Public Safety Plan - Financial Framework Summary
Public Works Shops
Current Plan
w/19-20 budget
Net Changes
Revised as of
10/8/19
5
6
7
8
9
10
11
IL
13
14
15
16
17
IL)
19
21
22
23
24
25
27
28
29
30
31
32
33
34
35
36
Revenues
LTGO Bond Proceeds
Transfer Fund 301
Interfund transfer in (out)
Investment Earnings
General Fund Contributions
Utility Fund Contributions
Total Revenues
Project Expenses
Public Works Shops
Addt'I Tenant Improvements
27,674,036
3,000,000
(2,033,709)
243,426
141,854
3,141,854
(2,000,000)
2,033,709
2,200,000
32,167,461 2,233,709
30,000,000
4,400,000
30,000,000 4,400,000
25,674,036
3,000,000
243,426
2,341,854
3,141, 854
34,401,170
30,000,000
4,400,000 (C)
Total Expenses 34,400,000
Increase/(Decrease) 2,167,461 (2,166,291) 1,170
Debt Service
2018 LTGO
2019 LTGO
()
28,720,676 28,720,676
10,734,241 (3,549,008) 7,185,233 (
General Fund Debt Service
Utility Fund Debt Service
19,727,459 (2,874,504) 16,852,955
19,727,459 (674,504) 19,052,955
Reduce PW Shops 2019 LTGO Bond allocation from $7.5M to $5.5M.
Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M.
Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M
from PW Shops to PSP. Settlement Costs not eligible for bond procceds.
(C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate).
Debt Service updated to current information; GF/Utility contributions adjusted to maintain 50/50
H split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved
debt rating of AA+.
Combined General Fund contributions to PSP plan decreases by $236k; $2.2M incrase to operating
(C) transfer plus a reduction of $2.436M for debt service.
)
Printed: 10/8/2019
Page: 1 of 2
A
B
E
F
37
Public Safety Plan - Justice Center and Fire Stations/Eq/APP
38
39
40
41
42
43
44
45
46
47
48
fJ
50
52
53
54
55
56
57
JV
59
61
62
63
64
66
67
68
Project Revenues
UTGO Bond Proceeds
LTGO Bond Proceeds
Fire Impact - Segale
Fire Impact - Other
Property/Land Sales
REET 1
Sales Tax Mitigation pmts
Interfund transfer in (out)
Investment Earnings
General Fund Contributions
Total Revenues
Project Expenses
Justice Center
Fire Station 51
Fire Station 52
Fire Station 54
App/Eq
Total Expenses
Increase/(Decrease)
Debt Service
2019 LTGO
77,385,000
17,500,000
4,750,000
8,017,000
13,053,090
10,000,000
4,017,452
2,033,709
1,227,398
2,000,000
(2,033,709)
77,385,000
19,500,000 (A)
4,750,000
8,017,000
13,053,090
10,000,000
4,017,452
()
1,227,398
137,983,649 (33,709) 137,949,940
66,994,711 66,994,711
14,814,632 14,814,632
23,490,000 23,490,000
1,502,000 1,502,000
15,825,796 15,825,796
122,627,139 - 122,627,139
15,356,510 15,322,801
25,046,585
428,332 25,474,917 (D)
General Fund Debt Service 25,046,585 428,332 25,474,917
Combined Project Summary
69
70
71
72
73
74
75
76
77
78
(A)
General Fund Project Costs
General Fund Debt Service
141,854
44,774,044
2,200,000
(2,446,172)
2,341,854
42,327,872
44,915,898 (246,172) 44,669,726 (E)
Reduce PW Shops 2019 LTGO Bond allocation from $7.SM to $5.5M.
Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M.
Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M
from PW Shops to PSP. Settlement Costs not eligible for bond procceds.
(C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate).
Debt Service updated to current information; GF/Utility contributions adjusted to maintain 50/50
( ) split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved
debt rating of AA+.
Combined General Fund contributions to PSP plan decreases by $236k; $2.2M incrase to operating
(E) transfer plus a reduction of $2.436M for debt service.
