washington, the City Council of the City of Tukwila has previously
adopted a Transportation Improvement Program and has thereafter periodically modified
said Transportation Improvement Program by resolution, in compliance with state law;
and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2020-2025); and
WHEREAS, on June 10, 2019, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2020 to 2025, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington.
W:\Legislative Development\TIP 2020-2025 5-14-19
CK:bjs Review and analysis by Barbara Saxton
Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this 1 �-1Y day of 6,J( , 2019.
ATTEST/AUTHENTICATED:
Christy 'Fla rty, MMC, City Cle
APPROVED AS TO FORM BY:
Rachel B. Turpin,'City Attorney
Kathy Hou r 1y,� r it Pre cent
Filed with the City Clerk:
Passed by the City Council:( -
Resolution Number: 10161
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2020 to 2025
W:\Legislative Development\TIP 2020-2025 5-14-19
CK:bjs Review and analysis by Barbara Saxton
Page 2 of 2
Washington State
�' Department of Transportadion
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
D
3
m
3
z
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
TUK-62
42nd Ave S Bridge Replacement
42nd Ave S over he Duwamish River at the intersection with Interurban Ave S
Interurban Ave S to Northem end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement would require
preliminary engineer design, right-of-way, and construction phases. The new
structure would meet current road and bridge design standards. The replacement
structure configuration would be two through lanes, possibly a tum pocket, and
include sidewalks.
06/10/19
06/17/19
11
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
BR
1,280,000
0
320,000
1,600,000
P
RW
2021
BR
800,000
0
450,000
1,250,000
P
CN
2022
BR
9,920,000
0
2,980,000
12,900,000
Totals
12,000,000
0
3,750,000
15,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
1,600,000
250,000
250,000
250,000
0
RW
0
1,000,000
0
0
0
CN
0
0
6,250,000
6,150,000
0
Totals
1,600,000
1,250,000
6,500,000
6,400,000
0
Report Date: May 22, 2019
Page 1
V;Washington State
1; Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
-n
c
n
m o
m m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11113
46th Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE corner of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
06/10/19
06/17/19
05
0.370
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
SRTS
180,000
0
180,000
P
RW
2021
0
SRTS
232,000
0
232,000
P
CN
2022
0
SRTS
2,125,000
0
2,125,000
Totals
0
2,537,000
0
2,537,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
180,000
0
0
0
RW
0
232,000
0
0
0
CN
0
0
2,125,000
0
0
Totals
0
412,000
2,125,000
0
0
Report Date: May 22, 2019
Page 2
Wash ton state
�t of snsport+ttt
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
13.
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/10/19
06/17/19
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
1,050,000
1,050,000
Totals
0
0
1,050,000
1,050,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
50,000
200,000
200,000
200,000
400,000
Totals
50,000
200,000
200,000
200,000
400,000
Report Date: May 22, 2019
Page 3
i
Washington e
*I Department of Wansporrtathon
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
o
m
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA-07746
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left tum lanes on Andover Park East and reconstruct traffic signal
06/10/19
06/17/19
03
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000.
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
134,000
0
0
0
0
RW
10,000
0
0
0
0
CN
0
1,570,000
0
0
0
Totals
144,000
1,570,000
0
0
0
Report Date: May 22, 2019
Page 4
WWashington State
% Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
m
0
Adopted
3
to
0.
m
Resolution No.
Improvement Type
Z
o
�a
w
Total Length
Environmental Type
RW Required
14
WA-03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
06/10/19
06/17/19
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
2,495,000
2,495,000
Totals
0
0
2,495,000
2,495,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
405,000
405,000
405,000
900,000
Totals
335,000
405,000
405,000
405,000
900,000
Report Date: May 22, 2019
Page 5
ANIL
Washington State
T j Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
-n
c
n
w o`
m m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
!Environmental Type
RW Required
16
WA-03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/10/19
06/17/19
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
0
0
8,400,000
8,400,000
Totals
0
0
8,400,000
8,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,400,000
1,400,000
1,400,000
1,400,000
2,800,000
Totals
1,400,000
1,400,000
1,400,000
1,400,000
2,800,000
Report Date: May 22, 2019
Page 6
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
.n
c
:T.
N N
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Numbero
E. Begin & End Termini
F. Project Description G. Structure ID
=
1
ro
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/10/19
06/17/19
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
0
100,000
100,000
Totals
0
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
100,000
0
Totals
0
0
0
100,000
0
Report Date: May 22, 2019
Page 7
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
a
Adopted
T.
