Loading...
HomeMy WebLinkAboutPermit M15-0043 - BOEING #9-101 / BR&T LAB - EXHAUST FAN, HOOD, VAV BOXES ETCBOEING #9-1O1 - BR&T LAB 9725 E MARGINAL WAY S BLDG 9-101 M15-0043 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 0003400018 Permit Number: 9725 E MARGINAL WAY S BLDG 9-101 Issue Date: Permit Expires On: Project Name: BOEING #9-101 - BR&T LAB M15-0043 6/11/2015 12/8/2015 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN Phone: (206) 250-4530 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS, INC. PO BOX 69208 , SEATTLE, WA, 98188 HOLADP1379NO Phone: (206) 248-9700 Expiration Date: 9/3/2015 DESCRIPTION OF WORK: INSTALL (1) NEW ROOFTOP EXHAUST FAN. (1) NEW FUME HOOD FOR EXHAUST FAN. (3) NEW VAV BOXES. CHILLED WATER AND COOLING PIPING TO AUTOCLAVE. ALSO GASEOUS NITROGEN SUPPLY AND RELIEF PIPING TO AUTOCLAVE. (AUTOCLAVE INSTALLED BY OTHERS). COOLING WATER PIPING TO WASH PRESS. DI MACHINE. VACUUM PIPING. RELOCATING FUME HOODS/OVENS AND ASSOCIATED DUCTWORK. Valuation of Work: $150,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $1,965.22 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE,VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: te,orp Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developrx a I -per- it a \a ree to t -conditions attached to this permit. Signature. Date: (. Print Name: Lc->nvi ��- This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL q30ean4 `-t-1 0 V CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http:/il�t411TuknilaWA.2 SITE LOCATION Project No. Date Application Accepted: Date Application Expires: 0'. / O—1 (For of ice use onl MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** Q% �� ,, King Co Assessor's Tax No.Q� 3y O D g Site Address: ' �� �}` ncO Suite Number: Floor: Tenant Name.'�"^:'6\ New Tenant: ❑ Yes PROPERTY OWNER Name. pipe e Address: Ci Stater zertkim,- CONTACT PERSON — person receiving all project communication (No MECHANICAL CONTRACTOR INFORMATION Company Name `clo, 1tix6nA P r �S Address ( - J co �» 11 i te ( City: Sta, j`J PhoneFax: x a �j Zs � zeto (i f G da Contr Re No.: 31106 Exp Dat Tukwila Business License No.: Valuation of project (contractor's bid price): $_ l v �D Describe the scope of work in detail: BLDG: (1) new rooftop exhaust fan with motorized damper. (1) new fume hood for exhaust fan. (3) new VAV boxes. Chil ed01 water and cooling piping to Auto Clave. Also Gaseous Nitrogen supply and relief piping to Auto clave. (Auto clave installed by others.) Cooling water piping to wash press. DI Machine. Vacuum piping. Relocating fume hoods/ovens and associated Use: . Rductwork. iww LJ Replacement ❑ — _-- Commercial: New 0 Replacement Fuel Type: Electric ❑ Gas 0 Other: H:1Applications1Fomn-Applications On Line12011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfin Unit Type Air handling unit >10,000 cfin Qty Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial IPERMIT APPLICATION NOTES - Unit Type Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Qty Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Boiler/Compressor 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu Qty Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDI HORIZED NT: Signature: ��) . • \/ ` — Date: Lb V v -- ( �� Print Name: �DYLb% ksAf (I ^ Day Telephone: ZIRO 2 �r... .3e) Mailing Address: LI G D b S' .--S(4 a C City — tl� Zip State Zip H:\Applications\Forms-Applications On Line \2011 Applications\Mechanical Permit Application Revised 8-9-1 Ldocx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT QUANTITY PAID PermitTRAK $2,812.10 M15-0043 Address: 9725 E MARGINAL WAY S BLDG 9-101 Apn: 0003400018 $1,965.22 MECHANICAL $1,889.