HomeMy WebLinkAboutFIN 2019-08-12 Item 2A - Resolution - 2020 Fire Department Fee ScheduleCity of Tukwila
Allan Ekberg, Mayor
TO:
INFOR ATIONAL E ORANDU
Finance Committee
FROM: Vicky Carlsen, Finance Director
Ben Hayman, Fire Marshal
CC: Mayor Ekberg
DATE: August 7, 2019
SUBJECT: Update Fire Department Fee Schedule
ISSUE
Recommendation for Council to update the current Fire Department fee schedule by adjusting
current fees to market rates and adding new fees to more closely align with other fire jurisdictions.
BACKGROUND
The Fire Department charges fees for a variety of services performed. The fees are intended to
recover a portion of the City' costs for processing permit applications, plan reviews, and re -
inspections as well as a fee in conjunction with recovery of hazardous incident response costs.
With the exception of fees for fire permits required by the International Fire Code and plan reviews,
fees have not been increased since at least 2010.
Because the structure of fire fee schedules can vary significantly from entity to entity, comparison
data has been provided at the end of this memo.
DISCUSSION
As noted above, the Fire Department charges fees for a variety of services performed. Fees
charged can be categorized in several sections including fire permit, plan review and inspection
fees, re -inspection, and new fees. Each fee type is discussed below. In order to review and
streamline current processes, the City is recommending that the changes to the fee schedule take
effect January 1, 2020.This date will allow the build -out of the new fees in TRAKIT and the
outreach to key stakeholders.
Fire Permit Fees
The first table represents fire permit fees. The current fee is $150.00 for all fire permit fees. The
recommended update to the fee breaks the permits into several categories with fees reflective of
the type of permit and complexity. Also reflected in this section are short-term/temporary permits,
which reflect a fee increase plus the addition of one inspection included in the fee, and special
event permits with no recommended change to the fee.
1
INFORMATIONAL MEMO
Page 2
Fire Permit Fees
Current Fee
Revised Fee
Fire permits required by the International
Fire Code
TMC 16.16.080
$150.00 for each
permit
Construction Permits:
$500.00 for high pile
storage, flammable and
combustable liquids,
hazardous materials.
$300.00 all other
contruction fire permits
Operational Permits:
$300.00 for high pile
storage, flammable and
combustable liquids,
hazardous materials.
$175.00 for all other
operational fire permits
Short term permits (i.e. for food
vendors); for events not to exceed
3 consecutive days in duration:
- Liquid propane permit
- Open flame permit
TMC 16.16.080
$25.00 for each
permit
$250.00. Fee includes one
inspection
Temporary / Special Events Permit:
TMC 16.16.030
- Commercial
- Residential
$400.00
$100.00
$400.00
$100.00
Plan Review and Inspection Fees
The recommendation for plan review fees is to revamp the structure to more accurately reflect
the types of systems installed in the City and the effort required as the number of sprinkler heads
in a sprinkler system and number of devices in an alarm system increase. The current fee
structure breaks the number of sprinkler heads/alarm devices between 1 and 5 then 6 and more.
The revised schedule provides for more categories and adds in inspection fee to the schedule.
The first chart reflects the current structure, while the second chart displays the recommended
new fee structure for plan review fees.
