HomeMy WebLinkAboutCOW 2019-10-28 Item 3A - Powerpoint Shown at Meeting - Public Safety Plan: Public Works Shops Facility Phase ITUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY SPU RIGHT OF WAY I S 112TH ST COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 11 TUKWILA PUBLIC WORKS FACILITY: MASTER PLAN RECOMMENDATION -3 PHASES PHASE 1 HEISER RENOVATION DEMOLISH LANDSCAPE + COFFEE SHOP POLICE IMPOUND SITE WORK COVERED SPOILS 1,20181 ge7552177.77,'"7•,R11:71,7711 BY. COurt, PHASE 2 ADMIN + SHOPS BUILDING I COVERED MATERIAL STORAGE I INTERIOR + COVERED PARKING I POLICE IMPOUND SITE WORK 0 GEORGE LONG SHOPS + LONG ACRES RELOCATES IN SPRING 2021 UPS SITE REMAINS OCCUPIED BY UPS THROUGH OCT 2023 MINKLER RELOCATES IN 2024 PHASE 3 FLEET MAINTENANCE BUILDING SITE WORK COVERED STORAGE I SPOILS SITE WORK ‘W, -mtnr DECANT + BRINETANKS ftEFIMOIRMAXCE.11.18 NEW FLEET MAINTENANCE SHOP COVERED SPOILS, AND DECANT IN 2029T0 COMPLETE CONSOLIDATED PUBLIC WORKS FACILITY TUKWILA PUBLICWORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE OFTHE VVHOLE I 10 28 19 SHKSARCHITECTS 1 2 -THE • E'VE 1 ET ETHE • Y TI ITI • KICKOFF MEETINGS AND GOALS EXERCISE • ASSESS EXISTING FACILITIES • (3+) ROUNDS OF INTERVIEWS WITH EACH DIVISION • JOB SHADOW OF OPERATIONS • TOURS OF LOCAL PUBLIC WORKS FACILITIES • ALL -HANDS MEETING TO PRESENT (2) TEST -TO -FIT OPTIONS • REFINE TEST -TO -FIT OPTIONS WITH CREW FEEDBACK • SHARE FINALIZED MASTER PLANNING OPTION AT ALL -HANDS MEETING • I GOAL SETTING/ NEEDS ASSESSMENT / PROGRAMMING DEVELOP AND REFINETEST-TO-FIT OPTIONS AND PHASING • STAFF INTERVIEWS • TEAM MEETINGS • SITE VISITS • ALL - HANDS MEETING • PUBLIC WORKSTOURS • COUNCIL MEETING * • • NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 11 MONTHS 2020 TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY COMMITTEE °FINE VVHOLE 10 28 19 ARCHITECTS 13 TUKWILA PUBLIC WORKS FACILITY: GOAL SETTING EXERCISE - 4 PRIORITY GOALS FUNCTIONAL • • • • • • • • • • SAFE •• 4 4 • • • •a, EFFICIENT •• t''' • • • • • • • • • • • • PROUD TO GOT O '111"ORE •• •• ADAPTABLE •• • TECHNOLOGICALLY ADVANCED •• •• • •• • TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 14 LI A Ul 1 P'I CIPL S F The facility provides a safe environment for workers and visitors and improves employee health and wellness. F TI • L The facility houses a collaborative Public Works Department with the capacity and flexibility to support the operations of tomorrow efficiently and effectively. F • 1 Le* I The facility conveys the Department's values to its customers and employees. It supports a long-term investment strategy to raise existing facility standards and plans for technological advancements that improve service to the public. T 1 • FT 1 • T The facility will exemplify environmental and regulatory