HomeMy WebLinkAboutTIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and ExpendituresAllentown/Duwamish/Foster Point Projects and Expenditures 1989 - 2019 1989 Annexed into the City, took over Water District 25 and Fire District 1 Expenditures Project No. 56th Ave S Bridge to Foster Point 1993 King County Metro Sewer Capacity line 1994 EMW Water, served fire flow and water pressure in Allentown Pave Pamela Dr, S 133rd St Overlay & Drainage, 56th Ave S Ped Path $ 129,000.00 1996 Allentown Water/Sewer/SWM Sewer Phase I 7,500,000.00 W/S/SWM 96-WT01 1996 Tukwila Community Center built 4,100,000.00 Buildings 1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S 500,000.00 Roads 1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place S 20,000.00 Surface Water 1998 1998 Small Drainage Project Site 5 - 43rd Ave S 40,000.00 Surface Water 1999 1999 Small Drainage Project Site 3 - S 129th St 20,000.00 Surface Water 2001 Duwamish Improvements Water & SWM 1,068,431.93 W/S/SWM 01-WT01 Included sidewalks and No Parking, PWTF loan 2002 to 2021 (Valley View spent $1,047,148.70 for a total of $2,115,580.63) 2005 2005 Small Drainage Project Site 1- 45th Ave S 60,000.00 Surface Water 2007 2007 Small Drainage Project Site 2 - S 116th St 100,000.00 Surface Water 2007 2007 Small Drainage Project Site 5 - 47th Ave S 150,000.00 Surface Water 2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II $ 2,274,384.47 Water Sidewalks on 42nd Ave S and guardrail on river 5,431,368.81 Sewer 01-SW02 1,071,541.38 Surface Water 01-DRO1 $ 8,777,294.66 2009 Allentown Storm Water Pump Station 421,129.00 Surface Water 2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S. 174,636.00 Surface Water 2011 2010-11 Small Drainage Project Site 6 - S 122nd St - Pipe Lining 94,800.00 Surface Water 2017 42nd Ave S Roadside Barriers (wood barrier along river) 192,531.95 Roads 91310301 2015 Overlay and Repair on S 124th St 260,000.00 Roads 2014-2016 BNSF Intermodal Access Study 241,000.00 2016-2018 S 1191j' St Ped Bridge (repair failing girder tops & non-skid deck) 120,000.00 Bridges 2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities 50,000.00 Bridges 2003-2018 Duwamish Hill Preserve 2006-2018 Duwamish Gardens $ 411,000.00 Subtotal $ 24,018,823.54 3,673,915.33 Parks 5,611,661.02 Parks Total with Parks $ 33,304,399.89 90330109 90630102 W:\Shared Copy Only \ Gall \Neighborhood Projects 1989-2019 gl 030619.81,, Ryan Hill Projects and Expenditures 1989 - 2019 1989 Annexed into the City, took over SPU Water in 1996 1990 1990 Annual Overlay- 109th, 111th 1993 1993 Annual Overlay- 47th Ave S from Ryan way to NCL. 1996 Ryan Hill Waterline Improvements, drainage and overlay 2001 2001 Small Drainage Projects - S 114th Street 2001 2001 Small Drainage Projects - S 107th Street 2002 2002 Small Drainage Projects - Ryan Way S 2004 2004 Annual Overlay- Ryan Way S 2012 2012 Small Drainage Program - 47th Ave S 2012 2012 Small Drainage Program - S 107th St 2012 2012 Small Drainage Program - 49th Ave S 2012 2012 Small Drainage Program - S 114th St 2014 2014 Annual Overlay- Beacon Ave S, 49th Ave, S 107th, S 114th 2015-2019 Beacon Ave S Bridge (new deck and seismic retrofit) Future Martin Luther King Jr Wy S Water Main Expenditures $ 85,000.00 180,000 513,000 105,000 60,000 75,000 300,000 106,869 146,119 51,100 38,473 520,000 1,186,928 Total $3,367,489.24 $ 545,000.00 Roads Roads Water SWM SWM SWM Roads SWM SWM SWM SWM Roads Bridges 94-WTO3 W:\Shared Copy Only \Gail\Neighborhood Projects 1989-201991030619.,1s, Tukwila Hill Projects and Expenditures 1989 - 2019 Expenditures