HomeMy WebLinkAboutReg 2019-08-05 Item 4F - Contract Amendment #1 - 196th-200th Street Bridge Improvements, 42nd Avenue Bridge Replacement Funding and Miscellaneous Bridge Program Support with TranTech Engineering for $68,163COUNCILAGENDA SvNoPsIs
Initials
MeetingDate
Prepared by
Mayoes review
Council review
08/05/19
HK
ITE
INFORMATION
ITEM No.
4.F.
S'I AFF SPONSOR: ADAM COX
ORIGINAL AGENDA DATE: 08/05/19
AGENDA I l'EM TULE Annual Bridge Inspections and Repairs 2019
Design Consultant Amendment No. 1 with TranTech Engineering, LLC.
CATEGORY J /Alt. 1,1,1 J Ion
Mtg Date
IAI
Motion
Date 08/05/19
0 Resolution
Mtg Date
El Ordinance
Mtg Date 0
El BidAward Award
Mtg Date
Ei Public Hearing
Mtg Date
Ejl Other
Mtg Date
Mfg
SPONSOR ECoumil IUaoi LIHR EIDCD LIFzname LIFie ETS ope-R
Polzce I PW•Court
SPONSOR'S Council is being asked to approve Amendment No. 1 with TranTech Engineering for the
SUMMARY 2019 Bridge Support Services. This amendment will finish design and supply construction
management support of the S 196th/200th St Bridge Repair. Council is being asked to
approve the TranTech Engineering Amendment No. 1 to Contract No. 18-244 for
$68,163.00.
REVIEWED BY
El COAX/.
Mtg, 0 CDN Comm El] Finance Comm. E] Pubhc Safety Comm.
LI Arts Comm. E] Parks Comm. [1:1 Planning Comm.
COMMITTEE CHAIR: ZAK IDAN
Trans &Infrastructure
DATE: 07/16/19
RECOMMENDATIONS:
SPoNsott/ADmIN.
COMMI
Public Works Department
FITE Unanimous Approval; Forward to Regular Consent
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRI .1) AMOUNT BUDGETED APPROPRIATION REQUIRED
$68,163.00 $335,000.00 $0.00
Fund Source: ARTERIAL STREETS & BRIDGES - 104
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
08/05/19
MTG. DATE
ATTACHMENTS
08 0 9
Informational Memorandum dated 07/12/19
Page 17, 2019 CIP
TranTech Contract for Services Amendment No. 1
Minutes from the Transportation and Infrastructure Committee 07 6 9
43
44
Allan Ekberg, Mayor
Public Works Department - Henry Hash, Director
INFOR ATIONAL E ORANDU
TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director 44 d
BY: Adam Cox, Transportation Project Manager
CC: Mayor Ekberg
DATE: July 12, 2019
SUBJECT: Annual Bridge Inspections and Repairs 2019
Project No. 91910402, Contract 18-244
Design Consultant Amendment No. 1 - Bridge Support Services
ISSUE
Approve Amendment No. 1 for the 2019 Bridge Program Engineering Support Services contract with TranTech
Engineering, LLC (TranTech) for the S 196th/200th St Bridge improvements, 42nd Ave S Bridge Replacement funding
assistance, and miscellaneous bridge program support.
BACKGROUND
The City has been monitoring the S 196th/200th St Bridge for the settlement on the west end of the structure. This
settlement now requires action to be taken by the City to remedy the issue as part of a construction project. The City is
also required to update and provide load rating analysis of the 42nd Ave S Bridge to meet FHWA requirements. The City
also requires technical support for the 42nd Ave S Bridge BRAC replacement grant that was submitted in April 2019.
ANALYSIS
Originally it was believed that the design/repair of the S 196th/200th St Bridge would be a fairly simple process of jacking
up one end of the bridge. Upon further analysis, a full pier retrofit is needed, which will require full design. TranTech has
requested Amendment No. 1 to finish design and supply construction management support during construction.