3
3
r
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(004) TUK-61
Boeing Access Road over Airport Way Seismic Retrofit
S Boeing Access Road over Airport Way S
Airport Way S to Airport Way S
Install seismic protection on the structure.
06/10/19
06/17/19
06
0.050
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2020
STP(BR)
2,613,855
0
0
2,613,855
Totals
2,613,855
0
0
2,613,855
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
2,614,000
0
0
0
0
Totals
2,614,000
0
0
0
0
Report Date: May 22, 2019
Page 8
Aft
washington
tment a ` ,rtatson
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA-11115
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8-foot wide Green River Trail with 12-foot wide concrete paved
trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
06/10/19
06/17/19
28
0.140
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2022
STP(E)
896,000
0
140,000
1,036,000
Totals
896,000
0
140,000
1,036,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
74,000
962,000
0
0
Totals
0
74,000
962,000
0
0
Report Date: May 22, 2019
Page 9
Department ott Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA-11110
Macadam Rd S Complete Streets Project
Macadam Road
S 150th Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
06/10/19
06/17/19
04
0.350
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
397,000
0
397,000
P
RW
2022
0
Ped/Bike Program
100,000
0
100,000
P
CN
2023
0
Ped/Bike Program
2,273,000
460,000
2,733,000
Totals
0
2,770,000
460,000
3,230,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
397,000
0
0
RW
0
0
100,000
0
0
CN
0
0
0
2,733,000
0
Totals
0
0
497,000
2,733,000
0
Report Date: May 22, 2019
Page 10
Washington State
7%I Department of Wansportati0
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
m
c
o
m o
w m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA-09873
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Street/Tukwila International
Blvd intersection
06/10/19
06/17/19
04
C G P S T
W
0.100
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
Ped/Bike Program
67,000
8,000
75,000
P
RW
2021
0
Ped/Bike Program
40,000
10,000
50,000
P
CN
2022
0
Ped/Bike Program
568,000
57,000
625,000
Totals
0
675,000
75,000
750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
75,000
0
0
0
RW
0
50,000
0
0
0
CN
0
0
625,000
0
0
Totals
0
125,000
625,000
0
0
Report Date: May 22, 2019
Page 11
rf�rDepartnient at 1 ansportal an
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
D
a
0
-o
a
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA03782
S 144th St Bridge Sidewalks
5 144th Street
51 st Ave 5 to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S
06/10/19
06/17/19
28
0.250
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
SRTS
443,000
0
0
443,000
Totals
443,000
0
0
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
216,000
227,000
0
Totals
0
0
216,000
227,000
0
Report Date: May 22, 2019
Page 12
it De Washington State�ion
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
-n
c
51.
d o
m m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini3.
F. Project Description G. Structure ID
m
m
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA-11112
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila Intemational Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
06/10/19
06/17/19
05
0.300
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
243,000
0
243,000
P
CN
2023
0
SRTS
2,584,000
0
2,584,000
Totals
0
2,827,000
0
2,827,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
243,000
0
0
CN
0
0
0
2,584,000
0
Totals
0
0
243,000
2,584,000
0
Report Date: May 22, 2019
Page 13
Washington State
♦ Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
/ 1276(007) TUK-59
Strander Blvd./SW 27th St Extension
Strander Blvd./SW 27th St Extension
West Valley Highway to Naches Ave
This project is Phase 3 of a multi -phase improvement that will connect Strander
Blvd./SW 271h St between West Valley Hwy in Tukwila and Oakesdale Ave in
Renton. This project will complete the design, right-of-way and construction phases
for the roadway segment between West Valley Hwy and Naches Ave. Project
components include a railroad bridge for the Union Pacific RR to provide grade
separation, a new 4/5 lane roadway segment east of West Valley Hwy, roadway
widening of two lanes for a portion of the project segment, a separated joint -use trail,
a new trail bridge for the Interurban Trail (including new trail connections to Strander
Blvd.), a new flyover bridge connection to the Tukwila Station, a new traffic signal
serving the Tukwila Station, and storm drainage facilities. Current funding will
complete the preliminary engineering and right of way phases. Construction will be
funded as part of a future phase.