2
Z:\Council Agenda ItemsTinance108.12.191Info Memo - Fire Department Fee Schedule.docx
INFORMATIONAL MEMO
Page 3
Plan Review Fees (Current Fee Schedule)
Fee
For alternative fire protection systems
77kC1(lY6.080
Commercial:
For 1'5de\tineo/headeBase fee =$2O0.OU
For or more de\Aces/heado 8eoe fee = $300.00 + $2.00 per
de\Aoe/hoadinexcess cf10
Single-family- Base fee = $50.00 + $1.50 per
sprinkler head inexcess of1O
ResVb[nitta|fee
$300.00
For fire alarm plans
7lmCf640.04D
Commercial:
For 1'5dmAoao Base fee = $200.00
For or more de\Aoeo Base fee = s300.00 + $2.00 perde\Ane in excess
of1Q
Single-family: Base fee = $50.00 + $1.50 perde\Aoe
inexcess of1Ocle\tiueo
F{eaubnnitta|fee
$300.00
For sprinkler system plans
77NC1G.42040
Commercial:
For 1-5heads Base fee =$2O0.0O
For or more heads Base fee = $300.00 + $2.00 per sprinkler head in
excess ofY0
Single-family: Base fee = $50.00+ $1.50 per
sprinkler head inexcess of1n
Resubmitta|fea
$300.00
Z:�Coumcil Ag,nda1tems\FinanceW812.1Rmfo Memo . Fire Department Fee Schedule.dox
INFORMATIONAL MEMO
Page 4
Proposed Fee Schedule
Commercial Fire Sprinkler Fees
Numberof heads
Plan Re\�ew Fee
Per Head Re\Aew
Inspection Fee
Per Head
Inspection
1 to10
$300.00
$2.50
$175.00
$1�50
11to25
$350.00
$2.50
$200.08
$1.50
26to50
$350.00
$2.30
$225.00
$1.50
51to100
$350.00
$2.25
$300.00
$1.50
101to1000
$358�00
$1.90
$500.00
$1.30
1001 or More
$400.00
$2.25
S750.00
$1.00
13O Sprinkler System Fees
Number nfheads
Plan Re�AewFee
Per Head Ra\tiew
Inspection Fee
Per Head
Inspection
1 to1O
$150
N64
$%OO.UO
N/A
11 to25
$175
N64
$250.00
N/4
2GorMore
$200
N/A
$300.00
N/4
Additional Systems
Plan Re\hevvFee
Inspection Fee
Per Riser
$100
$100.00
Per Fire Pump
$150
$300.00
Fire Alarm System Fees
Number ofDe\Acee
Plan Re�iew Fee
Per Oe\Acn Ra\iiew
Inspection Fee
Per Device
Inspection
1 tp1O
$300
$2.25
$150
$1.00
11 to25
$300
$0.75
$250
$1.00
26tV100
$350
$1.00
$275
$1.00
101to500
G400
$1.10
$500
$1.50
5OOorMore
$500
$0.85
G1.100
$1.00
CoDlDnG[cia| Clean Agent SVst8'nlS and
Commercial Kitchen Fire Protection Systems
Plan Re\AewFee
PerDo\hce Re\�avv
Inspection Fee
$350
$1.00
$150.00
ReinopectionFeeo
The current fee schedule for re -inspections reflects a stair step approach. Aoeach additional re -
inspection occurs the fee increases. The first neineoecUOnat $0O.00then stepping uptoefeeof
$135 for the fourth re -inspection and any subsequent re -inspection. The recommended
nainSp8cUon fee schedule sets all re -inspection fees to$175.00 [8ganj|esG of how many re -
inspections occur. This will streamline the invoicing process for re -inspections by eliminating the
Deed totrack the number ofre-inspections for each project. Re -inspections also include an appeal
fee currently set to$25O.00. The recommendation iStoincrease the appeal fee to$5OO.00. The
chart below displays the current 'fee structure aawell aothe recommended fee structure.
Z:\Council Agenda ItemaTinanne0K1x1V mnMomo Fire Department FemGchedulo,docx
INFORMATIONAL MEMO
Page 5
Re -inspection fees
For new construction, tenant improvements orspot inspections
rxC*z/6.n00
7nxC?s*813o
7MC/6.42110
nwC/6.46,1sO
7MC 16.48.150
$100.00 (current fee)
For company level inspections:
TnmC/6,Y6,O80
On the follow-up inspection 3Vdays after the initial company |ee|\An|aUnn.
when the inspector finds that the wu|mdonohavenot been corrected =$nn.on
Oothe second follow-up inapem1on.wmanthe inspector finds that the
�Ao|oUwno havenot been corrected = $85.00
Onthe third follow-up inspection, when the inspector finds that the �io|atiuns
have not been corrected ~ $110.00
Fee for the fourth and any subsequent follow-up inspections when the inspector
finds that the \fin|ationobmmnot been corrected =$l35.Un
APPEALFEE
TxmC 16.16.090
rMC/6.4u1r0
TMC/6.41Y50
TnmC 16.46./70
TMC/a48.1ro
Re\Ased Fee
$175.QOper re -
inspection
Proposed New Fees
In addition to the current fees charged for services provided by the Fire Departnlent, other
oen/ioea provided by Fins are not currently supported by fees. The City is recommending that
new fees be added to the schedule to recover m portion of the City's cost of providing these
services.
The table below reflects two new categories offees. The first category are fees bzrecoup costs
associated with development, public works, mechanical, and land use permits that are reviewed
bvFire personnel. The second category are special fees and include fees for expedited and after-
hours plan review and expedited and aftaFh8Oro inepections, both resulting in poeo|b|g overtime
costs Unthe City. Other recommended fees in the category inc|ude, but are not limited to, ofae
forstarting work before the issuance of a permit and a 5% technology fee for Fire fees only (there
will not be a double technology fee charged if there already is a technology fee charged), similar
tDthe fee charged by Department of Community Development.