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $1,479.20 PLAN CHECK FEE R000.322.102.00.00 0.00 $377.93 TECHNOLOGY FEE $75.59 TECHNOLOGY FEE R000.322.900.04.00 0.00 $75.59 M15-0044 Address: 9725 E MARGINAL WAY S BLDG 9-099 Apn: 5624200990 $846.88 MECHANICAL $814.31 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $618.95 PLAN CHECK FEE R000.322.102.00.00 0.00 $162.86 TECHNOLOGY FEE $32.57 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R5104 R000.322.900.04.00 0.00 $32.57 $2,812.10 Date Paid: Monday, April 20, 2015 Paid By: HOLADAY PARKS FAB INC Pay Method: CREDIT CARD 06795G Printed: Monday, April 20, 2015 3:56 PM 1 of 1 rISYSTEMS INSPECTION RECORD Retain a copy with permit IN ION NO PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:: e Type f IInssp re r Address: V r t 7 2 /4arpoct i Date balled: J® Special Instructions: 4—M ate Vyante ((oo .. !J a.m. p.m. Requester: Phone No: FApproved per applicable codes. .Corrections required prior to approval. OMMENTS: r y106 r t Inspector: Date; s .— il3 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 P ject: 4_4(10 (c 6gf Type f Inspec ion: C3 a, �C2�1� A 7V at Special Instruction �� �1 Date Wante �j '"�6 `�� a.m. p.m. Requester: Wits_ Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: -xC - - Adtc2 o r Inspector: Date: W REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. MAYES TESTING ENGINEERS, INC. Project No. L15217 Project Boeing Seattle ADC Phase 569 Interior Labs Address 9725 E Marginal Way S., Tukwila, WA Permit No. Onsite Bldg Dept. City of Tukwila Client Dahlgren Industrial Contractor Dahlgren Industrial Record No. 002 Date 05/22/15 Weather Cloudy Inspection Structural steel Sample(s) N/A Seattle Office 20225CedarValey Rued Sub 110 Lynnwood, WA 98036 ph 425.742.9360 fax425.745.1737 Taoana orrice 10029 S. Tacoma Way Su te E-2 Tacoma, WA98499 ph 253.584.3720 fax253.584.3707 Portland Oboe 7911 NE 33rd Drive Sule 190 Portland, OR 97211 ph 503281.7515 fax503281.7579 Inspected field welding of pipe support at roof per details 2 and 3 on RFS 517. Found 3/16" fillet welds meet AWS D1.1 visual acceptance criteria. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Dave Schmutzler Reviewed By: 2- Robert Gardner Senior Project Manager w\tcotD4o, Information in this report applies only to the actual items inspected or tested and shall not be reproduced except in full, without the approval of Mayes Testing Engineers, Inc. Page 1 of 1 H Y-PAIR M INC SMART Mechanical Solutions® Project: 9-101 WD-X Interiors Lab Job #: 59751 EQUIPMENT PRE -START & START-UP CHECKLIST BELT DRIVEN FAN Fan Number: EF-1G2 Area: I Interiors Lab (roof) IDate: I 5/26/2015 Make Model Serial # Design Data 1411111215D Name Plate Data Greenheck 12-CSW-B1-21-10-0-7-X HP Volts/Phase Full Load Amps (FLA) Design Data Name Plate Data 4-Mar 460 2.5 PRE -START-UP INSPECTION Yes NA Mountings Checked (Shipping Bolts Removed) x Vibration Isolators Installed x Equipment Guards Installed x Pulleys Aligned and Belt Tension Correct x Plenums Clear and Free of Loose Material x Fans Rotate Freely x Fans, Motors & Linkages Lubricated x Fire & Balance Dampers Positioned x Disconnect Switch Installed x VFD [Motor Starter X IControled by BMS Fan Belt (Qty/Size) (1) AP 31 IRpm - 1725 ISF 1.15 Fan Pulley/Hub: AK39 x 5/8 Motor Pulley/Hub I AK30x 1 in START-UP INSPECTION Yes NA Fan Rotation Correct x Electrical Interlocks Verified x Supply Fan Interlock Verified x MEASURED VALUE Motor Volts L1 476 L2 475 L3 479 Motor Amps L1 0.8 L2 0.8 L3 0.7 Pre -Start -Up By: Aaron Carter Date: ROWEED5 I111 n Start -Up By: Aaron Carter Date: orrr or 1 �t �t,t Ii2k/2�C INF Qemci:rotin NEUDORFER ENGINEERS INC. TEST, ADJUST & BALANCE BALANCE REPORT Boeing Building 9-101 BR&T Interior Labs Seattle, Washington 2015-345 Project Completion Date: 06/13/15 Revision Date: Revision Number: BILL NEUDORFER CERTIFICATION 2465 Exp.3131/17 5516 1 st Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 1500 NE Sandy Boulevard, Suite #1 Portland, OR 97232 Phone (503) 235-8924 Fax (503) 235-8925 RECEIVED CffY OFTUKWILA JUN 2.5, MS' Neudorfer Engineers. Inc. Consulting En541noers Seattle Portland Krca. N uc rterttgin`:,r; Corn PROJECT LOCATION Boeing Building 9-101 / BR & T Interior Labs Seattle, WA TABLE OF