)
Printed: 10/8/2019
Page: 2 of 2
LY
October 7, 2019
1
City of Tukwila
c/o Hari Ponnekanti
6300 Southcenter Blvd, Suite 100
Tukwila, WA 98188
Office: (206)431-2455
E-mail: Hari.Ponnekanti@TukwilaWA.gov
RE: Tukwila Public Works Office Demolition
Dear Hari,
On behalf of Lydig Construction, Inc., we are pleased to submit our proposal for the Tukwila Public Works Office
Demolition in Tukwila, Washington for Seventy Three Thousand Seven Hundred and Seven ($73,707) Dollars
Alternates:
No Alternates
Documents Utilized:
SHKS Architects Plans Dated 07/23/2019
LPD Engineering Specification Section 31 10 00 dated 07/29/2019
NOVO Good Faith Inspection Letter dated 07/12/2019
Bid Walk on 09/25/2019
Clarifications:
• We have assumed the project starting three weeks after NTP with a two -week duration
• Please note that the required Puget Sound Clean Air Permit is required to be filed 10 days before
demolition can begin
• Work priced to be performed on normal day shift, Monday through Friday
• If Lydig is to pay for permits or special inspections, the full cost will be reimbursed via Change Order
• Lydig has assumed that all junk, loose items and biological waste will be removed by the owner, from both
buildings, prior to mobilization to the job site
• Proof of disconnect for all utilities is required prior to starting work (coordination of disconnects by
Owner)
• All underground utilities are to be abandoned in place
• Sanitary sewer will be plugged per district standards, roof drain pipes will be plugged at slab, storm drain
clean out will be plugged on the building side
• This proposal is lump sum in the amount listed above
General Exclusions
• Permits and fees
• Special Inspections
1 t9[Ir A� SI% Si 11i'> 13c11r_s
L' I
• Local and State Sales Taxes
• Code Upgrades required / Identified by City Inspectors
• Removal of hazardous materials which includes but is not limited to asbestos, airborne silica, PCB's,
• Freon, hydraulic oil, underground storage tanks (USTs), biological waste, lead, air monitoring, dangerous
or hazardous waste evaluation, characterization, or disposal, regulatory notices and hazardous materials
surveys
• Removal of junk and miscellaneous items not a part of the buildings to be demolished
• Cut and cap, locate, make -safe, or de -energize site utilities
• Removal of below grade utilities
• Salvaging of owner materials
• Removal of slabs and footings (this is not scheduled for demo per plans provided)
• Client to provide a Good Faith Asbestos Survey prior to beginning demolition
• Mastic removal or floor prep. Flooring removal includes one pass with a Terminator. This typically leaves
the substrate in a condition suitable for following trades (if required). Some residual adhesives may
remain.
• Engineering for Demolition; engineering of shoring or bracing of existing to remain
• Salvage items for reuse, relocation or return salvage to owner
• Any demolition not clearly shown or dimensioned on the Architectural or Structural drawings
• As -built documents / O&M Manuals
Sincerely,
Lydig Construction, Inc.
Kiel Lunsford
Project Manager
Attachments:
1. Public Works Demolition Proposal Estimate dated 10/7/2019
2. SHKS Architects Plans Dated 07/23/2019
3. LPD Engineering Specification Section 31 10 00 dated 07/29/2019
4. NOVO Good Faith Inspection Letter dated 07/12/2019
1'Oth Avc l iik
LYDIG
Project:
Duration:
Bldg area:
City of Tukwila Public Works Demo
2. weeks
24,200 sf
Section I Description I Qty I UM I Unit Cost I Total Cost 1 Notes
Div 1 General Requirements
0110 00 Summary Requirements
Project Management Labor
40
hr
90.49
3,620
LCI
Supervision Labor
80
hr
99.92
7,994
LCI
Pre- Mobilization Video on DVD
1
Is
450,00
450
LCI
011000
Summary Requirements Total
12,063
0150 00 Temporary Facilities and Controls
Locate and document existing utilities and controls
8
hr
105.00
840
LCI
Temporary Construction Perimeter Security Fencing
275
If
4.50
1,238
Secure A Site
TESC Measures Materials
1
LS
1,250.00
1,250
LCI
Catch Basin Insert Materials
1
ea
250.00
250
LCI
Silt Fence Install/Removal Labor
32
hrs
72.83
2,331
LCI
Save and Protect Exist Planter
2,060
sf
0.75
1,545
LCI
Save and Protect Water Meter
1
ea
500.00
500
LCI
Dust Control
32
hr
59.60
1,907
LCI
Fire Sprinkler Drain Down
4
hr
125.00
500
LCI
Electrical make safe within building
4
hr
115.00
460
LCI
01 50 00
Temporary Facilities and Controls Total
10,820
0170 20 Temporary Services
Dump Fees/Dumpster/Miscellanous Final Cleanup Labor
16
hr
59.60
954
LCI
Dump Fees/Dumpster/Miscellanous Final Cleanup Materials
12
ea
750.00
9,000
LCI
01 70 20
Temporary Services Total
9,954
Div 2 Existing Conditions
02 40 00 Demolition
Demolition Subcontractor
1
Is
25,986.00
25,986
Ascendent
Demolition Layout
8
hrs
105.00
840
LCI
02 40 00
Demolition Total
26,826
02 50 00 Site Remediation
Junk Removal from storage areas Excl
-
load
-
-
EXCLUDED
Hazardous materials removal from storage areas Excl
-
Is
-
-
EXCLUDED
02 50 00
Site Remediation Total
-
Div 33 Utilities
33 00 00 Utilities
Utility Demolition
1
Is
-
-
Ascendent, incl above
Abandon Underground Electrical Lines
2
ea
-
Ascendent, incl above
Abandon Electrical Lines
2
ea
-
Ascendent, incl above
Demo existing electrical line to pole
1
ea
-
Ascendent, incl above
Plug 5S per District Standards
1
ea
-
Ascendent, incl above
Plug Roof Drain Pipe
1
ea
-
Ascendent, incl above
Plug SDCO on building side
1
ea
-
Ascendent, incl above
33 00 00
Utilities Total
Direct Cost Subtotal
Contractor Contingency
Pre -Construction
General Conditions
Subtotal
BRI
B&O Tax
GLI
Bond
Subtotal
OH & Fee
TOTAL COST EXCLUDING WSST
3.0%
Yes
0.471%
0,75%
Yes
10.0%
59,663
1,790
2,647
64,100
1,000
337
537
1,032
67,006
6,701
73,707
Print Date: 10/7/2019
Lydlg Construction
Page 1 of