Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M15-0088 - BOEING #9-53 - BOILERS, EXPANSION TANK AND AIR SEPARATOR
BOEING #9-53 9725 E MARGINAL WAY S BLDG 9-053 M15-0088 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 5624200990 Permit Number: M15-0088 9725 E MARGINAL WAY S BLDG 9-053 Issue Date: 7/20/2015 Permit Expires On: 1/16/2016 Project Name: BOEING #9-53 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: DESIMNONE TRUST BOEING 1201 3RD AVE STE 5010 C/O BNY MELLON NA, SEATTLE, WA, 98101 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS, INC. PO BOX 69208 , SEATTLE, WA, 98188 HOLADP1379NO Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2015 DESCRIPTION OF WORK: REPLACING 2 BOILERS, 1 EXPANSION TANK & 1 AIR SEPARATOR. Valuation of Work: $80,000.00 Type of Work: REPLACEMENT Fuel type: GAS Fees Collected: $1,200.82 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree �ttothe conditions attached to this permit. V Signature: 4 ' __' c `'uDate: 7/20 I) '5 Print Na This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0701 ROUGH -IN MECHANICAL CITY OFrl'UKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov q3� Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: O 7//d//i oI Po (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION • Site Address: (A -IS- t41) (✓\Al Tenant Name:.ipP t �S3 PROPERTY OWNER Name Address ew 7 ` Ao 4� �Stat : Zip? CONTACT PERSON — person receiving all project communication Name: aonni.e. lla {'; Address: L j s 1.se• (pl tc:,l1 City: /� Stat ZQ GPJd _i , , I b 8` J'7i)�,,(Zsv, Phone:' Fax:,.14 '.�ce..f. 704 Emailt„on,€ 10 hot -aw1/4 King,Co Assessor's Tax No.:Q O <. Cj r . Suite Number: Floor: New Tenant: ❑ Yes [ . Io MECHANICAL CONTRACTOR INFORMATION Company Name:POtAkg Address: 4 t b 5 t3 ct P-P City:�� , c Stater Zips ? i /t 0 . �4530 Fax. wL Za -' 70 b Phone,n 1, zs Contr Reg No.: `' _'a An 37415 Date: q _l� �JU Tukwila Business License No.: Valuation of project (contractor's bid price): $ U On Describe the scope of work in detail: a %O, i e r-s i pa-K s cts,, 1 aA a a2. Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement L1 Fuel Tvpe: Electric 0 Gas 0 Other: H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised S-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 7- 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu l PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: D AGENT: 1y Mailing Address: 4100 0 S H:\Applications\Forms-Applications On Line \2011 Applications\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Date: 1 " 10 — I Day Telephone: (e ZS?) 4-($ r t City State Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $65.00 M15-0088 Address: 9725 E MARGINAL WAY 5 BLDG 9-053 Apn: 5624200990 $65.00 MECHANICAL $65.00 ADDITIONAL PLAN REVIEW TOTAL FEES PAID BY RECEIPT: R6193 R000.345.830.00.00 1.00 $65.00 $65.00 Date Paid: Friday, September 18, 2015 Paid By: HOLADAY PARKS, INC. Pay Method: CREDIT CARD 03378G Printed: Friday, September 18, 2015 9:55 AM 1 of 1 CI $SYSTEMS DESCRIPTIONS ACCOUNT QUANTITY I PermitTRAK PAID $1,200.82 M15-0088 Address: 9725 E MARGINAL WAY S BLDG 9-053 Apn: 5624200990 $1,200.82 MECHANICAL $1,154.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $891.20 PLAN CHECK FEE R000.322.102.00.00 0.00 $230.93 TECHNOLOGY FEE $46.19 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R5704 R000.322.900.04.00 0.00 $46.19 $1,200.82 Date Paid: Friday, July 10, 2015 Paid By: HOLADAY PARKS FAB INC Pay Method: CREDIT CARD 05400G Printed: Friday, July 10, 2015 2:00 PM 1 of 1 5YS EMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO, CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 4415ao8' Project: 7-53 Type of Inspe�cction: j Address: Da a Called: Special Instructions: ,, �Q Date Wan d: sr: I /VA p.m. Requesterb e ((, c pal, Phone N n N): fir-- 9,2 7 Approved per applicable codes. El Corrections required prior to approval. OMMENTS: t nspector: Date�—ly l6� REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 South`center Blvd.. Suite 100. Call to schedule reinspection. ill Retain a copy with permit INSPECTION RECORD '"'� ECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: -1 #--f- 53 Type o Inspection: r 1e t<�q / Address. c q7 - Metj� av ( (Jay D�t e Ca ailed: JO . Special Instructions: �J /�(( R"1 Daternted? f 1^- "2—t— IJ a.m. p.m. Regu_ct 1-yaGk Phone No: --707-b'2gj Approved per applicable codes. Corrections required prior to approval. COMMENTS: r— 1 k t- or. ` toi v Vi ' -q V t0Gf t,i4f 51l crC fie re,„--,- i9,, H-L,l &- - Iti 1-LI 6' - 2- i o mot f--( v q t k 6-0 /Cr Cqt ( i7f- kr, ( ncee—C-;TC611 Inspector: Date, REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD ECTION NO. MIME Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 /MC-66 WV Pr ect: Type of Inspection: Address: 47 2C g7ilseavu,i it 4/ Date Called: Special Instructions: Ake t7o0r IIV-� Date Wani� / �_ a. m. p Rem: 41,0 Phone %% -T-2-4(7 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: ik( rifeKure_Te_Jr atics c L� r� Pv Inspector: Dater ('i� REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. N O rn n n 0 O v O m 0 7J O y z 3 m 0 v 831N30 !Mind - `� CD C4cn a BCD C o. o _� 0 v m =• CO n v m 0 (D 3 0 N 00 v a Oa W :s;ua;uoo jo awl Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version CD 7 CO Er' m 0 cn 0 1 CD w 9 N O O V N c CD 0 —14 C) n cD CO a CD cn cn 0 0 ED 0 5 9 0 3 2J 0 0 m 0 0 0 m 0 3 —n co 0 z v 3 m v a) (DD OWT Unocc O occ o ICmd 0 I Htg D OA EMCS Outlet Water Temp Unoccupied 1 Occupied Command C) 0 0 5 co Heating Temperature Differential Physical Inspection Outside Air Energy Management Control System *y N c OAT 13 i 0*v c v n Hot Water Supply Inlet Water Temp Air Handling Unit Outside Air Temperature Hot Circulating Water Pump CO 0 m Variable Speed Drive Greater than Less than 2 0 w m Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version « 03 B_ co ƒ 0 ƒ E F p d 0 @ -o k / / n Q CD m 0 co ƒ 0 / E p 0 0 3 2 0 7 0 0 2 2 m 3 co CD 01 0 m E • Final mapping of all points to the operator's station verified. • ƒo / 3 aA \ 0 0 2 c ■ 73 k 0 m 0 0 \o gm � C. 2 m 0 3 E k / 0 3 (0 E � \ 0 § m / 0 ] ( sellslnbeield III Demonstrate boiler and pump alarms. D Q 2 O n § - § j o CD 0 CIJ §w £ a m _ 0) _ §E W7 a)� 0f CD 7 ] 0 2 5 § o 0 bo. / 2 ƒ f ® —a co / a/ @ m o :a 2 »5 * / a ƒg 0 cm a 22 2 kk cow — coR '< 3 0 0 O a/ 0 cn £ co D- 3 0 T. c f d 0 « n u) J 0 F_0 k a 0 0 k 3 3 a f 3 c ] c(0 a) Demonstrate that the heating water system is controlled to maintain the HWS temperature setpoint ± 2°F. k C > C a] w] CD 0 0 0 C 0 f - c — ° 2 - $g‘:<--2 o/ \3 -0m (Dm % 2 q 73k .. 0' o E* 72 2 £ / f / -, J 0 ] 0R k/ \ / -L3 - as• a= �0 o= co k(Q (D k� a)* 5 CO .