Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TIC 2019-10-22 COMPLETE AGENDA PACKET
City of Tukwila Transportation and Infrastructure Committee • • • • • • Zak Idan, Chair Kate Kruller Thomas McLeod AGENDA Distribution: Z. Idan K. Kruller T. McLeod K. Hougardy D. Robertson Mayor Ekberg D. Cline R. Bianchi L. Humphrey H. Hash H. Ponnekanti G. Labanara TUESDAY, OCTOBER 22, 2019 - 5:30 PM HAZELNUT CONFERENCE Room (EAST ENTRANCE OF CITY HALL) H. Kirkland B. Still R. Turpin A. Youn Clerk File Copy 2 Extra Place pkt pdf on SharePoint: Z Trans & Infra Agendas e-mail cover to: F. Ayala, A. Le, C. O'Flaherty, A. Youn, B. Saxton, S. Norris, L. Humphrey 11 eco tided Action P PRESENTATIONS 2. BUSINESS AGENDA a) Public Safety Plan — Public Works Shops Adopt Master Plan and Funding b) Public Safety Plan — Public Works Shops Phase 1 Amendment No. 2 with SHKS Architects for Design c) Public Safety Plan — Public Works Shops Phase 1 Change Order No. 5 with Lydig Construction for Demolition d) Water and Sewer Comprehensive Plans Consultant Contract with Carollo Engineers 3. SCATBd/RTC 4. MISCELLANEOUS 5. ANNOUNCEMENTS a) Forward to 10/28/19 Committee of Whole b) Forward to 10/28/19 Committee of Whole c) Forward to 10/28/19 Committee of Whole d) Forward to 11/4/19 Consent Agenda Future Agendas: • Reckless Driving • Street Operations Pg. 1 Pg. 25 Pg. 27 Pg. 33 Next Scheduled Meeting: Tuesday, November 5, 2019 IS The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. City of Tukwila Public Works Department - Henry Hash, Director - INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director 2'7 BY: Hari Ponnekanti, City Engineer CC: Mayor Allan Ekberg DATE: October 4, 2019 (revised 10/18/19) SUBJECT: Public Safety Plan — Public Works Shops First Phase 1 Project No. 91630601 Master Plan Next Steps Allan Ekberg, Mayor ISSUE .A.p.prove the Public Works Shops Master Plan and funding for Public Works Shops Phase 1. Updotc on thc Public Works ! .", f'r thcirnT.:rovcrnents tc thc Heiser prf-Nporty. BACKGROUND The City hired SHKS Architects to conduct a Master Planning and Programming effort for the City's Public Works Maintenance Shops facilities in September 2018. Master Planning efforts are a good tool to loiisally implement overall facility improvements. The Public Works Master Plan envisions the redevelopment of over 13 acres of land, which will serve the Public Works Department into the future with planned growth through the year 2045. SHKS conducted several meetings with PW staff, visited the existing facilities, toured similar PW facilities in the region and developed a Master Planning and Programming Report. Several options were discussed and the selected Master Plan and the proposed tenant improvements to the Heiser site are the most practical and least expensive option. The current George Long building lacks sufficient spacing for routine maintenance and is also one of the most seismically deficient City building. The new site will be much safer for our employees and provides more space, therefore increasing operation efficiency. In addition, some of the equipment from Minkler Shops can also be moved to Heiser, allowing more space at Minkler Shops for maneuverability and productivity. ANALYSIS The findings from the Public Works Shops Master Plan are summarized in the attached updated PowerPoint presentation. The City took possession of the Heiser properties in July 2019 and will take possession of the UPS site in 2023. Master Plan Summary • The Public Works Shops First Phase 1 of the Master Plan focuses on relocating the PW Fleet Maintenance and Facilities divisions from George Long Shops to the Heiser property after seismic retrofitting and upgrades. The First Phase 1 will also include moving the Police vehicle evidence storage and spoils from the Longacres site. • The Longacres site will need to be vacated and moved to the Heiser site by 2021. To meet federal NPDES reaulations. spoils need to be stored in a covered site. • Public Works staff a ree that the best option is to move George Lona and Longacres operations to the Heiser Building. • George Lona was chosen to move to the Heiser Building, after necessary renovations, as the George Lona Building is seismically and environmentally deficient and is hazardous to City employees. • The Fleet mechanics work full-time in George Long as opposed to other Public Works employees that are mainly in the field. The George Long facility does not have an adeauate exhaust system and does not meet regulatory requirements. • As George Long is seismically deficient, if there is an earthauake and the buildina is destroyed, the entire City would be without the facilities and fleet divisions to assist with Police, Fire and other emergency operations. W:IPW Eng1PROJECTSIA- BG Projects101 Pubic Safety PlanIPW Shops Fist Phase (91630601)Unfo Memo Master Plan Round 2 101819 a.docz Informational Memo Page 2 • With the table below. George Lona's square footage needs will be covered in Phase 1. If Minkler were to move to Heiser at this time, their needs would not be met and would have to move twice (see page 53 of Master Plan). Facilities Current Sauare Footage George Long Shops Facilities. Fleet. Spoils and Police Impound Yard Phase 1 Square Footage 57 770 Longacres site (need covered sooils) Subtotal 13 215 Minkler Shops Streets. Water. Sewer, Surface Water New Decant facility. New Fleet Parkina 70 985 100 618 55 670 15 460 Heiser Program Area 71 130 73,925 Next Steps Approval of $4.4 million for funding the PW Shops Fir-sPhase 1 (to move forward with Heiser improvements) • Demolition of two outbuildings at the Heiser site. Oct/Nov 2019 • Heiser design for seismic retrofitting and interior and exterior improvements. Upgrades to HVAC, mechanical, electrical, and storm drainage. Nov 2019 — April 2020 • Advertise and award seismic retrofitting and improvements. April 2020 • Project completion. December 2020 Staff will return to Council for financing of Phase 2. Phase 2 - Possession of UPS site in 2023. Build Administrative offices and relocate Minkler. Cost estimate of $33 million. At the completion of Phase 2, all Public Works employees will be relocated to safe and efficient facilities. Phase 3 — Build new Fleet Maintenance Building, demolish Heiser Building. and install covered storage for $37 million. At the end of Phase 3, all future needs will be met with the entire buildout of the Heiser and UPS sites. PHASE 1 FINANCIAL IMPACT Expenditures 2019 Budget Budget Request Land Purchases $ 25,334,123.00 $ 30,000,000.00 Contracts & Demolition 856,928.88 PW Shops First Phase General Fund $ 2,200,000.00 Utilities 2,200,000.00 Total $ 26,191,051.88 $ 30,000,000.00 $ 4,400,000.00 Budget Balance $ 3,808,948.12 SHKS estimates that the PW Shops gr-st-Phase 1's costs will be $5.8 million and soft costs at $2.4 million, for an estimated total project cost of $8.2 million. Project soft costs include design fees, construction management fees, construction contingency, and sales tax. 2 W \PW Eng \PROJECTS \A- BG Projeets \ 01 Public Safety Plan \PW Shops First Phase (91630601)\Info Memo Master Plan Round 2 101819 a docx Informational Memo Page 3 The 2019 CIP's PW Shops budget is $30 million and to date $26,191,051.88 is estimated to be spent, which leaves a balance of $3.809 million. To complete the PW Shops gr-st Phase 1 at an estimated cost of $8.2 million, additional funding of $4.4 million is needed. The current funding has the PW Shops split 50/50 between the General fund (Streets. Facilities. & Fleet) and the Enterprise funds (Water, Sewer, & Surface Water). To continue with this 50/50 division, the General fund will need to budget $2.2 million and the Utilities would fund the remaining $2.2 million. Both Water and Sewer Utilities appear to have sufficient unreserved fund balance to absorb the additional costs, further analysis is needed to determine if the Surface Water utility can absorb the additional costs with the current rate model. There is funding available in all three of the Water/Sewer/Surface Water Utilities to fund the $2.2 million that will not impact utility rates or capital improvement proiects. FINANCING PLAN To fund the gap of $2.2 million in the General fund, funds can come from two sources. A transfer of $1 million from the general fund to the arterial street fund is currently budgeted in 2020. Because there is currently a healthy fund balance due to impact fees exceeding budget, the budgeted transfer can be redirected to the PW Shops project fund. Additionally, the 2020 general fund budget has a budgeted surplus of $1.4 million and could be utilized to fund the remaining request of $1.2 million. f. r /NV, +In rs1 +inn n k r n Due to favorable interest rates in the bond market, coupled with the City's upgrade in rating from AA to AA+, total debt service for the 2019 LTGO bond issue was $3.6 million less than budaeted attached in u dated financing schedule) The The resulting savinas will be realized in the general fund and utility funds over the life of the bonds, which is 20 years. The general fund will realize savinas of approximately $2.8 million and the utility_funds will realize a combined savings of $800,000. Minkler Shops Interim Improvements Until we take possession of the UPS site in 2023, Minkler Shops will require some improvements in the interim. Currently there are limited bathroom facilitiesonly one showerand the locker room does not have adequate space. Proposed improvements include an expansion of the men's restroomrelocating the locker room and building a new mud room. Also proposed are safety and security upgrades that include additional yard Iiqhtin and main gate improvements. The existin sate is currently not automated and left open durina the day as staff come and go The cost estimate for the Minkler Shops Interim Improvements are $500.000 and would be included in a new CIP proiect with funding from the Utility Enterprise funds. RECOMMENDATION • frervat k re es nrern.et 2049 0,cr,Imittco of the Whde. ; nfr S.01 ta 0.f I 141,00, 'Plorks Shops Firl Phz:ors ar.c.' a!!c‘..: st2.ff tsat4occ,sIdor this itcrn r Council is being asked to approve one or both of the following options and to consider these items at the October 28, 2019 Committee of the Whole and subsequent November 4, 2019 Regular Meeting: Option A) Approve the Public Works Shops Master Plan and fund an additional $4.4 million for Public Works Shops Phase 1 (Heiser) and, Option B) Approve the Minkler Shops Interim Improvements that would be funded by utility enterprise funds for $500,000. attachments: Financial Framework Summary (updated 10/16/19) PW Shops Master Plan PowerPoint (updated 10/18/19) Link to PW Shops Master Plan https : //shksarchitec s.sharefile.com/d-s56 0e59a6467c 3 W \PW Eng \PROJECTS \A- BG Projects \ 01 Public Safety Plan \PW Shops First Phase (91630601)\Info Memo Master Plan Round 2 101819 a.docx A B E F 1 3 4 Public Safety Plan - Financial Framework Summary Current Plan w/19-20 budget Public Works Shops Net Changes Revised as of 10/16/19 6 8 9 10 11 1 L 13 14 15 16 17 1 U 19 21 22 23 24 25 27 28 29 30 31 32 33 34 35 36 Revenues LTGO Bond Proceeds Transfer Fund 301 Interfund transfer in (out) Investment Earnings General Fund Contributions Utility Fund Contributions Total Revenues Project Expenses Public Works Shops Addt'I Tenant Improvements Total Expenses Increase/(Decrease) Debt Service 2018 LTGO 2019 LTGO 27,674,036 3,000,000 (2,033,709) 243,426 141,854 3,141,854 (2,000,000) 2,033,709 2,200,000 32,167,461 2,233,709 30,000,000 4,400,000 30,000,000 4,400,000 2,167,461 (2,166,291) 28,720,676 10,734,241 (3,671,701) General Fund Debt Service 19,727,459 Utility Fund Debt Service 19,727,459 (735,850) 25,674,036 (A) 3,000,000 (B) 243,426 2,341,854 3,141,854 34,401,170 30,000,000 4,400,000 (C) 34,400,000 1,170 28,720,676 7,062,540 (D) 6,791,608 18,991,608 Reduce PW Shops 2019 LTGO Bond allocation from $7.5M to $5.5M. A Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M. Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M (B) from PW Shops to PSP. Settlement Costs not eligible for bond proceeds. (C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate). Debt Service updated to actual for 2019 LTGO; GF/Utility contributions adjusted to maintain 50/50 (D) split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved debt rating of AA+. Combined General Fund contributions to PSP plan decreases by $236k; $2.2M increase to operating (E ) transfer plus a reduction of $2.436M for debt service. Printed: 10/16/2019 4Page: 1 of 2 A B E F 37 Public Safety Plan - Justice Center and Fire Stations/Eq/APP 38 39 40 41 42 43 44 45 46 47 48 J 50 J 52 53 54 55 56 57 JL 59 61 62 63 64 66 67 68 Project Revenues UTGO Bond Proceeds 77,385,000 77,385,000 LTGO Bond Proceeds 17,500,000 2,000,000 19,500,000 (A) Fire Impact - Segale 4,750,000 4,750,000 Fire Impact - Other 8,017,000 8,017,000 Property/Land Sales 13,053,090 13,053,090 REET 1 10,000,000 10,000,000 Sales Tax Mitigation pmts 4,017,452 4,017,452 Interfund transfer in (out) 2,033,709 (2,033,709) (B) Investment Earnings 1,227,398 1,227,398 General Fund Contributions Total Revenues Project Expenses Justice Center Fire Station 51 Fire Station 52 Fire Station 54 App/Eq Total Expenses Increase/(Decrease) Debt Service 2019 LTGO 137,983,649 (33,709) 137,949,940 66,994,711 66,994,711 14,814,632 14,814,632 23,490,000 23,490,000 1,502,000 1,502,000 15,825,796 15,825,796 122,627,139 15,356,510 25,046,585 (6,671) 122,627,139 15,322,801 25,039,914 (D) General Fund Debt Service 25,046,585 (6,671 25,039,914 Combined Project Summary 69 70 71 72 73 74 75 76 77 78 General Fund Project Costs General Fund Debt Service 141,854 44, 774, 044 2,200,000 (2,942,522) 2,341,854 41,831,522 44,915,898 (742,522) 44,173,376 (E) Reduce PW Shops 2019 LTGO Bond allocation from $7.5M to $5.5M. (A) Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M. Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M (B) from PW Shops to PSP. Settlement Costs not eligible for bond procceds. (C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate). Debt Service updated to actual for 2019 LTGO; GF/Utility contributions adjusted to maintain 50/50 (D) split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved debt rating of AA+. Combined General Fund contributions to PSP plan decreases by $236k; $2.2M increase to operating (E) transfer plus a reduction of $2.436M for debt service. Printed: 10/16/2019 5Page: 2 of 2 TUKWILA PUBLIC WORKS FACILITY: MASTER PLAN - PHASING PHASE 1 HEISER RENOVATION I DEMOLISH LANDSCAPE + COFFEE SHOP POLICE IMPOUND I SITE WORK I COVERED SPOILS ROM - ESTIMATED COSTS - PHASE 1 PHASE 2 ADMIN + MINKLER SHOPS BUILDING I COVERED MATERIAL STORAGES INTERIOR + COVERED PARKING I POLICE IMPOUND I SITE WORK ROM - ESTIMATED COSTS - PHASE 2 CONSTRUCTION COSTS: CONSTRUCTION COSTS: $5,800,000 $22,600,000 SOFT COSTS: SOFT COSTS: $2,400,000 $10,400,000 TOTAL PROJECT COST: TOTAL PROJECT COST: $8,200,000 $33,000,000 ANTICIPATED CONSTUCTION START: MID - 2020 OCCUPANCY DATE: OCT 2023 AFTER COMPLETION OF PHASE 1, THE HEISER SITE WILL MEET THE NEEDS OF THE FLEET AND FACILITIES DIVISIONS AND BE SEISMICALLY SAFE. AFTER COMPLETION OF PHASE 2, BOTH GEORGE LONG AND MINKLER STAFF WILL HAVE A SAFE AND FUNCTIONAL FACILITY THAT MEETS FUTURE NEEDS. PHASE 3 FLEET MAINTENANCE BUILDING I SITE WORK I DECANT + BRINE TANKS COVERED STORAGE I SPOILS I SITE WORK ROM - ESTIMATED COSTS - PHASE 3 CONSTRUCTION COSTS: $24,400,000 SOFT COSTS: $13,000,000 TOTAL PROJECT COST: $37,400,000 DATES: TO BE DETERMINED AFTER COMPLETION OF PHASE 3, THE ENTIRE SITE WILL BE BUILTOUT WITH ALL FUTURE SPACE NEEDS. NOTE: ALL PHASES ARE FUNDED BY A 50/50 FUNDING MODEL BETWEEN THE GENERAL FUND AND WATER/SEWER/SURFACE WATER ENTERPRISE FUNDS. SHKSARCHITECTS FNOVATION CONSTRUCTION LANOSCAPING 6 TUKWILA PUBLIC WORKS FACILITY: EXISTING FACILITIES vs HEISER SITE -AREA MINKLER 2.52 ACRES GEORGE LONG 3.62 ACRES S H K S A R C H I 100' 50 LONGACRES .25 ACRES 100 HEISER + LANDSCAPE SITE 4 ACRES TUKWILA PUBLIC WORKS FACILITY: MINKLER vs GEORGE LONG AND LONGACRES MINKLER SHOPS "It is recommended that the [Minkler] buildings be seismically retrofitted." "Seismic improvements, while inconvenient, can likely be performed without vacating the facility." City of Tukwila Seismic Screenings & Evaluations (Reid Middleton 2008) GEORGE LONG SHOPS "Given the age, condition, construction type, and potential cost associated with retrofitting the [George Long] building, it is recommended that the building be replaced." City of Tukwila Seismic Screenings & Evaluations (Reid Middleton 2008) Issues: • Employee Health and Wellbeing -Building is occupied/operational 6:30 am -4:00 pm M-F and 24 hrs during city emergencies to keep fleet and equipment operational - George Long Shops currently lacks a vehicle exhaust system and does not meet building regulations • Stormwater Pollution Prevention - Currently all storage of materials / spoils are uncovered • Operations Deficiencies -Undersized maintenance bays for size of vehicles needing to be maintained, including emergency vehicles LONGACRES SITE: Currently used for storage of spoil and this is not meeting NPDES requirements. Most of these spoils are required to be stored under covered storage to meet federal regulations. SHKSARCHITECTS 8 FACILITIES SCORE CARD RATING 1 TO (1=BEST, 5=WORST) CM HALL 9 FIRE STAII 51 FIRE I ARE STATION 5 4 4 0 FIRE T1 ER SHOPS GEORGE LONG SHOPS r NTER. 4 4 4 29 SHKS 9 SErE VERIGLEAGGESS v BNILCINI4 VEHICLE ACIISS STAFF MRNNG KEPI' PARKING FOILS MA1GE IMPOUND UNGO7REO STORAGE 181JMY EENG4G INE F (pure 44, TPVb' 0astsa Plan- Phase One Cuncep1Ta0 Ste Plan 6 PHASE 0N1 PHASE 1 PROGRAM SUMMARY INTERIOR PROGRAM EXIST ING AREA EXISTING AREA REQUIRED AREA PROVIDED AREA DELTA (FLEET 87AC1017&S) (GEORGE LONG) (1/DVGA IRE) (NEISER) OFFICE 2,645 SF - 1,810 S 1,865SF +3% HEALTH &UVE1861NG 7809F - K1©91 005SF +'1% EBREASROCM' (RECOVEHEI MEET NG SPA Cf 2,10 SF 375 SF 375 SF 0% SHOP 9,1I09F - 10,6.95 SF 11,760 SF +10Y OPERATIONS STORAGE 0,450 SF - 4,770 SF 5,420 SF -61460 BUILDING SUPPORT 595 SF - 2,070 SF 2,320 SF + 1.2% (LOG*R R(A7M( BBLLOtNG UHLLIIES) 5I14T0TAl. 16,2205F - 20,6205F 22,645 SF +10 , EXAERION PROGRAM EXIST ING AREA EXISTING AREA REFAIIRED AREA PROVIDE DARER DELTA (FLEET&EAcuas? ((66056E LLTVO) (0004AF.I0ES) (HH0R) UNCOVERED STORAGE 1,6955F - 1,3395SF 1,0556% 0% UNCOVERED FLEET PARKING 12,330 SF - 12,360 Sr 12,300 5F 0% STAFF PARKIN? 6,610 SF - 4,356 SP 4,305 Sr 0% POLICE IMPOUND 10,400 SF - 10,400 SF 13400 SF 0% SIAFCTAL 65,690SE - 29,060SF 259305E +0% EXTERIOR PROGRAM EXIST INGAREA EXISTING AREA REQUIRED AREA PROVIDED AREA DELTA (WATER, 07WER, STTIEE E7 (GEORGE 006000( (1'0VG A(PMES) (61462R) UNCOVERED SIORAOE 5555F 5,6555F 6,220SF 6,290SF 0% SPUIL5'JRGANI00 '7,NOOEF 7,560 SF 1546E0 "a7 16,160 SF° +F5% SUEETOTAL 9460SF 12,215SF 21,E50SF 23450SF +4% TOTAL 57,770 SF 13,215 SF 71,130 SF 73,525 05 +4% TP.DRPON CIF 004110TIF64N1L_ PF OVIOEO I NODE HNSI% BUILDN6, 5EE SHEET FEII.2 PARKING EXISTING STALLS PROVIDED STALLS DELTA pTEET&[AC11/R1S) ( CFa ONG) (HEISER) U4076620D FLEET 9420 6 6 +0 0CV30 4 R +E7 1545 1 1 +0 FLkE7T 00601600RNO+0 STAFF 26 26 +6 TOTAL 77 77 +O TEHE3 /L.-A PUELIC WORKS 10 TUKWILA PUBLIC WORKS FACILITY: MINKLER INTERIM IMPROVEMENTS — Rough Order of Costs MAIN GATE SECURITY UPGRADE CONSTRUCTION COST - $20,000 YARD LIGHTING UPGRADE CONSTRUCTION COST - $150,000 SHKSARCHITECTS EXPANSION OF MENS RESTROOM AND RELOCATION OF LOCKER ROOM CONSTRUCTION COST - $150,000 ADDITIONAL STORAGE FOR CREW'S GEAR/ MUD ROOM CONSTRUCTION COST - $60,000 ESTIMATED COSTS - MINKLER UPGRADES CONSTRUCTION COSTS: $400,000 MISCELLANEOUS: $20,000 TAX + CONTINGENCY: $80,000 TOTAL ROM PROJECT COST: $500,000 ANTICIPATED CONSTUCTION START MID - 2020 11 TUKWILA PUBLIC WORKS FACILITY 0 SHKSARCHITECTS TUKWILA PUBLIC WORKS FACILITY: CURRENT FACILITIES GEORGE LONG MINKLER SHKSARCHITECTS 8 13 TUKW|U1pUA||C WORKS FACILITY: EXISTING PROGRAM W1|NKLER Street, Water, Sewer, SurfaceWater ____ � � 32' N� FLEET MAINTENANCE COVERED STORAGE @� ADM |m+snops UNCOVERED STORAGE SPOILS S*uSAxCn|rscrS GE0RGELONG Facilities, Fleet Maintenance Sam ____ mv/� FLEET PARKING FLEET MAINTENANCE PARKING STAFF PARKING LONG ACRES Spoils ____ xm�� e 14 TUKWILA PUBLIC WORKS FACILITY: NEW SITES HEISER HEISER - OPEN SHOPS SHKSARCHITECTS 10 15 TUKWILA PUBLIC WORKS FACILITY: HAT E HAVE DONE • KICKOFF MEETINGS AND GOALS EXERCISE • SITE VISITS OF EXISTING FACILITIES • 2-3 ROUNDS OF INTERVIEWS • JOB SHADOW OF OPERATIONS • TOURS OF LOCAL PUBLIC WORKS FACILITIES • ALL -HANDS MEETING PRESENTED (2) TEST -TO - FIT OPTIONS • SHARED FINALIZED MASTER PLANNING OPTION AT ALL -HANDS MEETING PROGRAM NEEDS ASSESSEIVINT/ GOAL SETTING NOV SHKSARCHITECTS DEC JAN • DMEvASEIL0ERpmPLAENNT FEB • STAFF INTERVIEWS TEAM MEETINGS SITE VISITS ALL - HANDS MEETING PUBLIC WORKS TOURS COUNCIL MEETING MAR APR MAY JUN J UL AUG SEP OCT NOV DEC a) 0 r-1 0 CD esj • 2020 16 K0|Ul PUBLIC WORKS FACILITY: GUIDING PRINCIPLES FRO�� GOALSETTING TU The facility provides asafe environment for workers and visitors and improves employee health and wellness. FUNCTIONAL The facility houses ocollaborative Public Works Department vviththe capacity and flexibility to support the operations of tomorrow efficiently and effectively. FORWARD LOOKING The facility conveys the Department's values toits customers and employees. It supports a | investment strategy to raise existing facility d rds and plans for technological advancements that improve service tothe public. STEWARDS 0FTHE ENVIRONMENT The facility will exemplify environmental and regulatory standards for a sustainable future. It promotes human and environmental health. s*wsAxcH|rscrs 17 TUKWILA PUBLIC WORKS FACILITY: NEXT STEPS, FIRST PHASE TENANT IMPROVEMENT AND SPOILS STORAGE SOUTH 112TH ST L,,,LLMYLMI:M1, co- "HoLHA mom, RIOK,Mmommo,„ ist"'"C:M110‘Vstl. NC\ AV view.,-"vardiht PROPI4MIllt SHKSARCHITECTS POLICE IMPOUND UNCOVERED STORAGE SITE VEHICLE ACCESS BUILDING VEHICLE ACCESS STAFF PARKING FLEET PARKING SPOILS UNCOVERED STORAGE FLEET MAINTENANCE PARKING SITE REGRADING SECURITY FENCING 18 TUKWILA PUBLIC WORKS FACILITY: TENANT IMPROVEMENT FOR HEISERBUILDING TEST -TO -FIT Wgi "f.hORRAVIS, 11111111[11[1111111111111111 I11111r1Irrr- n'"'""IiiiiiiiI11:11111111111111111111111111111!!!!'