TO: Transportation and Infrastructure Committee
FROM: Henry Hash, Public Works Director '
BY: Pat Bnnd|n.Development Manager
CC: Mayor Allan Ekberg
DATE: October 1W,2019
SUBJECT: Water and Sewer Comprehensive �Plans
Project Nos. 91940101, 91940201
Consultant Contract with Coro||oEngineers for 3D2OUpdate
�W A
�I
Altan Ekberg, Mayor
ISSUE
Approve a consultant contract with Carollo Engineers to update the Comprehensive Plans for the Water and Sewer Utilities.
BACKGROUND
Washington State Department of Health requires 8Oupdate to the City'SWater Supply Plan every six years to ensure that the
water utility is active, and the operating permit remains in the green status, or compliant. Likewise, the Departmentof Ecology
approves the Comprehensive Sewer Plan every six years. In the last update in 2015,the City contracted with C80U0
Engineers for the Water and Sewer Comprehensive Plans. The new updates to the Water and Sewer Comprehensive Plans
must b9completed and approved bythe end Of2U20.
DISCUSSION
The current MRSC Consultant Roster was reviewed and three firms were short-listed to complete the updates to the Water
and Sewer Comprehensive Plans. The firms were Carollo Engineers, HDR Engineers, and Pace Engineers. The Summary of
Qualifications tables were evaluated from each firm and C80||Owas the unanimous choice based 0Otheir regional experience
and SOUOd knowledge regarding Tukvvi|3's water and sewer infrastructure. Key water topics included in the update will be
demographic and d808Od projections, iOCO[p0GtiDg remaining USefb| life, updating and calibrating the water model, provide
updated fire flow results, and water quality regulatory requirements. Water storage iSGOissue that will need 0Jb9addressed.
Key sewer topics include sewer flow projections, OOw0Vnik}hOgatChdC8|S8we[|VCati0OS,Co38t83Sewer0od8|Ofth8
commercial business district 02aid with capital projects @Od9v8|Uat8th8C000S[cia|diSthctS0Dm8y8OC6Sy3teDU.S9w8[|ift
station improvements, update the repair and replacement program, summarize reclaimed water use, and update any
regulatory requirements.
FINANCIAL IMPACT
The consultant contract with Carollo Engineers will split between the Water and Sewer Utilities: The Sewer Contractin
this update will be higher than expected because of the Department of Ecology reset and new model.
Ud|itV C-am||o Contract BudOet
Water Comp Plan $ 182,441.00 $280'000.0O
Sewer Comp Plan 277.951.00 280,000.00
Total $400382D0 $590.000.00
RECOMMENDATION
Council is being asked to approve the consultant contract with Carollo Engineers for the update to the Comprehensive
Water and Sewer Plans for $460.392.00and consider this item on the Consent Agenda at the November 4.2018
Regular Meeting.
Attachments
Scoring Sheet
Consultant Agreement w/Scopes
33
WAPW EngTROJECTMA- WT ProjecWWater Comprehensive Plan -Water (91040101)klnfo Mew Water Sewer Comp Plan 2019102519.docx
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Water Comprehensive Plan Project No. 91040101
DESCRIPTION: Prepare the new Water Comprehensive Plan incorporating any regulatory or new Growth Management
Act Comprehensive Plan issues related to running the water utility.
JUSTIFICATION: Plan needs to be consistent with City's Comprehensive Plan and the Department of Health requires
the plan to be updated every 6 years.
STATUS: Current Water update was adopted in 2015. The next update is scheduled for 2021.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
(in $000's)
EXPENSES
Design
Land (R/VV)
Const. Mgmt.
Construction
TOTAL EXPENSES
FUND SOURCES
Awarded Grant
Proposed Grant
Mitigation Actual
Mitigation Expected
Utility Revenue
TOTAL SOURCES
2017 2018 2019
234
234
0
140
140
2020
140
140
2021
0
2022
0
2023
0
2024
0
BEYOND TOTAL
0
514
0
0
0
514
234
234
0
0
140
140
140
140
0
0
0
0
0
0
0
0
0
0
0
0
0
0
514
514
Project Location:
Entire System
2019 - 2024 Capital Improvement Program
64
34
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2019 to 2024
PROJECT: Sewer Comprehensive Plan Project No. 91040202
Prepare new Sewer Comprehensive Plan incorporating any new or regulatory Growth Management
DESCRIPTION:
Act Comprehensive Plan issues related to sewer.
Sewer Comprehensive Plan needs to be consistent with City Comprehensive Plan, Department of
JUSTIFICATION:
Ecology and Department of Health. Update is required every 6 years.
STATUS: 2013 Sewer update was adopted by Council on 6/2/14. Next update is scheduled for 2021.
MAINT. IMPACT:
COMMENT:
FINANCIAL
(in $000's)
EXPENSES
Design
Land (R/VV)
Const. Mgmt.
Construction
TOTAL EXPENSES
FUND SOURCES
Awarded Grant
Proposed Grant
Mitigation Actual
Mitigation Expected
Utility Revenue
TOTAL SOURCES
Through Estimated
2017 2018 2019 2020 2021 2022 2023
158
158
0
140
140
140
140
0
0
0
2024 BEYOND TOTAL
0
0
438
0
0
0
438
158
158
0
0
140
140
140
140
0
0
0
0
0
0
0
0
0
0
0
0
0
438
438
Project Location:
Entire System
2019 - 2024 Capital Improvement Program
80
35
co IQ
36
City of Tukwila
6200 Southcenter Boulevard, Tukwila WA 98188
Contract Number:
PROFESSIONAL SERVICES AGREEMENT
(Includes consultants, architects, engineers, accountants, and other professional services)
THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter
referred to as "the City", and Carollo Engineers, hereinafter referred to as "the Consultant", in
consideration of the mutual benefits, terms, and conditions hereinafter specified.
1. Project Designation. The Consultant is retained by the City to perform Engineering Plan
services in connection with the project titled Water and Sewer Comprehensive Plan Update.
2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A"
attached hereto, including the provision of all labor, materials, equipment and supplies.
3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and
effect for a period commencing upon execution and ending December 31, 2020, unless
sooner terminated under the provisions hereinafter specified. Work under this Agreement
shall commence upon written notice by the City to the Consultant to proceed. The
Consultant shall perform all services and provide all work product required pursuant to this
Agreement no later than December 31, 2020 unless an extension of such time is granted in
writing by the City.
4. Payment. The Consultant shall be paid by the City for completed work and for services
rendered under this Agreement as follows:
A. Payment for the work provided by the Consultant shall be made as provided on Exhibit
"B" attached hereto, provided that the total amount of payment to the Consultant shall
not exceed $560,000.00 without express written modification of the Agreement signed
by the City.
B. The Consultant may submit vouchers to the City once per month during the progress of
the work for partial payment for that portion of the project completed to date. Such
vouchers will be checked by the City and, upon approval thereof, payment shall be
made to the Consultant in the amount approved.
C. Final payment of any balance due the Consultant of the total contract price earned will
be made promptly upon its ascertainment and verification by the City after the
completion of the work under this Agreement and its acceptance by the City.
D. Payment as provided in this section shall be full compensation for work performed,
services rendered, and for all materials, supplies, equipment and incidentals necessary
to complete the work.
E. The Consultant's records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City and the state of Washington for a
period of three (3) years after final payments. Copies shall be made available upon
request.
37
5. Ownership and Use of Documents. All documents, drawings, specifications and other
materials produced by the Consultant in connection with the services rendered under this
Agreement shall be the property of the City whether the project for which they are made is
executed or not. The Consultant shall be permitted to retain copies, including reproducible
copies, of drawings and specifications for information, reference and use in connection with
the Consultant's endeavors. The Consultant shall not be responsible for any use of the said
documents, drawings, specifications or other materials by the City on any project other than
the project specified in this Agreement.
6. Compliance with Laws. The Consultant shall, in performing the services contemplated by
this Agreement, faithfully observe and comply with all federal, state, and local laws,
ordinances and regulations, applicable to the services rendered under this Agreement.
7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers,
officials, employees and volunteers harmless from any and all claims, injuries, damages,
losses or suits including attorney fees, arising out of or resulting from the acts, errors or
omissions of the Consultant in performance of this Agreement, except for injuries and
damages caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Consultant
and the City, its officers, officials, employees, and volunteers, the Consultant's liability
hereunder shall be only to the extent of the Consultant's negligence. It is further specifically
and expressly understood that the indemnification provided herein constitutes the
Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. This waiver has been mutually negotiated by the parties.
The provisions of this section shall survive the expiration or termination of this Agreement.
8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may arise from
or in connection with the performance of the work hereunder by the Consultant, its agents,
representatives, or employees. Consultant's maintenance of insurance as required by the
agreement shall not be construed to limit the liability of the Consultant to the coverage
provided by such insurance, or otherwise limit the City's recourse to any remedy available at
law or in equity.
A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the
types and with the limits described below:
1. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident. Automobile Liability
insurance shall cover all owned, non -owned, hired and leased vehicles.
Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a
substitute form providing equivalent liability coverage. If necessary, the policy
shall be endorsed to provide contractual liability coverage.
2. Commercial General Liability insurance with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate. Commercial General Liability
insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall
cover liability arising from premises, operations, stop -gap independent contractors
and personal injury and advertising injury. The City shall be named as an
additional insured under the Consultant's Commercial General Liability insurance
policy with respect to the work performed for the City using an additional insured
endorsement at least as broad as ISO CG 20 26.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington.
CA revised December 2016
Page 2
38
4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000
policy aggregate limit. Professional Liability insurance shall be appropriate to the
Consultant's profession.
B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial
General Liability insurance policies are to contain, or be endorsed to contain that they
shall be primary insurance with respect to the City. Any Insurance, self-insurance, or
insurance pool coverage maintained by the City shall be excess of the Consultant's
insurance and shall not be contributed or combined with it.
C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M.
Best rating of not less than A:VII.
D. Verification of Coverage. Consultant shall furnish the City with original certificates and
a copy of the amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of the Contractor
before commencement of the work. Upon request by the City, the Consultant shall
furnish certified copies of all required insurance policies, including endorsements,
required in this Agreement and evidence of all subcontractors' coverage.
E. Notice of Cancellation. The Consultant shall provide the City with written notice of any
policy cancellation, within two business days of their receipt of such notice.
F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the
insurance as required shall constitute a material breach of contract, upon which the City
may, after giving five business days notice to the Consultant to correct the breach,
immediately terminate the contract or, at its discretion, procure or renew such insurance
and pay any and all premiums in connection therewith, with any sums so expended to be
repaid to the City on demand, or at the sole discretion of the City, offset against funds
due the Consultant from the City.
9. Independent Contractor. The Consultant and the City agree that the Consultant is an
independent contractor with respect to the services provided pursuant to this Agreement.
Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the parties hereto. Neither the Consultant nor any employee of the
Consultant shall be entitled to any benefits accorded City employees by virtue of the services
provided under this Agreement. The City shall not be responsible for withholding or
otherwise deducting federal income tax or social security or for contributing to the state
industrial insurance program, otherwise assuming the duties of an employer with respect to
the Consultant, or any employee of the Consultant.
10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or
retained any company or person, other than a bonafide employee working solely for the
Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any
company or person, other than a bonafide employee working solely for the Consultant, any
fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent
upon or resulting from the award or making of this contract. For breach or violation of this
warrant, the City shall have the right to annul this contract without liability, or in its discretion
to deduct from the contract price or consideration, or otherwise recover, the full amount of
such fee, commission, percentage, brokerage fee, gift, or contingent fee.
11. Discrimination Prohibited. Contractor, with regard to the work performed by it under this
Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin,
age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation,
the presence of any disability, or any other protected class status under state or federal law,
in the selection and retention of employees or procurement of materials or supplies.
12. Assignment. The Consultant shall not sublet or assign any of the services covered by this
Agreement without the express written consent of the City.
CA revised December 2016
Page 3
39
13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation
provided for in this Agreement shall not constitute a waiver of any other provision.
14. Termination.
A. The City reserves the right to terminate this Agreement at any time by giving ten (10)
days written notice to the Consultant.
B. In the event of the death of a member, partner or officer of the Consultant, or any of its
supervisory personnel assigned to the project, the surviving members of the Consultant
hereby agree to complete the work under the terms of this Agreement, if requested to do
so by the City. This section shall not be a bar to renegotiations of this Agreement
between surviving members of the Consultant and the City, if the City so chooses.
15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the
Consultant shall at all times comply with, all applicable federal, state and local laws,
regulations, and rules, including the provisions of the City of Tukwila Municipal Code and
ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is
instituted to enforce any term of this Agreement, the parties specifically understand and
agree that venue shall be properly laid in King County, Washington. The prevailing party in
any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action
arising from or related to this Agreement shall be exclusively in King County Superior Court.
16. Severability and Survival. If any term, condition or provision of this Agreement is declared
void or unenforceable or limited in its application or effect, such event shall not affect any
other provisions hereof and all other provisions shall remain fully enforceable. The
provisions of this Agreement, which by their sense and context are reasonably intended to
survive the completion, expiration or cancellation of this Agreement, shall survive termination
of this Agreement.
17. Notices. Notices to the City of Tukwila shall be sent to the following address:
City Clerk
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Notices to Consultant shall be sent to the following address:
Carollo Engineers
1218 3rd Ave., Suite 1600
Seattle, WA 98101
18. Entire Agreement; Modification. This Agreement, together with attachments or addenda,
represents the entire and integrated Agreement between the City and the Consultant and
supersedes all prior negotiations, representations, or agreements written or oral. No
amendment or modification of this Agreement shall be of any force or effect unless it is in
writing and signed by the parties.
CA revised December 2016
Page 4
40
DATED this day of .2019
CITY OFTUKVV|LA CONSULTANT
Allan Ekberg, Mayor
Attest/Authenticated:
Printed Name:
Title:
Approved 8StOForm:
City Clerk, Christy O'Flaherty Office of the City Attorney
carevised December 2016
EXH|BITA
CITY OFTgKW|LA
DRAFT SCOPE OF SERVICES
COMPREHENSIVE WATER SYSTEM PLAN
The following Scope of Services has been developed to assist the City of Tukwila (City)with the 2O20update ofits
Water System Plan (Plan). The objective of this project is to update and review all elements of the Plan
documents, in accordance with WAC 246-290-100 and State of Washington Department of Health (DOH)
regulations. The following tasks under this Scope ofServices has been prepared based on[anoUo's([onso|tant)
and its subconsultant's current understanding of the proposed project, and on discussions with City staff.
The City initiated this Plan update recognizing the importance of planning, developing, and financing water
system facilities as a means to provide reliable and efficient service for existing customers and to serve
anticipated growth. The Plan isdesigned tomeet state, county, and local requirements. The Oty'slast Water
System Plan was completed in 201S. This Plan will be consistent with the City's current update of the City's
Comprehensive Plan, creating a cohesive and complementary set of documents.
I. [aruUoEngineecs,|ncanditssobconsohantswiUberefenedtoas"[onsohant"inthisdocoment.
Z. The City of Tukwila and its staff will be referred to as "City" in this document.
l All meetings will he held atCity offices.
4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or
secure file transfer.
I City comments on draft chapters will be documented in the Project Comment Response Log by the
Consultant. The Consultant will prepare responses to address the comments in the Comment Response
Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency
Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be
produced upon City required.
6. Electronic Demand Tool will be provided in x|sxformat.
7. The Consultant will prepare an agenda, presentation materials, and document discussions, including
action items and decisions, inmeeting minutes for Consultant -led meetings.
O. Meeting notes and related materials will betransmitted electronically in K4SWord and PDFformats via
email.
9. The City will print and produce additional copies of all documents as necessary for its use.
10. The City will provide available information related to the project and as requested by the Consultant in a
timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to
Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as
required; furnish to Consultant services of others required for the performance of Consultant's services
hereunder, and Consultant shall be entitles to use and rely upon all such information and services
provided by the City or others in performing Consultant's services under this Agreement.
DRAFT 19 Page 1mf16
Executive Summary
ERS AND APPENDICES
Chapter 1:
Introduction
Chapter 2:
Existing System
Chapter 3: Policies & Criteria
Chapter 4: Water Requirements
Chapter 5: System Analysis
Chapter 6:
Chapter 7:
Water Use Efficiency
Water Quality
Chapter 8:
Chapter 9:uv�w�e,u_.0 �..
Chapter 10:�����_,..
Appendix A:
Appendix B: ...rv., �.
Appendix C:
Appendix D:
Operations and Maintenance
Capital Improvement Plan
Financial Plan
Consultant
Consultant
Consultant
Consultant
Notice of Determination of Non -Significance (DNS)
Consultant
Consultant
Consultant
Consultant
Consultant
Consultant
City
City
State Environmental Policy Act (SEPA) Checklist
Local Government Consistency Determination Form
Agency Comment Letters and Responses
Appendix E:
Appendix F:
Appendix G:__._..
Appendix H:
Ordinances and Approvals
Water System Plan Submittal Form
City
DOH Water System Plan Checklist
Interlocal Agreements
City
City
City
Consulta nt
Consultant
City
Appendix I: Water Facilities Inventory Form
City
Appendix J: Water Rights Self -Assessment Forms
Appendix K: Demographic and Demand Forecast Tables
Appendix L: TM 1:H drauLicM
pp y Model Update and Calibration
Consultant
Consultant
Consultant
Appendix M: Water Quality Sampling Procedures and Program City
Appendix N: Revised Coliform Monitoring Plan City
Appendix 0:
Appendix P:
Emergency Response Plan
Appendix 0:
�
Appendix R:
Water Shortage Response Plan and Service Reliability
Cross -Connection Control Program
City
City
City
Standard Construction Specifications for Distribution Mains
Appendix S: CIP Cost Estimates
City
Consultant
DRAFT - 10/14/2019
pvr_IlCaiolio)Cocumens/ClleotlrWAlTulomilai_ProposablTulomla_Wate r_Scope
Page 2 of 16
43
TASKS
To meet the objectives of this Scope of Services, the Consultant shall complete the tasks as summarized in the
table below and discussed in detail in the text that follows.