Project No. 1990 North Hill Reservoir and Pump Station - 57th Ave S $ 3,800,000 1991 S 150th St (Macadam Rd to 55th Ave S) 128,000 8710301 1999 1999 Small Drainage Program - 53rd Ave S Drainage Improvements 15,000 2000 2000 Small Drainage Program - 58th Ave S/59th Ave S Alley 150,000 2000 2000 Small Drainage Program - 56th Ave S/ S 147th St 15,000 2000 2000 Small Drainage Program - 53rd Ave S/S 139th St 15,000 2001 2001 Small Drainage Program - Macadam Road Stairs 15,000 2001 2001 Small Drainage Program - S 138th St 25,000 2002 2002 Small Drainage Program - 57th Ave S 15,000 2002 2002 Small Drainage Program - 65th Ave S 25,000 1989-2003 Interurban Ave S Bridge Widening & Trail Bridge 1,887,000 2003-2015 Fort Dent Park (from CIP Park page, 32) 2,017,000 2004-2007 Macadam Winter Garden 424,000 2007 2007 Small Drainage Program - 65th Ave S 20,000 2008 2008 Small Drainage Program - S 149th St & S 150th St 175,000 2012 2012 Small Drainage Program - S 142nd St 75,000 2017 2017 Small Drainage Program - 58th Ave S 104,000 2005-2017 Interurban Ave S (S 144rd St to Fort Dent) 12,934,588 2018 2018 Overlay & Repair - Southcenter Blvd 750,000 2018 Grady Way Bridge Seismic Repairs 354,214 2015-2019 53rd Ave S Road, Water, Sewer, & SWM 9,250,000 2019 Budget Total $ 32,193,802 W:\Shared Copy Only \ Gail \Neighborhood Projects 1989-2019 gl 030619.xlsx McMicken Projects and Expenditures 1989 - 2019 Expenditures Project No. 1989 51st Ave S (S 160th St to S 166th St) $ 560,000 8610301 1993 South 160th Street (42nd Ave S to 51st Ave S) 1,100,000 1994 South 160th Street (51st Ave S to 53rd Ave S) 500,000 1994 Slade Way Overlay and Pedestrian Path 25,000 199X 53rd Ave S (Klickitat to Slade Way) 450,000 199X 42nd Ave S Pedestrian Path (S 154th St to S 160th St) 85,000 199X 51st Ave S & S 158th St c/g/sw/ug 325,000 1994 Crystal Springs Park 567,000 199X Crestview Park 90,000 199X Klickitat Drive LTL and raised Pedestrian Path 525,000 2000 2000 Small Drainage Program - Loop Drainage - Site 1 (Outfall) 104,067 2000 2000 Small Drainage Program - Loop Drainage - Site 2 (47th Ave S/ S 156th St) 142,500 2001 2001 Small Drainage Program - 54th Ave S 168,572 2003 2003 Small Drainage Program - Loop Drainage Phase 2 190,029 2004 2004 Small Drainage Program - Loop Drainage Phase 3 136,930 2007 2007 Small Drainage Program - S 162nd St 51,114 2014 I-5/Klickitat Dr - Unstable Slope/Elevated Walkway (Grant funded) 286,001 91410406 2016 Crystal Springs Emergency Surface Water Repair 475,924 2016 S 160th St Speed Cushion Pilot Project 47,237 91610410 2017 2017 Small Drainage Project - 48th Ave S 338,646 2019 42nd Avenue S Phase III/Gilliam Creek Culvert Replacement Project 10,537,780 99410303 Majority of 42nd Ave S Phase 1I1 (from SR-518 to 5160th St), no Gilliam Creek Total $ 16,705,800 W:\Shared Copy Only\Gail \Neighborhood Protects 1989-2019 g1030619.xisx Thorndyke Projects and Expenditures 1989 - 2019 1989 51st Ave S Bridge 51st Ave S Pedestrian Path and Drainage S 150th St Pedestrian Path (42-48) N Gilliam Creek Gilliam Creek 46th Ave S Pedestrian Path (S 148th St - S 150th St) S 148th St Pedestrian Path (TIB - 42nd Ave S) S 150th St Pedestrian Path (TIB - 42nd Ave S) S 152nd St Pedestrian Path (TIB - 42nd Ave S) 42nd Ave S Pedestrian Path (S 144th St - S 154th St) 1997 42nd Ave S Phase II (S 144th St to SC Blvd) 1999-2006 Tukwila International Blvd Phase I Macadam Pedestrian Path & Drainage 2001 2001 Small Drainage Program - Site 5 - S 150th St 2002 S 150th St (42nd Ave S to 46th Ave S) with new traffic signal at 42nd Ave S 2002 2002 Small Drainage Program - Site 2 - 37th Place S Alley 2002 2002 Small Drainage Program - Site 3 - S 154th St 2003 2003 Small Drainage Program - Site 1- 40th Ave S 2003 2003 Small Drainage Program - Site 5 - S 154th St 2003 2003 Small Drainage Program - Site 6 - S 146th St 2005 2005 Small Drainage Program - Site 3 - 42nd Ave S 2007 2007 Small Drainage Program - Site 8 - S 146th St at 42nd Ave S 2009 2009 Small Drainage Program - Site 1 - S 146th St Drainage Improvements 2011 2011 Small Drainage Program - Gilliam Creeek Control Structure Access 2012 Thorndyke Safe Routes to School (S 150th St) 2012 2012 Small Drainage Program - Gilliam Creeek Inlet 2015 2015 Small Drainage Program - 51st Ave S - Roadway Culvert Replacements 2016 2016 Small Drainage Program - Gilliam Creek Control Structure Access Improvements 2017 2017 Small Drainage Program - S 150th St Creek Outfall 2017 Part of 42nd Ave S (from SC Blvd to SR-518) & Gilliam Creek Culvert 2018 South 144th St Phase II 2018 TIB Channelization Study Expenditures $ 1,791,000.00 50,000.00 30,000.00 50,000.00 55,000.00 59,000.00 82,000.00 69,000.00 39,000.00 80,000.00 2,100,000.00 11,075,000.00 35,000.00 82,507.00 1,121,835.28 65,574.00 22,757.00 40,280.00 49,445.00 55,770.00 21,600.00 46,998.00 150,000.00 68,500.00 1,472,076.62 135,432.00 76,968.00 86,340.00 69,630.00 4,000,000.00 2,871,560.86 42,002.22 Total $25,994,275.98 Project No. 99110403 00DR01 99910301 01DRO3 01DRO3 03DRO1 03DRO1 03DRO1 05DRO1 07DRO1 09DRO1 91041201 91210302 91241201 91541201 91641201 91741201 99410303 99510402 81710404 W:\Shared Copy Only \Gail \Neighborhood Projects 1989-2019 gl 030619.x1sx Cascade View Projects and Expenditures 1989 - 2019 Expenditures Project No. 1999-2006 Tukwila International Blvd Phase I $ 11,075,000.00 99110403 2001-2004 Cascade View Community Park Phase I 2,476,000.00 90130101 99730103 19XX 37th Avenue S Ped Path, Drainage 120,000.00 19XX 33rd & 34th Ave S Pedestrian Path 48,000.00 2003-2006 Cascade View Drainage Improvements 5,092,000.00 00-DRO6 (extensive neighborhood improvements) 19XX 32nd Ave S Overlay, c, g, sw 265,000.00 2006 Cascade View Park Playground Equipment Phase II 52,000.00 91730101 2007 S 144th St Phase I 3,100,000.00 99510401 2003-2011 Tukwila International Blvd Phase II 9,059,720.19 99510403 2003-2011 Tukwila International Blvd Phase III 7,245,889.95 99510403 2014 Cascade View Safe Route to Schools Phase I (School path) 547,673.29 91210301 2014-2019 5 144th St Phase II (Military to TIB) 2,972,750.58 99510301 2017 Cascade Safe Route to School Phase II (sidewalks) 1,774,905.39 91510302 2018 TIB Channelization Study 42,002.22 81710404 2019 S 140th St Intersection Improvements 263,859.10 91610405 Total $ 44,134,800.72 W:\Shared Copy Only \Gail\Neighborhood Projects 1989-2019 g1030619Als, Foster Projects and Expenditures 1989 - 2019 Expenditures Project No. Tukwila Pool CIP (grant funded) $ 1,721,542.69 112630001 1998? 42nd Ave S Phase II (S 144th St to S 139th St) 1,850,000.00 2002 2002 Small Drainage Program - Site 4 - Macadam Road South 13,400.00 2003 2003 Small Drainage Program - Site 3 - 45th Place S. 80,101.25 2003-2011 Tukwila International Blvd Phase II 9,059,720.19 99510403 2004 2004 Small Drainage Program - Site 5 29,267.50 2005 2005 Small Drainage Program - Site 2 - 43rd Ave S/S 140th St/45th Ave S 98,750.00 2014-2019 S 144th St Phase II (Military to TIB) 2,972,750.58 99510301 2018 TIB Channelization Study 42,002.22 81710404 2019 S 140th St Intersection Improvements 263,859.10 91610405 Total $ 16,131,393.53 W:\Shared Copy Only\Gail\Neighborhood Projects 1989-2019 gl 030619.x1sx