HomeMy WebLinkAboutTIC 2019-08-20 Handout Distributed at Meeting - 1989-2019 Allentown / Duwamish / Foster Point Projects and ExpendituresAllentown/Duwamish/Foster Point Projects and Expenditures 1989 - 2019
1989 Annexed into the City, took over Water District 25 and Fire District 1 Expenditures Project No.
56th Ave S Bridge to Foster Point
1993 King County Metro Sewer Capacity line
1994 EMW Water, served fire flow and water pressure in Allentown
Pave Pamela Dr, S 133rd St Overlay & Drainage, 56th Ave S Ped Path $ 129,000.00
1996 Allentown Water/Sewer/SWM Sewer Phase I 7,500,000.00 W/S/SWM 96-WT01
1996 Tukwila Community Center built 4,100,000.00 Buildings
1996 Street Improvements, curb, gutter, sidewalk on S 124th St to 42nd Ave S 500,000.00 Roads
1997 1997 Small Drainage Project Site 4 - S 124th St/51st Place S 20,000.00 Surface Water
1998 1998 Small Drainage Project Site 5 - 43rd Ave S 40,000.00 Surface Water
1999 1999 Small Drainage Project Site 3 - S 129th St 20,000.00 Surface Water
2001 Duwamish Improvements Water & SWM 1,068,431.93 W/S/SWM 01-WT01
Included sidewalks and No Parking, PWTF loan 2002 to 2021
(Valley View spent $1,047,148.70 for a total of $2,115,580.63)
2005 2005 Small Drainage Project Site 1- 45th Ave S 60,000.00 Surface Water
2007 2007 Small Drainage Project Site 2 - S 116th St 100,000.00 Surface Water
2007 2007 Small Drainage Project Site 5 - 47th Ave S 150,000.00 Surface Water
2007 Allentown/Foster Point Water/Sewer/SWM Sewer Phase II $ 2,274,384.47 Water
Sidewalks on 42nd Ave S and guardrail on river 5,431,368.81 Sewer 01-SW02
1,071,541.38 Surface Water 01-DRO1
$ 8,777,294.66
2009 Allentown Storm Water Pump Station 421,129.00 Surface Water
2011 2010-11 Small Drainage Project Site 4 - 44th Ave. S. 174,636.00 Surface Water
2011 2010-11 Small Drainage Project Site 6 - S 122nd St - Pipe Lining 94,800.00 Surface Water
2017 42nd Ave S Roadside Barriers (wood barrier along river) 192,531.95 Roads 91310301
2015 Overlay and Repair on S 124th St 260,000.00 Roads
2014-2016 BNSF Intermodal Access Study 241,000.00
2016-2018 S 1191j' St Ped Bridge (repair failing girder tops & non-skid deck) 120,000.00 Bridges
2018 42nd Ave Bridge load ratings & truck checks for BNSF and Baker Commodities 50,000.00 Bridges
2003-2018 Duwamish Hill Preserve
2006-2018 Duwamish Gardens
$ 411,000.00
Subtotal $ 24,018,823.54
3,673,915.33 Parks
5,611,661.02 Parks
Total with Parks $ 33,304,399.89
90330109
90630102
W:\Shared Copy Only \ Gall \Neighborhood Projects 1989-2019 gl 030619.81,,
Ryan Hill Projects and Expenditures 1989 - 2019
1989 Annexed into the City, took over SPU Water in 1996
1990 1990 Annual Overlay- 109th, 111th
1993 1993 Annual Overlay- 47th Ave S from Ryan way to NCL.
1996 Ryan Hill Waterline Improvements, drainage and overlay
2001 2001 Small Drainage Projects - S 114th Street
2001 2001 Small Drainage Projects - S 107th Street
2002 2002 Small Drainage Projects - Ryan Way S
2004 2004 Annual Overlay- Ryan Way S
2012 2012 Small Drainage Program - 47th Ave S
2012 2012 Small Drainage Program - S 107th St
2012 2012 Small Drainage Program - 49th Ave S
2012 2012 Small Drainage Program - S 114th St
2014 2014 Annual Overlay- Beacon Ave S, 49th Ave, S 107th, S 114th
2015-2019 Beacon Ave S Bridge (new deck and seismic retrofit)
Future
Martin Luther King Jr Wy S Water Main
Expenditures
$ 85,000.00
180,000
513,000
105,000
60,000
75,000
300,000
106,869
146,119
51,100
38,473
520,000
1,186,928
Total $3,367,489.24
$ 545,000.00
Roads
Roads
Water
SWM
SWM
SWM
Roads
SWM
SWM
SWM
SWM
Roads
Bridges
94-WTO3
W:\Shared Copy Only \Gail\Neighborhood Projects 1989-201991030619.,1s,
Tukwila Hill Projects and Expenditures 1989 - 2019
Expenditures Project No.