Task 100
ASK SUM AR
Task Name`
Project Management
Task 200 Introduction
Task 300 Existing System
Task 400 Demographic Analysis and Demand Projections
Task S00 System Analysis
Task 600
Water Use Efficiency
Task 700
Task 800
Task 900
Task 1000
Task 1100
Water Quality
Operations and Maintenance
Capital Improvement Plan
Financial Analysis
Plan Integration
TASK 100 — PROJECT MANAGEMENT
The purpose of this task is to direct all activities within the Plan as assigned by the City and maintain the project
within the contracted scope, schedule, and budget. This includes project administration, monthly invoicing, client
and team coordination and quality assurance/quality control review necessary to successfully complete the
assigned chapter of the Plan to the City's expectations. Additionally, the Consultant will develop a Project
Management Plan (PMP) and lead the initial team kick-off meeting. This task includes the following activities:
TASK 100 f .CTRViTI`_5
101. Monthly Progress Reports and Invoices. This subtask includes production and implementation of the project
plan, schedule, and budget. Assist the project team members in the implementation of the task items, reviewing
the work -in -progress reports. Prepare and submit monthly activity reports showing current project status and
identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An
electronic version of the monthly progress reports will be sent to the City for review and approval. This task
assumes that no hard copy of the monthly progress reports will be distributed.
102. Project Management Plan. Prepare a Project Management Plan (PMP) that describes deliverables, Plan
outline, anticipated meetings, project roles and responsibilities, lists contact information for the project team,
describes communications protocols, quality management, and includes the scope of services, schedule, and
budget. Quality Management includes, but is not limited to, the following elements:
• Project Manager overview of all primary documents to verify technical consistency and compliance with
contract requirements.
• Organization of the work into logical deliverables with qualified staff for each task assigned to the work.
• Resolution of all review comments with a memorandum summarizing key comments and the manner in
which each was addressed in the work.
An electronic version of the Project Management Plan will be sent to the City for review and approval. This task
assumes that no hard copy of the Project Management Plan will be distributed.
DRAFT - 10/14/2019 Page 3 of 1644
pw //CaroUo/Documents/Cheat/WA(Tulcwda/_Proposals/ T uiemdaWate iSco pe
1O].Meeting No. 2— Meeting. Facilitate a kick-off meeting to review project management and initial data
requests.
1U4.Client Coordination.
* Manage the consultant project team to track time and budget, work elements accomplished, work items
planned for the next period, manpower, scope changes, time and budget needed to complete the project.
m Create and maintain a working project schedule based on the schedule in the PMP.
• Review project status, including scope, budget, and schedule.
* The PMPwill beupdated with full incorporation ufrevewcommentsafterthe[ityrevewofthed/aft
PK4P.
* The total length ofthe project isl8months.
~ City provides required documents for appendices.
I. Team member contact information.
2. PMPreview for completeness.
l Receive, review, and process Consultant invoices inatimely manner.
4. Respond todata requests inatimely manner.
7os,',l0DCmnsol-ton'Delive/obles
I. Draft request list.
I. Draft Plan outline.
I DmftPK4P.
4. Final P&4P.
5� Eighteen monthly progress reports and invoices.
7ozkI0J1111ceL'if�os,
* Meeting No. l—KickoffMeeLing.
TASK 200— INTRODUCTION
The objective of this task is to create the City's introduction to the Plan. This task will develop Chapter 1 —
Introduction of the Plan and will develop Chapter 3 — Policies and Criteria. The chapters will be developed based
on the information contained in 201S Plan Chapter 1. A new Chapter 3 — Policies and Criteria is created to facilitate
review and implementation of newly proposed policies and criteria. The task includes the following activities:
TASK 2OOAlT|V|TlES
I01 Meeting No. 2-20I5 ChapterlReviev Facilitate ameeting toreview and identify updates needed toZUIS
Plan Chapter 1 — Introduction. This may include: related comprehensive water plans from the neighboring
jurisdictions and other related plans; recent history of the City's water system; and policies and criteria. A data
request will beprepared based onthe meeting.
202. Data Acquisition. Prepare a data request for the required information, The request may include, but is not
limited to, the following:
* Related comprehensive waterp|ansfnomtheneighbuhngjohsdichonsandotherre|atedp|ans.
• Agreements with neighboring jurisdictions.
* Neigh bohng/ diacentjvhsdictionsmaAinGeographic|nfomnationSystem(GB)formatvvithcorrent
boundaries.
DRAFT' 19 Page 4of16
• GIS data for the sewer system including City Limits, current water service area, urban growth area (UGA),
anUinterties.
• Policies and criteria related to service area and conditions of service, in MS Word. Itisassumed the City
will provide language for all requested changes topolicies and criteria.
m Emergency Management goals, including redundancy and reliability standards related to system
components, inK4SWord.
° Duty toServe.
w City and County land use plans and zoning.
° Satellite management program.
* Annexation policy.
w SEPAand Notice ofDetermination ofNon-Significance (DNS).
• Local Government Consistence Determination Form.
203.Revise Chapterl. Prepare arevised Chapter I — Introduction based oncurrent information. Itisanticipated
that any revisions will be minor. An electronic version of the draft Chapter will be sent to the City for review. City
comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the City
Review Draft Plan.
I04 Create New Chapter3.Pepaearevsed[hapter3—PdidesandCritehahasedonChYinputnnPo|idesand
Criteria. As part of the preparation, the Consultant will review policies and criteria and confirm they fulfill DOH
Water System Plan requirements. Itisanticipated that any revisions will beminor. Anelectronic version ofthe
draft Chapter will be sent to the City for review. City comments will be recorded in the Record of Comment and
will beincorporated into the Chapter aspart ofthe City Review Draft Plan.
Tosk20OAssumgt/nns
^ City can provide elements listed under Task 2OZ.
^ It is anticipated that the City will lead the environmental and agency Plan review and approval process.
The City will provide all associated documentation tothe Consultant.
m This task will involve updating the chapter from the 2UI5Plan.
m Nohard copy ofthe chapter will bedistributed.
Tpsk200[dvDeVvpmbles
I. Requested Data from TaskZ02.
2. Agency Comment Letters and Responses.
3. Adopting ordinances and approvals.
4. Water System P|anSuhmitta| Form.
I Comments ondraft Chapter l—Introduction.
6. Comments ondraft Chapter ]— Policies and Criteria.
Task ZO0Consultant Defiverobles
l. Meeting No. 2 — 201S Chapter I Review Meeting Agenda, Materials, and Minutes.
2. Draft Chapter I —Introduction.
l ROC for Chapter l—Introduction.
4. Draft Chapter 3—Policies and Criteria.
S. ROC for Chapter ]—Introduction.
6. DOH Water System Plan Checklist.
Tosk200 Mee'; 7as
* Meeting No. 2—ZOI5Chapter IReview.
TASK 300-EXISTING SYSTEM
DRAFT -1O/14/2U19 Page 5of16
Highline water district intertie
Water district 75 intertie
Water district #75 intertie
The objective of this task is to document the City's existing water system (e.g., supply, storage, booster pump
stations, interties, and distribution). The task will develop 2020 Chapter 2 —Existing Water System, which will be
based on revisions to the 2015 Chapter 4 — Existing System. The change in chapter numbering is intended to
better align with DOH's Water System Outline and assist in regulatory review. This task includes the following
3O1.Meeting No. 3 Existing System Review. Facilitate a meeting to review and identify updates needed to 201S
Chapter 4 — Existing System. A data request will be prepared based on the meeting.
302. Data Acquisition. Prepare a data request for the required information. The request may include, but isnot
limited to, the following:
* G|Sdata for existing facilities, service areas, and inventory.
~ Data onpipeline materials and age bvlinear foot, asavailable.
Existing renew and replacement program.
Summary ofimprovements completed since the ZOI5Plan.
Data onexisting infrastructure (e.g. supply, storage, booster pump stations, interties,and disthbotinn).
• Water Facilities Inventory Form.
• |nter|oca|Agreementz.
]U3.Revise 2DZ0 Chapter 2—Existing System. Prepare arevised Chapter 2—Existing System with updated
information. It is anticipated that any revisions wi I I be minor. An electronic version of the draft Chapter wi I I be
sent to the City for review. City comments will be recorded in the Record of Comment and will be incorporated
into the Chapter aspart ofthe City Review Draft Plan.
Tuut3O0Assomobons
* City can provide elements listed under Task 3OI.
* This task will involve updating the chapter from the 2Ol5Plan.
• No hard copy of the chapter will be distributed.
I. Requested Data from Task 30I.
2. |ntedoca|Agneements.
3. Water Facilities Inventory Form.
4 Comments onDraft Chapter 2—Existing System.
Tosk}OO[nnsvlLontDelivenrb&s
l. Draft Chapter Z—Existing System.
2. ROC for Chapter Z—Existing System.
3. Meeting No.] — Existing System Review Meeting Agenda, Materials, and Minutes.
0 Meeting No. 3 — Existing System Chapter Review.
TASK 400— DEMOGRAPHIC ANALYSIS AND DEMAND PROJECTIONS
The purpose of this task is to perform a demographic analysis and demand projections for the City's Service Area;
10-year and 20-year planning horizons will be evaluated using the best available information. This task will
develop the 2020 Chapter 4 — Demographic Analysis and Demand Projections, which will include completely
revised projections consistent with the Puget Sound Regional Council (PSRQ 2040 Vision and the most recent
DRAFT 19 Page 6of16
water use information. Note, it has been moved from the 2015 Chapter 2 to 2020 Chapter 4 to better align with
DOH's Water System Plan outline and facilitate regulatory review. This task includes the following activities:
401. Data Request. Develop and submit a request for data required for Chapter 4. The following data are
anticipated toberequired:
a. Demographic growth rates consistent with Regional Planning under PSRC 2040 Vision. Population,
household, and employment projections (if available) by Transportation Analysis Zones JAZ) are
preferred.
b. Historical connection and water use information by customer class from 2010 through the present.
Monthly orBimonthly water use ispreferred.
c. Historical supply purchases from 2010 through the present, including maximum day supply (if available).
Monthly orBimonthly purchases ispreferred.
d. Historical supply purchases for the maximum week in 2015, 2018, or 2019 to generate a diurnal water use
curve for the system.
e. Historica|wate/osefromoptoten(lO)|argecustomeo.|f|argeu»eohavemoethanonemete\then
water use bvmeter ispreferred.
f. Accounted -for Non -Revenue water from 2010 through the present.
g.
GIS data: land use and zoning data, vacant and re -developable land, TAZ boundaries.
402. Demographics Analysis. Analyze demographic growth 1ncustomers. Use data from PSR[and the City to
calculate rates of growth for each TAZ and each pressure zone. High, low, and average number of accounts will be
pnepaedfo/thelO-yearandZ0-yearp|anninghohzonsbypessoezone\ifsuf0cientdatai»avai|ab|e.
403. Demand Projections. Demand projections will be for the 10-year and 20-year.
a. Develop the historical average day demands (ADD) and maximum day demands (MDD), the accounted-
forevenoevvateruses,estimatedwater|ossand|eakagep|anningva|ues,andestab|isheqoiva|ent
residential unit (ERU)values for the different customer classes.
b� Project the future ADD and MDD water demand for each pressure zone based on the demographic
ana|ysisandhistorica|ERUdemand.Estimatesof|ow\modemte,andhighscenariofotorevvaterdemand
will bedetermined. The scenarios will be based on the variations in key demand parameters, such as ERU
value orthe MDD/ADD peaking factor. Up to ten (10) of the City's largest connections may be projected
separately and added to other projected system demands. Peak hour demand (PHD) will be calculated
using a diurnal water use curve from a maximum water use week in recent years.
4O4.Meeting No. 4— Demographic Analysis and Demand Projections. Present the methods and results ofthe
demographic analysis and demand projections for the City's review and approval. The WUE program will also be
discussed. Prepare an agenda, presentation materials, and document discussions, including action items and
decisions, inmeeting minutes.
405. Demand model. Provide excel database with projected ERUs and resulting demand for City's use in future
updates.
406.[mate Draft Chapter 4 — Demographic Analysis and Demand Projections. Prepare draft Chapter 4 for City's
review and approval. City comments and Consultant responses will be tracked in the Comment Response Log.
Comments nnthis chapter will beincorporated into the final Plan.
Task400 Assurnotions
Page 7 of 16
48
° The Service Area andpresoezonesviUbedeUheatedphortodeve|opmentofthewatereqoiements.
* This task will require a complete update of the Chapter with all new information.
Tc�sk4O0[tvDe8vemb�es
l. Requested Data.
2. Comments onChapter 4—Demographic Analysis and Demand Projections.
Deliverables .
l. [0eetingNo.4—DemographicAna|ysisandDemandPnojecbonsK4eetihgAgenda,Mateha|s,and
Minutes,
Z. Draft Chapter 4—Demographic Analysis and Demand Projections.
I ROC for Chapter 4—Demographic Analysis and Demand Projections.
4. Demographic and Demand Forecast Tables.
Zpsk400
° Meeting No. 4—Demographic Analysis and Demand Projections.
TASK 500—SYSTEM ANALYSIS
The purpose of this task is to evaluate the future water system to identify potential deficiencies and proposed
improvements, including supply, storage, booster pump stations, and distribution. The hydraulic model piping will
be updated and calibrated based on results of hydrant tests performed by the City. Improvements identified in
other tasks will be incorporated into the model, as appropriate, to determine the effect of comprehensive
improvements. This task will develop 2020 Chapter 5 — System Analysis. It includes information contained in 2015
Chapters 3 — Supply Analysis, 2015 Chapter 5 — Hydraulic Model Update, and Chapter 6 — Distribution System
Analysis. This task includes the following acdvities:
501. Data Request. Develop and submit a request for data required by Chapter 5. The following data are
anticipated tuberequired:
a. Cascade Water future supply planning.
b. King County Reclaimed Water planning.
c. Existing well pump tests, capacity evaluations and/or aquifer characterizations.
d. Potential location for future storage facilities.
502.Updot Hydraulic Profile. Prepare anupdated hydraulic profile figure.
SU3.Water Right Self-Asscssmont. Complete DOH Water Right Self -Assessment (Tables lthrough 3).
5O4.Desktop Analysis — Water Supply Analysis. Summarize the City and Cascade VYate/'slong-term supply
planning. Summarize City's existing water right (Foster Links Golf Course). Additionally, summarize potential use
ofreclaimed water.
5OS.Desktop Analysis —Storage Analysis. identify the storage volume required for each pressure zone based on
the established storage criteria for equalizing, fire flow, operational, and standby volumes. The storage analysis
will beperformed for the l0'yearand 2O'yearprojected demands.
5U6.Desktop Analysis —Pump Station Analysis. Identify the pumping capacity requirements per the evaluation
criteria. Compare requirements to current pump station capacity to identify any deficiencies for the 10-year and
20'yea/pnojecteddemandscenarios.Requi/edupgmdes,modifications,oroperationa|changeswiUbe
recommended, as necessary.
DRAFT - 19 Page 8of16
507. Desktop Analysis —Limiting Factor Analysis, Conduct the limiting factor analysis using DO H WSDM 6-1.
Calculate the water system service connections correlated to ERUs and the physical system capacity as ERUs. The
Limiting Factor Analysis will use information summarized in previous chapters, where applicable. The Limiting
Factor Analysis will beconducted for the sought approval period.
5O8.Meeting No. 5—DasktopAnukobWorkzhop.Faci|itateameetingtopresentthevvaterright,sopp|Kstorage,
and pump station analysis results for the City's review and approval. As part of this meeting, the City will select
preferred options for future storage options.
5O9.Update Hydraulic Mode6Co0h/otion. Review and update system piping, asrequired. Calibrate the steady state
InfoWater hydraulic model to check model results against field conditions through up to three hydrant flow test
comparisons.Hydrantf|ovvtestswi||becondvctedbythe[ity.A||ocatelO'year,20'yeardemands,andupdated
diurnal curve to the model. It is assumed the City will confirm all fire flow requirements (FFR) in the model and
provide revisions, as needed.
510Futore Storage Siting. Based on the required storage, up to four locations for a future reservoirs will be
evaluated based on the locations defined in 2014 Water Reservoir Siting Study that may include, but are not
limited to:
a. [ehni Hill.
b. Existing Tank Location
c. Lease from Adjacent Utility.
d. Private Parcel onNorth Hill.
Develop required pipe sizing for each location using the hydraulic model determine if pipe upsizing improvements
to the existing system would be required for each location. It is assumed the locations will use the same pipe
routing proposed in the 2014 study; no new reservoir locations will be considered. Iti»assumed the City will
conduct all discussions with adjacent utilities. The options will exclude service to the 340, 380, and 465 Pressure
Zones. Develop preliminary costs consistent with Task 900 for the options to aid with City decision making.
Future Storage Siting will be presented as part of Meeting No. 5 — Desktop Analysis Workshop
531. Fire and System Pressure Analysis. Using the updated hydraulic model, perform analysis of the system
evaluating fire flow and system pressures per DOH regulations and guidelines based on the City's water system
criteria. The steady state analysis will focus on distribution capacity deficiencies for pressure, velocity, and
available fire flow. Prepare figures showing deficiencies.
512. Identification of Water Improvement Projects. identify improvements to address deficiencies under the MDD
plus fire flow simulations and the peak hour simulations for the 10-year and 20-year scenarios. Previously
identified supply, storage, and booster pump station improvements will be incorporated to assist in meeting
deficiencies. The water system projects will be incorporated into the existing CIP from the 2015 Plan and any
changes toprojects will besummarized, ifrequired.
513.Meeting No. 6—System Improvements Workshop. Present identified deficiencies and improvements for City
review and comment.
514 Create Draft Chapterfor Chapter5—System Analysis. Prepare draft Chapter 5 for City's review and approval.
City comments and Consultant responses will be tracked in the Comment Response Log. Comments on this
chapter will beincorporated into the final Plan.
Task 500Asson?ptions
w The City will provide assumptions onfuture sources and quantities ofsupply.
r The City will provide assumptions on future storage locations and conduct all discussions with SPU or
adjacent utilities.
* The City will conduct hydrant flow testing tosupport model calibrations.
DRAFT- 19 Page 9ofl60
° This task will require a complete update of the Chapter with all new information.
/osk5D0
l. Requested Data.
2. Comments ondraft Chapter 5—System Analysis
7skBJ0Cons u/tun'De/1ve[ob les
I. Meeting No. 5 — Desktop Analysis Workshop Agenda, Materials, and Minutes.
2. Meeting No. 6 — System Improvements Workshop Agenda, Materials, and Minutes.
]. Draft Chapter S—System Analysis.
