Loading...
HomeMy WebLinkAboutPS 2019-11-04 Item 2B - Public Safety Plan - Contract Amendment for Fire Station 52 Full Maximum Allowable Construction Cost (MACC) with Lydig ConstructionAllan Ekberg, Mayor Administrative Services Department- Rachel Bianchi, Deputy CityAdministrator INFORMATIONAL E ORANDU TO: Public Safety Committee CC: Mayor Allan Ekberg FROM: Rachel Bianchi, Deputy City Administrator DATE: October 28, 2019 SUBJECT: Fire Station 52 Mini-MACC2 ISSUE The Council is being asked to consider allowing the Mayor to execute an amendment to the contract with Lydig Construction to increase it by $9,227,381. BACKGROUND The new Fire Station 52 is to be located on the City Hall Campus just north of the 6300 Building in the upper parking lot. With Fire Station 51 moving further south, the FACETS study determined that it would be important for Fire Station 52 to move further south to maximize coverage and response times throughout the City. Fire Station 52 will become the new headquarters station and thus is a larger, more complex building than Fire Station 51. Early on, the City chose to use the General Contractor/Construction Management (GCCM), which allows the contractor to join the project early in the design process and inform the City and architects of cost impacts associated with design. City staff have found this to be a very productive delivery model, which has resulted in multiple steps of estimating and checking the budget in real time as decisions are made. The Council previously authorized mini-MACC1 for Fire Station 52, which covers two bid packages: one for earthwork and utilities; the other for structures, which includes retaining walls, steel, and the elevator. Mini-MACC1 also included allowances for long -lead items, including early submittals and early mechanical work that will ensure that these items are addressed in time for mini-MACC2. Fire Station 52 is currently under construction and on schedule. The remaining services have been bid, and the project is under the newly revised budget by approximately $637,000. Service Total Pre -Construction $ 125,000 Mini-MACC1: Earthwork and utilities; structures (retaining walls, steel, elevator) $6,801,879 Mini-MACC2: Concrete, glazing, metal framing, insulation, acoustical ceiling, miscellaneous, flooring, fencing, landscape, electrical, painting, $8,591,342 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 5 aluminum paneling and cement fiber board, roofing and flashing, mechanical. Construction cost: $15,518,221 Washington State Sales Tax: $1,551,822 Total without contingency: $17,070,043 Construction contingency: $ 1,503,879 Total with contingency: $18,573,922 The project team has carried the buildout of the Administration space as the only alternate on the project. The total cost of the buildout, including construction, tax, contingency and FF&E (furniture fixtures and equipment) is $845,747. Between the savings achieved in the newly revised budget (just over $637,000), and achievable budget reductions in professional services on the Justice Center and Fire Station 51 the buildout of the Administration space is attainable in the current mini-MACC2. The project team proposes transferring $104,057 each from the Fire Station 51 and Justice Center budgets to fully fund the Administration space buildout. As such, the final budget would be: Service Total Base Fire Station $18,573,922 Alternate #1 — Administration space buildout $ 845,747 Total Fire Station 52: $19,419,669 RECOMMENDATION The project team recommends moving forward with mini-MACC2 and Alternate #1 to complete Fire Station 52. The Council is being asked to provide the Mayor the authority for the following: •To sign a contract amendment with Lydig Construction for $16,154,260 for the full construction of Fire Station 52, including the buildout of the Administration space. •To spend $1,615,426 in sales tax associated with the full project. •To spend, if needed, the project's contingency for change orders, up to $1,567,483 *Transfer $104,057 each from the Fire Station 51 and Justice Center budgets to fully cover the cost of the Administration space buildout. Steve Goidblatt, the Council's Project Management Quality Assurance consultant, has reviewed the project status and agrees with this recommendation. ATTACHMENTS Fire Station 52 mini-MACC2 presentation Amended contract with Lydig Construction 6 Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov v ottom Line • Fire Station 52 is below the amended budget by approximately $637,000 • Fire Station 52 alternate for the Administrative space buildout came in at $845,747, including FF&E (furniture, fixtures and equipment), sales tax and 10% contingency • The Public Safety Plan existing budget can cover the delta between the savings in the base bid and the cost of the alternate so that the Administrative space can be built out during construction of the station. Fire Station 52 • Council previously authorized $6,801,879 for mini-MACC1 to capitalize on the summer months. • Mini-MACC1 covered earthwork and utilities, as well as structures. • The project is on schedule at this time. • Mini-MACC2 is for all remaining bid packages. Fire Station 52 Construction Costs Preconstruction Mini-MACC1 ini-MACC2 Earthwork and utilities; structures (retaining walls, steel, elevator Concrete, glazing, metal framing, insulation, acoustical ceiling, miscellaneous, flooring, fencing, landscape, electrical, painting, aluminum paneling and cement fiber board, roofing and flashing, mechanical. $ 125,000 $6,801,879 $8,591,342 Total Construction Cost Sales Tax Total without contingency Contingency Total with contingency $15,518,221 1 822 9 $18,573,922 Fire Station 52 Construction : ud e A/E Services Permits/Fees Construction (Pre -Con, Construction Related Costs (incl. bond & FF&E) Contingency $1,770,172 $1,756,152 Fire Station 52 Alternate — Admin Buildout Construction cost Additional furniture fixtures and equipment {FF&E) with 10% contingency $636,039 $82,500 Total $845,747 Fire Station 52 Alternate Suggested Funding Savings from FS 52 Mini-MACC2 Fire Station 51 budget reduction in remaining A/E, permit fees, printing, reimbursables and project management Justice Center budget reduction in remaining A/E, permit fees and professional services $637,633 $104,057 Fire Station 52 Council Consideration: •The Council is being asked to provide the mayor the authority to: • To sign a contract with Lydig Construction for $16,154,260 for the remaining construction of Fire Station 52, including the Admin buildout • To spend $1,615,426 in sales tax associated with the contract discussed above • To spend, if needed, the full project's contingency for change orders, budgeted at up to $1,567,483 • Transfer $104,057 each from the Fire Station 51 and Justice Center budgets to fully cover the cost of the Admin space buildout Fire Station 52 0) Init. !AIA Document A133TM — 2009 Exhibit A Guaranteed Maximum Price Amendment AMENDMENT NO. 5 for the following PROJECT: (Name and address or location) Tukwila Fire Stations 51 and 52 Tukwila WA Note: THIS AMENDMENT IS FOR THE BALANCE OF FIRE STATION 52 ONLY, EXCEPT AS SPECIFICALLY NOTED IN ARTICLE A.4 BELOW. PREVIOUS AMENDMENTS ADDRESSED INITIAL FIRE STATION 52 SCOPES AND FIRE STATION 51 SCOPE. WORK RELATED TO FIRE STATION 54, EXCEPT FOR THE DEMOLITION OF THE EXISTING STRUCTURE, WAS DELETED IN THE FIRST AND SECOND AMENDMENTS BETWEEN THE PARTIES. THE OWNER: (Name, legal status and address) City of Tukwila 6200 Southcenter Boulevard Tukwila WA 98188 THE CONSTRUCTION MANAGER: (Name, legal status and address) Lydig Construction 3180 139th Ave SE Suite 110 Bellevue WA 98005 ARTICLE A.1 § A.1.1 Total Contract Cost Pursuant to Section 2.2 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Maximum Allowable Construction Cost (MACC) and Total Contract Cost (TCC) for the balance of Fire Station 52. Without limiting the foregoing, this Amendment includes bid packages for site concrete; masonry; glazing, gypsum wall board, metal framing, insulation, and acoustical ceilings; miscellaneous package, floor finishes and tiling; fencing and gates; landscaping and irrigation; electrical; painting and coatings; exterior enclosure; roofing and roof flashing for Fire Station 52. As agreed by the Owner and Construction Manager, the Total Contract Cost is an amount that the Contract Sum shall not exceed. The Total Contract Cost consists of the MACC (including the Construction Cost, Negotiated Support Services, Subcontractor Bonds, and MACC Contingency); the Fixed Fee; the Fixed Amount for Specified General Conditions work; and applicable Washington State sales tax (although the TCC for this Fifth Amendment does not include WSST). ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 TM-2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 17 QA.1i1The Total Contract Cost for the Fire Station 52scope described above is guaranteed bythe Construction Manager not to exceed Nine Million Two Hundred Twenty -Seven Thousand Three Hundred Eighty -One Dollars ($9,227,381) ),subject to additions and deductions by Change Order as provided in the Contract Documents. Thus, the full Total Contract Cost for Fire Station 52 is guaranteed by the Construction Manager not to exceed Sixteen Million Twenty -Nine Thousand Two Hundred Sixty Dollars ($\6,029.260)).and the full Total Contract Cost for fort hoAgreement isguaranteed bythe Construction Manager not to exceed Twenty -Five Million Nine Hundred Bighty'Ggh\lhoosondFivcHuud,rdSovcnty'FourDoUurs($25,088,574)),hodhs"bjcc\moddbimuyouddodoctioua 6yChange Order asprovided iothe Contract Documents. Notwithstanding the references N"Construction Total" and "Total Contract Cost," the parties understand this amount is only for the uonpc described iuthis Amendment uudonr for the full and final scope nf Fire Station 52. § A.1.1.2 Itemized Statement of the Total Contract Cost. Provided below is an itemized statement of the Total Contract Cost organized by its component parts: TOTALS FOR THIS AMENDMENT #5ONLY Specified General Conditions $417'539 Maximum Allowable Construction Contract (K8ACC) Construction Total 88.018.602 Negotiated Support Services (NSS) $180.064 Subcontractor Bonds Included MACCContingency @3.096 $240.561 GC/CM Fixed Fee @4.6%(Fee ionot allowed onthe Specified General Conditions, orPreonnatructionAllowance) $381.625 TOTAL AMENDMENT #5CONTRACT COST (Excluding WSST) $9'227.381 TOTALS FOR FIRE STATION 52 Specified General Conditions $752.784 Maximum Allowable Construction Cmntnoot(K8ACC) Construction Total $13.804.692 Negotiated Support Services (NSS) $309.804 Subcontractor Bonds Included MACCContingency @3.O96 $414.141 GC/CM Fixed Fee @4.5Y6(Fee isnot allowed onthe Specified General Conditions, orPnaconntnuotionAllowance) $657.830 TOTAL FIRE STATION 52 CONTRACT COST (Excluding VVSST) $16.029'260 For the Total Proiect Scooe: Original Contract Sum (FG51.FS52.FS54) $372.000 Amendment No. 1(FS54) $O Amendment No. 2(FS54) $O Amendment No. 3(FS51) $9,587,314 Amendment No. 4(FS52) S6.801.879 Amendment No. 5(FS52) $9,227,381 TOTAL CONTRACT COST (Excluding WSST) $25,988,574 § A.1j.2.1lhe Preconstruction Services NTELimit for the entire Contract, aspreviously agreed mby the parties, is: Three Hundred Seventy -Two Thousand Dollars ($372,000) xmDocument Ao3 T"-uoo Exhibit ^`Copyrigmm1eo/.zoo and 2009 uvThe American Institute of Architects. All rights reserved. mmew/ma:mismA5 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlAc) Document, 'xany portion ", it, may result msevere civil and criminal penalties, and will ueprosecuted mthe maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. Init. § A.1.1.3 The Total Contract Cost is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.) Alternate 1 - Full Tenant Build of 2nd Floor Administrative Spaces: $636,039 (included in the Amendment #5 MACC above) § A.1.1.4 Allowances included in the Total Contract Cost, if any: (Identify allowance and state exclusions, if any, from the allowance price.) Item Price Allowances carried forward from Mini-MACC Allowance 1: Revise Elevator Specification (deductive) ($18,000) Allowance 2: Remove Unsuitable Soils (deductive) ($40,000) Allowance 3: Negotiated Savings Allowance (deductive) ($75,000) MACC Allowances Allowance 1: 100% CD Set — ASI 003 — BP01 & BP03 (ROM) $255,000 Allowance 2: PSE Work at 65th $25,000 Allowance 3: Concrete Wall Change $85,000 Allowance 4: Wood Bench Allowance $10,000 Allowance 5: Traffic Signalization $75,000 BP-11— Electrical Allowance for all work associated with Specification Section 285005 — Fire Station Alerting $75,000 Allowance for all work associated with Specification Section 281301 — Video Surveillance System $50,000 § A.1.1.5 Assumptions, if any, on which the Total Contract Cost is based: Assumptions and Clarifications: • All clarifications and scope modifications described in Addenda 01-08 shall be incorporated into the project documents. • Construction CPM Schedule shall carry forward from the Mini-MACC as updated through the date of this contract • PSE Work at 65th allowance does not include restoration of the road surface. This allowance is intended to cover the added cost for BP-01, BP-03 and restoration of two concrete panels and curb at this location. • Early Electrical Allowance of $215k is being returned to the MACC budget from BP-03. • All mockups shall be in -place in lieu of any freestanding mockup requirements. • Caulking of exterior concrete to be clarified to exist only where specifically shown on landscape paving drawings. • Specification section 26 05 19 paragraph 2.1C prohibits aluminum wire. Revise spec section 26 05 19 paragraph 2.1C to allow aluminum wire for sizes #1 AWG and larger. • Flooring surfaces shown as carpet in alternate 1 are changed to polished concrete as the base bid. Exclusions: • Building permit and fees per GCCM Matrix. • Special Inspections per GCCM Matrix. • Utility company fees and charges per GCCM Matrix. AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 19 Init. 20 • Commissioning authority. • Professional Liability (E&O) insurance coverage. • City, County, State, PUD and PSE requirements. • Utility Connection fees and assessments per GCCM Matrix. • Gas & Water Meters. • All owner soft costs and FF&E. • Any costs associated with Owner moves. • Washington State Sales Tax. • Costs exceeding our allowances included in the Bid Packages. See listing of Allowances below. • For the alerting system, all back -end connection, setup charges, etc. are excluded. Programming, software or other setup required in order to facilitate the function of the alerting system are excluded. No offsite work or function is included in this contract. § A.1.1.6 The Total Contract Cost is based upon the following General Conditions: AIA Document A201 — 2007, General Conditions of the Contract for Construction, as modified (Table deleted) § A.1.1.7 The Total Contract Cost is based upon the following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Agreement.) Weinstein A+U, Tukwila Fire Station 52 Specifications, Construction Set, incorporated by this reference. See Attachment A for the list of Specifications. (Table deleted) § A.1.1.8 The Total Contract Cost is based upon the following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Agreement.) Weinstein A+U, Tukwila Fire Station 52 Drawings, Construction Set, incorporated by this reference. See Attachment B for the list of Drawings. (Table deleted) § A.1.1.9 The Total Contract Cost is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) Not applicable. ARTICLE A.2 § A.2.1 Substantial Completion Dates The anticipated date of Substantial Completion for Fire Station 51 established by Amendment No. 3: May 19, 2020 The anticipated date of Substantial Completion for Fire Station 52 established by this Amendment: December 17, 2020 § A.2.2 Physical Completion Dates The anticipated date of Physical Completion for Fire Station 51 established by Amendment No. 3: May 19, 2020 The anticipated date of Physical Completion for Fire Station 52 established by this Amendment: December 17, 2020 AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) Init. § A.2.3 Final Completion Dates The anticipated date of Final Completion for Fire Station 51 established by Amendment No. 3: June 23, 2020 The anticipated date of Final Completion for Fire Station 52 established by this Amendment: January 19, 2021 § A.2.4 Construction Schedule Construction Manager's Construction Schedule for Fire Station 52 is updated and attached as Attachment C, and incorporated herein. ARTICLE A,3 Key Personnel The following named key personnel shall remain assigned for the duration of the Project unless otherwise agreed to in writing by Owner: Project Manager: Project Superintendent: Project Engineer: Kiel Lunsford Don Lehman Alex Carey ARTICLE A.4 Additional Change to Contract Terms Payment for overhead and profit for adjustments to the Contract Sum that are based on any method other than the unit price method shall be with a Four and One -Half percent (4.5%) fee on the cost of the changed work. This change applies retroactively and applies to both Fire Station 51 and Fire Station 52. Accordingly, Section 7.5.1 of the parties' AIA Document A201 — 2007, General Conditions of the Contract for Construction, is modified by this Amendment as follows: §7.5.1 For any adjustments to the Contract Sum that are based on any method other than the unit price method, the Contractor agrees to charge and accept as payment for overhead and profit, the following percentages of costs attributable to the change on Work: .1 Four and One -Half percent (4.5%) for Changes in the Work paid from Owner's contingency. .2 Zero percent (0%) for