Loading...
HomeMy WebLinkAboutCOW 2019-10-28 COMPLETE AGENDA PACKETTukwila City Council Agenda A, 90 COMMITTEE OF THE WHOLE/0 ❖ Allan Ekberg, Mayor Counci/members: •:• Dennis Robertson ❖ Verna Seal David Cline, City Administrator •:• De'Sean Quinn •:• Kate Kruller Kathy Hougardy, Council President ❖ Thomas McLeod •:• Zak Idan Monday, October 28, 2019; 7:00 PM Tukwila City Hall Council Chambers 1. CALL TO ORDER / PLEDGE OF ALLEGIANCE 2. PUBLIC COMMENTS At this time, you are invited to comment on items not included on this agenda (please limit your comments to five minutes per person). To comment on an item listed on this agenda, please save your comments until the issue is presented for discussion. (Refer to back of agenda page for additional information.) 3. SPECIAL ISSUES a. Discussion of Master Plan and funding for Public Works Shops facility —Phase 1. b. Contract Change Order #5 with Lydig Construction for demolition of two buildings for the new Public Works Shops facility —Phase 1 (Public Safety Plan). c. Fire Department budget considerations. d. Discussion on Standing Council Committee structure and scope. Pg.1 Pg.11 Pg.23 Pg.47 4. REPORTS a. Mayor b. City Council c. Staff d. Council Analyst 5. MISCELLANEOUS 6. ADJOURNMENT Reasonable City Clerk's Office www.tukwilawa.Qov, Tukwila City Hall is ADA accessible. accommodations are available at public hearings with advance notice to the (206-433-1800 or TukwilaCityClerk@TukwilaWA.gov). This agenda is available at and in alternate formats with advance notice for those with disabilities. Tukwila Council meetings are audio/video taped (available at www.tukwilawa.aov) HOW TO TESTIFY When recognized by the Presiding Officer to address the Council, please go to the podium and state your name and address clearly for the record. Please observe the basic rules of courtesy when speaking and limit your comments to 5 minutes. The Council appreciates hearing from citizens and members of the public, and may not be able to answer questions or respond during the meeting. PUBLIC COMMENTS Members of the public are given the opportunity to address the Council on items that are NOT included an the agenda during PUBLIC COMMENTS. Please limit your comments to 5 minutes. If you have a comment on an Agenda item, please wait until that item comes up for discussion to speak on that topic. SPECIAL MEETINGS/EXECUTIVE SESSIONS Special Meetings may be called at any time with proper public notice. Procedures followed are the same as those used in Regular Council meetings. Executive Sessions may be called to inform the Council of pending legal action, financial, or personnel matters as prescribed by law. Executive Sessions are not open to the public. PUBLIC HEARINGS Public Hearings are required by law before the Council can take action on matters affecting the public interest such as land -use laws, annexations, rezone requests, public safety issues, etc. Section 2.04.150 of the Tukwila Municipal Code states the following guidelines for Public Hearings: 1. The proponent shall speak first and is allowed 15 minutes for a presentation. 2. The opponent is then allowed 15 minutes to make a presentation. 3. Each side is then allowed 5 minutes for rebuttal. 4. Members of the public who wish to address the Council may speak for 5 minutes each. No one may speak a second time until everyone wishing to speak has spoken. 5. After each speaker has spoken, the Council may question the speaker. Each speaker can respond to the question, but may not engage in further debate at that time. 6. After the Public Hearing is closed and during the Council meeting, the Council may choose to discuss the issue among themselves, or defer the discussion to a future Council meeting, without further public testimony. Council action may only be taken during Regular or Special Meetings. COUNCIL MEETING SCHEDULE No Council meetings are scheduled on the 5th Monday of the month unless prior public notification is given. Regular Meetings - The Mayor, elected by the people to a four-year term, presides at all Regular Council Meetings held on the 1st and 3rd Mondays of each month at 7:00 p.m. and Special Meetings. Official Council action in the fonn of formal motions, adopting of resolutions and passing of ordinances can only be taken at Regular or Special Council meetings. Committee of the Whole Meetings - Councilmembers are elected for a four-year term. The Council President is elected by the Councilmembers to preside at all Committee of the Whole meetings for a one-year term. Committee of the Whole meetings are held the 2nd and 4th Mondays at 7:00 p.m. Issues discussed there are forwarded to Regular or Special Council meetings for official action. COUNCIL AGENDA SYNOPSIS Initials MeetingDate Prepared by Mayo 's review Council review 10/28/19 HK 11/04/19 HK ITEM INFORMATION ITEM No. 3.A. STAFF SPONSOR: HARI PONNEKANTI ORIGIN 1L AGENDA DA IT: 0 2 9 AGLNII\ II EM TITLE Public Adopt Safety Plan - Public Works Shops Master Plan CAILGORY Discussion Altcg Date 10/28/19 .0 Motion Date 11/04/19 El Resolution ilit,g Dale El Ordinance -111,g Date . Bid ,lward EI Public Hearing Mtg Date EI Other Aftg Date Mt,g Mfg Date SPONSOR Ecouneil UMcyor IIHR EIDCD DFinance Firt flTS P R Court Police PIV SPONSOR'S Council is being asked to adopt the Public Works Shops Master Plan. The Public Works SummARy Master Plan's Phase 1 focuses on relocating the Public Works Fleet and Facilities divisions from George Long to the Heiser property after seismic retrofitting and upgrades. The Public Works Phase 1 also includes moving the Police vehicle evidence storage and Surface Water spoils from the Longacres site. RI ArlItWkl) BY Ell C.O.W. Mtg. El CDN Comm fl Arts Comm. & 10/22/19 El Finance Comm. 0 Parks Comm. El Public Safety Comm. Li Planning Comm. ZAK IDAN E Trans &Infrastructure DATE: 10/08/19 COMMII lEE CHAIR: RECOMMENDATIONS: SPONSOR/ADMIN. CommiTTEE Public Works Department No recommendation; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDI I ERE REQUIRI I) AMOUNT BUDGETED APPROPRIATION REQUIRED $8,200,000.00 $30,000,000.00 $4,400,000.00 Fund Source: 306 FUND & WATER, SEWER, AND SURFACE WATER FUNDS Comments: pg 59, 2019 CIP MTG. DATE RECORD OF COUNCIL ACTION wat 9 11/04/19 MTG. DATE ATTACHMENTS 10/28/19 Informationale orandum revised date 10 19 Financial Framework Summary Public Works Shops Master Plan PowerPoint Presentation (distributed separately) Minutes from the Transportation & Infrastructure Committee 10/08/19 & 10/22/19 2 Allan Ekberg, Mayor Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director BY: Hari Ponnekanti, City Engineer CC: Mayor Allan Ekberg DATE: October 4, 2019 frevised 10/25/19) SUBJECT: Public Safety Plan — Public Works Shops First -Phase 1 Project No. 91630601 Master Plan Next Steps ISSUE Approve the Public Works Shops Master Plan and funding for Public Works Shops Phase 1. Update on the Public Works BACKGROUND The City hired SHKS Architects to conduct a Master Planning and Programming effort for the Citys Public Works Maintenance Shops facilities in September 2018. Master Planning efforts are a good tool to logically implement overall facility improvements. The Public Works Master Plan envisions the redevelopment of over 13 acres of land, which will serve the Public Works Department into the future with planned growth through the year 2045. SHKS conducted several meetings with PW staff, visited the existing facilities, toured similar PW facilities in the region and developed a Master Planning and Programming Report. Several options were discussed and the selected Master Plan and the proposed tenant improvements to the Heiser site are the most practical and least expensive option. The current George Long building lacks sufficient spacing for routine maintenance and is also one of the most seismically deficient City building. The new site will be much safer for our employees and provides more space, therefore increasing operation efficiency. In addition, some of the equipment from Minkler Shops can also be moved to Heiser, allowing more space at Minkler Shops for maneuverability and productivity. ANALYSIS The findings from the Public Works Shops Master Plan are summarized in the attached updated PowerPoint presentation. The City took possession of the Heiser properties in July 2019 and will take possession of the UPS site in 2023, Master Plan Summary • The Public Works Shops First Phase 1 of the Master Plan focuses on relocating the PW Fleet Maintenance and Facilities divisions from George Long Shops to the Heiser property after seismic retrofitting and upgrades. The Ficst Phase 1 will also include moving the Police vehicle evidence storage and spoils from the Longacres site. • The Longacres site will need to be vacated and moved to the Heiser site by 2021. To meet federal NPDES regulations, spoils need to be stored in a covered site. • Public Works staff agree that the best option is to move George Long and Longacres operations to the Heiser Building. • George Long was chosen to move to the Heiser Building, after necessary renovations, as the George Long Building is seismically and environmentally deficient and is hazardous to City employees. • The Fleet mechanics work full-time in George Long as opposed to other Public Works employees that are mainly in the field. The George Long facility does not have an adequate exhaust system and does not meet regulatory requirements. • As George Long is seismically deficient, if there is an earthquake and the building is destroyed, the entire City would be without the facilities and fleet divisions to assist with Police, Fire and other emergency operations. V9:1PW Eng1PROJECTS1A- BG Projects101 Public Safety Plan\PW Shops First Phase (91630601)1Info Memo Master Plan Round 3 102519.docx 3 Informational Memo Page 2 • With the table below, George Long's square footage needs will be covered in Phase 1. If Minkler were to move to Heiser at this time, their needs would not be met and would have to move twice (see page 53 of Master Plan). Facilities Current Square Footage Phase 1 Square Footage George Long Shops 57,770 55,670 Facilities, Fleet, Spoils and Police Impound Yard Longacres site (need covered spoils) 13,215 15,460 Subtotal 70,985 71 130 Minkler Shops Streets, Water, Sewer, Surface Water New Decant facility, New Fleet Parking 100,618 Heiser Program Area 73 925 Next Steps Approval of $4.4 million for funding the PW Shops gr-st-Phase 1 (to move forward with Heiser improvements) • Demolition of two outbuildings at the Heiser site. Oct/Nov 2019 • Heiser design for seismic retrofitting and interior and exterior improvements. Upgrades to HVAC, mechanical, electrical, and storm drainage. Nov 2019 — April 2020 • Advertise and award seismic retrofitting and improvements. April 2020 • Project completion. December 2020 Staff will return to Council for financing of Phase 2. Phase 2 - Possession of UPS site in 2023. Build Administrative offices and relocate Minkler. Cost estimate of $33 million. At the completion of Phase 2, all Public Works employees will be relocated to safe and efficient facilities. Phase 3 — Build new Fleet Maintenance Building, demolish Heiser Building, and install covered storage for $37 million. At the end of Phase 3, all future needs will be met with the entire buildout of the Heiser and UPS sites. PHASE 1 FINANCIAL IMPACT Expenditures 2019 Budget Budget Request Land Purchases $ 25,334,123.00 $ 30,000,000.00 Contracts & Demolition 856,928.88 PW Shops Phase 1 General Fund $ 2,200,000.00 Utilities 2,200,000.00 Total $ 26,191,051.88 $ 30,000,000.00 $ 4,400,000.00 Budget Balance $ 3,808,948.12 SHKS estimates that the PW Shops gr-st-Phase 1's costs will be $5.8 million and soft costs at $2.4 million, for an estimated total project cost of $8.2 million. Project soft costs include design fees, construction management fees, construction contingency, and sales tax. The 2019 CIP's PW Shops budget is $30 million and