Additional funds will also support the 42nd Ave S Bridge load ratings and BRAC grant application along with
miscellaneous bridge support.
FINANCIAL IMPACT
TranTech has provided a consultant fee determination of an additional fee of $68,163.00 to perform Task 1 through Task
4 (refer to the attachment) services as part of the 2019 Annual Bridge Inspections and Repair Project. The S 196th/200th
St Bridge will be a two-year process and we will be using funding from 2019 and 2020 for design and construction.
Contract 2019 Bridge Budget
Original Bridge Support Services $39,517.00
Amendment No. 1 68,163.00
Total $107,680.00 $335,000.00
RECOMMENDATION
Council approve Amendment No. 1 to Contract No. 18-244 with TranTech Engineering for bridge engineering in the
amount of $68,163, for a new total contract of $107,680, and consider this item on the Consent Agenda at the August
5, 2019 Regular Council meeting.
ATTACHMENTS
• 2019 CIP, page 17
• Contract for Services Amendment No. 1
45
VV:1PW Eng1PROJECTS1A- RW 8, RS Projects1Bridge Inspection Programs1Bridge Inspections 2019 (91910402)102 - 196th200th bridge inspectionstinfo Memo PE TranTech Adm 1 071219.docx
46
CITY OFTUKWILA CAPITAL PROJECT SUMMARY
PROJECT: Annual Bridge Inspections and Repairs Project No. 9XX10402
DESCRIPTION: Ongoing program ufbi-annuo|inspections, repairs, painting and rehabilitation ofthe 22City bridges.
Federally required program identifies safety orrepair needs in the early stages tominimize hazards and
JUSTIFICATION: costs. The number of bridge inspections necessary each year can vary year to year. Inspection frequencies
vary from bridge to bridge and King County has provided some inspection services.
STATUS: Construction projects will be determined from inspection reports and noted deficiencies/problems.
MA|wT.|xxpAoT: Reduces maintenance costs.
COMMENT: Ongoing project, only one year actuo|oare shown |nthe first column,
RmAmcU\L Through Estimated
in $000's
2017 2018 2019
.EXPENSES
Design
141
45
45
45
os
55
65
no
sa
581
Land(R/W)
»
Com,LMgmt.
i
48
40
40
50
50
VO
60
80
401
Construction
oo
usO
250
250
000
000
825
325
3e5
2.35/
TOTAL EXPENSES
174
335
335
335
405
405
450
450
450
3.338
FUND SOURCES
Awarded Grant
Proposed Grant
»
Mitigation Actual
O
Mitigation Expected
n
City Opor.Revenue
174
335
335
335
405
405
450
450
450
3.339
TOTAL SOURCES
174
oos
aas
335
405
405
450
450
^so
3.33*
Project Location.,
Entire System
=
2019-2024 Capital Improvement Program
17
47
48
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Agreement Number: 18-244
CONTRACT FOR SERVICES
Amendment # 1
Between the City of Tukwila and TranTech Engineering, LLC
That portion of Contract No. 18-244 between the City of Tukwila and
TranTech Engineering, LLC is amended as follows:
Section 1 & 2:
The scope has been updated to reflect that some of the original work has been completed
and to include the requested work currently under way. See the attached Exhibit A1.
Section 4A:
The "not to exceed" amount is increased by $68,163.00 to $107,680.00 per the attached
Exhibit B1.
All other provisions of the contract shall remain in full force and effect.
Dated this
day of , 20
CITY OF TUKWILA CONTRACTOR TranTech Engineering, LLC
Allan Ekberg, Mayor Printed Name: Grant D Griffin
ATTEST/AUTHENTICATED APPROVED AS TO FORM
Christy O'Flaherty, MMC, City Clerk City Attorney
Page 1 of 1
49
SCOPE OF WORK
TRANTECH Engineering
2019 Bridge Program Engineering Support
Amendment 1
Exhibit Al
CITY of Tukwila, WA
PROJECT DESCRIPTION
The CITY of Tukwila (CITY) has entered into an on -call engineering services contract with
TranTech Engineering, LLC (TranTech) to provide ongoing bridge program support for 2019.
