HomeMy WebLinkAboutPlanning 2011-10-27 Southcenter Plan - Attachment B - Tukwila Urban Center Plan ProcessAttachment B
Southcenter Subarea Planning Process
2002 -2004 Development of the Vision for the Urban Center
Council Briefing
6 Public Workshops See 9118108 Memo for Summaries
2 Joint PC /CC Worksessions
Multiple Team Meetings with City Staff Consultants
2004 Endorsement of the Vision by CC and PC
Joint PC /CC Meeting Directed Team to prepare regulations that implement
the Vision
Adoption of Updated Comprehensive Plan Policies
2005 -2008 Development of the Plan to Implement the Vision
Staff review of Draft Plan by Freedman, Tung Bottomley (FTB
Urban Land Institute Technical Advisory Panel Worksession on the
Implementation Aspects of the Draft Plan
Meetings with Local and Regional Developers to Review Plan Direction
"Testing" draft regulations on Proposed Developments (Mall expansion, Baker
Blvd Retail, Fidelity Bank of A merica, other office retail projects
Grant Funding for Pedestrian Bridge Study
Sounder Station Review
Coordination on Tukwila Pond Park Master Plan
Grant and Developer Funding for Transit Center Design and Construction
2008 Affirmation of the Vision and Introduction to the Plan
Public Open House with FTB 10123108
Joint PC /CC Worksession with FTB 10123108
2008 -2009 Public Outreach for the Plan
Presentation to the SWKC Chamber of Commerce 1017108
Presentation to the Parks Commission 11119108
Mailings Emailings to 1400 Property Owners, Tenants, Interested Parties
Public Open House 314109
Meetings with Multiple Property Owners
Hazelnut Article
2009 Review of the Plan Specifics by PC
Presentation by FTB 3112109
Public Hearings 3126109, 4123109, 5128109
3 Worksessions
Meetings with Fire Department 3125, 518, 5120
Plan remanded to staff for revisions to address the public comments
Z: ,PC Lasertiche Packet PC packet 10 -27 -11 Attachment B Plan Process Attachment B
13
Staff to Review Public Comments and Revise Draft Plan
Meeting and PC work session with EcoNW to discuss additional economic
analysis 718109
Meetings with Fire Department and PW
Individual meetings with Property Owners
EcoNW led Focus groups 9/29/09
Local and Regional Developers
Local Property Owners and Managers
Westfield Mall Representatives
Presented EcoNW TUC Implementation Analysis to PC 12/10/09
2010 Internal Departmental Review Process on Street Cross sections
Meetings with DCD, Public Works Fire 315110, 4120110, 514110, 5118110
Presented EcoNW TUC Implementation Analysis to CAP 3/22/10
Proposed Stakeholder Review Process
to CAP 9 106110
to CC 9/27/10
to CAP 2128111
Council Directs Staff to Reduce Project Scope 3114111
Future Staff Revises Draft Southcenter Plan
Review of the Revised Plan by PC
Public Hearings
Public Open House
Work Sessions
Forward PC Recommended Draft Plan to CC
Review of the PC Recommended Plan by CC
Review of Supplemental Environmental Impact Statement for the Plan
Open House
Public Hearing
Worksessions
Adoption of Plan, Implementing Ordinances and SEIS by CC
i[!