to date $26,191,051.88 is estimated to be spent, which leaves a balance of $3.809 million. To complete the PW Shops PFst Phase 1 at an estimated cost of $8.2 million, additional funding 4 W \PW Eng \PROJECTS \A- BG Projects301 Public Safety Plan \PW Shops First Phase (91630601)3Info Memo Master Plan Round 3 102519 docx Informational Memo Page 3 of $4.4 million is needed. The current funding has the PW Shops split 50/50 between the General fund (Streets, Facilities, & Fleet) and the Enterprise funds (Water, Sewer, & Surface Water). To continue with this 50/50 division, the General fund will need to budget $2.2 million and the Utilities would fund the remaining $2.2 million. Both Water and Sewer Utilities appear to have sufficient unreserved fund balance to absorb the additional costs, further analysis is needed to determine if the Surface Water utility can absorb the additional costs with the current rate model. There is funding available in all three of the Water/Sewer/Surface Water Utilities to fund the $2.2 million that will not impact utility rates or capital improvement projects. FINANCING PLAN To fund the gap of $2.2 million in the General fund, funds can come from two sources. A transfer of $1 million from the general fund to the arterial street fund is currently budgeted in 2020. Because there is currently a healthy fund balance due to impact fees exceeding budget, the budgeted transfer can be redirected to the PW Shops project fund. Additionally, the 2020 general fund budget has a budgeted surplus of $1.4 million and could be utilized to fund the remaining request of $1.2 million. Staff will walk through the entire financing plan at the meeting on October 8, 2019. Due to favorable interest rates in the bond market, coupled with the City's upgrade in rating from AA to AA+, total debt service for the 2019 LTGO bond issue was $3.6 million less than budgeted (attached in updated financing schedule). The resulting savings will be realized in the general fund and utility funds over the life of the bonds, which is 20 years. The general fund will realize savings of approximately $2.8 million and the utility funds will realize a combined savings of $800,000. Minkler Shops Interim Improvements Until we take possession of the UPS site in 2023, Minkler Shops will require some improvements in the interim. Currently there are limited bathroom facilities, only one shower, and the locker room does not have adequate space. Proposed improvements include an expansion of the men's restroom, relocating the locker room and building a new mud room. Also proposed are safety and security upgrades that include additional yard lighting and main gate improvements. The existing gate is currently not automated and left open during the day as staff come and go. The cost estimate for the Minkler Shops Interim Improvements are $500,000 and would be included in a new CIP project with funding from the Utility Enterprise funds. Update after 10/22/19 Transportation and Infrastructure Meeting: • An updated PowerPoint presentation includes a full timeline and details of the Master Planning effort along with the two options developed (Spine and Filter). • Staff has confirmed that the only Minkler upgrade in the last ten years was a renovation to the surface water office in 2016 for $27,000. RECOMMENDATION 2019 Committee of the Whole. Council is being asked to approve one or both of the following options and to consider these items at the October 28, 2019 Committee of the Whole and subsequent November 4, 2019 Regular Meeting: Option A) Approve the Public Works Shops Master Plan and fund an additional $4.4 million for Public Works Shops Phase 1 (Heiser) and, Option B) Approve the Minkler Shops Interim Improvements that would be funded by utility enterprise funds for $500,000. attachments: Financial Framework Summary (updated 10/16/19) PW Shops Master Plan PowerPoint (updated 10/25/19) Link to PW Shops Master Plan https: //shksarchltects sharefile.com/d-s563380e59a6467c8 W 3PW Eng\PROJECTS\A- BC Projects30 I Public Safety Plan\PW Shops First Phase (91630601)31nfo Memo Master Plan Round 3 102519 docis 5 6 B E F G 4 Public Safety Plan - Financial framework Summary Public Works Shops Current Plan w/19-20 budget Net Changes Revised as of 10/16/19 5 8 9 10 1 L. 14 15 16 17 u 19 21 22 23 24 25 27 28 29 30 32 34 35 36 Revenues LTGO Bond Proceeds Transfer Fund 301 Interfund transfer in (out) Investment Earnings General Fund Contributions Utility Fund Contributions Total Revenues Project Expenses Public Works Shops Addt'I Tenant Improvements Total Expenses Increase/(Decrease; Debt Service 2018 LTGO 2019 LTGO (A) Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M. 27,674,036 (2,000,000) 25,674,036 (A) 3,000,000 3,000,000 (2,033,709) 2,033,709 (B) 243,426 243,426 141,854 2,200,000 2,341,854 3,141,854 3,141,854 167,461 2,233,709 34,401,170 30,000,000 30,000,000 4,400,000 4,400,000 (C) 30,000,000 4,400,000 34,400,000 2,167,461 (2,166,291) 1,170 28,720,676 10,734,241 (3,671,701) 28,720,676 7,062,540 (D) General Fund Debt Service Utility Fund Debt Service 9,727,459 9,727,459 5,850) 6,791,608 8,991,608 (B) Reduce PW Shops 2019 LTGO Bond allocation from $7.5M to $5.5M. Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M from PW Shops to PSP. Settlement Costs not eligible for bond proceeds. (C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate). Debt Service updated to actual for 2019 LTGO; GF/Utility contributions adjusted to maintain 50/50 (D) split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved debt rating of AA+. Combined General Fund contributions to PSP plan decreases by $236k; $2.2M increase to operating E transfer plus a reduction of $2.436M for debt service. Printed: 10/16/2019 Page: 1 of 2 7 B F G 37 Public Safety Plan - Justice Center and Fire Stations/Eq/APP 38 39 40 41 42 43 44 45 46 47 48 50 52 53 54 55 56 57 59 61 62 63 64 66 67 68 Project Revenues UTGO Bond Proceeds LTGO Bond Proceeds Fire Impact - Segale Fire Impact - Other Property/Land Sales REST 1 Sales Tax Mitigation pmts Interfund transfer in (out) Investment Earnings General Fund Contributions Total Revenues Project Expenses Justice Center Fire Station 51 Fire Station 52 Fire Station 54 App/Eq Total Expenses Increase/(Decrease) Debt Service 2019 LTGO 77,385,000 77,385,000 17,500,000 2,000,000 19,500,000 (A) 4,750,000 4,750,000 8,017,000 8,017,000 13,053,090 13,053,090 10,000,000 10,000,000 4,017,452 4,017,452 2,033,709 (2,033,709) - (B) 1,227,398 1,227,398 137,983,649 (33,709) 137,949,940 66,994,711 14,814,632 23,490,000 1,502,000 15,825,796 122,627,139 15,356,510 25,046,585 (6,671) 66,994,711 14,814,632 23,490,000 1,502,000 15,825,796 122, 627,139 15,322,801 25,039,914 (D) General Fund Debt Service i,046,585 (6,671 25 9,914 Combined Project Summary 69 70 71 72 73 74 75 76 77 78 General Fund Project Costs General Fund Debt Service 141,854 2,200,000 2,341,854 44,774,044 (2,942,522) 41,831,522 44,915,898 (742,522) 44,173,376 (E) Reduce PW Shops 2019 LTGO Bond allocation from $7.5M to $5.5M. Increase PSP 2019 LTGO Bond allocation from $17.5M to $19.5M. Budget included $2.033M transfer from PW Shops to PSP. Remove budget transfer in/out of $2.033M from PW Shops to PSP. Settlement Costs not eligible for bond procceds. (C) Increase PW Shops project budget by $4.4M to complete Phase 1 (estimate). Debt Service updated to actual for 2019 LTGO; GF/Utility contributions adjusted to maintain 50/50 (D) split. Cost of debt is less due to lower interest rates, conservative budgetting, and the City's improved debt rating of AA+. Combined General Fund contributions to PSP plan decreases by $236k, $2.2M increase to operating transfer plus a reduction of $2.436M for debt service. (A (B) Printed: 10/16/2019 8 Page: 2 of 2 Transportation & Infrastructure Committee Minutes October 8, 2019 E. Demolition Agreement: Public Safety Plan - Public Works Shops Phase 1 Staff is seeking Council approval of Amendment No. 5 to Contract 18-001 with Lydig Construction in the amount of $73,707 for demolition of the Lifestyles landscape building and the former coffee shop building on the new Public Works shops site. Council Resolution 1964 declared these building, fixtures and equipment as surplus and authorized their disposal, and demolition is deemed necessary to begin the other site improvements and to deter squatters and trespassers. Chair Idan noted that the estimated project management hours seemed high and asked if BNBuilders had been asked to participate? Staff stated that Lydig has the capacity to perform this demolition work now and BNBuilders do not. RETURN TO COMMITTEE. F. Public Safety Plan - Public Works Shops Phase 1 Staff is seeking Council approval to move forward with Phase 1 of the Public Works facility Master Plan, which was created by SHKS Architects in partnership with Public Works staff at all levels. Staff recommends beginning implementation of the Master Plan by moving the George Long operations, Police vehicle evidence, and spoils from the Longacres site to the Heiser site as the most practical and least expensive option. Subsequent phases will include the entire buildout of the Heiser and UPS sites and relocation of the Minkler operations. The UPS building is not available until 2023. Phase 1 is estimated to cost $8.2 million. The CIP budget for PW Shops has a balance of $3.783 million, so an additional $4.4 million is needed. Of that, $2.2 million is available from utilities, and existing resources can be reallocated to fund the remainder, offset by reduced debt service payments due to better than projected interest rates. The City needs to identify funding for Phase 2 and beyond and will put together a comprehensive facilities plan to identify all the needs. Councilmembers discussed the proposal and did not arrive at a recommendation to move forward with Phase 1 at this time. Staff was asked to return to Committee with additional information on the following: • Better justification for George Long operations to move ahead of Minkler operations • Other options for housing Minkler staff, such as former landscaping building, 6300 Building, Station 51 • Opportunity to discuss Phase 2 and beyond • Call out in the memo that no utility projects will be delayed by moving forward • Cost estimate for improving current Minkler site • Contingency update on other Public Safety Plan projects RETURN TO COMMITTEE. II. MISCELLANEOUS The Transportation Committee Meeting adjourned at 6:59 p.m. Committee Chair Approval Minutes by LH 9 City of Tukwila City Council Transportation & Infrastructure Committee TRANSPORTATION & INFRASTRUCTURE COMMITTEE Meeting Minutes October 22, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Zak Idan, Chair; Kate Kruller, Thomas McLeod Staff: David Cline, Henry Hash, Pat Brodin, Hari Ponnekanti, Vicky Carlsen, Han Kirkland, Gail Labanara, Bryan Still, Laurel Humphrey Guests: Jonathan Hartung & Adam Hutschreider, SHKS Architects; Steve Goldblatt, PMQA CALL TO ORDER: Committee Chair Idan called the meeting to order at 5:30 p.m. I. BUSINESS AGENDA Chair Idan announced that item B will be postponed to another meeting. A. Public Safety Plan - Public Works Shops Master Plan Committee members and staff continued discussion of the Public Works facility Master Plan and the request to move forward with Phase 1. Phase 1 includes moving the George Long and Longacres site operations to the Heiser site which was determined to be the most practical and least expensive path forward. Future phases will include the entire buildout of the Heiser and UPS sites and relocation of the Minkler operations. Staff returned with additional information explaining the preference to move George Long staff and operations before Minkler staff and operations, more detail about funding Phase 1, and a $500,000 cost estimate for near -term improvements to the Minkler Shops. Councilmember Kruller does not support putting money into Minkler and asked for a list of investments at the site since 2011. She would also like to understand how much of the Master Plan is "must have" versus "nice to have," and asked if Phase 1 could be broken down further. Staff replied that seismic work, wiring and exhaust cannot be phased and bid results will be more favorable with a total package. Mr. Goldblatt agreed that it would be more expensive to separate Phase 1 into further phases. He stated that the Master Plan is a well -designed program and Phase 1 is not an expensive retrofit for the scale of the operation. Councilmember McLeod asked about stopping after Phase 2, and if that would have an impact on the design of Phase 1. Mr. Hartung advised that the full program through Phase 3 reflects a consolidated operation and that stopping at Phase 2 will not get the City the recommended site circulation or needed space for operations through 2045. Councilmembers Kruller and McLeod asked several questions about what other design options had been considered, which can be found in the Plan appendices. Staff will plan to present additional information about the design options to the Committee of the Whole. Chair Idan clarified that funding for Phase 1 is in place and as a result he supports moving forward as the deficient Public Works buildings need to be addressed. Councilmembers McLeod and Kruller were in favor of forwarding the discussion to the Committee of the Whole without a Committee recommendation. NO MAJORITY RECOMMENDATION. FORWARD TO OCTOBER 28, 2019 COMMITTEE OF THE WHOLE. B. Public Safety Plan - Amendment with SHKS Architects Postponed. 