Loading...
HomeMy WebLinkAboutReg 2011-10-03 Item 5D - Final Acceptance - 6300 Building Standby Generator Project with Urban Electric (Genesis 3) for $116,803.72CAS NUMBER: AGENDA ITEM TITLE COUNCIL AGENDA SYNOPSIS Initials ITEM NO. Meeting Date Prepared by, n MavorV review Council review- 10/03/11 I WBG� 5.D. ITEM INFORMATION 11-100 I ORIGINAL AGENDA DATE: OCTOBER 3, 2011 Accept as complete 6300 Building Standby Generator Project and release retainage bond CATEGORY Disczssion Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date Mtg Date 10103111 Mtg Date Mtg Date Mtg Date Mtg Date Mtg Date SPONSOR E] Council E] Ma Adm Svcs DCD Finance Fire ❑Legal P &R Police ®PW/ SPONSOR'S The contract with Urban Electric, Inc. (now Genesis 3) of Tukwila, WA is complete for the SUMMARY 6300 Building Standby Generator Project. This project installed a new standby generator for the 6300 Building that services the City's computer system. Construction started February 3, 2011 and was physically completed on August 9, 2011. Council is being asked to accept and finalize the contract in the amount of $116,803.72. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 09/27/11 RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda ,COST IMPACT FUND SOURCE; EXPENDI"PURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $116,803.72 $131,189.93 $0.00 Fund Source: 303.97 GENERAL IMPROVEMENTS Comments: Funded by the Emergency Preparedness Bond MTG. DATE J RECORD OF COUNCIL ACTION 10/03/11 MTG. DATE 1 ATTACHMENTS 10/03/11 Informational Memorandum dated 09/23/11 State of WA Dept of Revenue Notice of Completion 11 -017 Minutes from the Utilities Committee meeting of 09/27/11 15 16 TO: FROM DATE City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee Bob Giberson, Public Works Director September 23, 2011 SUBJECT: 6300 Building Standbv Generator Proiect Project No. 90630302, Contract 11 -017 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 11 -017 with Urban Electric, Inc. (now Genesis 3) of Tukwila, Washington, was issued on February 3, 2011 for construction of the 6300 Building Standby Generator Project, which included installation of a standby generator as part of the bonded emergency preparedness initiatives. ANALYSIS Construction was physically completed on August 9, 2011. Two change orders were issued during construction for $2,489.06. The first change order included modifications to the electrical system of the 6300 Building to allow for the entire building load to be supported by the new generator (as opposed to limited load such as only lighting). The second change order allowed for the relocation of the electrical meter housing to the outside of the building per PSE standards (meter was inside one of the garage closets and had restricted access). The budget for this contract with a 15% contingency was $131,189.93 and the outstanding retainage amount is $5,333.50. Contract Award Amount 104,181.00 Change Order Nos. 1 2 2,489.06 Sales Tax (at 9.5 10,133.66 Total Amount Paid (incl. retainage) 116.803.72 RECOMMENDATION The Council is being asked for formal acceptance and retainage release authorization, subject to standard claim and lien release procedures, for the contract with Genesis 3 (dba Urban Electric) in the amount of $116,803.72 and consider this item on the Consent Agenda of the October 3, 2011 Regular Meeting. Attachment: Dept of Revenue Notice of Completion WAPW Eng\PROJECTS\H- BG Projects\06BG01 Stand -by Power Upgrade\6300 Building 10901301 \Constwction\#.200 Correspondence\010 To Otherskinfo Memo Closeout 9- 23- 11.docx 17 im vTA NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 603 068 122 Date: 9/26/11 Name Address, of Pubiic A N enc "a g Y pepartment Use Only City of Tukwila Assigned to: 6200 Southcenter Blvd. Tukwila, WA 98188 Date Assigned: UBI Number: Notice is hereby given relative to the completion of contract or project described below Project Name Contract Number Job Order Contracting 6300 Building Standbv Generator 11 -017 Yes No Description of Work Done/Include Jobsite Address(es) Installation of standby generator at 6300 Southcenter Blvd., Tukwila, WA 98188 Federally funded road transportation project? 1'es V No Contractor's Name 'Telephone Number Genesis 3 dba Urban Electric 206- 686 -8722 Contractor Address PO Box 58328, Seattle, WA 98138 If Retainage is Bonded, List Surety's Name (or attach a copy) Western Surety Company Propel Insurance (Local Agent) Surety Agent's Address PO Box 2940, Tacoma, WA 98401 Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted 1/31/11 2/3/11 8/9/11 Contract Amount 104,181.00 Additions 2,489.06 Liquidated Damages 0.00 Reductions 0.00 Amount Disbursed 111,470.22 Sub -Total 106,670.06 Amount Retained 5,333.50 Amount of Sales Tax Paid at .095 jJf ,anus rates apply, please send a breakdown) 10,133.66 t Wit' TOTAL 116,803.72 TOTAL 116,803.72 NOTE: These two totals must be equal Please List all Subcontractors Below: Subcontractor's Name: IUBI Number: lAffidavit ID (if known) Green River Construction I 600 582 949 Gage Concrete I 602 984 621 I F 08 -2011 REV 31 0020e(08/25/11) Continued on page 2 19 City of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes September 27, 2011 S: 00 p.m. Conference Room #1 PRESENT De'Sean Quinn, Chair; Dennis Robertson and Kathy Hougardy Staff: Frank Iriarte, Mike Ronda, Peter Lau, Gail Labanara and Kimberly Matej CALL TO ORDER: Committee Chair Quinn called the meeting to order at 5:00 p.m. I. PRESENTATIONS No Presentations II. BUSINESS AGENDA A. 2010/2011 Small Drainage Prop-ram. Supplement No. 2 Staff is seeking Council approval of Supplement No. 2 with KPG, Inc. in the amount of $54,376.76 for construction management support services (mostly field inspections) related to the 2010/2011 Small Drainage Program. Additional construction management will be provided by City staff. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 10 COW FOR DISCUSSION. B. Proiect Completion and Acceptance: 6300 Building Standbv Generator Proiect Staff is seeking Council approval for project completion, closeout and release of retainage to Genesis 3 (previously dba Urban Electric, Inc.) in the amount of $116,803.72 for the installation of a standby emergency generator located at the 6300 Building. Two change orders in the amount of $2,489.06 were issued during this project. The project was completed under budget. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 3 CONSENT AGENDA. III. MISCELLANEOUS Meeting adjourned at 5:08 p.m. Next meeting: Tuesday, October 11, 2011 5:00 p.m. Conf. Room No. 1. Committee Chair Approval Minutes by KAM. Reviewed by GL. 20