Changes in the Work paid from the MACC Contingency. .3 For additional Work ordered as described above that will be self -performed by Contractor (i.e., using its own forces) or executed by Subcontractors or Sub -subcontractors of any tier, it is agreed that the entity actually performing the Work will be permitted to charge a total of fifteen percent (15%) for overhead and profit, and upper tier Subcontractors and Contractor shall charge no more than eight percent (8%) on such Changed Work. .4 When both additions and credits are involved in any one change, the allowance for overhead and profit shall be figured on the basis of the net increase, if any. The overhead and profit percentage in this Section 7.5.1 includes reimbursement for indirect and direct costs associated with the management of the Change Work. Therefore no additional markups or direct costs will be allowed in Change Order pricing. This includes, without limitation, coordination, ordering of materials, field office and home office costs, estimating and scheduling, preparation of the change and pricing, indirect supervision and non -working foreman, safety, and supervision. AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any 5 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 21 Init. 22 OWNER (Signature) CONSTRUCTION MANAGER (Signature) (Printed name and title) (Printed name and title) AIA Document A133TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) ATTACHMENT A 23 24 100 01 10 Table of Contents 1011000 Summary 101 11 50 Delegated Design and Deferred Submittals 01 20 00 Price and Payment Procedures 01 22 00 Unit Prices 10123 00 Alternates 01 30 00 Administrative Requirements 0140 00 Quality Requirements 01 42 00 References 0143 39 Mockups 01 45 54 Building Envelope Air Barrier Testing 0150 00 Temporary p y Facilities and Controls 01 56 39 Temporary Tree and Landscape Protection 0157 13 Temporary Erosion and Sediment Control 01 60 00 Product Requirements 0177 00 Closeout Procedures 01 91 13 General Commissioning Requirements 01 21 00 Allowances 01 62 00 Product Options and Substitutions 03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast -In -Place Concrete 03 35 43 Polished Concrete Finishing 03 37 13 Shotcrete 04 22 00 Concrete Unit Masonry 04 26 13 Masonry Veneer 05 12 00 Structural Steel Framing 05 12 13 Architecturally Exposed Structural Steel Framing (AESS) 05 31 00 Steel Decking 05 40 00 Cold -Formed Metal Framing 05 50 00 Metal Fabrications 05 5113 Metal Pan Stairs 05 73 00 Decorative Metal Railings 06 10 53 Miscellaneous Rough Carpentry 06 16 43 Gypsum Sheathing 06 20 23 Interior Finish Carpentry 06 41 16 Architectural Wood Casework 06 73 00 Composite Decking 07 11 13 Bituminous Dampproofing 07 14 13 Hot Fluid -Applied Rubberized Asphalt Waterproofing 07 17 00 Bentonite Waterproofing 07 19 00 Water Repellents 07 21 00 Thermal Insulation 07 21 19 Foamed -In -Place Insulation���� 07 25 00 Weather Resistant Barriers 07 42 13.13 Formed Metal Wall Panels 07 46 46 Fiber -Cement Siding 07 54 23 Thermoplastic-Polyolefin (TPO) Roofing 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories 07 84 13 Penetration Firestopping 07 92 00 Joint Sealants 08 11 13 Hollow Metal Doors and Frames 08 14 16 Flush Wood Doors 08 31 13 Access Doors and Frames 08 36 13 Sectional Doors 08 37 13 Four -Fold Doors 08 41 13 Aluminum -Framed Entrances and Storefronts 08 54 13 Fiberglass Windows 08 62 00 Unit Skylights 08 80 00 Glazing 08 83 00 Mirrors 08 71 00 Door Hardware 09 22 16 Non -Structural Metal Framing 09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 2 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/12/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/24/2019 ASI-003 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 25 109 51 13 Acoustical Panel Ceilings 2 9/13/2019 Construc 09 54 26 Linear Wood Ceilings 2 9/13/2019 Construct 09 65 13 Resilient Base and Accessories 2 9/13/2019 Construction Se 09 65 66 Resilient Athletic Flooring 2 9/13/2019 Construction Set 109 68 13 Tile Carpeting 2 9/13/2019 Construction Set 09 84 36 Sound -Absorbing Ceiling Units 2 9/13/2019 Construction Set 09 91 13 Exterior Painting 09 91 23 Interior Painting 09 96 00 High -Performance Coatings 10 1100 Visual Display Units 110 13 23.16 Room -Identification Panel Signage 10 14 19 Dimensional Letter Signage 10 21 23 Cubicle Curtains and Track 110 26 00 Wall and Door Protection 10 28 00 Toilet and Bath Accessories 10 44 13 Fire Protection Cabinets 110 44 16 Fire Extinguishers 10 75 16 Ground -Set Flagpoles 11 31 00 Residential Appliances 12 24 13 Roller Window Shades 12 36 16 Metal Countertops 12 36 23 Plastic -Laminate Clad Countertops 112 36 61.19 Quartz Agglomerate Countertops 12 48 13 Entrance Floor Mats and Frames 12 93 00 Site Furnishings 14 21 23 Machine Room -Less Electric Traction Passenger Elevators 21 0500 Common Work Fire Suppression 12110 00 Fire Suppression 121 13 16 Preaction Double Interlock Fire Suppression 22 05 00 Common Work Plumbing 122 07 00 Plumbing Insulation 22 08 00 Commissioning of Plumbing 22 10 00 Domestic Water Piping 22 11 23 Domestic Water Pumps 122 13 16 Sanitary Waste and Vent Piping 22 30 00 Plumbing Equipment 22 42 00 Plumbing Fixtures 22 6100 Compressed Air 23 05 00 Common Work HVAC 23 05 48 Vibration Isolation 23 05 93 Balancing 23 07 00 HVAC Insulation 123 08 00 Commissioning of HVAC 123 09 23 Controls - BMS 23 11 23 Natural Gas Piping 23 23 00 Refrigerant Piping 123 31 00 Air Distribution 23 34 00 HVAC Equipment 23 35 20 Automatic Emergency Vehicle Exhaust System 26 05 19 Low -Voltage Cable and Terminations 26 05 26 Grounding and Bonding for Electrical Systems 126 05 29 Hangers and Supports for Electrical Systems 126 05 33 Raceways and Boxes for Electrical Systems 26 05 34 Raceways and Boxes for Communications Systems 126 05 43 Underground Raceways 126 05 53 Identification for Electrical Systems 26 05 73 Power Systems Protective Device Study 26 08 00 Electrical Systems Commissioning 126 09 23 Lighting Control 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclose d Switches and Circuit Breakers 26 29 13.. ... Motor Control 126 32 13 Engine Generators 126 51 00 Lighting 26 05 00 Common Work Results 127 15 00 Data and Telephone Cabling System 27 41 33 Television Distribution System 27 51 23 Clock Program System 28 13 01 Security Access System 128 23 00 Video Surveillance System 28 31 11 Fire Alarm System 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 2 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Se 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 26 128 50 05 Fire Station Alerting 131 10 00 Site Preparation 31 22 00 Earthwork 13141 33 Trench Safety 132 12 00 Flexible Paving 32 12 43 Flexible Porous Pavement 32 13 13 Pedestrian Concrete Paving 132 17 23 Pavement Markings 32 31 19.53 Decorative Metal Fences and Gates 132 84 00 Planting Irrigation 132 92 00 Turf and Grasses 32 93 00 Planting 32 94 00 Soil Cells 133 10 00 Water Utilities 33 30 00 Sanitary Sewer 133 40 00 Storm Drainage 9/13/2019 Construc 9/13/2019 Construct 9/13/2019 Construction Se 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 1 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 2 9/13/2019 Construction Set 27 28 ATTACHMENT B 29 30 G001 IG101 G 201 G 202 G500 COVER SHEET LAND USE CODE DIAGRAMS BUILDING CODE SUMMARY BUILDING CODE DIAGRAMS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Sete 2 9/12/2019 Construction Set 1 9/12/2019 Construction Set ACCESSIBILITY DIAGRAMS TOPOGRAPHIC SURVE' TOPOGRAPHIC SURVEY CO.1 COVER SHEET 2 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set C1.0 TESC AND DEMOLITION PLAN C1.1 C1.2 C1.3 C2.0 C2.1 C2.2 C2.3 C2.4 2 9/12/2019 Construction Set TESC AND DEMOLITION PLAN TESC AND DEMOLITION DETAILS TESC AND DEMOLITION NOTES GRADING AND DRAINAGE PLAN 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 4 9/12/2019 Construction Set GRADING AND DRAINAGE PLAN DRIVEWAY PROFILE 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set STORM PROFILE SECTIONS 9/12/2019 Construction Set 3 9/12/2019 Construction Set C2.5 SECTIONS 2 9/12/2019 Construction Set C2.6 SECTIONS 2 9/12/2019 Construction Set C2.7 SECTIONS 2 9/12/2019 Construction Set C2.8 I C2.9 IC2.10 C2.11 C3.0 GRADING AND DRAINAGE NOTES AND DETAILS GRADING AND DRAINAGE DETAILS GRADING AND DRAINAGE DETAILS GRADING AND DRAINAGE DETAILS 2 9/12/2019 Construction Set 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set PAVING AND HORIZONTAL CONTROL PLAN C3.1 C3.2 C3.3 C3.4 C4.0 C4.1 IC4.2 IC4.3 PAVING AND HORIZONTAL CONTROL PLAN 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set PAVING AND HORIZONTAL CONTROL NOTES AND DETAILS PAVING AND HORIZONTAL CONTROL NOTES AND DETAILS PAVING AND HORIZONTAL CONTROL DETAILS SEWER AND WATER PLAN SEWER AND WATER PLAN SEWER PROFILE SEWER DETAILS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 