HomeMy WebLinkAboutTIC 2019-10-22 Item 2B - Public Safety Plan - Contract Amendment #2 for Public Works Shops Phase I (Heiser Building) Design with SHKS ArchitectsTO: FROM: BY: CC: DATE: SUBJECT: EUor'ks hepart!n rtt Henry Hash, INFORMATIONAL MEMORANDUM Transportation and Infrastructure Committee Henry Hash Public Works Director Hari Ponnekanti, Deputy PW Director Mayor Ekberg October 18, 2019 Public Safety Plan — Public Works Shops Project No. 91630601, Contract No. 18-197 Amendment No. 2 with SHKS for Phase 1 Design of Heiser Building Allan Ekberg, Mayor. ISSUE Approve Amendment No. 2 to Contract No. 18-197 with SHKS Architects to design the Heiser Building tenant improvements as part of the Public Works Shops Phase 1 BACKGROUND The City purchased the Heiser property at 11210 and 11234 Tukwila International Blvd in 2018 and took possession in July 2019 for the new Public Works Shops. City Council approved a Master Planning and Programming contract with SHKS Architects for $299,997 in September 2018. Amendment No. 1 to this contract was for $16,500 to complete demolition specifications. ANALYSIS SHKS has completed the Master Planning effort and Phase 1 includes relocating the George Long and Longacres operations to the Heiser Building. Divisions being relocated include facilities and fleet operations, the Police vehicle impound yard, and the Longacres spoils site. Amendment No. 2 with SHKS Architects will design the necessary improvements to the Heiser Building to include seismic retrofit, interior and exterior improvements, upgrades to the HVAC, mechanical, electrical, and storm drainage systems. FINANCIAL IMPACT Land Purchases SOJ Contract SHKS Contract 18-197 SHKS Amendment No. 2 SHKS 10% Contingency Misc. Charges Survey, Attorney Bond Debt Service Charges Lydig Demolition Total $ 26.068.073.97 Total Expenditures Expenditures Balance Owin 2019 Budget $ 25,334,123„00 166,757.52 267,226.09 128,826.35 171,141.01 $ 49,270.91 414,900.00 41,490.00 73,707.00 _55 W 79367.91 26 647.441.88 $ 30,000,000.00 $ 30,000,000.00 RECOMMENDATION Council is being asked to approve Amendment No„ 2 to Contract No. 18-197 with SHKS Architects for $414,900.00 with $41,490.00 in contingency for a total of $456,390.00 for design services for the Public Works Shops Phase 1 and to consider this item at the October 28, 2019 Committee of the Whole and subsequent November 4, 2019 Regular Council meeting. Attachments: SHKS Contract Amendment No.2 W:IPW EngIPROJECTSW- BG Projects101 Public Safety PIanIPW Shops First Phase (91630601)1Info Memo SHKS Am 2101819.docx 25 Tukwila PW SIIIIIKSARCH ITECTS 10/15/2019 Estimated MACC $3,500,000 Per A/E Fee Schedule C 10.74% Fee $375,900 Team Composition SHKS PIC JH PM AH PA PW Staff MF Staff TBD Rate $175 $135 $105 $90 $65 Basic Services Estimator Discipline Consultant Pre -Design Schematic Design Design Development Construction Documents Bidding Phase Construction Administration Close Out Total 18% 20% 31% 2% 27% 2% $67,662 $75,180 $116,529 $7,518 $101,493 $7,518 $375,900 Target % of fee Architectural 56% $37,891 $42,101 $65,256 $4,210 $56,836 $4,210 $210,504 Subconsultant M 10% Structural 14% $8,612 $9,568 $14,831 $957 $12,917 $957 $47,842 Mechanical 15% $9,227 $10,252 $15,890 $1,025 $13,840 $1,025 $51,259 Electrical 10% $6,151 $6,835 $10,594 $683 $9,227 $683 $34,173 Cost 5% $3,076 $3,417 $5,297 $342 $4,613 $342 $17,086 100% Additional Service Value Engineering $7,500 Maintenance Facility Design $10,000 Existing Building Survey $9,000 AS -Built Documentation $5,000 Envelope Consulting $7,500 Subtotal $414,900 12% Design Services Contingency Total 10% $41,490 $456,390 26