4. ROC for Chapter 5—System Analysis.
S. Hydraulic Model Update and Calibration Technical Memorandum.
Task 500A1eet1ntos
* Meeting No. 5—Desktop Analysis Workshop.
w Meeting No. 6—System Improvements Workshop.
TASK 600—WATER USE EFFICIENCY
The purpose of this task is to summarize the City's Water Use Efficiency Program as a member of Cascade Water
Alliance and will develop 2020 Chapter 6 — Water Use Efficiency. An independent WUE Chapter is being created to
assist the City in meeting future regulatory requirements. The task will include the following activities:
602. Data Acquisition. Prepare a data request for the required information. WUE will be discussed as part of
Meeting No. 4 — Demographic Analysis and Demand Projections. The request may include, but is not limited to,
the following:
• Cascade Water Use Efficiency Program.
• VYUEgoals and public adoption documentation.
• VYUEmeasures that have been implemented.
• Yearly consumer education.
w Reported Water Loss.
603. Revise Chapter6. Prepare a revised Chapter 6 — Water Use Efficiency based on updated information. It is
anticipated that program revisions will be minor and the water demand with conservation will be reflected in the
^|ow"demand scenario developed. Anelectronic version ofthe draft Chapter will besent tothe City for review.
City comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the
City Review Draft Plan.
Tusk000 11'ioumotiot35
• City can provide elements listed under Task 6O2
° This task will involve updating the content from the 2OI5Plan.
• No hard copy of the chapter will be distributed.
I. Requested Data from Task 6OI.
2. Water Loss Control Action Plan.
l Comments onDraft Chapter 6—Water Use Efficiency.
[onsu/tnntDeJvembles
l. Draft Chapter 6—Water Use Efficiency.
Page lOofl6
2. ROC for Chapter 6—Water Use Efficiency.
° None
TASK 700—WATER QUALITY
The purpose ofthis task is to summarize water quality regulations and reporting requirements, evaluation of
water quality against the regulations, summary of any water quality violations, and recommended improvements,
if necessary, to meet anticipated or future water quality regulations. This task will develop 2020 Chapter7— Water
Quality of the Plan. An independent Water Quality Chapter is being created to assist the City in meeting future
regulatory requirements. The task will include the following activities:
7O2.Data Acquisition. Prepare a data requests will be provided required information. The request may include, but
is not limited to, the following:
• Water Quality Sampling Procedures &Program.
* Consumer Confidence Reports.
• Water quality violations, if applicable.
• Revised [o|ifonnMonitoring Plan.
• Boil Water Notices.
703. Revise ChapterT Prepare a revised 2020 Chapter 7—Water Quality based on updated information. Revisions
will be discussed as part of Meeting No. 8 — Operation and Maintenance Chapter Review. Iti»anticipated that any
revisions will be minor. An electronic version of the draft Chapter will be sent to the City for review. City
comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the City
Review Draft Plan.
To,sk 7100 Assomn'ions�
w City can provide elements listed under Task 7O2.
• This task will involve updating the chapter from the 2OlSPlan.
• Nohard copy ofthe chapter will bedistributed.
• This task does not include review or update of the City's Water Quality Monitoring Plan, Coliform
Monitoring Plan, and other water quality programs and plans.
Task 0UCitvDefiverables
L Requested Data from Task 70l
Z. Water Quality Sampling P/ocedues&Program.
I Revised [oUformMonitoring Plan.
4. Comments onDraft Chapter 7—Water Quality.
Task
I. Draft Chapter 7—Water Quality.
2. ROC for Chapter 7 — Water Quality.
w None
DRAFT 19 Page 11of16_
TASK 800 — OPERATION AND MAINTENANCE
The purpose of this task is to review, update, and evaluate the City's Operations and Maintenance (O&M)
Program document 2020 Chapter 8 — Operations and Maintenance. The chapters will be developed based on the
information contained in 2015 Plan Chapter 7, which has been renumbered from the 2015 Plan due to changes in
earlier chapters. An evaluation of the O&M programs will provide recommendations for new or updated
maintenance programs, as needed. This task will include the following activities:
801. Meeting No. 7 Existing ChapterReview. Facilitate a meeting to review and identify updates needed to 2020
Chapter 8 — Operations & Maintenance. A data request will be prepared based on the meeting.
802. Data Acquisition, Prepare a data requests will be provided required information. The request may include,
but is not limited to, the following:
• The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans
and specifications for inclusion in the Plan.
• Water system organization chart and operator certifications.
• Public Works Emergency Response Plan.
• Cross -Connection Control Program.
• Route and preventive maintenance schedules for major system components.
• Water Shortage Response Plan and Service Reliability.
003.Summarize Remaining Useful Life. Summarize remaining useful life ofwater mains based onthe Pipeline
Asset Management Study completed by Carollo in 2014. Develop a future water main repair and replacement
program based onthe findings ofthe study.
804 ReviseChapter7— Operation and Maintenance. Update 2015 Chapter 7 based on information provided by the
City. This may include organization, certification, O&M program activities updates, and known major deficiencies
inthe [ity'sO&M program. Adetailed evaluation nfCity O&M programs will not beconducted. Anelectronic
version of draft 2020 Chapter 8 will be sent to the City for review and City comments will be recorded in the
comment response log. Comments will be incorporated in the Chapter as part of the City Review Draft Plan. This
task assumes that nohard copy ofthe chapter will bedistributed.
Task 000AssomDtions
• City can provide elements listed under Task O02.
• This task will involve updating the chapter from the 2OI5Plan.
* Nohard copy ofthe chapter will bedistributed.
1. Requested Data from Task O0Z.
I. Comments onDraft Chapter 8—Operations and Maintenance.
T sk BOO ConsultowDefiverobles
I. Meeting No. 7 — Operations & Maintenance Chapter Review Agenda, Materials, and Minutes.
2. Draft[hapterO—OperationsandMaintenance.
I ROC for Chapter 8—Operations and Maintenance.
Tusk
0 Meeting No. 7 — Operations and Maintenance Chapter Review.
TASK 900 — CAPITAL IMPROVEMENT PLAN
DRAFT 19 Page 12ofl6
This task wi I I summarize the recommended improvements for the water system in accordance with the City's
policies and criteria. This task will develop 2020 Chapter 9 — Capital Improvement Plan, which has been
renumbered from the 2015 Plan due to changes in earlier chapters. Total project costs will be developed for each
recommended improvement and ranked by priority. Tasks involved include the following activities:
901. CIP Projects with Triggers. Identify and describe CIP projects from prior tasks and existing City planning.
Prepare a description of each project. A recommended implementation date, with based on a quantitative project
^thgger",will bedefined for each OPproject.
902. Cost Estimates. Develop planning level cost estimates for all recommended projects using costs provided in
other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be
prepared; all costs will begiven inIO2Udollars.
903. Prioritization. Prioritize condition -related and capacity -related projects identified in the previous tasks for
inclusion inthe [|P incollaboration with the City in Meeting No. 8.
9D4.Electronic [0o Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each
project will be listed on a separate tab including project description, justification, estimated cost, and
recommended year for implementation. City staff will be provided the ability to adjust indirect costs and
escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets
will be included as an appendix. The Consultant will train City staff on using the CIP Tool.
9O5.Meeting No. O—[opito Improvement Plan. Facilitate meeting with City Staff to review the recommended CIP.
9O6.Create Draft Chapter 9-Capital Improvements Plan. Prepare chapter including adescription ofcost estimating
methods, project analysis, final recommendations, summary table, and system maps with the location of
recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter
with all new information. An electronic version of draft Chapter 9 will be sent to the City for review and address City
comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as
part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed.
This task will require a complete update of the Chapter with all new information.
l. Standard Construction SpedficatonforDisthbutionk4ains.
Z. Comments ondraft Chapter 9—Capital Improvement Plan.
Task 900'TnnsultpntDp8vembles
I. CIP Cost Estimates
2. Draft Chapter 9—Capital Improvement Plan,
l ROC for Chapter 9—Capital Improvement Plan.
4. Meeting No. 8 —Capital Improvement Plan Agenda, Materials, and Minutes.
Task g00Meetings
~ Meeting No. 8—[apita| Improvement Plan.
TASK 1000 — FINANCIAL PLAN
The purpose of this task is to develop 2020 Chapter 10 — Financial Plan, which has been renumbered from the
2015 Plan due to changes in earlier chapters. The City will lead Chapter 10, which will include an historical financial
overview of the system and summarize current policies, rates, and fees. Ten-year projections of revenues and
Page 13of16
54
expenses will bedeveloped toidentify the total cost ofproviding water service and implementing the capital
improvement program. Potential funding sources for CIP projects will be identified.
1002. Meeting No. 9 —Rnondo/Plan. Review financial analysis conducted by City Staff.
1003.Review and Format Draft Chapter I0—Financial Plan. Review and format City prepared draft Chapter IOfor
[ity'sreview and approval. Comments will beprovided for City responses electronically
ToskIO00»ssompt/ons
° This task will require acompleted bythe City
l. R Draft ChapterIO—Finanda| Plan.
l� Draft Chapter lO—Financial Plan
I. Meeting No. 9—Financial Review Agenda, Materials, and Minutes.
TaskI00O
* Meeting No. 9—Financial Review.
TASK 1100 — PLAN INTEGRATION
The purpose of this task is to integrate all chapters and appendices into the full Plan for review and adoption by
the City. This task includes review of all chapters for consistency with DOH's requirements for a Comprehensive
Water System Plan per VVA[2O6'29U'I00.
1101.Exocutkve Summary. Prepare an executive summary, summarizing each element of the Water System Plan.
1102. City Draft Plan. Prepare Cover Sheet and Table of Contents. Compile Chapters and develop Appendices.
Incorporate comments into Draft Chapters based onCity accepted RD[s.Prepare electronic review draft
document for City Staff (one PDFcopy).
1103. MeetinyNulO—CityDmftPlan. Meet with City todiscuss comments ofdraft document. Incorporate
comments tobeincluded into Agency Draft Plan.
3104. Agency Draft Plan. Incorporate City comments into an Agency Draft plan to be submitted for agency
review. Prepare three (3) hard copy and one PDF for distribution of Plan to Agencies and Adjacent Purveyors.
11DS.Meeting No. ll Commission IPublic Review. Attend a Commission meeting to support City Staff in gaining
public comment and/or commission approval of the Plan, as selected by City staff. Aid City Staff in preparing
technical materials for the meeting.
1106.Fino Plan Consultant will review agency review letters for incorporation into the Final Plan. Delivery of the
Fina|P|anvviUindodetwnPE'stampednotebookbinders,onePDF,andaUe|ectnonicde|ivenab|es.
° City provides required documents for appendices, including acceptance ordinances.
° It is anticipated that City will distribute the Plan to DOH, County agencies, and adjacent purveyors review
for approval. The City will collect public and agency review comments and address all comments. The
55
Consultant will provide technical assistance, if required. City will develop written responses tocomments
received during Agency Review process.
Td�2I0O[De!;vsnb��
I. City Comments.
2. Public and Agency Review Comments.
'Dekve/ob�es
I. Executive Summary.
2. City Draft Plan — One PDF.
3. AgencyDn*ftMan—TheehardcopiesandonePDF.
4. Final P|an—TwohandcopiesandonePDF.
5. Meeting No. IU—City Draft Plan Agenda, Materials, and Minutes.
6. Meeting No. Il—Commission / Public Review materials.
Tt�tII0JAviesDoos
� Meeting No. l0—City Draft Plan.
w Meeting No. Il—Commission / Public Review.
Meeting No. I Kick-off Meeting
Meeting No. 2 201S Chapter 1 Review
Meeting No. 3 202OChapter I&3Review
Meeting No. 4 Existing System Chapter Review
_
kXeetngNo�S Demogra�h�Ana�ssand DemandPn�ecdonsVVodmhop
Meeting No. 6 Desktop Analysis Workshop
Meeting No. 7
Meeting No. 8
System Improvements Workshop
Water Use Efficiency Chapter Review
Meeting No. 9 Water Quality Chapter Review
Meeting No. 10 Operations and Maintenance Chapter Review
Meeting No. ll Capital Improvement Plan
Meeting No. 12 Financial Review
Meeting No�I3 ��D�ft�an
��
Meeting No. 14 Commission / Public Review
Project Management Plan
All Meeting Agendas & Minutes
Month�PnogressRepo�s�v�hinvoices)
_
Data Request Spreadsheet
— — -- ---
D/aftandRO[fnrExecutiveSommary
Draft Chapter and ROC for Chapter I — Introduction
Draft Chapter and ROC for Chapter 2 — Description of the Water System
Revision of chapter from 2015 Plan
Revision of chapter from 2015 Plan
Draft Chapter and ROC for Chapter 3 — Policies and Criteria
Draft Chapter and ROC for Chapter 4—Water Requirements
Draft[hapterandROC for [hapter5—Sys�/mAna|ysis
_ _______
Draft [hapterand ROC for Chapter 6—VVaterUse EfGciency
Draft Chapter and ROC for Chapter 7—Water Quality
Revision of chapter from 2015 Plan
Draft Chapter and ROC for Chapter 8 — Operations & Maintenance
Draft Chapter and ROC for Chapter 9 — Capital Improvement Plan
Full chapter odate
Full chapter update
Revision ofchapter from 2OI5Plan
Revision ofchapter from 2OlSPlan
Revision ofchapter from 101SPlan
Full chapter update
Draft Chapter and ROC for Chapter l0—Financial Plan Full chapter update
City Draft Plan
Agency Draft Plan
Final Draft Plan &All Electronic Files
DRAFT- 19
Page 16 of 16
57
EXH|BITA
CITY OFTUKW|LA
DRAFT SCOPE OFSERVICES
COMPREHENSIVE SANITARY SEWER PLAN
The fol lowing is a scope of work for the Com pre hensive Sanitary Sewer Plan (Plan) for the City of Tukwila. The
Plan will becompleted by[anoUoEngineers. However, some tasks and task elements will require the participation
of City staff from the Planning, Finance, and Public Works Departments. This scope is developed to describe the
content and purpose ofthe Plan, determine tasks tobecompleted for the update ofthe previous plan, and
identify the resources necessary toaccomplish those tasks.
The Plan will be based on the Washington Administrative Code (WAQ 173-240-OSO standards. The plan will
include afuture flow projections, system analysis, and acapital improvements plan (OP)for existing (2Ol - IO'
year,andbui|d'ootscenarios.The2Ol36evve/SystemP|anUpdate([aroUo)vviUbeosedasthebasisforthis
scope ofwork.
PROJECT AS SU MPT10"NS
l. [a/oUoEngineecs,|nc.anddssobconsohantzviUberefeoedtoas"[onsuhant"inthisdocoment.
2. The[ityofTokwi|aandhsstadfvviUberefenedtoas"[ity"inthisdocoment.
1 All meetings will heheld atCity offices.
4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or
secure file transfer.
5. City comments on draft chapters will be documented in the Project Comment Response Log by the
Consultant. The Consultant will prepare responses toaddress the comments inthe Comment Response
Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency
Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be
produced upon City required.
6 The Consultant will prepare an agenda, presentation materials, and document discussions, including
action items and decisions, for Consultant -led meetings. Meeting notes and related materials will be
transmitted electronically in MSWord and PDFformats via email.
7. The City will print and produce additional copies of all documents as necessary for its use.
8. The City will provide available information related to the project and as requested by the Consultant in a
timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to
Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as
required; furnish to Consultant services of others required for the performance of Consultant's services
hereunder, and Consultant shall be entitles to use and rely upon all such information and services
provided by the City or others in performing Consultant's services under this Agreement.
Page
ofD
58
Cehensive Sewer P'16n
r����~���T�` �.
,
—
C"~p`=v,`pp==x
::Chapter Lead,: I
Executive Summary
[hapterl: Introduction
Chapter 2: Flow Monitoring
Consultant
Consultant
Consultant
Chapter 3: Flow Projections
Chapter 4: Existing System
Chapter 5: System Analysis
Chapter 6: Operations and Maintenance
Consultant
Ommhont
Consultant
Consultant
Appendix A: State Environmental Policy Act Checklist and Determination of Non -Significance City
AppendixB: Agency Review and Comment Letters Appendix C: Adopting Resolution
City
city
Appendix D: King County WTD Conveyance Agreement City
Appendix E: System Map with Detailed Pipe Consultant
Tomeet the objectives ofthis Scope ofServices, the Consultant shall complete the tasks assummarized inthe
table below and discussed in detail in the text that follows.
Task 100
TaskZUO
'}P��,
/ ��/ �"�p.`�,"��=��_n-����-. ..
Project Management
Introduction
Task3OO
Task4UO
Task5UO
Flow Monitoring
Flow Projections
----- —
Existing System
Task@0
Task7OU
System Analysis
Operation and Maintenance
Task 800 Capital Improvement Plan
Task 900 Plan Preparation
The scope of services for the above project will consist of the following tasks.
TASK I00—PROJECT MANAGEMENT
DRAFT -1O/14/lO19
pmsls: Slop,
Page
of 17
59
This task includes routine management activities, submittal of monthly progressreports, and overall coordination
and assistance. It is anticipated that the Project will be complete by December 2020. Project timeline
modifications may require project hour and budget modifications. This task includes the following activities:
TA5KIOO'4!-_T!V!T|ECZ.
101. Monthly Progress Reports. This subtask includes production and implementation of the project plan,
schedule, and budget. Assist the project team members in the implementation of the task items, reviewing the
work-i n -progress reports. Prepare and submit monthly activity reports showing current project status and
identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An
electronic version of the monthly progress reports will be sent to the City for review and approval, This task
assumes that nohard copy ofthe monthly progress reports will bedistributed.
102 Project Management Plan. Prepare a Project Management Plan (PMP) that describes deliverables, Plan
outline, anticipated meetings, project roles and responsibilities, lists contact information for the project team,
describes communications protocols, quality management, and includes the scope of services, schedule, and
budget{loa|ityManagementindodes,botisnotUmitedto,thefoUovvinge|ements:
w Project Manager overview of all primary documents to verify technical consistency and compliance with
contract requirements.
* Organization of the work into logical deliverables with qualified staff for each task assigned to the work.
w Resolution of all review comments with a memorandum summarizing key comments and the manner in
which each was addressed inthe work.