These tasks originally include providing construction support for the west approach slab repairs of
the 196th/ 200th Street Bridge, continued permit load rating services to manage the load posting of
the 42" Avenue Truss, funding support for the 42' Avenue Truss, and providing miscellaneous
engineering support for other bridge program tasks as identified by the CITY. The scope of this
agreement has changed at the request of the CITY as detailed below.
The CITY has requested revisions to the existing PS&E package previously prepared for the
196th/200th Street Bridge. These changes have been proceeding as directed by the CITY. In
addition, TranTech has provided unplanned miscellaneous engineering support as a stopgap for an
unanticipated personnel shortfall at the CITY. Progress on the original tasks along with these
unexpected additions have exhausted the remaining available budget for Agreement 18-244.
Amendment 1 provides additional funds to complete the requested revisions to the 196th/200th
Street Bridge Repair PS&E, to continue the miscellaneous engineering support as these tasks are
transitioned to a new CITY employee, and to continue engineering support for the original tasks.
SCHEDULE
The Agreement shall remain in effect through December 31, 2019. However, all tasks will be
completed per the time requirements and submittal schedules of the individual tasks as agreed to
with the CITY.
SCOPE OF WORK — TECHNICAL APPROACH
All work shall be in accordance with WSDOT/ FHWA procedures and requirements and with the
requirements of the National Bridge Inspection Standards (NBIS) where applicable.
Task 1-196th/ 200th Street Bridge Repair Project
Task 1.1— PS&E Revisions
The CITY has requested changes to the current PS&E package to provide a more
permanent repair than previously scoped. Task 1.1 provides additional funds for this effort
as TranTech provides requested changes as directed by the CITY.
2019 Tukwila Bridge Program Engineering Support - Amendment 1 -- SCOPE OF WORK Page 1
TRANTECH ENGINEERING
50
Task 1.2 - Construction Management Support
The 196th/200th Street Bridge Repair Project will move to the construction phase in
Summer 2019. Task 1.2 provides for on -call construction management support as
requested by the CITY.
Task 2 — 42nd Street Load Rating Services
TranTech will provide load rating analysis for all trucks requiring permit access to cross the Toad
posted bridge as requested by the CITY.
The CITY has contacted two primary truck dispatchers in BNSF and Baker Commodities that
utilize this bridge for their truck route to provide their specific truck information to be used for
load rating purposes.
Deliverables
• Structural Memo to supplement the current load rating report that identifies the rating
factors associated with the specific permit truck information.
• Electronic PDF copies of all reports generated provided on compact disk.
Task 3 — 42"d Ave Bridge Replacement Funding Assistance
A Federal Bridge Program Call for Projects was advertised in early 2019. Task 3 originally
consisted of assisting the CITY in the development of a bridge replacement application package
to be submitted to the Local Agency Bridge Program for the 42"d Avenue South Truss in
Allentown. TranTech assisted the CITY in assembling and updating the existing construction
estimates and analysis.
TranTech has provided and submitted the initial funding request per the Call for Projects
requirements and deadlines. Amendmentl provides for continued support through the spring and
summer candidate review period and through the funding meeting expected in the Fall of 2019.
Task 4 — Miscellaneous Bridge Program Support
TranTech shall provide miscellaneous engineering support as directed by the CITY of
Tukwila's Project Manager. Anticipated work will include tasks identified related to current
on -going projects not specified in the preceding tasks above, such as tasks associated with
the continued support of Tukwila Bridge Program, general engineering support, and other
projects as needed.
