HomeMy WebLinkAboutReg 2019-09-03 Item 6C - Reports - City Administrator / Public Safety Plan Monthly UpdateAllan Ekberg, Mayor
Mayor's Office - David Cline, City Administrator
The City of opportunity, the community of choice
Mayor Ekberg
Councilmembers
FROM: David Cline, City Administrator
DATE: Aueost38"3019
SUBJECT: City Administrator's Report
The City Administrator Report is meant to provide the Council, staff and community an update on
the activities Ofthe City and nnissues that concern Tukwila. Please let nleknow ifyou have any
questions or need additional information about any of the following items,
L Intergovernmental Update
* [|tV
Administrator David Cline attended the WCMA Annual Conference held in Kennewick August
13 - 16. At the conference Tukwila was presented with the Innovations in Local Government
Award for the free mi-fiproject anMthe(]utStendingAss|stantaVVardvv8s given toRachel
Bianchi for going above and beyond iDher duties aSDeputy City Administrator.
• King County Flood Control District Advisory Meeting: Mayor Ekberg aMdCVUnciimennber
Robertson attended aKing County Flood Control District Advisory meeting 0nAugust l5.
* Meeting with Senator Murray's Office: Mayor Ekberg, City Administrator David Cline and
Community Engagement Manager NieshaFort-Brooks met with StashaEspinosa, Director of
King County Affairs for Senator Patty Murray OMAugust 2ItOdiscuss barriers for the
underserved and best practices for voter education to improve voter turnout.
• Meeting with Councilmember Upthegrove: City Administrator David Cline and Business
Relations Manager Brandon Miles met with Councilmember Upthegrove on August 23 and
provided a tour of the areas by the Sound Transit commuter rail station and the Tukwila
International Boulevard light rail station where vv2have applied for grant funds that would
beallocated for pedestrian improvements,
U' Community Events
• Tukwila Community Center Mural: The new mural atthe Tukwila Community Center is
complete. The mural was created b«Hoa HoOg,a local Tukwila resident and artist and
depicts the four seasons and keeping 3watchful eye {Jnthe river.
• See You in the Park The Sullivan CenterShindig: The Sullivan Center Shindig was the final
See You in the Park event of the summer, held on August 21 at the Sullivan Center. While the
weather may have impacted attendance, there was an overall turnout of about 125
Tukwila /City Hall ^ 620WJouthxsmterBoulevard ^ Tukwila, WA 98188 4 800 ° Ne6xite
235
City Administrator's Report
August28,20I8
Page
attendees. The event was held inconjunction VviththeTUkvvi}aFa[nnersMarket Several
vendors from local organizations shared resources ontransit, care programs and more.
Global toLocal was nnsiteproviding free health screenings. The City was presented with the
Governor's Smart Communities Partnership Award for Tukwila Village at the event.
* Welcome the Water Event: Welcome the Woter will be held September 8 at the Tukwila
Community Center. Anafternoon gathering bythe river tohonor the water, the Dum/amish
River, the salmon, and the change ofthe seasons.
UL Staff Updates
Public Safety
w SacumeMa�kbox Program: The City has purchased another IO0mailboxes tooffer tnthe
residents ofTukwila. The high security mailboxes were purchased at8discount 0f$1)Rto
sell to Tukwila residents at cost and at reduced rate for lower income residents. The
application can befound online at http://TukVvi[aVVA.g8v/nnaiibOx.There are also
applications available atCity Hall. once the application iSapproved, staff will contact the
applicant for payment and pickup arrangements.
• Communitv Meeting: The Community Police Team had a fruitful community meeting
regarding activity occurring along IG4mStreet. The area isactively being patrolled and issues
are � r being addressed.
w Interurban Trail Ctean-Up: The major clean up on the Interurban Trail was completed earlier
than anticipated and the trail has been reopened, The contractor for Puget Sound Energy
cutback overgrown non-native vegetation and blackberries along the public trail from
Strander Boulevard south to 180th St. In the process, crews removed hundreds of junked
automotive and truck tires, and more than 25 tons of trash, which included more than 40
shopping carts, wooden pallets, broken furniture, automotive parts, medical waste and
pickup load of various electronics 'for recycling.
