Loading...
HomeMy WebLinkAboutReg 2011-10-03 Item 5C - Final Acceptance - East Marginal Way South / South 86th Place Signal Pole Project with Signal Electric for $38,351.23COUNCIL AGENDA SYNOPSIS Initials ITEM NO. Meeting Date Prepared Mayor'.l review Council review. 10/03/11 I MG I I 5. V 1``° ITEM -INFORMATION CAS NUMBER: 11-099 I ORIGINAL AGENDA DATE: OCTO 3, 2011 AGENDA ITEM TITLE Accept as complete E Marginal Way S S 86 PI Signal Pole Replacement Project and release retainage bond CATEGORY Discussion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date 10103111 Mtg Date Mig Date Mtg Date Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW SPONSOR'S The contract with Signal Electric, Inc. of Kent, WA is complete for the East Marginal Way SUMMARY South and South 86 Place Signal Pole Replacement Project. This project replaced the signal pole that was damaged by a vehicular accident on February 20, 2010. Construction started January 6, 2011 and was physically completed on July 14, 2011. Council is being asked to accept and finalize the contract in the amount of $38,351.23. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 09/19/11 RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda [,COST IMPACT FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $38,351.23 $38,559.40 $0.00 Fund Source: 000.16 STREET FUND Comments: To be fu //y reimbursed by driver's insurance company I MTG. DATE I RECORD OF COUNCIL ACTION 10/03/11 IMTG.DATEI ATTACHMENTS 10/03/11 Informational Memorandum dated 09/16111 State of WA Dept of Revenue Notice of Completion 11 -002 Minutes from the Transportation Committee meeting of 09/19/11 9 10 TO: FROM: DATE: SUBJECT: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee Bob Giberson, Public Works Director September 16, 2011 East Marainal Wav S and S 86 PI Siqnal Pole Replacement Proiect Project No. 11001605, Contract 11 -002 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 11 -002 with Signal Electric, Inc. of Kent, Washington, was issued on January 6, 2011 for construction of the East Marginal Way S and S 86 PI Signal Pole Replacement Project. The project included the installation of a signal pole that was damaged by a vehicular accident on February 20, 2010. The driver's insurance company will be billed for all reimbursement costs. ANALYSIS Construction was physically completed on July 14, 2011. Three change orders were issued during construction for $3,297.23. The first two change orders included modifications to the signal pole base to allow the reuse of the existing cantilever section and the final change order modified the signal light mount point to achieve an acceptable clearance height above the road surface. The budget for this contract with a 10% contingency was $38,559.40 and the outstanding retainage amount is $1,917.56. Contract Award Amount 35,054.00 Change Order Nos 1 through 3 3.297.23 Total Amount Paid (incl. retainage) 38.351.23 RECOMMENDATION The Council is being asked for formal acceptance and retainage release authorization, subject to standard claim and lien release procedures, for the contract with Signal Electric, Inc. in the amount of $38,351.23 and consider this item on the consent agenda of the October 3, 2011 Regular Meeting. Attachment: Dept of Revenue Notice of Completion W:\PW Eng \PROJECTSW- RW RS Projects \11001605 EMW 86th PI Signal Pole \Construction\ #.200 Correspondence \010 -To Others \Info Memo Closeout 9- 13- 11.docx 11 12 State of Washington Department of Revenue PO Box 47474 REVENUE Olympia WA 98504 -7474 Contractor's Registration No. (UBI No.) 173 005 578 Date 8/17/11 From: r 1 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT name &:Address of Public Agency: Department Use Only Assigned To City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned Notice is hereby given relative to the completion of contract or project described below Description of Contract East Marginal Way S and S 86"' PI Signal Pole Replacement Contractor's Name Signal Electric, Inc Contractor's Address PO Box 6209, Kent WA 98064 -6209 Date Work Commenced Date Work Completed 1/6/11 7/14/11 Surety or Bonding Company Fidelity and Deposit Company Propel Insurance (Local Agent) Agent's Address PO Box 2940 Tacoma WA 98401 Contract Amount 35,054.00 Additions 3,297.23 Reductions 0.00 Sub -Total 38,351.23 Amount of Sales Tax Paid at 0.0% 0.00 (If various rates apply, please send a breakdown) TOTAL 38,351.23 TOTAL 38,351.23 sz, '"D><slurs><ng:Office'r Signature Comments: Tax Rule 171 Finance Approval 1 Contract Number 11 -002 Telephone Number 253- 872 -7177 Date Work Accepted XX/XX/XX Liquidated Damages 0.00 Amount Disbursed 36,433.67 Amount Retained 1,917.56 Type or Print Name Diane Jaber Phone Number 206 433 -1871 The Disbursing Officer must complete and mail THREE copies of this notice to the Department of Revenue, PO Box 47474, Olympia, WA 98504 -7474, immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of Department's certificate, and then only in accordance with said certificate. To inquire about the availability of this document in an alternate format for the visually impaired, please call (360) 753 -3217. Teletype (TTY) users please call (800) 451 -7985. You may also access tax information on our Internet home page at http: /dor.wa.gov. REV 31 0020e (6- 27 -01) 13 Citv of Tukwila Transportation Committee TRANSPORTATION COMMITTEE Meeting Minutes September 19, 2011 5: 00 p.m. Conference Room I PRESENT Councilmembers: Joan Hernandez, Chair; and Verna Seal Absent: Joe Duffie Staff. Bob Giberson, Frank Iriarte, Robin Tischmak, Peter Lau, Shawn Hunstock, Gail Labanara and Kimberly Matej CALL TO ORDER: The meeting was called to order at 5:03 p.m. I. PRESENTATIONS No presentations. II. BUSINESS AGENDA A. Project Completion and Acceptance: Signal Pole at :East Marginal Way South South 86 Place Staff is seeking full Council approval for formal project completion, acceptance and release of the retainage to Signal Electric, Inc. of Kent for the Signal Pole Replacement Project at East Marginal Way South and South 86 Place. Damage was caused by a vehicular accident in February, 2010. Three change orders were issued during this project for $3,297.23, all which were within the project's 10% contingency. The project costs came in slightly under budget at $38,351.23. Project costs will be billed to the driver's insurance company for reimbursement UNANIMOUS APPROVAL. FORWARD TO OCTOBER 3 CONSENT AGENDA. III. SCATBd The Committee reviewed and briefly discussed the August 16 SCATBd meeting summary and the September 20 meeting agenda. INFORMATION ONLY. IV. MISCELLANEOUS After the meeting adjourned, Committee Members present went on a mobile tour of Southcenter Parkway Extension and Tukwila Urban Center (Klickitat) Access projects which are under construction. Meeting adjourned at 5:13 p.m. Next meeting: Monday, October 3, 2011 5:00 p.m. Conference Room 1 Committee Chair Approval Minutes by KAM. Reviewed by GL. IM,