(D aR -n% 4<]. 0'< k2 ®- 0\00 - D 0 o -a § -8 q , @ — . 3. m £ E� 7» 5§ Eƒ § a) ] c ES 2 $ caw isCD \ o 0 co a § CD • o » 7 . 0 ■ g T1 -o Heating Water System — HWG-1, HWG-2 w/ P-8 and P-8A 1.61jSej swa;sAs Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version O O v ca 0 .p 0 0 n n 73 0 0 0 0 co C- CD (D 3 -1 c (o 0 0 z v 3 1.4. TAB contractor has completed air and hydronic balance for the equipment being tested. 1.3. Completion of graphical interface FPT for this system 1.2. Final mapping of all points to the operator's station verified. 1.1. Complete start-up and checkout of equipment being tested. Attach completed start-up documentation from the Manufacturer's Start-up Representative. 1. Verify prerequisites complete: Field Test Procedure Heating Water System — HWG-1, HWG-2 w/ P-8 and P-8A 2 Results D D D D a GI DDD D a HWG-2 D D D D a 7 co -13 DDD D a co D CD oN 0• o CD CD y (U < 3 8 o CD <"3i O O • C a O 0 N N N • O (p a • (u3 • 2.O 0 3 ) (D N 0 0 O CD • UN Q (D 0 3 • 0 (D 0m(n (0 0 Z - (n 0 v 0 a 0CD 3 . 3• ' (D �. co San 0 ct., z 0. -00 0 0 cn 0. 0 o cn O c'.(n o �► O • 0 3_ -* Z• =. • o `0 (0 O m 0 O 0(0 o- o' D 0 O o 0 5 v ) D 0 0 0 ea0 v O o a- 3 a. m v 0 (D :s;Insab pue ampeooJd ;sal play • . O D 0 3 0 O - c 3 • ((D 0 aa 0 O 0 0 0a (D O N O• a < 0 30 3O N • O 5 N as ✓ 0 co • c 0 � °-o O � (0 c (D ao 0• o 30 0 0 cr c.-0 Q-o 5•(0 (o 2 to 3 c 3 0 • 20 CD (n • r. (ten 3 m 0 2 w 0 0 F' Perform field test procedures for the equipment to demonstrate the functionality of the control programming. :yoeoJddy;sal •Jo;oeJ;uoO sioiiuoO :yoal;sol ■ ■ Commissioning Authority or Owner's Witness. :s;uedlowed wnualum ■ TAB contractor has completed hydronic balance for the equipment being tested. ■ Completion of graphical interface FPT for this system. Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version CD CO 0• CD cn cn O n • C(D Cn 5 n n n n 0 3 0) 0 N 01 01 Q 0) C0 4.3. Use the Mfg. minimum operating startup data to confirm that the boiler is operating at maximum efficiency at minimum firing input. 4.2. The DDC varies the boiler firing rate to maximize the condensing capabilities and thermal efficiency of the entire heating plant. 4.1. The supply water temp setpoint is 140°F 4. Verify boiler control loop response to changed heating demand: Manually Tower the OAT in small increments to 12°F until heating output is operating at maximum demand. Verify that: • /1 O 0 •� I. O 11 II 11 11 '• ID 0 III •1 11 1 o •• 1 O ' 1/ 41 • • • ' • 11° „ 1 11 ' 0 n • 0 0 • 1 • 0 /, • • • • ' • - n 11 • , I 11 11 ' 0 . II ' • lb 11 1 • 41 11 • 0 /1 • ••1 11 1/ „ 11 , • lb„ 1. „ 11 1 11 11 1� ... 11 ' ' lb• ' •' . • 1 ' • o ' 11• „ 4 „• '' • • . III 11 ; " 41 ' 0 • II 1 11 ' " ID , • 40, • lb „ „ • •' , ' 0 • „ , 11 o " o • 0 , 11 11 • 11 ID 11 11 11 4 1. 1 •1• Ir • • p • r " . '• • ' • , , . • . • ' • 11 . „ • 11p • • •• , 11 " , , ID• - 11 11 1 • ' „ 11 •0• 0 • . • • 11 • 11 • , , 11 • 1, 0 11 0 11 , 11 „ 1 11 ; 11 11 ° 1 • . 1 . 11 • , 11 11 ID • U •• p • 1• it 0 • , 0 1• 1 • U lb • 1. U 11 0 , 0 „ o • • u 11• , 11 11 1 11 . 11 „ 11 11 • 11 ,1 11 11 11 ,I 1. , ,. • • . • �. U • • 0 0 • 1• 1 Field Test Procedure 9 \/er.if.r nes_1ILII I he.nv4inra Plokr»wnr) he.sfinn cvcir.m 4...sn4r...1. 11Annunllvr nrii.,oi +hn Heating Water System — HWG-1, HWG-2 w/ P-8 and P-8A D D D 1 1 1 1 1 Z 1 Y/ Results DD D 1 1 1 •Z 1 2 N • 1 1 • • • 1 1 • > 1 • j� 03 1 • • • 1 • 1 • • D 1 • MI ' 03 D Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version v 0 0) 0 0 n 0 co v 0• CD 0 0 0 0 v' m co F 9 0 0 3 v 73 0 m 0 0 0 c_ m m 3 m c cm 8.4. The lag boiler starts. 8.3. The alarming boiler is locked out. 8.2. A boiler alarm is indicated on the graphics. 8.1. The lead boiler is proven off. 8. Verify boiler alarm: Switch the lead boiler off at the disconnect switch. Verify the following: 7.3. Release the shutdown switch and allow boiler to restart. 7.2. The boiler goes through a purge cycle. 7.1. The boiler has shutdown. 7. Verify emergency boiler shutdown: Engage the emergency shutdown switch. Verify that: 6.4. The lead boiler becomes the lag boiler and shuts down. 6.3. The lag boiler starts and becomes the lead boiler. 6.2. The lead pump becomes the lag pump and shuts down. 6.1. Lag pump starts and VSD modulates to maintain 38 PSI differential pressure, then becomes the lead pump. 6. Lead/lag switch: Adjust the lead/lag switch schedule point to cycle lead boiler and lead pump. Verify that: 5.4. Lead pump VSD continues to modulate to maintain loop pressure within 10%. 5.3. No more than 3 cycles of over/undershoot are observed. 5.2. With each change the burner modulates to satisfy setpoint ±2°F. 5.1. The supply water temp setpoint is70°F 5. Decreased HW system demand: Manually raise the OAT in small increments to 5580°F until heating output is operating at minimum demand. Verify that: 4.6. Lead pump VSD continues to modulate to maintain loop pressure within 10%. 4.5. No more than 3 cycles of over/undershoot are observed. 4.4. With each change the burner modulates to satisfy setpoint ±2°F. Field Test Procedure Heating Water System — HWG-1, HWG-2 w/ P-8 and P-8A DDDD 1 > NA > 1 DD i 1 1 1 DDD I DD0 2 Results DDDD 1 > NA D I DD . 1 1 1 DDD 1 I DD* 2 N 1 1 1 1 1 III 1 1 1 D 1 > 1 1 1 1 > 1 1 CO w 1 1 1 1 1 1 1 1 I I I D 1 D I 1 I 1 D P-8A Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version 0 co _ 0) cn m CD a / k 0 9 k co m CD cn 0 ƒ E 5 p n 0 ] -o § 0 0 0 0 co 2 m 3 m 0 -5 -a 0 % 0 0 P) 0 k3 —3 jka)o a� qJ - 0) - §E E0 ET)� P2 cn J 22 10 o 0) § o§ % 0 bk 7 3f a) ,_ 7 o3 CD C ib- a- .-A.: Dc m Co 0. m-m- ig kk k ƒ3 ] : 0 0 %\ 0 £ co § = c 2 3 0 < . @ J O E t E CD 1 a 0 0 k 2 3 / \ f R o 0 ] c a) 1.4. Demonstrate that the heating water system is controlled to maintain the HWS temperature setpoint ± 2°F. w 0CJ ( >0 .] ¥] jk /j 0 .0 0 st -40 ,z0) u \� R 0 0 ?•ifir ]2 /( (n® co/ƒ o o E 3� i7)m .E 5 ®J o cp ka) o ) f _ k� 0k aƒgig CD CO0_ \a kcn 0� 9CD m\ �". O® (0 » kk �/ o. / O o 0 o ® —3 k 33§ k x. ] m k /� 1 /3 dc E\ E0 k - a o m co § co o• 0 > . -n 1. Set up a 1 week data trend log to verify the following: Real Time Performance Analysis END OF FIELD FPT 10. Real Time Performance Analysis (trend logging): Provide trend logging analysis as specified under Real Time Performance Analysis 9.5. Release all overrides and allow the system to stabilize. 9.4. The lag pump starts. 9.3. The alarming pump is locked out. 9.2. A pump alarm is indicated on the graphics. 