Project Updates
w 53rd Ave S: Estimated Completion: November 2OI9
The contractor is currently with Seattle City Light (SCL) in order to secure operation
acceptance for the project. The#]ntractnrisa|snr2storingtheirrigatiOnSy3tgnnsfnrthe
adjacent school district properties.
0 43md Ave Phase Ill: Estimated Completion: November 2Ol9
The contractor is coordinating with the electrical sub -constructor to finish instahingthe
rernaiDing3treetUghts.
* S 196th/200th Street Bridge Repair: Six bids were received on August 20 and are currently
being reviewed.
* 2019 Overlay and Repair: Estimated Completion: August20I9
AH contracted work has been completed, except for pedestrian signal modifications at 52nd
Ave Sand Interurban Ave S.
phoneZ0G-433'18OV ° EmaiLNayor@TukwiiaVVA.gov + VVe6site Tukwi
236
City Administrator's Report
August 28, 2019
Page 3
• Economic Development Plan Outreach: Economic Development staff attended the recent
Human Services Advisory Board meeting to explain how Board members can be involved in
the City's Economic Development Plan.
• Potential Land Sale Coordination: Economic Development staff met with two of the
property owners adjacent to the City's vacant lot at 14840 Tukwila International Boulevard
(former Newporter motel) to discuss a coordinated sale in 2020.
• HealthPoint Health and Wellness Center: HeathPoint has hired Adam Taylor, formerly with
Global to Local, to coordinate community input on needs for the future development.
• Tukwila Village Land Sale: The City and developer reached agreement on the final land price
for the remaining parcels and the land sale has closed escrow.
• Tukwila Village Transportation Management Plan: On August 13 the property owner for
the first phase of Tukwila Village submitted a proposed Transportation Management Plan,
including a Parking Management Plan, to the City and King County Library System. Both
agencies are reviewing the plan. Staff anticipates their will need to be some further work on
the plan before it is approved.
Boards and Commissions
• Arts Commission: Vacant Position: Position #7 Resident.
• Civil Service Commission: No vacancies.
• COPCAB: Vacant Position: Student Representative.
• Equity & Social Justice Commission: Vacant Position: Student Representative.
• Human Services Advisory Board: No vacancies
• Landmark Commission: No vacancies.
• Library Advisory Board: Vacant Positions: Position #7 Resident & Student Representative.
One application received.
Lodging Tax Advisory Committee: No vacancies.
• Park Commission: Vacant Positions: Position #4 Resident & Student Representative. One
application received.
• Planning Commission: No vacancies.
IV. Responses to Council/Citizen Inquiries
Date of Inquiry
July 15, 2019
August 5, 2019
Inquiry
Councilmember Kruller indicated People
are trespassing at cemetery late at night.
Councilmembers requested clarification
about whether emergency vehicles
manage speed humps or not?
Response
Chief Linton has requested
additional patrols.
Fire vehicles can manage all
current "speed cushions" being
used in the city, although they may
reduce response by approximately
30-45 seconds
Phone: 206-433-1800 • Email: Mayor@Tukwi aWA.gov • Website: Tukwil A.gov
237
238
TWKVy|L&PU0UC SAFETY PLAN
Monthly Update
August SI,ZOl9
Overall Plan
Outreach
� Team anticipates another event for the public in late 2019. Ground breaking ceremony
for all Public Safety Plan Projects at the future FS51 site was held on Saturday, March
]O,20l9.
Financial Oversight Committee
w The Committee reported to Council onSeptember 4,2O18. The Chair ofthe Committee
presented tothe Finance Committee onJune 34,2O19.
• Next Committee Report toCouncil scheduled for end of2O19.
Siting Advisory Committee
� The Siting Advisory Committee voted todefer regular meetings asthe major dedsions
have been made. They will meet onanas-needed basis.
Acquisition Lease Updates
0 Process is complete.
Disadvantaged Business Enterprise (DBE) Outreach
0 See attached status report from outreach consultant Darling Nava.
Near -term Council Decisions and Key Dates
w Contract amendments toPublic Safety Committee and Council
w Easement authority
• Fire Station 53 mini-K4AC[
~ Fire Station 54immediate needs report toPublic Safety
• PW Masterplan update to Full Council 9/3
Fire Stations
Siting
w Complete.