DCnunnAgenda kmns\Finnce0G12.19VmnMemo Fire Department FeeSnhedole.docx
INFORMATIONAL MEMO
Page 6
Development, Public Works, Mechanical and
Land Use permits reviewed by Fire
Wireless Communications Facility
$ 150.00
Boundary Line Adjustment: Residential
$ 100.00
Boundary Line Adjustment: Commercial
$ 200.00
Lot Consolidation: Residential
$ 100.00
Lot Consolidation- Commercial
$ 400.00
Short Plat Fire Review
$ 200�00
Sub Fire Division
$ 500.00
SEPxFire Review
$ 400.00
Development Fire Review: Residential
$15O.Q0
Development Fire Review: Commercial
$ 400.00
Public Works Fire Review: Residential
$15O.00
Public Works Fire Review: Commercial
$ 300.00
Mechanical Fire Review: RogUonUu|
s 150.00
Mechanical Fire Review: Commercial
$ 300.00
Special Fees
Expedited and After -Hours Fire Plan Review
S400.00
Expedited and After -Hours Inspection
$500.00
New Business Life Safety Inspection
$5o.oOp|us
Applicable
Operational Permit
Fees
Annual Life Safety Inspection
$5V+Applicable
Operational Permit
Fees
Smoke Control System Plan Review
S750o0
siuhseSmoke Control System Inspection
$500,00
HiqhriseSmoke Control System Inspection
$900.00
Reoubmitta|Plan Review Fee
S300.00
Emergency Responder Radio Coverage System Te
s300.00
Fire Variance Request: Residential
s250.00
Fire Variance Request: Commercial
S500.00
Fire Appeal Fee
$onuoo
Fire Suppression and Detection Confidence Test
Administrative Fee
S1s.00per system
Starting work before apermit issuance shall besub ectman
investigation fee equal me1OV96ofapplicable permit fees
x5v&Technology Fee will ueadded mall Fire Fees
Outreach Plan
In order to communicate the changes to the Fire Department fee schedule, the City has identified
the following steps to notify those affected by the changes in the fee schedule.
- Work with Chamber tOhelp notify businesses ofthe pending changes.
- Notifications posted VO Cityw8bSite.
- Meetings held with hey stakeholders.
- Signs of upcoming fees at P8n0i[ Center and Fire Marshal's Office.
Fee Schedule Comparison tVOther Jurisdictions
Fee schedules for fire services vary significantly from entity to entity. For exGnnp|e, some fee
schedules for permit fees are listed as broad categories with a flat fee for each category. Others
list detailed categories with flat fees for each or the fee is a percentage based on the value of the
permit. Because ofthe complexity and variances between fee schedules, comparison data is
provided bytype nfbusiness rather than type of fee. Fees are examples and would vary based
onsize and complexity ofthe project.
Small Restaurant - Fire Protection Fees
$2,833 $2'886 $lOuU
$2,074 IDZZ
+ ' $1'511 $1'295 $1'136
Kent Kirkland Bellevue Tukwila Lynnwood SeaTac Covington Renton VRFA Tukwila
Proposed
Current
ZACouncil AgondokmnoWinance081219hfo Memo ' Fire Department FemSohedulndocx
INFORMATIONAL MEMO
Page 7
$19,241
$12,594
'"'""'•'•''''''''"'"'"'''''"••"''''''"‘"
„„....„„.. „..„„„„„..„.........,..„„,,„
...................,...„_„........„.„
....„.......„.„..................... ...................„.„......... .................................
.„.„,„,„..!„...„.„....„,„•„.........„,......„.„,„„‘„,„:„„:„,„:„:„.„:„....„.„,........„,„:„.,„„„„„„,..„.,.....„„:„:„....„.„.„..„;,„„‘„,.,„„:„
• „ „,'....".r.„.‘,,,,,'."
.....,...„.....„...„„,,,...„,,,,,„
..........„.........„..,...,......„..„.„.„
..............,.......„ „.......„.„„„ ..,.............„ „.........„„.„„„
...................„.....„.„.........„
..„....., . ,..... .
.........„......„„ .... „.„„...,... ......„.„,.....„........„..........„
. ,..,..... „.„.......„.„.„.„.„....„.„....