9.1. The lead pump is proven off. 9. Verify pump alarm: Switch the lead pump off at the disconnect switch. Verify the following: Field Test Procedure Heating Water System — HWG-1, HWG-2 w/ P-8 and P-8A x Results >..... . lE c) x > . . . . . E 0 & -a. DDDD>1 -co DDDD>1 Co Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version CD CO -, » 0 O E Si) 9 ) 0 @ 0 0 0 3 -a @ 0 0 0 73 0 2 0 0 3 m 0 2 0) ] 0 0 0 _ E M "3 "3 ") ") "3 NI ") ") "3 "3 "3 "3 "3 puewwoo Z-OMH .IP sn}ets L.-OMH '£ 3 ? 0 3 ] k sntets V8-d ' I. puewwoo y8-d '0 i Hot water system temperature setpoint algeslp/algeue Janos .4. FC2CC2 supply air temperature setpoint w � FC2BB2 supply air temperature setpoint AHU-4 supply air temperature setpoint AHU-2 supply air temperature setpoint 2.1. The following data points shall be logged at any change of value: gƒ»» - ciln)Eg if) i33 a)gi n r 0 w Q § - m m c m a) cp 7 Ca -0 2 -A 2 R7�k �� Sk ¥ekof� 75 ] co st g� CC) CD K 7 3 ea 3 0 k0cDk • * -£ 2f $• o 3o ®272 D\ •-a• • > 2 > O § ga2-2 ƒ m C Jc a/$a) ƒkƒ g m 0 \ O) ƒgym CD �CD m 0 g 2/ 2 0 o @ n g 5%ƒ a_ ma • ea i�E7 • 7 k/a -0 - @ = = 71 E *. £S 5. -0 = S.-0 \• o • 0 2 cc) ƒ ® 0) -0�0 0 m=0-0 7 (0= m 0 0 0 ci.=Ep • 0 77ID— ] m 5 a -a 13 0. • 0 - '< ea- 3. ° o E$55 0 a_nco 3 so q KA/ 7 a 0 (D 3 • = =a2• D a -a q 0 a) — o 0 9 c k 01 -• In E m q / • sn 7R % 3 m a) -o • / • ®" — • c m / ƒ o ] O o 7 0 1.7. Demonstrate boiler and pump alarms. Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version (D CO 0 O C) n (D 3 -n c (0 (D z n) 3 v v N m c 3 N 0 0 (D 0 O 0 O O ca com '4 (D (D 0 D 0 o 3a� O S 0 0 CD(D -0 '0 a) a) -v( (n0CD C CD (D N 0 m m r'< 0 09 =; o 0 c 0 0 0 m � v (n0m D) 0) p O O O 0 � CD O 'D D) o 5- cc, (D (D �. N. (,) 'o Z 1 O " 0 0) (D CI O. c (D cup) cf (D (D Z 0- O n. cn c no o 7. o '+ (D m Z 0 m PPPPPP PPPPPP IeRuaJa}flp ainssaid wats,(S •s puewea 6ugeeH •1 aanteiadwat VO '£ lequaia}flp aansseid yg-d 'Z leguaia}}lp aanssaid g-d •t. % GSA VS-d "0 N N N N N N N N N P P N N (D 00 V P to A w % GSA 8-d IMO Z-OMH IMO I.-OMH aanteaadwat wntaJ MH klewPd ainteiadwat i iddns MH / .iewl.►d aantwadwat ne i iddns ZOOZOJ ainteaadwat ale Aiddns Z88Z0� 2.2.2. AHU-4 supply air temperature am;eJedwai ale Aiddns Z-nHV 2.2. The following data points shall be logged at 10 minute intervals: swielv'96' 67 sn1e1s Z-OMH 'S 6' 1.'Z Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version 01. 40 01. abed 0 0 s k W 0) a- cn 0) 0 0 v' 0 cn 0 0 Q) 7J 0 o- 0 0 7J 0 c_ m 3 11 c cc 0 Z v 3 0 0 01 V1 0 a) N Notes: 11/11/15 Per KBA: Diff. Press setpoint was set to 8.00 PSI. # enssl aaS 00 2 0 D Boeing 09-53 Boiler Replacement — Functional Performance Test Procedures — Record Version 9-53 Boiler Replacement Gas Solenoid Shutoff Valve - DCN-1 Added ® General Purpose & Watertight Enclosure 2/2 ASCUGas Shutoff Valves SERIES �, r3L s Indication & Proof of Closure (Optional) 8214 �' 3/4" to 3" NPT (200) Re dia Features • Unique double disc design with overtravel provides redundant sealing for leak tight shutoff • Visual indication of open and shut position (Suffix "VI" & "C") • Proof of closure switch 1 amp & visual indicator (Suffix "C") • Silicon -free construction (Suffix "SF") • For on -off control of fuel gas in commercial and industrial gas burners • 1/8" NPT pipe taps with plugs for routine testing • Optional flange adapters for ease of installation and service Fluid REVISION Construction NO±L Valve Parts in Contact with Fluids Body Aluminum Seals and Disc NBR Care Tube 305 Stainless Steel Core Guide POM Rider Ring PTFE Core and Plugnut 430F Stainless Steel Springs 302 Stainless Steel Shading Coil Copper Pipe Plug Zinc -Plated Steel Electrical Standard Coil and Class of Insulation Watt Rating and Power Consumption Ambient Temp.°F Spare Coil Family DC Watts AC General Purpose Watts VA Holding VA Inrush AC DC General Purpose F 35.1 20 43 240 -40 to 125 099257 206410 H 35.1 - - - -40 to 132 - 236825 H - 20 43 240 -40 to 140 222345 - Watertight F 15.8 20.1 48 240 -40 to 125 272610 501695 , H 15.8 20.1 48 240 -40 to 140 272810 440162 Standard Voltages: 24.120, 240 volts AC, 60 Hz (or 110, 220 volts AC, 50 Hz) 12, 24 volts DC. Optional High Ambie Temp:140°F Class H coil with prefix HB (3/4' to 2' AC only), '- ' 140°F Class H coil with prefix HT (3/4" to 2" DC only) 132"F Class H coil with prefix HB (2' High flow to 3' DC Only) Solenoid Enclosures General Purpose: RedHat metal Type 1 General Purpose housing has a 7/8" diameter�,h le to accept standard conduit hubs or connectors. Add prefiR to catalog number for a Junction Box construction with two 7/8" diameter knock -outs. (i.e. JB8214 265) Watertight: RedHat II molded epoxy Type 1, 2, 3, 3S, 4 and 4X combination. General Purpose and Watertight solenoid enclosures with 1/2" conduit hub as standard. Add prefix JKP to Watertight catalog number for a Watrigl,nchoiE G?tGBox. (i.e. JKP82146) CITY OFT V Valve Response Time Opening Time: Less than 1 second Closing Time: Less than 1 second UKWILA SEP 1 1 2015 PERMIT CENTER IEWED FC E COMPLIA PPROVaD EP 18 2015 Approvals UL listed to standard 429 "Electrically Operated Valves," Guide YIOZ, File MP618 Safety Shutoff Valves. FM Approved to Class 7400 "liquid and gas safety shutoff valves." (Suffix VI and C only) CSA Certified to: 1) Standard C22.2 No. 139 "Electrically Operated Valves," File 010381. 2) Automatic Gas Valves Z21.21 (6.5), C/I, File 112872. 3) Automatic Gas Safety Shutoff Valves (3.9), File112872. IS-OoQ37 :d�lW lid 1[I1 `G mThih1[Ti 2/2 SERIES 8214 (200) ASVA Specifications - Standard (English units) Pipe Size (in) Orifice Size (in) Cv Flow Factor Flow Capacity® Fuel Gas Capacity® Operating Pressure Differential (psi) Max. Fluid Temp.°F Catalog Number Const. Ref. Agency Watt Ratting/ Class of Coil Insulation Approx. Shipping Weight (Ibs) ft3/hr Btu/hr Min. Max. AC DC AC DC UL FM CSA AC DC GENERAL PURPOSE 3/4 1 5/8 11 593 593,200 0 5 125 - 8214 235 1 0 - 0 20/F - 5.1 1 1 5/8 21 1132 1.132,300 0 5 125 - 8214 250 1 0 - 0 20/F - 5.0 1 1/4 1 5/8 32 1726 1,725,500 0 5 125 - 8214 260 1 - O - O 20/F - 4.9 1 1/2 1 5/8 35 1887 1.887,200 0 5 125 - 8214 270 1 - 0 - 0 20/F - 4.7 1 1/4 (High Flow) 2 3/32 36 1925 1,925,000 0 5 125 - 8214 265 2 - O - O 20/F - 6.9 1 1/2 (High Flow) 2 3/32 45 2406 2.406.000 0 5 125 - 8214 275 2 0 - 0 20/F - 6.6 2 2 3/32 55 2941 2,940,500 0 5 125 - 8214 280 2 O - O 20/F - 6.2 2 Flow) 3 75 4044 1,044,100 0 5 125 125 8214 285 3 16 7 O 20/H 35.1/F 13.1 (High 2 1/2 3 104 5608 5,607,800 0 5 125 125 8214 290 3 16 0 - O 201H 35.1/F 12.6 3 3 105 5662 5,661,700 0 5 125 125 8214 240 3 16 0 - 0 20/H 35.1/F 11.7 WATERTIGHT 3/4 1 5/8 11 593 593,200 0 5 125 125 8214G236 4 4A 0 - 0 20.1/F 15.8/F 5.1 1 1 5/8 21 1132 1,132,300 0 5 125 125 8214G251 4 4A 0 - 0 20.1/F 15.8/F 5.0 11/4 15/8 32 1726 1,725,500 0 5 125 125 8214G261 4 4A 7 - 0 20.1/F 15.8/F 4.9 11/2 1 5/8 35 1887 1,887,200 0 5 125 125 8214G271 4 4A O - 0 20.1/F 15.8/F 4.7 1 1/4 (Hlgh Flow) 2 3/32 36 1925 1,925,000 0 5 125 125 8214G266 5 5A O - 0 20.1/F 15.8/F 6.9 1 1/2 (High How) 2 3/32 45 2406 2,406,000 0 5 125 125 8214G276 5 5A 0 - 0 20.1/F 15.8/F 6.6 2 2 3/32 55 2941 2,940,500 0 5 125 125 8214G281 5 5A O - O 20.1/F 15.8/F 6.2 0 = Safety Shutoff Valve. O 1" W.C. Drop C 2" W.C. Inlet Pressure, 1.000 Btu/cu.ft. or more, 0.64 Specific Grayly Gas Specifications - Standard (Metric units) Size Size fin) Sizeee (mm) FlowK Factor Flow Capacity O Fuel Gas Capacity ® Operating Pressure Differential (bar) Max. Fluid Temp.