Architecture and Programming
0 Architectural program has been reviewed and approved by the team.
239
Design and Permitting
• Building permit for Station 51 was submitted in October. Building permit was received
inall areas except wetlands report. Permit revisions for accepted alternates for Station
51have been submitted and are under review.
• Station 52 Public Works and initial building permits submitted and under review.
m Station S2traffic determination was submitted in Februrary, 2O18with approval
received inApril, 3Ol9.
• Station 52 Conditional Use Application and Design Review Application have been
submitted. Hearings Thursday, June 26,20l9.
w Fire Station 51 meetings scheduled with neighbors to negotiate temporary construction
easements.
• Station 52 Phase 1 Public Works Permit Issued 7/9/I9.
• Station 52Phase 2Building Permit application subnnitted8/9/l9.
Bidding and Construction
~ Construction for 51began inMay 2Ol9.
• Bidding and construction schedule for S2are ontrack, early work bidding tostart in
June with construction to begin inJuly.
w Fire Station 51first concrete pour done on6/l3.
~ See monthly Construction Report for FS51construction progress and photos.
• Fire Station 52 bidding to continue in Sept.
w Station 52 NTP executed for Lydig7/I6.
• Station 52site mobilized and fenced 7/22.
• Station 5ZPhase 1work continued.
• See monthly Construction Report for FS 51and FSG2 construction progress and
photos.
• Station G1first slab mngrade pour8/12'
• Station G2site grading 'and stabilization occurred through August.
Justice Center
Siting
0 Complete.
Architecture and Programming
Design and Permitting
240
0 Complete.
Bidding and Construction
* Construction began in early April, 2019 with mobilization of construction trailersand
fencing, utility disconnect work,' excavation in the north lot for stornnVyater utilities,
contaminated soil removal, hazardous materials abatement and demolition of
remaining buildings Onthe site.
• 5itexvork, excavation, contaminated soil removal, underground utilities and foundation
construction continued.
• See monthly Construction Report for construction progress and photos.
Public Works Facility
0 Project is transferred to Public Works Department in August / 2019.
0 See attached Budget Report
Schedule
August2019
• Fire Station 52 phase (building) permit submitted
• Public Works Masterplan with phasing presented to Commiitee and
September2019
• Fire Station 52phase 2 (bui|ding) permit issued
• Fire Station 52 phase 2 bidding begins
October 2019
• Fire Station 52phase 2bidding completed
• Fire Station 52 Lydig contract amendment to Public Safety Committee
pAovamnber2019
• Fire Station 52Lvdi contract amendment toCouncil
m Fire Station S2phase 2construction begins
241
December 2019 through May 2020
• All projects construction continues
May 2020
• Fire Station 51 Substantial Completion
• Public Works Move In
June 2020
• Fire Station 51 Final completion
July 2020
• Fire Station 51 move-in/occupancy
September 2020
• Justice Center Substantial Completion
October 2020
• Justice Center furniture installation and move-in/occupancy
January 2021
• Fire Station 52 Substantial Completion
February/March 2021
• Fire Station 52 move-in/occupancy
242
TU�y�I|��U��||��AF�TV���|�FT�
.~.~,'^~`. PUBLIC SAFETY PROJECTS
Justice Center
��|
�`��
Construction Management Monthly Report
4nm/Sf7Ol
Report Prepared by: Ethan Be[DaU
Ovvne/S Shiels Obletz Johnsen(Jl]
Architect: DLRGroup
GCCN:BNBuildeo
Construction Progress:
* Completed first lift nfasphalt paving atNorth Lot.
* [Ur0pletedunders|ab utilities installation.
• Completed slab ongrade pours.
* Completed removal of underground storage tanks (LISTS) and associated contaminated soils.
~ Started structural steel erection.
Upcoming es:
* Continue structural steel erection, complete inSeptember.
* install decking for ndfloor and roof.
• Install primary power ductbankfrom Military Rdtnelectrical vault location.
Budget Status:
w See overall TPSP budget summary updated monthly and included in monthly report package.
Change Order Status:
• Change Order #1was executed.