..""'1111111111111111111111111111"-IIIIII1111"::+„:::::::,1,1,',1: .11111111111IIII"'I1"''— „„„„„, II""Irmrrrrrrrrr. 4..rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr"----.- . 11111111111111111111 """""" PARKING SHKSARCHITECTS ,,g99404, ++XI,I4F+ FFEFaItt+F VEHICLE ACCESS FLEET MAINTENANCE OFFICE + SUPPORT FACILITIES SHOPS FACILITIES STORAGE SPOILS/ORGANICS FLEX/OVERNIGHT PARKING 19 TUKWILA PUBLIC WORKS FACILITY: NEXT STEPS EXAMPLES OF COMPLETED FACILITIES WAREHOUSE STORAGE SHKSARCHITECTS OCKER ROOM low EXTERIOR SPOILS 15 20 TUKWILA PUBLIC WORKS FACILITY: NEXT STEPS COST SU ARY ESTIMATED CONSTRUCTION COST - $ 5,800,000 ESTIMATED SOFT COSTS - $ 2,400,000 THESE COSTS ARE TYPICALLY PAID FOR BY THE OWNER AND ARE IN ADDITION TO THE CONTRACTOR'S COSTS. THESE COSTS INCLUDE: • A/ E FEES- ARCHITECT AND CONSULTANTS UNDER THE ARCHITECT'S CONTRACT. (11.5%) • ENGINEERING FEES AND STUDIES - OTHER PROJECT SPECIFIC CONSULTANTS NOT UNDER THE ARCHITECT'S CONTRACT (EX: ENVIRONMENTAL IMPACT, GEOTECH, SURVEY, LOCATION WORK, ETC). (3.5%) • PERMITS AND FEES- INCLUDES MUP, BUILDING PERMITS, FIRE DEPARTMENT REVIEW, ETC. (2%) • COMMISSIONING- THIRD PARTY SYSTEM COMMISSIONING. (1%) • WA STATE SALES TAX. (10%) • FURNITURE, FIXTURES AND EQUIPMENT ALLOWANCE. (1.5%) • OWNER'S CONTINGENCY. (10%) ESTIMATED TOTAL PROJECT COST - $ 8, 200,000 NOTE: CONSTRUCTION COSTS AND SOFT COSTS WILL BE MORE ACCURATE ONCE DESIGN PROGRESSES SHKSARCHITECTS 21 U1 PUBLIC WORKS FACILITY: MASTER PLAN / ,4OyERCD FLEET PARKING I! COVERED FLEET PARKING ` PROPOSED WETLAND mKING COUNTY S*uSxncH|TsCTS � , � UNCOVERED EE�!�-"a ' INTERIOR FLEET STAFF PARKING N FLEET MAINTENANCE PARKING ADMIN VISITCR PARKING ` pnoanxM Lsscwo N�xoxx|m + snopS 0NFLEET xxA|mTsmxm[s FLEET xxmwTsmAmcspxxmms INTERIOR FLEET PARKING[OvsnsopLscTpxnmmG UNCOVERED nssTpxxmmG �uscxmr+ax|mc 0�5PO|LS COVERED STORAGE � � STORAGE ROM 22 K8|blpUA||C WORKS FACILITY: EXISTING VS 2045 PROJECTED PROGRAMAREAS TU FLEET MAINTENANCE ADM|N+SHOPS STAFF/VISITOR PARKING COVERED FLEET PARKING DECANT+ BRINE WASH RACK SPOILS BULK BINS COVERED STORAGE UNCOVERED STORAGE POLICE IMPOUND S*uSAxCn|rsCrS 10,moSF 20,zessp zz'zsoop 41'ssnsp 14,0s86r z2,yzosp »'nsoSF zy'xznsF nSp 4,7sosp osF z'yoosp za'zaosF zs'soosp a'soosF 6,oOnop J'6Z0Sp s'3nOsF 1z's3nsp z4,onnsF a'zsosF G'2s0Sp wiffiffm cx|5nma NEW REGIONAL PUBLIC WORKS PROGRAM SIZES 300' oouSQUARE FEET PER rEnSow~ rumw/LAPUBLIC WORKS PROGRAM s*o SQUARE FEET PER nensow *RANGE orPROGRAM SIZES DUE voVARYING PROGRAM REQUIREMENTS 23 TUKWILA PUBLIC WORKS FACILITY SHKSARCHITECTS TO: FROM: BY: CC: DATE: SUBJECT: Public Works Det)ortttlerlt - Henry Hash, Directot- INFO ATIONAL E ORA DU Transportation and Infrastructure Committee Henry Hash Public Works Director ./M, Hari Ponnekanti, Deputy PW Director Mayor Ekberg October 18, 2019 Public Safety Plan — Public Works Shops Project No. 91630601, Contract No. 18-197 Amendment No. 2 with SHKS for Phase 1 Design of Heiser Building Man Ekberg, Mayor ISSUE Approve Amendment No. 2 to Contract No. 18-197 with SHKS Architects to design the Heiser Building tenant improvements as part of the Public Works Shops Phase 1. BACKGROUND The City purchased the Heiser property at 11210 and 11234 Tukwila International Blvd in 2018 and took possession in July 2019 for the new Public Works Shops. City Council approved a Master Planning and Programming contract with SHKS Architects for $299,997 in September 2018. Amendment No. 1 to this contract was for $16,500 to complete demolition specifications. ANALYSIS SHKS has completed the Master Planning effort and Phase 1 includes relocating the George Long and Longacres operations to the Heiser Building. Divisions being relocated include facilities and fleet operations, the Police vehicle impound yard, and the Longacres spoils site. Amendment No. 2 with SHKS Architects will design the necessary improvements to the Heiser Building to include seismic retrofit, interior and exterior improvements, upgrades to the HVAC, mechanical, electrical, and storm drainage systems. FINANCIAL IMPACT Land Purchases SOJ Contract SHKS Contract 18-197 SHKS Amendment No. 2 SHKS 10% Contingency Misc. Charges Survey, Attorney Bond Debt Service Charges Lydig Demolition Total $ 26.068.073.97 Total Expenditures Expenditures Balance Owing 2019 Budget $ 25,334,123.00 166,757.52 267,226.09 128,826.35 171,141.01 $ 49,270.91 414,900.00 41,490.00 73,707.00 $ _ 579 367 91 $26.647.441.88 $ 30,000,000.00 $ 30,000,000 00 RECOMMENDATION Council is being asked to approve Amendment No. 2 to Contract No. 18-197 with SHKS Architects for $414,900.00 with $41,490.00 in contingency for a total of $456,390.00 for design services for the Public Works Shops Phase 1 and to consider this item at the October 28, 2019 Committee of the Whole and subsequent November 4, 2019 Regular Council meeting. Attachments: SHKS Contract Amendment No.2 WAPW EngIPROJECTSIA- BG Projects101 Public Safety PlaMPW Shops First Phase (91630601)\Info Memo SHKS Am 2 101819.docx 25 Tukwila PW SHKSARCHITECTS 10/15/2019 Estimated MACC $3,500,000 Per A/E Fee Schedule C 10.74°/ Fee $375,900 Team Composition SHKS PIC' JH Basic Services .Esti Discipline Consultant tol 0 PM, AH PA', PW Staff MF Staff TBD $175 $135 $105 $90 $65 a) y d R E d s o > c R o i+ o 7.1 • t7 c G. t7 t+ c 0 c c +L+ . O> N N N O O O u) o c• ic° m ci¢ a 0 E a 18% 20% 31% 2% 27% 2% $67,662 $75,180 $116,529 $7,518 $101,493 $7,518 $375,900 Target % of fee Architectural Subconsultant N Structural Mechanical Electrical Cost Additional Service Value Engineering Maintenance Facility Design Existing Building Survey AS -Built Documentation Envelope Consulting Subtotal Design Services Contingency 10% 56% 14% 15% 10% 5% 100%' $37,891 $42,101 $65,256 $4,210 $56,836 $4,210 $210,504 $8,612 $9,568 $14,831 $957 $12,917 $957 $47,842 $9,227 $10,252 $15,890 $1,025 $13,840 $1,025 $51,259 $6,151 $6,835 $10,594 $683 $9,227 $683 $3,076 $3,417 $5,297 $342 $4,613 $342 Total $34,173 $17,086, $7,500 $10,000 $9,000 $5,000 $7,500 $414,900 12% 10% $41,490 $456,390 26 u���' ������� ~ �_J�K� ��� �����U���la ~`� ISM U�������� U����J�U ����������������KU�� no�n ��nnxmu�n u n��o���u~ xmu�~unn��"xx�^u���*�omn TO: Transportation and Infrastructure Committee FROM: Henry Hash Public BY: Hari PonDekanti,Deputy PVVDirector ' CC: Mayor Ekberg DATE: October 4.2O19(revised 101B/1S) SUBJECT: Public SafetyPlan - Public Works Shops First Phase 1 Project No. 91630601, Contract No. 18-001 Amendment hanqeOPder No. 5with Lydig Construction for Demolition A!LnnEkbr/g,Mayor ISSUE Approve Amendment Ch3OqeOrder No. 5k}Contract No. 18-0U1k)allow LYdigConstruction 0Jdemolish the Lifestyles landscape building and the coffee shop outbuilding as part of the new Public Works Shops. BACKGROUND The City purchased the Heiser property [t11210and 11234Tukwila International Blvd iO2U18for the new Public Works Shops. These properties came with buildings and facilities that are not needed by Public Works or any other City department. Council adopted Resolution No. 1884atthe August 19,2O1gRegular Meeting that declared the large fixtures, equipment, and outbuildings @Ssurplus and authorized their sale Ordisposal. ANALYSIS The demolition Vfthe two buildings isthe first step for the needed improvements hJaccommodate the new Public Works Shops First Phase 1. These two buildinas are not suitable for Public Works functionality as both Fleet and Facilities needto be inone area. ASi)8rtOfthe GHKG Master Plan, the Ldemolition Ofthese bVi|din the future shoos area for access by IaEge v Uid8S'such 83the V8C0J[trucks and dump trucks. Also, removal 0fthe buildings at the Heiser location is necessary to prevent the public nuisance from squatters and trespassers. Adding Amepdp*F#-Chanqe Order No. 5 for the demolition into the existing contract with Lydig Construction would enable USk)perform the demolition quickly and efficiently. Lvdighas received the bid i)K)PuSalSfor atotal 0f$73.707DOand has the C8VaCib/tDcomplete the demolition 6kthis time. Ore8°pD:tcd It:b:Cp--ncdon OStcb ,2.2S1S.The w:rkic,C-stirp3tcdt:--ostn10S'00"I::dIh3vc firm cost at tl�— O:mbCr8.2019T!Cnn::�i�g FINANCIAL IMPACT Expenditures BalanceOvvnm 30198udmet Land Purchases $25,334.123.00 $3O.000,00ODO SOJ Contract 188'757.52 GHKGCOOtract 287'226.09 $ 49.270.91 N1iSCCharges Survey, Attorney 128.820.35 Bond Debt Service Charges 171,141.01 LydigDemolition -EaU*+et Total $28.008.U73.87 $ 122,977.81 83U.000.00O.O0 Total Estimated Expenditures $26.191�051.88 RECOMMENDATION �� Council i3being asked tUapprove the Ch8Oq8Order No. 5k}Contract No. 18'OO1for Vpk]$1OO,OOO $73,707.00 with Lydig Construction for the demolition of two buildings at the new Public Works Shops and t0consider this item at the October 28.201SCommittee 0fthe Whole and0-, the Co:sC:1«~Cnd-- --, 'hC3UbS8aU8OtNovember 4. 2019013t}he 24'2O1-9Regular Council meeting. Aftaohmonm:2019C|p.page 59.LvdivPm000a|for C»onooOrder No, s CITY OF TUKWILA CAPITAL PROJECT SUMMARY 3019 to 2024 PROJECT: Public Works Shops Project No. 91630601 DESCRIPTION: Cnns�uotanew ChyPubUoVVo�smaintenance and opemdonsoo�e�combining aUopemdnne|funnhnno atone location. Facility may also include a City Clerk & Police Records Center and Police evidence storage. Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current JUSTIFICATION: land for staging dirt and vactor materials is only temporary. Project includes selling dirt/vactor land, Minkler Shops, and George Long Shops Voacquire the real estate 1nbuild anequipment operations center that meets current code --- STATUS: Separate from the Public Safety Plan. Was formerly known as City Maintenance Facility. MAINT. IMPACT: Improves safety and efficiency for First Responders and maintenance operations. COMMENT: Based on usage and bonefits, hisestimated that the Water, Sewer, and Surface water enterprise funds will fund 5O%ofthe Public Works Shops with the other 5O%funded byStreets, Facilities, & Equipment Rental. FINANCIAL Through Estimated in $000's BEYOND TOTAL EXPENSES Design/PM 284 357 1.379 1.501 3.521 Land(R8W) 21.978 21.879 ConsLMgm1 0 Construction 1.500 5.000 4.500 TOTALEXPENSES 284 23.336 2.879 4.501 0 V 0 0 V 30.000 FUND SOURCES Enterprise Funds 12.250 3.750 10.000 Cnunoi|matic8nnd 10.000 750 10.750 REET Funds 3.000 3.000 Mitigation Expected 0 300Fund Balance 204 (2.914) (1.821) 4.501 V 0 0 0 0 250 TOTAL SOURCES 284 23.336 2.879 4.501 U V 0 0 0 30.000 Project Location 2019 2024capxa Improvement Program 59 28 October 7, 2019 City of Tukwila c/o Hari Ponnekanti 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 Office: (206)431-2455 E-mail: Hari.Ponnekanti@TukwilaWA.gov RE: Tukwila Public Works Office Demolition Dear Hari, On behalf of Lydig Construction, Inc., we are pleased to submit our proposal for the Tukwila Public Works Office Demolition in Tukwila, Washington for Seventy Three Thousand Seven Hundred and Seven ($73,707) Dollars Alternates: No Alternates Documents Utilized: SHKS Architects Plans Dated 07/23/2019 LPD Engineering Specification Section 31 10 00 dated 07/29/2019 NOVO Good Faith Inspection Letter dated 07/12/2019 Bid Walk on 09/25/2019 Clarifications: • We have assumed the project starting three weeks after NTP with a two -week duration • Please note that the required Puget Sound Clean Air Permit is required to be filed 10 days before demolition can begin • Work priced to be performed on normal day shift, Monday through Friday • If Lydig is to pay for permits or special inspections, the full cost will be reimbursed via Change Order • Lydig has assumed that all junk, loose items and biological waste will be removed by the owner, from both buildings, prior to mobilization to the job site • Proof of disconnect for all utilities is required prior to starting work (coordination of disconnects by Owner) • All underground utilities are to be abandoned in place • Sanitary sewer will be plugged per district standards, roof drain pipes will be plugged at slab, storm drain clean out will be plugged on the building side • This proposal is lump sum in the amount listed above General Exclusions • Permits and fees • Special Inspections 29 • Local and State Sales Taxes • Code Upgrades required / Identified by City Inspectors • Removal of hazardous materials which includes but is not limited to asbestos, airborne silica, PCB's, • Freon, hydraulic oil, underground storage tanks (USTs), biological waste, lead, air monitoring, dangerous or hazardous waste evaluation, characterization, or disposal, regulatory notices and hazardous materials surveys • Removal of junk and miscellaneous items not a part of the buildings to be demolished • Cut and cap, locate, make -safe, or de -energize site utilities • Removal of below grade utilities • Salvaging of owner materials • Removal of slabs and footings (this is not scheduled for demo per plans provided) • Client to provide a Good Faith Asbestos Survey prior to beginning demolition • Mastic removal or floor prep. Flooring removal includes one pass with a Terminator. This typically leaves the substrate in a condition suitable for following trades (if required). Some residual adhesives may remain. • Engineering for Demolition; engineering of shoring or bracing of existing to remain • Salvage items for reuse, relocation or return salvage to owner • Any demolition not clearly shown or dimensioned on the Architectural or Structural drawings • As -built documents / O&M Manuals Sincerely, Lydig Construction, Inc. Kiel Lunsford Project Manager Attachments: 1. Public Works Demolition Proposal Estimate dated 10/7/2019 2. SHKS Architects Plans Dated 07/23/2019 3. LPD Engineering Specification Section 31 10 00 dated 07/29/2019 4. NOVO Good Faith Inspection Letter dated 07/12/2019 30 LY Project: City of Tukwila Public Works Demo Duration: 2. weeks Bldg area: 24,200 sf Section Description Qty UM Unit Cost Total Cost Notes Div 1 General Requirements 01 10 00 Summary Requirements Project Management Labor Supervision Labor Pre- Mobilization Video on DVD 40 80 hr hr Is 90.49 99.92 450.00 3,620 7,994 450 LCI LCI LCI 011000 Summary Requirements Total 12,063 0150 00 Temporary Facilities and Controls Locate and document existing utilities and controls Temporary Construction Perimeter Security Fencing TESC Measures Catch Basin Insert Silt Fence Install/Removal Save and Protect Exist Planter Save and Protect Water Meter Dust Control Fire Sprinkler Drain Down Electrical make safe within building Materials Materials Labor 8 275 1 1 32 2,060 1 32 4 4 hr If LS ea hrs sf ea hr hr hr 105.00 4.50 1,250.00 250.00 72.83 0.75 500.00 59.60 125.00 115.00 840 LCI 1,238 Secure A Site 1,250 LCI 250 LCI 2,331 LCI 1,545 LCI 500 LCI 1,907 LCI 500 LCI 460 LCI 01 50 00 Temporary Facilities and Controls Total 01 70 20 Temporary Services Dump Fees/Dumpster/Miscellanous Final Cleanup Dump Fees/Dumpster/Miscellanous Final Cleanup Labor Materials 16 12 hr ea 59.60 750.00 10,820; LCI LCI 954 9,000 01 70 20 Temporary Services Total 9,954 Div 2 Existing Conditions 02 40 00 Demolition Demolition Subcontractor 1 Is 25,986.00 25,986 Demolition Layout 8 hrs 105.00 840 Ascendent LCI 02 40 00 Demolition Total 26,826 02 50 00 Site Remediation Junk Removal from storage areas Hazardous materials removal from storage areas Excl Excl load Is EXCLUDED EXCLUDED 02 50 00 Site Remediation Total Div 33 Utilities 33 00 00 Utilities Utility Demolition 1 Is Abandon Underground Electrical Lines 2 ea Abandon Electrical Lines Demo existing electrical line to pole 1 ea ea Plug SS per District Standards 1 ea Plug Roof Drain Pipe Plug SDCO on building side 1 ea ea Ascendent, incl above Ascendent, incl above Ascendent, incl above Ascendent, incl above Ascendent, incl above Ascendent, incl above Ascendent, incl above 33 00 00 Utilities Total Direct Cost Subtotal Contractor Contingency 3.0% Pre -Construction General Conditions Subtotal BRI B&O Tax 0.471% GLI 0.75% Bond Subtotal Yes Yes OH & Fee ' 100% 59,663 1,790 2,647 64,100 1,000 337 537 1,032 67,006 6,701 TOTAL COST EXCLUDING WSST 73,707 Print Date: 10/7/2019 Lydig Construction Page 1 of 1 31 32 Public Works Department - Henry Hash, 'Director �0 _r a� ��U uu �0 ~� �A U TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director ' BY: Pat Bnnd|n.Development Manager CC: Mayor Allan Ekberg DATE: October 1W,2019 SUBJECT: Water and Sewer Comprehensive �Plans Project Nos. 91940101, 91940201 Consultant Contract with Coro||oEngineers for 3D2OUpdate �W A �I Altan Ekberg, Mayor ISSUE Approve a consultant contract with Carollo Engineers to update the Comprehensive Plans for the Water and Sewer Utilities. BACKGROUND Washington State Department of Health requires 8Oupdate to the City'SWater Supply Plan every six years to ensure that the water utility is active, and the operating permit remains in the green status, or compliant. Likewise, the Departmentof Ecology approves the Comprehensive Sewer Plan every six years. In the last update in 2015,the City contracted with C80U0 Engineers for the Water and Sewer Comprehensive Plans. The new updates to the Water and Sewer Comprehensive Plans must b9completed and approved bythe end Of2U20. DISCUSSION The current MRSC Consultant Roster was reviewed and three firms were short-listed to complete the updates to the Water and Sewer Comprehensive Plans. The firms were Carollo Engineers, HDR Engineers, and Pace Engineers. The Summary of Qualifications tables were evaluated from each firm and C80||Owas the unanimous choice based 0Otheir regional experience and SOUOd knowledge regarding Tukvvi|3's water and sewer infrastructure. Key water topics included in the update will be demographic and d808Od projections, iOCO[p0GtiDg remaining USefb| life, updating and calibrating the water model, provide updated fire flow results, and water quality regulatory requirements. Water storage iSGOissue that will need 0Jb9addressed. Key sewer topics include sewer flow projections, OOw0Vnik}hOgatChdC8|S8we[|VCati0OS,Co38t83Sewer0od8|Ofth8 commercial business district 02aid with capital projects @Od9v8|Uat8th8C000S[cia|diSthctS0Dm8y8OC6Sy3teDU.S9w8[|ift station improvements, update the repair and replacement program, summarize reclaimed water use, and update any regulatory requirements. FINANCIAL IMPACT The consultant contract with Carollo Engineers will split between the Water and Sewer Utilities: The Sewer Contractin this update will be higher than expected because of the Department of Ecology reset and new model. Ud|itV C-am||o Contract BudOet Water Comp Plan $ 182,441.00 $280'000.0O Sewer Comp Plan 277.951.00 280,000.00 Total $400382D0 $590.000.00 RECOMMENDATION Council is being asked to approve the consultant contract with Carollo Engineers for the update to the Comprehensive Water and Sewer Plans for $460.392.00and consider this item on the Consent Agenda at the November 4.2018 Regular Meeting. Attachments Scoring Sheet Consultant Agreement w/Scopes 33 WAPW EngTROJECTMA- WT ProjecWWater Comprehensive Plan -Water (91040101)klnfo Mew Water Sewer Comp Plan 2019102519.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Water Comprehensive Plan Project No. 91040101 DESCRIPTION: Prepare the new Water Comprehensive Plan incorporating any regulatory or new Growth Management Act Comprehensive Plan issues related to running the water utility. JUSTIFICATION: Plan needs to be consistent with City's Comprehensive Plan and the Department of Health requires the plan to be updated every 6 years. STATUS: Current Water update was adopted in 2015. The next update is scheduled for 2021. MAINT. IMPACT: COMMENT: FINANCIAL Through Estimated (in $000's) EXPENSES Design Land (R/VV) Const. Mgmt. Construction TOTAL EXPENSES FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected Utility Revenue TOTAL SOURCES 2017 2018 2019 234 234 0 140 140 2020 140 140 2021 0 2022 0 2023 0 2024 0 BEYOND TOTAL 0 514 0 0 0 514 234 234 0 0 140 140 140 140 0 0 0 0 0 0 0 0 0 0 0 0 0 0 514 514 Project Location: Entire System 2019 - 2024 Capital Improvement Program 64 34 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Sewer Comprehensive Plan Project No. 91040202 Prepare new Sewer Comprehensive Plan incorporating any new or regulatory Growth Management DESCRIPTION: Act Comprehensive Plan issues related to sewer. Sewer Comprehensive Plan needs to be consistent with City Comprehensive Plan, Department of JUSTIFICATION: Ecology and Department of Health. Update is required every 6 years. STATUS: 2013 Sewer update was adopted by Council on 6/2/14. Next update is scheduled for 2021. MAINT. IMPACT: COMMENT: FINANCIAL (in $000's) EXPENSES Design Land (R/VV) Const. Mgmt. Construction TOTAL EXPENSES FUND SOURCES Awarded Grant Proposed Grant Mitigation Actual Mitigation Expected Utility Revenue TOTAL SOURCES Through Estimated 2017 2018 2019 2020 2021 2022 2023 158 158 0 140 140 140 140 0 0 0 2024 BEYOND TOTAL 0 0 438 0 0 0 438 158 158 0 0 140 140 140 140 0 0 0 0 0 0 0 0 0 0 0 0 0 438 438 Project Location: Entire System 2019 - 2024 Capital Improvement Program 80 35 co IQ 36 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Contract Number: PROFESSIONAL SERVICES AGREEMENT (Includes consultants, architects, engineers, accountants, and other professional services) THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and Carollo Engineers, hereinafter referred to as "the Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform Engineering Plan services in connection with the project titled Water and Sewer Comprehensive Plan Update. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending December 31, 2020, unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than December 31, 2020 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $560,000.