• •'•••-'"...'"'"•...."•‘'.•••.•‘'',.•
„„,,,.,„.„,•••„„„,...„..,,,,,,...„.,,.,„..„ ...„„.„„„.......„...„,„„„„„.„,.......,„
„......„„„„„„.„..,.„...„......„.„..,....„„
Fire Protection Fees- 5 story hotel
$6,509 $6,490 $6,202 $5,356 $4,913 $3,860 $3,192 $2,961
Kent Lynnwood Kirkland Proposed SeaTac Bellevue Renton VRFA Current Covington
Tukwila
Fees
$338
$321
$ 3 2 1
$ 3 0 0
d'e6
.zz`
O
$268 $258
High PlIefRack Storage- OPERATIONAL
$268
$258
$ 2 0 0 $ 2 0 0
$ 1 7 5 $ 1 7 5
6 6
go-
ac• `• '
4
"t
44\\
s‘i -
Tukwila
$155 $150
ALL OTHER OPERATIONAL PERMITS
$125
$ 100
4) ,cocN
ecs
cbz
$200 $200 $175 $175 $175 $155 $150 $125 $100
6
e, ecio
cp
o e, ‘o -. CR
•'••••',•'•"'"'••••,•,•,"••,•••••'
........ .,., .. .. .„.....„.„„„ „.......„....,... ..„.„,...................... „..........„........„......„„
RECOMMENDATION
The City Council is being asked to approve the resolution and consider this item at the August
26, 2019 Committee of the Whole meeting and at the subsequent September 3, 2019 Regular
Meeting.
Z:\Council Agenda Items IFinance108.12.191Info Memo - Fire Department Fee Schedule.docx
7
8
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF TUKWILA, WASHINGTON, REPEALING
RESOLUTION NO. 1935 AND ADOPTING A
REVISED FIRE DEPARTMENT FEE SCHEDULE.
WHEREAS, the City has analyzed current Fire Department fees for various services
provided including, but not limited to, permits, plan review and re -inspections; and
WHEREAS, the City Council wishes to recover a portion of the City's costs for
processing of permit applications, plan reviews, re -inspections, and other services
provided by the Fire Department; and
WHEREAS, the City has not reviewed and updated fees charged by the Fire
Department for several years;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution No. 1935 is hereby repealed.
Section 2. Fire Department Fee Schedule. Fire Department fees will be charged
according to the following schedule, which shall supersede any previously adopted fire
permit fee, plan review fee or re -inspection fee.
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton Page 1 of 8
9
FIRE DEPARTMENT FEE SCHEDULE
FIRE PERMIT FEES
Fire permits required by the International Fire Code
TMC 16.16.080
$150.00 for each
permit
Construction Permits:
$500.00 for high pile
storage, flammable and
combustible liquids,
hazardous materials.
$300.00 all other
construction fire permits
Operational Permits:
$300.00 for high pile
storage, flammable and
combustible liquids,
hazardous materials.
$175.00 for all other
operational fire permits
Short term permits (i.e. for food vendors); for events not
to exceed 3 consecutive days in duration:
- Liquid propane permit
- Open flame permit
TMC 16.16.080
$25.00 for each
permit
$250.00. Fee includes
one inspection.
Temporary / Special Events Permit:
TMC 16.16.030
- Commercial
- Residential
$400.00
$100.00
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton
10
Page 2 of 8
PLAN REVIEW FEES
For alternative fire protoctionsystems
TMC16.fGO80
Cnmrnoro1a|:
For 15doviceohcsds Bo-.ofee -$28UM
devicc/hoodimnexcess of1O
sprinkler head in excess of 1G
Rcsubmitt3l fee
For fire alarm plans
TMC 15.10.040
Commercial-.