• Change Order #2 will be prepared due to unforeseen conditions associated with additional
contaminated soils, underground storage tanks and other miscellaneous issues.
SchcduleStatus:
� See TPSP master project schedule updated monthly and included in monthly report package.
Critical Issues:
� mOn2.
Tukwila Public Safety Plan - Justice Center 'Monthly Report
243
244
Asphalt Paving and Curs at Nort
aar 'Placement, Area C
Lot
Tukwila Public Safety Plan - Justice Center - Monthly Report
Steel Erection, Area A
41iPteWaNeN
Steel Erection, Area A
Tukwila Public Safety Plan — Justice Center - Monthly Report
3
246
TU�A||��U�|[/`����TV���|��T�
' "'^..'`�` PUBLIC SAFETY PROJECTS
Fire Station 51
SO
-I
Construction Management Monthly Report
AUgUSƒ20lA
ReDD[f Reviewed by: JustineKlm
Owner's Representative: Ihieb<]bletzJohnsen (SJl)
Architect: Weinstein A+U
Construction Progress:
* Stem wall forn7 installation complete.
m First slab cmgrade pourAugustI3m,
• Second slab Ongrade pour August l9m.
* Site grading continues.
• First structural steel delivery August I9'h
* Structural steel erection tDstart August y9'h
Upcoming Activities:
• Pond tie-in connection and dewatehngtncomplete inSeptember.
• Place and finish slab onmetal decking late September.
• Frame exterior walls late September.
Budget Status:
0 See overall TPSP budget summary updated monthly and included in monthly report package.
Change Order Status:
0 Nochange orders issued inAugust.
Schedule Status:
� See TPSPmaster project schedO|eupda d monthly and included `nmonthly report package.
Critical Issues:
w None.
TuxwilapublicsafetyPlan-Jumcccr uer-wonthlyneport
248
Vapor barrier prep for slab on grade pour
zrnmmo., bOgArinhvr,
First slab on grade pour
r 4
•
Tukwila Public Safety Plan - Justice Center - Monthly Report
2
249
Slab on grade pour
Tukwila Public Safety Plan - Justice Center - Monthly Report
3
250
T�KN/|b1 PUBLIC
����TVPROJECTS
�_�—.�--.� —__---.�_��
F'pe Station 52
��|
����
FC)[lst[Urt'C)D Management MonfHy Report
Report Reviewed by: Justine Kim
Owner's Reon��ntadv��5h��Oh��JOhnsen�JlA
� '
Architect- Weinstein A+U
Construction Progress:
• Site demo has been completed.
• Shoring contractor 0nzitepreparing for shoring wall linstallation.
* First shoring pile installed August 20m.
w PSEelectrical design coordination continues.
p Excavation for concrete walls continues through August.
• Zayobegan conduit and meet -me vault installation August l9'h
Upcoming Activities:
• Footings tostart rnid-Septemher
w� Retaining wall yy
• Hollow core planks tObeset for detention vault September3[yh
Bud get Status:
0 See overall TPSP budget summary updated monthly and included in monthly report package.
Change 'Order Status:
* No change orders issued in August.
3chedu|e Status:
0 See TPSPmaster project schedule updated monthly and included inmonthly reportpackage.
Critical Issues:
0 None.
Tukwi[a Public Safety Plan - Justice Center - Monthly Report
z
252
Site Clearing and Demo
Site Clearing and Demo
\s4niti041100,14,,, „Nr,
vb'01114$40,P,1
Tukwila Public Safety Plan - Justice Center - Monthly Report
First solider pile installation
Tukwila Public Safety Plan - Justice Center - Monthly Report
3
254
UKWILA PUBLIC SAFETY PLAN
2016
FIRE STATION 51.