An electronic version of the Project Management Plan will be sent to the City for review and approval. This task
assumes that no hard copy of the Project Management Plan will be distributed.
103. Meeting No.1 - Kick-off Meeting, Facilitate a kick-off meeting to review project management and initial
data requests.
104 Client Coordination.
• Manage the consultant project team to track time and budget, work elements accomplished, work items
planned for the next period, manpower, scope changes, time and budget needed tocomplete the project.
m Create and maintain a working project schedule based on the schedule in the PMP.
• Review project status, including scope, budget, and schedule.
0 The PMP will be updated with full incorporation of review comments after the City review of the draft PMP.
a The total length ofthe project isl4months.
0 City provides required documents for appendices.
Task, I00City Defiverables
I. Team member contact information.
2. PK4Preview for completeness.
3. Receive, review, and process Consultant invoices inatimely manner.
4� Respond todata requests inatimely manner.
Task 1l00L[onsu/tuntDeliverables
I. Draft request list.
2. Draft Plan outline.
DRAFT '1O/14/2O19 '
Page
of 17
60
I DratP01P.
4. Fina|PMP.
5. 14 monthly progress reports and invoices.
To k
0 Meeting No. 1 — Kick off Meeting.
TASK 200— INTRODUCTION
This task includes basic information that will serve as a foundation for developing a comprehensive program to
meet current and projected future sewer system needs. This task will develop Chapterl Introduction. The task
includes the following activities:
TA5K2OOA—T(V0ES
201.K8eetingNm.2'2013[hapter1Reviam.Fad|itateameetingtoeviewandidentifvopdatesneededto
Chapter l—Introduction. This may include: related comprehensive sewer plans from the neighboring jurisdictions
and other related plans; recent history ofthe City'ssewer, system background; and policy and criteria. Adata
request will beprepared based onthe meeting.
202. Data Acquisition. Prepare a data request for the required information. The request may include, but is not
limited to, the following:
• Related comprehensive sewer plans from the neighboring jurisdictions and other related plans.
w Agreements with neighboring jurisdictions.
• Neighboring/adjacent jurisdictions map, in Geographic Information System (G|S)format with current
boundaries.
w GIS data for the sewer system including City Limits, current sewer service area, urban growth area (UGA),
Aoto[ADdata for existing facilities, and interties.
• Service and Fiscal Policies related to service area and conditions of service, in MS Word. It is assumed the
City will provide language for all requested changes to policies and criteria.
• Emergency Management goals, including redundancy and reliability standards related to system
components, inK4SWord.
w The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans
and specifications for inclusion inthe Plan.
ZO3.Revise Chapter 1'introduction. Prepare arevised Chapter l Introduction based onCity direction. |tis
anticipated that any revisions will be minor. An electronic version of draft Chapter 1 will be sent to the City for
review and Consultant will address City comments in a comment response (ROC) log for the City's approval.
Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900.
To5,'( ns
• City can provide elements listed under Task 2OI.
• This task will involve updating the chapter from the 2OI3Plan.
w Nohard copy ofthe chapter will bedistributed.
roskZ00[iivDeli veozbles
l. Requested Data from Task Z0I.
DRAFT 10/14/2019
Page
ot17
61
Z. Comments ondraft Chapter l—Introduction.
Ta s k 20'Donsu/�one0vc{e l/e -
I. Draft Chapter l—Introduction.
2. ROC for Chapter I —Introduction.
3. Meeting Agendas and Minutes.
TASK 300 — FLOW MONITORING
This Task will conduct and evaluate flow monitoring to allow accurate estimates of existing and future system
flows so that the City can adequately plan to accommodate its future sewer needs. This task will include flow
monitoring of up to seven (7) locations by a Subconsultant. This task will be documented in TM No.2—Flow
Monitoring that will be included as an Appendix of the Plan. The task includes the following activities:
TA,SK3OOA[T|V|T|ES
301. Review and Update Sewer Service Area and Basins. Review existing sewer service area and basins based on
changes to parcels, collection system piping, and laterals information. It is anticipated the City will provide updated
information electronically. Update Sewer Basins and provide an updated map for City review and confirmation.
302. Identify Primary Collectors and Lift Stations. The City will identify primary collectors and lift stations for
potential flow monitoring and inclusion in the hydraulic model (Task 600). It is anticipated the collectors will be
"skeletonized" to only include pipes greater than 12-inch and 8-inch pipes needed to represent flow conditions from
sewer basins. To assist with future tasks, the City will need to provide invert elevations for the selected primary
collectors and information onLift Stations.
303. Identify Flow Monitoring Locations. Identify recommended locations in install temporary flow monitoring
devices in the gravity system at up five (5) locations to measure primary collectors and or Lift Stations south of I-
40S.Anadditiona|two(Z)flovvmonitorsnnphmarycoUectorsor|iftstationsvviUbeaddednorthnf|'4O5,as
directed by the City. Flow monitoring locations will be provided to the City to confirm their suitability for meter
installation.
3U4'Flow Monitoring ADS will provide temporary flmwmonitornguepvicesto[onsultanttocoUatthee(])
months of flow data up to seven (7). After completion of the monitoring, ADS will provide a Rain Dependent
Inflow & Infiltration (RDI/1) Analysis and an electronic report. The work will be performed in three phases as set
forth below:
a. Phase|-YNobi|ization
u' Site Locations ADS will work with the Consultant and the City toidentify/verify the seven h1
locations for monitor installations. Upon approval by the City, additional locations may be added per
the optional costs inthe budget.
a. Site Inve»tigation ' Once the installation sites are provided toADS, ADS field cevv(s)will perform
site investigations. ADS will utilize astandard two (z) person field crew for fieldwork and comply
with Federal standards for confined -space entry. The proposed flow monitoring location will be
located, inspected, and verified for hydraulic suitability. ADS will also check for debris inthe
manhole that could impact data quality and coordinate any required cleaning efforts with the City.
62
ADS field crews will look for evidence and signs oferratic flow patterns. ADS will also investigate
adjacent manholes inorder tuidentify the best monitoring locations.
I Site Reports Site reports will be generated upon completion of the site investigations. The site
reports will include a sketch of the general location, physical characteristics and diameters of the
proposed monitoring locations, manhole depths, flow measurements, and other comments
pertinent tuthe location such asany special traffic o/safety issues. Final site locations tobe
approved bvthe Consultant.
4. Equipment -ADS will utilize wireless ADS@ Model Triton+ T11 flow monitors during the course of this
project. Atypical monitor installation will include anultrasonic deothsenso/thatviUbemoontedat
the invert of the pipe, a redundant pressure depth sensor; and a Doppler velocity sensor also
mounted atornear the invert.
Monitor Activation Once installed, the monitor will beactivated and set totake readings at5-
minute intervals. ADS Field crews will take manual depth readings with a ruler and velocity readings
with a portable, instantaneous velocity meter in order to confirm the monitor is collecting accurate
data based onthe actual existing hydraulic conditions ateach location.
b. PhaseU Flow Monitoring
�. Flow Monitoring Once the monitors are installed and verified tobeinworking order, ADS will
monitor for a period of four (4) calendar months ("monitoring period"). This initial monitoring period
can be extended based on mutual consent and written agreement of additional work and price for
such additional work. Anticipated flow monitoring locations are listed in Table 1. Upon approval of
the City, the flow monitoring may be extended by up to two months per the optional costs in the
budget.
a. Data Collection and Equipment Maintenance - ADS will collect data from each monitoring location
remotely using telemetry on a daily schedule (for sites with good wireless signal). The ADS project
team will review the data weekly to ensure each monitor is running properly meeting the project
objectives as well ADS'standards. ADS Field Crews will perform site confirmations, site
maintenance which may include, cleaning the sensor(s), moving, changing or replacing any failed
component ateach monitor location.
3. Demobilization Field crews will continue data collections and confirmations (as necessary) until the
end ofthe monitoring period. Once authorized, crews will immediately begin removing the flow
monitors and deliver final data tuthe data analyst.
C. Phase III Data Editing, Analysis and Reporting
i. Data Analysis Upon completion ofthe monitoring period, atrained ADS Data Analyst will begin to
finalize the data collected for each monitoring location. The data analyst will directly calculate flow
using the continuity equation from recorded depth and average velocity data. Flow quantities as
determined bvthe continuity equation will beplotted.
z. S|i/icerRD|/|Analysis For each of the flow monitoring location, the analysis will characterize the
average dry weather flow conditions and RDI/l calculations for all significant wet weather events, an
assessment ofhydraulic performance under such conditions. The results ofdry weather and wet
weather performance will be plotted on maps of the sewer sheds to make it easier to understand
where RDI/I originates. The Shicer.com section of the Report will include the following items:
� Dry WeatherAnalysis — A characterization of the conditions observed during weekday and
weekend periods of the flow monitoring period during dry weather periods, excluding periods of
extended system recovery to previous rain events. Summarized as a time -series hydrograph of
the average diurnal flow quantities for weekday and weekend dry weather periods.
S.
Page
ofl7
63
• Dry Weather Flow Summary —A table of the Average Dry Day Flow (ADD F) and an estimation of
Base Infiltration (131). Average dry weather diurnal patterns will be provided for each flow
monitoring location during weekday and weekend portions of the monitoring period.
° Wet WeatherAnatysis — A characterization of the conditions observed during specific wet
weather events observed during the flow monitoring period, summarized as a time -series
hydrograph comparing observed flow quantities to average diurnal flow quantities for
corresponding weekday and weekend dry weather periods.
* Wet WeatherSummuty— A characterization of the conditions observed during the maximum
rain event of the monitoring period. This can be summarized as the maximum 30 minute
average peaking factor observed during the flow monitoring period.
w Wet Weather Prioritization — A column chart of the Rain Dependent Inflow/Infiltration (RDI/1)
determined for each flow monitoring location for each wet weather event. Column chart
provides a prioritized ranking based on net RDI/I (as percent rain ingress if basin acreages are
provided) or net RDI/I per linear foot of sewer per inch of rain when linear footage information is
provided toADS.
� HydozolicPorfhnnunceEvoluution—Anarotiveinterpetationofhydrau|icperfo/manceneconded
at each flow monitoring location as determined using a scattergraph of flow depth and velocity
data. The scattergraph interpretation shall evaluate the ability of each flow monitoring location
to accommodate flow quantities observed during dry weather and wet weather conditions
observed during the monitoring period.
z. _DataDe|iveryand TK4NO. z—Flow /Non�?ringSummary ADS vvi||prepare aFinal TK4toindode
e|ect/onicdata ofthe flow data intabular, hydrograph,scattergmph,and a RDy|report inelectronic
format.
z. Meeting No. a Flow Monitorina Summarv-Facilitate aworkshop with City Staff toreview the
results and conclusions drawn from the flow monitoring.
305. Rainfall Data Review. Obtain and process hourly rainfall data corresponding to the monitoring period from the
NOAASEATA[Airport weather station.
306. Flow Monitoring Data Review. It is anticipated that data will be available from up to seven (7) monitoring
locations for the 2019/2020 winter. The data quality for the events will be evaluated for each meter and reviewed
with the City. Flow monitoring data will also be reviewed to identify storm events that lead to wet weather flows in
the collection system and are suitable for wet weather model calibration. The rainfall for these specific events will be
compared with the rainfall record to assess the individual storm sizes return periods. Ideally data will be available for
three to five storms. Wet weather flows, R-Factors and 1/1 rates will be calculated for each meter or SCADA source
for up to three storm events. The flow monitoring data analysis will result in modified wet weather modeling
parameters that will beused |nthe hydraulic model.
307. Meeting No. 3 - Flow Monitoring Review. Facilitate a workshop with City staff to review the findings of the
Flow Monitoring.
308. Draft Chapter 2 — Flow Monitoring. Consultant will summarize the results of the flow monitoring and data
review in Chapter 2: Flow Monitoring. It is assumed the efforts in this Task will require a complete update of the
Chapter with all new information. An electronic version of draft Chapter 2 will be sent to the City for review and
Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will
be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900.
Task �00 Assoo!udnns
This task will require a complete update of the Chapter with all new information.
Page
of 17
64
0 No hard copy of the draft chapter will be distributed.
/c-,sk 300[iL`vDehvombles'
I. Requested Data.
I. Review ofDraft TMNu.I—Flow Monitoring.
I Review ofDraft Chapter Z—Flow Monitoring.
I. Draft and Final TMNo.I—Flow Monitoring.
2. Draft Chapter Z—Flow Monitoring.
3. ROC for Chapter Z—Flow Monitoring.
4. Meeting Agendas and Minutes.
Tnsk3i-)i)8�«e�Tgs
* Meeting No. 3—Flow Monitoring Review.
TASK 400 — FLOW PROJECTIONS
The objective of this task is to develop the sewer flow projections for the sewer service area for the current (2019),
lO-year,and build -out (maximum density) scenarios. Sewer flows will bebased onthe flow monitoring inTask
300 and the City's demographic projections. A new hydraulic model will be created and used to estimate future
wet weather flows. The model will include the developed area south of 1405 and up to two (2) sewer basins north
of4O5. This will not be an all pipe model of the system. The information developed in this task will become
Chapter Flow Projections. This task includes the following activities:
TASK 4OOA(__TiV|T|E,S
401 Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the
project. The City will provide:
• Current Nprogram.
• Summary of|/|projects completed since the 2Ol3Plan.
• Sewer connections bycustomer class.
• Sewer conservation flow reduction rate.
• Map with direct connections toKing County wastewater system.
• Data on number, horsepower, capacity, design point for all pumps at the City's Lift Stations.
• Lift Stations runtime.
• City Planning Department existing and future populations and employment based on PSRC's 2040 Vision
demographic projections and more current planning for the service area. These growth rates for the 10-
yearscenariowiUbeconsistentwiththe[omprehensiveVYaterP|an.
* GIS Data: land use, zoning data within the City Limits, sewer service area and UGA. It is assumed that
these data will beprovided in6|Sformat.
w G|SData: existing facilities (pipes,manholes, lift stations, connections with King County, etc),and
interties.
65
4OZ.Update Service Area, Land Use, and Zoning. Basedon[ityp/ovideddata update mapping and
descriptions of existing and future service areas, land use, and zoning for the City Sewer Service Area. The Plan
will include both figures and text.
403. Demographic Projections. Allocate the existing and 10-year and build -out projection of sewered population
and employment provided by the City Planning Department to Sewer Basins. The 10-year growth rates will be
consistent with the Comprehensive Water Plan. The build -out projections are anticipated to be based on
Comprehensive Plan land use.
404. Design Storm. A design storm has been developed from a long term historical rainfall record at a number of
sites near the City. Rainfall data from the ongoing city monitoring program will be reviewed and evaluated to
determine if the design storm previously identified for wet weather flow modeling should be revised. The more
recent data will also be used to evaluate any local rainfall variability and trends. This review will be prepared to
prooidetheCityvvithadefensib|e^Design"sto/mthatemo|ates|oca|vveatherpatterns
405. Develop Existing Dry Weather Flows by Basin. Utilize existing land use maps to develop or confirm average
dry weather flows (ADWF) for the modeled sewer basins. The flows will be confirmed with the flow monitoring
data as well as the available flow data from the lift stations. Existing land use and currently served areas will be
used to estimate flow factors per acre per land use category. The flow factor will be customized to match the
observed existing ADWIF and will be used to develop flow projections. For basins without measured flow data,
flow factors will be assigned from a measured basin with similar land use characteristics.
406.Deve|op 10-year and Build -out Dry Weather Flows by Basin. The City's comprehensive plan and any
additional information on housing densities, commercial and industrial uses will be used along with the flow
factors developed in the above task to determine the ultimate development acreage and the ADWIF for build -out
conditions for uptosewer collection system.
407. Create Hydraulic Model. Using the most recent information from the City's GIS data, create a sewer system
hydraulic model using Innovyze lnfoSWIVIM software. The model will include the developed area south of 1405 and
up to two (2) sewer basins north of 40S. The model will include lift stations and primary collectors, and does not
include the laterals, branches, or smaller truck sewers serving individual parcels within the basins. The City's
existing GIS ArcView ".shp" files will be used to import the collection system data into the hydraulic model. If not
available in the G|S, the City will provide invert elevations at key locations to construct the model. Add |nft station
controls provided by the City to simulate realistic lift station operation. Estimate likely boundary conditions at
connections King County transmission mains, asrequired.
The up to seven (7) basins associated with flow monitoring will be further divided into mini -basins for sanitary and
wet weather loading in the model. These mini -basins will group parcels that contribute to common branches and
trunks, and will beconnected tothe modeled primary collector orlift station atthe appropriate location.
408. Meeting No4 - Hydraulic Model Creation.. Facilitate a meeting with City staff to review and confirm the
elements of the hydraulic model. City staff may be requested to perform field verification of model elements
based on this meeting.
409. Calibrate Existing Dry Weather and Wet Weather Flows. The existing dry and wet weather flows will be
calibrated based upon the flow monitoring data, and rainfall data provided by the City as well as additional data
available from the [ity's S[ADAsystem for optoseven (7) locations inthe collection system. Existing flow depths
and velocities will also bechecked and calibrated.
The first step istocalibrate the model todry weather flow conditions. Flow monitoring data will provide custom
hourly diurnal curves that establish the daily flow patterns for each metering basin. Model results will be
compared to measured flows to check for agreement between model results and measured flows. Model
parameters will be adjusted, as needed, to best match the flow monitoring and SCADA data. It is assumed that
the City will provide SCADA data in electronic format.
Page
ot17
66
Once the dry weather calibration is completed, the wet weather calibration is conducted. Rainfall information will
aid in developing the required rainfall -derived infiltration/inflow (RDI/1) estimations that enter the collection
system during a storm event. Wet weather calibration consists of using three storms that occurred during the flow
monitoring period. It is recommended that the use of a single calibration period incorporating a number of
independent rainfall events should be considered whenever possible. Model results will be reviewed and adjusted,
asneeded, tobest match the flow monitoring, rainfall and SCADAdata.
The flows from unmetered basins will be developed as best possible using a mass balance between the available
data, and proportioned as best as possible based on development type, age, pipe material, and extent of
collection system components.