standards for a sustainable future. It promotes human and environmental health. TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY COMMITTEE OF THE VVHOLE 10 28 19 ARCHITECTS 15 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - EXISTING PROGRAM ANALYSIS MINKLER 2.3 ACRES GROSS ACTIVE SITE AREA 100'O 0' 50' GEORGE LONG 2.2 ACRES GROSS ACTIVE SITE AREA tiatmatarf:i 100' 0' 50' LONG ACRES N 1.0 ACRE GROSS ACTIVE SITE AREA o' So' 100'0 TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY I COMMITTEE OFTHE WHOLE 110 28 1 SHKSARCHITECTS TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - JOB SHADOW MINKLER GEORGE LONG LONG ACRES KO, LIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 17 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - CURRENT AND FUTURE PROGRAM ANALYSIS FLEET MAINTENANCE ADMIN + SHOPS 10,760 SF 20,195 SF 22,150 SF 42,860 SF STAFF/VISITOR PARKING 14,050 SF 12,910 SF COVERED FLEET PARKING 3,860 SF 29,310 SF DECANT + BRINE WASH RACK SPOILS BULK BINS COVERED STORAGE UNCOVERED STORAGE POLICE IMPOUND 0 SF 3,800 SF 0 SF 1,900 SF " ,,•Gr);,;;Al.;.44,,kr!hTT:414";Il'itA,4,ittAgt,;Z: 1,ye 7' Iv' " 6,„„ „ • '1•„' • ••• PT 13,260 SF 19,500 SF 3,500 SF 4,800 SF 3,620 SF 5,300 SF 12,600 SF 14,000 SF 6,250 SF 6,250 SF A 11,,lial'Ate „A ` AAA AA4 „.1 kA A AAJAAAAAA A'4 Wtt„tbMVW EXISTING NEW TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE OF THE WHOLE 1 10 28 19 EXISTING AREAS PROJECTED 2045 AREAS r I I I I I I I I I 1 I 1 I I I I I 1 I I I I I I I I I I I I I I 111 11 1 1 111 I I I I I I I 111 11 I I INTERIOR PROGRAM 50,389 SF: --------------------.11. EXTERIOR 152,611 SF: PROGRAM 1 , 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I .1 L I 1 1 1 1 1 11 :SITE/ 225,222 SF: CIRCULATION CIRCULATION , , , 1. ....... TOTAL: 192,856 GSF TOTAL: 447,131 GSF 4.4 ACRES 10.3 ACRES SHKSARCHITECTS 18 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - DAILY OPERATIONS SEWER /WATER / STREET CUSTODIAL FACILITIES ADMIN STAFF / MANAGER FLEET MAINTENANCE VISITOR N I III III ▪ IM N I NI • IN NI IN IN • IN N I NI NI • FLEET PARKING • • • • NI NI JOB SITE ....„ „ ..„,. .„ „.. • • al al NI • • • MI MI 'FLEET PARKING „ II FLEET 4. PARKING FLEET PARKING 1.1 PARKING 1111 • IN • • NI JOB SITE LEET PARKING FLEET NI IN I PARKING JOB SITE • IN NI 1111 NI JOB SITE FLEET PARKING' • " a • • • 4... 1111 JOB SITE N I IIII JOB SITE JOB SITE • w DECANT JOB SITE TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE °FINE WHOLE 1 10 28 19 SHKSARCHITECTS 1 9 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - CONSOLIDATED DAILY OPERATIONS SEWER /WATER / STREET CUSTODIAL FACILITIES ADMIN STAFF / MANAGER FLEET MAINTENANCE VISITOR • MI • • • FLEET PARKING JOB SITE MI 111 FLEET PARKING 111 FLEET +1. JOB SITE PARKING FLEET PARKING FLEET PARKING III