°C Catalog Number Const. Ref. Agency Watt Ratting/ Class of Coil Insulation Approx. Shipping Weight (kgs) (m3/hr) Btu/hr Min. Max. AC DC AC DC UL FM CSA AC DC GENERAL PURPOSE 3/4 41 9.4 17 593,200 0 0.3 52 - 8214 235 1 - 0 - 0 20/F - 2.3 1 41 17.9 32 1,132,300 0 0.3 52 - 8214 250 1 0 - 0 20/F - 2.3 1 1/4 41 27.3 49 1.725,500 0 0.3 52 - 8214 260 1 0 - 0 20/F - 2.2 1 1/2 41 29.9 53 1.887,200 0 0.3 52 - 8214 270 1 0 - 0 20/F - 2.1 1 1/4 (High Flow) 53 30.7 55 1,925,000 0 0.3 52 - 8214 265 2 - 0 - 0 20/F - 3.1 1 1/2 (High Flow) 53 38.4 68 2,406,000 0 0.3 52 - 8214 275 2 - 0 - 0 20/F - 2.9 2 53 46.9 83 2.940.500 0 0.3 52 - 8214 280 2 0 - 0 20/F - 2.8 2 (High Flow) 76 64.0 115 4,044,100 0 0.3 52 52 8214 285 3 16 O - 0 20/H 35.1/F 6.0 21/2 76 88.7 159 5.607.800 0 0.3 52 52 8214 290 3 16 0 - O 20/H 35.1/F 5.7 3 76 89.6 160 5,661.700 0 0.3 52 52 8214 240 3 16 0 - 0 20/H 35.1/F 5.3 WATERTIGHT 3/4 41 9.4 17 593,200 0 0.3 52 52 8214G236 4 4A 0 - 0 20.1/F 15.8/F 2.3 1 41 17.9 32 1.132.300 0 0.3 52 52 8214G251 4 4A 0 - 0 20.1/F 15.8/F 2.3 11/4 41 27.3 49 1,725,500 0 0.3 52 52 8214G261 4 4A 0 - 0 20.1/F 15.8/F 2.2 11/2 41 29.9 53 1,887.200 0 0.3 52 52 8214G271 4 4A 0 - 0 20.1/F 15.8/F 2.1 1 1/4 (High Flow) 53 30.7 55 1,925,000 0 0.3 52 52 8214G266 5 5A 0 - 0 20.1/F 15.8/F 3.1 1 1/2 (High Flow) 53 38.4 68 2,406,000 0 0.3 52 52 8214G276 5 5A 0 - 0 20.1/F 15.8/F 2.9 2 53 46.9 83 2.940.500 0 0.3 52 52 8214G281 5 5A 0 - 0 20.1/F 15.8/F 2.8 7 = Safety Shutoff Valve. ® 1" W.C. Drop © 2" W.C. Inlet Pressure, 1,000 Btu/cu.ft. or more, 0.64 Specific Gravity 338 AVA 2/2 SERIES 8214 (200) Dimensions inches (mm) Const. Ref. ABC H J K LMNPR T W 1 in 2.69 4.65 1.86 6.97 3.55 4.14 5.30 2.48 5.95 5.51 2.40 2.20 5.39 mm 68 118 47 177 90 105 135 63 151 140 61 56 137 2 in 3.16 4.64 1.86 7.63 3.55 4.48 6.09 2.48 6.36 5.85 2.81 2.20 6.32 mm 80 118 47 194 90 114 155 63 161 149 71 56 161 3 in 4.13 4.65 1.86 9.62 3.55 5.86 7.80 2.48 7.44 7.23 3.89 2.20 7.95 mm 105 118 47 244 90 149 198 63 189 184 99 56 202 4 in 2.69 3.13 - 6.90 2.11 4.28 5.30 - 4.51 5.47 2.40 1.95 5.39 mm 68.5 80 - 176 53 109 135 - 114 139 61 50 137 4A in 2.69 3.72 - 6.90 2.27 4.4 5.30 4.67 5.5 2.40 2.45 5.39 mm 68.5 94 - 176 58 111 135 - 119 139 61 62 137 5 in 3.16 3.13 - 7.63 2.11 4.66 6.09 - 4.92 5.85 2.81 206. 6.32 mm 80 80 - 194 53 118 155 - 125 149 71 52 161 5A in 3.16 3.72 - 7.6 2.27 4.7 6.09 - 5.08 5.8 2.81 2.45 6.32 mm 80 94 - 193 58 119 155 - 129 148 71 62 161 16 in 4.13 5.49 1.86 10.3 4.13 5.71 7.8 3.31 8.03 7.91 3.89 3.31 6.32 mm 105 147 47 261 105 145 198 84 204 201 99 84 161 R Const. Ref. 1-3, 16 7/8 DIAMETER KNOCKOUT FOR 1/2' CONDUIT CONNECTION BOTH SIDES) 1/8' NPT UPSTREAM PIPE PLUG 2 PLACES NPT BOTH ENDS 1/8' NPT DOWNSTREAM PIPE PLUG 2 PLACES T C Const. Ref. 4, 4A, 5, 5A 1/8` NPT UPSTREAM PIPE PLUG 2 PLACES 1/8` NPT DOWNSTREAM PIPE PLUG 2 PLACES T-^ P 1/2" NPT W 3/4" through 2" - AC constructions can be mounted with solenoid in any position above horizontal. DC constructions must be mounted with solenoid vertical and upright. 2" High Flow through 3" must be mounted with solenoid vertical and upright. )41I7 fI4.111i1i 341 2/2 SERIES 8214 (200) Dimensions inches (mm) Const. Ref. A SC H J K LMNPR 7 W 6 in 2.69 4.64 1.86 9.16 3.55 4.14 5.30 2.48 5.95 5.51 2.40 2.20 5.39 mm 68 118 47 233 90 105 135 63 151 140 61 56 137 7 in 3.16 4.64 1.86 9.54 3.55 4.48 6.09 2.48 6.36 5.85 2.81 2.20 6.32 mm 80 118 47 242 90 114 155 63 161 149 71 56 161 8 in 4.13 4.65 1.86 12.03 3.55 5.86 7.80 2.48 7.44 7.23 3.89 2.20 7.95 mm 105 118 47 306 90 149 198 63 189 184 99 56 202 9 in 2.69 3.15 - 9.12 2.11 4.28 5.30 - 4.51 5.47 2.40 2.06 5.39 mm 68 80 - 232 53 109 135 - 144 139 61 52 137 10 in 3.16 3.15 - 9.54 2.11 4.66 6.09 - 4.92 5.85 2.81 2.06 6.32 mm 80 80 - 242 53 118 155 - 125 149 71 52 161 B J -+ Const. Ref. 6-8 M 71E DIAMETER KNOCKOUT FOR 1PY CONDUIT CONNECTION (BOTH SIDES) N N 1/S. NPT UPSTREAM PIPE PLUG 2 PLACES NPT BOTH ENOS 1/B. NPT DOWNSTREAM PIPE PLUG 2 PLACES Const. Ref. 9, 10 1/2' NPT UPSTREAM PIPE PLUG 2 PLACES NPT BOTH ENDS 1/8° NPT DOWNSTREAM PIPE PLUG 2 PLACES Visual Indication constructions (Suffix VI) must be mounted with solenoid vertical and upright. 342 2/2 SERIES 8214 (200) Dimensions inches (mm) Const. Ref. A BCF GHJKLMNP R T UWY 11 in 2.69 4.64 1.86 2.91 2.60 10.99 3.55 4.14 5.30 2.48 5.95 5.51 2.40 2.20 1.18 5.39 1.69 mm 68 118 47 74 66 279 90 105 135 63 151 140 61 56 30 137 43 12 in 3.16 4.64 1.86 2.91 2.60 11.36 3.55 4.48 6.09 2.48 •6.36 5.85 2.81 2.20 1.18 6.32 1.69 mm 80 118 47 74 66 289 90 114 155 63 161 149 71 56 30 161 43 13 in 4.13 4.65 1.86 2.91 2.60 13.88 3.55 5.86 7.80 2.48 7.44 7.23 3.89 2.20 1.18 7.95 1.69 mm 105 118 47 74 66. 352 90 149 198 63 189 184 99 56 30 202 43 14 in 2.69 3.15 2.91. 2.58 10.95 2.11 4.28 5.30 - 4.51. 5.47 2.40 2.06 1.18 5.39 1.69 mm 68 80 - 743 66 278 53 109 135 - 114 139 61 52 30 137 43 � i 3..16. 3.17: - 2.91 2.58 11.36 2.1 4.66 6.09 - 4.92 5.85 2.81 2.06 1.18 6.32 1.69 m~80 80. 74 66 289 53 118 155 - 125 149 71 52 30 161 43 R Const. Ref. 11-13 r. %IH ❑IAMFTFR KNOCKOUT FOR / 1!2' CON2UP CONNECTION / (BOTH SIDES) 1/e' NPT �-I UPSTREAM NPT f t'I PIPE BOTH ENDS 2PLACES now _ 1/EK NPT DOWNSTREAM PIPE PLUG 2 PLACES G L N Const. Ref. 14, 15 N 8 J - vs. NPT UPSTREAM PIPE PLUG 2 PLACES 1/E' NPT DOWNSTREAM PIPE PLUG 2 PLACES Proof of Closure constructions (Suffix C) must be mounted with solenoid vertical and upright. 343 11UM7 1 2/2 SERIES 8214 (200) ASVA Dimensions inches (mm) Flange Adapters B1 H1 L1 HEX 3/4' 1' in 4.8 2.5 1;27 2.5 mm 122 76 32 64 1 1/4" - 2 in 5 3.56 1.38 3 mm 127 90 35 76 2' (High Flow) 3' in 7 4.5 2.015 4.5 mm 178 114 51 114 Flange Adapter Kits (Optional)* Pipe Size (in) Inlet & Outlet Adapter/Hardware Kit Approx. Shipping Weight fibs) 3/4 296659-001 1.6 1 296659-002 1.5 11/4 296659-003 1.3 1 1/2 296659-004 1.2 1 1/4 (High Flow) 296659-005 2.4 1 1/2 (High Flow) 296659-006 2.1 2 296659-007 1.7 2 (High Flow) 296659-008 6.6 2 1/2 296659-009 6.0 3 296659-010 4.9 * Please refer to the Double Gas Shutoff Valves catalog pages for more kit information. General Purpose Rebuild Kits Pipe Size (in) Standard Rebuild Kit Suffix AC DC 3/4,1 1/4, 1 1/2, 2 None 323632 323946 VI 323637 - 11/4 (High Flow), None 323499 323522 11/2 (High Flow), 2 VI 323501 - 2 Flow), 2 1/2, 3 None 323947 325565 (High VI 323948 Watertight Rebuild Kits Pipe Size (in) Standard Rebuild Kit Suffix AC DC None 323939 325741 3/4. 