HomeMy WebLinkAboutReg 2019-10-21 Item 4D - Bid Award / Contract - KC Equipment for 2019 Annual Small Drainage Program in Amount of $434,267.50COUNCIL AGENDA SYNOPSIS Initials MeetingDate Prepared by Ma or's review Council review 10/21/19 GL A1/11C 21(1 p ITEM INFORMATION ITEM No. 4.D. STAFF SPONSOR: RYAN LARSON ORIGINAL AGENDA DATE: 10/21/19 AGENDA ITEM TITLE Surface Water Fund - 2019 Annual Small Drainage Program Bid Award to KC Equipment, LLC CATEGORY Ij Discussion Mtg Date II] Motion Mtg Date El Resolution Mtg Date El Ordinance Mtg Date ge Bid Award 10/21/19 Public Hearing Mtg Date Other Mtg Date Mtg Date SPONSOR ECouncil EMqyor EHR DCD LjFinance Fire LTS •P&R ElPolice ZPIV ECourt SPONSOR'S The 2019 Annual Small Drainage Program was advertised for bids on August 20 and 27, SUMMARY 2019. Three bids were opened September 10 with the low bid of $434,267.50 from KC Equipment, LLC. For 2019, seven locations are scheduled for drainage improvements throughout the City. Council is being asked to award the bid to KC Equipment in the amount of $434,267.50. REVIEWED BY LI C.O.W. Mtg. 111 CDN Comm LI Finance 0 Parks Comm. lij Public Safety Comm. Comm. [1] Planning Comm. CHAIR: ZAK IDAN Arts Comm. a Trans &Infrastructure DATE: 10/08/19 COMMIT TEE RECOMMENDATIONS: SPONSOR/ADMIN. COMMFITEE Public Works Department Unanimous Approval; Forward to Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $434,267.50 $515,000.00 $0.00 Fund Source: 412 SURFACE WATER FUND Comments: pg 88, 2019 CIP MTG. DATE RECORD OF COUNCIL ACTION 10/21/19 MTG. DATE ATTACHMENTS 10/21/19 Informational Memorandum dated 10/04/19 Page 88, 2019 CIP Project Vicinity Map KPG Project Award Recommendation Letter 09/10/19 Bid Tabulation Minutes from the Transportation & Infrastructure Committee meeting of 10/08/19 27 28 Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director L/ BY: Ryan Larson, Senior Program Manager CC: Mayor Ekberg DATE: October 4, 2019 SUBJECT: Surface Water Fund - 2019 Annual Small Drainage Program Project No. 91941201 Bid Award ISSUE Award a contract to KC Equipment,LLC for construction of the 2019 Annual Small Drainage Program. BACKGROUND The Small Drainage Program constructs drainage projects throughout the City that are too large for City staff to complete but are smaller than a typical capital improvement project. The projects originate from citizen complaints and maintenance staff recommendations and are compiled on the Small Drainage Project List. Each year the projects are prioritized based on need, expense, permitting requirements, and length of time on the list. The highest priority projects are then designed and constructed. The 2019 Annual Small Drainage Program was advertised to provide drainage improvements at up to seven locations as noted in the attached vicinity map. DISCUSSION The 2019 Annual Small Drainage Program was advertised for bids on August 20 and 27, 2019. Three bids were received and opened on September 10, 2019. The bids were checked, tabulated, and no errors were found. KC Equipment LLC is the apparent low bidder with an overall bid of $434,267.50. The engineer's estimate was $493,662.00. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2019 Budget Bid Amount (Schedule A & B) $ 434,267.50 $ 493,662.00 $ 515,000.00 Contingency (10%) 43,426.75 Total $ 477,694.25 $ 493,662.00 $ 515.000.00 RECOMMENDATION Council is being asked to award the construction contract for the 2019 Annual Small Drainage Program to KC Equipment, LLC in the amount of $434,267.50 and consider this item on the Consent Agenda at the October 21, 2019 Regular Meeting. Attachments: 2019 CIP, page 88 Project Vicinity Map KPG Project Award Recommendation Letter 091019 Bid Tabulation W:IPW Eng1PROJECTSIA- DR ProjectslAnnual Small Drainage Programs12019 SDP (91941201)106 - Final Bid Docs1Bid Awardllnfo Memo Bid Award 2019.docx 29 30 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Annual Small Drainage Program Project No. 9XX41201 DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing/ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Projects for this annual program are taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. COMMENT: Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar years. FINANCIAL Through Estimated in $000's 2017 2018 2019 2020 2021 2022 2023 2024 BEYOND TOTAL EXPENSES Design 50 80 80 80 80 80 80 80 80 690 Streamgages/Monitor 31 35 35 35 36 36 36 36 40 320 Const. Mgmt. 90 45 80 80 80 80 80 80 80 695 Construction 448 600 515 515 514 513 514 514 513 4,646 TOTAL EXPENSES 619 760 710 710 710 709 710 710 713 6,351 FUND SOURCES Awarded Grant 0 Proposed Grant 65 65 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 619 695 710 710 710 709 710 710 713 6,286 TOTAL SOURCES 619 760 710 710 710 709 710 710 713 6,351 Project Location: Entire System 2019 - 2024 Capital Improvement Program 88 31 S 152ND ST @ 42ND AVE S CIPP LINING 40TH AVE S ® SOUTHCENTER BLVD CIPP LINING i 2019 Small Drainage Program - Seven Locations Ifl ,Y S 130TH ST 0 33RD PL S CIPP LINING S 140TH ST 0 38TH AVE S CIPP LINING IE3E`E7E*: E1k''" FL1ill�r�► 1��` � �` EffErlem EkEh INN 11t��t1lli IMIPIP INNIIMINEW LIMEIPITAKIIN GILUAM CREEK INLET ACCESS IMPROVEMENTS Project Location Map \ GILLIAM CREEK CONTROL STRUCTURE ACCESS IMPROVEMENTS SOUTHCENTER BLVD 61ST AVE S CIPP UNING 32 1•CPC4- SEATTLE •TACOMA September 10, 2019 City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Attention: Felipe Ayala Reference: City of Tukwila 2019 Small Drainage Program Contract No. #91941201 Subject: Project Award Recommendation Mr. Ayala, As requested, KPG has completed the verification for KC Equipment Company, LLC for the 2019 Small Drainage Program. We have checked the status of KC Equipment Company, LLC on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records arose federally or statewide regarding KC Equipment Company, LLC. There were four subcontractors listed on their bid form to confirm. We phoned the references listed in KC Equipment Company, LLC's bid and were able to speak with 2: Paul Garrett, Syed Kazmi, and Eugene Pike. Paul Garrett is with KBA who provided construction management services for the City of Bonney Lake and the Seattle Department of Transportation on several of KC Equipment's project. He had positive comments about KC Equipment and stated the contractor did good work. Eugene Pike provided construction management services on six different entities: the Seattle Department of Transportation, the Port of Seattle, Seattle City Light, Soos Creek Water & Sewer District, the City of Renton, and the City of Des Moines. Mr. Pike was enthusiastic about KC Equipment's work ethic and felt they were a great contractor to work with. It is KPG's recommendation that the 2019 Small Drainage Program project be awarded to KC Equipment Company, LLC. We have enclosed the contractor verification package and reference checks for your review. Respectfully, Ariana Vallejos ' Assistant Resident Engineer KPG, Inc. CC: Andy Youn, City of Tukwila Kelly Clark, KPG Mike Ronda, City of Tukwila 33 W CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2019 Small Drainage Program BID TABS OW BIDDER 2nd Low Bidder 3rd Low Bidder Total 09/10/19 Engineer's Estimate KC Equipment, LLC Nordvind Company, LLC. Road Construction Northwest No. Section No. Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost ROADWAY (SCHEDULE A) 1 1-04 Unexpected Site Changes 1 FA $6,000.00 $ 6,000 $6,000.00 $ 6,000 i $6,000.00 $ 6,000 $6,000.00 $ 6,000 2 1-09 Mobilization 1 LS $35,000.00 $ 35,000 $20,000.00 $ 20,000 $25,000.00 $ 25,000 $21,000.00 $ 21,000 3 1-10 Project Temporary Traffic Control 1 LS $50,000.00 $ 50,000 $20,000.00 $ 20,000 $120,000.00 $ 120,000 $54,000.00 $ 54,000 4 4-04 Off -Duty Uniformed Police Officer 20 HR $130.00 $ 2,600 $125.00 $ 2,500 $200.00 $ 4,000 $125.00 $ 2,500 5 8-01 Temporary Water Pollution / Erosion Control 1 LS $20,000.00 $ 20,000 $5,000.00 $ 5,000 $15,000.00 $ 15,000 $5,000.00 $ 5,000 6 8-04 Cement Conc. Traffic Curb and Gutter 55 LF $200.00 $ 11,000 $35.00 $ 1,925 $20.00 $ 1,100 $85.00 $ 4,675 7 8-14 Cement Conc. Sidewalk and Curb Ramp 1 EA $5,000.00 $ 5,000 $3,500.00 $ 3,500 $5,000.00 $ 5,000 $4,000.00 $ 4,000 (ROADSIDE DEVELOPMENT (SCHEDULE A) 8 8-02 Property Restoration STORM DRAINAGE (SCHEDULE A) 1 FA $3,000.00 $ 3,000 $3,000.001 $ 3,000 Y $3,000.00 $ 3,000 $3,000.00 $ 3,000 9 10 11 7-04 7-08 7-08 Pipe Repair Rehabilitate 8" CMP Pipe, 40th Ave S Rehabilitate 12" Cement Conc. Pipe, S 130th St 2 50 130 EA LF LF $5,000.00 $100.00 $125.00 $ 10,000 $ 5,000 $ 16,250 $10,000.00 $80.00 $250.00 $ 20,000 $ 4,000 $ 32,500 $5,000.00 $81.76 $81.76 $ 10,000 $ 4,088 $ 10,629 $3,000.00 $215.00 $110.00 6,000 10,750 $ 14,300 12 7-08 Rehabilitate 12" Cement Conc./CMP Pipe, S 140th St 296 LF $130.00 $ 38,480 $250.00 $ 74,000 $81.76 $ 24,201 $70.00 $ 20,720 13 7-08 Rehabilitate 12" Cement Conc./CMP Pipe, S 152nd St 172 LF $130.00 $ 22,360 $250.00 $ 43,000 $81.76 $ 14,063 $100.00 $ 17,200 14 7-08 Rehabilitate 18" Cement Conc./CMP Pipe, 61 st Ave S 110 LF $150.00 $ 16,500 $250.00 $ 27,500 $203.96 $ 22,436 $180.00 19,800 15 7-20 Temporary Stormwater Bypass System 1 LS $33,000.00 $ 33,000 $10,000.00 $ 10,000 $25,000.00 $ 25,000 $28,400.00 $ 28,400 Schedule A Total ROADWAY (SCHEDULE B) 274,190.00 MINIM 272,925.00 I 289,516.08 11 $ 217,345.00 16 17 1-04 1-09 Unexpected Site Changes Mobilization 1 FA 1 LS $6,000.00 $10,000.00 $ 6,000 $ 10,000 $6,000.00 $10,000.00 $ 6,000 $ 10,000 $6,000,00 $10,000.00 $ 6,000 $ 10,000 $6,000.00 $26,500.00 $ 6,000 $ 26,500 18 1-10 Project Temporary Traffic Control 1 LS $12,500.00 $ 12,500 $20,000.00 $ 20,000 $10,000.00 $ 10,000 $20,000.00 $ 20,000 19 2-01 Clearing and Grubbing 1 LS $5,000.00 $ 5,000 $5,000.00 $ 5,000 $10,000.00 $ 10,000 $10,600.00 $ 10,000 20 2-09 Structure Excavation Class B Incl. Haul 80 CY $40.00 $ 3,200 $75.00 $ 6,000 $100.00 $ 8,000 $80.00 $ 6,400 21 4-04 Crushed Surfacing Base Course 26 TN $40.00 $ 1,040 $75.00 $ 1,950 1 $100.00 $ 2,600 $85.00 $ 2,210 22 4-04 Trail Surface Aggregate 3 TN $110.00 $ 330 $125.00 $ 375 $150.00 $ 450 $350.00 $ 1,050 23 6-04 Timber Stairs 1 LS $30,000.00 $ 30,000 $20,000.00 $ 20,000 $20,000.00 $ 20,000 $73,700.00 $ 73,700 24 6-20 Metal Stair Structure 1 LS $95,000.00 $ 95,000 $50,000.00 $ 50,000 $45,000.00 $ 45,000 $93,250.00 $ 93,250 25 26 8-01 8-15 Temporary Water Pollution / Erosion Control Quarry Spells & Hand Placed Rip Rap 1 20 LS CY $18,000.00 $ $100.00 18,000 2,000 $2,500.00 $200.00 $ 2,500 4,000 $5,000.00 $100.00 5,000 2,000 $2,450.00 $275.00 2,450 5,500 27 B-24 Rock Wall 160 SF $50.00 $ 