1990 North Hill Reservoir and Pump Station - 57th Ave S $ 3,800,000
1991 S 150th St (Macadam Rd to 55th Ave S) 128,000 8710301
1999 1999 Small Drainage Program - 53rd Ave S Drainage Improvements 15,000
2000 2000 Small Drainage Program - 58th Ave S/59th Ave S Alley 150,000
2000 2000 Small Drainage Program - 56th Ave S/ S 147th St 15,000
2000 2000 Small Drainage Program - 53rd Ave S/S 139th St 15,000
2001 2001 Small Drainage Program - Macadam Road Stairs 15,000
2001 2001 Small Drainage Program - S 138th St 25,000
2002 2002 Small Drainage Program - 57th Ave S 15,000
2002 2002 Small Drainage Program - 65th Ave S 25,000
1989-2003 Interurban Ave S Bridge Widening & Trail Bridge 1,887,000
2003-2015 Fort Dent Park (from CIP Park page, 32) 2,017,000
2004-2007 Macadam Winter Garden 424,000
2007 2007 Small Drainage Program - 65th Ave S 20,000
2008 2008 Small Drainage Program - S 149th St & S 150th St 175,000
2012 2012 Small Drainage Program - S 142nd St 75,000
2017 2017 Small Drainage Program - 58th Ave S 104,000
2005-2017 Interurban Ave S (S 144rd St to Fort Dent) 12,934,588
2018 2018 Overlay & Repair - Southcenter Blvd 750,000
2018 Grady Way Bridge Seismic Repairs 354,214
2015-2019 53rd Ave S Road, Water, Sewer, & SWM 9,250,000 2019 Budget
Total $ 32,193,802
W:\Shared Copy Only \ Gail \Neighborhood Projects 1989-2019 gl 030619.xlsx
McMicken Projects and Expenditures 1989 - 2019
Expenditures Project No.
1989 51st Ave S (S 160th St to S 166th St) $ 560,000 8610301
1993 South 160th Street (42nd Ave S to 51st Ave S) 1,100,000
1994 South 160th Street (51st Ave S to 53rd Ave S) 500,000
1994 Slade Way Overlay and Pedestrian Path 25,000
199X 53rd Ave S (Klickitat to Slade Way) 450,000
199X 42nd Ave S Pedestrian Path (S 154th St to S 160th St) 85,000
199X 51st Ave S & S 158th St c/g/sw/ug 325,000
1994 Crystal Springs Park 567,000
199X Crestview Park 90,000
199X Klickitat Drive LTL and raised Pedestrian Path 525,000
2000 2000 Small Drainage Program - Loop Drainage - Site 1 (Outfall) 104,067
2000 2000 Small Drainage Program - Loop Drainage - Site 2 (47th Ave S/ S 156th St) 142,500
2001 2001 Small Drainage Program - 54th Ave S 168,572
2003 2003 Small Drainage Program - Loop Drainage Phase 2 190,029
2004 2004 Small Drainage Program - Loop Drainage Phase 3 136,930
2007 2007 Small Drainage Program - S 162nd St 51,114
2014 I-5/Klickitat Dr - Unstable Slope/Elevated Walkway (Grant funded) 286,001 91410406
2016 Crystal Springs Emergency Surface Water Repair 475,924
2016 S 160th St Speed Cushion Pilot Project 47,237 91610410
2017 2017 Small Drainage Project - 48th Ave S 338,646
2019 42nd Avenue S Phase III/Gilliam Creek Culvert Replacement Project 10,537,780 99410303
Majority of 42nd Ave S Phase 1I1 (from SR-518 to 5160th St), no Gilliam Creek
Total $ 16,705,800
W:\Shared Copy Only\Gail \Neighborhood Protects 1989-2019 g1030619.xisx
Thorndyke Projects and Expenditures 1989 - 2019
1989 51st Ave S Bridge
51st Ave S Pedestrian Path and Drainage
S 150th St Pedestrian Path (42-48)
N Gilliam Creek
Gilliam Creek
46th Ave S Pedestrian Path (S 148th St - S 150th St)
S 148th St Pedestrian Path (TIB - 42nd Ave S)
S 150th St Pedestrian Path (TIB - 42nd Ave S)
S 152nd St Pedestrian Path (TIB - 42nd Ave S)
42nd Ave S Pedestrian Path (S 144th St - S 154th St)
1997 42nd Ave S Phase II (S 144th St to SC Blvd)
1999-2006 Tukwila International Blvd Phase I
Macadam Pedestrian Path & Drainage
2001 2001 Small Drainage Program - Site 5 - S 150th St
2002 S 150th St (42nd Ave S to 46th Ave S) with new traffic signal at 42nd Ave S
2002 2002 Small Drainage Program - Site 2 - 37th Place S Alley