2019 Tukwila Bridge Program Engineering Support - Amendment 1 -- SCOPE OF WORK Page 2
TRANTECH ENGINEERING
51
ngineering LLC
Exhibit B1 - Consultant Fee Determination
City of Tukwila 2019 Bridge Program Engineering Support
Task 1.1- 196th/ 200th Street Bridge PS&E Revisions $ 42,007
Task 1.2- 196th/ 200th Street Bridge Repair CM Support $ 10,461
Task 2 - 42nd Avenue Load Rating Services $ 4,160
Task 3 - 42nd Ave Bridge Replacement Funding Assistance $ 1,283
Task 4 - Miscellaneous Bridge Program Support $ 9,753
Direct Costs $ 500
Grand Total $ 68,163
52
ngineering LLC
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Project QA/QC Senior Project Senior Const. Senior Clerical Total
Task Items Manager Engr. Struc. Struc. Civil Engr. CAD
Engr. Engr. Engr.
Task 1.1 - 196th/ 200th Street Bridge PS&E Revisions 3 13 75 71 50 2 80 7 301
Total Manhours 3 13 75 71 50 2 80 7 301
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 52.00 $ 79.00 $ 37.00 $ 22.00
Total Direct Salary Cost $173 $767 $4,350 $3,905 $2,600 $158 $2,960 $154 $15,067
Profit at 30% of DLR $4,520
Overhead at 1.4881 times DLR $22,420
Total Labor Cost $42,007
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
ngineering LLC
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Project QA/QC Senior Project Staff Senior Senior Const. Assistant Clerical Total
Task Items Manager Engr, Struc. Struc. Struc. Traffic CAD Engr. Inspector
Engr. Engr. Engr. Engr.
Task 1.2 - 196th/ 200th Street Bridge Repair CM Support 4 2 2 2 2 2 6 16 56 4 96
Total Manhours 4 2 2 2 2 2 6 16 56 4 96
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 50.00 $ 37.00 $ 56.00 $ 36,00 $ 22.00
Total Direct Salary Cost $230 $118 $116 $110 $78 $100 $896 $2,016 $88 $3,752
Profit at 30% of DLR $1,126
Overhead at 1.4881 times DLR $5,583
Total Labor Cost $10,461
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Task Items
Task 2 - 42nd Avenue Load Rating Services
ngineering LLC
Project QA/QC Senior Project Staff Sen.ikr Senior Const, Assistant Clerical Total
Manager Engr. Struc. Struc. Struc. CAD Civil Engr. Inspector
Engr, Engr. Engr. Engr.
4 2 2 10 10 4 32
Total Manhours 4 2 2 10 10 0 0 0 0 4 32
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 37.00 $ 52.00 $ 56.00 $ 36.00 $ 22.00
Total Direct Salary Cost $230 $118 $116 $550 $390 $0 $0 $0 $88 $1,492
Profit at 30% of DLR $448
Overhead at 1.4881 times DLR $2,220
Total Labor Cost $4,160
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Task Items
ngineering LLC
Project QA/QC Senior Project Staff Senior Senior Const. Assistant Clerical Total
Manager Engr. Struc. Struc. Struc. CAD Civil Engr. Inspector
Engr. Engr. Engr. Engr.
Task 3 - 42nd Ave Bridge Replacement Funding Assistance 8
Total Manhours 8 0 0 0 0 0 0 0 0 0 8
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 37.00 $ 52.00 $ 56.00 $ 36.00 $ 22.00
Total Direct Salary Cost $460 $0 $0 $0 $0 $0 $0 $0 $0 $0 $460
Profit at 30% of DLR $138
Overhead at 1.4881 times DLR $685
Total Labor Cost $1,283
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
ngineering LLC
EXHIBIT B1 - Budget
City of Tukwila 2019 Bridge Program Engineering Support
Project QA/QC Senior Project Staff Senior Senior Office Const. Clerical Total
Task Items Manager Engr. Struc. Struc. Struc. Coating Traffic Engineer Engr.