The hydraulic model will be calibrated in accordance with international modeling standards. The Urban Drainage
Group from the Chartered Institution of Water and Environmental Management (CIWEM) has established
generally agreed upon principles for model verification. The dry weather and wet weather calibration will focus on
meeting the recommendations on model verification contained in the "Code of Practice for the Hydraulic
Modelling of Urban Drainage Systems," published by CIWEM (November 2017).
410. Meeting No. 5 - Model Calibration. Consultant will conduct a workshop (Meeting No. 5) with the City to
summarize the model calibration results. Consultant will present the model calibration results for both dry and
wet weather scenarios, Summary tables will be presented that quantify the percent difference between the
measured data and the modeling results. Consultant will discuss calibration standards and confidence levels at the
workshop.
411. Hydraulic Model Creation and Calibration TM No.2. Consultant will summarize the model creation and
calibration in a Draft and Final TM. Anelectronic version ofdraft TK8will besent tothe City for review and
address City comments in a Final TM that will be included as an Appendix to the Plan.
412. Develop Existina. 10-vearm and Build out Wet Weather Flow. The calibrated model will be used to
determine the existing, 10-year, and build out flows peak wet weather flows for the sewer service area. Wet
weather flows will bebased onthe selected design storm.
413. Reclaimed Water. As required by Ecology, reclaimed water opportunities will be updated. The City currently
uses reclaimed water from King County's South Treatment Plant. The City's current use and potential future
customers will be summarized based on information provided by the City. No new analysis is anticipated for this
effort.
413.Draft Chapter 3— Flow Projections. Consultant wi I I summarize the sewer flow projections in Chapter 3: Flow
Projections. It is assumed the efforts in this Task will require a complete update of the Chapter with all new
information. Anelectronic version ofdraft Chapter 3will besent tothe City for review and address City comments
in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the
City Review Draft Plan.
Task 400Assumpdons
° City can provide elements listed under Task 4OI.
• This task will require a complete update of the Chapter with all new information.
* Nohard copy ofthe draft chapter will bedistributed.
* The model will include the developed area south of 1405 and the primary interceptors north of 405. This
will not beanall pipe model ofthe system.
of17
67
I. Requested Data.
2. Field verification ofmodel elements, asrequired.
3. Comments onTK4No. Z—Hydraulic Model Creation and Calibration
4. Comments onChapter ]— Flow Projections.
b�es
I. Draft and Final TMNo. 2—Hydraulic Model Creation and Calibration.
2. Draft Chapter 3—Flow Projections.
l ROC for Chapter 3—Flow Projections.
4. Meeting Agendas and Minutes.
7osk�G,0
I- Meeting No. 4—Hydraulic Model Creation.
2. Meeting No. 5—Hydraulic Model Calibration.
TASK 500—EXISTING SYSTEM
The objective of this task is to summarize the existing sewer system facilities and components including lift
stations, and interties.This task includes the following activities:
TASK 50OA[T|V|T|E�
501. Meeting No.6 - 2013 Chapter Review. Facilitate a meeting to review and identify updates needed to
Chapter 4 — Existing System. A data request will be prepared based on the meeting.
5O2.Data Acquisition. A data request will be provided for required information for this task. The request may
include, but is not limited to, the following:
w Data onpipeline materials and age bylinear foot, as available.
w Existing renew and replacement program.
• Summary ofimprovements completed since the 2OI3Plan.
• S[ADAdata for sewer system.
503.Uodate Existing Sewer System. Update the components of the major sewer collectors and pump stations
using City provided information. This may include changes to boundaries of sewer service basins, lift stations and
force mains, and the total length of pipe based on diameter and material. Summarize improvements to the City's'
wastewater collection system that have been completed since the 2013 Plan. Develop new system map.
504. Draft Chapter 4 — Existing System. Consultant will summarize the existing system in Chapter 4. An
electronic version of draft Chapter 4 will be sent to the City for review and address City comments in a comment
response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review
Draft Plan.
Task 500Assurmo t,ior?
• City can provide elements listed under Task 5U2.
• This task will involve updating the chapter from the 2Ol]Plan.
• Nohard copy ofthe chapter will bedistributed.
o{oh/es
DRAFT -1O/14/J019 Page11
ofl7
68
l. Requested Data
l. Comments onChapter 4—Existing System.
I. Draft Chapter 4—Existing System.
Z. ROC for Chapter 4—Existing System.
l Meeting Agendas and Minutes.
4. System Map —AppendixE
TASK 600—CONVEYANCE SYSTEM ANALYSIS
The objective of this task is to evaluate the capacity of the conveyance system to convey existing and future flows
during the [ity'sdesign storm. This task will form the basis for [600terS Conveyance System Analysis ofthe Plan.
The capacity assessment will be conducted for the collection system included in the hydraulic model and at lift
stations. This task will develop recommended improvements to the system in support of a CIP for 10-year and
build -out scenarios. This task includes the following activities.
TA5������-R�)T>_S�
GUl.[olection System Analysis. After the model has been calibrated, the design storm will be routed through
the modeled collection system capacity to evaluate capacity during existing, 10-year and build -out conditions.
Evaluate capacity deficient segments and identify bottlenecks or other system limitations. Identify improvements
to resolve deficiencies using the hydraulic model. All improvements will be confirmed using the hydraulic model.
GUI Lift Station Capacity Analysis. Evaluate the existing lift stations capacity based on flow estimates for the
design storm. The current performance of the existing lift stations, as provided by the City, will be compared to
the modeled peak flows to confirm capacity during the existing, 10-year, and build -out scenarios. Required
opgrade$modif i cations will be recommended, as necessary, to address lift station capacity deficiencies.
603. Meeting No. 7 - Capacity Analysis. Facilitate a meeting with City Staff to review the results of the collection
system and Lift analysis, aswell asinitial recommended improvements.
604. Lift Station Operational Analysis and Meeting No.8. Conduct a high-level evaluate up to three existing lift
stations operational and hydraulic performance to determine if improvements are needed to the Lift Stations.
The evaluation will focus on hydraulic capacity, redundancy, facility reliability, and operational considerations,
such as wet well sizing. Conduct a site visit of the selected Lift Stations (Meeting No. 8) to document existing
infrastructure (Assumed half day site visit). Formulate conceptual Alternatives to address identified issues.
Planning level costs, technical considerations and operation and maintenance issues will be compared to develop
a recommended alternative. Results of this task will be incorporated into the CIP.
605. Draft Chapter 5 - Conveyance System Analysis. Chapter 5 will document the conveyance system analysis
including the recommended improvements to the system. It is assumed the efforts in this Task will require a
complete update of the Chapter with all new information. An electronic version of draft Chapter 5 will be sent to
the City for review and address City comments in a comment response log for the City's approval. Comments will
beincorporated mtothe Chapter aspart cfthe City Review Draft Plan.
Iask600 Asso
* City can provide any data requested.
DRAFT 19 Page1Z
otl7
69
° This task will require a complete update of the Chapter with all new information.
° Nohard copy ofthe chapter will bedistributed.
l. Requested Data.
2. Comments on Chapter S— Conveyance System Analysis.
T�5/,_500[ors,Ion�DeWerobies
l. Draft Chapter S—Conveyance System Analysis.
I. ROC for Chapter 5—Conveyance System Ana|ysi».
l Meeting Agendas and Minutes.
l Meeting No. 7—Conveyance System Analysis.
4. Meeting No. 8—Lift Stations Site Visit.
TASK 700 —OPERATION AND MAINTENANCE
The objective of this task is to assure satisfactory management of sewer system operations. Itwill provide an
overview ofthe sewer system responsibility and authority, system operation and maintenance plan, equipment
supplies and inventory, and emergency response. The City may need to update its existing emergency response
plan that will beincluded asanappendix tothe Comprehensive Plan. This task includes the following activities:
TA 5 K7O0ACT|V|T|E'S
7D1.Meeting No. 9—O&M Chapter Review. Facilitate ameeting toreview and identify updates needed to
Chapter 6—O&k4.Adata request will beprepared based onthe meeting.
702. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the
project. The City will provide:
w Copy ofthe organization chart.
• Copy ofthe FOG control program.
• Copy ofthe overflow emergency response plan.
• Current operations and maintenance program activities.
703. Collection System and Lift Station Condition and Maintenance Summary. The City's reported condition
and maintenance problems will be summarized. Review basins identified with high 1/1 for potential causes of 1/1
including history of repairs, and pipe age and material. Discuss 1/1 causes with City operation staff.Review the
existing |/|program. Summarize completed projects. Identify or update 1/1 reduction goals, Document pipes with
known maintenance issues, such as accumulation of solids, FOG build up, or root intrusion. A GIS map will be
created, identifying the location of these pipe segments. General pipe replacement timing based on Remaining
Useful Life will be based on prior analyses. Document City concerns with condition or maintenance of Lift
Stations. No site visits will be completed during this task. information for this task will be provided by the City
electronically orduring Meeting No.7.
704. Update Chapter 6 — Operations and Maintenance. Update Chapter 6 based on information provided by the
City. This may include updates to organization chart, certification, and collection system and lift station
maintenance, O&M program activities, and known major deficiencies in the City's operation and maintenance
DRAFT 19 Page13
of 17
70
(O&M) programs. This task does not include a FOG ordinance or program, overflow emergency response plan, a
detailed O&M Manual, or maintenance management system. A detailed evaluation of City O&M programs will
not be conducted. An electronic version of draft Chapter 6 will be sent to the City for review and address City
comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as
part ofthe City Review Draft Plan.
7usk7 0 0 A s _-- u i o n si
• City can provide elements listed under Task 7O2.
° This task will involve updating the chapter from the 2Ol]Plan.
• Nohard copy ofthe chapter will bedistributed.
Tusk 7V0!��De1ivemNc;
l. Requested Data from Task 7O2.
I. Comments onDraft Chapter 6—Operations and Maintenance.
l. Draft Chapter 6—Operations and Maintenance.
2. ROC for Chapter 6—Operations and Maintenance.
I Meeting Agenda and Minutes
Meeting No. 9 — 2013 Chapter Review.
TASK 800 — CAPITAL IMPROVEMENT PLAN
This Task will summarize the recommended improvements for the conveyance systemand|Utstatinnsin
accordance with the City's Policy and Criteria. This task will develop Chapter 7 Capital Improvement Program for
the Plan. Total project costs will be developed for each recommended improvement and ranked by priority. This
task includes the following activities:
DD1.[|PProjects. Identify and describe [|Pprojects from prior tasks and existing City planning. Prepare a
description ofeach project.
8DZ.Cost Estimates. Develop planning level cost estimates for all recommended projects using costs provided in
other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be
prepared; all costs will begiven in2OI9dollars.
803. Prioritization. Prioritize condition -related and capacity -related projects identified in the previous tasks for
inclusion inthe OPinto IVyear and long term scenarios
804. Meeting No. 3.0 — CIP Review. Facilitate a meeting with City staff to review and verify CIP projects, costs and
prioritization
805. Electronic CIP. Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each
project will belisted onaseparate tab including project de»cdption,justification,estimatedcost,and
recommended year for implementation. City staff will be provided the ability to adjust indirect costs and
escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets
will be included as an appendix. The Consultant will train City staff on using the CIP Tool.
DRAFT' 19 Page14
of 17
71
8O6.Financial Summary, Summarize Sewer Utility financial information per WAC requirements. City to provide a
discussion cost per service in terms of both debt service and operation and maintenance costs, of all exisUng
facilities. Carollo will estimate additional costs for future facilities recommended during the planning period. This
summary does not include an analysis of rates, connection charges, or methods to fund the recommended CIP.
D07.Meeting No. 11—Financial Review. Facilitate ameetings with City Staff toreview the financial summary
and update priority ofOPprojects, asrequired.
DOD.Draft Chapter 7. Prepare Chapter 7 Capital Improvements Plan, including adescription ofcost estimating
methods, project analysis, final recommendations, summary table, and system maps with the location of
recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter
with all new information. An electronic version of draft Chapter 7 will be sent to the City for review and address City
comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as
part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed.
Task800Assu�2��I�
° City can provide any data requested.
w This task will require a complete update of the Chapter with all new information.
* Nohard copy ofthe chapter will hedistributed.
l. Requested Data.
2. Comments on Chapter 7 —Capital Improvement Plan.
Lgs—k Deliverables
1. Draft Chapter 7— Capital Improvement Plan.
2. ROC for Chapter 7—Capital Improvement Plan.
* Meeting No. lO—Capital Improvement Plan.
° Meeting No. II — Financial Review.
TASK 900 — PLAN PREPARATION
This Task will include the compilation ofall previous tasks, [aroUowill prepare afina|[omp/ hensiveSewerP|an
that is the compilation of the chapters that have been created as a part of the project, with revisions based on
feedback provided bvthe City throughout the project. The[omprehensiveSevverP|anwiUmomp|yvvithVVA[l7]'
240'OSO.Thistask|ndodesthefo||ovvingactivities:
"TASK 9N}A[T|WT|E5
901. Executive Summary, Carollo will prepare an executive summary, summarizing each element of the
Comprehensive Plan.
902. Prepare Staff Review Draft. Incorporate comments from draft chapters. Compile Chapters and develop
Technical Appendices. Prepare review draft document for City Staff in one (1) notebook binder copies and an
electronic copy.
9O3.Meeting No. 1Z—Staff Review Draft. Meet with City todiscuss comments onthe Staff Review draft Plan.
Comments tobeincorporated into SEPA/AgencyReview Draft.
DRAFT- 19 Pa8e1S
nt17
72
9O4.Meeting No. 1]—Council Review. Assist the City in presenting the findings of the Plan to Council. Carollo
will prepare a power point summarizing the Plan's key points and attend the Council session to support City Staff.
Itisanticipated the Council presentation will beno|ongerthan3Ominutes.
905. Prepare Agency Review Draft. Prepare three (3) hard copies and one electronic version forthe City to
distribute for agency review. This task assumes the City will lead the Agency Review process. The City will
complete the SEPA review process and obtain approval during the Agency Review period. Carollo will assist City
in responding to written comments by regulatory agencies, neighboring jurisdictions, and the public, including no
more than three letters. No meetings are anticipated for this task. Additionally, no majorp|anevi»ionsare
included inthe scope based onAgency Review comments.
906. Meeting No. 14 — Agency Review Comments. Meet with City to discuss comments on the Agency review
comments. Aresponse tocomment log will beformulated based onthe meeting.
907. Prepare Final Comprehensive Sewer Plan. Incorporate final comments based on agency reviews, as
requested by the City. Provide City with three (3) signed and stamped Final Comprehensive Sewer Plans and one
electronic version for the City's use. This task assumes only the documents above will be developed for the Plan
approval and any other interim draft plan documents are considered out of scope.
�sk
I. City Comments.
2. Public and Agency Review Comments.
Tnsk, 900[onsv/tontDeKvembies
l. Executive Summary.
Z. City Draft Plan — One PDF.
l AgencyDraftP|an—ThreehardoopiesandonePDF.
4. Final Plan —Two hard copies and one PDF.
S. Comment Response Log.
° Meeting No. l2—Staff Review Plan Review.
w Meeting No. I3—Coond| Review
w Meeting No. I4—AgencyReview Comments.
DRAFT 19 Page 16
of17
73
Compreheri�!Ve�5,4hiia��,St%w�r Plan',
;�x��x��e/�m-���
Meeting No. I Kick-off Meeting
Meeting No. 2
Meeting No. 3
Meeting No. 4
Meeting No. 5
2013 Chapter 1 Review
Demographic Analysis Meeting
Flow Projections and I&I Evaluations
Existing System Review
Meeting No. 6 System Analysis
Meeting No. 7 Operations and Maintenance Chapter Review
Meeting No. 8 Capital Improvement Plan
Meeting No. 9 Financial Review
Meeting No. 10 Plan Review
�4�
DeliverableNn+016,(ifppnfieab el,
Project Management Plan
All Meeting Agendas & Minutes
Monthly Progress Reports (with invoices)
Data Request Spreadsheet
Draft and ROC for Executive Summary
Draft Chapter and RO
Draft Chapter and RO
_
Draft Chapter and RO
[ for Chapter l—Introduction Revision ofchapter from 28l3Plan
[ for Chapter 2—Demographic Analysis Full chapter update
[ for Chapter 3—Flow Projections Full chapter update
Hydraulic Mod e|
Draft Chapter and ROC for Chapter 4 — Existing System
New
Draft [hapterandRO[for[hapterS—Sys��mAnak�a
Draft Chapter and ROC for Chapter 6—Operations &Maintenance
Draft Chapter and ROC for Chapter 7 —Capital Improvement Plan
City Draft Plan
Agency Draft Plan
Final Draft Plan QAll Electronic Files
Revision of chapter from 2013 Plan
Full chapter update
Revision ofchapter from 2813Plan
Full chapter update
_
of17
�
74
Task 200 - Introduction
201 IMeefing No. 2 - 2015 Chapter 1 Review
202 'Data Acquisition
203 'Revise Chapter 1 - Introduction
204 Create New Chapter 3 Policies and Criteria
Task 400 - Demographic Analysis and Demand Pro
401 Data Request
Demographics Analyst
Demand Projections
EXHIBIT C, Cost Estimate
Water System Plan Update
2 4
2
Meeting No. 4 - Demographic Analysis and
Demand Projections 3
Demand Model
Create Draft Chapter 4 - Demographic
406 Analysis and Demand Projections 4 2
Subtotal - Task 400
pwA\10-PW-INT_Carollo.local:Carollo \ Documents \Client \ WAVukwile \_Proposals \Tukwila WSP Budget.xlsx
17
2
24
40
4 1
8
24
4 4
20 5
City of Tukwila
December 2016
Total Carollo Labor
Hours Cost
10,080
1,378
1,151
8,370
20,979
1,151
1,428
894
2,718
6,191
OTHER DIRECT COSTS
Travel and
Printing
PECE
$12.00
TOTAL COST
Total ODC
756 $ 756
120 $ 120
96 $ 111
540 540
1,512 $ 1,527
$ 15 $ 96 $ 111
$ - $ 120 $ 120
$ 84 $ 84
240 $ 240
540 $ 555
1,151 1$ 15 $ 96 $ 111
1,252 $ - $ 108 $ 108 $
10,836
1,498
$ 1,262
8,910
22,506
1,548
978
1,360
2,836 $ - $ 252 $ 252 $ 3,088
15 $ 456 $ 471 $ 5,710
880
4,616
7,080
1,151
1,408
5,252
20,387
72 $
408 $
624 $
96 $
120 $
72 $
408
624
952
5,024
7,704
120 $
1,262
1,528
- $ 456 $ 456 5,708
15 $ 1,776 $ 1,791 $ 22,178
DRAFT
1 of 4
EXHIBIT C, Cost Estimate
Water System Plan Update
PM
TASK / DESCRIPTION
DLR
QM
LRK
PE
AT
Staff Prof
NLR
GIS
Varies
WP
Varies
Total
Hours
OTHER DIRECT COSTS
TOTAL COST
PECE
Carollo Labor Travel and
Cost
Printing
$12.00 Total ODC
Total Labor Rate
$ 176
$ 226
$ 152
$ 132
$ 137
$ 95
Task 500 - System Analysis
501 Data Request
1
2
6
$ 440 $ - $ 36
$
$ 108 1 $
$ 36 $
1,410
516
•
3$
480 $ - $ 36
$ 36 $
516
6$
2,528 $ - $ 192
$ 192 $
$ 36 $
$ 96 $
2,720
• Desktop Analysis -Pump Station Analysis
1
2
$ 480 $ - $ 36
516
507 Desktop Analysis -Limiting Factor Analysis
2
6
$ 1,264 $ - $ 96
1,360
508
11$
49
1,909 $ 15 $ 132
$ 147 $
2,056
509
$ 6,928 $ - $ 588
$ 588. $
7,516
510
16
40
23
40
8
860
.