A/E PROCUREMENT
PROGRAMMING
DESIGN/PERMITTING
BIDDING/CONSTRUCTION
MOVE-IN/OCCUPANCY
FIRE STATION 52
A/E PROCUREMENT
PROGRAMMING
DESIGN/PERMITTING
BIDDING/CONSTRUCTION
MOVE-IN/OCCUPANCY
JUSTICE CENTER
A/E PROCUREMENT
PROGRAMMING
DESIGN/PERMITTING
BIDDING/CONSTRUCTION
MOVE-IN/OCCUPANCY
PUBLIC WORKS
A/E PROCUREMENT
MASTER SITE PLAN
DESIGN PHASE 1
BIDDING/CONSTRUCTION PHASE 1
MOVE-IN/OCCUPANCY PHASE 1
MOM
2017
2018
2019
2020
llllllllllllll1l1111l1 I
1�
2021
PROJECT IMO
A/E PROCUREMENT NM
PROGRAMMING
DESIGN/PERMITTING MI
BIDDING/CONSTRUCTION
MOVE-IN/OCCUPANCY Ile
City of Tukwila - Facilities Plan
TOTAL PROJECT
MONTHLY Budget Report
(REVISED Budgets; D-20 Plan Adopted by Council)
Life to Date Costs
as of Angus, 23, 2019 (reconeiktlisVacclg ihru Aug 13, 2019 GI)
t, ' . nSA
UST10E CENTER
A/E Services (both Design & CA)
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Contingency for Site Contamination (soils,hazmat)
Land Acquisition
Contingency for Land Acquisition
Original Budget
S 3,278,125
700,000
$ 38,738,678
$ 2,112,639
$ 1,815,875
$ 6,507,731
$ -
$ 14,133,295
$ 1 250,000
Budget Transfers
22t,875
$ 50,000
$ (376,684)
$ (25,275)
$ 266,721
$ (2,061,555)
$ 550,000
$ (416,714)
$ 250,000
Current Budget
5 3,500,000
$ 750,000
$ 38,361,994
$ 2,087,364
$ 2,082,596
$ 4,446,176
$ 550,000
$ 13,716,581
$ 1,500,000
Committed Budget
Life to Pate Costs
Rentaink Committed Remaining !lodger
Cod at Complaint,
....
,195,000
$ 443,049
$ 38,361,993
$ 586,628
$ 1,988,766
$ -
$ -
$ 13,716,007
$ 1,491,500
S 2,462,797
443,049
8,973,292
385,800
1,147,654
-
S -
S 13,692,053
1,491,500
732,203 305,000
$ - 306,951
$ 29,388,701
$ 200,828 1,500,736
$ 841,112 93,830
$ _S 4,446,176
$ - 5 550,000
$ 23,954 574
$ -5 8,500
-
-
-
-
S_
5 -
-
S -
TOTAL
S 68,536,343
S (1,541,632)
$ 66,994,711
S 59,782,942
$ 28,596,145
$ 31,186,798 S 7,211,769
S -
IRE STATION 51
AlE Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
Original - Budget
5 1,070,000
$ -
S 234,000
$ 9,396,000
$ 931,000
$ 526,000
$ 1,116,000
Budget Tronsfers
$ 322,7 1
$ -
$ 100,000
$ 1,315,046
$ (300,000)
$ (50,000)
$ 153,806
Curretalludget
1,392,781
$ -
$ 334,000
$ 10,711,045
$ 631,000
S 476,000
$ 1,269,806
........................................................................................,..............................,,.....
C011111littedfindget
If ta Date Costs
Rentaiteg Committed
Remaining Ilnelget
Cod tst Coltudetion
..
,287,071
$ -
$ 151,939
$ 10,711,045
$ 167,917
$ 363,412
$ -
936, 0
$ -
$ 136,151
$ 1,481,838
$ 95,150
$ 178,113
$ -S
350,521
-
15,788
5 9,229,208
5 72,767
185,299
-
05,710
S 182,061
S ..
S 463,083
112,588
1,269,806
S -
-
-
ii-..
;.,.
TOTAL
S 13,273,000
S 1,541,633
$ 14,814,632
S 12,681,384
5 2,827,802
S 9,853,582
$ 2,133,249
$ -
.............................................,.... ..,........,.....,........., ..............,......,.......................