Engr. Engr. Engr. Engr. Engr.
Task 4- Miscellaneous Bridge Program Support 8 2 2 4 4 4 4 40 4 2 74
Total Manhours 8 2 2 4 4 4 4 40 4 2 74
Direct Labor Rates (DLR) $ 57.50 $ 59.00 $ 58.00 $ 55.00 $ 39.00 $ 40.00 $ 50.00 $ 45.00 $ 56.00 $ 22.00
Total Direct Salary Cost $460 $118 $116 $220 $156 $160 $200 $1,800 $224 $44 $3,498
Profit at 30% of DLR $1,049
Overhead at 1.4881 times DLR $5,205
Total Labor Cost $9,753
Note — The sum of the above Profit and Overhead is equal to a combined multiplier of 2.7881
58
City of Tukwila
City Council Transportation & Infrastructure Committee
TRANSPORTATION & INFRASTRUCTURE COMMITTEE
Meeting Minutes
July 16, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall
Councilmembers: Zak Idan, Chair; Kate Kruller, Thomas McLeod
Staff: Henry Hash, Hari Ponnekanti, Bryan Still, Greg Villanueva, Mike Perfetti, Peter Lau,
Han Kirkland, Adam Cox, Cyndy Knighton, Chris Andree, Alison Turner
Guests: Matthew Bates, resident
CALL TO ORDER: Chair Idan called the meeting to order at 5:30 p.m.
I. BUSINESS AGENDA
A. WSDOT Transportation Demand Management Program Allocation 2019-2021
Staff is seeking Council approval to accept the biennial Washington State Department of
Transportation (WSDOT) Transportation Demand Management allocation in the amount of
$74,205.00 for 2019-2021. This allocation is a renewal that is consistent with previous allocations
and provides funding for the City's TDM activities that include consultation, technical assistance,
training, and more. UNANIMOUS APPROVAL. FORWARD TO AUGUST 5, 2019 REGULAR CONSENT
AGENDA.
B. Consultant Agreement: Surface Water - Storm Water Quality Retrofit Program
Staff is seeking Council approval of an agreement with KPG, Inc. in the amount of $242,440 for
project feasibility and design of the Storm Water Quality Retrofit Project. This project is intended
to improve water quality at select City -owned and operated stormwater discharge points and
reduce pollutants discharged from roadways to the Green-Duwamish River. UNANIMOUS
APPROVAL. FORWARD TO AUGUST 5, 2019 REGULAR CONSENT AGENDA.
C. Contract Amendment: Annual Bridge Inspections & Repair 2019
Staff is seeking Council approval of an amendment to Contract 18-244 with TranTech Engineering
in the amount of $68,163 for activities within the Annual Bridge Inspections & Repair Program. The
amendment will support the remaining design and supply construction management support for
the S. 196th/200th St. Bridge Improvements as well as support for the 42"d Avenue South Bridge load
ratings and BRAC grant application along with miscellaneous bridge report. The new contract total
will be $107,680 and the project budget is $335,000.00. UNANIMOUS APPROVAL. FORWARD TO
AUGUST 5, 2019 REGULAR CONSENT AGENDA.
D. Project Completion: South 144th Street Phase II (42"d Avenue South - TIB)
Staff is seeking Council approval of contract completion and release of retainage to Marshbank
Construction, Inc. in the amount of $1,932,044.97 for the South 144th Street Phase 11 (42"d Avenue
South - Tukwila International Boulevard) Project. This project reconstructed 780 lineal feet of
street improvements including asphalt paving, curbs, gutters, sidewalks, bicycle lanes, on -street
parking, retaining walls, utility adjustments, storm drainage, illumination, and a new signal. Final
costs were under budget. UNANIMOUS APPROVAL. FORWARD TO AUGUST 5, 2019 REGULAR
CONSENT AGENDA.
59