2002 2002 Small Drainage Program - Site 3 - S 154th St
2003 2003 Small Drainage Program - Site 1- 40th Ave S
2003 2003 Small Drainage Program - Site 5 - S 154th St
2003 2003 Small Drainage Program - Site 6 - S 146th St
2005 2005 Small Drainage Program - Site 3 - 42nd Ave S
2007 2007 Small Drainage Program - Site 8 - S 146th St at 42nd Ave S
2009 2009 Small Drainage Program - Site 1 - S 146th St Drainage Improvements
2011 2011 Small Drainage Program - Gilliam Creeek Control Structure Access
2012 Thorndyke Safe Routes to School (S 150th St)
2012 2012 Small Drainage Program - Gilliam Creeek Inlet
2015 2015 Small Drainage Program - 51st Ave S - Roadway Culvert Replacements
2016 2016 Small Drainage Program - Gilliam Creek Control Structure Access Improvements
2017 2017 Small Drainage Program - S 150th St Creek Outfall
2017 Part of 42nd Ave S (from SC Blvd to SR-518) & Gilliam Creek Culvert
2018 South 144th St Phase II
2018 TIB Channelization Study
Expenditures
$ 1,791,000.00
50,000.00
30,000.00
50,000.00
55,000.00
59,000.00
82,000.00
69,000.00
39,000.00
80,000.00
2,100,000.00
11,075,000.00
35,000.00
82,507.00
1,121,835.28
65,574.00
22,757.00
40,280.00
49,445.00
55,770.00
21,600.00
46,998.00
150,000.00
68,500.00
1,472,076.62
135,432.00
76,968.00
86,340.00
69,630.00
4,000,000.00
2,871,560.86
42,002.22
Total $25,994,275.98
Project No.
99110403
00DR01
99910301
01DRO3
01DRO3
03DRO1
03DRO1
03DRO1
05DRO1
07DRO1
09DRO1
91041201
91210302
91241201
91541201
91641201
91741201
99410303
99510402
81710404
W:\Shared Copy Only \Gail \Neighborhood Projects 1989-2019 gl 030619.x1sx
Cascade View Projects and Expenditures 1989 - 2019
Expenditures Project No.
1999-2006 Tukwila International Blvd Phase I $ 11,075,000.00 99110403
2001-2004 Cascade View Community Park Phase I 2,476,000.00 90130101 99730103
19XX 37th Avenue S Ped Path, Drainage 120,000.00
19XX 33rd & 34th Ave S Pedestrian Path 48,000.00
2003-2006 Cascade View Drainage Improvements 5,092,000.00 00-DRO6
(extensive neighborhood improvements)
19XX 32nd Ave S Overlay, c, g, sw 265,000.00
2006 Cascade View Park Playground Equipment Phase II 52,000.00 91730101
2007 S 144th St Phase I 3,100,000.00 99510401
2003-2011 Tukwila International Blvd Phase II 9,059,720.19 99510403
2003-2011 Tukwila International Blvd Phase III 7,245,889.95 99510403
2014 Cascade View Safe Route to Schools Phase I (School path) 547,673.29 91210301
2014-2019 5 144th St Phase II (Military to TIB) 2,972,750.58 99510301
2017 Cascade Safe Route to School Phase II (sidewalks) 1,774,905.39 91510302
2018 TIB Channelization Study 42,002.22 81710404
2019 S 140th St Intersection Improvements 263,859.10 91610405
Total $ 44,134,800.72
W:\Shared Copy Only \Gail\Neighborhood Projects 1989-2019 g1030619Als,
Foster Projects and Expenditures 1989 - 2019
Expenditures Project No.
Tukwila Pool CIP (grant funded) $ 1,721,542.69 112630001
1998? 42nd Ave S Phase II (S 144th St to S 139th St) 1,850,000.00
2002 2002 Small Drainage Program - Site 4 - Macadam Road South 13,400.00
2003 2003 Small Drainage Program - Site 3 - 45th Place S. 80,101.25
2003-2011 Tukwila International Blvd Phase II 9,059,720.19 99510403
2004 2004 Small Drainage Program - Site 5 29,267.50
2005 2005 Small Drainage Program - Site 2 - 43rd Ave S/S 140th St/45th Ave S 98,750.00
2014-2019 S 144th St Phase II (Military to TIB) 2,972,750.58 99510301
2018 TIB Channelization Study 42,002.22 81710404
2019 S 140th St Intersection Improvements 263,859.10 91610405
Total $ 16,131,393.53
W:\Shared Copy Only\Gail\Neighborhood Projects 1989-2019 gl 030619.x1sx