Loading...
HomeMy WebLinkAboutTIC 2019-11-05 COMPLETE AGENDA PACKETCity of Tukwila Transportation and Infrastructure Committee • • • • • • Zak Idan, Chair Kate Kruller Thomas McLeod Distribution: Z. ldan K. Kruller T. McLeod K. Hougardy D. Robertson Mayor Ekberg D. Cline R. Bianchi L. Humphrey H. Hash H. Ponnekanti G. Labanara AGENDA TUESDAY, NOVEMBER 5, 2019 — 5:30 PM HAZELNUT CONFERENCE ROOM (EAST ENTRANCE OF CITY HALL) H. Kirkland B. Still R. Turpin A. Youn Clerk File Copy 2 Extra Place pkt pdf on SharePoint: Z Trans & Infra Agendas e-mail cover to: F. Ayala, A. Le, C. O'Flaherty, A. Youn, B. Saxton, S. Norris, L. Humphrey :e eon ed Action Palge 1. PRESENTATIONS 2. BUSINESS AGENDA a) 2020 Overlay and Repair Program Design Consultant Selection and Agreement b) Purchase of SLR 8000 VHF Base Radio c) Public Works Street Division Report 3. SCATBd/RTC d) • SCATBd October 15, 2019 Meeting Agenda • RTC October 16, 2019 Meeting Agenda 4. MISCELLANEOUS 5. ANNOUNCEMENTS a) b) Forward to 11/18/19 Consent Agenda Committee approval c) Discussion Only. Can be forwarded to Committee of the Whole on 11/12/19 d) Information only Future Agendas: • Reckless Driving • PW Shops - SHKS Design Amendment Pg. 1 Pg. 15 Pg. 17 Pg. 27 Next Scheduled Meeting: Tuesday, November 19, 2019 IS The City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. City of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director 74, BY: Scott Bates, Traffic Engineering Project Manager CC: Mayor Ekberg DATE: November 1, 2019 SUBJECT: 2020 Overlay and Repair Program Project No. 92010401 Design Consultant Selection and Agreement Allan Ekberg, Mayor ISSUE Execute a contract with KPG, Inc. (KPG) to provide design services for the 2020 Overlay and Repair Program. BACKGROUND Three engineering firms were evaluated from the MRSC Consultant Roster to provide design services for the 2020 Overlay and Repair Program (see attached scoring & selection matrix). All of the firms offer baseline qualifications, however KPG provides a unique blend of knowledge and understanding of the City's overlay program that provides efficiency and benefits which cannot be matched at this time by any other firm. KPG has also performed very well in providing construction management services. DISCUSSION KPG has provided a contract, scope of work, and fee estimate to complete the design of the 2020 Overlay and Repair Program and advertise for construction bids. Starting the design phase earlier in the year for a projected construction advertisement date of March 2, 2020, should provide a more favorable bidding climate. Preliminary locations for 2020 Overlay are shown on the attached vicinity map. Also included in this year's design is a new comprehensive pavement management survey that can be integrated into the City's Lucity maintenance management program. FISCAL IMPACT The fee estimate is more than the available 2020 budget. Funds from the 2019 Overlay budget will be carried over and applied to the 2020 design. Staff anticipates a minimum carryover amount of $50,000 from the 2019 Overlay. 2020 CIP 2019 Carryover KPG Design Contract Contract $ 189,775.00 Budget $ 150,000.00 50 000.00 $ 200,000.00 RECOMMENDATION Council is being asked to approve the design contract with KPG, Inc. for the 2020 Overlay and Repair Program in the amount of $189,775.00 and consider this item on the Consent Agenda at the November 18, 2019, Regular Meeting. Attachments: Consultant Selection Scoring Matrix Page 16, 2019 CIP Vicinity/Candidate Map Consultant Agreement, Scope of Work and Fee Estimate W:1PW EnMPROJECTSIk RW & RS Profectst.Annual Overlay & Repair Programa2020 Overlay & Repair Program (9201040 tylDesi g MDesig n Consultant Selec0on42020 Overlay To TIClInfoMemo Overlay 2020 Design 101920 olocx 2020 Overlay Program Contract for Design Services Parametrix a a Paving Project Design and Construction Management Experience with the City 0 3 5 Knowledge of FHWA, State, and Tukwila Standards and Procedures 5 4 5 Environmental Experience 5 5 5 Experience with Similar Projects. 3 4 5 Traffic Control Design Expertise. 4 4 4 Experienced Design Project Manager. 4 4 4 Small Scale Project Experience. 