10 COUNCIL AGENDA SYNOPSIS Initials MeetingDate Prepared by May r:r review Council view 10/28/19 HK 11/04/19 HK ITEM INFORMATION ITEM No. 3.B. ST.,11,P SPONSOR: HARI PONNEKANTI ORIGINAL AGENDA DATE: 10/28/19 AGENDA ITEM TITLE Public Safety Plan - Public Works Shops Lydig Change Order No. 5 for Demolition C\TEGORY a 1)1J-cm-Ron 10/28/19 Motion Date 11/04/19 DResolution Altg Date El Ordinance AN Date El Bid Award Arts Date El Public Hearing Ally Date 0 Other AN Date Mtg Date Mtg SPONSOR Council Mgyor E1HR El DCD flFinance Fire EITS EIP&R LI Court Police 14 PW SPONSOR'S Council is being asked to approve Change Order No. 5 to Contract No. 18-001 to allow SUMMARY Lydig Construction to demolish the Lifestyles landscape building and the coffee shop outbuilding as part of the Public Safety Plan - Public Works Shops. The two buildings are not suitable for Public Works functionality and the removal of the buildings are necessary to prevent the public nuisance from squatters and trespassers. Lydig will be able to perform the demolition quickly and efficiently. REVIEWED BY •C.O.W. Mtg. 0 CDN Comm Arts Comm. & 10/22/19 0 Finance 0 Parks Comm. Comm. CHAIR: a Public Safety Comm. Trans &Infrastructure I Planning Comm. DATE: 10/08/19 ZAK IDAN COMM11 lEE RECOMMENDATIONS: SPONSOR/ADMIN. CommmEE Public Works Department No recommendation; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDI FURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $73,707.00 $30,000,000.00 $0.00 Fund Source: 306 FUND & WATER, SEWER, AND SURFACE WATER FUNDS Comments: pg 59, 2019 CIP MTG. DATE RECORD OF COUNCIL ACTION 10/28/19 11/04/9 MTG. DATE ATTACHMENTS 10/28/19 Informational Memorandum revised date 10/18/19 2019 CIP, page 59 Lydig Proposal for Change Order No. 5 Minutes from he Transportation & Infrastructure Committee 10/08/ 19 & 10/22/19 11 12 Allan Ekberg, Mayor Public Works DepartmentHenry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Commit ee FROM: Henry Hash Public Works Director 4(/, BY: Hari Ponnekanti, Deputy PW Director CC: Mayor Ekberg DATE: October 4, 2019 (revised 10/18/19) SUBJECT: Public Safety Plan — Public Works Shops First Phase 1 Project No. 91630601, Contract No. 18-001 Change Order No. 5 with Lydig Construction for Demolition as • • e aa • • ISSUE Approve Amendment Change Order No. 5 to Contract No. 18-001 to allow Lydig Construction to demolish the Lifestyles landscape building and the coffee shop outbuilding as part of the new Public Works Shops. BACKGROUND The City purchased the Heiser property at 11210 and 11234 Tukwila International Blvd in 2018 for the new Public Works Shops. These properties came with buildings and facilities that are not needed by Public Works or any other City department. Council adopted Resolution No. 1964 at the August 19, 2019 Regular Meeting that declared the large fixtures, equipment, and outbuildings as surplus and authorized their sale or disposal. ANALYSIS The demolition of the two buildings is the first step for the needed improvements to accommodate the new Public Works Shops Fi-rst-Phase 1. These two buildings are not suitable for Public Works functionality as both Fleet and Facilities need to be in one area. As part of the SHKS Master Plan, the demolition of these buildings is necessary for the ingress/engress of the future shops area for access by large vehicles, such as the Vactor trucks and dump trucks. Also, removal of the buildings at the Heiser location is necessary to prevent the public nuisance from squatters and trespassers. Adding Amendment Change Order No. 5 for the demolition into the existing contract with Lydig Construction would enable us to perform the demolition quickly and efficiently. Lydig has received the bid proposals for a total of $73,707.00 and has the capacity to complete the demolition at this time. is currently seeking bids from sub contractors for the demolition and bids arc expected to be opened on October 2, 2019. The work is estimated to cost $100,000 and we will have firm costs at thc October 8, 2019 TIC meeting. FINANCIAL IMPACT Expenditures Land Purchases $ 25,334,123,00 SOJ Contract 166,757.52 SHKS Contract 267,226.09 $ 49,270.91 Misc Charges Survey, Attorney 128,826.35 Bond Debt Service Charges 171,141.01 Lydig Demolition -Estimate 73,707.00 Total $ 26 068,073.97 $ 122,977.91 Balance Owing Total - Expenditures $26,191,051.88 2019 Budget $ 30,000,000.00 $ 30,000 000.00 RECOMMENDATION Council is being asked to approve the estimated Amendment Change Order No. 5 to Contract No. 18-001 for up-to-MOOG $73,707.00 with Lydig Construction for the demolition of two buildings at the new Public Works Shops and to consider this item at the October 28, 2019 Committee of the Whole and on the Consent Agenda at the subsequent November 4, 20190etabar 24, 201-9 Regular Council meeting. Attachments: 2019 CIP, page 59, Lydiq Proposal for Change Order No. 5 W:\PW Eng PROJECTSIA- BG Projects101 Public Safety Plan\PW Shops First Phase (91630601)9nfo Memo demolition PW Shops Revised 101819 docx 13 14 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 201e to 202* PROJECT: Public Works Shops Project No. 91630601 Cnno�u�one�CayPu��m��um�u�nanceandope�Unnsoen�r combining all ope�Uono functionsD���R|PD�m� � ' a,one location. Facility may also include oCity Clerk & Police Records Center and Police evidence storage. Existing Public Works operations and maintenance areas are inadequate structurally and seismically. Current |andforvb�gingg|�endvoc*orm���a|aiaon�hampu��.P,�ectindudeosoUingdi�vacto/|and.Mink|e,3hnps. �U�T|F|�/�'|�N` ' � and George Long Shops macquire the real estate tobuild anequipment operations center that meets current codes. STATUS: Separate from the Public Safety Plan. Was formerly known ooCity Maintenance Facility. MA|NTVNPACT Improves safety and efficiency for First Responders and maintenance operations. COMMENT: Based onusage and benefits, it isestimated that the Water, Sewer, and Surface water enterprise funds will fund50% of the Public Works Shops with the other50% funded by Streets, Facilities, &Equipment Rental. p|mAmou\L Through Estimated in $000's BEYOND TOTAL EXPENSES Design/PM 284 557 1,373 1,501 3,521 Land(R&Af) 21.979 21,979 CnnetMgmt O Construction 1.500 3,000 4.500 TOTAL EXPENSES 284 22.336 2.878 4.501 o 0 n n o 30,000 FUND SOURCES Enterprise Funds 12.250 3.750 16.000 Cuunoi|matic8nnd 10.000 750 10.750 REETFundo 3.000 3.000 Mitigation Expected Q 9UOFund Balance 284 (2.914) (1.821) 4.501 U U 0 O O 250 TOTAL SOURCES 284 22,33e 2.879 4,501 n o n o u 30,000 2019 2024oapxa Improvement Program SS 15 16 I u-Y City of Tukwila c/o Hari pnnnekanti 63QQSuuthcenterBlvd, Suite lOO Tukwila, WAQ8IgO 0ffice:(ZV6)43I'2455 E-mail: Hari.Ponnekanti@TukwilaWA.gov RE: Tukwila Public Works Office Demolition Dear Hari, On behalf of Lydig Construction, Inc., we are pleased to submit our proposal for the Tukwila Public Works Office Demolition inTukwila, Washington for Seventy Three Thousand Seven Hundred and Seven ($73,7V7)Dollars Alternates: No Alternates Documents Utilized: SHK5Architects Plans Dated 07/Z3/2Ol9 LPDEngineering Specification Section 311UOOdated 07/29/2019 NOVOGond Faith Inspection Letter dated 07y12/2019 Bid Walk onO9/Z5/2O19 Clarifications: • VVehave assumed the project starting three weeks after NTPwith atwo-week duration • Please note that the required Puget Sound Clean Air Permit is required to be filed 10 days before demolition can begin ° Work priced tobeperformed onnormal day shift, Monday through Friday w If Lydig is to pay for permits or special inspections, the full cost will be reimbursed via Change Order •Lydighas assumed that all junk, loose items and biological waste will beremoved 6ythe owner, from both buildings, prior tomobilization tothe job site • Proof of disconnect for all utilities is required prior to starting work (coordination of disconnects by Owner) m All underground utilities are tobeabandoned inplace ° Sanitary sewer will be plugged per district standards, roof drain pipes will be plugged at slab, storm drain clean out will beplugged pnthe building side • This proposal islump sum inthe amount listed above General Exclusions ° Permits and fees ° Special Inspections 17 v Local and State Sales Taxes ° Code Upgrades required/|dentifiedbyOt Inspectors • Removal of hazardous materials which includes but is not limited to asbestos, airborne silica, PCB's, = Freon, hydraulic oil, underground stpra8etanko(USTs,bio|ogica|vvaste,|ead'airmnnitudng,danAenous or hazardous waste evaluation, characterization, or disposal, regulatory notices and hazardous materials surveys ° Removal of junk and miscellaneous items not a part of the buildings to be demolished ° Cut and cap, locate, make'safe^orde-energize'site utilities p Removal ofbelow grade utilities w Salvaging ofowner materials • Removal of slabs and footings (this is not scheduled for demo per plans provided) • Client toprovide aGood Faith Asbestos Survey prior tnbeginning demolition * Mastic removal orfloor prep. Flooring removal includes one pass with aTerminator. This typically leaves the substrate in a condition suitable for following trades (if required). Some residual adhesives may remain. ° Engineering for Demolition; engineering of shoring or bracing of existing to remain ° Salvage items for reuse, relocation orreturn salvage toowner w Any demolition not clearly shown or dimensioned on the Architectural or Structural drawings • As -built documents/ O&M Manuals Sincerely, Lyclig Construction, Inc. 0e|Lunsford Project Manager l. Public Works Demolition Proposal Estimate dated 10/7/2019 2. SHKSArchitects Plans Dated O7/23/ZO19 3. LPDEngineering Specification Section 31l00Odated O7/Z9/ZOl9 4, NQVOGood Faith Inspection Letter dated O7/l2/2ol9 I a 18 429UX&5�3g* 1 sm��J�cmu ILYDIG Project: Duration: Bldg area: City of Tukwila Public Works Demo 2. weeks 24,200 sf Section I Description I Qty I UM I Unit Cost 1 Total Cost I Notes Div 1 General Requirements 01 in 00 Summary Requirements Project Management Labor 40 hr 90,49 3,620 ICI Supervision Labor 80 hr 99.92 7,994 LCI Pre- Mobilization Video on DVD 1 Is 450.00 450 LCI 0110 00 Summary Requirements Total 12,063 01 50 GO Temporary Facilities and Controls Locate and document existing utilities and controls 8 hr 105.00 840 LCI Temporary Construction Perimeter Security Fencing 275 If 4,50 1,238 Secure A Site TEST Measures Materials 1 LS 1,250.00 1,250 LCI Catch Basin Insert Materials 1 ea 250.00 250 LCI Silt Fence Install/Removal Labor 32 hrs 72.83 2,331 LCI Save and Protect Exist Planter 2,060 at 0.75 1,545 LCI Save and Protect Water Meter 1 ea 500.00 500 LCI Dust Control 32 hr 59.60 1,907 LCI Fire Sprinkler Drain Down 4 hr 125.00 500 LCI Electrical make safe within building 4 hr 115.00 460 LCI 01 50 00 Temporary Facilities and Controls Total 10,820 . 