1 1/4, 1 1/2. 2 VI 323941 11/4,11/2,2 None 323538 325742 VI 323539 - 344 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0088 DATE: 09/11/15 PROJECT NAME: BOEING #9-53 SITE ADDRESS: 9725 E MARGINAL WAY S Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued X Revision # 1 after Permit Issued DEPARTMENTS: AT iff Building Division Building Division Public Works ❑ Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 09/15/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/13/15 Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg D Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0088 DATE: 07/10/15 PROJECT NAME: BOEING #9-53 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Auk, Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator n PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 07/14/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08/11/15 Approved Corrections Required Approved with Conditions n Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 Received at the City of Tukwila Permit Center by: Q--Entered in Permits Plus on Q~ t I L44- see RECEIVED ITv OF TuKW!LA 112015 PERMIT CENTER City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fa., etc. Date:CAllik Plan Check/Permit Number: 01 is an b Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: 2,0e_ t neS � Project Address: _l �SV t;1t.V Contact Person: 6r i.Q, Phone umber: 7,b(ptS0k.5.30 Summary of Revision: ?rov'ck_ s2M.n�nc� stre-e-g-crt-ei9 VA-avc m. Sheet Number(s):' Y 1-1 .7.-- ......_1121K-- "Cloud" or highlight all areas of revision nclu� ding da revis/pn,, .-----/ H:\Applications\Fours-Applications On Line\2010 Applications \7-2010 - Revision Submittal.doc Revised: May 2011 PROJECT NAME: PERMIT NO: SITE ADDRESS: C1 ys -bun' N,'t. W1 S ORIGINAL ISSUE DATE: 1—)Q /S .EVIS ON IOG mi-s-oogg REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIAL Summary of Revision: t e ANy 4.� & Lv4 - d j� 04.4404 vctl v-c ov )-j' a_� f t cep s - r m� boi l r ✓i Received hryi d,.i) AA— V S REVISION N• DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED ,i ATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: 32" PANEL AXIAL FAN MOUNTED 10'-6" TO C A.F.F. 36" x 36" WALL LOUVER WITH BACK DRAFT DAMPER A° TEF PIP FL EMERGENCY AIR COMPRESSOR FROM BLDG AIR 100 PSIG 18"X96" INTAKE AIR LOUVER ABOVE DOOR MINATE 8" CHWR NG W/ 8" BFV AND NGE FOR FUTURE A6 2 1M452 M503 A9 CRONE CONTL - - - -VALVE - -- T EF-4 2" 0 REFRIGERANT VENT SEE DETAIL 1 M452 1M505 GAYLORD #800A 1000 CFM MAHU iY " 4 3/4' PW 2—TYPICAL SEE DETAIL 2 2"0 1M452 1M505 TERMINATE 10" CHWS PIPING W/ BLIND FLANGE FOR FUTURE CONNECTION TO CH 3 1 PENN VENTILATION MODEL #BLL24 WALL EXHAUST FAN, 12" AFF, 2"CLWS FROM FILTER 1200 CFM, .25" TSP, PUMP, F-1 (TYP. 1/2 HP, 120 VOLT FOR F-2) MOTOR 2"CLWS TO FILTER PUMP, F-1 (TYP. FOR F-2) B 4" COOLING TOWER DRAIN A 3A TO FFD 1M452 M503 8" o VENT DUCT` SEE 1M515 FOR CON'T CH �U) -CO 120 U U ,C H • VTR 11' 8" 0 CWR UP TO COOLING TOWER TYP. 2" 0 - r 1% "U P TO TOWER#2 Co 8"0 WS UP TO C OLING TOWER TYP. U) U CH CH v) U 03 O 1 CH `L PW i u U CO c 10" 0 CHW L;,_ P-5 900 GPM -e, 100 GAL. AIR RECEIVER CO\TROL /REFRIGERATED AIR DRYER AIR FILTER PRV A 1— v1ICRON 100/20 PSIG C AGRAV 1 M451 P-2 750 GPM 355) P-4 900 GPM TAPPING FOR FUTURE ANNUBAR FITTING PANEL TO CONTROL 1M452 1M505 P 750 GFM B5 —(3 COMBUSTION AIR LOUVERS) ONE — 36" x 24" @ 4'-10" A.F.F. ONE — 12" x 24" @ 14" A.F.F. ONE — 12" x 24" @ 12'-0" A.F.F. Fe EXPANSION TANK ET-1 AIR SEPARATOR A5-1 —7" (SAS APPRC 18 A.F.F. GAS REGUL \TOR /WATER METER BELOW P-7 1500 GPM r.� LJ �10" 3„ =.D. TYP. L I I BFP I— " NV 4-P 7A (' 0 U U 3" HWS & HWR 10" DECOUPLER BYPASS SEPARATE PERMIT F kQUIRED FOR: 0 Mechanical C9-itectrtcst tumbing !YGas Piping :ty of Tukwila St.F,i.z,'WG DIVISION 10" CH\VR 10" CH\VS 3 1M452 505 B°9 (3 Irv 452 1M505 C )< 4" DOVI. WATER FOR CONTINUATION OF DOM. WATER, GAS & COMPRESSED AIR, SEE PLUMBING DRAWINGS M-102 & M-108 PRESSURE REDUCING VALVE APPROX. 30" A.F.F. 4" DOM. WATER UP 2" PRESSURE REDUCING VALVE (45 PSIG) 2" BACKFLOW P.R.V. 2" VALVE 2" IW FOR HVAC SYSTEMS DDC CONTROL PANELS —{ AIR RECEIVER 100 GAL T'STAT SET AT 65°F SEE CNTL AIR DIAGRAM .6 SEE DETAIL TYP. 1M452 1M505 1 1M452 1M505 1M505 SEE DETAIL TYP. 1M452 1M505 6"x 10" REDUCER 4" C.W. TO BLDG. LE COPY Permit No. (\,5— Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By: Date: City of Tukwila BUILDING DIVISION REVISIONS No changes shell he' l� made to the scope of work withoi.,t prior approval of Tukwila Building Division. NQT�: Previsions will require a new plan submittal and may include additional plan review fw s. LFG 3 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD—RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI —PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065—SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUMI VALVE PACKAGE. BELL AND GOSSETT ROLAIRTROL MODEL# R3 AIR SEPARATOR, 3" INLET/OUTLET. 4 > AXIOM INDUSTRIES MODEL NT25 CONDENSATE NEUTRALIZATION TANK, 4.8 GAL. TANK, 45 GAL/HR CAPACITY, (2) 1" NPT INLET/OUTLET CONNECTIONS. CORROSION RESISTANT POLYPROPYLENE TANK AND LID. ASCO REDHAT 2/2 SERIES 8214 GAS SOLENOID VALVE, 2" NPT INLET AND OUTLET, NORMALLY OPEN, 120V/1PH. GE\ - RAC \OT =S 1. SEE MOA FOR GENERAL NOTES. 2. SEE HEATING WATER PIPING DIAGRAM ON SHEET M312. CO\STRCT O\ \OTIS RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206-947-4897 NEW HEATING HOT WATER CONDENSING BOILERS HWG-1 & HWG-2. ANCHOR BOILERS THROUGH MANUFACTURER —PROVIDED 1/2" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 1/2" DIAMETER HILTI KB—TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-5/8 IN. EMBEDMENT (3-1/4" EFFECTIVE). INSTALLATION AND MINIMUM EDGE DISTANCES PER ESR-1917. ROUTE NEW 6" STAINLESS STEEL FLUE UP THROUGH EXISTING ROOF OPENINGS. ROOF REPAIR, FLASHING AND SEALING BY G.C. NEW HEATING HOT WATER PUMPS P-8 AND P-8A. PROVIDE PUMPS SIMILAR IN SIZE TO EXISTING. SEE PUMP SCHEDULE FOR REVISED WATER GPM. ANCHOR PUMPS THROUGH MANUFACTURER —PROVIDED 5/8" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 5/8" DIAMETER HILTI KB—TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-9/16 IN. EMBEDMENT (3-1/8" EFFECTIVE). INSTALLATION AND MINIMUIv EDGE DISTANCES PER ESR-1917. PROVIDE NEW FLOOR MOUNTED EXPANSION TANK ET-2. PROVIDE NEW AIR SEPARATOR AS-2. PROVIDE NEW CONDENSATE NEUTRALIZER TANK. SEE 1M312 FOR 1 E j PROVIDE EMERGENCY GAS SHUTOFF SOLENOID VALVE ON 2" GAS SERVICE UPSTREAM OF BOILERS. SEE