3 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 2 9/12/2019 Construction Set C4.4 WATER NOTES AND DETAILS C4.5 SH101 SH102 SH201 SH202 SH301 SH302 SV101 SV201 SV301 S101 IS102 S201N S201S S202N S202S IS203N S203S S301 S302 WATER NOTES AND DETAILS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set SHORING GENERAL STRUCTURAL NOTES STATEMENT OF SPECIAL INSPECTIONS SHORING PLAN RETAINING WALL PLAN 2 9/12/2019 Construction Set 9/12/2019 Construction Se 2 9/12/2019 Construction Set SHORING WALL ELEVATION & DETAILS RETAINING WALL ELEVATIONS 6 9/12/2019 Construction Set 6 9/12/2019 Construction Set 6 9/12/2019 Construction Set GENERAL NOTES & STATEMENT OF SPECIAL INSPECTIONS DETENTION VAULT PLANS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set VAULT DETAILS GENERAL STRUCTURAL NOTES 2 9/12/2019 Construction Set STATEMENT OF SPECIAL INSPECTIONS NORTH FOUNDATION PLAN SOUTH FOUNDATION PLAN 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set NORTH LEVEL 2 FLOOR FRAMING PLAN SOUTH LEVEL 2 FLOOR FRAMING PLAN NORTH ROOF FRAMING PLAN SOUTH ROOF FRAMING PLAN CONCRETE DETAILS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set CONCRETE DETAILS 2 9/12/2019 Construction Set S401 TYPICAL STEEL DETAILS S402 TYPICAL STEEL DETAILS S403 STEEL DETAILS 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set S404 STEEL DETAILS S501 A001........._.. A002 IA003 I A101.1 N A101.1S A101N A101S 1 9/12/2019 Construction Set LIGHT GAUGE FRAMING DETAILS 2 9/12/2019 Construction Set ARCHITECTURAL FULL SITE PLAN ENLARGED ARCHITECTURAL SITE PLAN SITE UTILITIES 2 9/12/2019 Construction Set 9/12/2019 Construction Set 2 9/12/2019 Construction Set SLAB PLAN LEVEL 1 NORTH 1 9/12/2019 Construction Set SLAB PLAN LEVEL 1 SOUTH FLOOR PLAN LEVEL 1 NORTH FLOOR PLAN LEVEL 1 SOUTH A102.1S A102N A102S SLAB PLAN LEVEL 2 SOUTH FLOOR PLAN LEVEL 2 NORTH 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set FLOOR PLAN LEVEL 2 SOUTH - BASE A102S.A FLOOR PLAN LEVEL 2 SOUTH - ALT 2 9/12/2019 Construction Set 9/12/2019 Construction Set 31 A103N ROOF PLAN NORTH 2 9/12/2019 Construction Set A1035 ROOF PLAN SOUTH 2 9/12/2019 Construction Set A201N RCP LEVEL 1 NORTH 2 9/12/2019 Construction Set A2015 RCP LEVEL 1 SOUTH 2 9/12/2019 Construction Set A202N RCP LEVEL 2 NORTH 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 1 9/12/2019 Construction Set 1 9/12/2019 Construction Set 1 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set A616 INTERIOR ELEVATIONS APP BAY 2 9/12/2019 Construction Set A617 INTERIOR ELEVATIONS 1 9/12/2019 Construction Set A618 INTERIOR ELEVATIONS 1 9/12/2019 Construction Set A621 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A622 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A625.A INTERIOR ELEVATIONS ALTERNATES 2 9/12/2019 Construction Set A626.A INTERIOR ELEVATIONS ALTERNATES 2 9/12/2019 Construction Set A627.A INTERIOR ELEVATIONS ALTERNATES 1 9/12/2019 Construction Set A701 INTERIOR ASSEMBLIES 2 9/12/2019 Construction Set A702 INTERIOR DETAILS 2 9/12/2019 Construction Set A703 INTERIOR DETAILS 2 9/12/2019 Construction Set A704 INTERIOR DETAILS 1 9/12/2019 Construction Set A710 INTERIOR ASSEMBLIES - RATING INFO 0 9/12/2019 Construction Set A721 MILLWORK DETAILS 1 9/12/2019 Construction Set A722 MILLWORK DETAILS 1 9/12/2019 Construction Set A901 FINISH SCHEDULE 2 9/12/2019 Construction Set A911 DOOR SCHEDULE 3 9/24/2019 ASI-003 A921 SIGNAGE 2 9/12/2019 Construction Set A922 SIGNAGE 1 9/12/2019 Construction Set E100 LEGEND, LIGHT FIXTURE SCHEDULE, ONE LINE DIAGRAM 2 9/12/2019 Construction Set E101 FULL SITE PLAN - ELECTRICAL 2 9/27/2019 ASI-004 E102 FULL SITE PLAN - ELECTRICAL- LIGHT CALC 1 9/12/2019 Construction Set E201N FLOOR PLAN LEVEL 1 NORTH - LIGHTING 2 9/12/2019 Construction Set E2015 FLOOR PLAN LEVEL 1 SOUTH - LIGHTING 2 9/12/2019 Construction Set E202N FLOOR PLAN LEVEL 2 NORTH - LIGHTING 2 9/12/2019 Construction Set E2025 FLOOR PLAN LEVEL 2 SOUTH - BASE - LIGHTING 2 9/12/2019 Construction Set E2025.A FLOOR PLAN LEVEL 2 SOUTH -ALT- LIGHTING 2 9/12/2019 Construction Set E301N FLOOR PLAN LEVEL 1 NORTH - POWER 2 9/12/2019 Construction Set E3015 FLOOR PLAN LEVEL 1 SOUTH - POWER 2 9/12/2019 Construction Set A2025 RCP LEVEL 2 SOUTH - BASE A2025.A RCP LEVEL 2 SOUTH - ALT A301 EXTERIOR ELEVATIONS A302 EXTERIOR ELEVATIONS A303 EXT DECK ELEVATIONS A321 ENLARGED WALL SECTIONS - APP BAY A322 ENLARGED WALL SECTIONS - BRICK A323 ENLARGED WALL SECTIONS - DECK A324 ENLARGED WALL SECTIONS A325 ENLARGED WALL SECTIONS - ENTRY A401 EXTERIOR VERTICAL ASSEMBLIES A402 EXTERIOR HORIZONTAL ASSEMBLIES A411 WINDOW SCHEDULE A421 EXTERIOR PLAN DETAILS - BRICK A422 EXTERIOR PLAN DETAILS - WEST A423 EXTERIOR PLAN DETAILS A424 EXTERIOR PLAN DETAILS A450 EXTERIOR CLADDING LAYOUT A451 EXTERIOR SECTION DETAILS - BRICK A452 EXTERIOR SECTION DETAILS - ENTRY A453 EXTERIOR SECTION DETAILS - DECK A454 EXTERIOR SECTION DETAILS - NORTH WALL A455 EXTERIOR SECTION DETAILS - NORTH BAR A456 EXTERIOR SECTION DETAILS - APP BAY EAST A457 EXTERIOR SECTION DETAILS -APP BAY WEST A458 EXTERIOR SECTION DETAILS - MISC A459 EXTERIOR SECTION DETAILS A460 OPENING DETAILS A461 WATERPROOFING DETAILS A462 ROOF DETAILS A463 DECK DETAILS A501 STAIR 1 A502 STAIR 2 A503 STAIR DETAILS A504 ELEVATOR PLANS & SECTIONS A611 INTERIOR ELEVATIONS RESTROOMS 2 0 2 2 A612 INTERIOR ELEVATIONS 2 A613 INTERIOR ELEVATIONS 2 A614 INTERIOR ELEVATIONS 2 A615 INTERIOR ELEVATIONS APP BAY 2 32 E302N FLOOR PLAN LEVEL 2 NORTH - POWER E3025 FLOOR PLAN LEVEL 2 SOUTH - BASE - POWER E3025.A FLOOR PLAN LEVEL 2 SOUTH - ALT- POWEP E303N ROOF PLAN NORTH - POWER E3035 ROOF PLAN SOUTH - POWER E401N FLOOR PLAN LEVEL 1 NORTH - COMM E4015 FLOOR PLAN LEVEL 1 SOUTH - COMM E4025 FLOOR PLAN LEVEL 2 SOUTH - BASE - COMM E4025.A FLOOR PLAN LEVEL 2 SOUTH - ALT - COMM E403N ROOF PLAN NORTH - COMM E501N FLOOR PLAN LEVEL 1 NORTH - FIRE ALARM, SECURITY, CLOCK E5015 FLOOR PLAN LEVEL 1 SOUTH - FIRE ALARM, SECURITY, CLOCK E502N FLOOR PLAN LEVEL 2 NORTH - FIRE ALARM, SECURITY, CLOCK E5025 FLOOR PLAN LEVEL 2 SOUTH - BASE - FIRE ALARM, SECURITY, CLOCK E5025.A FLOOR PLAN LEVEL 2 SOUTH - ALT - FIRE ALARM, SECURITY, CLOCK E601N FLOOR PLAN LEVEL 1 NORTH - ALERTING SYSTEM E6015 FLOOR PLAN LEVEL 1 SOUTH - ALERTING SYSTEM E6025 FLOOR PLAN LEVEL 2 SOUTH - BASE -ALERTING SYSTEM E6025.A FLOOR PLAN LEVEL 2 SOUTH -ALT- ALERTING SYSTEM E701 DETAILS. E702 MECH SCHEDULE, LIGHTING RELAY SCHEDULE E801 PANEL SCHEDULES L001 SITE OVERVIEW PLAN L010 TREE PROTECTION PLAN L101 SITE MATERIALS AND LAYOUT PLAN L111 SITE MATERIALS AND LAYOUT ENLARGEMENT PLAN L211 SITE DETAILS L212 SITE DETAILS L213 SITE DETAILS L301 IRRIGATION PLAN L311 IRRIGATION DETAILS L401 PLANTING PLAN L411 PLANTING DETAILS L412 SOIL CELL DETAILS M001 ABBREVS., LEGEND, NOTES & INDEX M002 MECHANICAL SCHEDULES M003 MECHANICAL SCHEDULES M004 MECHANICAL SCHEDULES M101 MECHANICAL SITE PLAN M201N MECHANICAL FOUNDATION PLAN NORTH M2015 MECHANICAL FOUNDATION PLAN SOUTH M300 FIRE PROTECTION ABBREVS., LEGEND, NOTES, & INDEX M301N FIRE PROTECTION DIAGRAM LEVEL 1 NORTH M3015 FIRE PROTECTION DIAGRAM LEVEL 1 SOUTH 2 2 2 2 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 1 9/12/2019 Construction Set 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 1 9/12/2019 Construction Set 2 9/12/2019 Construction Set 2 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 9/12/2019 Construction Set 1 9/12/2019 Construction Set M302N FIRE PROTECTION DIAGRAM LEVEL 2 NORTH 2 9/12/2019 Construction Set M3025 FIRE PROTECTION LEVEL 2 SOUTH 1 9/12/2019 Construction Set M3025.A FIRE PROTECTION LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set M401N PLUMBING PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M4015 PLUMBING PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M402N PLUMBING PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set M4025 PLUMBING PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M4025.A PLUMBING PLAN LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set M501N HVAC PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M5015 HVAC PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M502N HVAC PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set M5025 HVAC PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M5025.A HVAC PLAN LEVEL 2 SOUTH ALTERNATE 1 9/12/2019 Construction Set M503N PIPING PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M5035 PIPING PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M504N PIPING PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set M5045 PIPING PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M5045.A PIPING PLAN LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set M601N MECHANICAL ROOF PLAN NORTH 2 9/12/2019 Construction Set M6015 MECHANICAL ROOF PLAN SOUTH 1 9/12/2019 Construction Set M701 MECHANICAL LARGE SCALE PLANS 1 9/12/2019 Construction Set M702 MECHANICAL DIAGRAMS 1 9/12/2019 Construction