8,000 $75.00 12,000 $25.00 4,000 $95.25 $ 15,240 ROADSIDE DEVELOPMENT (SCHEDULE B) 28 29 30 31 32 33 8-02 8-02 8-02 8-02 8-02 8-02 Topsoil Type A PSIPE Acer CircinatumNine Maple; 1 Gal Cont. PSIPE Mahonia Aguifolium/Oregon Grape; 1 Gal Cont. PSIPE Rubus Parvifolia/Thimbleberry; 1 Gal Cont. PSIPE Symphoricarpus Albus/Snowberry; 1 Gal Cont. Property Restoration 8 12 26 26 26 1 CY EA EA EA EA FA $60.00 $85.00 $25.00 $25.00 $25.00 $5,000.00 $ 480 $ 1,020 $ 650 $ 650 650 5,000 $200.00 $25.00 $25.00 $25.00 $25.00 $5,000.00 $ 1,600 $ 300 $ 650 $ 650 $ 650 $ 5,000 $100.00 $100.00 $100.00 $100.00 $100.00 $5,000.00 $ 800 $ 1,200 $ 2,600 $ 2,600 $ 2,600 $ 5,000 $96.00 $32.00 $32.00 $32.00 $32.00 $5,000.00 $ 768 $ 384 $ 832 832 832 5,000 Schedule B Subtotal Schedule B WSST 10% Schedule B Total 1 $ 199,520.00 $ 146,675.00 $ 137,850.00 $ $ 19,952.00 1$ 14,667.50 ( $ 13,785.00 ($ 219,472.00 (r 161,342.50 $ 151,635.00 270,948 $ 27,094.80 298,042.80 City of Tukwila City Council Transportation & Infrastructure Committee TRANSPORTATION & INFRASTRUCTURE COMMITTEE Meeting Minutes October 8, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Zak Idan, Chair; Kate Kruller, Thomas McLeod Staff: David Cline, Henry Hash, Hari Ponnekanti, Vicky Carlsen, Tony Cullerton, Aaron Williams, Jeff Friend, Gail Labanara, Han Kirkland, Ryan Larson, Bryan Still, Michael Ronda, Laurel Humphrey Guests: Pia Westen &Adam Hutschreider, SHKSArchitects CALL TO ORDER: Committee Chair Idan called the meeting to order at 5:30 p.m. I. BUSINESS AGENDA A. Bid Award: 2019 Annual Small Drainage Program Staff is seeking Council approval of a contract with KC Equipment, LLC in the amount of $434,267.50 for construction of the 2019 Annual Small Drainage Program. This program constructs drainage projects that are too large for city staff but smaller than a typical capital improvement project, and prioritized based on need, cost, requirements, and length of time on the list. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 21, 2019 REGULAR CONSENT AGENDA. B. Contract Amendment: 2019 Annual Small Drainage Program Staff is seeking Council approval of Amendment No. 1 to Contract 19-061 with KPG, Inc. for construction management of the 2019 Annual Small Drainage Program. KPG was selected from six firms for best meeting the requirements of the project. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 21, 2019 REGULAR CONSENT AGENDA. C. Grant Acceptance: Riverton Creek Flap Gate Removal Staff is seeking Council approval of an agreement with King County for $140,000 of Cooperative Watershed Management (CWM) grant funding for the Riverton Creek Flap Gate Removal Project. CWM funds are distributed annually to each WRIA in King County and Tukwila was awarded $140K toward design and construction of this project, which will increase available salmonid rearing habitat and flood refuge in the lower Duwamish. The required match of $950,000 is available from other grant funds and Surface Water revenue. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 21, 2019 REGULAR CONSENT AGENDA. D. Grant Acceptance: NPDES Stormwater Capacity Grant Staff is seeking Council approval of a grant agreement with the Washington State Department of Ecology for a $95,000 2019-2021 Water Quality Stormwater Capacity Grant. Funds will be used to assist Phase II Permittees in implementation or management of municipal stormwater programs and no matching funds are required. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 21, 2019 REGULAR CONSENT AGENDA. 35