ELECTRICAL DWGS FOR 120V POWER CONNECTION AND EMERGENCY SHUTOFF SWITCH LOCATION. = ERE\C DRAW \GS 9-53-1M312 CHILLED & HOT WATER PIPI 9-53—M362 SCHEDULE — MECHANICAL 9-53-1M505 MACHINERY ROOM SECTIONS REVISION 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 REVIEWED FOR ( : OMPLIANCE J I PPROVED 8e DETAILS SEP 18 2015 City of Tukwila BUILDING DIVISION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 E DESIGN SILICA WATER SOFTENER 12337243 M.WONG RWS 11.09.11 A INSTALL (2) CHILLERS 703544-00 KGP 3/09/01 F REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 B NEW VENTING PLAN FOR J#703544-00 J#703544-00 KGP 6/05/01 REPLACE BUILDING BOILERS—DCN #1 23910 SAZAN/GB 09.02.15 INSTALL CONDENSER CONTROL VALVES J#315796-00 KGP 05.08.02 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SRL DATE 8.4.85 CHECKED DPN 8.4.85 SUBTITLE MACHINERY ROOM PARTIAL PIPING PLAN CURRENT REVISION 23910 SYMBOL G DATE 09.02.15 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED TITLE REPLACE BUILDING BOILERS BUILDING 9-53 SHEET 452 JOB NO. 23910 COMP NO. GBOGGIE: 09/02/2015 9:38:06 AM INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 APPROVED MECHANICAL MASTER COL. A.4—C/-2-1 DEV. CENTER, WA DWG NO. 9-53-1M452 EXPANSION TANK ET-1 AIR SEPARATOR A5-1 —7" (SAS APPRC 18 A.F.F. GAS REGUL \TOR /WATER METER BELOW P-7 1500 GPM r.� LJ �10" 3„ =.D. TYP. L I I BFP I— " NV 4-P 7A (' 0 U U 3" HWS & HWR 10" DECOUPLER BYPASS SEPARATE PERMIT F kQUIRED FOR: 0 Mechanical C9-itectrtcst tumbing !YGas Piping :ty of Tukwila St.F,i.z,'WG DIVISION 10" CH\VR 10" CH\VS 3 1M452 505 B°9 (3 Irv 452 1M505 C )< 4" DOVI. WATER FOR CONTINUATION OF DOM. WATER, GAS & COMPRESSED AIR, SEE PLUMBING DRAWINGS M-102 & M-108 PRESSURE REDUCING VALVE APPROX. 30" A.F.F. 4" DOM. WATER UP 2" PRESSURE REDUCING VALVE (45 PSIG) 2" BACKFLOW P.R.V. 2" VALVE 2" IW FOR HVAC SYSTEMS DDC CONTROL PANELS —{ AIR RECEIVER 100 GAL T'STAT SET AT 65°F SEE CNTL AIR DIAGRAM .6 SEE DETAIL TYP. 1M452 1M505 1 1M452 1M505 1M505 SEE DETAIL TYP. 1M452 1M505 6"x 10" REDUCER 4" C.W. TO BLDG. LE COPY Permit No. (\,5— Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By: Date: City of Tukwila BUILDING DIVISION REVISIONS No changes shell he' l� made to the scope of work withoi.,t prior approval of Tukwila Building Division. NQT�: Previsions will require a new plan submittal and may include additional plan review fw s. LFG 3 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD—RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI —PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065—SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUMI VALVE PACKAGE. BELL AND GOSSETT ROLAIRTROL MODEL# R3 AIR SEPARATOR, 3" INLET/OUTLET. 4 > AXIOM INDUSTRIES MODEL NT25 CONDENSATE NEUTRALIZATION TANK, 4.8 GAL. TANK, 45 GAL/HR CAPACITY, (2) 1" NPT INLET/OUTLET CONNECTIONS. CORROSION RESISTANT POLYPROPYLENE TANK AND LID. ASCO REDHAT 2/2 SERIES 8214 GAS SOLENOID VALVE, 2" NPT INLET AND OUTLET, NORMALLY OPEN, 120V/1PH. GE\ - RAC \OT =S 1. SEE MOA FOR GENERAL NOTES. 2. SEE HEATING WATER PIPING DIAGRAM ON SHEET M312. CO\STRCT O\ \OTIS RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206-947-4897 NEW HEATING HOT WATER CONDENSING BOILERS HWG-1 & HWG-2. ANCHOR BOILERS THROUGH MANUFACTURER —PROVIDED 1/2" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 1/2" DIAMETER HILTI KB—TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-5/8 IN. EMBEDMENT (3-1/4" EFFECTIVE). INSTALLATION AND MINIMUM EDGE DISTANCES PER ESR-1917. ROUTE NEW 6" STAINLESS STEEL FLUE UP THROUGH EXISTING ROOF OPENINGS. ROOF REPAIR, FLASHING AND SEALING BY G.C. NEW HEATING HOT WATER PUMPS P-8 AND P-8A. PROVIDE PUMPS SIMILAR IN SIZE TO EXISTING. SEE PUMP SCHEDULE FOR REVISED WATER GPM. ANCHOR PUMPS THROUGH MANUFACTURER —PROVIDED 5/8" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 5/8" DIAMETER HILTI KB—TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-9/16 IN. EMBEDMENT (3-1/8" EFFECTIVE). INSTALLATION AND MINIMUIv EDGE DISTANCES PER ESR-1917. PROVIDE NEW FLOOR MOUNTED EXPANSION TANK ET-2. PROVIDE NEW AIR SEPARATOR AS-2. PROVIDE NEW CONDENSATE NEUTRALIZER TANK. SEE 1M312 FOR 1 E j PROVIDE EMERGENCY GAS SHUTOFF SOLENOID VALVE ON 2" GAS SERVICE UPSTREAM OF BOILERS. SEE ELECTRICAL DWGS FOR 120V POWER CONNECTION AND EMERGENCY SHUTOFF SWITCH LOCATION. = ERE\C DRAW \GS 9-53-1M312 CHILLED & HOT WATER PIPI 9-53—M362 SCHEDULE — MECHANICAL 9-53-1M505 MACHINERY ROOM SECTIONS REVISION 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 REVIEWED FOR ( : OMPLIANCE J I PPROVED 8e DETAILS SEP 18 2015 City of Tukwila BUILDING DIVISION SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 E DESIGN SILICA WATER SOFTENER 12337243 M.WONG RWS 11.09.11 A INSTALL (2) CHILLERS 703544-00 KGP 3/09/01 F REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 B NEW VENTING PLAN FOR J#703544-00 J#703544-00 KGP 6/05/01 REPLACE BUILDING BOILERS—DCN #1 23910 SAZAN/GB 09.02.15 INSTALL CONDENSER CONTROL VALVES J#315796-00 KGP 05.08.02 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SRL DATE 8.4.85 CHECKED DPN 8.4.85 SUBTITLE MACHINERY ROOM PARTIAL PIPING PLAN CURRENT REVISION 23910 SYMBOL G DATE 09.02.15 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED TITLE REPLACE BUILDING BOILERS BUILDING 9-53 SHEET 452 JOB NO. 23910 COMP NO. GBOGGIE: 09/02/2015 9:38:06 AM INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 APPROVED MECHANICAL MASTER COL. A.4—C/-2-1 DEV. CENTER, WA DWG NO. 9-53-1M452 IL 9-05 BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 SUMMARY OF WORK REMOVE EXISTING GAS FIRED ATMOSPHERIC SHELL AND TUBE BOILERS, PRIMARY HEATING HOT WATER PUMPS, HEATING SYSTEM EXPANSION TANK, AIR SEPARATOR, AND RELATED PIPING AND APPURTANCES. PROVIDE NEW GAS FIRED FULL CONDENSING BOILERS (SIMILAR CAPACITY TO EXISTING BOILERS), HEATING HOT WATER PUMPS, EXPANSION TANK, AIR SEPARATOR, RELATED PIPING, AND APPURTANCES. CONNECT TO EXISTING 3" BUILDING HOT WATER HEATING PIPING. PROVIDE NEW INSULATION ON ALL NEW PIPING, FITTINGS, AND EQUIPMENT AS REQUIRED PER CODE. PROVIDE NEW BOILER FLUE EXHAUST. COMBINE STACKS PRIOR TO LEAVING THE ROOM AND PENETRATE THE ROOF (EXISTING OPENING) WITH ONE STACK. TERMINATE 4'-0" ABOVE THE ROOF WITH VENT CAP. PATCH AND REPAIR ROOF OPENINGS. CONNECT BOILER CONTROLS TO EXISTING SITE ECMS SYSTEM. PROVIDE CONTACTS AND POINTS AS SHOWN ON DRAWINGS. COMMISSION OPERATION OF THE NEW BOILER SYSTEM AND DOCUMENT RESULTS TO VERIFY OPERATIONAL COMPLIANCE WITH CONSTRUCTION DOCUMENTS AND MANUFACTURER'S SPECIFICATIONS. SHEET NO. GO MOA MOB 1M312R 1M452R M362 1M60 1 M312 1M452 M505 M507 1E502R 1E502 E501 SHEET INDEX DRAWING TITLE COVER SHEET LEGEND, ABBREVIATION, AND NOTES MECHANICAL LEGEND