CONTENTS Cover Report Title Certification Warranty 3 4 5 Terms & Abbreviations 6-7 Executive Summary 8-9 Air Handling Units 10-11 Fan Units 12-16 TAB Drawings 17-18 Instrument Calibration 19 2 Neudorfer Engineers. Inc. Consulting Eno inceers Scathe Portland Report Title CERTIFIED TEST: BALANCE REPORT Project: Boeing Building 9-101 BR&T Interior Labs Seattle, Washington NEI Job#: 2015-345 Engineer: Boeing Contractor: Holaday Parks TAB Firm: Neudorfer Engineers Inc Test Engineer: Alex Lebedev 5516 151 Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 gT y9es yhe�„� Pligriat) BILL NEUDORFER CERTIFICATION 2465 Exp. a61n7 o+ a 1500 NE Sandy Boulevard, Suite #1 Portland, OR 97232 Phone (503) 235-8924 Fax (503) 235-8925 3 itNeudorfer Engineers. Inc. Consult,ny Engineers ;ra1tk Pbrlland CERTIFICATION Boeing Building 9-101 The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test-Adiust-Balance Report Proiect Summary. Significant / Noteworthy Remarks are noted on the General Remarks and General Field Notes pages. Other remarks are noted on individual test sheets. Noted deficiencies are not Neudorfer Engineers responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any discrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers Inc Certification No: 2465 Expiration Date: March 31, 2017 Certification Date: June 13, 2015 (Date completed) Signed and Sealed by: NEBB Supervisor: William C. Neudorfer BILL NEUDORFER CERTIFICATION 2465 Exp.3131/17 4 Neudorfer Engineers. Inc. Consulting Enginirors Seraltle Portland Warranty Project: Boeing Building 9-101 Warranty of Services: Neudorfer Engineers, Inc. warrants that the air & hydronic balancing, evaluated during this performance evaluation are operating at the specified levels as documented within this report. At and only this time, and makes no other warranties, stated or implied, concerning the continued performance, operation or safety in the use of this equipment past this time. Neudorfer Engineers warrants the air and hydronic balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Warranty Procedures: For all warranty items, Neudorfer Engineers requires written request. The written request should be specific on the areas of concern, such rooms, or equipment, and the type of issue the occupants are having. Once written notification is received Neudorfer Engineers will schedule a Technician. It is recommended that and Owner or A/E Representative be on site at that time. Voided Warranty and Additional Charges: If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the return trip maybe subject to a service charge, not covered under warranty. Neudorfer Engineers reserves the right to resolve any TAB issue. If a third party or competing Test & Balance/ Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all warranty when a competing firm test or manipulates their systems.) Any return trip to the job site are subject to a service charge and a purchase order will be required before returning to the job site. Document Archiving An electric file of all test documents will be kept on file until the end of the Warranty period. During that time and electronic copy of the test data will be provided a no charge. Any additional hard / bound copies requested will be subject to a fee. 5 Neudorfer Engineers. Inc. Consultmq Enwneers Seiat a Pors and t_.uc rert.nginear.k Terms and Abbreviations Project: Boeing Building 9-101 AC or ACU Air Conditioner or Air Conditioning Unit Act. Actual ACCU Air Cooled Condensing Unit Address Equipment designation number given on the Control Program AH or AHU Air Handler or Air Handling Unit Amps Amperage AP Access Point APP. Application Arr Arrangement AVG Average BHP Brake Horsepower BTU British Thermal Units BTUH British Thermal Units per Hour CAV Constant Air Volume CBV Calbirated Balancing Valve (Circuit Setter) CC Cooling Coil CD Ceiling Diffuser CFLA Correct Full Load Amperage CFM Cubic Feet per Minute CH Chiller CHWS Chilled Water