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 37 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non -owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be at least as broad as ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, stop -gap independent contractors and personal injury and advertising injury. The City shall be named as an additional insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City using an additional insured endorsement at least as broad as ISO CG 20 26. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. CA revised December 2016 Page 2 38 4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. Upon request by the City, the Consultant shall furnish certified copies of all required insurance policies, including endorsements, required in this Agreement and evidence of all subcontractors' coverage. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. Contractor, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation, the presence of any disability, or any other protected class status under state or federal law, in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. CA revised December 2016 Page 3 39 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive termination of this Agreement. 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: Carollo Engineers 1218 3rd Ave., Suite 1600 Seattle, WA 98101 18. Entire Agreement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. CA revised December 2016 Page 4 40 DATED this day of .2019 CITY OFTUKVV|LA CONSULTANT Allan Ekberg, Mayor Attest/Authenticated: Printed Name: Title: Approved 8StOForm: City Clerk, Christy O'Flaherty Office of the City Attorney carevised December 2016 EXH|BITA CITY OFTgKW|LA DRAFT SCOPE OF SERVICES COMPREHENSIVE WATER SYSTEM PLAN The following Scope of Services has been developed to assist the City of Tukwila (City)with the 2O20update ofits Water System Plan (Plan). The objective of this project is to update and review all elements of the Plan documents, in accordance with WAC 246-290-100 and State of Washington Department of Health (DOH) regulations. The following tasks under this Scope ofServices has been prepared based on[anoUo's([onso|tant) and its subconsultant's current understanding of the proposed project, and on discussions with City staff. The City initiated this Plan update recognizing the importance of planning, developing, and financing water system facilities as a means to provide reliable and efficient service for existing customers and to serve anticipated growth. The Plan isdesigned tomeet state, county, and local requirements. The Oty'slast Water System Plan was completed in 201S. This Plan will be consistent with the City's current update of the City's Comprehensive Plan, creating a cohesive and complementary set of documents. I. [aruUoEngineecs,|ncanditssobconsohantswiUberefenedtoas"[onsohant"inthisdocoment. Z. The City of Tukwila and its staff will be referred to as "City" in this document. l All meetings will he held atCity offices. 4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or secure file transfer. I City comments on draft chapters will be documented in the Project Comment Response Log by the Consultant. The Consultant will prepare responses to address the comments in the Comment Response Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be produced upon City required. 6. Electronic Demand Tool will be provided in x|sxformat. 7. The Consultant will prepare an agenda, presentation materials, and document discussions, including action items and decisions, inmeeting minutes for Consultant -led meetings. O. Meeting notes and related materials will betransmitted electronically in K4SWord and PDFformats via email. 9. The City will print and produce additional copies of all documents as necessary for its use. 10. The City will provide available information related to the project and as requested by the Consultant in a timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as required; furnish to Consultant services of others required for the performance of Consultant's services hereunder, and Consultant shall be entitles to use and rely upon all such information and services provided by the City or others in performing Consultant's services under this Agreement. DRAFT 19 Page 1mf16 Executive Summary ERS AND APPENDICES Chapter 1: Introduction Chapter 2: Existing System Chapter 3: Policies & Criteria Chapter 4: Water Requirements Chapter 5: System Analysis Chapter 6: Chapter 7: Water Use Efficiency Water Quality Chapter 8: Chapter 9:uv�w�e,u_.0 �.. Chapter 10:�����_,.. Appendix A: Appendix B: ...rv., �. Appendix C: Appendix D: Operations and Maintenance Capital Improvement Plan Financial Plan Consultant Consultant Consultant Consultant Notice of Determination of Non -Significance (DNS) Consultant Consultant Consultant Consultant Consultant Consultant City City State Environmental Policy Act (SEPA) Checklist Local Government Consistency Determination Form Agency Comment Letters and Responses Appendix E: Appendix F: Appendix G:__._.. Appendix H: Ordinances and Approvals Water System Plan Submittal Form City DOH Water System Plan Checklist Interlocal Agreements City City City Consulta nt Consultant City Appendix I: Water Facilities Inventory Form City Appendix J: Water Rights Self -Assessment Forms Appendix K: Demographic and Demand Forecast Tables Appendix L: TM 1:H drauLicM pp y Model Update and Calibration Consultant Consultant Consultant Appendix M: Water Quality Sampling Procedures and Program City Appendix N: Revised Coliform Monitoring Plan City Appendix 0: Appendix P: Emergency Response Plan Appendix 0: � Appendix R: Water Shortage Response Plan and Service Reliability Cross -Connection Control Program City City City Standard Construction Specifications for Distribution Mains Appendix S: CIP Cost Estimates City Consultant DRAFT - 10/14/2019 pvr_IlCaiolio)Cocumens/ClleotlrWAlTulomilai_ProposablTulomla_Wate r_Scope Page 2 of 16 43 TASKS To meet the objectives of this Scope of Services, the Consultant shall complete the tasks as summarized in the table below and discussed in detail in the text that follows. Task 100 ASK SUM AR Task Name` Project Management Task 200 Introduction Task 300 Existing System Task 400 Demographic Analysis and Demand Projections Task S00 System Analysis Task 600 Water Use Efficiency Task 700 Task 800 Task 900 Task 1000 Task 1100 Water Quality Operations and Maintenance Capital Improvement Plan Financial Analysis Plan Integration TASK 100 — PROJECT MANAGEMENT The purpose of this task is to direct all activities within the Plan as assigned by the City and maintain the project within the contracted scope, schedule, and budget. This includes project administration, monthly invoicing, client and team coordination and quality assurance/quality control review necessary to successfully complete the assigned chapter of the Plan to the City's expectations. Additionally, the Consultant will develop a Project Management Plan (PMP) and lead the initial team kick-off meeting. This task includes the following activities: TASK 100 f .CTRViTI`_5 101. Monthly Progress Reports and Invoices. This subtask includes production and implementation of the project plan, schedule, and budget. Assist the project team members in the implementation of the task items, reviewing the work -in -progress reports. Prepare and submit monthly activity reports showing current project status and identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An electronic version of the monthly progress reports will be sent to the City for review and approval. This task assumes that no hard copy of the monthly progress reports will be distributed. 102. Project Management Plan. Prepare a Project Management Plan (PMP) that describes deliverables, Plan outline, anticipated meetings, project roles and responsibilities, lists contact information for the project team, describes communications protocols, quality management, and includes the scope of services, schedule, and budget. Quality Management includes, but is not limited to, the following elements: • Project Manager overview of all primary documents to verify technical consistency and compliance with contract requirements. • Organization of the work into logical deliverables with qualified staff for each task assigned to the work. • Resolution of all review comments with a memorandum summarizing key comments and the manner in which each was addressed in the work. An electronic version of the Project Management Plan will be sent to the City for review and approval. This task assumes that no hard copy of the Project Management Plan will be distributed. DRAFT - 10/14/2019 Page 3 of 1644 pw //CaroUo/Documents/Cheat/WA(Tulcwda/_Proposals/ T uiemdaWate iSco pe 1O].Meeting No. 2— Meeting. Facilitate a kick-off meeting to review project management and initial data requests. 1U4.Client Coordination. * Manage the consultant project team to track time and budget, work elements accomplished, work items planned for the next period, manpower, scope changes, time and budget needed to complete the project. m Create and maintain a working project schedule based on the schedule in the PMP. • Review project status, including scope, budget, and schedule. * The PMPwill beupdated with full incorporation ufrevewcommentsafterthe[ityrevewofthed/aft PK4P. * The total length ofthe project isl8months. ~ City provides required documents for appendices. I. Team member contact information. 2. PMPreview for completeness. l Receive, review, and process Consultant invoices inatimely manner. 4. Respond todata requests inatimely manner. 7os,',l0DCmnsol-ton'Delive/obles I. Draft request list. I. Draft Plan outline. I DmftPK4P. 4. Final P&4P. 5� Eighteen monthly progress reports and invoices. 7ozkI0J1111ceL'if�os, * Meeting No. l—KickoffMeeLing. TASK 200— INTRODUCTION The objective of this task is to create the City's introduction to the Plan. This task will develop Chapter 1 — Introduction of the Plan and will develop Chapter 3 — Policies and Criteria. The chapters will be developed based on the information contained in 201S Plan Chapter 1. A new Chapter 3 — Policies and Criteria is created to facilitate review and implementation of newly proposed policies and criteria. The task includes the following activities: TASK 2OOAlT|V|TlES I01 Meeting No. 2-20I5 ChapterlReviev Facilitate ameeting toreview and identify updates needed toZUIS Plan Chapter 1 — Introduction. This may include: related comprehensive water plans from the neighboring jurisdictions and other related plans; recent history of the City's water system; and policies and criteria. A data request will beprepared based onthe meeting. 202. Data Acquisition. Prepare a data request for the required information, The request may include, but is not limited to, the following: * Related comprehensive waterp|ansfnomtheneighbuhngjohsdichonsandotherre|atedp|ans. • Agreements with neighboring jurisdictions. * Neigh bohng/ diacentjvhsdictionsmaAinGeographic|nfomnationSystem(GB)formatvvithcorrent boundaries. DRAFT' 19 Page 4of16 Highline water district intertie Water district 75 intertie Water district #75 intertie • GIS data for the sewer system including City Limits, current water service area, urban growth area (UGA), and interties. • Policies and criteria related to service area and conditions of service, in MS Word. Itisassumed the City will provide language for all requested changes topolicies and criteria. m Emergency Management goals, including redundancy and reliability standards related to system components, inK4SWord. ° Duty toServe. w City and County land use plans and zoning. ° Satellite management program. * Annexation policy. w SEPAand Notice ofDetermination ofNon-Significance (DNS). • Local Government Consistence Determination Form. 203.Revise Chapterl. Prepare arevised Chapter I — Introduction based oncurrent information. Itisanticipated that any revisions will be minor. An electronic version of the draft Chapter will be sent to the City for review. City comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the City Review Draft Plan. I04 Create New Chapter3.Pepaearevsed[hapter3—PdidesandCritehahasedonChYinputnnPo|idesand Criteria. As part of the preparation, the Consultant will review policies and criteria and confirm they fulfill DOH Water System Plan requirements. Itisanticipated that any revisions will beminor. Anelectronic version ofthe draft Chapter will be sent to the City for review. City comments will be recorded in the Record of Comment and will beincorporated into the Chapter aspart ofthe City Review Draft Plan. Tosk20OAssumgt/nns ^ City can provide elements listed under Task 2OZ. ^ It is anticipated that the City will lead the environmental and agency Plan review and approval process. The City will provide all associated documentation tothe Consultant. m This task will involve updating the chapter from the 2UI5Plan. m Nohard copy ofthe chapter will bedistributed. Tpsk200[dvDeVvpmbles I. Requested Data from TaskZ02. 2. Agency Comment Letters and Responses. 3. Adopting ordinances and approvals. 4. Water System P|anSuhmitta| Form. I Comments ondraft Chapter l—Introduction. 6. Comments ondraft Chapter ]— Policies and Criteria. Task ZO0Consultant Defiverobles l. Meeting No. 2 — 201S Chapter I Review Meeting Agenda, Materials, and Minutes. 2. Draft Chapter I —Introduction. l ROC for Chapter l—Introduction. 4. Draft Chapter 3—Policies and Criteria. S. ROC for Chapter ]—Introduction. 6. DOH Water System Plan Checklist. Tosk200 Mee'; 7as * Meeting No. 2—ZOI5Chapter IReview. TASK 300-EXISTING SYSTEM DRAFT -1O/14/2U19 Page 5of16 The objective of this task is to document the City's existing water system (e.g., supply, storage, booster pump stations, interties, and distribution). The task will develop 2020 Chapter 2 —Existing Water System, which will be based on revisions to the 2015 Chapter 4 — Existing System. The change in chapter numbering is intended to better align with DOH's Water System Outline and assist in regulatory review. This task includes the following 3O1.Meeting No. 3 Existing System Review. Facilitate a meeting to review and identify updates needed to 201S Chapter 4 — Existing System. A data request will be prepared based on the meeting. 302. Data Acquisition. Prepare a data request for the required information. The request may include, but isnot limited to, the following: * G|Sdata for existing facilities, service areas, and inventory. ~ Data onpipeline materials and age bvlinear foot, asavailable. � Existing renew and replacement program. � Summary ofimprovements completed since the ZOI5Plan. � Data onexisting infrastructure (e.g. supply, storage, booster pump stations, interties,and disthbotinn). • Water Facilities Inventory Form. • |nter|oca|Agreementz. ]U3.Revise 2DZ0 Chapter 2—Existing System. Prepare arevised Chapter 2—Existing System with updated information. It is anticipated that any revisions wi I I be minor. An electronic version of the draft Chapter wi I I be sent to the City for review. City comments will be recorded in the Record of Comment and will be incorporated into the Chapter aspart ofthe City Review Draft Plan. Tuut3O0Assomobons * City can provide elements listed under Task 3OI. * This task will involve updating the chapter from the 2Ol5Plan. • No hard copy of the chapter will be distributed. I. Requested Data from Task 30I. 2. |ntedoca|Agneements. 3. Water Facilities Inventory Form. 4� Comments onDraft Chapter 2—Existing System. Tosk}OO[nnsvlLontDelivenrb&s l. Draft Chapter Z—Existing System. 2. ROC for Chapter Z—Existing System. 3. Meeting No.] — Existing System Review Meeting Agenda, Materials, and Minutes. 0 Meeting No. 3 — Existing System Chapter Review. TASK 400— DEMOGRAPHIC ANALYSIS AND DEMAND PROJECTIONS The purpose of this task is to perform a demographic analysis and demand projections for the City's Service Area; 10-year and 20-year planning horizons will be evaluated using the best available information. This task will develop the 2020 Chapter 4 — Demographic Analysis and Demand Projections, which will include completely revised projections consistent with the Puget Sound Regional Council (PSRQ 2040 Vision and the most recent DRAFT 19 Page 6of16 water use information. Note, it has been moved from the 2015 Chapter 2 to 2020 Chapter 4 to better align with DOH's Water System Plan outline and facilitate regulatory review. This task includes the following activities: 401. Data Request. Develop and submit a request for data required for Chapter 4. The following data are anticipated toberequired: a. Demographic growth rates consistent with Regional Planning under PSRC 2040 Vision. Population, household, and employment projections (if available) by Transportation Analysis Zones JAZ) are preferred. b. Historical connection and water use information by customer class from 2010 through the present. Monthly orBimonthly water use ispreferred. c. Historical supply purchases from 2010 through the present, including maximum day supply (if available). Monthly orBimonthly purchases ispreferred. d. Historical supply purchases for the maximum week in 2015, 2018, or 2019 to generate a diurnal water use curve for the system. e. Historica|wate/osefromoptoten(lO)|argecustomeo.|f|argeu»eohavemoethanonemete\then water use bvmeter ispreferred. f. Accounted -for Non -Revenue water from 2010 through the present. g. GIS data: land use and zoning data, vacant and re -developable land, TAZ boundaries. 402. Demographics Analysis. Analyze demographic growth 1ncustomers. Use data from PSR[and the City to calculate rates of growth for each TAZ and each pressure zone. High, low, and average number of accounts will be pnepaedfo/thelO-yearandZ0-yearp|anninghohzonsbypessoezone\ifsuf0cientdatai»avai|ab|e. 403. Demand Projections. Demand projections will be for the 10-year and 20-year. a. Develop the historical average day demands (ADD) and maximum day demands (MDD), the accounted- forevenoevvateruses,estimatedwater|ossand|eakagep|anningva|ues,andestab|isheqoiva|ent residential unit (ERU)values for the different customer classes. b� Project the future ADD and MDD water demand for each pressure zone based on the demographic ana|ysisandhistorica|ERUdemand.Estimatesof|ow\modemte,andhighscenariofotorevvaterdemand will bedetermined. The scenarios will be based on the variations in key demand parameters, such as ERU value orthe MDD/ADD peaking factor. Up to ten (10) of the City's largest connections may be projected separately and added to other projected system demands. Peak hour demand (PHD) will be calculated using a diurnal water use curve from a maximum water use week in recent years. 4O4.Meeting No. 4— Demographic Analysis and Demand Projections. Present the methods and results ofthe demographic analysis and demand projections for the City's review and approval. The WUE program will also be discussed. Prepare an agenda, presentation materials, and document discussions, including action items and decisions, inmeeting minutes. 405. Demand model. Provide excel database with projected ERUs and resulting demand for City's use in future updates. 406.[mate Draft Chapter 4 — Demographic Analysis and Demand Projections. Prepare draft Chapter 4 for City's review and approval. City comments and Consultant responses will be tracked in the Comment Response Log. Comments nnthis chapter will beincorporated into the final Plan. Task400 Assurnotions Page 7 of 16 48 ° The Service Area andpresoezonesviUbedeUheatedphortodeve|opmentofthewatereqoiements. * This task will require a complete update of the Chapter with all new information. Tc�sk4O0[tvDe8vemb�es l. Requested Data. 2. Comments onChapter 4—Demographic Analysis and Demand Projections. Deliverables . l. [0eetingNo.4—DemographicAna|ysisandDemandPnojecbonsK4eetihgAgenda,Mateha|s,and Minutes, Z. Draft Chapter 4—Demographic Analysis and Demand Projections. I ROC for Chapter 4—Demographic Analysis and Demand Projections. 4. Demographic and Demand Forecast Tables. Zpsk400 ° Meeting No. 4—Demographic Analysis and Demand Projections. TASK 500—SYSTEM ANALYSIS The purpose of this task is to evaluate the future water system to identify potential deficiencies and proposed improvements, including supply, storage, booster pump stations, and distribution. The hydraulic model piping will be updated and calibrated based on results of hydrant tests performed by the City. Improvements identified in other tasks will be incorporated into the model, as appropriate, to determine the effect of comprehensive improvements. This task will develop 2020 Chapter 5 — System Analysis. It includes information contained in 2015 Chapters 3 — Supply Analysis, 2015 Chapter 5 — Hydraulic Model Update, and Chapter 6 — Distribution System Analysis. This task includes the following acdvities: 501. Data Request. Develop and submit a request for data required by Chapter 5. The following data are anticipated tuberequired: a. Cascade Water future supply planning. b. King County Reclaimed Water planning. c. Existing well pump tests, capacity evaluations and/or aquifer characterizations. d. Potential location for future storage facilities. 502.Updot Hydraulic Profile. Prepare anupdated hydraulic profile figure. SU3.Water Right Self-Asscssmont. Complete DOH Water Right Self -Assessment (Tables lthrough 3). 5O4.Desktop Analysis — Water Supply Analysis. Summarize the City and Cascade VYate/'slong-term supply planning. Summarize City's existing water right (Foster Links Golf Course). Additionally, summarize potential use ofreclaimed water. 5OS.Desktop Analysis —Storage Analysis. identify the storage volume required for each pressure zone based on the established storage criteria for equalizing, fire flow, operational, and standby volumes. The storage analysis will beperformed for the l0'yearand 2O'yearprojected demands. 5U6.Desktop Analysis —Pump Station Analysis. Identify the pumping capacity requirements per the evaluation criteria. Compare requirements to current pump station capacity to identify any deficiencies for the 10-year and 20'yea/pnojecteddemandscenarios.Requi/edupgmdes,modifications,oroperationa|changeswiUbe recommended, as necessary. DRAFT - 19 Page 8of16 507. Desktop Analysis —Limiting Factor Analysis, Conduct the limiting factor analysis using DO H WSDM 6-1. Calculate the water system service connections correlated to ERUs and the physical system capacity as ERUs. The Limiting Factor Analysis will use information summarized in previous chapters, where applicable. The Limiting Factor Analysis will beconducted for the sought approval period. 