0' , (,), , , A "-
IRE STATION 52
Original !Bulger
Midget Transfers
Current Rodger
Committol /ludo
Life no Dare Co.,!,
Remain.]: Committed
Remaining nudge(
Cott or Completion
A/E Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
$ 1,415,000
$ 16,000
$ 353,000
$ 13,298,000
$ 1,398,000
$ 787,000
$ 1,343,000
$ 355,172
$ 9,160
$ 50,000
$ 4,409,676
$ (307,160)
$ (50,000)
$ 413,152
$ 1,770,172
$ 25,160
$ 403,000
$ 17,707,676
$ 1,090,840
$ 737,000
$ 1,756,152
$ 1,622,653
$ 17,157
$ 182,835
$ 7,619,567
$ 400,853
$ 547,375
$ -
$ 1,005,736
$ 17,157
$ 122,658
$ 187,223
$ 27,985
$ 268,829
$ -
$ 616,917
$ -
$ 60,177
$ 7,432,344
$ 372,868
$ 278,546
$ -
$ 147,519
$ 8,003
$ 220,165
$ 10,088,109
$ 689,987
$ 189,625
$ 1,756,152
$ -
$ -
$ -
$
$ ,
$ -
$ „
TOTAL
S 18,610,000
S 4,880,000
$ 23,490,000
S 10,390,439
5 1,629,587
8,760,852
$ 13,099,561
$ -
''''''"".
'"'"'""''''""- -
'
......„.............
............. ..
.. .......................................................,,-
.......
.................„........
.............. _.
'IRE STATION 54
Original Budget
Iludger Transfers
Current IWO
Committed Atka
Life ro Imre COM
Rentandg Committed
Rolland.]: 'hedge(
Cod al Completion
.,.
AlE Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
S 150,000
$ 902,668
$ 20,000
$ 230,000
$ 59,000
$ 107,500
$ 41,832
5 (17,005)
$ 31,206
$ (12,827)
$ (123,300)
$ (2,698)
$ (835)
$ 125,459
S 132,995
$ 933,874
$ 7, 173
$ 106,700
$ 47,302
$ 106,665
$ 167,291
5 134,495
S 933,875
$ 4,100
$ 106,700
$ 42,302
$ 106,665
$ -S
132,995
933,775
S 4,100
5 67,856
S 28,825
5 86,066
-
1,500
100
$ -
S 38,844
S 3,477
S 20,599
..
(1,500)
( I )
3,073
-
5,000
S -
167,291
-
S
S -
5 -
.,..,
..
TOTAL
S 1,502,000
S -
S 1,502,000
5 1,328,137
1,253,617
5 74,520
$ 173,863
$ -
..................„„,„.......„...............................„ ....
..............., „.....„.........„.....„.........................,...........„„
,.. ....................................„..
OUNCII. REPORTING SU.11111RY -
' URLIC WORN'S
........
original nudger
IludgO Trantflus
Owen, Budgo
Committed Illtdo
ITfe fil Date Cints
Remain): 0)1111111Well
, ......................,„.....„,......,
HeIllaillifIg Budget
Cua a ComplOion
..
.,'
'.'.
A/E Services (both Design & CA)
Land Acquisition
Permits/Fees
Construction (Pre -Con, Const & Tax)
Construction Related Costs (incl Bond)
PM Services (incl Other Professional Svcs)
Contingency (incl Construction & Project)
$ 767,385
$ 22,000,046
$ 110,000
$ 4,950,000
$ 529,036
$ 668,426
$ 975,107
S 5,000
$ 3,374,913
$ (20,000)
$ (1,895,000)
$ (404,793)
$ (348,426)
$ (721,694)
S 782,385
$ 25,374,959
$ 90,000
$ 3,055,000
$ 124,243
$ 320,000
$ 253,413
335,382
$ 25,372,307
$ -
$ -
$ 77,643
$ 279,832
$ -
5 264,039
25,370,107
$ -
-
S 61,111
$ 169,763
$ -
71,343
2,200
-
S ..
16,532
110,069
$ -
5 447,003
5 2,652
90,000
3,055,000
46,600
S 40,168
253,413
5 -
-
-
S -
S -
5 -
..
ii
.
.:.
.,
TOTAL
S 30,000,000
5 -
S 30,000,000
$ 26,065,163
$ 25,865,019
$ 200,144
$ 3,934,837
$
...................... ........ „........ „„.„.,.......,„„,......,„„...„,..„........................„.....,, ........,...
