HomeMy WebLinkAboutTIC 2019-07-16 Item 2C - Contract Amendment #1 - 2019 Annual Bridge Inspections and Repair with TranTech EngineeringAllan Ekberg, Mayor
TO:
FROM:
Public Works Department - Henry Hash, Director
INFOR ATIONAL E ORANDU
Transportation and Infrastructure Committee
Henry Hash, Public Works Director
BY: Adam Cox, Transportation Project Manager
CC: Mayor Ekberg
DATE: July 12, 2019
SUBJECT: Annual Bridge Inspections and Repairs 2019
Project No. 91910402, Contract 18-244
Design Consultant Amendment No. 1 - Bridge Support Services
ISSUE
Approve Amendment No. 1 for the 2019 Bridge Program Engineering Support Services contract with TranTech
Engineering, LLC (TranTech) for the S 196th/200th St Bridge improvements, 42nd Ave S Bridge Replacement funding
assistance, and miscellaneous bridge program support.
BACKGROUND
The City has been monitoring the S 196th/200th St Bridge for the settlement on the west end of the structure. This
settlement now requires action to be taken by the City to remedy the issue as part of a construction project. The City is
also required to update and provide load rating analysis of the 42nd Ave S Bridge to meet FHWA requirements. The City
also requires technical support for the 42nd Ave S Bridge BRAC replacement grant that was submitted in April 2019.
ANALYSIS
Originally it was believed that the design/repair of the S 196th/200th St Bridge would be a fairly simple process of jacking
up one end of the bridge. Upon further analysis, a full pier retrofit is needed, which will require full design. TranTech has
requested Amendment No. 1 to finish design and supply construction management support during construction.
Additional funds will also support the 42nd Ave S Bridge load ratings and BRAG grant application along with
miscellaneous bridge support.
FINANCIAL IMPACT
TranTech has provided a consultant fee determination of an additional fee of $68,163.00 to perform Task 1 through Task
4 (refer to the attachment) services as part of the 2019 Annual Bridge Inspections and Repair Project. The S 196th/200th
St Bridge will be a two-year process and we will be using funding from 2019 and 2020 for design and construction.
Contract 2019 Bridge Budget
Original Bridge Support Services $39,517.00
Amendment No. 1 68,163.00
Total $107,680,00 $335,000.00
RECOMMENDATION
Council approve Amendment No. 1 to Contract No. 18-244 with TranTech Engineering for bridge engineering in the
amount of $68,163, for a new total contract of $107,680, and consider this item on the Consent Agenda at the August
5, 2019 Regular Council meeting.
ATTACHMENTS
• 2019 CIP, page 17
• Contract for Services Amendment No. 1
23
W:1PW Eng1PROJECTS1A- RW & RS Projects1Bridge Inspection Programs1Bridge Inspections 2019 (91910402)102 - 196th200th bridge inspeconslinto Memo PE TranTech Adm 1 071219.docx
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Annual Bridge Inspections and Repairs Project No. 9xx10402
DESCRIPTION: Ongoing program of bi-annual inspections, repairs, painting and rehabilitation of the 22 City bridges.
Federally required program identifies safety or repair needs in the early stages to minimize hazards and
JUSTIFICATION: costs. The number of bridge inspections necessary each year can vary year to year. Inspection frequencies
vary from bridge to bridge and King County has provided some inspection services.
STATUS: Construction projects will be determined from inspection reports and noted deficiencies/problems.
MAiNT.|MPACT: Reduces maintenance costs.
COMMENT: Ongoing project, only one year actuals are shown in the first column.
FINANCIAL Through Estimated
(in*0VV's)
BEYOND TOTAL
EXPENSES
Design
141
45
45
45
55
55
05
05
05
581
Lond(R8N)
O
Conn1. MgmL
1
40
40
40
50
50
00
OO
00
401
Construction
32
250
250
250
300
300
325
325
525
2.557
TOTAL EXPENSES
174
335
335
335
405
405
450
450
450
3.339
FUND SOURCES
Awarded Grant
Proposed Grant
0
Mitigation Actual
O
Mitigation Expected
0
City Oper. Revenue
174
335
335
335
405
405
450
450
450
3.339
2019 2024capxm Improvement Program
17
24
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number: 18-244
CONTRACT FOR SERVICES
Amendment # 1
Between the City of Tukwila and TranTech Engineering, LLC
That portion of Contract No. 18-244 between the City of Tukwila and
TranTech Engineering, LLC is amended as follows:
Section 1 & 2:
The scope has been updated to reflect that some of the original work has been completed
and to include the requested work currently under way. See the attached Exhibit Al .