01 70 20 Temporary Services Dump Fees/Dumpster/Miscellanous Final Cleanup Labor 16 hr 59.60 954 LCI Dump Fees/Dumpster/Miscellanous Final Cleanup Materials 12 ea 750.00 9,000 LCI 01 70 20 Temporary Services Total 9,954 Div 2 Existing Conditions 02 40 00 Demolition Demolition Subcontractor I Is 25,986.00 25,986 Ascendent Demolition Layout 8 hrs 105.00 840 LCI 02 40 00 Demolition Total 26,826 02 50 00 Site Remediation Junk Removal from storage areas Excl - load - - EXCLUDED Hazardous materials removal from storage areas Excl - Is - - EXCLUDED 02 SO 00 Site Remediation Total - Div 33 Utilities 33 00 00 Utilities Utility Demolition 1 Is - - Ascendent, inn above Abandon Underground Electrical Lines 2 ea - Ascendent, in -I above Abandon Electrical Lines 2 ea - Ascendent, incl above Demo existing electrical line to pole 1 ea - Ascendent, incl above Plug SS per District Standards 1 ea - Ascendent, incl above Plug Roof Drain Pipe 1 ea - Ascendent, incl above . Plug SDCO on building side 1 ea - Ascendent, inel above 33 00 00 Utilities Total - Direct Cost Subtotal Contractor Contingency 3.0% Subtotal BRI B&O Tax 0.471% GLI 0.75% Bond Subtotal OH & Fee 10.0% TOTAL COST EXCLUDING WSST Yes 1 Yes 59,663 1,790 2,647 64,100 1,000 337 537 1,032 67,006 6,701 73,707 Print Date: 10/7/2019 tyclfg Construction Page 1 of 1 19 20 Transportation & Infrastructure Committee Minutes October22, 2019 C. Demolition Agreement: Public Safety Plan - Public Works Shops Phase 1 Staff is seeking Council approval of Change Order No. 5 to Contract 18-001 with Lydig Construction in the amount of $73,707 for demolition of the Lifestyles landscape building and the former coffee shop building on the new Public Works shops site. Committee members decided to forward this to Committee of the Whole with no recommendation as it relates to the overall Public Works Master Plan. NO RECOMMENDATION. FORWARD TO OCTOBER 28, 2019 COMMITTEE OF THE WHOLE. D. Consultant Contract: Water & Sewer Comprehensive Plans Staff is seeking Council approval of a contract with Carollo Engineers in the amount of $460,392.00 to update the Water and Sewer Utilities Comprehensive Plans. The Washington State Department of Health requires the update every six years and Carollo completed the last update in 2015. $560,000 was budgeted. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 4, 2019 REGULAR CONSENT AGENDA. II. MISCELLANEOUS The Transportation & Infrastructure Committee Meeting adjourned at 6:40 p.m. Committee Chair Approval Minutes by LH, Reviewed by GL 21 22 COUNCIL AGENDA SYNOPSIS ----- ------------------ -Initials - AlcetinsDate Prepared 4 Maye -'s .eview Council r, ,lea, 09/09/19 Vicky K I 10/28 19 Vicky , ITEM INFORMATION ITEM No, 3.C. STAPP SPONSOR: VICKY CARLSEN ORIGINAL AGF,NDA DATE: 9/9/19 AckNDA ITI1 TIFIM, Discuss Fire Department budget 9/9 El Motion ilitLg Dale 11 Resolution A 11gDate 0 Ordinance AltgDale E Bic/Apar,/ Aug Date E Public Hearing ANDate El Other Aug Dale C \ 1 l',GORY a Discuss/on AliDate SPONSOR ECozincil EMayor FfR EDCD OFInance Fire FiTS • Pe.--R Police PiV ECounl SP oNsoie S Council is being asked to discuss the fire department budget and consider a proposed SummARy budget amendment. Rky Ir \\ID BY [ COAX'. I\Itg. I— CDN Comm E Trans &Infrastructure Arts Comm. DATE: 7/8, 8/26, 10/28 IA Finance Comm. E Public Safety Comm. Comm, E Planning Comm. CHAIR: MCLEOD [ Parks COMMITTEE SPONSOR/ADNIIN. CONIMITIEk Finance and Fire Departments RECOMMENDATIONS: For Information Only COST IMPACT / FUND SOURCE EXMNDI CUR' RIQUIRF.1) AMOUNT BUDGETED APPROPRIATION REQUIRED $ $ $ Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 9/9/19 Forwarded back to Finance Committee 10/28/19 MTG. DATE ATTACHMENTS 9/9/19 Informational Memorandum (updated after 7/8/19 Finance Committee) Minutes from the 8/26/19 Finance Committee meeting 10/28/19 Attachments as listed above 23 24 City of Tukwila Allan Ekberg, Mayor TO: INFOR ATIONAL EMORANDU Finance Council Committee FROM: Vicky Carlsen, Finance Director Jay Wittwer, Fire Chief CC: Mayor Ekberg DATE: May 22, 2019 Updated after July 8, 2019 Finance Committee meeting I ew infor ation begins on page 17 of this memo) SUBJECT: Fire Budget Discussion ISSUE Review current and historical Fire Department budget, staffing, and service levels to determine a sustainable model which meets the City's financial and policy goals. BACKGROUND This section provides historical information on the Fire department as well as narrative discussing several aspects of the budget development process. The final section provides the current budget projection. Current Staffing Levels Total Fire Department Staffing The 2019-2020 Budget authorizes a total of 67.0 Full -Time Equivalents (FTE's) in the Fire Department. The table below summarizes these Budgeted FTE's. Position FTE's Notes Fire Chief Assistant Fire Chief Battalion Chief — EOC & Fire Marshall 2 Captains (Inspectors) — Fire Marshall's Office 2 Captains — Training Consortium 2 Work with the South King County Fire Training Consortium as part of City's financial commitment Senior Project Coordinator — Fire Marshall's Office 1 Plans reviewer Assistant to the Chief 1 Administrative Support Technician 2 1 supports the Fire Chief, 1 supports the Fire Marshall's office Emergency Management Specialist 1 Battalion Chiefs — Suppression 3 One per shift Captains — Suppression 12 4 per shift, 1 per Fire Station Firefighters — Suppression 39 13 per shift Total FTE's 67 25 INFORMATIONAL MEMO Page 2 There has not been a change in the number of Budgeted FTE's since 2013. Minimum Staffinq Levels -Suppression As noted in the chart obova, there are several actk/itiea, such as Fine Marshall, Training. and Emergency management which have staff and budgets allocated to these services. The majority of staffing (54 FTE'o) and budget is dedicated to suppression with 24/7 coverage for calls for service within the Tukwila community. This memo iafocused oM'the Suppression services within the Fine Department. Shift Coveraqe-4O/98 |n2OO9, per the newly adopted labor agreement, the Tukwila Fire Department began operating ono4O-hour.3shift model, with 18personnel assigned toeach shift. This translates into ashift being on for4R hOurs, then off for 90houna. also referred to as o ''48/98" model. This was a change from what is known as the Modified Detroit schedule of a 24-hour schedule. The chart below shows the shift schedule for both the 48/8Sand the Modified Detroit: Examole of Modified Detroit and 48196 Schedule ! / | | 48/96(Cune«' Schedule) On :On :Off :Off 'O# :Off / | l | | | | Then repeats Modified Detroit On :O� |�� :O� :On |o� |D� :Off Then repeats . . . . . . . MinimumGtaffirq Per current policy, the minimum staffing level h*for 13.OFTE. Each station has three firefighters (one Captain and two firefighters) who respond to calls with engines or the ladder, with the battalion chief stationed at 8teUmn 51. When staffing level for the shift is8tleast 15, the aid car can be placed in 8en/ice, which increases the level of service and can reduce response time by having an additional unit in service. The chart ba|oxv oUnnnlaricos daily staffing levels based on the number ofFTE'savailable. 8fmUon Apparatus Minimum Staffing 13]]FTE Additional Staffing 14.0FTE Aid Car Staffing 15.0FTE FS 51 1 1 1 Battalion Chief FS51 Engine 3 3 3 FS52 Engine 3 3 3 F853 Engine 3 3 3 FS 54 Ladder 3 4 3 FS54 Aid Car O O 2 Total Staffing 13 14 15 When the City added pipeline positions in 2014 (discussed be|mw), an additional 3 to 5 /unbudAeted> FTEvvema added. Currently,the policy is tOfill uphz 3 pipeline posUUonn, which effectively increases the staffing to 19personnel per shift. For each shift of 19 FTE, there are two slots set aside for vacation and two slots set aside for 26 INFORMATIONAL MEMO Page 3 or sick, leave before staffing fmUe to noiniDlUrn staffing of 13. When additional sick keave. Kelly daye, training days, orother activities occur that reduce Staffing below 13, the current policy is that other Staff are called in OO overtime to maintain the minimum staffing |8Ve|. Summary ofCurrent Shift Coverag � "A"Ghdt "B"8hUt "C"ShUf Total Staff per Shift 19 19 19 Less: Vacation Slots -2 -2 -2 Less: Kelly Day Slots -2 -2 -2 Staffing Level Prior tnUnexpected Leaves 15 15 15 Minimum Staffing 13 13 13 Slots Available for Unplanned bsava 2 2 2 Ne|Iv Day /\ Kelly Day is an additional day provided to meet FL8Aand contractual requirements. Due to FLSA ru|es, each personnel are provided a certain number of"Kelly Dgye", which is a day off during anFLSAperiod, and are scheduled ahead oftime similar tooplanned vacation day. Each FLSAcycle ia24days and only one Kelly Day may be scheduled each FLGAperiod. Kelly Days do not carry over into a new year. Starting in 2009. the total number of Kelly [}oyS per each position is 14 days. This was an increase from 13 per the prior labor agFeement, which was provided iDlieu ofG1%pay increase. Pipeline Positions |nMarch 2D14.the Council approved the use of3pipeline positions. The pipeline positions were intended to create potential cost savings and increase operational effectiveness. When 8 firefighter retires, the individual in the pipeline can Step into the vacated position. \8/h8O a recruit enters the academy, it can |aha between six and nine months before a recruit is fully trained. These pipeline positions were approved byCouncil atthe March 3,2O14meeting. In July 2018. in expectation of additional retirements and in an effort to reduce overtime usage, the Council increased this to authorize an additional 2 up to 5 pipeline positions. |ReJune 2O10 memo, it was stated that through the middle of the year, the department had filled 55 24'hour overtime shifts due tominimum staffing requirements. |fthe three pipeline positions had not been in axiateOce, the department would have filled 132 24-hourovedime shifts due to minimum staffing issues. The memo also stated that because of the pipeline positions, the aid car was in service more frequently, increasing service levels tnthe communities. The additional pipeline positions would enhance the department's capability to keep up with pending retirements and is more efficient and cost effective than the utilization of excessive overtime. The chart below shows total authorized positions and pipelinepVoitiODs. Authorized FTEs and Pipeline Positions 2010i 2011| 2012 i 2013| 20141 2015i 2016i 2017! 2010 FTEm 05GG! 87 67 67| 67! 87�/ 67! 67! ' Pipelines 3! 5� 5! 5! The additional pipeline positions add to the number of firefighters available per shift. 