2 3 4 Utilities Coordination Experience. 5 4 5 Storm water, Drainage, and Detention Design. 4 4 5 Public Outreach Experience. 3 3 4 Survey Crew In -House. 4 4 4 TOTALS 39 42 50 For each category, highest score is 5 (with the lowest or worst score 1) Consultant with the highest score is ranked the best. Staff: Scott Bates Selection Date: 9/18/19 Selected Consultant: KPG, Inc. Selection Justification: The selected firm has demonstrated relevant pavement overlay design experience on multiple past federal and locally funded paving projects including the City overlay program. KPG has provided excellent design construction management results on City drainage projects as well. They have exceptional familiarity with City Public Works systems, WSDOT and FHWA standards. Based on overall score KPG prevailed. Consultants percieved ablility to perform CM services was also reviewed since the design contract could be extended to include those services as well. 2 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2019 to 2024 PROJECT: Annual Overlay and Repair Program Project No. 8xx1U401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. Pm�moa�mein�nt�����u��a��a�us�b����������m �|u�`��ha|� JUSTIFICATION: � minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MA|NT.|NqPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. FINANCIAL Through Estimated BEYOND TOTAL EXPENSES Design 149 150 150 150 150 150 150 150 150 1.349 Land0R/VV O Const. Mgnt. 151 200 200 200 200 200 200 200 200 1.751 Construction 528 1.050 1.050 1.050 1.050 1.050 1.050 1.050 1.050 8.928 TOTAL EXPENSES 826 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 12.020 FUND SOURCES Awarded Grant 0 Proposed Grant O Mitigation Actual O Mitigation Expected O ChyOper. Revenue 826 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 12.020 TOTAL SOURCES 826 1.400 1.400 1.400 1.400 1.400 1.400 1.400 1.400 12.026 2019 2024cavoa Improvement Program 10 3 RAINIER GOLF & COUNTRY CLUB 4 W( CONSULTANT AGREEMENT FOR ENGINEERING SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, hereinafter referred to as "the City", and KPG, Inc., hereinafter referred to as "the Consultant", in consideration of the mutual benefits, teiius, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform engineering services in connection with the project titled `2020 Overlay Program'. 2. Scope of Services. The Consultant agrees to perfoiui the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Duration of Agreement; Time for Performance. This Agreement shall be in full force and effect for a period commencing upon execution and ending December 31, 2020, unless sooner terminated under the provisions hereinafter specified. Work under this Agreement shall commence upon written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement no later than December 31, 2020 unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $189,775.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment as provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and the state of Washington for a period of three (3) years after final payments. Copies shall be made available upon request. 5 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services rendered under this Agreement. 7. Indemnification. The Consultant shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out of or resulting from the acts, errors or omissions of the Consultant in performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Consultant and the City, its officers, officials, employees, and volunteers, the Consultant's liability hereunder shall be only to the extent of the Consultant's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Consultant's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. Insurance. The Consultant shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant, its agents, representatives, or employees. Consultant's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Consultant to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. A. Minimum Amounts and Scope of Insurance. Consultant shall obtain insurance of the types and with the limits described below: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Automobile Liability insurance shall cover all owned, non -owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 6 2. Commercial General Liability insurance with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Consultant's Commercial General Liability insurance policy with respect to the work performed for the City. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. 4. Professional Liability with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. Professional Liability insurance shall be appropriate to the Consultant's profession. B. Other Insurance Provision. The Consultant's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance with respect to the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Consultant's insurance and shall not be contributed or combined with it. C. Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. D. Verification of Coverage. Consultant shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Consultant before commencement of the work. Certificates of coverage and endorsements as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. E. Notice of Cancellation. The Consultant shall provide the City with written notice of any policy cancellation, within two business days of their receipt of such notice. F. Failure to Maintain Insurance. Failure on the part of the Consultant to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Consultant to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Consultant from the City. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an independent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 7 10. Covenant Against Contingent Fees. The Consultant warrants that he has not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that he has not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, religion, creed, color, national origin, age, veteran status, sex, sexual orientation, gender identity, marital status, political affiliation or the presence of any disability in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non -Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. The City reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the Consultant. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Applicable Law; Venue; Attorney's Fees. This Agreement shall be subject to, and the Consultant shall at all times comply with, all applicable federal, state and local laws, regulations, and rules, including the provisions of the City of Tukwila Municipal Code and ordinances of the City of Tukwila. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be properly laid in King County, Washington. The prevailing party in any such action shall be entitled to its attorney's fees and costs of suit. Venue for any action arising from or related to this Agreement shall be exclusively in King County Superior Court. 16. Severability and Survival. If any term, condition or provision of this Agreement is declared void or unenforceable or limited in its application or effect, such event shall not affect any other provisions hereof and all other provisions shall remain fully enforceable. The provisions of this Agreement, which by their sense and context are reasonably intended to survive the completion, expiration or cancellation of this Agreement, shall survive teii nination of this Agreement. 8 17. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: KPG 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 18. Entire Agreement; Modification. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. No amendment or modification of this Agreement shall be of any force or effect unless it is in writing and signed by the parties. DATED this CITY OF TUKWILA day of , 2019. Mayor, Allan Ekberg CONSULTANT By: Printed Name: Nelson Davis, KPG Title: Principal Attest/Authenticated: Approved as to Form: City Clerk, Christy O'Flaherty Office of the City Attorney 9 EXHIBIT A City of Tukwila 2020 Overlay Program Scope of Work October 16, 2020 The Consultant shall prepare final Plans, Specifications and Estimates for the 2020 Overlay Program. Specific projects will be determined from the following list of candidate streets: ❑ S 200th Street Southcenter Parkway to Green River Bridge ❑ 51 st Avenue S/Klickitat Dr Southcenter Bridge to SR518 Bridge ❑ S 126th Street East Marginal Way to 37th Ave S ❑ 44th Avenue S S 140th St to end ❑ 48th Avenue S S 109th S, North to Dead End ❑ S 1 09th St 47th Avenue S to 48th Avenue S ❑ S 150th St 46th Avenue S, East to Dead End ❑ 54th Avenue S S 166th St to Slade Way ❑ S 158th St 39th PIS to 42nd Ave S The 2020 Overlay Program will be bid as a single bid package as budget allows. Projects may be re -prioritized or deferred to a future overlay program based on available budget and other considerations. Detailed estimates will be prepared at the 50% design to verify the final project list to be included in the 2020 Overlay Program. The Consultant shall manage and coordinate a complete update to the pavement management program, including data collection and analysis. Infrastructure Management Service (IMS) has been identified as the service provider to perform the data collection and update the City's pavement management plan. The Consultant shall oversee all operations and work with IMS directly to successfully update the pavement management program. The City of Tukwila may require other services of the consultant. These services could include additional design, right of way, environmental documentation, construction phase services, or other work tasks not included in the scope of work. At the time these services are required, the Consultant will provide the City with a detailed scope of work and an hour and fee estimate. The Consultant will not proceed with the work until the City has authorized the work and issued a Notice to Proceed. 10 Assumptions for the 2020 Overlay Program Bid Package • Roadway and utility casting mapping will be based on aerial photography, GIS, and field reviews by the Consultant. Topographic field survey may be required for ADA ramp improvements and will be performed by the Consultant as required. • Typically, only surface utilities requiring adjustment to grade will be shown. • No utility upgrades are anticipated in the project design. • Drainage & Water Quality Reports will not be required. • Environmental Documentation will not be required. Deliverables • 50% review submittal with Plans and Estimate (6 copies) • 90% review submittal with Plans, Specifications, and Estimate (6 copies) • Routing of 50% and 90% Plans to utilities for review and comment. • Bid Documents and Engineer's Estimate for 2020 Overlay Program • 10 sets of Plans (11" X 17") and specifications for the Bid Documents. • Coordinate upload of Plans and Specifications to Builders Exchange. • Bid Analysis and recommendation for award. • Draft and final .pdf of Pavement Management Plan update SCOPE OF WORK TASK 1 — 2020 OVERLAY PROGRAM 1.1 The Consultant shall provide continuous project management and administration for the duration of the Project. (Estimate 6 months). • Hold project coordination meetings with the City to update progress and review submittals. Assume (4) meetings. • The Consultant shall provide monthly status reports and billings. • The Consultant shall provide independent QA/QC reviews by senior in- house staff of all deliverables prior to submittal to the City. 1.2The Consultant shall prepare base maps for all project locations using field measurements, available record drawings, and/or ortho-photography. Topographic survey will be utilized only at ADA ramp locations where field conditions require it to meet ADA compliance 1.3The Consultant shall prepare 50%, 90%, and final Plans for the proposed improvements including the following: 11 • Plans shall be prepared with such provisions in such detail as to permit field layout and construction within a degree of accuracy acceptable to the City and per industry standards. • It is assumed there will be approximately thirty (30) plan sheets at 1 "=20' scale full size (22" X 34"), 1"=40' at reduced scale (11" X 17"). • Typical sections and details will be prepared for items not available as standard details from the City, State, or WSDOT standard drawings. • Plans will identify curb ramp replacement limits and pedestrian push button