Section 4A:
The "not to exceed" amount is increased by S68,163.00 to S107,680.00 per the attached
Exhibit B1.
Al! other provisions of the contract shall remain in full force and effect.
Dated this
day of , 20
CITY OF TUKWILA CONTRACTOR TranTech Engineering, LLC
Allan Ekberg, Mayor Printed Name: Grant D Griffin
ATTEST/AUTHENTICATED APPROVED AS TO FORM
Christy O'Flaherty, MMC, City Clerk City Attorney
Page 1 of 1
25
PROJECT DESC
SCOPE OF WORK
TRANTECH Engineering
2019 Bridge Program Engineering Support
Amendment 1
Exhibit Al
CITY of Tukwila, WA
IPTION
The CITY of 'Tukwila (CITY) has entered into an on -call engineering services contract with
TranTech Engineering, LLC (TranTech) to provide ongoing bridge program support for 2019.
These tasks originally include providing construction support for the west approach slab repairs of
the 196th/ 200th Street Bridge, continued permit load rating services to manage the load posting of
the 42nd Avenue Truss, funding support for the 42nd Avenue Truss, and providing miscellaneous
engineering support for other bridge program tasks as identified by the CITY. The scope of this
agreement has changed at the request of the CITY as detailed below.
The CITY has requested revisions to the existing PS&E package previously prepared for the
196th/2001h Street Bridge. These changes have been proceeding as directed by the CITY. In
addition, TranTech has provided unplanned miscellaneous engineering support as a stopgap for an
unanticipated personnel shortfall at the CITY. Progress on the original tasks along with these
unexpected additions have exhausted the remaining available budget for Agreement 18-244.
Amendment 1 provides additional funds to complete the requested revisions to the 196th/200th
Street Bridge Repair PS&E, to continue the miscellaneous engineering support as these tasks are
transitioned to a new CITY employee, and to continue engineering support for the original tasks.
SC EDULE
The Agreement shall remain in effect through December 31, 2019. However, all tasks will be
completed per the time requirements and submittal schedules of the individual tasks as agreed to
with the CITY.
SCOPE OF WORK — TEC NICAL APP
•
OAC
All work shall be in accordance with WSDOT/ FHWA procedures and requirements and with the
requirements of the National Bridge Inspection Standards (NBIS) where applicable.
Task 1 — 196"/ 200' Street Bridge Repair Project
Task 1.1 — PS&E
•
evisions
The CITY has requested changes to the current PS&E package to provide a more
permanent repair than previously scoped. Task 1.1 provides additional funds for this effort
as TranTech provides requested changes as directed by the CITY.
2019 Tukwila Bridge Program Engineering Support - Amendment 1 -- SCOPE OF WORK Page 1
TRANTECH ENGINEERING
26
Task 1.2 - Construction Management Support
The 19011/200`" Street Bridge Repair Project will move to the construction phase in
Summer 2019. Task 1.2 provides for on -call construction management support as
requested by the CITY.
Task 2 — 42"d Street Load ating Services
TranTech will provide load rating analysis for all trucks requiring permit access to cross the load
posted bridge as requested by the CITY.
The CITY has contacted two primary truck dispatchers in BNSF and Baker Commodities that
utilize this bridge for their truck route to provide their specific truck information to be used for
load rating purposes.
Deliverables
• Structural Memo to supplement the current load rating report that identifies the rating
factors associated with the specific pen -nit truck information.
• Electronic PDF copies of all reports generated provided on compact disk.
Task 3 — 42"d Ave Bridge Replacement Funding Assistance
A Federal Bridge Program Call for Projects was advertised in early 2019. Task 3 originally
consisted of assisting the CITY in the development of a bridge replacement application package
to be submitted to the Local Agency Bridge Program for the 42nd Avenue South Truss in
Allentown. TranTech assisted the CITY in assembling and updating the existing construction
estimates and analysis.
TranTech has provided and submitted the initial funding request per the Call for Projects
requirements and deadlines. Amendmentl provides for continued support through the spring and
summer candidate review period and through the funding meeting expected in the Fall of 2019.
Task 4 — iscellaneous Bridge Program Support
TranTech shall provide miscellaneous engineering support as directed by the CITY of
Tukwila's Project Manager. Anticipated work will include tasks identified related to current
on -going projects not specified in the preceding tasks above, such as tasks associated with
the continued support of Tukwila Bridge -Program, general engineering support, and other
projects as needed.