27 INFORMATIONAL MEMO Page 4 Staffing level considerations There are several factors which come into play when balancing current staffing levels for suppression. Vocation|e@ve Per contract, each personnel are guaranteed g certain kaVe| of vacation leave. The table below ahoxvn the average usage of total vacation leave per year, by hours. As you can see vacation hours use has slowly increased over the years with a slight reduction in 2018. Per the labor union aQrGernGDt. pen;mnOG| may accumulate uptotwo years of accrued vacation. For example, if firefighter accrues two weeks per year, they can accumulate Uptofour weeks ofaccrued vacation. The exception to this rule isifonemployee had scheduled asmany aStwo work cycles nrless vacation and then was unable totake such vacation due toserious illness/injury, the80p|nyea may exceed the two-year maximum bythat amount with the understanding that (1)the employee will bring their vacation balance within the two-year Dl8XirnUrD within an agreed UpDO period Of time of return to work. The City does have apolicy regarding vacation accrual, but itiaspecific tonon-union employees. The policy states that an employee may accumulate up to a maximum of 384 hours (48 days) of accrued vacation leave. Vacation time earned inexcess of said maximum limit shall be used or forfeited. The policy goes contain a statement that reads: "union employees shall accrue vacation per their labor contract in instances where it may differ from these provisions". »6,mm 14,000 12,000 10,000 8,000 6,000 4,000 2,000 u 2010 Vacation Hours Taken Suppression Only 2012 2010 2011 2012 013 2014 2015 016 2017 018 KellvOay Per the contract and FLSA guida|ineo, as described earlier, the number of Kelly Dnve per personnel has remained constant mL14since 2OOS. The table below shows the average usage of total Kelly Days per year as expressed in hours. As you can See this has remained fairly consistent at about 18thousand per year. P{e||y Day usage increased in 2016 and 2017 along with the increase in pipeline positions. Further analysis is needed to determine why Kelly (]@y usage decreased in2O1B. 28 INFORMATIONAL MEMO Page 5 o Kelly Hours Taken Suppression Only 200 2011 2012 2013 204 2015 016 2017 018 lFraininq/OtherUsaqe There is required training and other education which firefighters complete each year. Some ofthis is done during normal scheduled work hours, while others impact daily staffing levels. The number Ofhours for training and education outside ofthe normal work schedule iSshown below. As the chart demonstrates, OV8diD1e training hours isnot consistent from year tVyear with itranging from a low ofapproximately 28Otog high ofover 1.1OO in 2017. o 2011 zno Training OTHOU[s Suppression Only ZOlU 2011 2012 2013 2014 2015 2016 2017 2018 Training Hours n/a 295 323 973 510 912 676 1,119 586 Sick Leave and Disabi|itv Sick leave can change bvday and bvshift. Below are two charts depicting sick leave hours from 2O1Othrough 2O1S. The first chart compares January through April inall years and the second one compares January through December from 2010 through 2018 and January through April for 2019. Both charts combine regular sick leave with long-term disability as our financial system 29 INFORMATIONAL MEMO Page 6 does not segregate long-term disability from sick leave. Along with disability, sick leave usage appears to be trending upward with the trend beginning in 2015. As the table below shows, the number of hours of sick leave has increased from just over 10,000 hours in2O10to8peak Vf14.00Ohours in2O18. Sick leave usage can have @ significant staffing and budget impact, especially ifcovered through overtime staffing. zmo Sick Hours Taken Suppression Only zms 2010 Z011 2012 2013 2014 2015 2016 2017 2018 Using sick leave usage through April 2018. the projection is for similar usage ofsick leave in 2O19aowas experienced in2O18. 7,000 6,000 5,000 4,000 3,000 2,000 zpoo o 2011 Sick Hours Taken Jan -April Suppression Only 2013 m!"00 2010 2011 2012 2013 014 2015 2016 2017 2018 2019 Lonq-Term0sabi|ity Whereas sick leave isintended for ashort period of time, there iealso the case when a firefighter is out for mlonger period oftime due tooDinjury, hea|thiaeue.V[otherieSue. 30 INFORMATIONAL MEMO Page 7 One factor contributing to the budget situation this year iathe number of firefighters out onlong- term disabi|ity, which wehave defined as at least one consecutive month of sick leave. Below is a chart that shows how many firefighters are out on long-term disability each month. The chart in an estimate through June and only reflects those currently out on extended leave. Names have been removed for privacy, Data on long-term disability for prior years will be presented at later date one the research has been completed.- As the table shows, in January there is one firefighter at on long-term disability, whereas in March and April there were four to seven firefighters out on long-term disability. Dates on long-term disability Employee . January . February . March April 4MM8-? FFY ! 1/7n9'0MU8 FF2 3/2/19'711/19 FF3 3n0h9~7(intenmiUenV FF4 1/21/19'4/28V19 FF5 215/194U019 3/19M9~5/5/19 1/16/19 -2/18V19 HF0 FF7 FF8 FF9 . ! Retirements/Leaves ofService and New Hires for Suppression Each year, individuals leave the department due to retirement, another opportunity or unfortunata|y, due to a death but the Department also makes new hires. On average, the Department loses one to three firefighters per year and seeks to maintain consistent staffing levels byhiring new employees. When the Department hires mnew firefighter, they first have to undergo approximately four months of training before they are deemed qualified asavailable for service. While the new firefighter is not able tofill aroster spot onashift during these initial four months, they are paid salary and benefits. The chart ba|0vv compares the Department's departures and hires for the time period 2010 thnouQh2O19. m o � ^ x u Departures &Hires All FD Since 2001 0 Departures 9 Hires in 2010 2011 umz 2013 2814 oms 2016 2017 2018 2019 Departures o a s o x u n 3 e o Hires 2 1 4 4 3 9 6 3 6 2 31 INFORMATIONAL MEMO Page 8 Deployments Another factor that affects staffing levels is deployments. When a natural disaster occurs somewhere else, often we will send firefighters to assist with recovery. Some recent examples include responding to the Oso disaster in our own state and the hurricanes that occurred on the east coast last year. When firefighters are deployed to assist with recovery, they are typically gone for several days which affects staffing levels. Most often, the City is reimbursed for the costs associated with these deployments but occasionally, the City is not reimbursed for all costs. Additional information on deployments will be provided at a later date. Summary of Staffing Considerations Overtime Usage Overtime is used to ensure that minimum staffing is met due to any reason, from vacation, Kelly Days, sick leave, long-term disabilities, retirements, or other issues. For example, when a firefighter goes out on long-term disability for an extended length of time (at least one month), the usual two slots available for education and sick leave drops to one. When more than one firefighter on the same shift is on long-term disability, any firefighter calling in sick automatically results in minimum staffing overtime. The overtime usage has fluctuated over time. The table below shows the number of minimum staffing overtime hours used 2011 through 2018 (overtime hours were not tracked per project code until 2011). 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 2011 2012 Minimum Staffing OT Hours Suppression Only 2013 2014 2015 2016 2017 2018 2010 2011 2012 2013 2014 2015 2016 2017 2018 Min Staff OT hours ,n/a 4,735 5,102 8,337 7,040 6,680 3,709 2,876 6,458 The following chart shows total overtime by category. Minimum staffing overtime can range from around 30% of total overtime to over 60% of total overtime. 32 INFORMATIONAL MEMO Page 9 400-100 Overtime Categories %ofWhole, byHours =—=^ WINNOW' 0 Minimum Staffing a muc 0sqvipmcnt *4 a I n zcu« zozs Training '.1 Meetings cm Wwo NNW Disaster Response moPACode Nothcr mneiwbuoaule cuv Events 0 Fire Investigation 0Shift Extension B&AVU Overtime 2011 2012 2013 2014 2015 2016 2017 2018 Grand Total Minimum Staffing 5,I67 5,648 9,325 7,359 6,968 3,972 3,024 6,678 48,140 Training 599 595 1,333 925 1,855 955 1/453 1,066 8,781 Meetings I'JlO 1,205 1,372 803 695 793 907 600 7,584 Disaster Response 239 30 4,031 89 36 1,439 416 6268 K4iso 503 235 777 1,469 1,024 1,I65 711 318 6,201 NoPACode 398 188 778 21 432 639 211 80 2,746 Other 198 32 45 127 283 406 940 2'031 Reimbursable 161 142 163 197 221 250 214 488 1,835 Equipment 87 123 284 573 180 131 147 112 1,635 City Events 174 232 260 226 175 l%S 209 55 1,455 Fire Investigation 164 126 73 307 175 206 237 161 1,447 Shift Extension 247 67 155 218 126 174 81 132 1,201 The cost ofovertime has increased due to the change iOusage and also the increase inaverage compensation over the past few years. As the table ehovvo` the coat per hour has consistently 33 INFORMATIONAL MEMO Page 10 $1,000,000 $900,000 $800,000 $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $100,000 $0 Total Overtime $ Paid 16a..1°,4,4 2010 2011 2012 2013 2014 2015 2016 2017 2018 Overtime $ r $60.00 $58.00 $56.00 $54.00 $52.00 $50.00 $48.00 $46.00 $44.00 2010 2011 2012 2013 2014 2015 2016 2017 2018 Overtime $ $407,964 $446,557 $440,553 $754,079 $857,927 $658,738 $495,855 $514,312 $647,876 Overtime Hours 8,221 8,907 8,831 14,592 16,127 12,065 8,717 9,038 11,046 $/Hr $ 49.63 $ 50.13 $ 49.89 $ 51.68 $ 53.20 $ 54.60 $ 56.89 $ 56.90 $ 58.65 A key administrative and policy question is what can be done to reduce the overtime usage and costs going forward. Budget Process The Finance staff budgets for personnel costs as well as liability insurance and fleet costs. Fire staff budget supplies and services. All departments develop their budgets within the parameters set by Administration and Council. When Finance drafts the budget for personnel, all approved positions are fully funded at the existing labor agreement rate schedules plus an estimate for COLA increases. Benefits are adjusted based on known or estimated rate increases. Positions that are not at the top step include an increase in both salary and benefits to account for any step increases due during the biennium. Any vacant position is budgeted at the lowest step plus benefits and medical at the full family rate. Overtime is typically budgeted at previous year levels unless a department can prove the need for additional budget. One change in how overtime was budgeted occurred with the 2017-2018 biennium. Prior to 2017, the overtime budget line item included both overtime and associated benefits. Beginning with the 2017 budget, the overtime line item is strictly overtime pay. Benefits associated with overtime are budgeted in the correct benefit line. There are a few items that are not budgeted and which the City departments are expected to absorb the difference within their original adopted budget. • Pipeline positions are not budgeted. It is expected that these costs will be offset by a reduction in overtime costs and usage. • As a policy, the City also does not budget for pending or possible retirements, specifically the vacation and sick leave payouts. 34 INFORMATIONAL MEMO Page 11 • The budget does not include funds for possible deployments. Typically, the budget will be amended once costs and reimbursement information can be estimated. Often, reimbursement funds are not received until the following year. • The City does not usually amend the adopted budget to account for any labor agreements that settle wages higher than what is included in the adopted budget. Departments are expected to absorb the difference. Budget Amendments The fire department budget has been amended every year since 2012. The amendments range in amounts from a low of $85 thousand in 2010 to a high of $1 million in 2014. The average budget amendment for the department is about $500 thousand. The chart below shows the total original adopted budget followed by a breakdown of amendments by year. One item to note on budget amendments is that in the first year of the biennial budget, the budget amendment will often be carried forward into the second year of the budget cycle. This can be seen in 2015 and 2016 when overtime was increased both years and again in 2017 and 2018 when budget was provided for pipeline positions. Fire Budget Amendment Details New Contract Revenue Deployments Deployments Final Adopted (Signing Increase Other Backed- Pipeline (Not Revenue (Revenue Total of Amended Budget Bonus) Overtime Adjustments Other Positions Backed) Backed) Amendments Budget 2010 10,212,773-----—----85,000---_--_-_-------------—-- 85,000 10,297,773 2011 9,948,846 - - - - - - - - 9,948,846 ------------------------------------------------------------------------------------------- 2012 10,226,000 234,768 --- 21,693 60,500 316,961 10,542,961 2013 10,247,976--_---__--- 200,000 - - 200,000 10,447,976 2014— 10,472,254 — _ _ — — — —_— — — — — 390,000355,000 —— —— — — — — 89,600 170,000 1,004,600 11,476,854 2015 11,056,925 _ 300,000 440,000 _ _ _ _ 740,000 11,796,925 2016 10,959,499 - 310,000 403,000 37,805 - - - 750,805 11,710,304 2017 11,862,568 _ _ _ 35,000240,000 —:— 125,000 400,000 12,262,568 2018— 12,192,595-------_------------ 69,045----_----240,00012,541,640 -------------- 40,000 ---- 349,045— 2019 . 