5O8.Meeting No. 5—DasktopAnukobWorkzhop.Faci|itateameetingtopresentthevvaterright,sopp|Kstorage, and pump station analysis results for the City's review and approval. As part of this meeting, the City will select preferred options for future storage options. 5O9.Update Hydraulic Mode6Co0h/otion. Review and update system piping, asrequired. Calibrate the steady state InfoWater hydraulic model to check model results against field conditions through up to three hydrant flow test comparisons.Hydrantf|ovvtestswi||becondvctedbythe[ity.A||ocatelO'year,20'yeardemands,andupdated diurnal curve to the model. It is assumed the City will confirm all fire flow requirements (FFR) in the model and provide revisions, as needed. 510Futore Storage Siting. Based on the required storage, up to four locations for a future reservoirs will be evaluated based on the locations defined in 2014 Water Reservoir Siting Study that may include, but are not limited to: a. [ehni Hill. b. Existing Tank Location c. Lease from Adjacent Utility. d. Private Parcel onNorth Hill. Develop required pipe sizing for each location using the hydraulic model determine if pipe upsizing improvements to the existing system would be required for each location. It is assumed the locations will use the same pipe routing proposed in the 2014 study; no new reservoir locations will be considered. Iti»assumed the City will conduct all discussions with adjacent utilities. The options will exclude service to the 340, 380, and 465 Pressure Zones. Develop preliminary costs consistent with Task 900 for the options to aid with City decision making. Future Storage Siting will be presented as part of Meeting No. 5 — Desktop Analysis Workshop 531. Fire and System Pressure Analysis. Using the updated hydraulic model, perform analysis of the system evaluating fire flow and system pressures per DOH regulations and guidelines based on the City's water system criteria. The steady state analysis will focus on distribution capacity deficiencies for pressure, velocity, and available fire flow. Prepare figures showing deficiencies. 512. Identification of Water Improvement Projects. identify improvements to address deficiencies under the MDD plus fire flow simulations and the peak hour simulations for the 10-year and 20-year scenarios. Previously identified supply, storage, and booster pump station improvements will be incorporated to assist in meeting deficiencies. The water system projects will be incorporated into the existing CIP from the 2015 Plan and any changes toprojects will besummarized, ifrequired. 513.Meeting No. 6—System Improvements Workshop. Present identified deficiencies and improvements for City review and comment. 514 Create Draft Chapterfor Chapter5—System Analysis. Prepare draft Chapter 5 for City's review and approval. City comments and Consultant responses will be tracked in the Comment Response Log. Comments on this chapter will beincorporated into the final Plan. Task 500Asson?ptions w The City will provide assumptions onfuture sources and quantities ofsupply. r The City will provide assumptions on future storage locations and conduct all discussions with SPU or adjacent utilities. * The City will conduct hydrant flow testing tosupport model calibrations. DRAFT- 19 Page 9ofl60 ° This task will require a complete update of the Chapter with all new information. /osk5D0 l. Requested Data. 2. Comments ondraft Chapter 5—System Analysis 7skBJ0Cons u/tun'De/1ve[ob les I. Meeting No. 5 — Desktop Analysis Workshop Agenda, Materials, and Minutes. 2. Meeting No. 6 — System Improvements Workshop Agenda, Materials, and Minutes. ]. Draft Chapter S—System Analysis. 4. ROC for Chapter 5—System Analysis. S. Hydraulic Model Update and Calibration Technical Memorandum. Task 500A1eet1ntos * Meeting No. 5—Desktop Analysis Workshop. w Meeting No. 6—System Improvements Workshop. TASK 600—WATER USE EFFICIENCY The purpose of this task is to summarize the City's Water Use Efficiency Program as a member of Cascade Water Alliance and will develop 2020 Chapter 6 — Water Use Efficiency. An independent WUE Chapter is being created to assist the City in meeting future regulatory requirements. The task will include the following activities: 602. Data Acquisition. Prepare a data request for the required information. WUE will be discussed as part of Meeting No. 4 — Demographic Analysis and Demand Projections. The request may include, but is not limited to, the following: • Cascade Water Use Efficiency Program. • VYUEgoals and public adoption documentation. • VYUEmeasures that have been implemented. • Yearly consumer education. w Reported Water Loss. 603. Revise Chapter6. Prepare a revised Chapter 6 — Water Use Efficiency based on updated information. It is anticipated that program revisions will be minor and the water demand with conservation will be reflected in the ^|ow"demand scenario developed. Anelectronic version ofthe draft Chapter will besent tothe City for review. City comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the City Review Draft Plan. Tusk000 11'ioumotiot35 • City can provide elements listed under Task 6O2 ° This task will involve updating the content from the 2OI5Plan. • No hard copy of the chapter will be distributed. I. Requested Data from Task 6OI. 2. Water Loss Control Action Plan. l Comments onDraft Chapter 6—Water Use Efficiency. [onsu/tnntDeJvembles l. Draft Chapter 6—Water Use Efficiency. Page lOofl6 2. ROC for Chapter 6—Water Use Efficiency. ° None TASK 700—WATER QUALITY The purpose ofthis task is to summarize water quality regulations and reporting requirements, evaluation of water quality against the regulations, summary of any water quality violations, and recommended improvements, if necessary, to meet anticipated or future water quality regulations. This task will develop 2020 Chapter7— Water Quality of the Plan. An independent Water Quality Chapter is being created to assist the City in meeting future regulatory requirements. The task will include the following activities: 7O2.Data Acquisition. Prepare a data requests will be provided required information. The request may include, but is not limited to, the following: • Water Quality Sampling Procedures &Program. * Consumer Confidence Reports. • Water quality violations, if applicable. • Revised [o|ifonnMonitoring Plan. • Boil Water Notices. 703. Revise ChapterT Prepare a revised 2020 Chapter 7—Water Quality based on updated information. Revisions will be discussed as part of Meeting No. 8 — Operation and Maintenance Chapter Review. Iti»anticipated that any revisions will be minor. An electronic version of the draft Chapter will be sent to the City for review. City comments will be recorded in the Record of Comment and will be incorporated into the Chapter as part of the City Review Draft Plan. To,sk 7100 Assomn'ions� w City can provide elements listed under Task 7O2. • This task will involve updating the chapter from the 2OlSPlan. • Nohard copy ofthe chapter will bedistributed. • This task does not include review or update of the City's Water Quality Monitoring Plan, Coliform Monitoring Plan, and other water quality programs and plans. Task 0UCitvDefiverables L Requested Data from Task 70l Z. Water Quality Sampling P/ocedues&Program. I Revised [oUformMonitoring Plan. 4. Comments onDraft Chapter 7—Water Quality. Task I. Draft Chapter 7—Water Quality. 2. ROC for Chapter 7 — Water Quality. w None DRAFT 19 Page 11of16_ TASK 800 — OPERATION AND MAINTENANCE The purpose of this task is to review, update, and evaluate the City's Operations and Maintenance (O&M) Program document 2020 Chapter 8 — Operations and Maintenance. The chapters will be developed based on the information contained in 2015 Plan Chapter 7, which has been renumbered from the 2015 Plan due to changes in earlier chapters. An evaluation of the O&M programs will provide recommendations for new or updated maintenance programs, as needed. This task will include the following activities: 801. Meeting No. 7 Existing ChapterReview. Facilitate a meeting to review and identify updates needed to 2020 Chapter 8 — Operations & Maintenance. A data request will be prepared based on the meeting. 802. Data Acquisition, Prepare a data requests will be provided required information. The request may include, but is not limited to, the following: • The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans and specifications for inclusion in the Plan. • Water system organization chart and operator certifications. • Public Works Emergency Response Plan. • Cross -Connection Control Program. • Route and preventive maintenance schedules for major system components. • Water Shortage Response Plan and Service Reliability. 003.Summarize Remaining Useful Life. Summarize remaining useful life ofwater mains based onthe Pipeline Asset Management Study completed by Carollo in 2014. Develop a future water main repair and replacement program based onthe findings ofthe study. 804 ReviseChapter7— Operation and Maintenance. Update 2015 Chapter 7 based on information provided by the City. This may include organization, certification, O&M program activities updates, and known major deficiencies inthe [ity'sO&M program. Adetailed evaluation nfCity O&M programs will not beconducted. Anelectronic version of draft 2020 Chapter 8 will be sent to the City for review and City comments will be recorded in the comment response log. Comments will be incorporated in the Chapter as part of the City Review Draft Plan. This task assumes that nohard copy ofthe chapter will bedistributed. Task 000AssomDtions • City can provide elements listed under Task O02. • This task will involve updating the chapter from the 2OI5Plan. * Nohard copy ofthe chapter will bedistributed. 1. Requested Data from Task O0Z. I. Comments onDraft Chapter 8—Operations and Maintenance. T sk BOO ConsultowDefiverobles I. Meeting No. 7 — Operations & Maintenance Chapter Review Agenda, Materials, and Minutes. 2. Draft[hapterO—OperationsandMaintenance. I ROC for Chapter 8—Operations and Maintenance. Tusk 0 Meeting No. 7 — Operations and Maintenance Chapter Review. TASK 900 — CAPITAL IMPROVEMENT PLAN DRAFT 19 Page 12ofl6 This task wi I I summarize the recommended improvements for the water system in accordance with the City's policies and criteria. This task will develop 2020 Chapter 9 — Capital Improvement Plan, which has been renumbered from the 2015 Plan due to changes in earlier chapters. Total project costs will be developed for each recommended improvement and ranked by priority. Tasks involved include the following activities: 901. CIP Projects with Triggers. Identify and describe CIP projects from prior tasks and existing City planning. Prepare a description of each project. A recommended implementation date, with based on a quantitative project ^thgger",will bedefined for each OPproject. 902. Cost Estimates. Develop planning level cost estimates for all recommended projects using costs provided in other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be prepared; all costs will begiven inIO2Udollars. 903. Prioritization. Prioritize condition -related and capacity -related projects identified in the previous tasks for inclusion inthe [|P incollaboration with the City in Meeting No. 8. 9D4.Electronic [0o Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each project will be listed on a separate tab including project description, justification, estimated cost, and recommended year for implementation. City staff will be provided the ability to adjust indirect costs and escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets will be included as an appendix. The Consultant will train City staff on using the CIP Tool. 9O5.Meeting No. O—[opito Improvement Plan. Facilitate meeting with City Staff to review the recommended CIP. 9O6.Create Draft Chapter 9-Capital Improvements Plan. Prepare chapter including adescription ofcost estimating methods, project analysis, final recommendations, summary table, and system maps with the location of recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 9 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed. This task will require a complete update of the Chapter with all new information. l. Standard Construction SpedficatonforDisthbutionk4ains. Z. Comments ondraft Chapter 9—Capital Improvement Plan. Task 900'TnnsultpntDp8vembles I. CIP Cost Estimates 2. Draft Chapter 9—Capital Improvement Plan, l ROC for Chapter 9—Capital Improvement Plan. 4. Meeting No. 8 —Capital Improvement Plan Agenda, Materials, and Minutes. Task g00Meetings ~ Meeting No. 8—[apita| Improvement Plan. TASK 1000 — FINANCIAL PLAN The purpose of this task is to develop 2020 Chapter 10 — Financial Plan, which has been renumbered from the 2015 Plan due to changes in earlier chapters. The City will lead Chapter 10, which will include an historical financial overview of the system and summarize current policies, rates, and fees. Ten-year projections of revenues and Page 13of16 54 expenses will bedeveloped toidentify the total cost ofproviding water service and implementing the capital improvement program. Potential funding sources for CIP projects will be identified. 1002. Meeting No. 9 —Rnondo/Plan. Review financial analysis conducted by City Staff. 1003.Review and Format Draft Chapter I0—Financial Plan. Review and format City prepared draft Chapter IOfor [ity'sreview and approval. Comments will beprovided for City responses electronically ToskIO00»ssompt/ons ° This task will require acompleted bythe City l. R Draft ChapterIO—Finanda| Plan. l� Draft Chapter lO—Financial Plan I. Meeting No. 9—Financial Review Agenda, Materials, and Minutes. TaskI00O * Meeting No. 9—Financial Review. TASK 1100 — PLAN INTEGRATION The purpose of this task is to integrate all chapters and appendices into the full Plan for review and adoption by the City. This task includes review of all chapters for consistency with DOH's requirements for a Comprehensive Water System Plan per VVA[2O6'29U'I00. 1101.Exocutkve Summary. Prepare an executive summary, summarizing each element of the Water System Plan. 1102. City Draft Plan. Prepare Cover Sheet and Table of Contents. Compile Chapters and develop Appendices. Incorporate comments into Draft Chapters based onCity accepted RD[s.Prepare electronic review draft document for City Staff (one PDFcopy). 1103. MeetinyNulO—CityDmftPlan. Meet with City todiscuss comments ofdraft document. Incorporate comments tobeincluded into Agency Draft Plan. 3104. Agency Draft Plan. Incorporate City comments into an Agency Draft plan to be submitted for agency review. Prepare three (3) hard copy and one PDF for distribution of Plan to Agencies and Adjacent Purveyors. 11DS.Meeting No. ll Commission IPublic Review. Attend a Commission meeting to support City Staff in gaining public comment and/or commission approval of the Plan, as selected by City staff. Aid City Staff in preparing technical materials for the meeting. 1106.Fino Plan Consultant will review agency review letters for incorporation into the Final Plan. Delivery of the Fina|P|anvviUindodetwnPE'stampednotebookbinders,onePDF,andaUe|ectnonicde|ivenab|es. ° City provides required documents for appendices, including acceptance ordinances. ° It is anticipated that City will distribute the Plan to DOH, County agencies, and adjacent purveyors review for approval. The City will collect public and agency review comments and address all comments. The 55 Consultant will provide technical assistance, if required. City will develop written responses tocomments received during Agency Review process. Td�2I0O[De!;vsnb�� I. City Comments. 2. Public and Agency Review Comments. 'Dekve/ob�es I. Executive Summary. 2. City Draft Plan — One PDF. 3. AgencyDn*ftMan—TheehardcopiesandonePDF. 4. Final P|an—TwohandcopiesandonePDF. 5. Meeting No. IU—City Draft Plan Agenda, Materials, and Minutes. 6. Meeting No. Il—Commission / Public Review materials. Tt�tII0JAviesDoos � Meeting No. l0—City Draft Plan. w Meeting No. Il—Commission / Public Review. Meeting No. I Kick-off Meeting Meeting No. 2 201S Chapter 1 Review Meeting No. 3 202OChapter I&3Review Meeting No. 4 Existing System Chapter Review _ kXeetngNo�S Demogra�h�Ana�ssand DemandPn�ecdonsVVodmhop Meeting No. 6 Desktop Analysis Workshop Meeting No. 7 Meeting No. 8 System Improvements Workshop Water Use Efficiency Chapter Review Meeting No. 9 Water Quality Chapter Review Meeting No. 10 Operations and Maintenance Chapter Review Meeting No. ll Capital Improvement Plan Meeting No. 12 Financial Review Meeting No�I3 ��D�ft�an �� Meeting No. 14 Commission / Public Review Project Management Plan All Meeting Agendas & Minutes Month�PnogressRepo�s�v�hinvoices) _ Data Request Spreadsheet — — -- --- D/aftandRO[fnrExecutiveSommary Draft Chapter and ROC for Chapter I — Introduction Draft Chapter and ROC for Chapter 2 — Description of the Water System Revision of chapter from 2015 Plan Revision of chapter from 2015 Plan Draft Chapter and ROC for Chapter 3 — Policies and Criteria Draft Chapter and ROC for Chapter 4—Water Requirements Draft[hapterandROC for [hapter5—Sys�/mAna|ysis _ _______ Draft [hapterand ROC for Chapter 6—VVaterUse EfGciency Draft Chapter and ROC for Chapter 7—Water Quality Revision of chapter from 2015 Plan Draft Chapter and ROC for Chapter 8 — Operations & Maintenance Draft Chapter and ROC for Chapter 9 — Capital Improvement Plan Full chapter odate Full chapter update Revision ofchapter from 2OI5Plan Revision ofchapter from 2OlSPlan Revision ofchapter from 101SPlan Full chapter update Draft Chapter and ROC for Chapter l0—Financial Plan Full chapter update City Draft Plan Agency Draft Plan Final Draft Plan &All Electronic Files DRAFT- 19 Page 16 of 16 57 EXH|BITA CITY OFTUKW|LA DRAFT SCOPE OFSERVICES COMPREHENSIVE SANITARY SEWER PLAN The fol lowing is a scope of work for the Com pre hensive Sanitary Sewer Plan (Plan) for the City of Tukwila. The Plan will becompleted by[anoUoEngineers. However, some tasks and task elements will require the participation of City staff from the Planning, Finance, and Public Works Departments. This scope is developed to describe the content and purpose ofthe Plan, determine tasks tobecompleted for the update ofthe previous plan, and identify the resources necessary toaccomplish those tasks. The Plan will be based on the Washington Administrative Code (WAQ 173-240-OSO standards. The plan will include afuture flow projections, system analysis, and acapital improvements plan (OP)for existing (2Ol - IO' year,andbui|d'ootscenarios.The2Ol36evve/SystemP|anUpdate([aroUo)vviUbeosedasthebasisforthis scope ofwork. PROJECT AS SU MPT10"NS l. [a/oUoEngineecs,|nc.anddssobconsohantzviUberefeoedtoas"[onsuhant"inthisdocoment. 2. The[ityofTokwi|aandhsstadfvviUberefenedtoas"[ity"inthisdocoment. 1 All meetings will heheld atCity offices. 4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or secure file transfer. 5. City comments on draft chapters will be documented in the Project Comment Response Log by the Consultant. The Consultant will prepare responses toaddress the comments inthe Comment Response Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be produced upon City required. 6 The Consultant will prepare an agenda, presentation materials, and document discussions, including action items and decisions, for Consultant -led meetings. Meeting notes and related materials will be transmitted electronically in MSWord and PDFformats via email. 7. The City will print and produce additional copies of all documents as necessary for its use. 8. The City will provide available information related to the project and as requested by the Consultant in a timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as required; furnish to Consultant services of others required for the performance of Consultant's services hereunder, and Consultant shall be entitles to use and rely upon all such information and services provided by the City or others in performing Consultant's services under this Agreement. Page ofD 58 Cehensive Sewer P'16n r����~���T�` �. , — C"~p`=v,`pp==x ::Chapter Lead,: I Executive Summary [hapterl: Introduction Chapter 2: Flow Monitoring Consultant Consultant Consultant Chapter 3: Flow Projections Chapter 4: Existing System Chapter 5: System Analysis Chapter 6: Operations and Maintenance Consultant Ommhont Consultant Consultant Appendix A: State Environmental Policy Act Checklist and Determination of Non -Significance City AppendixB: Agency Review and Comment Letters Appendix C: Adopting Resolution City city Appendix D: King County WTD Conveyance Agreement City Appendix E: System Map with Detailed Pipe Consultant Tomeet the objectives ofthis Scope ofServices, the Consultant shall complete the tasks assummarized inthe table below and discussed in detail in the text that follows. Task 100 TaskZUO '}P��, / ��/ �"�p.`�,"��=��_n-����-. .. Project Management Introduction Task3OO Task4UO Task5UO Flow Monitoring Flow Projections ----- — Existing System Task@0 Task7OU System Analysis Operation and Maintenance Task 800 Capital Improvement Plan Task 900 Plan Preparation The scope of services for the above project will consist of the following tasks. TASK I00—PROJECT MANAGEMENT DRAFT -1O/14/lO19 pmsls: Slop, Page of 17 59 This task includes routine management activities, submittal of monthly progressreports, and overall coordination and assistance. It is anticipated that the Project will be complete by December 2020. Project timeline modifications may require project hour and budget modifications. This task includes the following activities: TA5KIOO'4!