For 1 5 devices
Base fee -G2OO.00
device inexcess of1U
device
F7ecubn7itta|fea
$3OO.0Q
Forsprinkler systern plan --
,Commercial:
For 5he3do
For Sormore h'ads
EJng10 family:
Base fee -S2OO.OQ
MI-egislaUve DevelopmentTire Department Fee Schedule a-5-10
Page 3 of 8
11
Commercial Fire Sprinkler Fees
Number of
Plan Review
(Per Head)
Inspection
(Per Head)
Heads
Fee
Review
Fee
Inspection
1 to 10
$300.00
$2.50
$175.00
$1.50
11 to 25
$350.00
$2.50
S200.00
$1.50
26 to 50
S350.00
$2.30
S2250O
$1.50
51 to 100
S35ft0O
$2.25
$300.00
$1.50
101 to 1,000
$ 50.00
$1.90
$500.00
$1.30
1,001 or More
$400.00
$2.25
$750.00
$1 00
Additional
Plan Review
Inspection
Systems
Fee
Fee
Per Riser
$100.00
$100.00
Per Fire Pump
$150.00
$300.00
13D Sprinkler System Fees
Number of
Plan Review
(Per Head)
Inspection
(Per Head)
Heads
Fee
Review
Fee
Inspection
1 to 10
$150.00
N/A
$200.00
N/A
11 to 25
$175.00
N/A
$250.00
N/A
26 or More
S200.O0
N/A
$300.00
N/A
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton
12
Page 4 of 8
Fire Alarm System Fees
Number of
Plan Review
(Per
Inspection
(Per Device)
Devices
Fee
Device)
Fee
inspection
Review
1 to 10
$300.00
$2.25
$150.00
$1.00
11 to 25
S300.O0
$0.75
$250.00
$1.00
26 to 100
$350.00
$1.00
$275.00
$1.00_
101 o 500
$400.00
$1.10
$500.00
$1.50
501 or More
$500.00
$0.85
$1, 00.00
$1.00
Commercial Clean Agent Systems and
Commercial Kitchen Fire Protection Systems
Plan Review
(Per
Inspection
Fee
Device)
Fee
Review
$350.00
$1.00
$150.00
RE -INSPECTION FEES
For new construction,
inspections or spot
tenant improvements,
inspections
life safety
$100.00 $175.00
per re -inspection
TMC 16.16.080
TMC 16.40.130
TMC 16.42.110
TMC 16.46.150
TMC 16.48.150
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton
Page 5 of 8
13
For level inspections:
company
TMC 16.16.080
the inspector finds that the viobtionc have
been - $60.00
not corrected
the inspector finds that tho violations have
been - $85.00
not corrected
On thc third follow inspection, wiaen the
up
inspector finds that the violations have not
been - $110.00
corrected
Fee for the fourth subsequent
and any
follow inspections when the inspector
up
- $135.00
corrected
APPEAL FEE
TMC 16.16.090
TMC 16.40.170
TMC 16.42.150
TMC 16.46.170
TMC 16.48.170
$-2-51-0- $500.00
Development, Public orks, rechanicaI and Land Use Permits reviewed by Fire
Wireless Communications Facility
$150.00
Boundary Line Adjustment: Residential
$100.00
Boundary Line Adjustment: Commercial
$200.00
Lot Consolidation: Residential
$100.00
Lot Consolidation: Commercial
$400.00
Short Plat Fire Review
$200.00
Sub Fire Division
$500.00
SEPA Fire Review
$400.00
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton
14
Page 6 of 8
Development Fire Review: Residential
$150.00
Development Fire Review: Commercial
S400.00
Public Works Fire Review: Residential
$150.00
Public Works Fire Review: Commercial
$300.00
Mechanical Fire Review: Residential
$150.00
Mechanical Fire Review: Commercial
$300.00
Special Fees
Expedited and After -Hours Fire Plan Review
$400.00
Expedited and After -Hours Inspection
$500.00
New Business Life Safety Inspection
$50.00 plus
Applicable
Operational Permit
Fees
Annual Life Safety Inspection
$50.00 + Applicable
Operational Permit
Fees
Smoke Control System Plan Review
$750.00
Mid -rise Smoke Control System Inspection
$500.00
High-rise Smoke Control System Inspection
$900.00
Resubmittal Plan Review Fee
$300.00
Emergency Responder Radio Coverage System Test
$300.00
Fire Variance Request: Residential
$250.00
Fire Variance Request: Commercial
$500.00
Fire Suppression and Detection Confidence Test
$15.00 per system
Administrative Fee
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton
Page 7 of 8
15
Starting work before a permit issuance shall be subject to
an investigation fee equal to 100°/0 of applicable permit fees.
A 5`)/0 Technology Fee will be added to all Fire fees unless
the Technology Fee is already being charged by another
City department.
Recovery of Hazardous Incident Response Costs
TMC Chapter 6.14
Minimum fee for
incident response
costs = $250.00, plus
any "extraordinary
costs" as defined per
TMC Chapter 6.14.
Section 3. Effective Date. The fee schedule contained in this resolution shall be
effective immediately.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of , 2019.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Rachel B. Turpin, City Attorney
Kathy Hougardy, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
W:\Legislative Development\Fire Department Fee Schedule 8-5-19
VC:bjs Review and analysis by Barbara Saxton Page 8 of 8
16