modifications in accordance with ADA requirements. • The plans shall illustrate complete details of construction of the proposed improvements including limits of construction and removals, utility adjustments, surfacing depths and details, and applicable channelization and signing for the segments selected for final design. • Plans and specifications will include required criteria for traffic control plans and pedestrian traffic control during construction. Criteria will be developed in collaboration with the City. • The Consultant shall perform site walkthroughs with the City maintenance staff to determine extent of roadway improvements / resurfacing (Estimate 2 meetings) and to prioritize candidate streets within the available budget. • Pavement sections will be determined through consultation with the City's maintenance staff and previous experience. No geotechnical investigations are anticipated. 1.4The Consultant shall calculate quantities and prepare Engineers Estimate of Probable Construction Cost for each review submittal and the Bid Documents. Projects will be prioritized in collaboration with the City following the 50% Submittal to determine final project segments. 1.5The Consultant shall prepare the Contract Specification per 2020 WSDOT Standard Specifications for the 90% Review Submittal and the Bid Documents. 1.6The Consultant shall distribute 50% and 90% review submittals to franchise utility owners for adjustments within the Project limits. 1.7The Consultant shall assist the City with Project Advertisement and Award by uploading plans and specifications to bxwa.com, preparing addenda, bid tabulation, and recommendation for award. 12 TASK 2 — PAVEMENT MANAGEMENT PLAN UPDATE 2.1 The Consultant shall provide necessary management and coordination to Infrastructure Management Service (IMS) for a complete update to the City's pavement management program. IMS will perform tasks identified by the City and Consultant according to the attached quote. Work items include new updated field data collection, processing, and analysis tools that are provided to the City and Consultant. The Consultant shall provide necessary management service to see that the IMS data is compatible with the City's existing geographical information systems. 13 EXHIBIT B PRIME CONSULTANT COST COMPUTATIONS City of Tukwila 2020 Overlay Program October, 2019 Interdisciplina Task No, Labor Hour Estimate Total Hours and Labor Fee by Task Task Description Principal Survey Mgr Sr. Engineer Construction Mgr Business Manger Project EngJSarvoyor Design Engineer CAD Technician Sr. Admin Engineering Technician Survey Crew II Office Admin Estimate $ 232 $ 210 $ 184 $ 166 $ 150 $ 140 $ 117 $ 100 $ 115 $ 100 $ 216 $ 92 Hours Fee Task 1 - Project Management 1.1 Project Management and Administrative Services 12 6 12 12 42 $ 6,168 1.2 Prepare Project Base Maps 4 4 48 60 8 60 40 224 $ 30,756 1.3 Prepare 50%, 90%, and Final Plans 40 80 120 60 160 12 472 $ 55,704 1.4 Project Cost Estimates (50%, 90%, Final) 4 4 4 40 24 12 88 $ 11,936 1.5 Project Specifications 4 16 8 40 16 8 92 $ 13,408 1.6 Utility Coordination 2 16 4 2 4 28 $ 3,644 1.7 Project Advertisement and Award 4 4 4 8 4 8 4 8 44 $ 5,976 Task Total 24 4 70 16 6 232 228 76 16 242 40 36 990 $ 127,592 Task 2 - Pavement Management Program Update 2.1 I IMS Coordination and subconsultant support 4 4 16 4 28 $ 4,228 Task Total 4 0 0 0 4 16 0 0 4 0 0 0 28 $ 4,228 Total Labor Hours and Fee 28 4 70 16 10 248 228 76 20 242 40 36 1,018 131,820 Subconsultants IMS Services $ 55,955.00 Total Subconsultant Expense $ 55,955.00 Reimbursable Direct Non -Salary Costs Mileage at current IRS rate $ 500.00 Reproduction Allowance $ 1,500.00 Total Reimbursable Expense $ 2,000,00 Total Estimated Budget $ 189,775.00 FEE ESTIMATE 11018I2019 ^ Public Works Department -Hon[yHash, Director U�� ~~~" W� �A �� un �0 ~� Transportation and Infrastructure Committee Henry Hash, Public Works Director Bryan Still, Public Works Operations Manager CC: Mayor Allan Ekberg DATE: November 1.2019 SUBJECT: Purchase of SLR 8000 VHF Base Radio a� A �0 = A[lan Ekberg, Mayor ISSUE Approve purchase ofSLR 8000 VHF(136-174 MHz) Base Radio