12,473,387 - - - 12,473,387 Additional details on the "Other Adjustments" column is as follows: • 2010: Increase of $85K for fleet O&M • 2012: $21,693 for reinstating .25 FTE • 2014: $340K to fund LEOFF retiree medical and $40K to add fire permits to TRAKiT. • 2015: 80K for vacation payouts (not related to service separations), $210K for payouts due to service separation, and 90K for associated benefits. Also includes $60K for radio purchases • 2016: $90K for vacation payouts (not related to service separations), $220K for payouts due to service separation, and 93K for associated benefits. • 2018: $69k to budget for transfer to firemen's pension fund 35 INFORMATIONAL MEMO Page 12 201SProiectedYear-End Staff is preparing a projected year-end model along with e discussion on the assumptions that will beincluded inthe model. The model will be completed and presented atefuture meeting. New information for JU|y8.2O18 Mutual Aid In addition VJ the Citv`s firefighters responding to emergency incidents within the boundaries of the City, the crews also respond to, and naceive, mutual aid. Mutual aid provided is when the City's firefighters respond to an emergency incident in another jurisdiction's boundaries. Mutual aid received is when firefighters from other jurisdictions respond into the City'S area to respond to an incident. The charts be|Vvv graphically display mutual mid given and received on o basie, by jurisdiction, and by station. Data provided is from 2014 through 2018. The first chart demonstrates that, in total, the City provides more 0utWm| that what is received. For the period shown, the City responded to a total of3.3S4 mutual aid calls and received m total of2.822 received, g net difference of572. 2014 20I4-2010Mutual Aid 2015 m Mutual Aid Given 2016 a IVD utoa|Aid Received Another way b} look at mutual aid is to analyze DlUtUa{ aid given and FeQeived, but by jurisdiction. As the chart below indicates, the City responds into King County Fire District #20 (Skyway)and the Renton RFA more than the City receives aid. Conversely, Puget Sound RFA provides the City more nlUtUa| aid than the City provides the FlFA. 36 INFORMATIONAL MEMO Page 13 Entities included inthe ^[ther category include the following: Black Diamond FO#17. Booing Fire, Enumclaw FD, King County Medic One, KCFD #43, Port of Seattle, Seattle Fire, South King Fire, Valley RFA. \/nahon Island Fire & Rescue. and Woodinville. Vyhka the number of oaUo in many Ufthese areas are minimal, itdoes demonstrate that the City ufTukwila fire department can respond to ua||e in mnaae that do not border the City. 2,000 z'umo 1,600 1,400 1,200 z'ooO aDO 600 400 200 610 156 Mutual Aid by Jurisdiction xCFVw2D(Skymav) mmrthHigh|ine Puget Sound RFx Given axcceived Renton FD Other The final mutual aid chart looks at the same data as the chart above but displays the data by station. While, in total, the City gives more mutual aid than is received, both Station 52 and Station 54 receive more rnUtUo|aid than provide mutual aid. however, Stations 51 and 53 respond to more mutual aid calls that receive. |tisalso worth noting that Station 52gives and receives the least oMnOUMt of mutual aid than any other station. This could be relevant information since one of the policy choices presented includes reducing staffing levels at this station. 37 INFORMATIONAL MEMO Page 14 MUTUAL AID BY STATION GIVEN AND RECEIVED 450 400 350 300 250 200 150 103 50 0 51- Mutual Aid 51- Mutual Aid 52 - Mutual Aid 52 - Mutual Aid 53 Mutual Aid Given Received Given Received Given 2014 340 122 28 SS 105 2015 410 122 12 2016 286 110 24 2017 259 115 22 2018 273 137 29 33 37 45 51 142 153 169 118 53- Mutual Aid 54- Mutual Aid 54 - Mutual Aid Received Given Received 102 79 91 95 89 133 153 203 209 223 287 279 338 284 302 Schedule for Future Meetings Additional topics related to the fire department that will be presented at future meetings. Below is a tentative schedule with meeting dates and topics: July 22, 2019: Existing service levels for Tukwila fire department August 12, 2019: Cost and service level comparison to other fire/EMS service providers August 28, 2019: Options for service levels and how to fund the different service level options A memo on the fire marshal's office will also be presented as a topic for discussion at the July 22, 2019 meeting. DISCUSSION To begin the discussion on next steps to address the fire department's projected overbudget situation, two options regarding policy are being presented below as possible ways to keep the fire department within budget. Additional options could be presented at a later date. Policy Discussion There are some policy choices that relate to both the fire department budget as well as levels of service. As discussed above, there are a few items that, as a policy, the City does not budget for when drafting the biennial budget: • Pipeline positions — salary and benefits for an entry level firefighter is approximately $98 thousand. • Known retirements — based on current information, payouts in June are expected to be approximately $72 thousand total for three firefighters. Additionally, the current policy sets minimum staffing levels at 13 per shift. If staffing 13, minimum staffing overtime is triggered. a s below 38 INFORMATIONAL MEMO Page 1 5 Two suggestions that could keep the Fire department within budget follow. 1) Increase budget/revenues to support current level of service and staffing The first method would be to increase the fire department's budget to include funding for the pipeline positions and add budget for retirements that have already occurred in 2019 as well as those that are planned for later in the year. Funds could either come from increasing existing revenue sources, adding new revenue sources, decreasing budgets in other departments, or a combination of all the above. 2) Decrease minimum staffing level to 12 on days when minimum staffing is not met A policy option for the Fire Department would be to change the level of service to 12 rather than 13. When minimum staffing is below 13, rather than calling in one shift of overtime, the Fire Station 52 aid car could be placed in service rather than an engine. The aid car can respond to most calls but the reduction in service would come into play when a fire call comes from Station 52's area. An engine from another station would become the first due in unit, lengthening the response time. Engine 52 is also the second in engine for most fire calls in the City. If this engine is swapped out for the aid car, this will cause a delay in a second engine arriving on scene, putting the first -in unit at risk. The "two in - two out" rule by the State OSHA / L& I, is required for entry into a hazardous environment, such as a fire. Each of Tukwila's fire units are staffed at 3, a second staffed fire unit is needed. Fireground staffing levels (NFPA 1710) will also be affected, which will require an increase of aid from our neighboring fire agencies. From January 1, 2019 through April 30, 2019, there were 60 days when minimum staffing was below 13, resulting in minimum staffing overtime. Each shift of overtime costs approximately $1,400. If, on those 60 days, minimum staffing was reduced to 12 and the aid car placed in service, total savings in overtime costs would have been $84 thousand. Below is a chart showing fire calls by type that Station 52 engine responded to from 2014 through 2018. The chart represents first -in calls only and does not include fire calls were Station 52 was the second in engine. As demonstrated by the second chart, Station 52 responds to the fewest fire calls of all four stations. On average, this station responds as first in on 48 fire calls a year. 39 INFORMATIONAL MEMO Page 16 am zno om ,'m 120 mn 80 w ^» 20 n zz 9 Station 57 Fire Responses by Type zz 12 zO zo. � 8 mructvre Vehicle &mohUe cooWnu pmpprtv us s _ _ N IN o 56 25 worvra| Vegetation � Fire Calls by Station By Year with Average Response Times 38 m 44 62 m m n sz n o u o y sz sz sz o o o o o Fire Calls - Response Time New Option: Fully Fund Current Service Levels Rubbish & oumpters s, m, 76 � � o m 54 zz n Other types xo w m m mzo v:05:46 mn:02 mn.o vxnun 0:o.m v*n:43 54 Another option available would b8b}fully fund the current service levels iOthe following manner: 1) As previously 0endonod, the current staffing model includes 19 24-hourpersonne| per shift. Between 2013 and 2018, the average number of overtime hours worked was 12,000 across all divisions within the fire department. ASSU0iOg an hourly rate of $60 per hoV[, tofully fund overtime at the average number of overtime hours worked annually, the total overtime budget VvoV|d be $720 thousand. The current overtime budget for 2019 is $531 thousand. If the budget were trued up to reflect the average number of overtime hours xvorked, the budget should beincreased aOadditional $188thousand. Adjusting benefits would add aOadditional $24thousand for a total increase iObudget [f $213thOVgand. 40 INFORMATIONAL MEMO Page 17 Fire Overtime Costs Compared to Number of Overtime Hours (Excludes benefits) 2010 2011 2012 2013 2014 2015 2016 2017 2018 Overtime $ 407,964 446,557 440,553 754,079 857,927 658,738 495,855 514,312 647,876 Overtime Hours 8,221 8,907 8,831 14,592 16,127 12,065 8,717 9,038 11,046 Cost per Hour 49.63 50.13 49.89 51.68 53.20 54.60 56.89 56.90 58.65 Estimate Based on 2010-2018 2019 720,000 12,000 60.00 2) Fund the cost associated with the academy. The length of the academy is approximately 18 weeks and during those weeks, the fire department carries the full cost of the recruit (salary and benefits of approximately $40 thousand in total) but does not receive a level of service in return. Budget could be provided to cover the costs of the academy. Budget for four recruits would add $160 thousand to the existing budget. 