T���UU����UU��AF������1
_ '-- PUBLIC SAFETY --—
Monthk/DBEDUTREACHEFRJRTS
Outreach Consultant updates for July 2019
General Updates for the Last Month
0 LVdig's last report ofJuly 2O19DBE participation isabout 23%
0 131\113 last report of July 2019 DBE participation is about 7%
Lvdig Update
* GC'slast report ofJuly ZO19DBE participation isabout Z3%
m 1 have met w/Lydig at jobsite Thursday, 8.15.19 and discussed the Outreach Effort for Fire
Station#5Z
0 | have reached out toANEW/PACE Megan Clark tomeet with Lydig'sTeam F5#S2todiscuss pre -
apprentice opportunides
0 Lyclig, Project Manager Kiel Lunsford will be present at NAMC (National Association of Minority
Contractors) General Monthly Meeting on3.IS.l9 @6pm
BNB Update
* 8NBhad completed the outreach effort w/Dar|ingNava Consulting
Upcoming Events
0 Attaching Outreach Plan for Fire Station #52
Darling Nava COnSU|f'Dg
257
258
Outreach �|
��^^^�6���// Plan
�n�iJ�t �� ��1�
August
�'�� Station �f�2
~..y . Tukwila, Fire ..`= . "^°_
The plan for the Outreach on City of Tukwila Fire Station #52 are the following:
� Reaching out tomyExternal Partners
o Building Trades visitation every Tuesday and promoting the COT FS#SZtp
subcontractors attending PLA/CVVACompliance
o National Association of Minority Contractnrs—Gener | Monthly Meeting /SeptemberS,
ZDl9&email
o TaborI00 General Monthly Meeting (last Saturday nfeach month) ALemail
0 Working with Anthony Burnett (Business Development)
o Construction Designers & Entrepreneurs — via email (since they are not having meetings
ti|October ZU19
o Northwest Mountain Minority Supplier Development Council
� Meeting w/FernandoMartinez (President & Chief Executive Officer —awaiting
for response for me to stop by and engage with him to provide the flyer from
Lydig'sBid Opportunities
o Economic Alliance —Everett
� | have spoke with Lisa Lagerstrnmand engaging with their pool pf
subcontractors listed within intheir database
o Seattle 5nuthside Chamber nfCommerce — | am member and will be their Chamber
Mixer onAugust ZO,20l9to be held at Hotel Interurban, where you engage with small
business from the area and outside city limits nfTukwila
o OMVVBE (Office ofMinority Women Business Enterprise) — | will besending out the
flyers that Lydighad prepared to create buzz intheir community
o AGC(AssndationnfGeneral Contractors) |ammember, again | will besending out the
flyers that Lydig had prepared to create buzz intheir community
| will have aday today interaction with all this external partners and keep everyone posted nf
259
260
City of Tukwila
BNB - Justice Center
8/20/2019
WMBE Participation
GC Contract Value $
Award Amount:
29,098,05:100
4,645,946
Scopes of Work that you Intend to
Award to WMBEs
Sub/Supplier Name
PP
Certification
Approximate
Subcontract $
Amount
City of
Seattle Self-
Certification
OMWBE State
Certification
OMWBE
Federal
Certification
SCS
Supplier of Hardware, Doors and Frames
Contract Hardware Inc,.
SBE
$ 310,362
Site Concrete
Caliber Concrete
WBE
$ 520,550
Signage
Sign Wizards
SDBE/VVSB
E
$ 36,236
Supplier
SnapTex
SBE/VVBE/
MBE
$ 33,875
Shelving
Workpointe
SBE
$ 454,003
Plumbing
Redline Mechanical
X.
$ 809,002
Controls
C&C Solutions
VOSBE
$ 235,700
Marble Supply
Skyline Marble
WBE
$ 88,000
Rubber Base Install
Zombie Base
WSBE
$ 4,758
Roofing Systems
Axiom
#1027
$ 583,020
Painting and Coatings
Halili
WBE
$ 219,450
Fire Protection
Columbia Fire
#1599
$ 287,890
Irigation and Landscaping
RE Sides Landscaping
#1054
$ 1,020,000
Temp Sanitation (NSS)
Construction Site Services
$ 22,000
Waterproofing
Inland Waterproofing
WBE
$ 21,100
Outreach Coordinator
Darling Nava Consulting
M4F0026198
In Progress Participation:
$ 4,645,946
Percentage of Award Amount:
16%
Scopes where the sub/supplier is not
yet determined or committed
When do you anticipate making a
selection?