Set M703 MECHANICAL DIAGRAMS 1 9/12/2019 Construction Set M801 MECHANICAL SECTIONS 1 1 9/12/2019 Construction Set M901 MECHANICAL DETAILS 2 9/12/2019 Construction Set M902 MECHANICAL DETAILS 2 9/12/2019 Construction Set M903 MECHANICAL DETAILS 2 9/12/2019 Construction Set M904 MECHANICAL DETAILS 2 9/12/2019 Construction Set M905 MECHANICAL DETAILS 2 9/12/2019 Construction Set 33 34 ATTACHMENT C 35 36 Tukwila Fire Station 52 Data Date: Oct-21-19 Activity ID Activity Name Tukoita Fire Station-52 A2390 City Council Approval of TCC A1410 Structural Steel Orsite A1390 Contract Final Completion Date A2430 Phase II NTP A2400 City Council Approval of Phase 1 A2410 Phase 1 NTP A1090 Phase II Permit Received A1380 Phase 1 Permit Received Construction Milestones A1000 SOG Completion 0t girial Rematni Duration Dusti A1070 Substantial Completion A1080 Final Completion A2290 End of Wet Weather Season A3040 Structural Steel onsite A1040 Permanent Power A1050 Equipment Start Up A1060 Start of Commissioning A1030 Roof Dry In A1020 Building Dry In A1010 Structure Toppng Off A2120 Mobilize on site A2130 Start of Wet Weather Season Design Milestones A1180 60% CD - Review Set A1270 90% CD Set A1280 100% CD Set A12420 Perml Set Submitted A3050 Phase 1 Bid Documents Available A1290 Structural Steel Drawings Released for Detailing A1370 Remaining Mini MACC Items Released for Submittals d Package Contracting A9560 BP-01 - Earthwork & Utilities A9570 BP-02 - Site Concrete A9580 BP-03 - Structues A9590 BP-04 - Masonry A9600 BP-05 - Glazing A9610 BP-06 - Framing & GWB A9620 BP-07 - Misc A9630 BP-08 - Flooring A9640 BP-09 - Fencing & Gate Enclosures A9650 BP-10 - Landscaping A9660 BP-11 - Electrical A9670 MCCM Submission by BP A9460 BP-06 - 054000 - GWB BP Critical Submittals A9514 MCCM - 078413 - MCCM Underground & Long Lead A9428 BP-02 - 321313 - Site Concrete BP Critical Submittals A9472 BP-07 - 061053 - Misc BP Critical Submittals A9456 BP-05 - 079200 - Glazing BP Critical Submittals A9451 BP-04 - 042200 - Masonry BP Critical Submittals A9511 BP-10 - 328400 - Landscaping BP Critical Submittals A9508 BP-09 - 323111 - Fencing BP Critical Submittals A9502 BP-08 - 033543 - Flooring BP Critical Submittals A9420 BP-01 - 311000 - Earthwork BP - Utilities & Soils Start Finish u t-04-19 A Jan-19-21 19 16 Oct-21-19* Nov-11-19 0 0 Dec-13-19* 0 0 Jan-19-21 0 0 Nov-12-19* 0 Jul-16-19 A 0 Jul-16-19 A Ju1-16-19 A 0 0 Sep-16-19A 1 0 Jul-16-19 A Jul-18-19 A 380 275 Jul-16-19A Jan-19-21 0 0 Dec-1319 0 0 Dec-17-20" 0 0 Jan-19-21" 0 0 May-01-20* 0 0 Dec-12-19* 0 0 Jul-20-20 0 0 Oct-22-20 0 0 Oct-22-20 0 0 May-11-20 0 0 Jun-22-20 0 0 Jan-20-20 Jan-20-20 5 0 Jul-16-19 A Jul-22-19 A 0 0 Oct-01-19A 43 0 Jun-04-19A Sep-12-19A 0 0 Jul-16-19 A 0 0 Aug-23-19 A 0 0 Sep-12-19A 0 0 Aug-05-19 A 0 0 Jun-04-19 A 0 0 Aug-16-19 A 0 0 Sep-06-19A 60 0 Jun-10-19A 17 0 Jun-10-19 A 19 0 Sep-06-19A 14 0 Jun-10-19 A 19 0 Sep-06-19A 19 0 Sep-06-19A 15 0 Sep-06-19A 19 0 Sep-06-19A 19 0 Sep-06-19A 19 0 Sep-06-19A 19 0 Sep-06-19A 19 0 Sep-06-19A 1 0 Oct-09-19 A 15 5 10 15 20 15 15 15 5 Jut-25-19 A 12 Oct-21-19 2 Oct-21-19 5 Oct-21-19 12 Oct-21-19 15 Oct-21-19 5 Oct-21-19 10 Oct-21-19 10 Oct-21-19 12 Oct-21-19 0 Jun-25-19 A 2 to 4I2020 I 2020 JJurr: 20201 J 1 2 0I 1I""1� 3 111 2020,J 0 11 [213. 2 0I 2 oj1F1 City Council Approval of TCC '"♦ St al Steel Orsite t Phase NTP ♦ City Council Approval of Phase 1 1.4 Phase 1 NTP ♦ Phase II Permit Received base 1 Permit Received 1 , Jan-19-21, Tukwila Fire Jan-19-21, Milestones -I* Contract Final Comple b r SOG Completion Structural Steel onsite ize on site t 60 /C • Jun-12-19 A Phas - 1 Bid Doc, me C3ct 16-19 A Jun-24-19 A Oct-04-19 A Jun-28-19 A Oct-02-19 A Oct-09-19 A Oct-10-19 A Oct-16-19 A Oct-03-19 A Oct-10-19 A Oct-09-19 A Oct-10-19 A Oct-09-19 A Nov-0819 Nov-05-19 Oct-22-19 Oct-25-19 Nov-05-19 Nov-08-19 Oct-25-19 Nov-01-19 Nov-01-19 Nov-05-19 Jun-27-19 A P-01 - Earl 14.111111 BP-03-St oct ♦ Start Df Wet Weather Season I Sep-12-19 A, Design Milestones - Review Set -It 90%CD Set ♦ 100°/p CD Se St Permit Set bm tte¢ nts Available Structural Steel Drawings Released for Dela ing �♦ Rerrairirg M ni VIACC Items Relea ed for S -1.h.Structure Topph9 Off bmittals Mar-03-20, I Oct-16-19 A, Bid Packa le Cbntractirg ttiwrk & Utili ies B?-( 2 - Site Concrete ire ►� BF-04 - Masonry -1.11MINIMMLBF-05-Glazing BP-06 - Framing & CW✓B BP-07 - Misc BP-C3 - Flooring BP-09 - Fencing & C-.a e Enclostes BF -10 - Landscaping i BP-11 - Electrical ILMCCM BP -C1-31 130 Nov-08- a, Simmission by BP ' BP-06 - 05400C - GWB BP Critical Submittals MCCM - 07841 a - MOCM Underground & Long Lead BP-02 - 3213 - S .e Concrete 3P Critical Submittals -,s.A. BP-07 - OE 1053 - Mic BP Critical Submittals BP-05 - 3 792C 0 - Glazing BP Critical Submittals B?-04 - 0422C( - Masonry BP Critical Submittals awl - Earthwork BP - Utilities . oilf BP-10 - 320400 - Landscaping BP Critical Submittals BP-09 - 32 i 11 - Fer>ing BP Critical Submittals BP-08 - 033542 - Flooring BP Critical Submittals Procureme End of Wet Weather it/Fabrication easo n -II Permanent Power ng n Equipment tart U Start of Cortimis P I Jan-19-21, Constructio Substartial Completion Final Completion ning Actual Work Critical Rema Remaining Work • • Milestone ning Work ‘/ Summary Page 1 of 7 Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Data Date: Oct-21-19 AetMty l0 Activity Name OdginaI Remaining Start Finish 1 Juty 2 19 , A. .. .. � . ' #.. .. D J .. ..E ' t f.. -, . Apr8 2t#2b [ F y 2020 Ju 20201 J y 202(} A . .,� ...., 5 . '. I, ,.., "C} ., hl 'D. ,I t, tior 001'2301:20.1 4.20.01:201.20 19-.200 1201.'1- 00-1206}122(#1 2011'�{?1-201'1.. 00... 2 012tt01 i20#f 4.2201220 °12 01.22.0`1 A9430 BP-03 - 031000 - Stnuctual BP - Vault Precast & Shoring 5 0 Jul-16-19 A Aug-01-19 A BP :3 - C 31000 - Structural :1' - a t Precast & Shari' A9536 BP-11 - 078413 - Electrical Underground & Long Lead 5 0 Sep-06-19A Sep-19-19 A -► BP-11 - 478413 I - Electrical Urierg-ound & Long Lead A9565 Structural Steel Sui)mittal Prep 25 0 Aug-16-19A Oct-15-19A 3t I t .I Steel Si nitta Prep Lydig Review A12480 BP-06 - 054000 -GWB BP Critical Submittals A12530 MCCM - 078413 - MCCM Critical Submittals A12540 BP-11 - 078413 - Electrical BP Critical Submittals A12490 BP-07 - 061053 - Msc BP Critical Submittals A12470 BP-05 - 079200 - Glazing BP Critical Submittals A12460 BP-04 - 042200 - Masonry BP Critical Submittals A12520 BP-10 - 328400 - Landscaping BP Critical Submittals A12510 BP-09 - 323111 - Fencing BP Critical Submittals A12440 BP-02 - 321313 - Site Concrete BP Critical Submittals A12500 BP-08 - 033543 - Flooring BP Critical Submittals A9575 Structural Steel Submittal LCI Review A12430 BP-01 - 311000 - Earthwork BP Critical Submittals A12450 BP-03 - 031000 - Structual BP Critical Submittals 99; 20 Jun-27-19A Nov-15-19 5 5 Nov-06-19 Nov-12-19 5 1 Oct-23-19 Oct-23-19 5 5 Oct-21-19 Oct-25-19 5 5 Nov-06-19 Nov-12-19 5 5 Nov-11-19 Nov-15-19 5 5 Oct-28-19 Nov-01-19 5 5 Nov-04-19 Nov-08-19 5 5 Nov-04-19 Nov-08-19 5 5 Oct-28-19 Nov-01-19 5 5 Nov-06-19 Nov-12-19 5 0 Oct-15-19 A Oct-16-19 A 2 0 Jun-27-19 A Jul-02-19 A 2 0 Jul31-19 A Aug-01-19 A BP-01 - 411001 -04 BP - Earthwork BP :3 - 031000 - Critical Structu 11.1 `to al : • St ' • , Nov-' BP-06 r M - 078413 1 11 - 0784' I = BP-07 BP-03'' B'P-04 - 04 • BP-10 - - BP-09 - BP-02 - 32 -- BP-08 1 Steel Sumittr (. >I Submittal► 5-19, )54( - MC C - El )61(53 07, '200 - 3 -84( 323111 '..13 - )33, -ydig Revieyr 00 - GWB EiP -CM Critical :ctrical BP C - Misc BP 200 - Glazing MasonryBFP 0 - Landscaping -Fencing Site Concrete 43 - Flooring I LCI Revied✓ Critical Submittals Suh mittals ritical Submittals 0itical Submittals BP Critical Submittals Critical Submittals BP Critical Submittals P Critical Submittals BP Critical Submittals BP Critical Submittals I, it ; I , NE Review 109 27 ` Jun-27-19 A Dec-03-19 I DecJ3-19, A/E (Review A12600 BP-06 - 054000 - GWB BP Critical Submittals 10 10 Nov-13-19 Nov-28-19 - - B 06 - 054000 - n~3WB BP Critical Submittals A12650 MCCM - 078413 - MCCM Critical Submittals A12660 BP-11 - 078413 - Electrical BP Critical Submittals A12610 BP-07 - 061053 - Misc BP Critical Submittals 10 10 Oct-24-19 Nov-06-19f' 10 10 Oct-28-19 Nov-08-19 10 10 Nov-13-19 Nov-28-19 l II MCCM � BP-11 - Cr - 841 0-8413 Is 07 3 - MCCM Critical - Electricak - it Submittals BP Critical Submittals /1'ms 4sc BP Critical Submittals C A12590 BP-05 - 079200 - Glazing BP Critical Submittals A12580 BP-04 - 042200 - Masonry BP Critical Submittals A12640 BP-10 - 328400 - Landscaping BP Critical Submittals 10 10 Nov-18-19 Dec-03-19 10 10 Nov-04-19 Nov-15-19 10 10 Nov-11-19 Nov-26-19 - 3 '-04 E BP-( 041200 =-10 5 - 079200', - Masonry 328400 - Lbndscapirg Gazing BP Critical Submittals BP Critical Submittals BP Critical Submitt I; Is!! A12630 BP-09 - 323111 - Fencing BP Critical Submittals A12560 BP-02 - 321313 - Site Concrete BP Critical Submittals 10 10 Nov-11-19 Nov-26-19 10 10 Nov-04-19 Nov-15-19 =- -'-0, E..