06/10/19
06/17/19
01
0.300
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2020
STP
1,730,000
0
270,000
2,000,000
S
RW
2020
STP(UL)
1,487,000
0
233,000
1,720,000
S
CN
2021
FMSIB
5,000,000
0
0
5,000,000
S
CN
2021
Discretionary
5,000,000
0
0
5,000,000
P
CN
2021
STP
4,760,000
TIB
12,000,000
0
16,760,000
P
CN
2021
TIGER
25,000,000
WSDOT
24,518,000
0
49,518,000
Totals
42,977,000
36,518,000
503,000
79,998,000
Report Date: May 22, 2019
Page 14
sfj Washingtont off Transportation,
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
2,000,000
0
0
0
0
RW
1,720,000
0
0
0
0
CN
0
38,389,000
37,889,000
0
0
Totals
3,720,000
38,389,000
37,889,000
0
0
Report Date: May 22, 2019
Page 15
T Washington State
V// Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2020 to 2025
N Outside
-n
c
0o
m
a m
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
=
o
sl
ro
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
TUK-60
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway.
Design -only will be completed for future improvements on Longacres Way between
SR 181 to the Tukwila Sound Transit Link Station.
06/10/19
06/17/19
28
0.170
DCE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2020
0
TIB
50,000
50,000
100,000
S
CN
2020
CMAQ
441,000
TIB
2,276,000
728,000
3,445,000
Totals
441,000
2,326,000
778,000
3,545,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
CN
3,445,000
0
0
0
0
Totals
3,545,000
0
0
0
0
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
59,370,855
47,653,000
19,465,000
126,488,855
Report Date: May 22, 2019
Page 16
:hristy O'Flaherty
rom: Christy O'Flaherty
ent: Tuesday, June 18, 2019 10:32 AM
o: 'millarr@wsdot.wa.gov'
object: Tukwila Transportation Improvement Program 2020-2025
nportance: High
une 18, 2019
*0: WASHINGTON STATE DEPT OF TRANSPORTATION
I;E: CITY OF TUKWILA 2020-2025 TRANSPORTATION IMPROVEMENT PROGRAM
ollowing is a link to City of Tukwila Resolution #1961 passed June 17, 2019, adopting the Transportation
riprovement Program for 2020-2025.
;es 1961 - 2020-2025 Transportation Improvement Program
'lease contact me with any questions at 206 433-1855.
'lease respond to this email to ensure it was received satisfactorily. Thank you.
sincerely yours,
:hristy O'Flaherty, MMC, Records Governance Manager/City Clerk
c: Cyndy Knighton, Transportation Engineer
i
:hristy O'Flaherty
rom: Christy O'Flaherty
ent: Tuesday, June 18, 2019 10:27 AM
o: 'GregA@TI B.wa.gov'
object: Tukwila Transportation Improvement Program 2020-2025
nportance: High
une 18, 2019
'O: TRANSPORTATION IMPROVEMENT BOARD
;E: CITY OF TUKWILA 2020-2025 TRANSPORTATION IMPROVEMENT PROGRAM
ollowing is a link to City of Tukwila Resolution #1961 passed June 17, 2019, adopting the Transportation
nprovement Program for 2020-2025.
:es 1961 - 2020-2025 Transportation Improvement Program
'lease contact me with any questions at 206 433-1855.
'lease respond to this email to ensure it was received satisfactorily. Thank you.
sincerely yours,
:hristy O'Flaherty, MMC, Records Governance Manager/City Clerk
c: Cyndy Knighton, Transportation Engineer
i
:hristy O'Flaherty
rom: Christy O'Flaherty
ent: Tuesday, June 18, 2019 10:29 AM
o: Andi Markley
object: Tukwila Transportation Improvement Program 2020-2025
nportance: High
une 18, 2019
'O: PUGET SOUND REGIONAL COUNCIL
;E: CITY OF TUKWILA 2020-2025TRANSPORTATION IMPROVEMENT PROGRAM
ollowing is a link to City of Tukwila Resolution #1961 passed June 17, 2019, adopting the Transportation
nprovement Program for 2020-2025.
:es 1961 - 2020-2025 Transportation Improvement Program
'lease contact me with any questions at 206 433-1855.
'lease respond to this email to ensure it was received satisfactorily. Thank you.
sincerely yours,
;hristy O'Flaherty, MMC, Records Governance Manager/City Clerk
c: Cyndy Knighton, Transportation Engineer
1