NI MI 111 III .) FLEET PARKING I. IN II JOB SITE JOB SITE I NI • FLEET PARKING FLEET • PARKING II II JOB SITE 1111111 JOB SITE JOB SITE .. • DECANT MI • MI • JOB SITE PROCESS LEGEND ADM IN + SHOPS BLDG STAFF/VISITOR PARKING FLEET MAINTENANCE FLEET PARKING DECANT lig SPOILS ki•••4240• 0114/04 iMAir IteMA WASH RACK MATERIAL STORAGE BULK BINS TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE OF THE VVHOLE 1 10 28 19 SHKSARCHITECTs 110 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - NEW SITE ANALYSIS HEISER A HEISER " OFFICE HEISER - OPEN SHOPS q02 tt`R�'a , ,8Y HEISER - OPEN SHOPS TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY I COMMITTEE OF THE WHOLE 110 28 19 SHKSARCHITECTS 111 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - NEW SITE ANALYSIS VEHICULAR ACCESS VEGETATION N 6 SHORELINE BUFFER TRAFFIC N o Bus Stop + 111. Vehicle F — — Pedestrian 0 EASEMENTS & SETBACKS SOLAR ACCESS /WIND 0 0 TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 12 TUKWILA PUBLIC WORKS FACILITY: ASSESSMENT - ALIGNMENT WITH GUIDING PRINCIPLES BUFFER SAFE FUNCTIONAL FORWARD LOOKING STEWARDS OF THE ENVIRONMENT N o VIEW, AIR, AND LIGHT N 0 ZONES ANDTHRESHOLDS N o TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE OF THE WHOLE 1 10 28 19 SHKSARCHITECTS 13 TUKWILA PUBLIC WORKS FACILITY: OPTIONS STUDY - INITIALTEST-TO-FIT PROPER LINE mITZtegi POPODWTLflftfl po Homo 00 9 970 SE (8.6) SW PARKING... , OPTION 1.0 - "FILTER" ESTIMATEDTOTAL PROJECT COST: $71 - 74 MILLION PROS • Meets the guiding principles • Allows for multi -phase construction and occupancy • Utilizes a portion of the existing Heiser building SOUTH 112TH STREET ANDSCAPING DIMAMISH RIVER CONS 111 POWER PO, 7- 0, AVM, POKING 7 1,1 GUYED POWER POLE -FP Van/No • Does not meet 2045 program projections • Higher life cycle cost • On -going maintenance at existing Heiser building • Distance between Admin & Fleet Parking • Congested tool loading • Bottleneck areas • Fleet maintenance not isolated • Tight vehicle turning SHORELINE LIFfER 10 -100, ESTIMATED PREVIOUS OilM PP SOUTH I t2TH STREET , IMO :,00.4.04‘ '00000000j40 >000. 0 074"0. 0'6°77. rad00.p...5triK710 4,3,, Mr: I, faiti14117NVVTAMAZY",, " ilNINX:h.% &...1.14,1, „ PROKRI,I1C, PROPPSEIMETLANL 8,<ING GUM' OPTION 2.0 - "SPINE" ESTIMATEDTOTAL PROJECT COST: $77 - 80 MILLION PROS • Meets the guiding principles • Meets 2045 program projections • Improved site circulation and utilization of space • Lower life cycle cost • Optimized site circulation • Potential for regional decant • Better sight lines CONS - Ill LANDSCAPING ---, 000 porE . ---0 , I ' 1E1 GUYED POWER POLE , A00:01100010 00000.000 0'00. ,,,,,I,,,,..,""""""""""'11111111111111111111111111111111! ' 111111111111111111111, RUM,. RIVER • Does not retain any existing buildings • Pump station requires for sewer connection • Employee parking location • Load area access • Fleet maintenance not isolated • Bottleneck at tool room loading SHORELINE BUFFER (APPROXIMATED, PREVIOUS OH. (APPROXIMATED) TUKWILA PUBLICWORKS CONSOLIDATED FACILITY STUDY I COMMITTEE OFTHE VVHOLE I 10 28 19 SHKSARCHITECTS 14 TUKWILA PUBLIC WORKS FACILITY: OPTIONS STUDY - REFINED TEST -TO -FIT COY65tOf[EEYPA"" C�1M21t OEVAiF 4,00 FLEET MITERAWCPP N B9,P4 SF OPTION 2.1 - "SPINE" ESTIMATEDTOTAL PROJECT COST $77 - 80 MILLION PROS • Meets the guiding principles • Meets 2045 program projections • Improved site circulation and utilization of space • Lower life cycle cost • Optimized site circulation • Potential for regional decant • Better sight lines • Secured staff parking • Secured deliveries entrance • Improved vehicle turning CONS HALT PARKING II) GUYED POWER °OM', ',nuiiW!WWWWWVW!WWWWWVW!WWWWW,w,x • Does not retain any existing buildings • Pump station requires for sewer connection • Employee parking location • Fleet maintenance not isolated • Ladder testing area requires relocation of uncovered storage 200. (APPROXIMATED, RELINE HITHER I/IPPRdtlMAZIr"" PREVIOUS OliWtel IAPPROXIM D, OPTION 3.0 ESTIMATEDTOTAL PROJECT COST: $77 - 80 MILLION PROS CONS • Meets the guiding principles • Meets 2045 program projections • Lower life cycle cost • Maintains "spine" site circulation • Potential for regional decant • Better sight lines • Does not retain any existing buildings • Impound lot circulates through staff parking • Location of admin building • Fleet maintenance can't access remaining site • Dispersed fleet parking • Ladder testing area requires relocation of uncovered storage • Bottleneck at tool room loading (APPROXIMATED, 4wPROXIMATEEDJ&OFFFA REMUS A IAPPRWMATEoI TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 15 TUKWILA PUBLIC WORKS FACILITY: OPTIONS STUDY - FINAL MASTER PLAN DECANT + BRINE w\tetraNt UNCOVERED (4,t,..`ts1 COVERED FLEET PARK, 41+1,,I,Vmu ,tel‘ m\t++, +1•4t.ms11,14.1.1k NIVILITA„ twravalrreamoti PROPERTY LINE PROPOSED WETLAND BY KING COUNTY SOUTH 112TH ST POLICE IMPOUND FLEET MAINTENANCE PARKING WETLAND MEETS 2045 PROGRAM REQUIREMENTS MEETS GUIDING PRINCIPLES PROVIDED NET PROGRAM AREA: 211,000 NSF ??, REQUIRED NET PROGRAM AREA: 203,000 NSF PROGRAMMED GROSS AREA: -470,000 GSF DEVELOPABLE SITE AREA: -503,000 SF PROGRAM LEGEND ADMIN + SHOPS FLEET MAINTENANCE FLEET MAINTENANCE PARKING INTERIOR FLEET PARKING COVERED FLEET PARKING UNCOVERED FLEET PARKING DECANT + BRINE IN SPOILS COVERED STORAGE BULK BINS UNCOVERED STORAGE gReY ,,,ektkod ,0.1*W. COST: $78,600,000* *per proposed phasing TUKWILA PUBLIC VVORKS CONSOLIDATED FACILITY STUDY COMMITTEE OFTHE WHOLE I 10 28 19 SHKSARCHITECTS 16 TUKWILA PUBLIC WORKS FACILITY: PHASING - CONSIDERATIONS