%-09 • 32' 323111 - Fencng 313 - Site Concrete BP Critical Submittals BP Critical Submittals A12620 BP-08 - 033543 - Flooring BP Critical Submittals A9585 Structural Steel Submittal Approval A12550 BP-01 - 311000 - Earthwork BP Critical Submittals A12570 BP-03 - 031000 - Stnuctual BP Critical Submittals 10 10 Nov-13-19 Nov-28-19 10 0 Oct-16-19A Oct-22-19A 10 0 Jun-27-19 A Jul-11-19 A 10 0 Jul30-19 A Aug-22-19 A i^ BP-01 - 311:00 - Earthwok3 BP-03 -0; BP Critic 1000 -►M - Stnict ` Sup mittals :I BP ral,.t•el C i.41 9lbmit 13'-08 abmttalApprovl - 033543 - als Flooring BP Critical Submittals I Procurement 163 90 Jul-09-19A Mar-03-20 • • I Mar-03-20, Procuremeit A12720 BP-06 - 054000 - GWB BP Critical Submittals 30 30 Nov-29-19 Jan-16-20 A12770 MCCM - 078413 - MCCM Critical Submittals 3 3 Nov-07-19 Nov-11-19 11, 1 % )78z ; BP-06 13 -IMCCM Critical - 054000 - GWB BP Otitic91 Submittals Submi.ta (I s A9433 BP-03 - 051200 - Structural Steel Framing 30 30 Oct-22-19 A Dec-03-19 A12780 BP-11 - 078413 - Electrical BP Critical Submittals 7 7 Oct-28-19 Nov-05-19 -, BP-' :_-„ 1 - 0 13P-(3 8413 - 051200 i- S - Electrical P nictural Steel Framing Critical Submittals 11 A12730 BP-07 - 061053 - Misc BP Casework Submittals 60 60 Nov-29-19 Feb-27-20 BP-07 - 061 tl53i1- Misc BD ,,asev oriel Submittals A12800 BP-07 - 061053 - Msc BP Doors, Frames, Frame Submittal: 60 60 Nov-29-19 Feb-27-20 BP-07 - 061053;1- Misc BD boots, F6tes Frame Submittals A12820 BP-07 - 061053 - Misc BP Roofing 40 40 Nov-29-19 Jan-30-20 -,: - " ,: BP-07 - 061053 - Misc EiP 3oo?ng A12710 BP-05 - 079200 - Glazing BP Critical Submittals 60 60 Dec-04-19 Mar-03-20 A12700 BP-04 - 042200 - Masonry BP Critical Submittals 10 10 Nov-18-19 Dec-03-19 - BP-(4 042200j Nasorry -'^- BF t BFl-05 - 079200 - Critical ubmittajs ;; i,laz rig, BP Critical Submittals A12810 BP-07 - 061053 - Misc BP CFB, Metal Panels 50 50 Nov-29-19 Feb-13-20 -- -- ->= BP-07 - 041053 - lulistt gP CFB, Metal Pahe& A12760 BP-10 - 328400 - Landscaping BP Critical Submittals 30 30 Nov-27-19 Jan-14-20 - T 1BP-10 - 328z 00 - Landscaping; BP, Cr&cal Sdomitta s ; j A12750 BP-09 - 323111 - Fencing BP Critical Submittals 40 40 Nov-27-19 Jan-28-20 - -_ ...... BP-09 • 323111 1 Fencing Be Ciitical Submittals A12680 BP-02 - 321313 - Site Concrete BP Critical Submittals 10 10 Nov-21-19 A Dec-03-19 ; BP-02 - 321313 Ste Concre e BP Critical Subdnittal4 , A12740 BP-08 - 033543 - Flooring BP Critical Submittals 50 50 Nov-29-19 Feb-13-20 A12670 BP-01 - 311000 - Earthwork BP Critical Submittals 5 0 Jul-09-19 A Jul-15-19A i, BP d 1 - 3 1000 EartFvwc rk BP Critical Submittals =- BP-08 - 033543 - Floprirjg BP Cr�tticaSubs al$ .4-1 A12690 BP-03 - 031000 - Structual Precast 35 0 Aug-14-19 A Oct-25-19 A BP-03 - 03100C - St-uctural Prec st A12790 BP-03 - 031000 - Structural Shoring 5 0 Aug-06-19 A Aug-16-19 A BP- 3 - 0 31 00 - St J tta! Shoring Oct-21-19, Pot ial7me Im act P1130 Elevator Pit/ Spread Footing Revisions- RFI 048 5 1 Oct-08-19 A Oct-21-19 P1110 Detention Vault Revisions- RFI 032 5 0 Oct-09-19 A Oct-21-19 P1000 Approval for redesign of DV location & Block to CIP walls 14 0 Aug-06-19 A Aug-19-19 A Approva 1.11 Ell fo- redesign( Elevator Detention DV location Pit/ Spisad Vault'F?evisions- & Blirck Footing to Revisions- RFI 03' CIP walls RFI 043 P1010 Delay to issue of 90 % CD set 5 0 Aug-16-19 A Aug-23-19 A P1020 SMH Easment 5 0 Jul-17-19A Aug-29-19A P1030 Pellco 5 week lead time on SSMH's 25 0 Sep-03-19A Oct-14-19 A Delay t SMH issue of Eesment WY Fellco CD set 5 week leadtme on SSMH's ►I P1040 Shotcrete wall design 5 0 Jun-11-19 A Sep-30-19 A Shotc ete wall design Page 2 of 7 Lydig Construction - Tukwila Fire Station #52 Actual Work ® Critical Remaining Work // Summary :-.- Remaining Work • • Milestone Tukwila Fire Station 52 Data Date: Oct-21-19 Act" I0 Activ Name -Chi gat Remain Stai`t Finish =1uae 2019 Jti 2019 A. Ck t#= L7 J , F . ", tuf , nit 2020 Pi y2f)Y2U Juie 2020 J 2020 A Ar? y S "C} C1. 1xn tron � . � Cr1.2 3.0 1 22 0 I, I I 1 � 2 0 0 I . E 201 � . I 2 2"0 I 1 1.20 ll 0.122-01 � 1-2-0 0 1 I I I I 2(}0 1 22 1 1 2 I f� t31 .2.8 (1 1 20 121.1 1 1"2it(}:f I I:, 2= b I , I � 2 2 01 12.0.0.1 2 2 1 2 2 L I� .,,I 0 11 12 6 1:22,0 I P1050 Wa l # 8 RFI #25 Footing redesign& rebar deivery delay 15 0 Aug-29-19A Sep-30-19A Wa � # 3 RFI #25 Footirx edesign & rebel detvery delay „ C P1060 Weather Delay due to satuated native soils 5 0 Sep-23-19 A Sep-30-19 A P1070 ReWork of Detention Vault SOG 5 0 Sep-13-19A Oct-04-19 A P1090 Footing at Shoring Wall #1- RFI # 50 2 0 Oct-01-19A Oct-21-19A INIIMIIII_R=_Work . Weather OEN De of Forting ay due to sat Detention Ve at Shading rated it SOG Wall na ive soil #1 RFI # 50 ll ;; I E P1100 Site walls # 7 & 8 - RFI's 025, 034, 038, 038.1 5 0 Aug-29-19 A Oct-15-19A Site walls # 7 & 8 ; RFI's 02 , 034, h38, 038.1 P1120 Shoring/ Shotcrete RFI #019 5 0 Aug 29 19A Sep-26-19A Shoring Shotcrete- RFI #© 9 „ C II I I Ayg-13-20, Civil & Site grk C1310 Shotcrete Shoring wall # 1 **(Subcontract) C1490 Waterproof Shoring Wall # 1 C1150 Install Water Main at Building & East to Sta.51+50 C1170 Rough Grade Site around the BLDG for Rock Base Course C1160 FRPS Concrete Walls#7-8 C1450 Import Structual Fit for BLDG & Site Paving C1250 Fine Grade Base Couse around the Building 4 C1000 Survey Project Limits and Building C1010 Gear/Grub Site & Install TESL 2 2 Nov-01-19 Nov-04-19 2 2 Oct-28-19 Oct-29-19 5 5 Oct-21-19 Oct-25-19 2 2 Nov-12-19 Nov-13-19 15 1 Oct-03-19A Oct-21-19 5 5 Oct-21-19 Oct-28-19 2 2 Nov-12-19 Nov-13-19 3 0 Jul-22-19 A Jul-23-19 A 10 0 Jul-22-19A Aug-02-19A Survey " Projec Clear, Grub Limits Site a rd & Iretall •rtin= )Build T=SC ng '1.-E A Irstall FRPS Import Shotcrete;honing Waterproof Water Rougtt Concrete) Structural ii Fine Cjrade Shoring 4 in at Grade Valls#7- Fi Base wall # 1 ""(Subcontract Wall # 1 Bulling & Site arours for LDG & Course ffast to Sta.5"+50 the BLDG for Site Paving around the Building Rock Base Course;; I C1030 Grade Upper Site (NW) fo Shoring Wall #1 Piles C1050 Build Shoring Wall #1 C1070 Excavate for Concrete Walls #7-8 C1080 Fine Grade for Concrete Walls #7-8 C1090 Excavate & Lag Shoring Wall #1 3 0 Aug-09-19 A Aug-15-19A 5 0 Aug-20-19 A Sep-04-19A 2 0 Sep-05-19A Sep-30-19A 1 0 Sep-30-19 A Sep-30-19 A 3 0 Aug-26-19 A Sep-04-19A '1-r_ 3rade -011Exavat8 Upper Bu iv=. Site Id Shoring (NV/) E " Fine & Lag Wed .be Cade Shoing #1 fo Shoring Wall #1 Concrete V 'or Concrete Wall #1 les Its #'-8 Walls #7-$ I C1110 Mass Ex. Building Pad to Subgrade 15 0 Aug-14-19A Sep-30-19A >s ix. Building Pad to 3ubgradq C1120 Excavate for Concrete Walls #9 &10 2 0 Sep-09-19A Sep-10-19A ull Etcavate ' r acrete Walls #915r10 C1130 Excavate, Install, Inspect & Backfill Sanitary Sewer 6 0 Sep-23-19 A Oct-18-19 A i111.1111I Excavate, Install„ rape at & Backfill Sanitary Sewer C1140 Excavate, Install, Inspect & Backfill Storm Sewer 10 0 Sep-09-19 A Sep-20-19 A -Nil Excava e, nstal , Inspect & 8 t ckfil Storm Sew&r I C1330 Perrnenant Power Vert Set on Property and fed by PSE 38 0 Aug-09-19 A Oct-17-19 A Perrr errant Power Vault Set en Property and fed ay PSE C1420 FRPS Concrete Site Walls # 9 & 10 5 0 Sep-23-19A Oct-02-19 A = C910 Temp Site Fencing 1 0 Jul-22-19A Jul-30-19A C920 Demolish Select Site Hardscapings 5 0 Jul-31-19 A Aug-13-19 A C930 Demolish and Remove Site Lighting 2 0 Aug-08-19 A Aug-12-19 A k C1480 FRPS Footing # 9 & 10 5 0 Sep-06-19A Sep-27-19A - ep m n Demolish Site -mulish Fencing Select and i Remove FPS Site FRPS hard Si Footing Concrete scapi'es e Lighting Site We # 9 & 10 I s # 9 & 10 I AI _ Detention Vault 52 18 Aug-29-19A Nov-13-19 C1190 Backfill and Grade Site Above D.V. 5 5 Nov-04-19 Nov-08-19 D1120 FRPS D.V. Walt; 10 3 Oct-21-19 Oct-23-19 D1150 Set Mechanical Equip in D.V. 1 1 Oct-30-19 Oct-30-19 D1140 Set Hollow Core Planks 2 2 Oct-30-19 Oct-31-19 D1130 Install Risers 3 3 Nov-01-19 Nov-05-19 C1430 Stabilize Landscape Area Above D.V. 3 3 Nov-11-19 Nov-13-19 C1040 Excavate & Slope for Detention Vault 2 0 Aug-29-19 A Sep-06-19 A C1060 Rough Grade D.V. SOG 1 0 Sep-05-19A Sep-09-19A rilarawI Exc.