and Battery Back -Up System. BACKGROUND VHF Radio communications do not rely on other uU|hUao infrastructure to remain operational as do cell phones and land lines. When the NiequaUy earthquake occurred in 2001. Public Works VHF radio system with battery back-up power supply was the only City communication device operational for several hours following the earthquake allowing Public Works field staff to maintain continuity of operations. ANALYSIS Public Works uses a 154 MHZ VHF Radio to communicate with field staff during large eventsrequiring group coordination ofoperations. During the February 2O1Ssnow event, our current VHF Base Radio was not transmitting ounlrnunioabon reliably. It has been determined that the existing base radio has reached the end of serviceable life due to the age and lack of parts availability. FISCAL IMPACT Day Wireless Systems has provided ecost estimate of$B.83O9.48bmsupply and install anew SLR 8000 VHF (136-174 IVIHz) Base Radio with battery back-up. The quote is through the City of Seattle contract that other municipalities can use. The equipment would be purchased from Water, Sewer, Surface Water Utility Funds which are currently under budget. The purchase of unbudgeted capital equipment of$5.00Orequires Committee and Mayor approval. RE���MEN��T|�� ----_ Connnn�G ��eieb�ingskadtumpprovethepurohaoeof SLR 8OOOVHF Base Radio with battery back-up in the orn0urd of$S.3OS.48. Attachment: Day Wireless Systems Quote 249o1*o*SSw WAPW MinkleffILESHAREInmmemo VHF Radio.doc, 15 PAGE 1 \ WIRELESS SYSTEMS 20744 TO: Tukwila, City of 14000 Interurban Ave S Tukwila, WA 98168-4723 DAY WIRELESS SYSTEMS (03} 2415 South 200th Street SeaTac WA 98198 (206) 878-3750 QUOTATION QUOTE NO.:249901 - 00 ASSN DATE: 10/30/19 TERMS: COD ACCT DELIVERY: UPS GROUND Please reference Quotc No. on Correspondence & purchase orders. Prices firm for 30 days. WE ARE PLEASED TO QUOTE YOU THE FOLLOWING: DESCRIPTION SLR 8000 BASE RADIO **NEED TX/RX FREQS** ADD: VHF (136-174MHz) Battery Back-up Cable 12V 100AH TELECOM BATTERY SEALED AGM TOP TERMINAL INSTALL LABOR AND MATERIALS PER SOW UNIT PRICE TOTAL 3,692.46 3,692.46 3,407.92 46.47 429.00 870.04 Item Summary Subtotal *** QUOTE PER CITY OF SEATTLE CONTRACT #03032 *** Outbound Frt Sales Tax Grand Total 3,407.92 46.47 429.00 870.04 8,445.89 8,445.89 90.00 853.59 9,389.48 ORDERS SUBJECT TO SMITING & HANDLING AND SALES TAX IF APPLICABLE TERMS SUBJECT TO CREDIT REVIEW Quoted rate for maintenance is for service during normal business hours at Day Wireless System locations within designated service area and require a signed contract. Maintenance contract coverage invoiced separately. Please contact our Sales or Service Representative for a quote on Preferred Customer 24/7 On Site maintenance. BY Robert Miesse (253)606-0951 Ext THIS QUOTE IS SUBJECT TO REVIEW BY MANAGEMENT FOR COMPLETENESS AND ACCURACY. RIVIiesse@daywireless.com Accepted by --- LEGAL NAME OF PURCHASER AUTHORIZED SIGNATURE P.O. No. Date 16 11416O.,„ City of Tukwila Public Works Department - Henry Hash, Director INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Henry Hash, Public Works Director ///1 BY: Scott Mitchell, Street Superintendent CC: Mayor Allan Ekberg DATE: November 1, 2019 SUBJECT: Public Works Street Division Report Allan Ekberg, Mayor ISSUE Overview of the Public Works Street Division's operations and accomplishments. BACKGROUND The Street Division is responsible for maintenance of 127 lane miles of commercial/industrial streets and 90 lane miles of residential streets for a total of 217 lane miles, including bridges and sidewalk. It is comprised of twelve full-time employees: one Superintendent, three Foremen, five Maintenance & Operations Specialists, and three Maintenance Technicians. The Street division has three main units: Roadway, Traffic Control, and Vegetation. The Roadway unit is responsible for duties such as crack sealing, asphalt repairs, potholes, striping, pavement markings, maintenance and repair of shoulders, sidewalks, structures, curb and gutter, and snow/ice response. The Traffic Control crew oversees signal cabinets and heads, pedestrian modules, signs, streetlights, RRFBs, video and fiber, CCTV cameras, radar signs, and utility locating. The Street CleaningNegetation crew sweeps, mows, applies herbicide, island/median maintenance, irrigation system control, brush cut, tree/shrub replacement, litter control, and sweeping disposal. ANALYSIS In addition to the Street Division's core maintenance functions, the Street crew is also supporting numerous citywide programs that improve customer service such as: • Tukwila Works: 430 hours in 2017, 554 hours in 2018, and approx. 