MINKLER GEORGE LONG TUKWILA PUBLIC WORKS c 50' 000 oBoa'' So' Q LONG ACRES 100' 0' 50' HEISER + LANDSCAPE SITE AVAILABLE 2019 EXISTING AREAS MINKLER UPS SITE AVAILABLE OCT 2023 00'O 0' 50' GEORGE LONG LONG ACRES TOTAL INTERIOR 13,897 nsf 16,219 nsf 0 sf 30,116 nsf EXTERIOR 42,926 nsf 40,112 nsf 13,215 nsf 96,252 nsf CIRCULATION 43,795 nsf 22,692 nsf 0 sf 66,487 nsf 192,856 gsf AVAILABLE AREAS HEISER + LANDSCAPE SCL EASEMENT TOTAL INTERIOR 42,500 gsf 0 sf 42,500 gsf EXTERIOR 129,800 gsf 14,750 sf* 144,550 gsf* 187,050 gsf* SHKSARCHITECTS 17 TUKWILA PUBLIC WORKS FACILITY: PHASING - MASTER PLAN PHASE 1 HEISER RENOVATION DEMOLISH LANDSCAPE + COFFEE SHOP POLICE IMPOUND SITE WORK COVERED SPOILS ROM - ESTIMATED COSTS - PHASE 1 CONSTRUCTION COSTS: $5,800,000 SOFT COSTS: $2,400,000 TOTAL PROJECT COST: $8,200,000 ANTICIPATED CONSTRUCTION START: MID - 2020 PHASE 2 ADMIN + SHOPS BUILDING I COVERED MATERIAL STORAGE INTERIOR + COVERED PARKING I POLICE IMPOUND SITE WORK ROM - ESTIMATED COSTS - PHASE 2 CONSTRUCTION COSTS: $22,600,000 SOFT COSTS: $10,400,000 TOTAL PROJECT COST: $33,000,000 PHASE 3 FLEET MAINTENANCE BUILDING SITE WORK COVERED STORAGE I SPOILS SITE WORK ROM - ESTIMATED COSTS - PHASE 3 CONSTRUCTION COSTS: $24,400,000 SOFT COSTS: $13,000,000 TOTAL PROJECT COST: $37,400,000 DECANT + BRINETANKS ANTICIPATED CONSTRUCTION START: OCT 2023 ANTICIPATED CONSTRUCTION START: OCT 2029 DEMOLITION RENOVATION NEW CONSTRUCTION LANDSCAPING SITE WORK UNCOVERED PARKING TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OF THE WHOLE 110 28 19 SHKSARCHITECTS 18 TUKWILA PUBLIC WORKS FACILITY: PHASING - PHASE 1 TEST -TO -FIT 11111111111111111111111111111111111111111111111111111111111111111111111111, NIIIIIBkllllllllllllllllllll iiiiiiiiii 013 IIIN11' "" ^� IIIIIIIIIVu°1iiiiiiiii������������� iiiiloiillouuuuuuum, 'lllllllmmiv�,1uuuuuuum i �uuum ..., IIIIII uuuuuuu.. .. ^^, IIIIIIIIIIIVIIIIII6911111�""� 111111111111111 'lllllll1llllllllllluuuuuuuuuuu ....� .. Illllllhouuu� uuu1111111 ".... 11111111100111111111111111.111111111111111111111111i, 111111(111111111111111111111111111111111111111111111111.��������....... I 111111111111111111111111111111111111111111111 n ud11M'M' III.".. 1 rt llllllllll IIIIIIIIIIIIIIIIIIII , ,111111111111111111111111,,,, IIIIIIIIIIIII�������� TENANT IMPROVEMENT TO RELOCATE GEORGE LONG SHOPS INTO THE HEISER BUILDING HEISER T.I. ESTIMATED CONSTRUCTION COST - $3.5 MILLION • SEISMIC UPGRADES • HVAC UPGRADES • REQUIRED REPAIRS (ROOF, WALLS) • LOCKER ROOMS/OFFICES/MEETING • SHOP BUILD OUT • FIRE PROTECTION MODIFICATIONS • PLUMBING UPGRADES NOTE: CONSTRUCTION COSTS AND SOFT COSTS WILL BE MORE ACCURATE ONCE DESIGN PROGRESSES VEHICLE ACCESS FLEET MAINTENANCE OFFICE + SUPPORT FACILITIES SHOPS FACILITIES STORAGE SPOILS/ORGANICS FLEX/OVERNIGHT PARKING TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OF THE WHOLE 110 28 19 SHKSARCHITECTS 19 TUKWILA PUBLIC WORKS FACILITY: PHASING - PHASE 1 SITE TEST -TO -FIT SITE VEHICLE ACCESS BUILDING VEHICLE ACCESS STAFF PARKING FLEET PARKING SPOILS UNCOVERED STORAGE FLEET MAINTENANCE PARKING SITE REGRADING SECURITY FENCING PROPERTY LINE 1- SOUTH 112TH ST UNCOVERED s STORAGE ESTIMATED CONSTRUCTION COST - $5,800,000 • HEISER BUILDING T.I. - $3.5 MILLION • PERMANENT SITE STRUCTURES - $1.5 MILLION • SITE IMPROVEMENTS - $800K ESTIMATED SOFT COSTS - $2,400,000 THESE COSTS ARE TYPICALLY PAID FOR BY THE OWNER AND ARE IN ADDITION TO THE CONTRACTOR'S COSTS. THESE COSTS INCLUDE: • A/E FEES- ARCHITECT AND CONSULTANTS UNDER THE ARCHITECT'S CONTRACT. (11.5%) • ENGINEERING FEES AND STUDIES - OTHER PROJECT SPECIFIC CONSULTANTS NOT UNDER THE • ARCHITECT'S CONTRACT (EX: ENVIRONMENTAL IMPACT, GEOTECH, SURVEY, LOCATION WORK, ETC). (3.5%) • PERMITS AND FEES- INCLUDES MUP, BUILDING PERMITS, FIRE DEPARTMENT REVIEW, ETC. (2%) • COMMISSIONING- THIRD PARTY SYSTEM COMMISSIONING. (1%) • WA STATE SALES TAX. (10%) • FURNITURE, FIXTURES AND EQUIPMENT ALLOWANCE. (1.5%) • OWNER'S CONTINGENCY. (10%) ESTIMATED TOTAL PROJECT COST - $8,200,000 NOTE: CONSTRUCTION COSTS AND SOFT COSTS WILL BE MORE ACCURATE ONCE DESIGN PROGRESSES TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 20 TUKWILA PUBLIC WORKS FACILITY: PHASING - MINKLER INTERIM IMPROVEMENTS MAIN GATE SECURITY UPGRADE CONSTRUCTION COST- $20,000 SITE LIGHTING UPGRADE CONSTRUCTION COST - $150,000 LOCKER ROOM AND RESTROOM UPGRADES CONSTRUCTION COST - S150,000 ADDITIONAL STORAGE FOR CREW'S GEAR CONSTRUCTION COST - 560,000 ROM - ESTIMATED COSTS - MINKLER UPGRADES CONSTRUCTION COSTS: $400,000 SOFT COSTS: $100,000 TOTAL PROJECT COST: $500,000 ANTICIPATED CONSTRUCTION START: MID - 2020 TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY ( COMMITTEE OFTHE WHOLE 110 28 19 SHKSARCHITECTS 21 TUKWILA PUBLIC WORKS FACILITY: MASTER PLAN RECOMMENDATION -3 PHASES PHASE 1 HEISER RENOVATION DEMOLISH LANDSCAPE + COFFEE SHOP POLICE IMPOUND SITE WORK COVERED SPOILS PHASE 2 ADMIN + SHOPS BUILDING I COVERED MATERIAL STORAGE I INTERIOR + COVERED PARKING I POLICE IMPOUND SITE WORK 0 GEORGE LONG SHOPS + LONG ACRES RELOCATES IN SPRING 2021 UPS SITE REMAINS OCCUPIED BY UPS THROUGH OCT 2023 MINKLER RELOCATES IN 2024 PHASE 3 FLEET MAINTENANCE BUILDING SITE WORK COVERED STORAGE I SPOILS SITE WORK = 1 ',..*Vg1444.1=a DECANT + BRINETANKS MA. ftEFIMOIRMAXCE.11.18 NEW FLEET MAINTENANCE SHOP COVERED SPOILS, AND DECANT IN 2029T0 COMPLETE CONSOLIDATED PUBLIC WORKS FACILITY TUKWILA PUBLICWORKS CONSOLIDATED FACILITY STUDY 1 COMMITTEE OFTHE WHOLE I 10 28 19 SHKSARCH ITECTS 122 TUKWILA PUBLIC WORKS CONSOLIDATED FACILITY STUDY COMMITTEE OF THE WHOLE 1 10 28 19 ARCHITECTS 23