-_T!V!T|ECZ. 101. Monthly Progress Reports. This subtask includes production and implementation of the project plan, schedule, and budget. Assist the project team members in the implementation of the task items, reviewing the work-i n -progress reports. Prepare and submit monthly activity reports showing current project status and identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An electronic version of the monthly progress reports will be sent to the City for review and approval, This task assumes that nohard copy ofthe monthly progress reports will bedistributed. 102 Project Management Plan. Prepare a Project Management Plan (PMP) that describes deliverables, Plan outline, anticipated meetings, project roles and responsibilities, lists contact information for the project team, describes communications protocols, quality management, and includes the scope of services, schedule, and budget{loa|ityManagementindodes,botisnotUmitedto,thefoUovvinge|ements: w Project Manager overview of all primary documents to verify technical consistency and compliance with contract requirements. * Organization of the work into logical deliverables with qualified staff for each task assigned to the work. w Resolution of all review comments with a memorandum summarizing key comments and the manner in which each was addressed inthe work. An electronic version of the Project Management Plan will be sent to the City for review and approval. This task assumes that no hard copy of the Project Management Plan will be distributed. 103. Meeting No.1 - Kick-off Meeting, Facilitate a kick-off meeting to review project management and initial data requests. 104 Client Coordination. • Manage the consultant project team to track time and budget, work elements accomplished, work items planned for the next period, manpower, scope changes, time and budget needed tocomplete the project. m Create and maintain a working project schedule based on the schedule in the PMP. • Review project status, including scope, budget, and schedule. 0 The PMP will be updated with full incorporation of review comments after the City review of the draft PMP. a The total length ofthe project isl4months. 0 City provides required documents for appendices. Task, I00City Defiverables I. Team member contact information. 2. PK4Preview for completeness. 3. Receive, review, and process Consultant invoices inatimely manner. 4� Respond todata requests inatimely manner. Task 1l00L[onsu/tuntDeliverables I. Draft request list. 2. Draft Plan outline. DRAFT '1O/14/2O19 ' Page of 17 60 I DratP01P. 4. Fina|PMP. 5. 14 monthly progress reports and invoices. To k 0 Meeting No. 1 — Kick off Meeting. TASK 200— INTRODUCTION This task includes basic information that will serve as a foundation for developing a comprehensive program to meet current and projected future sewer system needs. This task will develop Chapterl Introduction. The task includes the following activities: TA5K2OOA—T(V0ES 201.K8eetingNm.2'2013[hapter1Reviam.Fad|itateameetingtoeviewandidentifvopdatesneededto Chapter l—Introduction. This may include: related comprehensive sewer plans from the neighboring jurisdictions and other related plans; recent history ofthe City'ssewer, system background; and policy and criteria. Adata request will beprepared based onthe meeting. 202. Data Acquisition. Prepare a data request for the required information. The request may include, but is not limited to, the following: • Related comprehensive sewer plans from the neighboring jurisdictions and other related plans. w Agreements with neighboring jurisdictions. • Neighboring/adjacent jurisdictions map, in Geographic Information System (G|S)format with current boundaries. w GIS data for the sewer system including City Limits, current sewer service area, urban growth area (UGA), Aoto[ADdata for existing facilities, and interties. • Service and Fiscal Policies related to service area and conditions of service, in MS Word. It is assumed the City will provide language for all requested changes to policies and criteria. • Emergency Management goals, including redundancy and reliability standards related to system components, inK4SWord. w The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans and specifications for inclusion inthe Plan. ZO3.Revise Chapter 1'introduction. Prepare arevised Chapter l Introduction based onCity direction. |tis anticipated that any revisions will be minor. An electronic version of draft Chapter 1 will be sent to the City for review and Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900. To5,'( ns • City can provide elements listed under Task 2OI. • This task will involve updating the chapter from the 2OI3Plan. w Nohard copy ofthe chapter will bedistributed. roskZ00[iivDeli veozbles l. Requested Data from Task Z0I. DRAFT 10/14/2019 Page ot17 61 Z. Comments ondraft Chapter l—Introduction. Ta s k 20'Donsu/�one0vc{e l/e - I. Draft Chapter l—Introduction. 2. ROC for Chapter I —Introduction. 3. Meeting Agendas and Minutes. TASK 300 — FLOW MONITORING This Task will conduct and evaluate flow monitoring to allow accurate estimates of existing and future system flows so that the City can adequately plan to accommodate its future sewer needs. This task will include flow monitoring of up to seven (7) locations by a Subconsultant. This task will be documented in TM No.2—Flow Monitoring that will be included as an Appendix of the Plan. The task includes the following activities: TA,SK3OOA[T|V|T|ES 301. Review and Update Sewer Service Area and Basins. Review existing sewer service area and basins based on changes to parcels, collection system piping, and laterals information. It is anticipated the City will provide updated information electronically. Update Sewer Basins and provide an updated map for City review and confirmation. 302. Identify Primary Collectors and Lift Stations. The City will identify primary collectors and lift stations for potential flow monitoring and inclusion in the hydraulic model (Task 600). It is anticipated the collectors will be "skeletonized" to only include pipes greater than 12-inch and 8-inch pipes needed to represent flow conditions from sewer basins. To assist with future tasks, the City will need to provide invert elevations for the selected primary collectors and information onLift Stations. 303. Identify Flow Monitoring Locations. Identify recommended locations in install temporary flow monitoring devices in the gravity system at up five (5) locations to measure primary collectors and or Lift Stations south of I- 40S.Anadditiona|two(Z)flovvmonitorsnnphmarycoUectorsor|iftstationsvviUbeaddednorthnf|'4O5,as directed by the City. Flow monitoring locations will be provided to the City to confirm their suitability for meter installation. 3U4'Flow Monitoring ADS will provide temporary flmwmonitornguepvicesto[onsultanttocoUatthee(]) months of flow data up to seven (7). After completion of the monitoring, ADS will provide a Rain Dependent Inflow & Infiltration (RDI/1) Analysis and an electronic report. The work will be performed in three phases as set forth below: a. Phase|-YNobi|ization u' Site Locations ADS will work with the Consultant and the City toidentify/verify the seven h1 locations for monitor installations. Upon approval by the City, additional locations may be added per the optional costs inthe budget. a. Site Inve»tigation ' Once the installation sites are provided toADS, ADS field cevv(s)will perform site investigations. ADS will utilize astandard two (z) person field crew for fieldwork and comply with Federal standards for confined -space entry. The proposed flow monitoring location will be located, inspected, and verified for hydraulic suitability. ADS will also check for debris inthe manhole that could impact data quality and coordinate any required cleaning efforts with the City. 62 ADS field crews will look for evidence and signs oferratic flow patterns. ADS will also investigate adjacent manholes inorder tuidentify the best monitoring locations. I Site Reports Site reports will be generated upon completion of the site investigations. The site reports will include a sketch of the general location, physical characteristics and diameters of the proposed monitoring locations, manhole depths, flow measurements, and other comments pertinent tuthe location such asany special traffic o/safety issues. Final site locations tobe approved bvthe Consultant. 4. Equipment -ADS will utilize wireless ADS@ Model Triton+ T11 flow monitors during the course of this project. Atypical monitor installation will include anultrasonic deothsenso/thatviUbemoontedat the invert of the pipe, a redundant pressure depth sensor; and a Doppler velocity sensor also mounted atornear the invert. Monitor Activation Once installed, the monitor will beactivated and set totake readings at5- minute intervals. ADS Field crews will take manual depth readings with a ruler and velocity readings with a portable, instantaneous velocity meter in order to confirm the monitor is collecting accurate data based onthe actual existing hydraulic conditions ateach location. b. PhaseU Flow Monitoring �. Flow Monitoring Once the monitors are installed and verified tobeinworking order, ADS will monitor for a period of four (4) calendar months ("monitoring period"). This initial monitoring period can be extended based on mutual consent and written agreement of additional work and price for such additional work. Anticipated flow monitoring locations are listed in Table 1. Upon approval of the City, the flow monitoring may be extended by up to two months per the optional costs in the budget. a. Data Collection and Equipment Maintenance - ADS will collect data from each monitoring location remotely using telemetry on a daily schedule (for sites with good wireless signal). The ADS project team will review the data weekly to ensure each monitor is running properly meeting the project objectives as well ADS'standards. ADS Field Crews will perform site confirmations, site maintenance which may include, cleaning the sensor(s), moving, changing or replacing any failed component ateach monitor location. 3. Demobilization Field crews will continue data collections and confirmations (as necessary) until the end ofthe monitoring period. Once authorized, crews will immediately begin removing the flow monitors and deliver final data tuthe data analyst. C. Phase III Data Editing, Analysis and Reporting i. Data Analysis Upon completion ofthe monitoring period, atrained ADS Data Analyst will begin to finalize the data collected for each monitoring location. The data analyst will directly calculate flow using the continuity equation from recorded depth and average velocity data. Flow quantities as determined bvthe continuity equation will beplotted. z. S|i/icerRD|/|Analysis For each of the flow monitoring location, the analysis will characterize the average dry weather flow conditions and RDI/l calculations for all significant wet weather events, an assessment ofhydraulic performance under such conditions. The results ofdry weather and wet weather performance will be plotted on maps of the sewer sheds to make it easier to understand where RDI/I originates. The Shicer.com section of the Report will include the following items: � Dry WeatherAnalysis — A characterization of the conditions observed during weekday and weekend periods of the flow monitoring period during dry weather periods, excluding periods of extended system recovery to previous rain events. Summarized as a time -series hydrograph of the average diurnal flow quantities for weekday and weekend dry weather periods. S. Page ofl7 63 • Dry Weather Flow Summary —A table of the Average Dry Day Flow (ADD F) and an estimation of Base Infiltration (131). Average dry weather diurnal patterns will be provided for each flow monitoring location during weekday and weekend portions of the monitoring period. ° Wet WeatherAnatysis — A characterization of the conditions observed during specific wet weather events observed during the flow monitoring period, summarized as a time -series hydrograph comparing observed flow quantities to average diurnal flow quantities for corresponding weekday and weekend dry weather periods. * Wet WeatherSummuty— A characterization of the conditions observed during the maximum rain event of the monitoring period. This can be summarized as the maximum 30 minute average peaking factor observed during the flow monitoring period. w Wet Weather Prioritization — A column chart of the Rain Dependent Inflow/Infiltration (RDI/1) determined for each flow monitoring location for each wet weather event. Column chart provides a prioritized ranking based on net RDI/I (as percent rain ingress if basin acreages are provided) or net RDI/I per linear foot of sewer per inch of rain when linear footage information is provided toADS. � HydozolicPorfhnnunceEvoluution—Anarotiveinterpetationofhydrau|icperfo/manceneconded at each flow monitoring location as determined using a scattergraph of flow depth and velocity data. The scattergraph interpretation shall evaluate the ability of each flow monitoring location to accommodate flow quantities observed during dry weather and wet weather conditions observed during the monitoring period. z. _DataDe|iveryand TK4NO. z—Flow /Non�?ringSummary ADS vvi||prepare aFinal TK4toindode e|ect/onicdata ofthe flow data intabular, hydrograph,scattergmph,and a RDy|report inelectronic format. z. Meeting No. a Flow Monitorina Summarv-Facilitate aworkshop with City Staff toreview the results and conclusions drawn from the flow monitoring. 305. Rainfall Data Review. Obtain and process hourly rainfall data corresponding to the monitoring period from the NOAASEATA[Airport weather station. 306. Flow Monitoring Data Review. It is anticipated that data will be available from up to seven (7) monitoring locations for the 2019/2020 winter. The data quality for the events will be evaluated for each meter and reviewed with the City. Flow monitoring data will also be reviewed to identify storm events that lead to wet weather flows in the collection system and are suitable for wet weather model calibration. The rainfall for these specific events will be compared with the rainfall record to assess the individual storm sizes return periods. Ideally data will be available for three to five storms. Wet weather flows, R-Factors and 1/1 rates will be calculated for each meter or SCADA source for up to three storm events. The flow monitoring data analysis will result in modified wet weather modeling parameters that will beused |nthe hydraulic model. 307. Meeting No. 3 - Flow Monitoring Review. Facilitate a workshop with City staff to review the findings of the Flow Monitoring. 308. Draft Chapter 2 — Flow Monitoring. Consultant will summarize the results of the flow monitoring and data review in Chapter 2: Flow Monitoring. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 2 will be sent to the City for review and Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900. Task �00 Assoo!udnns This task will require a complete update of the Chapter with all new information. Page of 17 64 0 No hard copy of the draft chapter will be distributed. /c-,sk 300[iL`vDehvombles' I. Requested Data. I. Review ofDraft TMNu.I—Flow Monitoring. I Review ofDraft Chapter Z—Flow Monitoring. I. Draft and Final TMNo.I—Flow Monitoring. 2. Draft Chapter Z—Flow Monitoring. 3. ROC for Chapter Z—Flow Monitoring. 4. Meeting Agendas and Minutes. Tnsk3i-)i)8�«e�Tgs * Meeting No. 3—Flow Monitoring Review. TASK 400 — FLOW PROJECTIONS The objective of this task is to develop the sewer flow projections for the sewer service area for the current (2019), lO-year,and build -out (maximum density) scenarios. Sewer flows will bebased onthe flow monitoring inTask 300 and the City's demographic projections. A new hydraulic model will be created and used to estimate future wet weather flows. The model will include the developed area south of 1405 and up to two (2) sewer basins north of4O5. This will not be an all pipe model of the system. The information developed in this task will become Chapter Flow Projections. This task includes the following activities: TASK 4OOA(__TiV|T|E,S 401 Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the project. The City will provide: • Current Nprogram. • Summary of|/|projects completed since the 2Ol3Plan. • Sewer connections bycustomer class. • Sewer conservation flow reduction rate. • Map with direct connections toKing County wastewater system. • Data on number, horsepower, capacity, design point for all pumps at the City's Lift Stations. • Lift Stations runtime. • City Planning Department existing and future populations and employment based on PSRC's 2040 Vision demographic projections and more current planning for the service area. These growth rates for the 10- yearscenariowiUbeconsistentwiththe[omprehensiveVYaterP|an. * GIS Data: land use, zoning data within the City Limits, sewer service area and UGA. It is assumed that these data will beprovided in6|Sformat. w G|SData: existing facilities (pipes,manholes, lift stations, connections with King County, etc),and interties. 65 4OZ.Update Service Area, Land Use, and Zoning. Basedon[ityp/ovideddata update mapping and descriptions of existing and future service areas, land use, and zoning for the City Sewer Service Area. The Plan will include both figures and text. 403. Demographic Projections. Allocate the existing and 10-year and build -out projection of sewered population and employment provided by the City Planning Department to Sewer Basins. The 10-year growth rates will be consistent with the Comprehensive Water Plan. The build -out projections are anticipated to be based on Comprehensive Plan land use. 404. Design Storm. A design storm has been developed from a long term historical rainfall record at a number of sites near the City. Rainfall data from the ongoing city monitoring program will be reviewed and evaluated to determine if the design storm previously identified for wet weather flow modeling should be revised. The more recent data will also be used to evaluate any local rainfall variability and trends. This review will be prepared to prooidetheCityvvithadefensib|e^Design"sto/mthatemo|ates|oca|vveatherpatterns 405. Develop Existing Dry Weather Flows by Basin. Utilize existing land use maps to develop or confirm average dry weather flows (ADWF) for the modeled sewer basins. The flows will be confirmed with the flow monitoring data as well as the available flow data from the lift stations. Existing land use and currently served areas will be used to estimate flow factors per acre per land use category. The flow factor will be customized to match the observed existing ADWIF and will be used to develop flow projections. For basins without measured flow data, flow factors will be assigned from a measured basin with similar land use characteristics. 406.Deve|op 10-year and Build -out Dry Weather Flows by Basin. The City's comprehensive plan and any additional information on housing densities, commercial and industrial uses will be used along with the flow factors developed in the above task to determine the ultimate development acreage and the ADWIF for build -out conditions for uptosewer collection system. 407. Create Hydraulic Model. Using the most recent information from the City's GIS data, create a sewer system hydraulic model using Innovyze lnfoSWIVIM software. The model will include the developed area south of 1405 and up to two (2) sewer basins north of 40S. The model will include lift stations and primary collectors, and does not include the laterals, branches, or smaller truck sewers serving individual parcels within the basins. The City's existing GIS ArcView ".shp" files will be used to import the collection system data into the hydraulic model. If not available in the G|S, the City will provide invert elevations at key locations to construct the model. Add |nft station controls provided by the City to simulate realistic lift station operation. Estimate likely boundary conditions at connections King County transmission mains, asrequired. The up to seven (7) basins associated with flow monitoring will be further divided into mini -basins for sanitary and wet weather loading in the model. These mini -basins will group parcels that contribute to common branches and trunks, and will beconnected tothe modeled primary collector orlift station atthe appropriate location. 408. Meeting No4 - Hydraulic Model Creation.. Facilitate a meeting with City staff to review and confirm the elements of the hydraulic model. City staff may be requested to perform field verification of model elements based on this meeting. 409. Calibrate Existing Dry Weather and Wet Weather Flows. The existing dry and wet weather flows will be calibrated based upon the flow monitoring data, and rainfall data provided by the City as well as additional data available from the [ity's S[ADAsystem for optoseven (7) locations inthe collection system. Existing flow depths and velocities will also bechecked and calibrated. The first step istocalibrate the model todry weather flow conditions. Flow monitoring data will provide custom hourly diurnal curves that establish the daily flow patterns for each metering basin. Model results will be compared to measured flows to check for agreement between model results and measured flows. Model parameters will be adjusted, as needed, to best match the flow monitoring and SCADA data. It is assumed that the City will provide SCADA data in electronic format. Page ot17 66 Once the dry weather calibration is completed, the wet weather calibration is conducted. Rainfall information will aid in developing the required rainfall -derived infiltration/inflow (RDI/1) estimations that enter the collection system during a storm event. Wet weather calibration consists of using three storms that occurred during the flow monitoring period. It is recommended that the use of a single calibration period incorporating a number of independent rainfall events should be considered whenever possible. Model results will be reviewed and adjusted, asneeded, tobest match the flow monitoring, rainfall and SCADAdata. The flows from unmetered basins will be developed as best possible using a mass balance between the available data, and proportioned as best as possible based on development type, age, pipe material, and extent of collection system components. The hydraulic model will be calibrated in accordance with international modeling standards. The Urban Drainage Group from the Chartered Institution of Water and Environmental Management (CIWEM) has established generally agreed upon principles for model verification. The dry weather and wet weather calibration will focus on meeting the recommendations on model verification contained in the "Code of Practice for the Hydraulic Modelling of Urban Drainage Systems," published by CIWEM (November 2017). 