3,100 hours so far in 2019 • Neighborhood Traffic Calming Program, approximately 900 hours in 2019 • Mailbox Program, approximately 180 hours so far in 2019 • Accident response (Seattle City Light), approximately 840 hours • Respond to other City departments; Parks (240 hours), CIP (200 hours), Police Parking Enforcement (over 200 signs installed, 724 hours), TIS (Wi-Fi hotspots) The total hours spent on these citywide programs is 6,184 hours or 3 full-time employees. As the hours increase for these citywide initiatives, it reduces the Street Division's time and manpower to complete routine maintenance activities. Many of these must be done seasonally due to weather requirements. Below is a list of activities that are being reduced or deferred: Crack Sealing Roadway Cracks in the asphalt allow water to penetrate and loosens the asphalt, which leads to potholes. A good crack sealing program can add an additional five years to the life of a road. Without a crack sealing program, we have increased roadway repair costs, poor driving surfaces, more pothole complaints, and increased claims for vehicle damage. Due to all of the newer tasks listed above, the Street division has not been able to crack seal for the last two years. WAShared Copy Only \Streets \Info Memo Street Overvew 102819 docx 17 Street Operations Info Memo Page 2 Asphalt Dig outs Asphalt dig outs are the removal of the asphalt down to the base for a complete replacement. These are done in relatively small areas where the asphalt has reached a level of deterioration that requires total removal. We have not performed asphalt dig outs in three years. Trip Hazards Trip hazards are created when a tree root heaves up a sidewalk panel or a sidewalk panel settles or cracks. The best repair is to completely replace the sidewalk panel, but short of that, we grind the raised lip or install an asphalt ramp to mitigate the hazard. We have not had time to properly address sidewalk trip hazards throughout the City. Shoulder Maintenance The maintenance of gravel shoulders involves regrading and adding material to fill holes. We can no longer support this maintenance activity. Right-of-Wav Vegetation Control and Tree Trimming Tree trimming in the right-of-way provides line -of -sight clearance for motorists, prevents large limbs from falling in a storm, and provides sunlight to the roadway to help prevent ice formation. We have not been able to complete roadway vegetation control over the last three years. Signalized Intersection Preventative Maintenance Since 2008, the Street Division staffing has been reduced from three IMSA Certified Signal Technicians to one Technician. This technician is responsible for 65 signalized intersections and 29 pedestrian crossings and flashing beacons. The industry standard for preventative maintenance on signals is twice a year and the industry standard for MMU testing (traffic signal controllers) is annually. Municipalities are responsible by Tort law to provide adequate maintenance of signal infrastructure. The negative impacts of not maintaining signals are the possibility of; the signals going into red flash, not working completely causing dark intersections, Opticom not responding for emergency vehicles, pedestrian crossing signals not operating properly, and vehicle detection equipment malfunctioning. We have not been able to keep up with the required maintenance. Traffic Camera System Maintenance The traffic camera system consists of 81 traffic CCTV cameras and 31 surveillance and security CCTV cameras. With only one signal technician with the technical skills to repair and replace these cameras, our level of