CHILLED AND HOT WATER PIPING DIAGRAMS —REMOVAL MACHINERY ROOM PARTIAL PIPING PLAN —REMOVAL PLAN SCHEDULE — MECHANICAL EQUIPMENT CHILLED AND HOT WATER PIPING PLAN CHILLED AND HOT WATER PIPING DIAGRAMS MACHINERY ROOM PARTIAL PIPING PLAN MACHINERY ROOM SECTIONS AND DETAILS BOILER SYSTEM CONTROLS MACHINE ROOM POWER PLAN REMOVAL MACHINE ROOM POWER PLAN MCC-1 & MCC-2 SCHEDULE gO 9 pc. p© c40 © REA O OF WORK PROJECT LOCATION PLAN P=e..:aItNo. Plan review approval is Approval of construction tha violation of any approved Reid RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER City of Tu BUILDING DIVISION No changes shaft ma o to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. SEPARATE PERMIT 'EQUIRED FOR: 0 r "echank:al Gd'Etectrical 'Iumbing iii•Gas Piping City of Tukwila BUILDING DIVISION 98 WED FOR 9QIDE CQMPLIANQE APPROVED 'JUL 15 2015 City oi'Tukwila WING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 N Tel 206.267.1700 Fax 206.267.1701 SAZAN #443-1373 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 Q� BOE/N o-- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE COVER SHEET CURRENT REVISION 23910 SYMBOL A DATE 01.16.15 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE . REPLACE BUILDING BOILERS BUILDING 09-53 COL. A.4—C/-2-1 SHEET GO JOB NO. 23910 COMP NO. DWG NO. 19 /77 /7(114 R•51.9(1 AM Expires: 05/02/16 ARCHITECTURAL MASTER DEV. CENTER, WA 09-53—GO MECHANICAL LEGEND SYMBOL DESCRIPTION MECHANICAL LEGEND SYMBOL DESCRIPTION GENERAL CONSTRUCTION NOTES - 1. PLANS ARE DIAGRAMMATIC AND DO NOT SHOW ALL BRANCHES, VALVES, SPECIALTIES AND EQUIPMENT. SYM A AAV AD ADD AF AFF AP AUD AVG BI BDD BFP BHD BHP BOD BOP BOS BTU BTU H BW C Cv `C CAP CC CCW CFM CI CONN CPLG CW DA DB DBD DIA, DN DS DWG dB EA EAT EFF ELL ELEV, EL ESP EVAP EWT EXH EXIST EXT `F FC FLR FOB FOF FOIC FOT FPM FS FT FV ANCHOR AUTOMATIC AIR VENT ACCESS DOOR ANGULAR DOWN DISCHARGE AIR FOIL WHEEL ABOVE FINISHED FLOOR ACCESS PANEL ANGULAR UP DISCHARGE AVERAGE BACKWARD INCLINED WHEEL BACK DRAFT DAMPER BACKFLOW PREVENTER BOTTOM HORIZONTAL DISCHARGE BRAKE HORSE POWER BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM OF STEEL BRITISH THERMAL UNIT BRITISH THERMAL UNIT PER HOUR BUTTWELD COMMON FLOW COEFFICIENT TEMPERATURE - DEGREES CELSIUS CAPACITY COOLING COIL COUNTER CLOCKWISE ROTATION CUBIC FEET PER MINUTE CAST IRON CENTER LINE CONNECTION COUPLING CLOCKWISE ROTATION DIRECT ACTING DRY BULB TEMPERATURE DOWN BLAST DISCHARGE DIAMETER DOWN DOWNSPOUT DRAWING DECIBELS EXHAUST AIR / EACH ENTER AIR TEMPERATURE CO EFFICIENCY ELBOW ELEVATION EXTERNAL STATIC PRESSURE EVAPORATOR ENTERING WATER TEMPERATURE EXHAUST EXISTING EXTERIOR / EXTERNAL TEMPERATURE - DEGREES FAHRENHEIT FORWARD CURVE WHEEL FLOOR FLAT ON BOTTOM FACE OF FLANGE FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FLAT ON TOP FEET PER MINUTE FLOW SWITCH FEET FACE VELOCITY FPM GAL GALLONS GPM GALLONS PER MINUTE GALV GALVANIZED GA GAGE, GAUGE HC HEATING COIL HD HEAD - FEET OF WATER HORIZ HORIZONTAL HP HORSEPOWER HPC HIGH PRESSURE CONDENSATE HR HOUR HVAC HEATING, VENTILATING AND AIR CONDITIONING ID INSIDE DIAMETER IE INVERT ELEVATION IGV INLET GUIDE VANE IN INCHES KW KILOWATT KVA KILOVOLT -AMPERE LAT LBS, LWT MA MAX MBH MCC MIN MOV MTD, MTG LEAVING AIR TEMPERATURE (`F) POUNDS LEAVING WATER TEMPERATURE ('F) MIXED AIR MAXIMUM HEAT CAPACITY BTU PER HOUR X 1000 MOTOR CONTROL CENTER MINIMUM MOTOR OPERATED VALVE MOUNTED, MOUNTING REVISION BY APPROVED DATE NC NIC NO NTS NPSH OA OBD OF OS&Y OD PBD PD/o P POS PRESS PRV PS PSIG PSV RA RECT REF RH RM ROT RPM RQD RTN SA SCFM SHC SHF SO SOV SP SQ SS STL SW SUCT SV TDH TEMP TH THC THD THRD TOD TOS TOP TP TS TSP TV TIP UBD VAV VD VP VERT VTA VTR WB WG W/ NOTES: NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN / NUMBER NOT TO SCALE NET POSITIVE SUCTION HEAD OUTSIDE AIR OPPOSED BLADE DAMPER OVERFLOW OUTSIDE SCREW AND YOKE OUTSIDE DIAMETER PARALLEL BLADE DAMPER PRESSURE DROP OR DIFFERENTIAL PRESSURE POSITION PRESSURE PRSSURE REGULATING VALVE PRESSURE SWITCH PRESSURE - POUNDS PER SQUARE INCH, GAUGE PRESSURE RELIEF (SAFETY) VALVE REVERSE ACTING (CONTROLLER) / RETURN AIR RECTANGULAR REFERENCE RELATIVE HUMIDITY ROOM ROTATION REVOLUTIONS PER MINUTE REQUIRED RETURN SUPPLY AIR CUBIC FEET OF AIR, AT STANDARD CONDITIONS SENSIBLE HEAT CAPACITY SENSIBLE HEAT FACTOR SCREENED OPENING SOLENOID OPERATED VALVE STATIC PRESSURE SQUARE STAINLESS STEEL STEEL SOCKET WELD SUCTION SAFETY RELIEF VALVE TOTAL DYNAMIC HEAD (FEET OF WATER) TEMPERATURE TOTAL HEAD (FEET OF WATER) TOTAL HEAT CAPICITY TOP HORIZONTAL DISCHARGE THREADED TOP OF DUCT TOP OF STEEL TOP OF PIPE TOTAL PRESSURE TEMPERATURE SWITCH TOTAL STATIC PRESSURE TURNING VANE TYPICAL UP BLAST DISCHARGE VARIABLE AIR VOLUME VOLUME DAMPER VELOCITY PRESSURE VERTICAL VENT TO ATMOSPHERE VENT THROUGH ROOF WET BULB TEMPERATURE WATER GAUGE (INCHES OF WATER) WITH DESIGNATES EQUIPMENT APPEARING ON MECHANICAL EQUIPMENT SCHEDULES, SEE DRAWINGS STARTING 0M15-6 FOR DESCRIPTION. 2. SEE DRAWING M 1 B FOR ABBREVIATIONS OF PIPING, IDENTIFICATIONS AND SPECIALTIES. 3. SEE CONTROL SCHEMATIC(S) FOR ADDITIONAL ABBREVIATIONS AND SYMBOLS RELATING TO CONTROL SYSTEMS. 4. DIFFUSERS WITHOUT ARROWS TO INDICATE AIR FLOW DIRECTION ARE FOR FLOW IN ALL DIRECTIONS (TWO DIRECTIONS FOR LINEAR DIFFUSERS). ARROWS ARE USED TO INDICATE DESIRED AIR FLOW DIRECTIONS IN OTHER CASES. SYM REVISION BY APPROVED A A DATE 2. ALL PIPING, VALVES AND EQUIPMENT ARE TO BE REMOVED IN DEMOLITION AREAS. 3. VALVES INDICATED FOR SHUT-OFF ISOLATION ARE SHOWN IN APPROXIMATE LOCATIONS. REFER TO REFERENCED BLDG. DRAWINGS FOR DETAILED SYSTEMS. 4. FIELD VERIFY EXACT LOCATIONS VALVES, EQUIPMENT AND PIPING. 5. CONTRACTOR TO VERIFY SYSTEM SHUT DOWN PRIOR TO ANY REMOVAL WORK. ACAL/ASIC LAB RELOCATION 12787 SAZAN/SS 07.12.12 RECORD DRAWING 12787 SAZAN/SS 08.13.13 A REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 CONT ACTO TO -OP N VAL ES A OMPL ION •F RE OVAL, CAP, & CUT TO RESTORE SYSTEM OPERATION WHERE REQUIRED. ER 7. SYSTEM SHUT DOWN REMOVAL, CUT & CAP SHALL ONLY BEGIN AFTER NEW, RE-ROUTED SYSTEM IS IN PLACE FOR SERVICE CONTINUITY WHERE REQUIRED. 8. ALL SYSTEMS SHALL BE DRAINED AND DISPOSAL OF FLUIDS HANDLED AS REQUIRED PER BOEING STANDARDS AND BOEING EHS REPRESENTATIVES PAUL YOUNT AND PAUL MORIN. 9. MECHANICAL DRAWINGS SHOW DISCONNECT AND RECONNECT POINTS AT THE PROJECT'S BOUNDARIES. AN ATTEMPT WAS MADE TO SHOW MAJOR MECHANICAL UTILITY WORK WITHIN THE PROJECT'S BOUNDARIES. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL/DISPOSAL OF ALL MECHANICAL 'WORK WITHIN THE PROJECT'S BOUNDARY. ENERGY CODE COMPLIANCE NOTES 1. NEW MECHANICAL SYSTEMS TO COMPLY WITH SECTION C403 OF THE WSEC. - CONTRACTOR TO SUBMIT TAB REPORT COMMISSIONING REPORT, CONTROLS TEST REPORT, RECORD DRAWNGS, TRAINING DOCUMENTATION. 