$ 276 '.3,564
$ 480
"'
511
II ll
16
3,288 $ $ J_. 276
5,872 1$ - $ 480
�Ydentitiication of Wafer Improvement Projects24
Meeting No. 6 - System Improvements
513 'Workshop4
514 'Draft Chapter 5 -System Analysis
1
1,151$ 15 $ 96
$ 1i1
• $ $ 576
$ 576 $
7,544
r $ 30 $ 3,576
$ 3,606
Task 600 - Water Use Efficiency
zl
601 IDataAcquisition
r
602 _Revise Chapter 6 -Water Use Efriciency
Subtotal - Task 600
t
I
$ 300
�: F
III
Task 700 - Water Quality
�Q
e •
r
$ - $ 300
3 968 $ - $ 324
300
$ 324
r !Revise •
I Subtotal - Task 00
2
18
Task 800 - Operation and Maintenance
3
8
3
nn
1,342
516
1,956
3,964
7,778
Meeting No. 7 - Operation and Maintenance
801 [Chapter Review
4
1
$ 1,231 $ 15 $ 96
$ 480 $ - $ 36
$ 111 $
$ 36 $
$ 144 $
$ 300 $
802 !Data Acquisition
1
2
803 !Summarize RUL
2
2
6
16
28
0
4
12
25
48
$ 1,812 $ - $ 144
$ 3,664 $ - $ 300
804 (Revise Chapter 7 - Operation and
Maintenance
1
2
6
4
5
I Subtotal - Task 800
8
1
$ 7,187 $ 15 $ 576
$ 591 $
pw:\\IO-PW-INT Carollo.locaLCarolio\Documents\Client\WA\Tukwila`Proposals\Tukwila WSP Budget.xisx
City of Tukwila
December 2016
DRAFT
2 of 4
TASK / DESCRIPTION
EXHIBIT C, Cost Estimate
Water System Plan Update
PM QM PE Staff Prof GIS WP
DLR LRK AT NLR Varies Varies
Total Labor Rate $
Task 900 - Capital Improvement Plan
901 CIP Projects with Triggers
902 Cost Estimates
903 Prioritization
904 Electronic CIP
905 Meeting No, 8 - Capital Improvement Plan
906
Create Draft Chapter 9 - Capital
Improvement Plan
Subtotal - Task 900
pw:\\10-PW-INT.Carollo,local:Carollo\ Documents \Client\WA\Tukwila proposals\Tukwila WSP Budget.xlsx
176 $ 226__$ 152 $ 132 $ 137 $ 95
City of Tukwila
December 2016
Total
Hours
31
19
14
11
Carollo Labor
Cost
4,550
OTHER DIRECT COSTS
Travel and
Printing
4,550', $
2,886 $
1,956
1,829
5,956 $
21,727
15
PECE
$12.00 Total ODC
372
372
228
68
504 $ 504
15 S ' 1,776 $ 1,791
TOTAL COST
4,922
4,922
$ 3,114
2,124_i
$ 1,976
$ 6,460
23,518
DRAFT
3 of 4
EXHIBIT C, Cost Estimate
Water System Plan Update
TASK / DESCRIPTION
PM QM PE Staff Prof GIS WP
DLR LRK AT NLR Varies Varies
Total
Hours
Total Labor Rate $ 176 $ 226 $ 152 132 137 $ 95
OTHER DIRECT COSTS
Carollo Labor
Travel and
Cost
Printing
PECE
$12.00 Total ODC
TOTAL COST
Task 1000 - Financial Plan
10001 'Meeting No. 9 - Financial Plan
Review and Format Draft Chapter 10 -
10002 Financial Plan
Subtotal - Task 1000
3
3
1,206 $
8 1 6 15 2,204 $
11 4 0 0 0 6 21 3,410 $ 1
15 $ 72 $ 87 $ 1,293
180 $
180 1 $ 2,384
252 267 $ 3,677
Task 1100 - Plan Integration
1101 'Executive Summary
1102 City Draft Plan
6
12
6 12
2 24 4 16 58
1103 'Meeting No. 10 - City Draft Plan
1104 !Agency Draft Plan
1105
3
12
Meeting No. 11 - Commission / Public
Review
1106 IFinaIPIan
Total
°3 PwAVO-MdfuTtaKgloimaWamMG u
MsICBe
Subtotal - Task 1100
AWA\ Tukwila \_Proposals \Tukwila WSP Budget.xlsx
8 2
4
24
16
1 8
12 66
1 27
1,848 144 $ 144 $ 1,992
7,652 $ - $ 696 $ 696 $ 8,348
1,151 $ 15 $ 96 $ 111 $ 1,262
9,480 $ 1,500 $ 792 $ 2,292 $ 11,772
4,067 $ 15 $
324 339 $ 4,406
8 4 12 4 12 40 5,288 1,000 480 $ 1,480 $ 6,768
49 8 10 86 16
42 211 29,486 $ 2,530 $ 2,532 $ 5,062 $ 34,548
City of Tukwila
December 2016
$ 166,132
$ 2,666 $ 13,644, 16,309
DRAFT
4 of 4
EXH|8ITA
CITY QFTUKW|LA
DRAFT SCOPE CJFSERVICES
COMPREHENSIVE SANITARY SEWER PLAN
The following is a scope of work for the Comprehensive Sanitary Sewer Plan (Plan) for the City of Tukwi [a. The
Plan will be completed by Carollo Engineers. However, some tasks and task elements will require the participation
of City staff from the Planning, Finance, and Public Works Departments. This scope is developed to describe the
content and purpose of the Plan, determine tasks to be completed for the update of the previous plan, and
identify the resources necessary toaccomplish those tasks.
The Plan will be based on the Washington Administrative Code (WAQ 173-240-050 standards. The plan will
include a future flow projections, system analysis, and a capital improvements plan (CIP) for existing (2019), 10-
year,andboUd'ootscenarios.The20I3 Sewer System Plan Update ([aro||o)will beused asthe basis for this
scope ofwork.
l. Carollo Engineers, Inc. and its subconsultants will be referred to as "Consultant" in this document.
I. TheCityofTokwi|aandi1sstaffvv|Ubereferredtoas^[ity~inthisdocument.
3. All meetings will be held atCity offices.
4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or
secure file transfer.
S. City comments on draft chapters will be documented in the Project Comment Response Log by the
Consultant. The Consultant will prepare responses toaddress the comments inthe Comment Response
Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency
Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be
produced upon City required.
6. The Consultant will prepare an agenda, presentation materials, and document discussions, including
action items and decisions, for Consultant -led meetings. Meeting notes and related materials will be
transmitted electronically in K4SWord and PDF formats via email.
7. The City will print and produce additional copies of all documents as necessary for its use.
8. The City will provide available information related to the project and as requested by the Consultant in a
timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to
Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as
required; furnish to Consultant services of others required for the performance of Consultant's services
hereunder, and Consultant shall be entitles to use and rely upon all such information and services
provided by the City or others in performing Consultant's services under this Agreement.
Page
of 17
79
Executive Summary
[hapterI: Introduction
'----
[hapter2: Flow Monitoring
1:v����&i������������,!
Chapter 3: Flow Projections
Chapter 4: Existing System
Chapter 5: System Analysis
Consultant
Consultant
Chapter 6: Operations and Maintenance
Chapter 7: Capital Improvement Plan
Consultant
Consultant
Consultant
[onmhom
Consultant
Consultant
Appendix A: StataEn�mnment Environmental [heckistandDetenninadonofNon'Sign�canoe [�y
_
AppendixB: Agency Review and Comment Letters City
AppendixC: Adopting Resolution [hY
AppendixD: King[ovntyVVTDConveyanceAgeement City
AppendixE: System Map with Detailed Pipe Consultant
Tomeet the objectives ufthis Scope ofServices, the Consultant shall complete the tasks assummarized inthe
table below and discussed in detail in the text that follows.
Task1OO
Task2OU
Project Management
Introduction
Task300 Flow Monitoring
_--
Task____________
4UO Flow Projections
--------------- --
Task 5U0 Existing System
Task 60 System Analysis
Task 700 Operation and Maintenance
Task 800 Capital Improvement Plan
Task 900 Plan Preparation
The scope of services for the above project will consist of the following tasks.
TASK I0Q—PROJECT MANAGEMENT
DRAFT-C/�����
80
This task includes routine management activities, submittal of monthly progress reports, and overall coordination
and assistance. It is anticipated that the Project will be complete by December 2020. Project timeline
modifications may require project hour and budget modifications. This task includes the following activities:
101. Monthly Progress Reports. This sobtaskincludes production and implementation ofthe project plan,
schedule, and budget. Assist the project team members in the implementation of the task items, reviewing the
work -in -progress reports. Prepare and submit monthly activity reports showing current projectgatosand
identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An
electronic version ofthe monthly progress reports will besent tothe City for review and approval. This task
assumes that no hard copy of the monthly progress reports will be distributed.
1O2Project yNanagemnentP|an.Pepa/eaPro/ect&1anagementP|an(PMP)thatdescribesde|iverab|es,P|an
outline, anticipated meetings, project ro|esandresponsibi|ities,Ustscontactinformationforthep/ojectteam,
describes communications protocols, quality management, and includes the scope of services, schedule, and
budget. Quality Management includes, but is not limited to, the following elements:
° Project Manager overview of all primary documents to verify technical consistency and compliance with
contract requirements.
m Organization of the work into logical deliverables with qualified staff for each task assigned to the work.
w Resolution of all review comments with a memorandum summarizing key comments and the manner in
which each was addressed inthe work.
An electronic version of the Project Management Plan will be sent to the City for review and approval. This task
assumes that nohard copy ofthe Project Management Plan will bedistributed.
103. Meeting No. I — Kick-off Meeting. Facilitate a kick-off meeting to review project management and initial
data requests.
1O4.Client Coordination.
• Manage the consultant project team totrack time and budget, work elements accomplished, work items
planned for the next period, manpower, scope changes, time and budget needed to complete the project.
° Create and maintain a working project schedule based on the schedule in the PMP.
m Review project status, including scope, budget, and schedule.
• The PMP will be updated with full incorporation of review comments afterthe City review of the draft PMP.
• The total length ofthe project isl4months.
• City provides required documents for appendices.
TuskI07
I. Team member contact information.
l PK4Preview for completeness.
l Receive, review, and process Consultant invoices inatimely manner.
4. Respond todata requests inatimely manner.
TuskI00
I. Draft request list.
Z. Draft Plan outline.
Page
nfl7
81
3. D/atPMP.
4. Final PK8P.
S. 14 monthly progress reports and invoices.
v Meeting No. I — Kick off Meeting.
TASK 200— INTRODUCTION
This task includes basic information that will serve asafoundation for developing acomprehensive p/ogramto
meet current and projected future sewer system needs. This task will develop Chapterl Introduction. The task
includes the following activities:
TASK 2OOi",-7|V>TiE�
201. Meeting No. 2 - 2013 Chapterl Review. Facilitate a meeting to review and identify updates needed to
Chapter I — Introduction. This may include: related comprehensive sewer plans from the neighboring jurisdictions
and other related plans; recent history ofthe [ity's sewer, system background; and policy and criteria. Adata
request will beprepared based onthe meeting.
202. Data Acquisition. Prepare a data request for the required information. The request may include, but is not
limited to, the following:
w Related comprehensive sewer plans from the neighboring jurisdictions and other related plans.
• Agreements with neighboring jurisdictions.
w Neighboring/adjacent jurisdictions map, in Geographic Information System (GIS) format with current
boundaries.
• G|Sdata for the sewer system including City Limits, current sewer service area, urban growth area (U6A),
Aoto[ADdata for existing facilities, and interties.
° Service and Fiscal Policies related toservice area and conditions of service, in MS Word. It is assumed the
City will provide language for all requested changes to policies and criteria.
= Emergency Management goals, including redundancy and reliability standards related to system
components, inK4SWord.
w The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans
and specifications for inclusion inthe Plan.
IO3.Revise Chapter 1'Introduction. Prepare arevised Chapter l Introduction based onCity direction. |tis
anticipated that any revisions will be minor. An electronic version of draft Chapter 1 will be sent to the City for
review and Consultant will address City comments in a comment response (ROC) log for the City's approval.
Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900.
Tosk20OAssonolobbns
* City can provide elements listed under Task 202.
° This task will involve updating the chapter from the ZOl3Plan.
° Nohard copy ofthe chapter will bedistributed.
1. Requested Data from Task 202.
DRAFT '1G
Page
of 17
T,&_wP~p—,/***°��SP S-p,
82
2. Comments ondraft Chapter 1—Introduction.
7�s�20�[onsv/�on��
I. Draft Chapter I —Introduction.
2. ROC for Chapter l—Introduction.
l Meeting Agendas and Minutes.
* Meeting No. 2—IOI3Chapter Ireview.
TASK 300—FLOW MONITORING
This Task will conduct and evaluate flow monitoring to allow accurate estimates of existing and future system
flows so that the City can adequately plan to accommodate its future sewer needs. This task will include flow
monitoring of up to seven (7) locations by a Subconsultant. This task will be documented in TM No.I—Flow
Monitoring that will be included as an Appendix of the Plan. The task includes the following activities:
30I. Review and Update Sewer Service Area and Basins. Review existing sewer service area and basins based on
changes to parcels, collection system piping, and laterals information. It is anticipated the City will provide updated
information electronically. Update Sewer Basins and provide an updated map for City review and confirmation.
302. Identify Primary Collectors and Lift Stations. The City will identify primary collectors and lift stations for
potential flow monitoring and inclusion in the hydraulic model (Task 600). It is anticipated the collectors will be
"skeletonized" to only include pipes greaterthan 12-inch and 8-inch pipes needed to represent flow conditions from
sewer basins. To assist with future tasks, the City will need to provide invert elevations for the selected primary
collectors and information on Lift Stations.
303. Identify Flow Monitoring Locations. Identify recommended locations in install temporary flow monitoring
devices inthe gravity system atupfive(5)|ocationstomeasorephmarycoUectooandorLift Stations south of|'
405.Anadditiona|two(2)flmwmonitorsonphmarycoUectuoo/|ift stations will beadded north of|'4O5,as
directed bythe City. Flow monitoring locations will be provided to the City to confirm their suitability for meter
installation.
304 - Flow Monitoring ADS will provide temporary flow monitoring services to Consultant to collect three (3)
months of flow data up to seven (7). After completion of the monitoring, ADS will provide a Rain Dependent
Inflow & Infiltration (RDI/1) Analysis and an electronic report. The work will be performed in three phases as set
forth below:
a. Phase I - Mobilization
�Site Locations ADS will work with the Consultant and the City toidentify/verify the seven (7)
locations for monitor installations. Upon approval by the City, additional locations may be added per
the optional costs inthe budget.
z. Site |nvesticiation_Once the installation sites are provided toADS, ADS field crew($will perform
site investigations. ADS will utilize astandard two (z) person field crew for fieldwork and comply
with Federal standards for confined -space entry. The proposed flow monitoring location will be
located, inspected, and verified for hydraulic suitability. ADS will also check for debris in the
manhole that could impact data quality and coordinate any required cleaning efforts with the City.
Page
of 17
83
ADS field crews will look for evidence and signs oferratic flow patterns. ADS will also investigate
adjacent manholes inorder toidentify the best monitoring locations.
3. Site Reports Site reports will be generated upon completion of the site investigations. The site
reports will include asketch ofthegene/a||ooation,physica|chanacte/ishcsanddiamete/softhe
proposed monitoring locations, manhole depths, flow measurements, and other comments
pertinent tothe location such asany special traffic orsafety issues. Final site locations tobe
approved bvthe Consultant.
4. Equipment ADS will utilize wireless ADS@ Model Triton +T11 flow monitors during the course of this
project. A typical monitor installation will include an ultrasonic depth sensor that will be mounted at
the invert of the pipe, a redundant pressure depth sensor; and a Doppler velocity sensor also
mounted atornear the invert.
S. Monitor Acivati»n Once installed, the monitor will beactivated and set totake readings at5-
minute intervals. ADS Field crews will take manual depth readings with a ruler and velocity readings
with a portable, instantaneous velocity meter in order to confirm the monitor is collecting accurate
data based onthe actual existing hydraulic conditions ateach location.
bPhaseU Flow Monitoring
z. Flow Monitoring Once the monitors are installed and verified to be in working order, ADS will
monitor for a period of four (4) calendar months ("monitoring period"). This initial monitoring period
can be extended based on mutual consent and written agreement of additional work and price for
such additional work. Anticipated flow monitoring locations are listed in Table :L. Upon approval of
the City, the flow monitoring may be extended by up to two months per the optional costs in the
budget.
u. Data Collection and Equipment [Maintenance ADS will collect data from each monitoring location
remotely using telemetry on a daily schedule (for sites with good wireless signal). The ADS project
team will review the data weekly to ensure each monitor is running properly meeting the project
objectives aswell ADS`cLandardc ADS Field Crews will perform site confirmations, site
maintenance which may include, cleaning the sensor(s), moving, changing or replacing any failed
component ateach monitor location.