410. Meeting No. 5 - Model Calibration. Consultant will conduct a workshop (Meeting No. 5) with the City to summarize the model calibration results. Consultant will present the model calibration results for both dry and wet weather scenarios, Summary tables will be presented that quantify the percent difference between the measured data and the modeling results. Consultant will discuss calibration standards and confidence levels at the workshop. 411. Hydraulic Model Creation and Calibration TM No.2. Consultant will summarize the model creation and calibration in a Draft and Final TM. Anelectronic version ofdraft TK8will besent tothe City for review and address City comments in a Final TM that will be included as an Appendix to the Plan. 412. Develop Existina. 10-vearm and Build out Wet Weather Flow. The calibrated model will be used to determine the existing, 10-year, and build out flows peak wet weather flows for the sewer service area. Wet weather flows will bebased onthe selected design storm. 413. Reclaimed Water. As required by Ecology, reclaimed water opportunities will be updated. The City currently uses reclaimed water from King County's South Treatment Plant. The City's current use and potential future customers will be summarized based on information provided by the City. No new analysis is anticipated for this effort. 413.Draft Chapter 3— Flow Projections. Consultant wi I I summarize the sewer flow projections in Chapter 3: Flow Projections. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. Anelectronic version ofdraft Chapter 3will besent tothe City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. Task 400Assumpdons ° City can provide elements listed under Task 4OI. • This task will require a complete update of the Chapter with all new information. * Nohard copy ofthe draft chapter will bedistributed. * The model will include the developed area south of 1405 and the primary interceptors north of 405. This will not beanall pipe model ofthe system. of17 67 I. Requested Data. 2. Field verification ofmodel elements, asrequired. 3. Comments onTK4No. Z—Hydraulic Model Creation and Calibration 4. Comments onChapter ]— Flow Projections. b�es I. Draft and Final TMNo. 2—Hydraulic Model Creation and Calibration. 2. Draft Chapter 3—Flow Projections. l ROC for Chapter 3—Flow Projections. 4. Meeting Agendas and Minutes. 7osk�G,0 I- Meeting No. 4—Hydraulic Model Creation. 2. Meeting No. 5—Hydraulic Model Calibration. TASK 500—EXISTING SYSTEM The objective of this task is to summarize the existing sewer system facilities and components including lift stations, and interties.This task includes the following activities: TASK 50OA[T|V|T|E� 501. Meeting No.6 - 2013 Chapter Review. Facilitate a meeting to review and identify updates needed to Chapter 4 — Existing System. A data request will be prepared based on the meeting. 5O2.Data Acquisition. A data request will be provided for required information for this task. The request may include, but is not limited to, the following: w Data onpipeline materials and age bylinear foot, as available. w Existing renew and replacement program. • Summary ofimprovements completed since the 2OI3Plan. • S[ADAdata for sewer system. 503.Uodate Existing Sewer System. Update the components of the major sewer collectors and pump stations using City provided information. This may include changes to boundaries of sewer service basins, lift stations and force mains, and the total length of pipe based on diameter and material. Summarize improvements to the City's' wastewater collection system that have been completed since the 2013 Plan. Develop new system map. 504. Draft Chapter 4 — Existing System. Consultant will summarize the existing system in Chapter 4. An electronic version of draft Chapter 4 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. Task 500Assurmo t,ior? • City can provide elements listed under Task 5U2. • This task will involve updating the chapter from the 2Ol]Plan. • Nohard copy ofthe chapter will bedistributed. o{oh/es DRAFT -1O/14/J019 Page11 ofl7 68 l. Requested Data l. Comments onChapter 4—Existing System. I. Draft Chapter 4—Existing System. Z. ROC for Chapter 4—Existing System. l Meeting Agendas and Minutes. 4. System Map —AppendixE TASK 600—CONVEYANCE SYSTEM ANALYSIS The objective of this task is to evaluate the capacity of the conveyance system to convey existing and future flows during the [ity'sdesign storm. This task will form the basis for [600terS Conveyance System Analysis ofthe Plan. The capacity assessment will be conducted for the collection system included in the hydraulic model and at lift stations. This task will develop recommended improvements to the system in support of a CIP for 10-year and build -out scenarios. This task includes the following activities. TA5������-R�)T>_S� GUl.[olection System Analysis. After the model has been calibrated, the design storm will be routed through the modeled collection system capacity to evaluate capacity during existing, 10-year and build -out conditions. Evaluate capacity deficient segments and identify bottlenecks or other system limitations. Identify improvements to resolve deficiencies using the hydraulic model. All improvements will be confirmed using the hydraulic model. GUI Lift Station Capacity Analysis. Evaluate the existing lift stations capacity based on flow estimates for the design storm. The current performance of the existing lift stations, as provided by the City, will be compared to the modeled peak flows to confirm capacity during the existing, 10-year, and build -out scenarios. Required opgrade$modif i cations will be recommended, as necessary, to address lift station capacity deficiencies. 603. Meeting No. 7 - Capacity Analysis. Facilitate a meeting with City Staff to review the results of the collection system and Lift analysis, aswell asinitial recommended improvements. 604. Lift Station Operational Analysis and Meeting No.8. Conduct a high-level evaluate up to three existing lift stations operational and hydraulic performance to determine if improvements are needed to the Lift Stations. The evaluation will focus on hydraulic capacity, redundancy, facility reliability, and operational considerations, such as wet well sizing. Conduct a site visit of the selected Lift Stations (Meeting No. 8) to document existing infrastructure (Assumed half day site visit). Formulate conceptual Alternatives to address identified issues. Planning level costs, technical considerations and operation and maintenance issues will be compared to develop a recommended alternative. Results of this task will be incorporated into the CIP. 605. Draft Chapter 5 - Conveyance System Analysis. Chapter 5 will document the conveyance system analysis including the recommended improvements to the system. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 5 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will beincorporated mtothe Chapter aspart cfthe City Review Draft Plan. Iask600 Asso * City can provide any data requested. DRAFT 19 Page1Z otl7 69 ° This task will require a complete update of the Chapter with all new information. ° Nohard copy ofthe chapter will bedistributed. l. Requested Data. 2. Comments on Chapter S— Conveyance System Analysis. T�5/,_500[ors,Ion�DeWerobies l. Draft Chapter S—Conveyance System Analysis. I. ROC for Chapter 5—Conveyance System Ana|ysi». l Meeting Agendas and Minutes. l Meeting No. 7—Conveyance System Analysis. 4. Meeting No. 8—Lift Stations Site Visit. TASK 700 —OPERATION AND MAINTENANCE The objective of this task is to assure satisfactory management of sewer system operations. Itwill provide an overview ofthe sewer system responsibility and authority, system operation and maintenance plan, equipment supplies and inventory, and emergency response. The City may need to update its existing emergency response plan that will beincluded asanappendix tothe Comprehensive Plan. This task includes the following activities: TA 5 K7O0ACT|V|T|E'S 7D1.Meeting No. 9—O&M Chapter Review. Facilitate ameeting toreview and identify updates needed to Chapter 6—O&k4.Adata request will beprepared based onthe meeting. 702. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the project. The City will provide: w Copy ofthe organization chart. • Copy ofthe FOG control program. • Copy ofthe overflow emergency response plan. • Current operations and maintenance program activities. 703. Collection System and Lift Station Condition and Maintenance Summary. The City's reported condition and maintenance problems will be summarized. Review basins identified with high 1/1 for potential causes of 1/1 including history of repairs, and pipe age and material. Discuss 1/1 causes with City operation staff.Review the existing |/|program. Summarize completed projects. Identify or update 1/1 reduction goals, Document pipes with known maintenance issues, such as accumulation of solids, FOG build up, or root intrusion. A GIS map will be created, identifying the location of these pipe segments. General pipe replacement timing based on Remaining Useful Life will be based on prior analyses. Document City concerns with condition or maintenance of Lift Stations. No site visits will be completed during this task. information for this task will be provided by the City electronically orduring Meeting No.7. 704. Update Chapter 6 — Operations and Maintenance. Update Chapter 6 based on information provided by the City. This may include updates to organization chart, certification, and collection system and lift station maintenance, O&M program activities, and known major deficiencies in the City's operation and maintenance DRAFT 19 Page13 of 17 70 (O&M) programs. This task does not include a FOG ordinance or program, overflow emergency response plan, a detailed O&M Manual, or maintenance management system. A detailed evaluation of City O&M programs will not be conducted. An electronic version of draft Chapter 6 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part ofthe City Review Draft Plan. 7usk7 0 0 A s _-- u i o n si • City can provide elements listed under Task 7O2. ° This task will involve updating the chapter from the 2Ol]Plan. • Nohard copy ofthe chapter will bedistributed. Tusk 7V0!��De1ivemNc; l. Requested Data from Task 7O2. I. Comments onDraft Chapter 6—Operations and Maintenance. l. Draft Chapter 6—Operations and Maintenance. 2. ROC for Chapter 6—Operations and Maintenance. I Meeting Agenda and Minutes Meeting No. 9 — 2013 Chapter Review. TASK 800 — CAPITAL IMPROVEMENT PLAN This Task will summarize the recommended improvements for the conveyance systemand|Utstatinnsin accordance with the City's Policy and Criteria. This task will develop Chapter 7 Capital Improvement Program for the Plan. Total project costs will be developed for each recommended improvement and ranked by priority. This task includes the following activities: DD1.[|PProjects. Identify and describe [|Pprojects from prior tasks and existing City planning. Prepare a description ofeach project. 8DZ.Cost Estimates. Develop planning level cost estimates for all recommended projects using costs provided in other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be prepared; all costs will begiven in2OI9dollars. 803. Prioritization. Prioritize condition -related and capacity -related projects identified in the previous tasks for inclusion inthe OPinto IVyear and long term scenarios 804. Meeting No. 3.0 — CIP Review. Facilitate a meeting with City staff to review and verify CIP projects, costs and prioritization 805. Electronic CIP. Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each project will belisted onaseparate tab including project de»cdption,justification,estimatedcost,and recommended year for implementation. City staff will be provided the ability to adjust indirect costs and escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets will be included as an appendix. The Consultant will train City staff on using the CIP Tool. DRAFT' 19 Page14 of 17 71 8O6.Financial Summary, Summarize Sewer Utility financial information per WAC requirements. City to provide a discussion cost per service in terms of both debt service and operation and maintenance costs, of all exisUng facilities. Carollo will estimate additional costs for future facilities recommended during the planning period. This summary does not include an analysis of rates, connection charges, or methods to fund the recommended CIP. D07.Meeting No. 11—Financial Review. Facilitate ameetings with City Staff toreview the financial summary and update priority ofOPprojects, asrequired. DOD.Draft Chapter 7. Prepare Chapter 7 Capital Improvements Plan, including adescription ofcost estimating methods, project analysis, final recommendations, summary table, and system maps with the location of recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 7 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed. Task800Assu�2��I� ° City can provide any data requested. w This task will require a complete update of the Chapter with all new information. * Nohard copy ofthe chapter will hedistributed. l. Requested Data. 2. Comments on Chapter 7 —Capital Improvement Plan. Lgs—k Deliverables 1. Draft Chapter 7— Capital Improvement Plan. 2. ROC for Chapter 7—Capital Improvement Plan. * Meeting No. lO—Capital Improvement Plan. ° Meeting No. II — Financial Review. TASK 900 — PLAN PREPARATION This Task will include the compilation ofall previous tasks, [aroUowill prepare afina|[omp/ hensiveSewerP|an that is the compilation of the chapters that have been created as a part of the project, with revisions based on feedback provided bvthe City throughout the project. The[omprehensiveSevverP|anwiUmomp|yvvithVVA[l7]' 240'OSO.Thistask|ndodesthefo||ovvingactivities: "TASK 9N}A[T|WT|E5 901. Executive Summary, Carollo will prepare an executive summary, summarizing each element of the Comprehensive Plan. 902. Prepare Staff Review Draft. Incorporate comments from draft chapters. Compile Chapters and develop Technical Appendices. Prepare review draft document for City Staff in one (1) notebook binder copies and an electronic copy. 9O3.Meeting No. 1Z—Staff Review Draft. Meet with City todiscuss comments onthe Staff Review draft Plan. Comments tobeincorporated into SEPA/AgencyReview Draft. DRAFT- 19 Pa8e1S nt17 72 9O4.Meeting No. 1]—Council Review. Assist the City in presenting the findings of the Plan to Council. Carollo will prepare a power point summarizing the Plan's key points and attend the Council session to support City Staff. Itisanticipated the Council presentation will beno|ongerthan3Ominutes. 905. Prepare Agency Review Draft. Prepare three (3) hard copies and one electronic version forthe City to distribute for agency review. This task assumes the City will lead the Agency Review process. The City will complete the SEPA review process and obtain approval during the Agency Review period. Carollo will assist City in responding to written comments by regulatory agencies, neighboring jurisdictions, and the public, including no more than three letters. No meetings are anticipated for this task. Additionally, no majorp|anevi»ionsare included inthe scope based onAgency Review comments. 906. Meeting No. 14 — Agency Review Comments. Meet with City to discuss comments on the Agency review comments. Aresponse tocomment log will beformulated based onthe meeting. 907. Prepare Final Comprehensive Sewer Plan. Incorporate final comments based on agency reviews, as requested by the City. Provide City with three (3) signed and stamped Final Comprehensive Sewer Plans and one electronic version for the City's use. This task assumes only the documents above will be developed for the Plan approval and any other interim draft plan documents are considered out of scope. �sk I. City Comments. 2. Public and Agency Review Comments. Tnsk, 900[onsv/tontDeKvembies l. Executive Summary. Z. City Draft Plan — One PDF. l AgencyDraftP|an—ThreehardoopiesandonePDF. 4. Final Plan —Two hard copies and one PDF. S. Comment Response Log. ° Meeting No. l2—Staff Review Plan Review. w Meeting No. I3—Coond| Review w Meeting No. I4—AgencyReview Comments. DRAFT 19 Page 16 of17 73 Compreheri�!Ve�5,4hiia��,St%w�r Plan', ;�x��x��e/�m-��� Meeting No. I Kick-off Meeting Meeting No. 2 Meeting No. 3 Meeting No. 4 Meeting No. 5 2013 Chapter 1 Review Demographic Analysis Meeting Flow Projections and I&I Evaluations Existing System Review Meeting No. 6 System Analysis Meeting No. 7 Operations and Maintenance Chapter Review Meeting No. 8 Capital Improvement Plan Meeting No. 9 Financial Review Meeting No. 10 Plan Review �4� DeliverableNn+016,(ifppnfieab el, Project Management Plan All Meeting Agendas & Minutes Monthly Progress Reports (with invoices) Data Request Spreadsheet Draft and ROC for Executive Summary Draft Chapter and RO Draft Chapter and RO _ Draft Chapter and RO [ for Chapter l—Introduction Revision ofchapter from 28l3Plan [ for Chapter 2—Demographic Analysis Full chapter update [ for Chapter 3—Flow Projections Full chapter update Hydraulic Mod e| Draft Chapter and ROC for Chapter 4 — Existing System New Draft [hapterandRO[for[hapterS—Sys��mAnak�a Draft Chapter and ROC for Chapter 6—Operations &Maintenance Draft Chapter and ROC for Chapter 7 —Capital Improvement Plan City Draft Plan Agency Draft Plan Final Draft Plan QAll Electronic Files Revision of chapter from 2013 Plan Full chapter update Revision ofchapter from 2813Plan Full chapter update _ of17 � 74 9 0 UJ (_) 5 w uJ a_ 0 60 TOTAL COST 2 • 2 A — 6 ° 3 E 0 0 0 0. w cn CD CO CO 0) CO st. 64 . te CO = 0 N 0 7s1. 04 64164 CO 01 co 69 64 64 69 0) CO 003ir- 03 0.1) 49 69 oo ca 69. 11) 04 49 0 .0 — v'r E— .1 & 2 1 ) f0 3 2 2406) p_ 64 Cs/ CO CD 1- .1.01 (N. 0). N 61. 63 64 r, 64 CNI 43 64 0 CR 01 CO -4. 1 co co co CO CO 0, I, 0 e 03 0.0 t 47! 0 01 Nr 0 0 Ci) 01 co csr 01 64 64 CO 0 V. CNI CO *ft 6969 CO 69- 04 69 a, oo 01 ▪ `0. CO C0 0) 10, 1 2 N z • Zd 0 "7 0 1.1 0Z0k '.4x N 0 0 N C0 C0 r- a, LO .1". C‘I (0- 04 44 0 th 943 6.4, 46 ‘r 01 63 69 co 63 0▪ ) CO CO 01 0 0 8 I co CO CO CO N_ 0110 69 co 64 IR N 69 64 , 64 CID OD 0) 0 T-` te 49 V> N CO CO CO N 04 04 .1) 491 641' 6444 '7) I 63 CO a> 63 ✓ 14, - .4- CO 0 E co 037 CO 4/4 43 co 0 co 0. E .c E 0 0 44. .bg LO 43 64 4+60 00 0 co 43 04; 64 N CO r1. 0 CI 'I. CO 69 op co 49 N 69 (010 CO CO CD '60- 63 CO 63 CO CO CO N 69 tn.: co CD 0 01 N te ,‘; 69. .4- c0 co- 43 N co co o r, r, 01 63 419 CO 63 04 (C' I 3./) . 64 LC) 0, CLI U5 O N 6344 co CO V' CO N N -0 60 60 S (0 E t 75' 60 (40) 0 0 CO NI. CO 00 0 0 0 0 kwila \ _Proposals \Tukwila WSP Budget.xlsx TOTAL COST O coO Mi E9 i ER u3 69. co r V3 (0 o M E9 (0 V 64 E9 A N V PN3 t+) M ER co M 69 E9 N O ER V M O N CO- 69 49 U 0 A 0 h co M A CO CO O M 69 CO .Q Mio ER `:, EH 69 M EA co M ER O co Eli (i3 N CO O CO V3 CR M 69. 69 O 0) K3 0) CO 99 R ER r 0- 0 0) d3 co 0) co op co 69 ro co O N <R co N O co d ER co d V3 EA 69 M 49 ED E» O 0) E9 0 E9 V N b V3 O O M O M EPr V3 ((V t7, ! 4 N 69 N ER sA O O M Eli co M EH V M eR EN V3 co ER En EH O CO 63 0- V 69 (0 d' M 0- E9 O M O co EA Eli 0) N V3 h N 0) a E4 J Q 02 17. 0 0— 0 03 d'] M V 6G m V co O N 69 op 0 63 0) N v3 0 O ER co 0) so - O O CO N M 69 ER CO CO EA 10 (OO D) O 69 fA (O0 01 • 4 En N v m M (") 4 ER M ER CO 0) M N ER c d CO 0( M M COso O n N N N n co N< a m co M Q. 0 z 0 SK/DESCRI ER E9 M M O 69 E9 N N N N N O N M O M v O V N 0- co N Y 0 CO CD E0 N v N O N -N Cv N O N N 0- M N V N - O N N (0 CO W H 0 4` N N (o a a • O O slo M a (O O (� N10 (0 0) 0 Q O . IY A T U (0 Q `"3 EO G} O CI O YNiOO np i R O O U O i) c U N N O 0. w F 0 0. 0 0 oa W CO .0 0- 0 N 76 TOTAL COST • 04 N N O 0) V: va- co 66 ccr CO (NI 0) c‘i 6 0 0 CO 0 CC1, c.c)-1 69, 0LLJUJ QuJ N N r— 00 0 CO co co 1qt 64 0 0 04 N OP CO N N NI CO 099 (0 CO 0,1 63 69 te9 69, CA 0 CD clr CO 0 N. • r•••• 1 43 2 • 8 e.) 0 0 1 0 CO CO 6, CA 69 69, f N 43 (0 N 49 • 1,7., T.• 01 40 7 2 • 3 0 0. 63 6,9 60 co co 00 00 co CO , CO V' N 0. N • ' N CO V. 60 CO 0 0 0 0 0 0 0 0) 0 OD 0 TOTAL COST e 69 co 69 00 69. co CV V. CO CO N. 691 69- 60 COst-lN CO 6)1 69, <0 <0 CV f 0) CO r-- 661 0 L° 60 69 to_ 0 0 N CO CO 0 0 'II 0 tej. (.") f0 69 69 A 0 0 0 60 0 .C2 -I 2 8 7, 0 0 63 N tO 0 69 co 69 691 69 41 0./ r- k 61. 6., :coo .52 UJF- > cLro 0_ < a 0 uJ co 69 0- 61. z 00 S.9 .1: CC ot 6— I CO ID 10 04 ID 10 Pent NWA\ Tukwila \_Proposals \Tukwila WSP Budget.xlsx EXH|8ITA CITY QFTUKW|LA DRAFT SCOPE CJFSERVICES COMPREHENSIVE SANITARY SEWER PLAN The following is a scope of work for the Comprehensive Sanitary Sewer Plan (Plan) for the City of Tukwi [a. The Plan will be completed by Carollo Engineers. However, some tasks and task elements will require the participation of City staff from the Planning, Finance, and Public Works Departments. This scope is developed to describe the content and purpose of the Plan, determine tasks to be completed for the update of the previous plan, and identify the resources necessary toaccomplish those tasks. The Plan will be based on the Washington Administrative Code (WAQ 173-240-050 standards. The plan will include a future flow projections, system analysis, and a capital improvements plan (CIP) for existing (2019), 10- year,andboUd'ootscenarios.The20I3 Sewer System Plan Update ([aro||o)will beused asthe basis for this scope ofwork. l. Carollo Engineers, Inc. and its subconsultants will be referred to as "Consultant" in this document. I. TheCityofTokwi|aandi1sstaffvv|Ubereferredtoas^[ity~inthisdocument. 