Supply CHWR Chilled Water Return Coeff. Coefficient CP Circulating Pump CR Ceiling Register CRAC Computer Room Air Conditioner CRU Computer Room Unit CT Cooling Tower CU Condenser Unit CUH Cabinet Unit Heater CWS Condenser Water Supply CWR Condenser Water Return DAT Discharge Air Temperature DB Dry Bulb DD Direct Drive DDC Direct Digital Controls: EMS Control System for the HVAC Delta Difference, net decrease or increase Des. Design Dia. Diameter Disch. Discharge DNL Data Not Listed EA Exhaust Air EAT Entering Air Temperature Economizer Controls and components that allow an air handler to logically utilize outdoor air for cooling as opposed to the use of mechanical cooling. EDC Electric Duct Coil EDH Electric Duct Heater EF Exhaust Fan EG Exhaust Grille EMCS Energy Management Control System ERU Energy Recovery Unit E.S.P. External Static Pressure Evap. Evaporator EWT Entering Water Temperature FCU Fan Coil Unit FD Fire Damper FH Fume Hood FLA Full Load Amperage: Maximum amperage a motor can draw. Flow Hood Instrument that captures air and converts the reading to CFM. FPB Fan Powered Box FPM Feet per Minute FR Field Report FT Foot, Feet FTU Fan Terminal Unit GPM Gallons per Minute HC Heating Coil HD Pressure Difference across the entering and leaving side of a pump. Heater O.L. Thermal overload protection for motors located at the motor starter (starter heaters) HEPA High Efficiency Particulate Arrestance HOA Hand / Off / Auto Switch HP Horsepower 6 Neudorfer Engineers. Inc. ConsulUnp Engineers Seattle Portland toBudorterEn r,enc rr Terms and Abbreviations Project: Boeing Building 9-101 HRC HUH HVAC HWS HWR HX HZ I.D. in. in.w.g. Kfactor KW LAT LWG LWR LINT MAU MBH MAX. MBH MIN N/A N/S OA OBD O.D. PD PH PHC Prim. PSI RA RAT RF RH RHC RPM RTU Heat Recovery Coil Hydronic Unit Heater Heating Ventilation and Air Conditioning Heating Water Supply Heating Water Return Heat Exchanger Hertz, cycle per second Inside Diameter inches inches of water gauge Correction factor to the free area need to calculate CFM. Kilowatts Leaving Air Temperature Low Wall Grille Low Wall Register Leaving Water Temperature Make-up Air Handling Unit 1,000 BTUH Maximum Flow Requirements for DDC Mega BTUs per hour (1MBH=1,000BTUH) Minimum Flow Requirements for DDC Not Available Not Shown or Specified Outside Air Opposed Blade Damper Outside Diameter Pressure Drop. Phase Preheat Coil Primary Pounds per Square Inch Return Air Return Air Temperature Return Fan Relative Humidity Reheat Coil Revolutions per Minute Roof Top Unit RVA Rotating Vane Anemometer -reads air velocity in feet per minute SA Supply Air SAT Supply Air Temperature S.F. Service Factor Schedule Design data obtained from the (sched) mechanical prints' schedule of equipment. SCR Silcon Controlled Rectifier Speed Controller SF Supply Fan SFD Smoke/Fire Damper SP Spec(s) sq.ft. Submittals (subs) Suct. SWG Static Pressure Specifications square feet Submitted data on equipment capabilities. Suction Sidewall Grille SWR Sidewall Register TAB Test; Adjust; and Balance Tach Tachometer Tech Technician TSP Total Static Pressure: Difference between the entering and leaving static pressure of a fan. TP Traverse or Test Point UH Unit Heater VAV Variable Air Volume; box that contains a motorized damper that modulates airflow. VD Volume Damper VFD Variable Frequency Drive Velgrid Instrument that reads used to read velocity in feet per minute. VP Velocity Pressure VVT Variable Volume Terminal WC Water Column W.G. Water Gauge WB Wet Bulb 7 Neudorfer Engineers. Inc. Consulting Engineers Scaltic Portland PROJECT Boeing Bldg 9-101 BR&T Interior Labs LOCATION Tukwila, Washington EXECUTIVE SUMMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. The fans have been checked for fan data, operating amperage, voltage, rotation, RPM, belt tension, alignment, and operating static pressure. All outlets have been proportioned to ± 10% of the percentage of total airflow of the system unless otherwise