3) Fund the cost of separations of service (retirements, etc.). Because current policy requires minimum staffing of 13, the fire department must absorb the costs of separations without reducing service levels. To date, the department is aware of three upcoming retirements with estimated payouts totaling $72 thousand. Adding budget of $100 thousand would cover not only known separations but provide some funding for possible future separations. To summarize, to fully fund current service levels, total budget of $473 thousand would be added to the 2019 budget. Future budget years would include these same increases with COLA adjustments factored in. True up overtime $213,000 Fund academy 160,000 Fund service separations 100,000 Total increase in budget $473,000 New Information for August 26, 2019 Fire Expenditure Budget The proposal for the items listed above, true up of overtime, academy, and service separations, are needed to fund existing service levels and would be proposed for both 2019 and 2020. If the same levels of service are maintained, these adjustments would be rolled into future budgets. The final proposed budget amendment would include an estimated COLA adjustment for 2020 for all three items. In addition to these ongoing amendments, staff will be recommending one-time amendments, specific to 2019. Two revenue -backed items and one unbudgeted significant event (not revenue - backed) occurred this year. For the propane tank incident, the Fire Department incurred approximately $11,500 in costs that will be reimbursed by the responsible party. The fire department also incurred approximately $7,800 in costs associated with an unexpected structural code compliance issue that will be reimbursed by the local business. The snowstorm event resulted in $30,600 in unbudgeted expenditures for the Fire Department that will not be reimbursed to the City. 41 INFORMATIONAL MEMO Page 18 Total recommended budget amendments are as follows: Proposed Budget Amendments 2019 2020 Propane Incident 11,500 - Code Compliance Issue 7,800� � Snowstorm 30,600 - Total Proposed 'Amendment $522,900 496.650 Revenue Budget In addition toincreasing the for the fire department, staff recommends that that the Fire Department begin billing for revenuespreviously authorized bY'Council, *False Alarms ~ Recovery ofhazardous incident response costs Another revenue source available to the City is be other cities in Zone 3 currently collect. Staff will work with the Fire Department to write a contract with the private ambulance companies to collect the fee. The addition of these revenues could Partially offset the additional expenditures being requested by the fire department, thereby lessening the impact to the general fund, Service Levels Another policy-' decision is related to service |eVm|e. Staff will be bringing forward information on existing service levels to the Public Safety committee in the near future. This information will be beneficial indiscussing the Fire department budget. Toenhance the discussion onservice levels, staff is gathering data on call statistics. Some of the information being gathered is call types by year and calls by station. Detailed call statistics will help guide future discussions on how best to address the .budget situation with the fire department. National Fire Protection Association (NFPA) The NFPA is a non-profit organization that convenes committees comprised of fire service -related professionals for the purpose ofdeveloping fire, electrical, and other life -safety standards. These standards are often utilized to make policy decisions regarding staffing and service levels. NFPA 1710 provides nnininnunn standards related to the organization and deployment of fire suppression operations, emergency medical operations, and special operations by career (paid) fire departments. Standards recommended by NFPA 1710 are summarized below and represent the resources necessary to provide the highest probability of a successful and safe outcome. mSingle-family dwellings: minimum 14 members, 15 if aerial ioused * Open strip malls and garden -style apartments: minimum 37members, 2Oifaerial iaused w High-rise with highest floor greater than 75 ft above |nvvent level of fire apparatus 000aos: nnininnVnl 42 nnenlbere. 43 if building is equipped with o fire pump. In addition to reviewing NFPA standards on staffing levels, it is important to review incidents and response times. As the chart below indicates, from 2O14through 2O17.thenurnberofhlcidents each year increased. However, in 2018 the total number of incidents decreased. It is too early toknow if2D1Owas ananomaly Orthe start Vfanew trend. 42 INFORMATIONAL MEMO Page 1 9 Along with the increase in incidents, response times also increased in apparent correlation with the increase in incidents except for 2017. In 2017 average response time actually decreased. 6000 5800 5600 5400 5200 5000 — 4800 2014 0.06. 2015 2016 Total Incidents 2017 —Avg Resp Time ao" 2018 0:06:29 0:06:20 0:06:12 0:06:03 0:05:54 0:05:46 0:05:37 0:05:28 Another trend in service levels worth noting is that the average duration of an incident has been declining over time. The shorter duration on calls helps to mitigate the impacts of increased call volume on average response times. 43 INFORMATIONAL MEMO Page 20 6000 5800 5600 5400 5200 5000 4800 5156 2014 RECOMMENDATION For information only 2015 5752 2016 Total Incidents 5840 2017 s „ -Avg Duration 2018 0:38:53 0:37:26 0:36:00 0:34:34 0:33:07 0:31:41 - 0:30:14 0:28:48 44 City of Tukwila City Council Finance Committee FINANCE COMMITTEE Meeting Minutes August 26, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Thomas McLeod, Chair; De'Sean Quinn, Kathy Hougardy Staff: David Cline, Vicky Carlsen, Jay Wittwer, Chris Flores, Bruce Linton, Tony Cullerton, Jeff Friend, Laurel Humphrey, Jeremy Brecher-Haimson CALL TO ORDER: Chair McLeod called the meeting to order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Fire Department Budget Committee members and staff continued discussion of the Fire Department budget. If the Council chooses to fund the existing service levels, it will need to authorize a budget amendment totaling $522,900 for 2019 and $496,650 for 2020. These amendments would increase overtime ($213K), funding the Fire Academy ($160K), funding service separations (100K), a COLA adjustment for these items in 2020, and unbudgeted significant events: the propane tank incident (reimbursable), snowstorms (non -reimbursable), and a structural code compliance issue (reimbursable). In addition to increasing the expenditure budget, staff recommends that the Fire Department begin billing for false alarms and recovery of hazardous incident response costs as previously authorized by Council. Another source of revenue is an ambulance transport fee similar to what other Zone 3 cities collect. These revenues will lessen the impact to the general fund. Councilmembers asked clarifying questions about minimum staffing, which is 13.0 FTE per current policy. Currently 18 personnel are funded per shift, which includes vacation and Kelly days. Chair McLeod asked if those on leave due to injuries can do administrative/light duty work. Staff replied that is occurring more frequently this year. Chair McLeod pointed out the policy question of determining what can be done to reduce overtime usage going forward. The bookends provided to Committee in May were to either fund the Department as it currently operates, or consider dropping minimum staffing down to 12 on days when only 12 report to shift. Chair McLeod referenced the potential impact to other departments if budget is added to Fire. He asked where budget would come from to cover the cost of funding the academy, and staff replied either reducing other departments or identifying a new revenue source. Councilmember Seal asked what it means to fund the academy and staff replied that it is the salary and benefits of those in the academy as well as overtime costs associated with being shorthanded. Councilmember Quinn asked about how Police covers academy costs and staff replied that it is 45 Finance Committee Minutes August 26, 2019 absorbed in their budget. He also stated it would be helpful to have costs broken out in greater detail so the Council can better anticipate the budget. Finance staff is working to update the chart of accounts for greater transparency. Councilmember Quinn asked if service separations are identified separately so they can be appropriately offset. Staff replied that separations can be costly and departments are expected to absorb them by cutting back in other areas. Councilmember Quinn stated that the Fire Department has requested significant budget amendments each year since 2012 and these proposed amendments reveal the true cost of service. Councilmember Seal pointed out that when the Department begins charging for false alarms again, the business community will direct any backlash to the Council. Councilmember Quinn said that the Council needs to give financial direction and structure to Fire and in return will need some guarantees. Chair McLeod stated support for the additional revenue sources proposed by staff as well as a more robust annual report as outlined in the RCW. FORWARD TO SEPTEMBER 9, 2019 COMMITTEE OF THE WHOLE. B. Resolution: Fire Department Fee Schedule Staff is seeking Council approval of a resolution that would update the Fire Department fee schedule by adjusting current fees and adding new fees to more closely align with other jurisdictions in the region. Fees are intended to recover a portion of the City's costs for services such as fire permits, plan review, and inspections. At its August 12, 2019 meeting, the Committee requested staff return with a different proposal for short term permits following Councilmember Quinn's comments expressing concern about deterring the types of activities the City would in fact like to attract. The revised proposal retains short-term permit at the current fee of $25.00. Staff noted that there is some statewide movement to address permitting of food trucks and the City is monitoring that activity. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 9, 2019 COMMITTEE OF THE WHOLE. C. Fire Department Special Operations Staff provided an overview of the special operations that the Fire Department has provided in the past as well as in the transition toward Zone 3 regionalization. Tukwila has been a leader in the state to specialize in hazardous materials and rescue efforts, responding to calls including the Oklahoma City bombing, World Trade Center emergency, and the OSO mudslide. The Zone 3 Technical Rescue Response model was formalized in 2004-2005, which organizes and coordinates responding agencies. Tukwila has a responsibility toward training and special operations as its contribution to the region. Chair McLeod asked about budgetary impacts of specialized training, and staff estimates courses cost $50,000 or less each year. Deployments are reimbursed at or nearly 100%. Chair McLeod asked about water rescue training on the Columbia River and staff responded that this was done once in 2010 during a flooding threat. Chair McLeod recommended a presentation to the full Council on July activities. DISCUSSION ONLY. 46 COUNCIL AGI-1.,NDA SYNoPsIs li;t05 - - ---- - -- -- Mech. as Date Prepared by Mayor's review Council review 10/28/19 LH ITEM INFORMATION ITEM Na 3.D. SlAii, SPONSOR: LAUREL HUMPHREY ORK3 IN \ I, AGEND \ D \ 1'1 ,: 10/28/19 AGENDA ITEM T1 tu, City Council Standing Committee Structure 10/28/19 I] Mpg Motion Date El Ordinance Altg Date ri Bid Aniard Ally Date ['Public Hearing A Itg Date [1] Other AlPs Date CATEGORY 11 Disaiiiion • Rejoin/ion Mpg Date A Itg Date EivIayoi Ft/lathe Fire E TS 1-11)&R EPoine EPIV Ecount S PONSOR Ng Council EFTR aDCD SP oNsoR' S The City Council needs to peridically evaluate the standing committee framework in an SUMMARY effort to appropriately balance policy work. Staff is seeking Council input that will be used toward the development of a committee resolution to be presented at the first meeting in January. REV IEWEI BY El C.O.W. Mtg. II CDN Comm E] Finance Comm. El Public Safety Comm. El Trans &Infrastructure E Arts Comm. ri Parks Comm. E Planning Comm. DATE: COMMITTEE CHAIR: RECOMMENDATIONS: SPoNSOR/ADMIN. CONIMITI El!. COST IMPACT / FUND SOURCE EXPEND' FLIRT. REQUIRIM AMOUNT BUDGETED APPROPRIATION REQUIRED $ $ $ Fund Source: Comments: Cost impacts include staff time for outreach and enforcement, if passed. MTG. DATE RECORD OF COUNCIL ACTION 10/28/19 MTG. DATE ATTACHMENTS 10/28/19 Informational Memo Attachment 47 48 City of Tukwila I F A TIO A E TO: Committee of the Whole CC: Mayor Ekberg FROM: Laurel Humphrey, Council Analyst DATE: October 22, 2019 SUBJECT: City Council Standing Committee Structure A DU Allan Ekberg, Mayor ISSUE Per Resolution 1956 adopted on January 2, 2019, there are four standing committees comprising three Councilmembers each: Public Safety, Finance, Transportation & Infrastructure, and Community Development & Neighborhoods. The resolution also states that "the City Council desires to evaluate the standing committee framework each year in an effort to appropriately balance the current policy work of the City." BACKGROUND The Tukwila City Council has used a system of subcommittees for 111 years, beginning with the July 14, 1908 meeting of the Town