3. All meetings will be held atCity offices. 4. Draft Chapters will be provided in electronic copy (PDF and/or Microsoft Word) transmitted via email or secure file transfer. S. City comments on draft chapters will be documented in the Project Comment Response Log by the Consultant. The Consultant will prepare responses toaddress the comments inthe Comment Response Log for the City's review and acceptance. Resulting changes will be incorporated in the Draft Agency Review Plan, rather than reissuing a draft chapter at the time. However, revised draft chapters can be produced upon City required. 6. The Consultant will prepare an agenda, presentation materials, and document discussions, including action items and decisions, for Consultant -led meetings. Meeting notes and related materials will be transmitted electronically in K4SWord and PDF formats via email. 7. The City will print and produce additional copies of all documents as necessary for its use. 8. The City will provide available information related to the project and as requested by the Consultant in a timely manner. The City shall furnish Consultant available studies, reports, and other data pertinent to Consultant's services; obtain, or authorize Consultant to obtain, or provide additional reports and data as required; furnish to Consultant services of others required for the performance of Consultant's services hereunder, and Consultant shall be entitles to use and rely upon all such information and services provided by the City or others in performing Consultant's services under this Agreement. Page of 17 79 Executive Summary [hapterI: Introduction '---- [hapter2: Flow Monitoring 1:v����&i������������,! Chapter 3: Flow Projections Chapter 4: Existing System Chapter 5: System Analysis Consultant Consultant Chapter 6: Operations and Maintenance Chapter 7: Capital Improvement Plan Consultant Consultant Consultant [onmhom Consultant Consultant Appendix A: StataEn�mnment Environmental [heckistandDetenninadonofNon'Sign�canoe [�y _ AppendixB: Agency Review and Comment Letters City AppendixC: Adopting Resolution [hY AppendixD: King[ovntyVVTDConveyanceAgeement City AppendixE: System Map with Detailed Pipe Consultant Tomeet the objectives ufthis Scope ofServices, the Consultant shall complete the tasks assummarized inthe table below and discussed in detail in the text that follows. Task1OO Task2OU Project Management Introduction Task300 Flow Monitoring _-- Task____________ 4UO Flow Projections --------------- -- Task 5U0 Existing System Task 60 System Analysis Task 700 Operation and Maintenance Task 800 Capital Improvement Plan Task 900 Plan Preparation The scope of services for the above project will consist of the following tasks. TASK I0Q—PROJECT MANAGEMENT DRAFT-C/����� 80 This task includes routine management activities, submittal of monthly progress reports, and overall coordination and assistance. It is anticipated that the Project will be complete by December 2020. Project timeline modifications may require project hour and budget modifications. This task includes the following activities: 101. Monthly Progress Reports. This sobtaskincludes production and implementation ofthe project plan, schedule, and budget. Assist the project team members in the implementation of the task items, reviewing the work -in -progress reports. Prepare and submit monthly activity reports showing current projectgatosand identifying key issues or elements of the project that will need to be addressed in the proceeding weeks. An electronic version ofthe monthly progress reports will besent tothe City for review and approval. This task assumes that no hard copy of the monthly progress reports will be distributed. 1O2Project yNanagemnentP|an.Pepa/eaPro/ect&1anagementP|an(PMP)thatdescribesde|iverab|es,P|an outline, anticipated meetings, project ro|esandresponsibi|ities,Ustscontactinformationforthep/ojectteam, describes communications protocols, quality management, and includes the scope of services, schedule, and budget. Quality Management includes, but is not limited to, the following elements: ° Project Manager overview of all primary documents to verify technical consistency and compliance with contract requirements. m Organization of the work into logical deliverables with qualified staff for each task assigned to the work. w Resolution of all review comments with a memorandum summarizing key comments and the manner in which each was addressed inthe work. An electronic version of the Project Management Plan will be sent to the City for review and approval. This task assumes that nohard copy ofthe Project Management Plan will bedistributed. 103. Meeting No. I — Kick-off Meeting. Facilitate a kick-off meeting to review project management and initial data requests. 1O4.Client Coordination. • Manage the consultant project team totrack time and budget, work elements accomplished, work items planned for the next period, manpower, scope changes, time and budget needed to complete the project. ° Create and maintain a working project schedule based on the schedule in the PMP. m Review project status, including scope, budget, and schedule. • The PMP will be updated with full incorporation of review comments afterthe City review of the draft PMP. • The total length ofthe project isl4months. • City provides required documents for appendices. TuskI07 I. Team member contact information. l PK4Preview for completeness. l Receive, review, and process Consultant invoices inatimely manner. 4. Respond todata requests inatimely manner. TuskI00 I. Draft request list. Z. Draft Plan outline. Page nfl7 81 3. D/atPMP. 4. Final PK8P. S. 14 monthly progress reports and invoices. v Meeting No. I — Kick off Meeting. TASK 200— INTRODUCTION This task includes basic information that will serve asafoundation for developing acomprehensive p/ogramto meet current and projected future sewer system needs. This task will develop Chapterl Introduction. The task includes the following activities: TASK 2OOi",-7|V>TiE� 201. Meeting No. 2 - 2013 Chapterl Review. Facilitate a meeting to review and identify updates needed to Chapter I — Introduction. This may include: related comprehensive sewer plans from the neighboring jurisdictions and other related plans; recent history ofthe [ity's sewer, system background; and policy and criteria. Adata request will beprepared based onthe meeting. 202. Data Acquisition. Prepare a data request for the required information. The request may include, but is not limited to, the following: w Related comprehensive sewer plans from the neighboring jurisdictions and other related plans. • Agreements with neighboring jurisdictions. w Neighboring/adjacent jurisdictions map, in Geographic Information System (GIS) format with current boundaries. • G|Sdata for the sewer system including City Limits, current sewer service area, urban growth area (U6A), Aoto[ADdata for existing facilities, and interties. ° Service and Fiscal Policies related toservice area and conditions of service, in MS Word. It is assumed the City will provide language for all requested changes to policies and criteria. = Emergency Management goals, including redundancy and reliability standards related to system components, inK4SWord. w The standard plans and specification, in MS Word. It is assumed the City will provide its standard plans and specifications for inclusion inthe Plan. IO3.Revise Chapter 1'Introduction. Prepare arevised Chapter l Introduction based onCity direction. |tis anticipated that any revisions will be minor. An electronic version of draft Chapter 1 will be sent to the City for review and Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900. Tosk20OAssonolobbns * City can provide elements listed under Task 202. ° This task will involve updating the chapter from the ZOl3Plan. ° Nohard copy ofthe chapter will bedistributed. 1. Requested Data from Task 202. DRAFT '1G Page of 17 T,&_wP~p—,/***°��SP S-p, 82 2. Comments ondraft Chapter 1—Introduction. 7�s�20�[onsv/�on�� I. Draft Chapter I —Introduction. 2. ROC for Chapter l—Introduction. l Meeting Agendas and Minutes. * Meeting No. 2—IOI3Chapter Ireview. TASK 300—FLOW MONITORING This Task will conduct and evaluate flow monitoring to allow accurate estimates of existing and future system flows so that the City can adequately plan to accommodate its future sewer needs. This task will include flow monitoring of up to seven (7) locations by a Subconsultant. This task will be documented in TM No.I—Flow Monitoring that will be included as an Appendix of the Plan. The task includes the following activities: 30I. Review and Update Sewer Service Area and Basins. Review existing sewer service area and basins based on changes to parcels, collection system piping, and laterals information. It is anticipated the City will provide updated information electronically. Update Sewer Basins and provide an updated map for City review and confirmation. 302. Identify Primary Collectors and Lift Stations. The City will identify primary collectors and lift stations for potential flow monitoring and inclusion in the hydraulic model (Task 600). It is anticipated the collectors will be "skeletonized" to only include pipes greaterthan 12-inch and 8-inch pipes needed to represent flow conditions from sewer basins. To assist with future tasks, the City will need to provide invert elevations for the selected primary collectors and information on Lift Stations. 303. Identify Flow Monitoring Locations. Identify recommended locations in install temporary flow monitoring devices inthe gravity system atupfive(5)|ocationstomeasorephmarycoUectooandorLift Stations south of|' 405.Anadditiona|two(2)flmwmonitorsonphmarycoUectuoo/|ift stations will beadded north of|'4O5,as directed bythe City. Flow monitoring locations will be provided to the City to confirm their suitability for meter installation. 304 - Flow Monitoring ADS will provide temporary flow monitoring services to Consultant to collect three (3) months of flow data up to seven (7). After completion of the monitoring, ADS will provide a Rain Dependent Inflow & Infiltration (RDI/1) Analysis and an electronic report. The work will be performed in three phases as set forth below: a. Phase I - Mobilization �Site Locations ADS will work with the Consultant and the City toidentify/verify the seven (7) locations for monitor installations. Upon approval by the City, additional locations may be added per the optional costs inthe budget. z. Site |nvesticiation_Once the installation sites are provided toADS, ADS field crew($will perform site investigations. ADS will utilize astandard two (z) person field crew for fieldwork and comply with Federal standards for confined -space entry. The proposed flow monitoring location will be located, inspected, and verified for hydraulic suitability. ADS will also check for debris in the manhole that could impact data quality and coordinate any required cleaning efforts with the City. Page of 17 83 ADS field crews will look for evidence and signs oferratic flow patterns. ADS will also investigate adjacent manholes inorder toidentify the best monitoring locations. 3. Site Reports Site reports will be generated upon completion of the site investigations. The site reports will include asketch ofthegene/a||ooation,physica|chanacte/ishcsanddiamete/softhe proposed monitoring locations, manhole depths, flow measurements, and other comments pertinent tothe location such asany special traffic orsafety issues. Final site locations tobe approved bvthe Consultant. 4. Equipment ADS will utilize wireless ADS@ Model Triton +T11 flow monitors during the course of this project. A typical monitor installation will include an ultrasonic depth sensor that will be mounted at the invert of the pipe, a redundant pressure depth sensor; and a Doppler velocity sensor also mounted atornear the invert. S. Monitor Acivati»n Once installed, the monitor will beactivated and set totake readings at5- minute intervals. ADS Field crews will take manual depth readings with a ruler and velocity readings with a portable, instantaneous velocity meter in order to confirm the monitor is collecting accurate data based onthe actual existing hydraulic conditions ateach location. bPhaseU Flow Monitoring z. Flow Monitoring Once the monitors are installed and verified to be in working order, ADS will monitor for a period of four (4) calendar months ("monitoring period"). This initial monitoring period can be extended based on mutual consent and written agreement of additional work and price for such additional work. Anticipated flow monitoring locations are listed in Table :L. Upon approval of the City, the flow monitoring may be extended by up to two months per the optional costs in the budget. u. Data Collection and Equipment [Maintenance ADS will collect data from each monitoring location remotely using telemetry on a daily schedule (for sites with good wireless signal). The ADS project team will review the data weekly to ensure each monitor is running properly meeting the project objectives aswell ADS`cLandardc ADS Field Crews will perform site confirmations, site maintenance which may include, cleaning the sensor(s), moving, changing or replacing any failed component ateach monitor location. 3. Demobilization Field crews will continue data collections and confirmations (as necessary) until the end ofthe monitoring period. Once authorized, crews will immediately begin removing the flow monitors and deliver final data tothe data analyst. C. Phase III Data Editing, Analysis and Reporting i. Data Analysis Upon completion of the monitoring period, a trained ADS Data Analyst will begin to finalize the data collected for each monitoring location. The data analyst will directly calculate flow using the continuity equation from recorded depth and average velocity data. Flow quantities as determined bythe continuity equation will beplotted. z. Sk/icerRD08nay$s For each of the flow monitoring location, the analysis will characterize the average dry weather flow conditions and RDI/l calculations for all significant wet weather events, an assessment of hydraulic performance under such conditions. The results of dry weather and wet weather performance will be plotted on maps of the sewer sheds to make it easier to understand where RDI/l originates. The Shicer.com section of the Report will include the following items: � Dty WeatherAnalysis — A characterization of the conditions observed during weekday and weekend periods of the flow monitoring period during dry weather periods, excluding periods of extended system recovery toprevious rain events. Summarized asatime-series hydrog/aphof the average diurnal flow quantities for weekday and weekend dry weather periods. Page of17 84 • Dry Weather Flow Summary —Atable ofthe Average Dry Day Flow (ADDF)and anestimation of Base Infiltration (BI). Average dry weather diurnal patterns will be provided for each flow monitoring location during weekday and weekend portions of the monitoring period. • Wet WeatherAnalysis — A characterization of the conditions observed during specific wet weather events observed during the flow monitoring period, summarized as a time -series hydrograph comparing observed flow quantities to average diurnal flow quantities for corresponding weekday and weekend dry weather periods. * Wet WeutherSummary— A characterization of the conditions observed during the maximum rain event of the monitoring period. This can be summarized as the maximum 30 minute average peaking factor observed during the flow monitoring period. • Wet Weather Prioritization — A column chart of the Rain Dependent Inflow/Infiltration (RDI/1) determined for each flow monitoring location for each wet weather event. Column chart provides a prioritized ranking based on net RDI/I (as percent rain ingress if basin acreages are provided) or net RDI/I per linear foot of sewer per inch of rain when linear footage information is provided toADS. • Hydraulic PorfonnoncoEvaluation —Anarrative interpretation ofhydraulic performance recorded at each flow monitoring location as determined using a scattergraph of flow depth and velocity data. The scattergraph interpretation shall evaluate the ability of each flow monitoring location to accommodate flow quantities observed during dry weather and wet weather conditions observed during the monitoring period. 1. Data oe1iven/and TK4 No. .2_F|ovvWYonito/inqSummary ADS will prepare Final TK8toindude e|ectronicdata ofthe flow data intabular, hydrograph,scattergraph,and aRD|/|report inelectronic format. z. Meetina NO. 22 —Flow Monitorina Summary -Facilitate a workshop with City Staff to review the results and conclusions drawn from the flow monitoring. 3O5.Rainfall Data Review. Obtain and process hourly rainfall data corresponding to the monitoring period from the NOAA SEATA[Airport weather station. 306. Flow Monitoring Data Review. It is anticipated that data will be available from up to seven (7) monitoring locations for the 2019/2020 winter. The data quality for the events will be evaluated for each meter and reviewed with the City. Flow monitoring data will also be reviewed to identify storm events that lead to wet weather flows in the collection system and are suitable for wet weather model calibration. The rainfall for these specific events will be compared with the rainfall record toassess the individual storm sizes return periods. Ideally data will beavailable for three to five storms. Wet weather flows, R-Factors and 1/1 rates will be calculated for each meter or SCADA source for up to three storm events. The flow monitoring data analysis will result in modified wet weather modeling parameters that will beused inthe hydraulic model. 307. Meeting No. 3 - Flow Monitoring Review. Facilitate a workshop with City staff to review the findings of the Flow Monitoring. 308. Draft Chapter 2 — Flow Monitoring. Consultant will summarize the results of the flow monitoring and data review in Chapter 2: Flow Monitoring. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter will be sent tothe City for review and Consultant will address City comments in a comment response (ROC) log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan in Task 900. Usk 300 * This task will require a complete update of the Chapter with all new information. DR AFT 2�& Page of17 85 * Nohard copy ofthe draft chapter will bedistributed. Z���7�[�v�e�u���� I. Requested Data. 2. Review ofDraft TK8No.I—Flow Monitoring. I Review ofDraft Chapter Z—Flow Monitoring. l. Draft and Final TK4No.l—Flow Monitoring. 2. Draft Chapter I — Flow Monitoring. I ROC for Chapter 2—Flow Monitoring. 4. Meeting Agendas and Minutes. 0 Meeting No. 3 — Flow Monitoring Review. TASK 400 — FLOW PROJECTIONS The objective of this task is to develop the sewer flow projections for the sewer service area for the current (2019), l0-year,and build -out (maximum density) scenarios. Sewer flows will bebased onthe flow monitoring |nTask 300 and the City's demographic projections. A new hydraulic model will be created and used to estimate future wet weather flows. The model will include the developed area south of 1405 and up to two (2) sewer basins north of4O5. This will not be an all pipe model of the system. The information developed in this task will become Chapter Flow Projections. This task includes the following activities: 401. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the project. The City will provide: • Current Nprogram. r Summary ofNprojects completed since the 20l3Plan. • Sewer connections bycustomer class. • Sewer conservation flow reduction rate. ° Map with direct connections toKing County wastewater system. w Data on number, horsepower, capacity, design point for all pumps at the City's Lift Stations. • Lift Stations run time. • City Planning Department existing and future populations and employment based on PSRC's 2040 Vision demographic projections and more current planning for the service area. These growth rates forthe 10- yearscenariowiUbeconsistentwiththe[omprehensiveVVaterP|an. w GIS Data: land use, zoning data within the City Limits, sewer service area and UGA. It is assumed that these data will beprovided inG|Sformat. w G|S Data: existing facilities (pipes, manholes, lift stations, connections with King County, etcj, and mterties. 86 4U2.Update Service Area, Land Use, and Zoning. Based onCity provided data, update mapping and descriptions of existing and future service areas, land use, and zoning for the City Sewer Service Area. The Plan will include both figures and text. 4O].Demographic Projections. Al|ocatetheexistingandl0-yearandboi|d'ootpnojecLionofsewenedpopo|ation and employment provided by the City Planning Department to Sewer Basins. The 10-year growth rates will be consistent with the Comprehensive Water Plan. The build -out projections are anticipated to be based on Comprehensive Plan land use. 404. Design Storm. A design storm has been developed from a long term historical rainfall record at a number of sites near the City. Rainfall data from the ongoing city monitoring program will be reviewed and evaluated to determine if the design storm previously identified for wet weather flow modeling should be revised. The more recent data will also be used to evaluate any local rainfall variability and trends. This review will be prepared to provide the City with a defensible "Design" storm that emulates local weather patterns 405. Develop Existing Dry Weather Flows by Basin. Utilize existing land use maps to develop or confirm average dry weather flows (ADWF) for the modeled sewer basins. The flows will be confirmed with the flow monitoring data as well as the available flow data from the lift stations. Existing land use and currently served areas will be used to estimate flow factors per acre per land use category. The flow factor will be customized to match the observed existing ADWF and will be used to develop flow projections. For basins without measured flow data, flow factors will be assigned from a measured basin with similar land use characteristics. 