noted. The scope of work for the project was to test and balance three newly installed variable air volume terminals and two exhaust fans serving the Composite Lab area indicated on the construction documents. Balancing diagrams are attached to this report with outlets numbered for locations. Existing Air Handling Unit (AHU) AHU is serving the multiple areas of the building. Three new dual duct variable air volume terminals were installed in the area of the project. The cold deck and hot deck primary airflow sensors for three terminals were calibrated and calibration factors recorded. All design and actual operating parameters of the terminals; minimum and maximum air flows; duct sizes were verified and recorded. The following should be noted: Drawing 1M19 grid lines N.6/9.4 exhaust inlet size 12" by 12" with design airflow of 655 CFM serving the relocated Laboratory has an actual airflow of 75 CFM. The branch duct was followed to the point of connection to the main ductwork. The volume damper at the point of connection was found in full open position. Existing fan appears to be not operating. New Exhaust Fan (EF-4) EF-4 is serving new slotted exhaust hood installed in the Composite Material Lab. EF-4 is designed to provide the airflow of 1210 CFM and it is providing 1275 CFM (105% of design). Electrical motor is operating at 83 percent of the full nameplate amperage capacity. NATIONAL ENVIRONMENTAL BALANCING BUREAU 8 Neudorfer Engineers. no. Consulong Engineers Seattle Poland AWA, N®unorrerEngin49era_oom PROJECT Woodinville High School Phase 2 Improvement & Addition LOCATION Woodinville, Washington EXECUTIVE SUMMARY(CONTD.) Existing Exhaust Fan (EF-4-09A) EF-4-09A is serving two canopy hoods in the relocated Lab. EF-4-09 is designed to provide the airflow of 500 CFM. Existing sheaves and belt were replaced with new sheave and belt combination. After the replacement EF-4-09A, it is providing 500 CFM (100% of design). Electrical motor is operating at 71 percent of the full nameplate amperage capacity. NATIONAL ENVIRONMENTAL BALANCING BUREAU 9 Buda r E gineersFbr'Jnd . Inc. Cnrkyuit ny Fn�a:rit rs Sa pop Air Handling Unit PROJECT: Boeing bldg 9-101 BR&T interior Tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: AHU-Existing AREA: AHU-Existing Exhaust Inlet Summary System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet-01 * Existing lab Flowhood EG 12x12 1 - 655 75 75 11 Totals : - - - - - 655 75 75 11 % - * Notes AHU-Existing / Inlet-01 12-Jun-15 Alex Lebedev Volume damper and motorized dampers are open. Two size 10" round exhaust inlets serving area next to the lab and connected to the same system are providing airflow of 150 cfm. SYSTEM/UNIT: AHU-Existing / CV-01 AREA: New Lab Unit Data Manufacturer Titus Model Number DEDV VAV Address 4 Application # 6668 Cooling Inlet Size 8 inches Cooling K Factor 0.58 Heating Inlet Size 8x7 inches Heating K Factor 0.55 AHU-Existing / CV-01 Supply Outlet Summary Tested By: Alex Lebedev Test Date: June 12, 2015 Air Test Data Clg Max Des. Primary Flow 655 CFM Clg Min Des. Primary Flow 100 CFM Clg Max Act. Primary Flow 660 CFM Clg Min Act. Primary Flow 105 CFM Htg Max Des. Primary Flow 650 CFM Htg Min Des. Primary Flow 100 CFM Htg Max Act. Primary Flow 645 CFM Htg Min Act. Primary Flow 90 CFM System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks Outlet-01 New Lab Flowhood CD 8 1 - 655 600 660 101 Totals : - - - - - 655 600 660 101 % - * Notes Neudorfer Engineers, Inc. 10 l� Neudorfer Engineers. Inc. Consult rig Enrj rteor5 Sean F`unsand Air Handling Unit PROJECT: Boeing bldg 9-101 BR&T interior Tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: AHU-Existing / CV-02 AREA: Exist.Lab Unit Data Manufacturer Titus Model Number DEDV VAV Address 5 Application # 6668 Cooling Inlet Size 10 inches Cooling K Factor 0.55 Heating Inlet Size 12x28 inches Heating K Factor 0.16 AHU-Existing / CV-02 Supply Outlet Summary Tested By: Alex Lebedev Test Date: June 12, 