3. Demobilization Field crews will continue data collections and confirmations (as necessary) until the
end ofthe monitoring period. Once authorized, crews will immediately begin removing the flow
monitors and deliver final data tothe data analyst.
C. Phase III Data Editing, Analysis and Reporting
i. Data Analysis Upon completion of the monitoring period, a trained ADS Data Analyst will begin to
finalize the data collected for each monitoring location. The data analyst will directly calculate flow
using the continuity equation from recorded depth and average velocity data. Flow quantities as
determined bythe continuity equation will beplotted.
z. Sk/icerRD08nay$s For each of the flow monitoring location, the analysis will characterize the
average dry weather flow conditions and RDI/l calculations for all significant wet weather events, an
assessment of hydraulic performance under such conditions. The results of dry weather and wet
weather performance will be plotted on maps of the sewer sheds to make it easier to understand
where RDI/l originates. The Shicer.com section of the Report will include the following items:
� Dty WeatherAnalysis — A characterization of the conditions observed during weekday and
weekend periods of the flow monitoring period during dry weather periods, excluding periods of
extended system recovery toprevious rain events. Summarized asatime-series hydrog/aphof
the average diurnal flow quantities for weekday and weekend dry weather periods.
Page
of17
84
• Dry Weather Flow Summary —Atable ofthe Average Dry Day Flow (ADDF)and anestimation of
Base Infiltration (BI). Average dry weather diurnal patterns will be provided for each flow
monitoring location during weekday and weekend portions of the monitoring period.
• Wet WeatherAnalysis — A characterization of the conditions observed during specific wet
weather events observed during the flow monitoring period, summarized as a time -series
hydrograph comparing observed flow quantities to average diurnal flow quantities for
corresponding weekday and weekend dry weather periods.
* Wet WeutherSummary— A characterization of the conditions observed during the maximum
rain event of the monitoring period. This can be summarized as the maximum 30 minute
average peaking factor observed during the flow monitoring period.
• Wet Weather Prioritization — A column chart of the Rain Dependent Inflow/Infiltration (RDI/1)
determined for each flow monitoring location for each wet weather event. Column chart
provides a prioritized ranking based on net RDI/I (as percent rain ingress if basin acreages are
provided) or net RDI/I per linear foot of sewer per inch of rain when linear footage information is
provided toADS.
• Hydraulic PorfonnoncoEvaluation —Anarrative interpretation ofhydraulic performance recorded
at each flow monitoring location as determined using a scattergraph of flow depth and velocity
data. The scattergraph interpretation shall evaluate the ability of each flow monitoring location
to accommodate flow quantities observed during dry weather and wet weather conditions
observed during the monitoring period.
1. Data oe1iven/and TK4 No. .2_F|ovvWYonito/inqSummary ADS will prepare Final TK8toindude
e|ectronicdata ofthe flow data intabular, hydrograph,scattergraph,and aRD|/|report inelectronic
format.
z. Meetina NO. 22 —Flow Monitorina Summary -Facilitate a workshop with City Staff to review the
results and conclusions drawn from the flow monitoring.
3O5.Rainfall Data Review. Obtain and process hourly rainfall data corresponding to the monitoring period from the
NOAA SEATA[Airport weather station.
306. Flow Monitoring Data Review. It is anticipated that data will be available from up to seven (7) monitoring
locations for the 2019/2020 winter. The data quality for the events will be evaluated for each meter and reviewed
with the City. Flow monitoring data will also be reviewed to identify storm events that lead to wet weather flows in
the collection system and are suitable for wet weather model calibration. The rainfall for these specific events will be
compared with the rainfall record toassess the individual storm sizes return periods. Ideally data will beavailable for
three to five storms. Wet weather flows, R-Factors and 1/1 rates will be calculated for each meter or SCADA source
for up to three storm events. The flow monitoring data analysis will result in modified wet weather modeling
parameters that will beused inthe hydraulic model.
307. Meeting No. 3 - Flow Monitoring Review. Facilitate a workshop with City staff to review the findings of the
Flow Monitoring.
308. Draft Chapter 2 — Flow Monitoring. Consultant will summarize the results of the flow monitoring and data
review in Chapter 2: Flow Monitoring. It is assumed the efforts in this Task will require a complete update of the
Chapter with all new information. An electronic version of draft Chapter will be sent tothe City for review and
Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will
be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900.
Usk 300
* This task will require a complete update of the Chapter with all new information.
DR AFT 2�&
Page
of17
85
* Nohard copy ofthe draft chapter will bedistributed.
Z���7�[�v�e�u����
I. Requested Data.
2. Review ofDraft TK8No.I—Flow Monitoring.
I Review ofDraft Chapter Z—Flow Monitoring.
l. Draft and Final TK4No.l—Flow Monitoring.
2. Draft Chapter I — Flow Monitoring.
I ROC for Chapter 2—Flow Monitoring.
4. Meeting Agendas and Minutes.
0 Meeting No. 3 — Flow Monitoring Review.
TASK 400 — FLOW PROJECTIONS
The objective of this task is to develop the sewer flow projections for the sewer service area for the current (2019),
l0-year,and build -out (maximum density) scenarios. Sewer flows will bebased onthe flow monitoring |nTask
300 and the City's demographic projections. A new hydraulic model will be created and used to estimate future
wet weather flows. The model will include the developed area south of 1405 and up to two (2) sewer basins north
of4O5. This will not be an all pipe model of the system. The information developed in this task will become
Chapter Flow Projections. This task includes the following activities:
401. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the
project. The City will provide:
• Current Nprogram.
r Summary ofNprojects completed since the 20l3Plan.
• Sewer connections bycustomer class.
• Sewer conservation flow reduction rate.
° Map with direct connections toKing County wastewater system.
w Data on number, horsepower, capacity, design point for all pumps at the City's Lift Stations.
• Lift Stations run time.
• City Planning Department existing and future populations and employment based on PSRC's 2040 Vision
demographic projections and more current planning for the service area. These growth rates forthe 10-
yearscenariowiUbeconsistentwiththe[omprehensiveVVaterP|an.
w GIS Data: land use, zoning data within the City Limits, sewer service area and UGA. It is assumed that
these data will beprovided inG|Sformat.
w G|S Data: existing facilities (pipes, manholes, lift stations, connections with King County, etcj, and
mterties.
86
4U2.Update Service Area, Land Use, and Zoning. Based onCity provided data, update mapping and
descriptions of existing and future service areas, land use, and zoning for the City Sewer Service Area. The Plan
will include both figures and text.
4O].Demographic Projections. Al|ocatetheexistingandl0-yearandboi|d'ootpnojecLionofsewenedpopo|ation
and employment provided by the City Planning Department to Sewer Basins. The 10-year growth rates will be
consistent with the Comprehensive Water Plan. The build -out projections are anticipated to be based on
Comprehensive Plan land use.
404. Design Storm. A design storm has been developed from a long term historical rainfall record at a number of
sites near the City. Rainfall data from the ongoing city monitoring program will be reviewed and evaluated to
determine if the design storm previously identified for wet weather flow modeling should be revised. The more
recent data will also be used to evaluate any local rainfall variability and trends. This review will be prepared to
provide the City with a defensible "Design" storm that emulates local weather patterns
405. Develop Existing Dry Weather Flows by Basin. Utilize existing land use maps to develop or confirm average
dry weather flows (ADWF) for the modeled sewer basins. The flows will be confirmed with the flow monitoring
data as well as the available flow data from the lift stations. Existing land use and currently served areas will be
used to estimate flow factors per acre per land use category. The flow factor will be customized to match the
observed existing ADWF and will be used to develop flow projections. For basins without measured flow data,
flow factors will be assigned from a measured basin with similar land use characteristics.
406. Develop 10-year and Build -out Dry Weather Flows by Basin. The City's comprehensive plan and any
additional information on housing densities, commercial and industrial uses will be used along with the flow
factors developed in the above task to determine the ultimate development acreage and the ADWF for build -out
conditions for optosewer collection system.
407. Create Hydraulic Model. Using the most recent information from the City's GIS data, create a sewer system
hydraulic model using Innovyze InfoSWMM software. The model will include the developed area south of 1405 and
up to two (2) sewer basins north of 405. The model will include lift stations and primary collectors, and does not
include the laterals, branches, or smaller truck sewers serving individual parcels within the basins. The City's
existing GIS ArcView ".shp" files will be used to import the collection system data into the hydraulic model. If not
available in the GIS, the City will provide invert elevations at key locations to construct the model. Add lift station
controls provided by the City to simulate realistic lift station operation. Estimate likely boundary conditions at
connections King County transmission mains, asrequired.
The up to seven (7) basins associated with flow monitoring will be further divided into mini -basins for sanitary and
wet weather loading in the model. These mini -basins will group parcels that contribute to common branches and
trunks, and will heconnected tothe modeled primary collector orlift station atthe appropriate location.
408. Meeting No4 - Hydraulic Model Creation.. Facilitate a meeting with City staff to review and confirm the
elements of the hydraulic model. City staff may be requested to perform field verification of model elements
based on this meeting.
409. Calibrate Existing Dry Weather and Wet Weather Flows. The existing dry and wet weather flows will be
calibrated based upon the flow monitoring data, and rainfall data provided by the City as well as additional data
available from the City's SCADA system for up to seven (7) locations in the collection system. Existing flow depths
and velocities will also bechecked and calibrated.
The first step istocalibrate the model todry weather flow conditions. Flow monitoring data will provide custom
hourly diurnal curves that establish the daily flow patterns for each metering basin. Model results will be
compared to measured flows to check for agreement between model results and measured flows. Model
parameters will be adjusted, as needed, to best match the flow monitoring and SCADA data. Itisassumed that
the City will provide SCADA data in electronic format.
Page
otD
m1,SP_*p,
87
Once the dry weather caUbmtoniscomp|eted,thewetweathe/o*|ibmtionismnndocted.Ra|nfaUinfonnadonviU
aid in developing the required rainfall -derived infiltration/inflow (RDI/1) estimations that enter the collection
system during a storm event. Wet weather calibration consists of using three storms that occurred during the flow
monitoring period. It is recommended that the use of a single calibration period incorporating a number of
independent rainfall events should beconsidered whenever possible. Model results will bereviewed and adjusted,
asneeded, tobest match the flow monitoring, rainfall and S[ADAdata.
The flows from unmetered basins will be developed as best possible using a mass balance between the available
data, and proportioned as best as possible based on development type, age, pipe material, and extent of
collection system components.
The hydraulic model will be calibrated in accordance with international modeling standards. The Urban Drainage
Group from the Chartered Institution of Water and Environmental Management (ClWEM) has established
generally agreed upon principles for model verification. The dry weather and wet weather calibration will focus on
meeting the recommendations on model verification contained in the "Code of Practice for the Hydraulic
K8ode||ingofUrbanDrainageSystems,^pob|ishedbyOVYEK4(November2Ol7).
410. Meeting No. 5 - Model Calibration. Consultant will conduct a workshop (Meeting No. 5) with the City to
summarize the model calibration results. Consultant will present the model calibration results for both dry and
wet weather scenarios. Summary tables will be presented that quantify the percent difference between the
measured data and the modeling results. Consultant will discuss calibration standards and confidence levels at the
workshop.
411. Hydraulic Model Creation and Calibration TM No.2. Consultant will summarize the model creation and
calibration inaDraft and Final TM. Anelectronic version ofdraft TK4will besent tothe City for review and
address City comments in a Final TM that will be included as an Appendix to the Plan.
412. Develop Existing, 10-yearm and Build out Wet Weather Flow. The calibrated model will be used to
determine the existing, 10-year, and build out flows peak wet weather flows for the sewer service area. Wet
weather flows will bebased onthe selected design storm.
413.Reclaimed Water. As required by Ecology, reclaimed water opportunities will be updated. The City currently
uses reclaimed water from King County's South Treatment Plant. The City's current use and potential future
customers will be summarized based on information provided by the City. No new analysis is anticipated for this
effo rt.
413. Draft Chapter 3 — Flow Projections. Consultant will summarize the sewer flow projections in Chapter 3: Flow
Projections. It is assumed the efforts in this Task will require a complete update of the Chapter with all new
information. Anelectronic version ofdraft Chapter 3will besent tothe City for review and address City comments
in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the
City Review Draft Plan.
6ons
^ City can provide elements listed under Task 40I.
° This task will require a complete update of the Chapter with all new information.
° Nohard copy ofthe draft chapter will bedistributed.
* The model will include the developed area south of 140S and the primary interceptorsnorth of4O5. This
will not beanall pipe model ofthe system.
Tosk';00Delivzmbles
DRAFT Page 10
of 17
88
l. Requested Data.
I. Field verification ofmodel elements, asrequired.
3. Comments onTK4No. 2—Hydraulic Model Creation and Calibration
4. Comments onChapter ]— Flow Projections.
T���4�O[ons»�on�De0verob��
I. Draft and Final TK4No. Z—Hydraulic Model Creation and Calibration.
2� Draft Chapter 3—Flow Projections.
3. ROC for Chapter ]— Flow Projections.
4. Meeting Agendas and Minutes.
7�s�40,"84eEb��
1. Meeting No. 4—Hydraulic Model Creation.
2. Meeting No. S —Hydraulic Model Calibration.
TASK SOO — EXISTING SYSTEM
The objective of this task is to summarize the existing sewer system facilities and components including lift
stations, and interties.This task includes the following activities:
[A5K�O84�T�Vf�ES
501. Meeting No.6 - 2013 Chapter Review. Facilitate a meeting to review and identify updates needed to
Chapter 4—Existing System. AdataeqoestvviUbepeparedbasedonthemeeting.
502. Data Acquisition. A data request will be provided for required information for this task. The request may
include, but is not limited to, the following:
* Data onpipeline materials and age bvlinear foot, as available.
w Existing renew and replacement program.
m Summary ofimprovements completed since the 20l3Plan.
• SCADA data for sewer system.
503. Update Existing Sewer System. Update the components of the major sewer collectors and pump stations
using City provided information. This may include changes to boundaries of sewer service basins, lift stations and
force mains, and the total length of pipe based on diameter and material. Summarize improvements to the City's'
wastewater collection system thathavebeencomp|etedsincethe20l3P|an.Deve|opnewsystemmap.
504. Draft Chapter 4 — Existing System. Consultant will summarize the existing system in Chapter 4. An
electronic version of draft Chapter 4 will be sent to the City for review and address City comments in a comment
response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review
Draft Plan.
Z�sk�00�ssumot�ns
� City can provide elements listed under Task 5O2.
� This task will involve updating the chapter from the 2Ol3Plan.
No hard copy of the chapter will be distributed.
Dsliverobks.
DRAFT- Page11
of 17
89
I. Requested Data
2. Comments on Chapter 4— Existing System.
7�s��0D��:su/tont�c0verob��
�
I. Draft Chapter 4—Existing System.
2. ROC for Chapter 4—Existing System.
l Meeting Agendas and Minutes.
4. System Map —AppendixE
��ill112_��-;,-�, S
Meeting No. 6 — 2013 System Review.
TASK 600 — CONVEYANCE SYSTEM ANALYSIS
The objective ofthis task istoevaluate the capacity of the conveyance system toconvey existing and future flows
during the [ity'sdesign storm. This task will form the basis for [hupterS Conveyance System Analysis ofthe Plan.
The capacity assessment will be conducted for the collection system included in the hydraulic model and at lift
stations. This task will develop recommended improvements to the system in support of a CIP for 10-year and
build -out scenarios. This task includes the following activities.
601. Collection System Analysis. After the model has been calibrated, the design storm will be routed through
the modeled collection system capacity to evaluate capacity during existing, 10-year and build -out conditions.
Evaluate capacity deficient segments and identify bottlenecks or other system limitations. identify improvements
to resolve deficiencies using the hydraulic model. All improvements will be confirmed using the hydraulic model.
602. Lift Station Capacity Analysis. Evaluate the existing lift stations capacity based on flow estimates for the
design storm. The current performance of the existing lift stations, as provided by the City, will be compared to
the modeled peak flows to confirm capacity during the existing, 10-year, and build -out scenarios. Required
upgrades/modifications will berecommended, asnecessary, toaddress lift station capacity deficiencies.
603. Meeting No. 7 - Capacity Analysis. Facilitate a meeting with City Staff to review the results of the collection
system and Lift analysis, aswell asinitial recommended improvements.
604. Lift Station Operational Analysis and Meeting No.8. Conduct high-level evaluate uptothree existing lift
stations operational and hydraulic performance to determine if improvements are needed to the Lift Stations.
The evaluation will focus on hydraulic capacity, redundancy, facility reliability, and operational considerations,
such as wet well sizing. Conduct a site visit of the selected Lift Stations (Meeting No. 8) to document existing
infrastructure (Assumed half day site visit). Formulate conceptual Alternatives to address identified issues.
Planning level costs, technical considerations and operation and maintenance issues will be compared to develop
a recommended alternative. Results of this task will be incorporated into the CIP.
6OIDraft Chapter S'Conveyance System Analysis. Chapter Swill document the conveyance system analysis
including the recommended improvements to the system. It is assumed the efforts in this Task will require a
complete update of the Chapter with all new information. An electronic version of draft Chapter 5 will be sent to
the City for review and address City comments in a comment response log for the City's approval. Comments will
beincorporated intothe Chapter aspart ofthe City Review Draft Plan.
Zcnsk��8��sun7��/ma
* City can provide any data requested.
0RAFT - Pa�elZof 17
�fl�j ;ki1,GP_Scn~
90
* This task will require a complete update of the Chapter with all new information.
* Nohard copy ofthe chapter will bedistributed.
7osK60�[�xDe8veroWs
l. Requested Data.
2. Comments on Chapter 5 —Conveyance System Analysis.
IDraft Chapter 5—Conveyance System Analysis.
2. RO[for [hapter5—ConveyanceSystem Ana |ysis.
l Meeting Agendas and Minutes.
I Meeting No. 7—Conveyance System Analysis.