406. Develop 10-year and Build -out Dry Weather Flows by Basin. The City's comprehensive plan and any additional information on housing densities, commercial and industrial uses will be used along with the flow factors developed in the above task to determine the ultimate development acreage and the ADWF for build -out conditions for optosewer collection system. 407. Create Hydraulic Model. Using the most recent information from the City's GIS data, create a sewer system hydraulic model using Innovyze InfoSWMM software. The model will include the developed area south of 1405 and up to two (2) sewer basins north of 405. The model will include lift stations and primary collectors, and does not include the laterals, branches, or smaller truck sewers serving individual parcels within the basins. The City's existing GIS ArcView ".shp" files will be used to import the collection system data into the hydraulic model. If not available in the GIS, the City will provide invert elevations at key locations to construct the model. Add lift station controls provided by the City to simulate realistic lift station operation. Estimate likely boundary conditions at connections King County transmission mains, asrequired. The up to seven (7) basins associated with flow monitoring will be further divided into mini -basins for sanitary and wet weather loading in the model. These mini -basins will group parcels that contribute to common branches and trunks, and will heconnected tothe modeled primary collector orlift station atthe appropriate location. 408. Meeting No4 - Hydraulic Model Creation.. Facilitate a meeting with City staff to review and confirm the elements of the hydraulic model. City staff may be requested to perform field verification of model elements based on this meeting. 409. Calibrate Existing Dry Weather and Wet Weather Flows. The existing dry and wet weather flows will be calibrated based upon the flow monitoring data, and rainfall data provided by the City as well as additional data available from the City's SCADA system for up to seven (7) locations in the collection system. Existing flow depths and velocities will also bechecked and calibrated. The first step istocalibrate the model todry weather flow conditions. Flow monitoring data will provide custom hourly diurnal curves that establish the daily flow patterns for each metering basin. Model results will be compared to measured flows to check for agreement between model results and measured flows. Model parameters will be adjusted, as needed, to best match the flow monitoring and SCADA data. Itisassumed that the City will provide SCADA data in electronic format. Page otD m1,SP_*p, 87 Once the dry weather caUbmtoniscomp|eted,thewetweathe/o*|ibmtionismnndocted.Ra|nfaUinfonnadonviU aid in developing the required rainfall -derived infiltration/inflow (RDI/1) estimations that enter the collection system during a storm event. Wet weather calibration consists of using three storms that occurred during the flow monitoring period. It is recommended that the use of a single calibration period incorporating a number of independent rainfall events should beconsidered whenever possible. Model results will bereviewed and adjusted, asneeded, tobest match the flow monitoring, rainfall and S[ADAdata. The flows from unmetered basins will be developed as best possible using a mass balance between the available data, and proportioned as best as possible based on development type, age, pipe material, and extent of collection system components. The hydraulic model will be calibrated in accordance with international modeling standards. The Urban Drainage Group from the Chartered Institution of Water and Environmental Management (ClWEM) has established generally agreed upon principles for model verification. The dry weather and wet weather calibration will focus on meeting the recommendations on model verification contained in the "Code of Practice for the Hydraulic K8ode||ingofUrbanDrainageSystems,^pob|ishedbyOVYEK4(November2Ol7). 410. Meeting No. 5 - Model Calibration. Consultant will conduct a workshop (Meeting No. 5) with the City to summarize the model calibration results. Consultant will present the model calibration results for both dry and wet weather scenarios. Summary tables will be presented that quantify the percent difference between the measured data and the modeling results. Consultant will discuss calibration standards and confidence levels at the workshop. 411. Hydraulic Model Creation and Calibration TM No.2. Consultant will summarize the model creation and calibration inaDraft and Final TM. Anelectronic version ofdraft TK4will besent tothe City for review and address City comments in a Final TM that will be included as an Appendix to the Plan. 412. Develop Existing, 10-yearm and Build out Wet Weather Flow. The calibrated model will be used to determine the existing, 10-year, and build out flows peak wet weather flows for the sewer service area. Wet weather flows will bebased onthe selected design storm. 413.Reclaimed Water. As required by Ecology, reclaimed water opportunities will be updated. The City currently uses reclaimed water from King County's South Treatment Plant. The City's current use and potential future customers will be summarized based on information provided by the City. No new analysis is anticipated for this effo rt. 413. Draft Chapter 3 — Flow Projections. Consultant will summarize the sewer flow projections in Chapter 3: Flow Projections. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. Anelectronic version ofdraft Chapter 3will besent tothe City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. 6ons ^ City can provide elements listed under Task 40I. ° This task will require a complete update of the Chapter with all new information. ° Nohard copy ofthe draft chapter will bedistributed. * The model will include the developed area south of 140S and the primary interceptorsnorth of4O5. This will not beanall pipe model ofthe system. Tosk';00Delivzmbles DRAFT Page 10 of 17 88 l. Requested Data. I. Field verification ofmodel elements, asrequired. 3. Comments onTK4No. 2—Hydraulic Model Creation and Calibration 4. Comments onChapter ]— Flow Projections. T���4�O[ons»�on�De0verob�� I. Draft and Final TK4No. Z—Hydraulic Model Creation and Calibration. 2� Draft Chapter 3—Flow Projections. 3. ROC for Chapter ]— Flow Projections. 4. Meeting Agendas and Minutes. 7�s�40,"84eEb�� 1. Meeting No. 4—Hydraulic Model Creation. 2. Meeting No. S —Hydraulic Model Calibration. TASK SOO — EXISTING SYSTEM The objective of this task is to summarize the existing sewer system facilities and components including lift stations, and interties.This task includes the following activities: [A5K�O84�T�Vf�ES 501. Meeting No.6 - 2013 Chapter Review. Facilitate a meeting to review and identify updates needed to Chapter 4—Existing System. AdataeqoestvviUbepeparedbasedonthemeeting. 502. Data Acquisition. A data request will be provided for required information for this task. The request may include, but is not limited to, the following: * Data onpipeline materials and age bvlinear foot, as available. w Existing renew and replacement program. m Summary ofimprovements completed since the 20l3Plan. • SCADA data for sewer system. 503. Update Existing Sewer System. Update the components of the major sewer collectors and pump stations using City provided information. This may include changes to boundaries of sewer service basins, lift stations and force mains, and the total length of pipe based on diameter and material. Summarize improvements to the City's' wastewater collection system thathavebeencomp|etedsincethe20l3P|an.Deve|opnewsystemmap. 504. Draft Chapter 4 — Existing System. Consultant will summarize the existing system in Chapter 4. An electronic version of draft Chapter 4 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. Z�sk�00�ssumot�ns � City can provide elements listed under Task 5O2. � This task will involve updating the chapter from the 2Ol3Plan. No hard copy of the chapter will be distributed. Dsliverobks. DRAFT- Page11 of 17 89 I. Requested Data 2. Comments on Chapter 4— Existing System. 7�s��0D��:su/tont�c0verob�� � I. Draft Chapter 4—Existing System. 2. ROC for Chapter 4—Existing System. l Meeting Agendas and Minutes. 4. System Map —AppendixE ��ill112_��-;,-�, S Meeting No. 6 — 2013 System Review. TASK 600 — CONVEYANCE SYSTEM ANALYSIS The objective ofthis task istoevaluate the capacity of the conveyance system toconvey existing and future flows during the [ity'sdesign storm. This task will form the basis for [hupterS Conveyance System Analysis ofthe Plan. The capacity assessment will be conducted for the collection system included in the hydraulic model and at lift stations. This task will develop recommended improvements to the system in support of a CIP for 10-year and build -out scenarios. This task includes the following activities. 601. Collection System Analysis. After the model has been calibrated, the design storm will be routed through the modeled collection system capacity to evaluate capacity during existing, 10-year and build -out conditions. Evaluate capacity deficient segments and identify bottlenecks or other system limitations. identify improvements to resolve deficiencies using the hydraulic model. All improvements will be confirmed using the hydraulic model. 602. Lift Station Capacity Analysis. Evaluate the existing lift stations capacity based on flow estimates for the design storm. The current performance of the existing lift stations, as provided by the City, will be compared to the modeled peak flows to confirm capacity during the existing, 10-year, and build -out scenarios. Required upgrades/modifications will berecommended, asnecessary, toaddress lift station capacity deficiencies. 603. Meeting No. 7 - Capacity Analysis. Facilitate a meeting with City Staff to review the results of the collection system and Lift analysis, aswell asinitial recommended improvements. 604. Lift Station Operational Analysis and Meeting No.8. Conduct high-level evaluate uptothree existing lift stations operational and hydraulic performance to determine if improvements are needed to the Lift Stations. The evaluation will focus on hydraulic capacity, redundancy, facility reliability, and operational considerations, such as wet well sizing. Conduct a site visit of the selected Lift Stations (Meeting No. 8) to document existing infrastructure (Assumed half day site visit). Formulate conceptual Alternatives to address identified issues. Planning level costs, technical considerations and operation and maintenance issues will be compared to develop a recommended alternative. Results of this task will be incorporated into the CIP. 6OIDraft Chapter S'Conveyance System Analysis. Chapter Swill document the conveyance system analysis including the recommended improvements to the system. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 5 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will beincorporated intothe Chapter aspart ofthe City Review Draft Plan. Zcnsk��8��sun7��/ma * City can provide any data requested. 0RAFT - Pa�elZof 17 �fl�j ;ki1,GP_Scn~ 90 * This task will require a complete update of the Chapter with all new information. * Nohard copy ofthe chapter will bedistributed. 7osK60�[�xDe8veroWs l. Requested Data. 2. Comments on Chapter 5 —Conveyance System Analysis. IDraft Chapter 5—Conveyance System Analysis. 2. RO[for [hapter5—ConveyanceSystem Ana |ysis. l Meeting Agendas and Minutes. I Meeting No. 7—Conveyance System Analysis. 4. Meeting No. 8—Lift Stations Site Visit. TASK 70G—OPERATION AND MAINTENANCE The objective of this task is to assure satisfactory management of sewer system operations. Itwill provide an overview of the sewer system responsibility and authority, system operation and maintenance plan, equipment supplies and inventory, and emergency response. The City may need to update its existing emergency response plan that will be included as an appendix to the Comprehensive Plan. This task includes the following activities: 701 Meeting No. 9—O&M Chapter Review. Facilitate ameeting toreview and identify updates needed to Chapter 6—O&K4.Adata request will beprepared based onthe meeting. 702. Data Acquisition. Data requests will be provided at the kick-off meeting and as needed throughout the project. The City will provide: w Copy otthe organization chart. • Copy ofthe FOG control program. w Copy ofthe overflow emergency response plan. • Current operations and maintenance program activities. 703. Collection System and Lift Station Condition and Maintenance Summary. The City's reported condition and maintenance problems will be summarized. Review basins identified with high 1/1 for potential causes of 1/1 including a history of repairs, and pipe age and material. Discuss 1/1 causes with City operation staff. Review the existing 1/1 program. Summarize completed projects. Identify or update 1/1 reduction goals. Document pipes with known maintenance issues, such as accumulation of solids, FOG build up, or root intrusion. A GIS map will be created, identifying the location of these pipe segments. General pipe replacement timing based on Remaining Useful Life will be based on prior analyses. Document City concerns with condition or maintenance of Lift Stations. No site visits will be completed during this task. Information for this task will be provided by the City electronically orduring Meeting No. 7. 704. Update Chapter 6 — Operations and Maintenance. Update Chapter 6 based on information provided by the City. This may include updates to organization chart, certification, and collection system and lift station maintenance, O&M program activities, and known major deficiencies in the City's operation and maintenance DRAFT' Pa8el3 of17 91 (O&M) programs. This task does not include a FOG ordinance or program, overflow emergency response plan, a detailed O&M Manual, ormaintenance management system. Adetailed evaluation ofCity O&M programs will not be conducted. An electronic version of draft Chapter 6 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part ofthe City Review Draft Plan. • City can provide elements listed under Task 7O2, • This task will involve updating the chapter from the 20I3Plan. • Nohard copy ofthe chapter will bedistributed. Tesk7U0[fyi__.e; i :erob6s l. Requested Data from Task 702. 2. Comments onDraft Chapter 6—Operations and Maintenance. l. Draft Chapter 6—Operations and Maintenance. 2. ROC for Chapter 6—Operations and Maintenance. 3 Meeting Agenda and Minutes Meeting No. 9 — 2013 Chapter Review. TASK 800— CAPITAL IMPROVEMENT PLAN This Task will summarize the recommended improvements for the conveyance system and lift stations in accordance with the City's Policy and Criteria. This task will develop Chapter 7 Capital Improvement Program for the Plan. Total project costs will be developed for each recommended improvement and ranked by priority. This task includes the following activities: A,1������� 8Ol.[|PProjects. Identify and describe [|Pprojects from prio/tasksand existing City planning. Prepare description ofeach project. 802. Cost Estimates, Develop planning level cost estimates for all recommended projects using costs provided in other planning efforts. Cost estimates for construction, engineering, permitting, and other contingencies will be prepared; all costs will begiven in2OI9dollars. 003.Prioritization. Prioritize condition -related andcapac|ty're|atedp/o/ectsidentifiedintheprevioostasksfo/ inclusion inthe [|Pinto I0year and long term scenarios 804. Meeting No. 10 — CIP Review. Facilitate a meeting with City staff to review and verify CIP projects, costs and prioritization 805. Electronic CIP. Develop an electronic CIP tool using Excel to assist the City with future budgeting. Each project will be listed on a separate tab including project description, justification, estimated cost, and recommended year for implementation. City staff will beprovided the ability toadjust indirect costs and escalation factors. A copy of the electronic CIP will be provided to City staff. Hardcopies of the project cut -sheets will be included as an appendix. The Consultant will train City staff on using the CIP Tool. DRAFT Page14 nf17 92 8D6.Financial Summary. Summarize Sewer Utility financial information per WAC requirements. City to provide a discussion cost per service in terms of both debt service and operation and maintenance costs, of all existing facilities. Carollo will estimate additional costs for future facilities recommended during the planning period. This summary does not include an analysis of rates, connection charges, or methods to fund the recommended CIP. 8O7.Meeting No. 11—Financial Review. Facilitate ameetings with City Staff toreview the financial summary and update priority of[|Pprojects, asrequired. 8O8.Draft Chapter 7.Prepare Chapter 7 Capital Improvements Plan, including adescription ofcost estimating methods, project analysis, final recommendations, summary table, and system maps with the location of recommended improvements. It is assumed the efforts in this Task will require a complete update of the Chapter with all new information. An electronic version of draft Chapter 7 will be sent to the City for review and address City comments in a comment response log for the City's approval. Comments will be incorporated in to the Chapter as part of the City Review Draft Plan. This task assumes that no hard copy of the chapter will be distributed. • City can provide any data requested. • This task will require a complete update of the Chapter with all new information. No hard copy of the chapter will be distributed. IRequested Data. 2. Comments onChapter /— Capital Improvement Plan. 7�s��0���nso��nt�e�ver b�s I. Draft Chapter 7—Capital Improvement Plan. 2� ROC for Chapter 7—Capital Improvement Plan. �v@� � • Meeting No. IO—Capital Improvement Plan. w Meeting No. II — Financial Review. TASK 900 — PLAN PREPARATION This Task will include the compilation of all previous tasks. Carollo will prepare a final Comprehensive Sewer Plan that is the compilation of the chapters that have been created as a part of the project, with revisions based on feedback provided bvthe City throughout the project. The Comprehensive Sewer Plan will comply with VVA[I73' 240'105O�ThistaskindodesthefoUovvingactivities: 901. Executive Summary. Carollo will prepare an executive summary, summarizing each element of the Comprehensive Plan. 902. Prepare Staff Review Draft. Incorporate comments from draft chapters. Compile Chapters and develop Technical Appendices. Prepare review draft document for City Staff in one (1) notebook binder copies and an electronic copy. 9O3.Meeting No. l2—Staff Review Draft. Meet with City todiscuss comments onthe Staff Review draft Plan. Comments tobeincorporated into SEPA/AgencyReview Draft. DR4FT Page15 of 17 ,,oc=Iw 93 904. Meeting No. 13 —Council Review. Assist the City in presenting the findings of the Plan to Council. Carollo will prepare a power point summarizing the Plan's key points and attend the Council session to support City Staff. It is anticipated the Council presentation will be no longer than 30 minutes. 905. Prepare Agency Review Draft. Prepare three (3) hard copies and one electronic version for the City to distribute for agency review. This task assumes the City will lead the Agency Review process. The City will complete the SEPA review process and obtain approval during the Agency Review period. Carollo will assist City in responding to written comments by regulatory agencies, neighboring jurisdictions, and the public, including no more than three letters. No meetings are anticipated for this task. Additionally, no major plan revisions are included inthe scope based onAgency Review comments. 906. Meeting No. 14 — Agency Review Comments. Meet with City to discuss comments on the Agency review comments. Aresponse tncomment log will beformulated based onthe meeting. 907. Prepare Final Comprehensive Sewer Plan. Incorporate final comments based on agency reviews, as requested by the City. Provide City with three (3) signed and stamped Final Comprehensive Sewer Plans and one electronic version for the City's use. This task assumes only the documents above will be developed for the Plan approval and any other interim draft plan documents are considered out of scope. I. City Comments. Z. Public and Agency Review Comments. 9' JJ I. Executive Summary. 2. City Draft Plan — One PDF. I AgencyDraftP|an—TheehaWcopiesandonePDF. 4. Final Plan —Two hard copies and one PDF. S. Comment Response Log. � Meeting No. l2—Staff Review Plan Review. � Meeting No. l3—Council Review Meeting No. 14 — Agency Review Comments. Pa8el6 of17 94 Meeting No. 1 Meeting No. 2 Meeting No. 3 Meeting No. 4 Kick-off Meeting 2013 Chapter 1 Review Demographic Analysis Meeting Flow Projections and I&I Evaluations Meeting No. 5 Existing System Review Meeting No. 6 Meeting No. 7 Meeting No. 8 Meeting No. 9 Meeting No. 10 System Analysis Operations and Maintenance Chapter Review Capital Improvement Plan Financial Review Plan Review Project Management Plan All Meeting Agendas & Minutes Monthly Progress Reports (with invoices) Data Request Spreadsheet Draft and ROC for Executive Summary Draft Chapter and ROC for Chapter 1— Introduction Draft Chapter and ROC for Chapter 2 — Demographic Analysis Draft Chapter and ROC for Chapter 3 — Flow Projections Hydraulic Model Draft Chapter and ROC for Chapter 4— Existing System Draft Chapter and ROC for Chapter 5—System Analysis Revision of chapter from 2013 Plan Full chapter update Full chapter update New Revision of chapter from 2013 Plan Full chapter update Draft Chapter and ROC for Chapter 6 — Operations & Maintenance Revision of chapter from 2013 Plan Draft Chapter and ROC for Chapter 7 —Capital Improvement Plan Full chapter update City Draft Plan-��--��- Agency Draft Plan Final Draft Plan & All Electronic Files DRAFT- 1 Page 17 of 17 m ,i proxs�lst uic.^i la_G5r_Scopo 95 96 97 cc 98