2015 Air Test Data Clg Max Des. Primary Flow 1020 CFM Clg Min Des. Primary Flow 220 CFM Clg Max Act. Primary Flow 1000 CFM CIg Min Act. Primary Flow 230 CFM Htg Max Des. Primary Flow 1020 CFM Htg Min Des. Primary Flow 220 CFM Htg Max Act. Primary Flow 1070 CFM Htg Min Act. Primary Flow 200 CFM System / Unit Area Served Type of Reading Outlet Type Size LxW I D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet-01 Exist.Lab Flowhood CD 16 1 - 1020 900 1000 98 Totals : - - - - - 1,020 900 1,000 98 % - * Notes SYSTEM/UNIT: AHU-Existing / CV-05 AREA: Compos. matiab Unit Data Manufacturer Titus Model Number DEDV VAV Address 3 Application # 6668 Cooling Inlet Size 10 inches Cooling K Factor 0.58 Heating Inlet Size 11x10 inches Heating K Factor 0.54 AHU-Existing / CV-05 Supply Outlet Summary Tested By: Alex Lebedev Test Date: June 12, 2015 Air Test Data Clg Max Des. Primary Flow 840 CFM Clg Min Des. Primary Flow 200 CFM CIg Max Act. Primary Flow 830 CFM Clg Min Act. Primary Flow 190 CFM Htg Max Des. Primary Flow 840 CFM Htg Min Des. Primary Flow 200 CFM Htg Max Act. Primary Flow 845 CFM Htg Min Act. Primary Flow 180 CFM System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final Remarks Outlet-01 * Composition mater. lab. Flowhood CD 10 1 - 420 405 405 96 (1) Outlet-02 Composition mater. lab. Flowhood CD 10 1 - 420 420 425 101 Totals : - - - - - 840 825 830 99 % - * Notes AHU-Existing / CV-05 / 12-Jun-15 Outlet-01 Alex Lebedev (1) Volume damper is full open. Neudon`er Engineers, Inc. 11 Neudorfer Engineers. Inc Consult.via Ei q r cats S �altie Portland Fan Unit PROJECT: Boeing bldg 9-101 BR&T interior Tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: EF-4 AREA: Comp. mat. lab Unit Data Fan Manufacturer Fan Model Number Fan Serial Number Fan Rotation Fan Discharge Drive Type Greenheck 12-CSW-BI-21-10-0-7-X 14111112 Clockwise Vertical Belt Drive Test Data Total Design Flow Total Actual Flow Fan RPM Actual Motor RPM Actual Motor Volts T1-T2 Motor Volts T2-T3 Motor Volts T1-T3 Motor Amps T1 Motor Amps T2 Motor Amps T3 1210 CFM 1275 CFM 2025 RPM 1747 RPM 470 Volts 468 Volts 470 Volts 1.00 Amps 1.00 Amps 1.00 Amps EF-4 Exhaust Inlet Summary Tested By: Alex Lebedev Test Date: June 11, 2015 Motor Data Motor Manufacturer Tianjin Motor Frame 56 Motor HP 3/4 HP Motor RPM 1725 RPM Motor Rated Volts 208-230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor Full Load Amps 2.5-2.4/1.2 Amps Motor Service Factor 1.15 Sheave Data Motor Sheave MFG Browning Motor Sheave Model AK39 Motor Sheave Bore QTx5/8 in. Motor Sheave Type Fixed Fan Sheave MFG Browning Fan Sheave Model AK Fan Sheave Diam. 3-1/4 OD Fan Sheave Bore QTx1 in. Number of Belts 1 Belt Size AP-31 Sheave Center Line 11.00 in. Motor to Extend 1.00 in. Motor to Retract 2.00 in. Test Pressures Fan Suction SP -2.10 in. wc Fan Discharge SP 0.1 in. wc Actual Total SP 2.20 in. wc System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet-01 New slot hood Pitot Tube Duct 10 0.55 2200 1210 1275 1275 105 Totals : - - - - - 1,210 1,275 1,275 105 % - * Notes Neudorfer Engineers, Inc. 12 Neudorfer Engineers. Inc. onsultrt tJ Engrnuars Soaitlu Portland NMCI Dr erEngintbr;ti com Duct Traverse PROJECT: Boeing bldg 9-101 BR&T interior labs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: EF-4 Total airflow AREA: New slot.hood Unit Data Type of Traverse Round Diameter 10 in. Air Flow Area 0.55 sq. ft. Number Of Rows 2 Readings Per Row 10 Total Readings 20 NOTES: Tested By: Alex Lebedev Test Date: June 10, 2015 Final Data Sum of Readings 46418 Average Reading 2321 FPM Design Total Flow 1210 CFM Actual Total Flow 1277 CFM Static Pressure -0.83 in. EF-4 Total airflow 10-Jun-15 Alex Lebedev (1) Shortridge Multimeter with Pitot Tube was used to obtain velocity readings. Hole 1 Duct Traverse Data Points N 0 x 10 0 Neudo fer Engineers, Inc. 13 Neudo1 er Engineers. Inc. Carn;ult ng Erwin, ors Seattle Port and Fan Unit PROJECT: Boeing bldg 9-101 BR&T interior tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: EF-4N09A AREA: New Lab Unit Data Fan Manufacturer Fan Model Number Fan Serial Number Fan Rotation Fan Discharge Drive Type Pace U12-BI-STD 93-73215-01 Counterclockwise Vertical Belt Drive Test Data Total Design Flow Total Actual Flow Fan RPM Actual Motor RPM Actual Motor Volts T1-T2 Motor Volts T2-T3 Motor Volts T1-T3 Motor Amps T1 Motor Amps T2 Motor Amps T3 500 CFM 500 CFM 891 RPM 1727 RPM 470 Volts 468 Volts 470 Volts 1.10 Amps 1.10 Amps 1.10 Amps EF-4N09A Exhaust Inlet Summary Tested By: Alex Lebedev Test Date: June 13, 2015 Motor Data Motor Manufacturer Marathon Motor Frame 56 Motor HP 3/4 HP Motor RPM 1725 RPM Motor Rated Volts 208-230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor Full Load Amps 3.0-2.8/1.4 Amps Motor Service Factor 1.25 Sheave Data Motor Sheave MFG Blackstar Motor Sheave Model 1VP34 Motor Sheave Bore 5/8 in. Motor Sheave Type Adjustable Adj Mtr Sheave Pos Middle Fan Sheave MFG Blackstar Fan Sheave Model AK54 Fan Sheave Bore H1-3/16 in. Number of Belts 1 Belt Size A-28 Sheave Center Line 8.75 in. Motor to Extend 2.00 in. Motor to Retract 2.00 in. Test Pressures Fan Suction SP -0.24 in. wc Fan Discharge SP 0.01 in. wc Actual Total SP 0.25 in. wc System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Inlet-01 * Canopy hood PitotTube Duct 8 0.35 714 250 580 255 102 (1) inlet-02 Canopy hood Pitot Tube Duct 8 0.35 714 250 630 245 98 Totals : - - - - - 500 1,210 500 100 % - * Notes EF-4N09A / Inlet-01 13-Jun-15 Alex Lebedev (1) Volume damper is full open. Neudorfer Engineers, Inc. 14 Neudorfer En ineer Consuitaig En_gvleors Scatuu PotUand Duct Traverse PROJECT: Boeing bldg 9-101 BR&T interior Tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: EF-P-9 inlet #1 AREA: Canopy hood Unit Data Type of Traverse Round Diameter 8 in. Air Flow Area 0.35 sq. ft. Number Of Rows 2 Readings Per Row 10 Total Readings 20 NOTES: Tested By: Alex Lebedev Test Date: June 13, 2015 Final Data Sum of Readings Average Reading Design Total Flow Actual Total Flow Static Pressure 14623 731 FPM 250 CFM 256 CFM -0.15 in. EF-P-9 inlet #1 13-Jun-15 Alex Lebedev (1) Shortridge Multimeter with Pitot Tube was used to obtain velocity readings. Hole I Duct Traverse Data Points m a x 8 Neudorfer Engineers, Inc. 15 Neudorfer Engineers. Inc. Consult,riq Enumeors Seattle+ Portland Duct Traverse PROJECT: Boeing bldg 9-101 BR&T interior Tabs LOCATION: , PROJECT #: 2015-345 DATE: 6/17/2015 CONTACT: Alex Lebedev SYSTEM/UNIT: EF-P-9 inlet #2 AREA: Canopy hood Unit Data Type of Traverse Round Diameter 8 in. Air Flow Area 0.35 sq. ft. Number Of Rows 2 Readings Per Row 10 Total Readings 20 NOTES: Tested By: Alex Lebedev Test Date: June 13, 2015 Final Data Sum of Readings 14020 Average Reading 701 FPM Design Total Flow 250 CFM Actual Total Flow 245 CFM Static Pressure -0.13 in. EF-P-9 inlet #2 13-Jun-15 Alex Lebedev (1) Shortridge Multimeter with Pitot Tube was used to obtain velocity readings. Hole Duct Traverse Data Points ea 0 8 oa Neudorfer Engineers, Inc. 16 ° - ' 1' 1'T 0 SC SY 77 . Sc I ` I— `fir^� U zam \o ) zY ,5 ni iiIN ® iy • -; $ ! PLAN - HVAC DUCTING BLDG. 9-101 KU.. CAD AVSEP COL 101 6 DEv. 'SuiEP,'V C eE ; Op all S 8 rt z , -rF a. 1 Lb — ,st t---= 'Fr " I f �a s� _ 'tea s �I© I :� .� • (cl ■�� s .. ,. 7 s r m,.,n., ' SiI _ a§L ll IF.. +eke: A _ fP i g ,u SiF CD Z Z W CC c�J 2a "� Yk iq g 36 14. eA II E 11 OY. w ST rz siaz/G/s'xrgx 0 Z d 06 O O a u N 0 CO C) (0 M 9m 0 0 0 to 2 o Z� o " 1 a ffi 3 " Neudorfer Engineers. Inc. Consuthng Enginrsers SCAttIO Portland Instrument Calibrations Instrument Type Air Data Meter with Flowhood Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M99620 Calibration Due Date 1/13/2016 Instrument Type Tachometer Instrument Manufacturer Shimpo DT-207L Instrument Model Number Type B Instrument Serial # C1CB0033 Calibration Due Date 4/20/2016 Instrument Type Amp Probe Instrument Manufacturer Fluke Instrument Model Number Fluke 902 