- Rough va re & Grade Slo FRPS re or E. SOG Nov-1 -19, Backfill are D.V. Wa(s Set Mechantal Set Hollowbare all Rses Stabilise Detention Va.. Detention Grade Ec Plank Lardscope t Vault biteAbbve Up i D.V. Are D.V. Move D.V. C C I I C1100 Fine grade D.V. SOG 1 0 Sep-09-19A Sep-10-19A D1100 Plunbing Underground 1 0 Sep-06-19A Sep-09-19A D1110 FRPS D. V. SOG 3 0 Sep-10-19A Oct-04-19A Fire lust grade ing U. Uxterground BPS i. SOG D. V. SOG ;; C I I May -July 2020 Work 72 72 May-01-20 Aug-13-20 C1180 Install Irrigation Sleeves 2 2 May-22-20 May-26-20 C1200 Excavate Roadway from Sta. 51+50 - 52+50 3 3 May-01-20 May-07-20 11 Excayatb rstall lioads'ayifrorr Im . a ion I{ I Sleeves Sta. 51+50 - Ayg-13-20, May 52 -50 - I July 0 0 Work I C1210 Temp Gose Cowlitz P.L. Driveway 13 13 May-07-20 May-26-20 C1220 Excavate Driveway & Roadway to Sta. 53+50 5 5 May-07-20 May-14-20 C1230 Install Storm Structures, Piping 3 3 May-18-20 May-21-20 C1240 Install Remaining Water Main out to Sta. 53+80 3 3 May-19-20 May-22-20 C1370 Irrigation 5 5 May-26-20 Jun-02-20 ;; 1 11 „ -X,ca'Vatt? Temp GoselCov1itz CkiVeway InitalI S unit Irt&tatl P,erriaing Irrigation & 'tructJres, P.L. Driveway Roadway to Sta. Piping Water Main out to 53+50 Sta. 53+80 C1380 Landscaping 15 15' Jun-02-20 Jun-23-20 C1390 Wheelstops & Striping 2 2 Jun-23-20 Jun-25-20 " 11 I -andr Atteelstops a p'ng & Striping C1400 Signage 2 2 Aug-11 20 Aug-13-20 C1440 Install Gas from 65th St. to the Building 2 2 May-14-20 May-18-20 ;; „ Ira,all Gas fror €5th St. to the -4;Signage Building i' C1470 Install New Fence 5 5 Jun-23-20 Jun30-20 C1460 Perrnanant Power to Bldg 5 5 May-18-20 May-25-20 C1270 FRPS Site Heavy Concrete Paving West of Bldg. 5 5 May-27-20 Jun-03-20 ;; ;; I L Be m FRPS Want S ns.all onus- e Heavy New Fereb , to Bldg I iI Concrete Pa irg West I f Bldg. Page 3 of 7 Lydig Construction - Tukwila Fire Station #52 Actual Work ® Critical Remaining Work // Summary :,.- Remaining Work • • Milestone C1280 Pave P.L. Driveway C1290 FRPS Cub & Gutter C1300 Fine Grade for Sidewalks C1320 Site Lighting Conduit & Bases C1340 Data & Communucation C1350 Set Light Poles C1360 Final Paving on A1530 Sleeve under footing MEP A1540 Excavate for footings A1550 Form, Place, Finish Footings A2150 Install MEP underground A2160 Install Cap Break A2170 Install Vapor barrier A2180 SOG Edge form A2190 Place and Finish SOG 1st pour NORTH A2560 Install Reinforcing A2141 FRPS Concrete walls C1260 Fire Grade Bldg Pad to Subgrade A2210 Back fill at foundation and grade A2140 Form, Place, Finish Stem walls A2540 Install Waerproofing & Insulation A2550 Install 1st Coase of CMU A2200 Place and Finish SOG 2nd Pour SOUTH A128 Install MEP underground A129 Install Cap Break A129 Install Vapor barrier A129 SOG Edge form 2 5 2 5 5 2 May-26-20 5 May-18-20 2 May-25-20 5 May-01-20 5 May-01-20 1 May-11-20 2 Jun-03-20 38? Sep-30-19A May-28-20 May-25-20 May-27-20 May-11-20 May-11-20 May-12-20 Jun-05-20 1 Oct-21-19 Oct-21-19 3 3 Sep-30-19A Oct-23-19 10 10 Oct-21-19 Nov-01-19 12 Oct-28-19 Nov-12-19 2 Nov-18-19 Nov-19-19 1 Nov-20-19 Nov-20-19 2 Nov-20-19 Nov-25-19 5 5 Nov-26-19 Dec-02-19 2 2 Nov-20-19 Nov-25-19 10 10 Nov-04-19 Nov-15-19 1 Nov-13-19 Nov-13-19 1 Nov-12-19 Nov-12-19 6 6 Oct-28-19 3 3 Oct-31-19 2 Oct-31-19 12 2 5 Dec-09-19 A129 Install Reinforcing C1500 Fine Grade Bldg Pad to Subgrade A128 Form, Place, Finish Footings A128 Sleeve under footing MEP A128 Excavate for footings A128 Form, Place, Finish Stem walls A129 Back fill at foundation and grade A128 Install Waterproofing & Insulation A128 Install 1st Coase of CMU Superstructure A1560 Erect Structural Steel and decking A1570 Place and Finish SOMD A1580 Frame Exterior Walls A2220 Install Exterior Sheathing (From Grid A/3 counter dockwise at Roofing A1630 Install Roofing System low roof A1640 Set Roof Top Mechanical Equipment A1720 Install Roofing System High Roof A1620 Install MEP penatratiore at roof eather Barrier Skin A1650 Install exterior weather barrier (From Grid A/3 counter clock a A1660 A1670 A1700 A1730 Facade Install Flashing ( From Grid A/3 counter clockwise around buil( Install exterior Insulation @ Brick Veneer (Counter clockwise f Install Temp Window Protection Install Exterior Insulation @ Metal Panel Siding ( Counter cloc Actual Work Critical Rema Remaining Work • • Milestone 1 1 Nov-14-19 3 3 Nov-07-19 2 2 Nov-07-19 65 65 Dec-16-19 20 20 Dec-16-19 11 11 Nov-13-19 2 2 Dec-03-19 1 1 Dec-05-19 2 2 Dec-05-19 2 2 Dec-05-19 1 1 Dec-02-19 10 10 Oct-28-19 1 1 Oct-24-19 3 3 Sep-30-19A Nov-04-19 Nov-04-19 Nov-01-19 Dec-13-19 Nov-29-19 Dec-04-19 Dec-05-19 Dec-06-19 Dec-06-19 Dec-02-19 Nov-08-19 Oct-24-19 Oct-28-19 6 6 Nov-04-19 Nov-11-19 Nov-14-19 Nov-11-19 Nov-08-19 Mar-20-20 Jan-17-20 2 2 Jan-23-20 Jan-24-20 20 20 Jan-27-20 20 20 Feb-24-20 15 10 Jan-27-20 15 Mar-23-20 10 May-05-20 15 15 Apr-13-20 Feb-21-20 Mar-20-20 May-18-20 Apr-10-20 May-18-20 May-01-20 5 5 Jan-27-20 40 40 Mar-23-20 10 10 Mar-23-20 10 10 Apr-06-20 15 15 Apr-20-20 10 5 Apr-27-20 5 5 May-12-20 54 55 Apr-27-20 ning Work // Summary Jan-31-20 May-18-20 Apr-03-20 Apr-17-20 May-11-20 May-01-20 May-18-20 4-20 2 2 2 2 2 212 Data Date: Oct-21-19 2 iR Site L Marr20120, Strurtfre 2 IPaVeP.L. rivevay ,RFFS Curb Gutter Fine Grade cc Sidewalks kMjng CpndLit & Bases to 4 Corrmurnea.ion Sett MP IeS ,Fipal,PaYing 2 2 2 2 2 ]'2 2 2 2 Dec-13-19, 0oundation / SOG 1111 Jec-J2-19, North SOG Sleeve under fob irg fr EP E x?Foaterm, or Fgs Form, Place Fini: h Footings EP tnderjrourd Cap Brebk Var or b nder SOG Edge prm 'lace arxd Finish OG 1st you NORTH _ s Ire all Fwinf 'rci g FRPS Canc-etells �'"Fine : de Bldg ad to Subgrade -yy '�1 Back HI at fo.ud ion and grade tem wIls Form, Plhw, Finsh Install Web proofing ,& Irsrlatioi rstall 1st CS.arse of CMU Dec-13-19, $oath SOG Place and Finish SOG 2nc Pour SO ►� Irstall ME underground =ins Gra -.I:ill Fora, Plate, Finisl Sleeve u>derfooting ME 1 Excavatd for footings Form, PIace Finish Stem wa Is Back fil at foundation arli grade Install Cop Break tall V por barrier SOG Edge forrrt Install Finforcir�g e Bldg Pad to Subgrade Footings Install W terproofing & Iniulation rstall 1st Coase of CMU Page 4 of 7 Mar20;20, Superstructure E ect Stnictral Steel and degkirg Place and Finish SOMD Frame xterior Uv411s Irst&Lll lnxteriorSheatUng (F7o Gri Mail-18-20, Re Install Roofing Syst;en) Icw too ------ I Set R4pfTdp MEP pbretrations at'topf Ma y� IrS all exteriorweatht ounter dockwise arbund buildinW Jul-14-20, t3uilping Envelgps he nical Equipment Install Rociirg Systerrj High Roof -1 -20, lV a her Barrier Skin barrer (Prim Grid A/3 counter dbck wise anburig building) Install Flashing t:Frgrr Gfid 41 /3 counter clockwise Pround building) Install exterior (ns4lation @ Brick Veneen (Counter clockwise from Grid A/3) Install Ter -tip Window=rotection I s'gll xter{or In elation @ Metal ir'arel Siding (2opnter clockwse from grid A/3) J 1-14-20, Facade Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Data Date: Oct-21-19 P Gtt t tD , Ekctn sty rrte , , Lki t al i3ematntr Ott .. 1 h 2619 3tiy S. - - F 10 :d .. ...F = �... 12020 P y2 0 du1e20201 202(r, .� A.., ....�, ; : . } ...... t 1.... Li, - .. 1 , ... F M DuratioN Lkratmn " 2 0 1 t 8 ,0 1` 2 2 0 1 2 2 0 1_'1 2 0 4 1 -2 2 0 1! 1 2 0 0 1- 0 1 2. 0 1 1 2 0 1 1 2 3 0 1 2 '2 0 ! 1 2 '0 4 1 .2 "3'.t} 1 2 2 0 1 1 -2 0 0 .1 2 2 0 1 2< 2 0 "1 2 2 0 1. 2 2 A1680 Install Brick veneer (From Grid A/3 counter clockwise around I 30 30 A1690 Install Metal Panel Siding (From Grid A/3 counter clockwise a 10 10 A2230 Install Exterior Windows and Doors (From Grid A/3 counter ct 10 10 A2570 Install Fiberglass Window System 10 10 Apr-27-20 Jun-08-20 Jun-30-20 Ju1-14-20 Jun-09-20 Jun-22-20 Jun-16-20 Jun-29-20 ; ' ; j .. .. -, ,- eneer (From Gnd -_ Install Metal Panel Exterior Window§ all Fiberglass!Ni(xiow A/3 counter Sidingj(F;.m and Doors' (F System ockwige;atound Grits • m Grfid buildir) AAcounter clopkwis: A/3 counter cldckwis around around *did buil. ng) ing) 4 9 . a a 7 o r,.c-02-2r, l ,•riorFinishes A1840 Hang GWB 16 16 Jun-08-20 Jun-29-20 j '. • GWB A1850 Tape GWB 15 15 Jun-30-20 Jul-21-20 A1920 Paint GWB 10 10 Jul-21-20 Aug-03-20 A1930 Install Ceiling Grid / ceiling systems 6 6 Aug-04-20 Aug-11-20 A1940 Electrical R.I. at Grid / Ceiling systems 10 10 Aug-12-20 Aug-25-20 A1950 All ceiling grid / ceiling system cover inspections Complete 0 0 Sep-01-20 A1960 Install Ceiling tile 7 7 Sep-02-20 Sep-11-20 A1970 Grind / Finish Floors all areas 10 10 Sep-14-20 Sep-25-20 A2110 Install Epoxy Flooring (Rooms126,128 and 136) 10 10 Sep-28-20 Oct-09-20 A2500 Mech R.I. at grid / Ceiling systems 10 10 Aug-14-20 Aug-27-20 A2510 Fire Sprinkler R.I. at grid / ceiling systems 10 10 Aug-19-20 Sep-01-20 A2520 Final Cleaning 10 10 Oct-28-20 Nov-10-20 A2880 Install Access Doors 2 2 Jun-30-20 Jul-01-20 A2890 Install Visual Display Units 3 3 Oct-12-20 Oct-14-20 A2900 Install Cubide Curtain 3 3 Oct-12-20 Oct-14-20 j ; ; jj C II , , ;; ;; , Tape G\VB Pah t j t tallA.cess Ddo GWB lnslall El -. iling ctrical II ceiling _ Ir}stal r -ch •, '. l3riG1 181. ' ' / ceiling at Grid grid / CeitrSg Grind ,rid R •r R.I.'at;grid systems / c ilirg kit+ . P,ir>Ish Install Ceiling stall .tall Ceiling systems system Over Floors all Epoxy Flooring systems / ceiling Fi <I Visual Display Cubicle r i .pectin area (ooms1 syst> s De., ing nits rtai Co "6,1 plete 8 and 136) A2940 Install Kitchen Cabinets 10 10 Sep-28-20 Oct-09-20 A2950 Install Appliances 5 5 Oct-20-20 Oct-26-20 A2960 Install Roller Shades 5 5 Oct-12-20 Oct-16-20 A3000 Install Resilient Base 5 5 Oct-12-20 Oct-16-20 ; ;; ; all Irjstall Kitchen . Install Apr, all Roller `hade- Resilie binet lia :. Bas: A2060 Paint exposed structure ceilings 10 10 Aug-04-20 Aug-17-20 ". -xpo- -.. - ceilings A2480 Complete Electrical Trim at Exposed ceilings 10 10 Aug-18-20 Aug-31-20 A2490 Complete Mech Trim at Exposed Ceilings 10 10 Aug-18-20 Aug-31-20 .m. .m. 1 rri Trim at Exp. at Expose. ed slings Ceili s A1980 Install Casework / Lockers 20 20 Sep-28-20 Oct-23-20 ; Install Casework Locke A2000 Install Electrical Trim @ GWB 16 16 Aug-04-20 Aug-25-20 A1870 Install Doors and Hardware 5 5 Oct-12-20 Oct-16-20 ;; all E:• 0.