service is not able to keep up with preventative maintenance. FISCAL IMPACT In 2019, there were unforeseen emergencies; the snowstorms and the SCL pole emergency, that required additional labor and supplies that impacted our core maintenance functions and the Street division's budget. RECOMMENDATION Discussion only. Presentation can be given to the Committee of the Whole. Attachment: Street Division Overview PowerPoint WAShared Copy Only‘StreelskInfo Memo Street Overvew 102&l9docx 18 19 20 21 IIIIIIIIIIII, u Illlllllllo uuuuumuuuum Illllllllllllllllllllllllllllllllllllllllll000111llllll�lllllllllll111H,H ,,, ,'1ti1111. N .I I IImIUmIIP1N looloot ""I""OIhINN°°°IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 11111101111111111111111111111111(1111111111 11111IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1hI , In lllllm11111111 Ilmi�,,,,,9""';;"""""""""' 1000000000000000000000001111111111111111111111000100000 SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBd) MEETING AGENDA Tuesday October 15, 2019 9:00 — 10:30 a.m. SeaTac City Hall 4800 South 188th Street SeaTac 1. Open Meeting (Breakfast treats provided by the City of Normandy Park) • Introductions • Approval of September meeting summary Action 9:00 a.m. 2. Reports and Communications • Chair or Vice Chair • Participant Updates (from RTC and Other Regional Committees) Report and Discussion 9:05 a.m. 3. Seattle Squeeze — Phase III Jennifer Charlebois, WA State Dept. of Transportation Heather Marx, Seattle Dept. of Transportation Alex Ko, Sound Transit Chris Arkills, King County Metro Discussion 9:10 a.m. 4. Electrifying our Region's Transportation System Kelly O'Callahan, Puget Sound Clean Air Organization Discussion 9:45 a.m. 5. • Public Comment • Good of the order: ✓ 2019-20 SCATBd Legislative Agenda V Next SCATBd Meeting: Tuesday, November 19, 2019 V Breakfast treats provided by the City of Pacific Discussion 10:00 a.m. 27 King County Meeting Agenda Regional Transit Committee Councilmembers: Claudia Balducci, Chair Joe McDermott, Dave Upthegrove Alternate: 1200 King County Courthouse 516 Third Avenue Seattle, WA 98104 Sound Cities Association: Dave Asher, Kirkland; Bruce Bassett, Mercer Island; Claude DaCorsi, Auburn; Leanne Guier, Pacific; Dennis Higgins, Kent; Kathy Hougardy, Tukwila; Hank Margeson, Vice Chair, Redmond; John Wright, Lake Forest Park Alternates: John Chelminiak, Bellevue; Kim Lisk, Carnation; Ryan Mclrvin, Renton; Susan Chang, Shoreline City of Seattle: Lisa Herbold, Mike O'Brien Alternate: Debora Juarez Staff: Paul Carlson, Lead Staff (206-477-0875) Marka Steadman, Committee Assistant (206-477-0887) 3:00 PM Wednesday, October 16, 2019 Room 1001 Pursuant to K.C.C. 1.24.035 A. and F., this meeting is also noticed as a meeting of the Metropolitan King County Council, whose agenda is limited to the committee business. In this meeting only the rules and procedures applicable to committees apply and not those applicable to full council meetings. 1. Call to Order 2. Roll Call 3. Public Comment 4. Approval of Minutes September 18, 2019 meeting pp. 3-5 5. Chair's Report To show a PDF of the written materials for an agenda item, click on the agenda item below. gn language and con o n McdeKal in alternate pm ats can .!:.e arranged given sufficierg. nofice (296- 1000). ED D Nar2beT 296- 1024. ASSET -WE LISTEAD1G DEVICES AVAILABLE ..0,r THE CO UNCIL CEL.VBERS. King County Page 1 RTC Meeting Materials Page 1 Printed on 10/7/2019 28 October 16, 2019 Regional Transit Committee Meeting Agenda October 1G.3O19 0. General Manager's Report 7. Announcements Briefing 8. BhefingNo. 2O1U'BO158 pp.7-25 Review of King County Metro Policy Documents (Strategic Plan for Public Transportation, King County Metro Service Guidelines, METRO CONNECTS Long Range Plan) Affected by the Mobility Framework Paul Carlson, Council staff 9. BhefngNo. 2O1Q'BU15Q pp.27'40 King County Metro's Access PanatranoitProgram Paul Carlson, Council staff iD. BhofngNo. 2019'B0100 pp.47'5S Metro Transit DopartmontCapda|PrognomUpdute Paul Carlson, Council staff Other Business Adjournment King County Page Printed on/unv2o/o RTC Meeting Materials Page 2 29 October 16'2019