Instrument Serial # 79611561 Calibration Due Date 2/26/2016 Instrument Type Temperature Probe Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M99620 Calibration Due Date 1/13/2016 Instrument Type Air Foil Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M99620 Calibration Due Date 1/13/2016 Instrument Type Hydrodata Multimeter Instrument Manufacturer Shortridge Instrument Model Number HDM-250 Instrument Serial # W11009 Calibration Due Date 3/2/2016 19 City of Tukwila Department of Community Development May 01, 2015 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Correction Letter # 1 MECHANICAL Permit Application Number M15-0043 BOEING #9-101 - BR&T LAB - 9725 E MARGINAL WAY S Dear CONNIE HARDIN, Jim Haggerton, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) All Structural Drawings and structural calculations sheets to be stamped (original signed wet stamp, not copied) by Washington State licensed architect, structural engineer or civil engineer. (BUILDING REVIEW NOTES) 1. Provide plans stamped and signed by the design professional in charge for this project. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-433-7165. Sincerely, r4411 Rachel e Riple Permit Technician File No. M15-0043 6 flfl.Cnlithnontor Rnlllovnr/1 Cult,' ft1nn Tulne)iln Wnchinotnn QR1RR m Phnno 11/,_d71_2F7n a hnr PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0043 DATE: 05/21/15 PROJECT NAME: BOEING #9-101 - BR&T LAB SITE ADDRESS: 9725 E MARGINAL WAY S Original Plan Submittal X Response to Correction Letter # 1 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: kW/ y-ti1�1S Buil ing Division 1111 Public Works Fire Prevention Structural Planning Division Permit Coordinator 1111 PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 05/26/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required n Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 06/23/15 n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0043 DATE: 04/20/15 PROJECT NAME: BOEING #9-101 - BR&T LAB SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: Building Division ow Public Works Fire Prevention Structural Planning Division Permit Coordinator n s PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 04/28/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 05/26/15 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only rr rr CORRECTION LETTER MAILED: J ) It Departments issued corrections: Bldg I Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: S a 1 Plan Check/Permit Number: M 15 -0043 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner fiEriEiVED e!lfrf OF TUKWILA MAY 212O1$ PERMIT CENTER Project Name: BOEING #9-101 — BR&T LAB Project Address: 9725 E MARGINAL WAY S Contact Person: (f)fl ra Phone Number: ib a5O-(S---?0 ary of Revision: JkAfco Si dLcLooe f;_&k ti CIO j -..5 a. l' cS SI-I f I'm I rvi 10\ / t m �� �C i Libi 1 6l1 ( 1/7, NIA GAX(, 1 N/l (ny�C , 1 m64J uq)C, 1 wtua, 1 t 1'1 t(Q 1 albs tWlatC1)C ,1 a.(oB't 1�a(o6, 1 Y 3[ol, wt3L '2 4 t viV J o? 1 10\-l.0g )(, t ry 3cA l MA3(#i , 1 W137 C( (M 314 Sheet Number(s): adiD t " to‘ SD' AS1ck vas-3z- tvis-3c 7J "Cloud" or highlight all areas of revision including date�f-xe�ision„ n Received at the City of Tukwila Permit Center by: a— Entered in TRAKiT on W:\Permit Center\TemplatesTortms\Revision Submittal Form.doc Revised: March 2014 HOLADAY PARKS INC Page 1 of 3 Home Inicio en Espanol Contact Search L&I [mac; AZ Index Help My Secure L&I Safety Claims & Insurance Workplace Rights Trades & Licensing Washington State Department of Labor & Industries HOLADAY PARKS INC Owner or tradesperson PARKS, GERALD T JR Principals PARKS, GERALD T JR, PRESIDENT NAILON, JUNE ANNETTE, VICE PRESIDENT O'CONNOR, BONNY K, SECRETARY BECK, DAVID CLARENCE, TREASURER VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL TUKWILA, WA98168 206-248-9700 KING County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2015 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 6/11/2015