Council when the Committee on Taxation and Revenue, Committee on Licenses, and Committee on Buildings were formally established. Committees had varying titles and scopes over the decades until 1987 when the Finance & Safety, Transportation, Utilities, and Community Affairs and Parks Committees were adopted. This committee framework was not reevaluated until late 2016, when the Council adopted a pilot committee structure that would include a Public Safety Committee to take on discussions and recommendations relating to the projects associated with the Public Safety Plan. This was an effective strategy for three years, but with the construction projects underway and fewer upcoming decision points for the City Council, the Public Safety Committee no longer makes sense as a standalone committee. Standing committees of the Tukwila City Council are tasked with reviewing information and making policy recommendations to the full Council. While there are exceptions, typically legislative matters are handled in three phases: Committee discussion resulting in recommendation, Committee of the Whole discussion, and action at a Regular Meeting. If the City Council finds this to be an effective process and wishes to retain its structure of four standing committees meeting bimonthly and consisting of three Councilmembers each, a proposal for 2020 is included in Attachment A. The City Council could also consider an alternate framework by reconsidering the number of committees, frequency of meetings, and/or role of standing committees versus Committee of the Whole. There are different approaches in neighboring cities, and following are a few examples: 49 INFORMATIONAL MEMO Page 2 • The Auburn City Council eliminated its standing committee structure in 2014 and moved to a study session format. Study Sessions occur on the 2F/4th/5th Mondays and the City Council meetings are held on the 1st and 3rd Mondays. • The Burien City Council does not have committees and meets in Study Sessions as needed. Regular City Council meetings are held on the 1st & 3rd Mondays and Study Sessions are frequently held on the 4th Mondays of every month. • The Renton City Council has six standing committees of three Councilmembers each. The Community Services, Public Safety, and Utilities Committees meet one time per month, and the Finance, Planning & Development, and Transportation/Aviation Committees meet up to twice per month as workflow requires. Renton City Council meetings are held the first four Mondays of every month and are frequently preceded by an hour-long Committee of the Whole for more in-depth discussion. • The SeaTac City Council has five standing committees of three Councilmembers each. The Parks & Recreation, Public Safety & Justice, and Planning & Economic Development Committees meet once per month. The Transportation & Public Works and Administration and Finance Committees meet twice per month. Regular City Council meetings are held on the 2nd and 4th Tuesdays each month. RECOMMENDATION Staff is seeking Council input on a proposed committee structure for 2020. This input will be used for the development of a resolution to be placed on the January 6, 2020 Regular Meeting for consideration and potential action. ATTACHMENT Current vs. Proposed Committee Structure 50 Attachment I 2019 Committee Structure Public Safety Finance * Police ° Financial management and fiscal * Fine operations w Emergency Services * Personnel issues w Public Safety Facilities * Information technology * Municipal Court* * Finance and administrative * Animal Control* services 0 Library* Transportation and Infrastructure Community Development and * Transportation, traffic, streets Neighborhoods w Water, sewer, surface water * Housing policies and programs w Power, street lighting and signals * Planning and [and use * Solid waste and recycling * Code enforcement w River basins and levees, * Community engagement and * Telecommunications outreach * Fleet w Parks ° Recreation facilities * Economic planning and tourism w Human services *Listed in Resolution 1956, very little Council interface October 28'2U19 Committee of the Whole Meeting Proposed Committee Structure (Titles to be determined) Community Services Finance * Police * Budget process • Fire/Ennergency3en/ices * Financial management and fiscal w Community Engagement operations * Human Services w Person neK[onnpensatinn * Parks & Recreation * Technology Systems w Library/Pub|icArt * Finance and administrative * Equity and justice services � Government performance Transportation and Infrastructure Plammimg&Ecommmnic Development * Transportation, traffic, streets * Housing * VVater,sem/er,yurfBceVVater * Planning and land use * Power, street lighting and signals v Bui|ding&Deve|opnnent ° Solid waste and recycling regulations; permitting * River basins and levees * Code Enforcement w Telecommunications * Economic Development w Fleet * Tourism * Public Works Facilities p Environment &Sustainabi|ity 52 OCT28 MONDAY OCT 29 TUESDAY OC Upcoming Meetings and Events October - November 2019 T30 WEDNESDAY OCT-31 THURSDAY NOV 1 FRIDAY NOV2 SATURDAY Finance Committee 5:30 PM Hazelnut Conference Room City Council Committee of the Whole Meeting 7t00-PM Council Chambers Community Development & Neighborhoods Committee 5.30 PM Hazelnut Conference Room TUK A Community Center Work Party Join EarthCorps and City of Tukwila as we work to improve the Duwamish River: 10:00AM-2PM Community Center 12424 42"a Ave S For information and sign-up, visit www.TukwilaWA. goy/event/green- Tukwila-work- party. NOV4 MONDAY Public Safety Committee 5:30 PM Hazelnut Conference Room . City Council Regular Meeting 7i00 PM Council Chambers You can vote and return your ballot as soon as you receive it. You can return your ballot by mail or to a ballot drop box. No stamp needed to return your ballot! You can vote and return your ballot through the U.S. Postal Service as soon as your receive it. Your ballot must be postmarked by Electron Day. For information, visit httpst,°iwww kingcounty gov/dents/elections/ how-to-vote.aspx. Transportation & Infrastructure Committee 5'30 PM Hazelnut Conference Room Library Advisory Board 5 30 PM Community Center NOV6 WEDNESDAY TRANSPORTAT DROP-iN Talk to representatives from King County Metro's ORCA To -Go, King County Public Health's Access and Outreach, South King County Transportation Options and Hopelink to learn about riding the light rail, bus or bicycle; shuttles, or to get an ORCA card. 1:30 PM — 3:30 PM Tukwila Library 14380 Tukwila International Blvd Offered on 151 and 3" Wednesdays of the month. NOV 7"THURSDAY Equity & Social Justice Commission 5:15 PM Hazelnut Conference Room NOV 8 FRIDAY Fundraiser for the local food bank: Join to taste local brews and support Tukwila Pantry as it makes sure everyone in our community has enough to eat: There will be a silent auction, and serving Odin Micro Brews and finger foods. $25 per person. 7:00 PM — 9:30 PM Sullivan Center 14350 Tukwila Intl Blvd To purchase tickets, visit https;l/tu kwilapantry ,orgl. NOV9 SATURDAY TUK LA Crystal Springs Work Party Join community members and neighbors to help restore this park to healthy forest! All ages are welcome and no experience is necessary. Tools and training will be provided, so bring along your friends and family, and get your hands dirty! 9:00 AM — 12:00 PM Crystal Springs Park 15832 51 sr Ave S To volunteer, email volunteer@forterra.org.. Community Sock Drive Begins in October Many people are surprised to hear that socks are the least -donated clothing items and yet the most in -demand for needy locals. Help keep toes warm for Tukwila residents by bringing new socks, any size to the Tukwila Community Center during the month of October. All donated socks will be given out during our Spirit of Giving event in December, Tukwila in Motion has launched! Live; work or go to school in Tukwila? Explore your travel options and get a FREE ORCA CARD for 2 weeks of unlimited travel! Offer available until December 15. TUKWILA )N MOTION Sign up atwww.kingcounty.govlinmotion. Civil Service Commission: 2nd Mon., 5:00 PM, Human Resources Conference Room, Contact Michelle Godyn at 206-431-2187. Community Development and Neighborhoods Committee: 2nd & 4th Tues., 5:30 PM, Hazelnut Conference Room. Contact Laurel Humphrey at 206-433-8993. (2A) Parks, Recreation and Open Space (PROS) Plan update and Q&A. (28) Interfocal Agreement with King County to receive Conservation Futures tax grant funds for 116' Avenue South property acquisition (2C) Resolution to name a donated parcel as "Cottonwood Comer. (2D) Safe parks discussion. (2E) Review of rental housing policies. COPCAB (Community Oriented Policing Citizens Advisory Board): 2nd Thurs., 6:30 PM, Duwamish Conference Room. Contact Chris Partman at 206-431-2197. Equity & Social Justice Commission: 1st Thurs., 5'15 PM, Hazelnut Conference Room, Contact Niesha Fort -Brooks at 206-454-7564, Finance Committee: 2nd & 4th Mon:, 5:30 PM, Hazelnut Conference Room. Contact Laurel Humphrey at 206-433-8993. (2A) Tax levy legislation: 1) Ordinance levying the general taxes commencing 1/1/2020 and 2) Ordinance increasing the regular tax levy commencing 1/1/2020. (28) Discussion of non -represented employees' compensation. (2C) Resolution on Fire Department service levels and compliance with State law. (2D) Fire Department budget considerations. Library Advisory Board: 1st Tues., 5:30 PM, Community Center. Contact Stephanie Gardner at 206-767-2342. Park Commission: 2nd Wed., 5:30 PM, Community Center. Contact Robert Eaton at 206-767-2332. Public Safety Committee: 1st & 3rd Mon., 5:30 PM, Hazelnut Conference Room. Contact Laurel Humphrey at 206-433-8993. Transportation and Infrastructure Committee: 1st & 3rd Tues. 5:30 PM, Hazelnut Conference Room. Contact Laurel Humphrey at 206-433-8993. ➢ Tukwila Historical Society: 3rd Thurs.,7:00 PM, Tukwila Heritage 8 Cultural Center, 14475 59th Avenue S Contact Louise Jones -Brown at 206-244-4478. . Tukwila International Boulevard Action Committee: 2nd Tues., 7:00-PM, Valley View Sewer District. Contact Chief Bruce Linton at206-433-1815 53 54 Tentative Agenda Schedule MONTH MEETING i —REGULAR MEETING 2 — C.O.W. MEETING 3 — REGULAR MEETING 4 C.Q.W. October 7 14 21 28 See agenda packet cover sheet for this week's agenda: October 28, 2019 Committee of the Whole Meeting November 4 Proclamation 12 (TUESDAY) Public Hearings 18 Appointments 25 A proclamation recognizing November as "National Hunger and Homelessness Awareness Month." Consent Agenda An ordinance regulating the use of bags at retail establishments, Special Issues Arts Commission appointments. Unfinished Business An ordinance regulating the use of bags at retail establishments. - An ordinance amending Ordinance No, 2612, as codified in Chapter 9.53 of the Tukwila Municipal Code, to correct the monetary penalty amount for automated traffic safety camera infractions for speeding in school zones, - Authorize the Mayor to sign a contract with Carollo Engineers for the Water and Sewer Comprehensive Plans, in the amount of $460,392. Public Hearing An ordinance regulating the use of bags at retail establishments. A quasi-judicial hearing to consider the final subdivision application for Osterly Park Townhomes Phase II. Unfinished Business - Authorize the mayor to sign Amendment #5 with Lydig Construction for demolition of 2 buildings at the new Public Works Shops Facility Phase I, in the amount, of $73,707. - Authorize the Mayor to sign Amendment #2 with SHKS Architects for design services for Public Works Shops Facility Phase I, in the amount of $456,390. - Authorize approval of 1 or both of the following: Option 1 — Approve the Public Works Shops Master Plan and fund an additional $4,4 million for the Public Works Shops Phase I (Heiser building); and Option 2 — Approve the Minkler Shops Interim Improvements that would be funded by Utility Enterprise funds for $500,000.