4. Meeting No. 8—Lift Stations Site Visit.
TASK 70G—OPERATION AND MAINTENANCE
The objective of this task is to assure satisfactory management of sewer system operations. Itwill provide an
overview of the sewer system responsibility and authority, system operation and maintenance plan, equipment
supplies and inventory, and emergency response. The City may need to update its existing emergency response
plan that will be included as an appendix to the Comprehensive Plan. This task includes the following activities:
701 Meeting No. 9—O&M Chapter Review. Facilitate ameeting toreview and identify updates needed to
Chapter 6—O&K4.Adata request will beprepared based onthe meeting.
702. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the
project. The City will provide:
w Copy otthe organization chart.
• Copy ofthe FOG control program.
w Copy ofthe overflow emergency response plan.
• Current operations and maintenance program activities.
703. Collection System and Lift Station Condition and Maintenance Summary. The City's reported condition
and maintenance problems will be summarized. Review basins identified with high 1/1 for potential causes of 1/1
including a history of repairs, and pipe age and material. Discuss 1/1 causes with City operation staff. Review the
existing 1/1 program. Summarize completed projects. Identify or update 1/1 reduction goals. Document pipes with
known maintenance issues, such as accumulation of solids, FOG build up, or root intrusion. A GIS map will be
created, identifying the location of these pipe segments. General pipe replacement timing based on Remaining
Useful Life will be based on prior analyses. Document City concerns with condition or maintenance of Lift
Stations. No site visits will be completed during this task. Information for this task will be provided by the City
electronically orduring Meeting No. 7.
704. Update Chapter 6 — Operations and Maintenance. Update Chapter 6 based on information provided by the
City. This may include updates to organization chart, certification, and collection system and lift station
maintenance, O&M program activities, and known major deficiencies in the City's operation and maintenance
DRAFT' Pa8el3
of17
91
(O&M) programs. This task does not include a FOG ordinance or program, overflow emergency response plan, a
detailed O&M Manual, ormaintenance management system. Adetailed evaluation ofCity O&M programs will
not be conducted. An electronic version of draft Chapter 6 will be sent to the City for review and address City
comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as
part ofthe City Review Draft Plan.
• City can provide elements listed under Task 7O2,
• This task will involve updating the chapter from the 20I3Plan.
• Nohard copy ofthe chapter will bedistributed.
Tesk7U0[fyi__.e; i :erob6s
l. Requested Data from Task 702.
2. Comments onDraft Chapter 6—Operations and Maintenance.
l. Draft Chapter 6—Operations and Maintenance.
2. ROC for Chapter 6—Operations and Maintenance.
3 Meeting Agenda and Minutes
Meeting No. 9 — 2013 Chapter Review.
TASK 800— CAPITAL IMPROVEMENT PLAN
This Task will summarize the recommended improvements for the conveyance system and lift stations in
accordance with the City's Policy and Criteria. This task will develop Chapter 7 Capital Improvement Program for
the Plan. Total project costs will be developed for each recommended improvement and ranked by priority. This
task includes the following activities:
A,1�������
8Ol.[|PProjects. Identify and describe [|Pprojects from prio/tasksand existing City planning. Prepare
description ofeach project.
802. Cost Estimates, Develop planning level cost estimates for all recommended projects using costs provided in
other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be
prepared; all costs will begiven in2OI9dollars.
003.Prioritization. Prioritize condition -related andcapac|ty're|atedp/o/ectsidentifiedintheprevioostasksfo/
inclusion inthe [|Pinto I0year and long term scenarios
804. Meeting No. 10 — CIP Review. Facilitate a meeting with City staff to review and verify CIP projects, costs and
prioritization
805. Electronic CIP. Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each
project will be listed on a separate tab including project description, justification, estimated cost, and
recommended year for implementation. City staff will beprovided the ability toadjust indirect costs and
escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets
will be included as an appendix. The Consultant will train City staff on using the CIP Tool.
DRAFT Page14
nf17
92
8D6.Financial Summary. Summarize Sewer Utility financial information per WAC requirements. City to provide a
discussion cost per service in terms of both debt service and operation and maintenance costs, of all existing
facilities. Carollo will estimate additional costs for future facilities recommended during the planning period. This
summary does not include an analysis of rates, connection charges, or methods to fund the recommended CIP.
8O7.Meeting No. 11—Financial Review. Facilitate ameetings with City Staff toreview the financial summary
and update priority of[|Pprojects, asrequired.
8O8.Draft Chapter 7.Prepare Chapter 7 Capital Improvements Plan, including adescription ofcost estimating
methods, project analysis, final recommendations, summary table, and system maps with the location of
recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter
with all new information. An electronic version of draft Chapter 7 will be sent to the City for review and address City
comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as
part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed.
• City can provide any data requested.
• This task will require a complete update of the Chapter with all new information.
No hard copy of the chapter will be distributed.
IRequested Data.
2. Comments onChapter /— Capital Improvement Plan.
7�s��0���nso��nt�e�ver b�s
I. Draft Chapter 7—Capital Improvement Plan.
2� ROC for Chapter 7—Capital Improvement Plan.
�v@�
�
• Meeting No. IO—Capital Improvement Plan.
w Meeting No. II — Financial Review.
TASK 900 — PLAN PREPARATION
This Task will include the compilation of all previous tasks. Carollo will prepare a final Comprehensive Sewer Plan
that is the compilation of the chapters that have been created as a part of the project, with revisions based on
feedback provided bvthe City throughout the project. The Comprehensive Sewer Plan will comply with VVA[I73'
240'105O�ThistaskindodesthefoUovvingactivities:
901. Executive Summary. Carollo will prepare an executive summary, summarizing each element of the
Comprehensive Plan.
902. Prepare Staff Review Draft. Incorporate comments from draft chapters. Compile Chapters and develop
Technical Appendices. Prepare review draft document for City Staff in one (1) notebook binder copies and an
electronic copy.
9O3.Meeting No. l2—Staff Review Draft. Meet with City todiscuss comments onthe Staff Review draft Plan.
Comments tobeincorporated into SEPA/AgencyReview Draft.
DR4FT Page15
of 17
,,oc=Iw
93
904. Meeting No. 13 —Council Review. Assist the City in presenting the findings of the Plan to Council. Carollo
will prepare a power point summarizing the Plan's key points and attend the Council session to support City Staff.
It is anticipated the Council presentation will be no longer than 30 minutes.
905. Prepare Agency Review Draft. Prepare three (3) hard copies and one electronic version for the City to
distribute for agency review. This task assumes the City will lead the Agency Review process. The City will
complete the SEPA review process and obtain approval during the Agency Review period. Carollo will assist City
in responding to written comments by regulatory agencies, neighboring jurisdictions, and the public, including no
more than three letters. No meetings are anticipated for this task. Additionally, no major plan revisions are
included inthe scope based onAgency Review comments.
906. Meeting No. 14 — Agency Review Comments. Meet with City to discuss comments on the Agency review
comments. Aresponse tncomment log will beformulated based onthe meeting.
907. Prepare Final Comprehensive Sewer Plan. Incorporate final comments based on agency reviews, as
requested by the City. Provide City with three (3) signed and stamped Final Comprehensive Sewer Plans and one
electronic version for the City's use. This task assumes only the documents above will be developed for the Plan
approval and any other interim draft plan documents are considered out of scope.
I. City Comments.
Z. Public and Agency Review Comments.
9' JJ
I. Executive Summary.
2. City Draft Plan — One PDF.
I AgencyDraftP|an—TheehaWcopiesandonePDF.
4. Final Plan —Two hard copies and one PDF.
S. Comment Response Log.
� Meeting No. l2—Staff Review Plan Review.
� Meeting No. l3—Council Review
Meeting No. 14 — Agency Review Comments.
Pa8el6
of17
94
Meeting No. 1
Meeting No. 2
Meeting No. 3
Meeting No. 4
Kick-off Meeting
2013 Chapter 1 Review
Demographic Analysis Meeting
Flow Projections and I&I Evaluations
Meeting No. 5 Existing System Review
Meeting No. 6
Meeting No. 7
Meeting No. 8
Meeting No. 9
Meeting No. 10
System Analysis
Operations and Maintenance Chapter Review
Capital Improvement Plan
Financial Review
Plan Review
Project Management Plan
All Meeting Agendas & Minutes
Monthly Progress Reports (with invoices)
Data Request Spreadsheet
Draft and ROC for Executive Summary
Draft Chapter and ROC for Chapter 1— Introduction
Draft Chapter and ROC for Chapter 2 — Demographic Analysis
Draft Chapter and ROC for Chapter 3 — Flow Projections
Hydraulic Model
Draft Chapter and ROC for Chapter 4— Existing System
Draft Chapter and ROC for Chapter 5—System Analysis
Revision of chapter from 2013 Plan
Full chapter update
Full chapter update
New
Revision of chapter from 2013 Plan
Full chapter update
Draft Chapter and ROC for Chapter 6 — Operations & Maintenance Revision of chapter from 2013 Plan
Draft Chapter and ROC for Chapter 7 —Capital Improvement Plan Full chapter update
City Draft Plan-��--��-
Agency Draft Plan
Final Draft Plan & All Electronic Files
DRAFT- 1
Page 17
of 17
m ,i proxs�lst uic.^i la_G5r_Scopo
95
96
EXHIBIT C, Cost Estimate
Comprehensive Sewer System Plan
PM QM PE Staff Prof GIS VW
DLR LRK AMT MM/JS Varies Varies
TASK 1 DESCRIPTION
Total Labor Rate $ 176 $ 226 $ 155 $ 132 $ 137 $ 95
Task 100 -Project Management
101 'Monthly Progress Reports and Invoices
Project Management Plan
103 Meeting No. 1 - Kick-off Meeting
104 Client Coordination
Subtotal - Task 100
Task 200 -Introduction
201 1Meeting No. 2 2013 Chapter 1 Review
202 !Data Acquisition
203 R-vi - C -•t -1 t ••u ti•
Subtotal -Task 100.
Task 300 -Flow Monitoring
Review and Update Sewer Service Area
and Basins
301
302
Identify Primary Collectors and Lift Stations
Identify Flow Monitoring Locations
Flow Monitoring
Rainfall Data Review
Flow Monitoring Data Review
Meeting No. 3 - Flow Monitoring Review
DraaChapter 2- Flow Monitoring
Subtotal- Task 200
Task 400 - Flow Projections
401 Data Acquisition
Update Service Area, Land Use, and -
Zoning
406
Demographic Projections
Design Storm
Develop Existing Dry Weather Flows by
Basin
Develop 10-year and Build -out Dry
Weather Flows by Basin
Create Hydraulic Model
Meeting No. 4 - Hydraulic Model Creation
Calibrate Existing Dry Weather and Wet
Weather Flows
Meeting No. 5 -Model Calibration
Hydraulic Model Creation and Calibration
TM No. 2
Develop Existing, 10-year, and Build -out
Wet Weather Flow
Reclaimed Water
Drag Chapter 3 - Flow Projections
Subtotal - Task 400
6 12
4 2 6 24 6 4
39 12 72 264 64 12
Total
Hours
63
14
12
35
124
Carollo Labor
Cost
b 1,972
$ 6,510
$ 20.203
$ 1,246
$ 1,780
$ 1,838
$ 2,098
$ 2,000.
$ _ 1,070
$ 2,528
$ 683
$ 2,952
1,785
b 4,238
17,444
2,230
3,590
2,078
$ 11,048
1,711�
$ 6,040
$ 3,408
$ 2,866
Sub Total Sub
Cast Markup i Total Cost
10%
11.ftudc 11�I1xN[K.19i 1
Travel and
Printing
PECE
$12.00
Total ODC
$ - $ 756 $ 756
$ - $ 168 $ 168
$ 50 $ 144 $ 194
- $ $ 420 $ ...--420
$ 50 $ 1,488 $ 1.538
50 $ 108 $ 158
156
$ - $ 168 $ 168
s0 $ 432 $ 482
$ - $ $ 168 $ 168
$ -a -$
s - $ ,- $
$ -a -s
$ s -a
$ 40.534 $ 4,053 $ 44.587
$ - $ 180 $ 180!
$ - $ 84 $ 84
$ $ 180 $ 180
$ - $ _ 60 $ 60
$ - $ 252 $ 252 ,
$ 50 $ 144 $ 194
372 $ 372
$ 50 $ 1,440 $ 1,490
$ - $ 192 $ 192
$ - $ 300 5 300
.� $ 168 $ 168
$ - $ 480 $ 480
- $ 936 $ 936
$ 50 $ 144 $ 194
$ - $ 528 $ 528
$ - $ 288 $ 288
$ - $ 228 $ 228
$ $ 552 $ 552
TOTAL COST
$ 10766
$ 2.140
$ 1,905.
$ 6,930
21,741
$_-.. 1,404
$ 1,936
$ 2,006
$ 5,346
$ 2,266
$ 2,270
$ 1,154
$ 47,295
$ _ 743
$ 3,204
$ 1,979
4,510
S a 521
$ 2,212
2,422
$ _ ... 3.890
$ 2,246
$ 6,410
a 10,812
$ 2,789
984
$ 1,905
$ _ 6,568
$ 3,696
3,094
$ 7,008
71,148
City of Tukwila
October 2019
DRAFT
1 of
EXHIBIT C, Cost Estimate
Comprehensive Sewer System Plan
TASK / DESCRIPTION
( PM
DLR
QM
LRK
PE
AMT
Staff Prof
MM/JS
GIS
Varies
WP ",I
Vanes I
Total
Hours
Carollo Labor
Cost
Sub Total
Cost
Sub
Markup @ Total
10%
OTHER DIRECT COSTS
TOTAL COST
PECE
Cost' Travel and
Printing
$12.00 Total ODC
'
','
Total Labor Rate $ 176
$ 226
$ 155
$ 132
$ 137
$ 95
Task 500 - Existing System
$
134.
501 - Review --
502 •- !Existing ,. . .
7
9 .._
13
$ 1,056
$ ._.. 1,252
'. +�
• 1
$ - $ - $
$ ®..®... $ ®,a....._ $ .aa.._a..®,..$
$ - $ - $
-', $ 50 $ 84
$ ,. 1,190
4
........d $ 108
-
- $ - $ 156
$
$
$
108
156
228
$ 1,360
$ 11936
$ 2,79048 e
$ 7,276'.
!Updatecquisition
503 Existing Sewer System
SO4 Revise Chapter 4 -Existing System
2
1
0
a
8
4
d
$
- $ - $
- $ - $ 228
_
$
S $
$ 50 $ 576
$...
626
__
__
..__.. -
..
Task 600 - Conveyance System Analysis
60
• 0
8,420$
_.
601Collection System Analysis
2
_
2
8
d0
8
- $ - $
- $ - $ 720
$
$
720
720
$ 9,140
$ 9,508
S02 Lift Station Capacity Analysis
2
2
24
24
4
8
8,788
$
- $ - $
- $ - $ 720
fiO3 �Mee5og No.7-Capacity Analysis
3
3
$
- $ - $
-'. $ 50 $ 120
$
170
$ 1,691
604 I Draft Chapter 5 - Conveyance System
Analysis
Subtotal -Task 600
2
9
2
6
8
43
24
92
4
20
444
4174
6,140$
$ 24,869
$
- $ - $
$ - $
- $ - $ 528
$
528
2,138
$ 6,668
- $ 50 $ 2,088
$
$ 27,007
Task 700 - Operation and Maintenance
3
4
21,246
$
- $ - $
701 (Meeting No. 8 - O&M Chapter Review
$ S0 $ 108
$
158
$ 1,404
702 (Data Acquisition
703 (Collection System and Lift Station
Condition antl Maintenance Summary
1
4
23
16
424
440$
$ 3,364$
3,618
8,668$
$
- $ - $
- $ - $
- $ - $
- $ - $ 36
$ - $ 288
$
$
36
288
$ 476
$ 3,652
3,942
704 (Draft Chapter 6 - Operations and
Maintenance
2
1
0
___
16
38
4
8
427
6$
-' $ - $ 324
$
324
Subtotal -Task 600
f0
1
- $ - $
-' $ 50 $ 756
$
806
Task 800 - Capital Improvement Plan
2
1
4
16
427
3,858
- $ - $ 324
$
324
801 CIP Projects with Triggers
$
- $ - $
_
802 Cost Estimates
2
4
8
16
434
34
29
$ 5,156$
I 2,802
1 $ 4,616
$ 4,098
-I1�$.III II1I -$,
: ®GIIl�Ci�IV���I�lVA31td
Ci
$ - $ - $
$ - $ - $
- $ - $ 408
$ $ 228
$
408
: • r
4
$
$
$
$
228
158
408
348
804 Meeting No. 9 -CIP _
805 Electronic CIP
3
2
4
2
$ 50 $ 108
- $ - $ 408
- $ - $ 348
1,404
5,024
4 • .
1
24
2d
8
806 Financial Summary
807 'Meetings No" 10 -Financial Review
3
2
4
24
4
24
4
6
r
����
����
�� 0
80
:
480
: 6,042
Draft and Final Chapter 7 -Capital
808 Improvement Plan
d
2
Subtotal -Task 700
22
9
18
120
Task 900 - Plan Preparation
I
12$ 1,848
$
$ - $
i
IV
144 .I
901 !Executive Summary
6
6
902 !Prepare Staff Review Draft
8
3
4
4
24
4
4
24
2
68
9$
$ 8,928
1,246
$
$
$
$
$
- $ - $
,
_.
$
158
158
903 'Meeting No. 11 - Staff Review Draft
- $ - $
$ - $
- $ - $
- $ - $
- 108
- 000
- $ 50 $ 108
: 1,404
$ 1,404
$ 9,968.
904 !Meeting No. 12 - Council Review
8
2
4
16
1
27
9$
$ 4,067
$ 10,632
1,246
905 Prepare Agency Review Draft
12
6
24
4
8
24
2
Meeting No. 13 - Agency Review
906 Comments
3
907 (Prepare Final Comprehensive Sewer Plan
I Subtotal -Task 800
8
48
8
20
4
12
12
4
24
•r
2
'$ 8,248
$ 36.215
$
- $ - $
-'..$ 1,000 $ 720
$
1,720
5.341
90
16
77
$
- $ - $
-', $ 2.185 $ 3.156
$
$ 41.556.
`
1. .....
Total 1 �...
. 21
1Q6"
TQ5
..
164
..
tgs',
1,490
24E,790.
$ 4034
_.:_ ..
S 053 S 44,587 .3'" 0E5 ; 17,8E0
S 20.565,277.951-
City of Tukwila
October 2019
DRAFT
2 of