Do you anticipate
using a SCS
Is this a
Spread the
Work SCS
Can only a
Sole Source
do the
work?
Approximate
Subcontract
Amount
$
$
$ -
-
$ -
$ -
$
Total Amount Not Yet Committed to a Sub/Supplier:
, $ -
261
Pane 70g
City of Tukwila
Lydig Construction, Inc Fire Station wn
NMBEParticipamm
GC Contract Value
Award Amount: $ 2,219,102.00
Scopes onWork that you Intend to
Award�,~",~�
Sub/Supplier
Certification
City of
Seattle Self-
Certification
o�Weeo��
cen/noatwn
omwas
Federal
Certification
aoa
Approximate
/
Amount
Roofing
Axiom Division 7
8CS
$ 217.945
Site Concrete
Caliber Concrete Cnnot
VVBE
$ 394,500
Ma000nry
Cascade Construction
GCG
$ 310.097
Fencing
Secure+A-Sde
VyBE
$ 298,000
Steel Erection
CHG Building Systems
GCG
$ 168,922
Overhead Doors
Crawford Door Company
GD.VOSD
G 102.261
Fire Protection
Emerald Fire LLC
VVBE
$ 49.750
Bituminous Waterproofing
Inland Waterproofing
VvBE
$ 10`850
Striping
Stanley Patrick Striping
GCG
o 4.034
Plumbing
Adept Mechanical
MBE
MBE DBE
GCG
$ 659.596
Concrete Sawing
Salinas Sawing &Sealing
MBE
$ 1^347
Trucking
Si|varGtreak|nn
VVBE
T/M
Site Services
Construction Site Services
MBE
VVBF
T/M
Office Supplies
Keeney Office Supply
VVBE
T/N1
Total Amount !ntendedtnbo9erforme by DBE to Date:
$ 2,219,102
Percentage of Contract Amount:
262
Scopes where the sub/supplier is not yet
determined or committed
When do you anticipate making a selection?
Do you
anticipate
using a SCS
Is this a
Spread the
Work SCS
Can only a
Sole Source
do the
work?
Approximate
Subcontract $
Amount
$
$ -
$
$
$ -
$ -
$
$ -
Total Amount Not Yet Committed to a Sub/Supplier:
$
263
o,rto 7,q
Apprentice Utilization Plan
List the prime and all subcontractors scheduled to work on this project, and indicate the estimated number of hours to be performed by journey leveland
apprentice workers for each. Apprentice utilization must equal or exceed 15% of the total labor hours.
Estimated information
P�rnm��ontracbmrand all Subcontractors
Journey
Labor Hours
ApprenticeHours
Labor Hours
Total Labor
for
'
Apprentice
Percentage
Number of
ApprenticesPro0ect
BNBui|ders
763
58
819
6.84%
1
Anoendmnt.LLC
566
55
621
8.80%
3
Iliad, Inc
2.848
O
2,848
0.00%
U
Rhino
0
0
U
#D|VYO|
Valley Electric
214
O
214
0.0096
O
/
'
'
�
'
4,391
111
4,502
Apprenticeship Utilization Requirement.����
4
Apprentice Utilization Plan
List the prime and all subcontractors scheduled to work on this project, and indicate the estimated number of hours to be performed by journey level and
apprentice workers for each. Apprentice utilization must equal or exceed 15% of the total labor hours.
Estimated information
PrmnoContractor and aUSubcontractors
Journey
Labor Hours
ApprenticeHours
Labor Hours
Total Labor
for
Project
Apprentice
Percentage
Number of
Apprentices
Lydig Construction
910
02
972
8.38%
, 3
ESK8Consulting Engineers
70
O
70
MO96
O
8C||nfrashucfurm
1.608
O
1.669
0.00Y6
U
West Wind Reinforcing
37
0
37
0'00Y6
O
`
`
62
2,746
Apprenticeship Utilization Requirement:
3