•i Install GWB Doors .hd H- .ware A2460 Install Mech Trim @ GWB 16 16 Aug-04-20 Aug-25-20 A2470 Install Plumbing Trim 6 6 Aug-04-20 Aug-11-20 A2910 Install Wall and Door Protection 5 5 Oct-12-20 Oct-16-20 A2920 Place Fire Extinguishers 5 5 Oct-19-20 Oct-23-20 A1800 Install Pre Framing overhead HVAC/ Mech 10 10 Feb-24-20 Mar-06-20 A1810 Frame walls, Soffits and ceilings (Starting from North to Sout1 10 10 Mar-18-20 Mar-31-20 =f _ Install ; P - Frdming Frame overhead :11s, Soffits a jj `Ct . coils -ch .s (` . i s fro North to I , ns all PI South) all - bi VV� Install Wall . , Pace Fire Do. Protect xting fishers on A1820 Electrical R.I. At Framing (From North to South) 15 15 Apr-01-20 Apr-21-20 A1830 All Cover Inspections Complete 0 0 Apr-21-20 - - lectrical R.I. • II Cover Insp•ctiti •t Kra ing (rr. . Corrpl.t_ Nort to South) A1890 Install Pre Framing overhead Electrical 15 15 Feb-26-20 Mar-17-20 1 Fra ing overhea. Elpc 'cal A1910 Plumbing RI. At Framing (From North to South) 15 15 Apr-01-20 Apr-21-20 A1900 Install Pre Framing overhead Sprinkler 5 5 Feb-28-20 Mar-05-20 A1880 Install Pre Framing overhead Plumbing 10 10 Feb-28-20 Mar-12-20 -= nstal I • • e Fra . Pre _--_- ing rams •Iumbing R.I. .verhead Sp . overhead • t Bta nkl�r lunobi ing ( . . Nort to South) A2070 HVAC / Mech R.I. @ Framing (From North to South) 10 10 Apr-01-20 Apr-14-20 A C / Mech R.1 @;F -mi . ( • No h to SotrthNM A2450 Fire Sprinkler R.I. Framing From North to South)10 10 Apr-01-20 Apr-14-20 @ rig ( A1860 Install Hollow Metal / Door frames 5 5 Feb-28-20 Mar-05-20 A1990 Install Floor at Phys Training 5 5 Sep-28-20 Oct-02-20 Install �3 Blow Fi • Metal Sprinkler R.I / Door frame ; a ming ( m No h to Saittj) = Ploor at Phys iraini; . Specialty Constructors Area Finishes 188 188 Mar-09 20 Dec 02 20 r,. c-02-2r, Srecialt y Construction Area Fi 1 r r,-c-02-2 r, mmunications Room A2080 MDF & IDF Patch Cable Completion 10 10 Aug-04-20 Aug-17-20 MDF . IDF • - h Ca .• Corirpletion A2090 Install Of WAP's 5 5 Nov-26-20 Dec-02-20 1 tall 01 AF°'s ,r 3 ' 1 3 Oct-0 -0 Apperat . Ba . A2580 Install Sectional Doors 10 10 Jul-15-20 Jul-28-20 A2590 Install Nederman System 10 10 Aug-25-20 Sep-08-20 A2600 Striping 4 5 Sep-25-20 Oct-01-20 Instalf Spctio - d Do —i 1 -- = edertn. nSgstem Strips:. 1 A2610 Install Epoxy Wainscot A2620 Install Rubber Base A2770 Paint Walls & Ceilings 10 10 Sep-09-20 Sep-22-20 2 2 Sep-23-20 Sep-24-20 10 10 Jul-29-20 Aug-11-20 ,, 1 Fr Its & -1 tall nstall rigs E• .xy Wainscot R •bet Base A2630 Install Overhead Lights / Ceiling Fans 15 15 Aug-18-20 Sep-08-20 ; ' 1 - al • erh@a. Lights / Ceili . Fa . Page 5 of 7 Lydig Construction - Tukwila Fire Station #52 Actual Work ® Critical Remaining Work // Summary :,.- Remaining Work • • Milestone Tukwila Fire Station 52 Activity ID A Duration A2780 -VAC Trim Out 7 7 Aug-17-20 Aug-25-20 A2850 Plunbing Trim Out 7 7 Aug-26-20 Sep-03-20 A2750 Hang GWB 15 15 Jun-08-20 Jun-26-20 A2760 Tape GWB 11 11 Jun-29-20 Jul-14-20 A2870 Install Access Doors 2 2 Jul-15-20 Jul-16-20 A2640 Install Pre Framing overhead HVAC / Mech 15 15 Mar-09-20 Mar-27-20 A2680 Frame walls, Soffits and ceilings (Starting from North to Soutl 10 10 Apr-13-20 Apr-24-20 A2700 Electrical R.I. At Framing (From North to South) 16 16 Apr-27-20 May-19-20 A2740 All Cover Inspections Complete 0 0 May-19-20 A2670 Install Pre Framing overhead Electrical 15 15 Mar-23-20 Apr-10-20 A2720 -VAC / Mech R.I. @ Framing (From North to South) 11 11 Apr-27-20 May-12-20 A2730 Fire Sprinkler R.I. @ Framing ( From North to South) 10 10 Apr-27-20 May-11-20 A2710 Plumbing RI. At Framing (From North to South) 16 16 Apr-20-20 May-12-20 A2690 Install Hollow Metal / Door frames 5 5 Apr-08-20 Apr-14-20 A2660 Install Pre Framing overhead Plumbing 10 10 Mar-25-20 Apr-07-20 A2650 Install Pre Framing overhead Sprinkler 5 5 Mar-23-20 Mar-27-20 A2790 Set HVAC Units A2800 -VAC Rough -in A2810 Sprinkler Rough -in A2820 Plumbing Rough -in A2830 Electrical Rough -in A2840 Install Lighting A2990 Install Traffic Coatings 5 5 Aug-17-20 Aug-21-20 5 5 Aug-24-20 Aug-28-20 5 5 Aug-31-20 Sep-04-20 5 5 Sep-08-20 Sep-14-20 6 6 Sep-15-20 Sep-22-20 5 5 Sep-23-20 Sep-29-20 5 5 Aug-12-20 Aug-18-20 A3090 Install Elevator 25 25 Jul-20-20 Aug-21-20 A3120 Elevator Fronts 5 5 Aug-24-20 Aug-28-20 A2270 Frame Elevator Shaft 10 10 May-05-20 May-18-20 A3060 Elevator Shaft Rough In - Electrical 5 5 May-19-20 May-25-20 A3070 Elevator Shaft Hang Drywall 5 5 Jun-16-20 Jun-22-20 A3080 Elevator Shaft Tape Drywall 10 10 Jun-23-20 Jul-07-20 A3100 Elevator Shaft Rough In - Fire Protection 5 5 Jun-09-20 Jun-15-20 A2010 Install Wall Tile A2020 Install casework / counters A2240 MEP trim A2250 Install toilet accessories A2530 Grind & Polish Restroom Floors A2380 Final Cleaning A2030 Install Plumbing Fixtures A2040 Install Main Electrical Gear A2050 Perm Power to building A2260 Frame Walls A2340 Hang Green Board A2350 Tape GWB A2360 Paint Walls A2370 Pour Housekeeping Pads 15 15 Sep-23-20 Oct-13-20 5 5 Oct-14-20 Oct-20-20 3 3 Oct-21-20 Oct-23-20 5 5 Oct-26-20 Oct-30-20 7 7 Sep-14-20 Sep-22-20 5 5 Oct-28-20 Nov-03-20 5 5 Oct-21-20 Oct-27-20 15 15 Jun-18-20 Ju1-09-20 5 5 Jul-13-20 Jul-17-20 1 1 Jun-10-20 Jun-10-20 1 1 Jun-11-20 Jun-11-20 3 3 Jun-12-20 Jun-16-20 1 1 Jun-17-20 Jun-17-20 2 2 Jun-08-20 Jun-09-20 Commissioning 52 52 Sep-28-20 Dec-10-20 A1140 TAB Report- Preliminary 5 5 Oct-28-20 Nov-03-20 A1150 TAB Adj.istments and Corrections 10 10 Nov-04-20 Nov-17-20 A1160 TAB Report - Final 10 10 Nov-18-20 Dec-03-20 A1100 Bump Start Equipment 5 5 Sep-28-20 Oct-02-20 A1110 Point to Point Testing 10 10 Sep-28-20 Oct-09-20 A1120 Manufacturer Start Up Verifications 10 10 Oct-02-20 Oct-15-20 A1130 Graphic Completion 10 10 Oct-13-20 Oct-26-20 Actual Work Critical Remaining Work Summary MIIM Remaining Work • • Milestone 21s J 4y 2t#2(1 t y2, 20 Juie 2020 i Jtiy 2020 Irsta Install Pn Cx Testing & Monitod Page 6 of 7 Data Date: Oct-21-19 2a"o12. 01.12b'012 Tape Instal h is (Starti ming (F Compl ming ming (From ugh In - Electrica or Shaft Harg D .II Elevator Shaft T. pe D haft Rough In - ire Jr1-17-20, Electrical Roy Install Main Ele. rical Gear ---------- --------- Perm Power o building came Wa15 sang Green Board Tape GWB Paid Walls our Housekeeping Pads 2 01 2 2. 0 12 2 01°1 2 0 1.22 • trip Rbugh-in gin_ Nov-0 all Wall Tile Irs'tall case NIEP trim I= i Install to sh Restroo Final • nstall Plu art Equipn- tq Point Te rdfactuer •i a Graphic •� n stroo / B unters ssorie. Fixtures Dec-1 port Prelim] BA. jstme AB Rep Jan-11-21, Closeout -20 Commissioning ry aryl Corrections rt - 9iml . Verifi tiord tion Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Activity ID ... t Activityh rne,.. Data Date: Oct-21-19 A1210 CxAgentSignOff A1170 Electronic Safety & Security A1200 Emergency Power / Generator A1190 Lighting Inspections A1230 Mechanical (HVAC) A1300 Building Department Final Inspection A1240 Fire Sprinkler A1250 Electrical A1260 Fire Alarm A1220 Plunbing A1400 Elevator Inspection A1310 Landscaping A1320 Prblic Works - Street Improvements Punch List A1330 Punch List Creation A1340 Punch List Completion A1350 Punch List Back Check A1360 Punch List Sign Off 5 cgiat Duration I emalnin4 t ratk n Finish 5 5 Dec-04-20 Dec-10-20 15 15 Oct-05-20 Oct-23-20 5 5 Sep-28-20 Oct-02-20 5 5 Oct-05-20 Oct-09-20 124 124 Jun-23-20 Dec-17 20 5 5 Dec-04-20 Dec-10-20 5 5 Dec-11-20 Dec-17-20 5 5 Nov-02-20 Nov-06-20 5 5 Nov-02-20 Nov-06-20 5 5 Nov-09-20 Nov-13-20 5 5 Nov-02-20 Nov-06-20 5 5 Aug-31-20 Sep-04-20 5 Jun-23-20 Jun-30-20 5 5 Jun-23-20 Jun-30-20 25 = 25 Dec-0320 Jan-11-21 5 5 Dec-03-20 Dec-09-20 10 10 Dec-10-20 Dec-23-20 5 5 Dec-28-20 Jan-04-21 5 5 Jan-05-21 Jan-11-21 tale 2019 9 P210F1' 01.01 112121 0 121011 01011121 12 ril a0201 t ay2020 ,I June 20201 <Jt y 2028, (, r111 0111 2 11 212 01011 2.1)12 Electronic ry Power / afety Ge 0 1 Cx Agent 4ign Off & Security e-ator Fire £prii Electrica `►® Fire A rm ► Plumbi Elevator Inspection HdLandscaping .'131 Prblic Works - Street Improvements l2l2 Dec-1720, Inspections Mechanical (HVAC) Building Department Final Inspection Jan-11-21, Punch List Punch List Q reation Punch List Completion Punch List Back Check _ Punch List Sign Off Actual Work Critical Remaining Work Summary Remaining Work • • Milestone Page 7 of 7 Lydig Construction - Tukwila Fire Station #52