2019 Tukwila Bridge Program Engineering Support - Amendment 1 -- SCOPE OF WORK Page 2
TRANTECH ENGINEERING
27
Exhibit B1 - Consultant Fee Determination
City of Tukwila 2019 Bridge Program Engineering Support
Task 1.1 - 196th/ 200th Street Bridge PS&E Revisions $ 42,007
Task 1.2 - 196th/ 200th Street Bridge Repair CM Support $ 10,461
Task 2 - 42nd Avenue Load Rating Services $ 4,160
Task 3 - 42nd Ave Bridge Replacement Funding Assistance $ 1,283
Task 4 - Miscellaneous Bridge Program Support $ 9,753
Direct Costs $ 500
Grand Total $ 68,163
28
EXHIBIT B1'Budget
City of Tukwila 2019 Bridge Program Engineering Support
Project QA/QC Senior Project Senior Const. Senior Clerical Total
Task Items Nvunugmr Eng: Struc. Struo. Civil Engr. CAD
Engr. Engc Engr.
Tanh1] 180N2O0thStreet Bridge PS&ERevisions 3 13 75 71 50 2 80 7 301
Tota|Manhoum 3 13 75 71 50 2 00 7 301
Direct Labor Rates (DLR) 8 57.50 8 59.00 $ 58.00 $ 55.00 $ 52.00 $ 79.00 $ 37.00 $ 22.00
Profit at 30% ofDLR *4,520
Overhead a\1.4881 dmo*DLR *22.420
Total Labor Cost $43.007
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Task Items
Task 1.2 - 196th/ 200th Street Bridge Repair CM Support
Project QA/QC Senior Project Staff Senior Senior Const. Assistant Clerical Total
Manager Engr. Struc. Struc. Struc. Traffic CAD Engr. Inspector
Engr. Engr. Engr. Engr.
4 2 2 2 2 2 6 16 56 4 96
Total Manhours 4 2 2 2 2 2 6 16 56 4 96
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 50.00 $ 37.00 $ 56.00 $ 36.00 $ 22.00
Total Direct Salary Cost $230 $118 $116 $110 $78 $100 $896 $2,016 $88 $3,752
Profit at 30% of DLR $1,126
Overhead at 1.4881 times DLR $5,583
Total Labor Cost $10,461
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Task Items
Task 2 - 42nd Avenue Load Rating Services
Project QA/QC Senior Project Staff Senior Senior Const. Assistant Clerical Total
Manager Engr. Struc. Struc. Struc. CAD Civil Engr. Inspector
Engr. Engr. Engr. Engr.
4 2 2 10 10 4 32
Total Manhours 4 2 2 10 10 0 0 0 0 4 32
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 37.00 $ 52.00 $ 56.00 $ 36.00 $ 22.00
Total Direct Salary Cost $230 $118 $116 $550 $390 $0 $0 $0 $88 $1,492
Profit at 30% of DLR $448
Overhead at 1.4881 times DLR $2,220
Total Labor Cost $4,160
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Task Items
Project QA/QC Senior Project Staff Senior Senior Const. Assistant Clerical Total
Manager Engr. Struc. Struc. Struc. CAD Civil Engr. Inspector
Engr. Engr. Engr. Engr.
Task 3 - 42nd Ave Bridge Replacement Funding Assistance 8
Total Manhours 8 0 0 0 0 0 0 0 0 0 8
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 37.00 $ 52.00 $ 56.00 $ 36.00 $ 22.00
Total Direct Salary Cost $460 $0 $0 $0 $0 $0 $0 $0 $0 $0 $460
Profit at 30% of DLR $138
Overhead at 1.4881 times DLR $685
Total Labor Cost $1,283
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Project QA/QC Senior Project Staff Senior Senior Office Const. Clerical Total
Task Items Manager Engr. Struc. Struc. Struc. Coating Traffic Engineer Engr.
Engr. Engr. Engr. Engr. Engr.
Task 4 - Miscellaneous Bridge Program Support 8 2 2 4 4 4 4 40 4 2 74
Total Manhours 8 2 2 4 4 4 4 40 4 2 74
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 40.00 $ 50.00 $ 45.00 $ 56.00 $ 22.00
Total Direct Salary Cost $460 $118 $116 $220 $156 $160 $200 $1,800 $224 $44 $3,498
Profit at 30% of DLR $1,049
Overhead at 1.4881 times DLR $5,205
Total Labor Cost $9,753
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881