2. ZONE TEMPERATURE CONTROL SHALL BE CAPABLE OF A DEADBAND OF AT LEAST 5° F. 3. THERMOSTATS SHALL BE 7 DAY PROGRAMMABLE WITH MANUAL OVERRIDE FOR TEMPORARY OPERATION UP TO TWO HOURS. 4. HVAC SYSTEM AUTOMATIC TEMPERATURE CONTROL SHALL PREVENT SIMULTANEOUS HEATING AND COOLING. 5. ALL DUCT SYSTEMS SHALL BE INSULATED PER SECTION C403 OF WSEC. PIPING SYSTEMS SHALL BE INSULATED PER TABLE C403.2.8 OF WSEC. ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS IN DUCT SYSTEM SHALL BE SEALED AIRTIGHT. 7. ALL LOW PRESSURE DUCT SYSTEMS SHALL BE SEALED TO A LEAKAGE RATE NOT TO EXCEED 6% OF THE FAN FLOW. 8. ECONOMIZERS SHALL BE CAPABLE OF PROVIDING 100% OF THE DESIGN SUPPLY AIR AS OUTSIDE AIR FOR FREE COOLING. 9. OUTSIDE AIR INTAKES SERVING CONDITIONED SPACE SHALL BE EQUIPPED WITH MOTORIZED DAMPERS WHICH CLOSE AUTOMATICALLY WHEN SYSTEM IS OFF OR UPON POWER FAILURE. DAMPER LEAKAGE RATE SHALL COMPLY WITH SECTION C403 OF THE WSEC. 10. AIR HANDLING SYSTEMS WITH CAPACITY EXCEEDING 2000 CFM SHALL HAVE OPTIMUM START CONTROLS. Q� BOE/NG p— ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SUBTITLE LEGEND, ABBREVIATIONS, AND NOTE TITLE REPLACE BUILDING BOILERS BUILDING 09-53 REVWED FOR 9ODE COMPLIANCE APPROVED JUL 15 2015 City of ukwlta i .DING DIVISION AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 JOB NO. 23910 COMP NO. Expires: 05/02/16 APPROVED ItAFP IANIIrAI WC -TM fl1\/ f`I t�ITI= D UMDWG NO. n�_n��_renA vECHA\ICAL LEGEND SYMBOL DESCRIPTION GENERAL NEW WORK EXISTING WORK ///////// EXISTING TO BE REMOVED - - HIDDEN OR BELOW GRADE CROSSING LINES, NO CONNECTION -++- CONNECTING LINES AHU MARK NUMBER VTEQUIPMENT PUMP ---@} INSULATED PIPE S— INSULATED PIPE WITH ELECTRIC HEAT TRACING - — — POINT OF CONNECTION • PIPE IDENTIFICATIO\ COMPRESSED AIR, PLANT --IAI ACID WASTE IAWI CONDENSATE RETURN (GRAVITY) ICI CHEMICAL FEED CFI CHILLED WATER RETURN —I CHWR I— CHILLED WATER SUPPLY —I CHWS I— CORROSION RESISTANT VENT —ICRVI— CORROSION RESISTANT WASTE —ICRWI— COOLING TOWER FILTER RETURN —ICTFW-- COOLING TOWER FILTER SUPPLY COOLING TOWER RETURN —ICTRI— COOLING TOWER SUPPLY —ICTS1— DOMESTIC COLD WATER —ICWI DEIONIZED WATER --IDII DISTILLED WATER IDWI FIRE LINE, AHEAD OF ALARM VALVE ITl FUEL OIL RETURN FUEL OIL SUPPLY FUEL OIL VENT —IFOVI— NATURAL GAS --IG REFRIGERANT HOT GAS DISCHARGE —IHGDI-- CONDENSATE RETURN (PRESSURE) IIIPR STEAM SUPPLY (HIGH PRESS, 125-250 PSIG) —IHPSI DOMESTIC HOT WATER SUPPLY IIWI DOMESTIC HOT WATER CIRCULATING —IHWCI— HEATING WATER RETURN IIIWRI HEATING WATER SUPPLY —IHWSI— INSTRUMENT AIR —!IA INDIRECT DRAIN ----HD INDUSTRIAL WASTE IW LIQUID PETROLEUM GAS —ILPGI— S STEAM SUPPLY (MEDIUM PRESS, 15-125 PSIG) —{MPSI— TR-1 CONDENSATE RETURN (PUMPED) PROCESS WATER If WI REFRIGERANT DISCHARGE IRDI REFRIGERANT LIQUID —IRLI REFRIGERANT SUCTION (GAS) —IRS] MECHANICAL LEGEND SYMBOL DESCRIPTION RAIN WATER LEADER --I Pk 1— ISI SPRINKLER LINE - SANITARY WASTE BELOW GRADE OR FLOOR --ISANI- SANITARY WASTE ABOVE GRADE OR FLOOR —ISANI— STEAM SUPPLY —MITI— I-- STORM DRAIN --I STS VACUUM —I VAC I— ----E0---- VENT PIPE FITTINGS X I Y PIPING MATERIAL CHANGE, X TO Y SCREWED FITTING OR AS SPECIFIED I 1 FLANGED FITTING q p WELDED FITTING • • PIPE TEE, STRAIGHT I+I PIPE TEE, OUTLET UP OR TOWARD — +0 I PIPE TEE, OUTLET DOWN OR AWAY I�31 PIPE UNION I PIPE CROSS I$I II.? PIPE ELBOW, 90' SHORT RADIUS I-}- PIPE ELBOW, 90' LONG RADIUS PIPE ELBOW, REDUCING l x PIPE ELBOW, 45' I 0 PIPE ELBOW, TURNED UP OR TOWARD I PIPE ELBOW, TURNED DOWN OR AWAY a PIPE CAP SCREWED OR SOLDER JOINT ] PIPE CAP, WELDED OR GROOVED D BLIND FLANGE II PIPE PLUG 11 REDUCING PIPE FLANGE CP PIPE REDUCER CONCENTRIC 0 PIPE REDUCER ECCENTRIC PIPE ANCHOR X PIPE HANGER / SPRING HANGER PIPE GUIDE = FLEXIBLE PIPE CONNECTION -Ply-JO_ EXPANSION JOINT DIRECTION OF FLOW SLOPE DIRECTION OF SLOPE, DOWN J HOSE BIBB B 71- NON FREEZE HOSE BIBB FHB WASTE FITTINGS FD FLOOR DRAIN FS FLOOR SINK C TRENCH DRAIN ammimID O WR WASTE RECEPTOR, ROOF FFD FUNNEL FLOOR DRAIN Cal °RD (OFD) ROOF DRAIN (OVERFLOW DRAIN - ROOF) S&0I SAND AND OIL INTERCEPTOR O O WALL CLEAN OUT WCO NECHANICAL LEGEND SYMBOL DESCRIPTION FCO 0 FLOOR CLEAN OUT IC0 CLEAN OUT, EXPOSED I---+ WASTE PIPING BEND I\ LATERAL I - SANITARY WYE AND I/8TH BEND PIPING SPECIALTIES -1-/-0.4- GATE VALVE, OPEN / CLOSED -41! I ANGLE GLOBE VALVE, ELEVATION / PLAN GATE VALVE OUTSIDE SCREW AND YOKE —1) GATE VALVE WITH HOSE CONNECTION -/-- GLOBE VALVE, OPEN / CLOSED ----DPI BALANCE VALVE PLUG PRESSURE REGULATING VALVE PRESSURE RELIEF VALVE / SAFETY VALVE PETCOCK BALANCE VALVE WITH METERING PORTS A SOLENOID OPERATED VALVE lYi MOTOR OPERATED VALVE 10-4 —11 SWING CHECK VALVE WITH FLOW -{/I-/ LIFT CHECK VALVE -R 1-/ [1- BALL VALVE, OPEN / CLOSED VALVE BUTTERFLY —6211 2 WAY CONTROL VALVE 3 WAY CONTROL VALVE I PLUG VALVE STOP COCK 1 / FLOAT VALVE —CC ‹ QUICK OPENING VALVE WYE STRAINER (WITH DRAIN VALVE) —14— COOLING COIL CHILLED WATER —Cj-- HEATING COIL -AAV AUTOMATIC AIR VENT (WITH DRAIN) -MAV MANUAL AIR VENT (WITH DRAIN) PRESSURE GAUGE WITH VALVE I. I I THERMOMETER, LINE MOUNT LM THERMOMETER, SEPARABLE WELL MOUNT II TEST PLUG Q / ® AIR DROP, SIMPLEX / DUPLEX E5 / 6 AIR OUTLET - HARD PIPE, SIMPLEX / DUPLEX jH $I{ PETE'S PLUG, WITH BALL VALVE TRAP SEAL PRIMER VALVE —IBFP[-- BACKFLOW PREVENTER FLOW METER, VENTURI TYPE ----c=1 T TRAP, FLOAT O VALVE BOX 400 AUTOMATIC FLOW CONTROL VALVE —171 (NUMBER INDICATES GPM) T STEAM TRAP 0 VACUUM DROP (LAB VAC) O VACUUM OUTLET (LAB VAC) HARD PIPED V VACUUM CLEANING OUTLET VALVE ICI IN RISER (TYPE SPECIFIED) Z PRESSURE REDUCING VALVE —i NECHANICAL LEGEND SYMBOL DESCRIPTION FIRE PROTECTION SPRINKLER HEAD, UPRIGHT, NEW 0 SPRINKLER HEAD, PENDENT, IN LINE, NEW SPRINKLER HEAD, PENDENT, OFFSET, NEW ----T---- ® SPRINKLER HEAD, SIDEWALL, PENDENT, NEW V SPRINKLER HEAD, SIDEWALL, UPRIGHT, NEW SPRINKLER HEAD, DRY PENDENT SPRINKLER HEAD, OVER AND UNDER /0:: 0 SPRINKLER HEADS (TO REMAIN) %EXISTING EXISTING SPRINKLER HEADS (REMOVE) FIRE HOSE CABINET FHC FDC Y FIRE DEPARTMENT CONNECTION, WALL TYPE FDCle FIRE DEPARTMENT CONNECTION, YARD TYPE FDC FIRE DEPARTMENT CONNECTION, FLUSH U 4-1 FH FIRE HYDRANT - 2 HOSE OUTLET 1 FH FIRE HYDRANT - 2 HOSE OUTLET AND PUMPER CONNECTION ® ASR AUTOMATIC SPRINKLER RISER WIv1G WATER MOTOR GONG ELECTRIC BELL 01 DRY PIPE VALVE W4 ALV ALARM VALVE, WET M MONITOR SWITCH OE FLOW SWITCH ' GC CSC GROOVED COUPLING, GROOVED CAP THRUST BLOCK —� PIV POST INDICATOR VALVE, YARD rIV �g WALL INDICATOR VALVE, PLAN / ELEVATION O HALON SYSTEM AUTOMATIC DISCHARGE STATION HALON SYSTEM, MANUAL DISCHARGE STATION 0 I 2 WAY EARTHQUAKE BRACING X 4 WAY EARTHQUAKE BRACING CONTROLS EMCS ENERGY MANAGEMENT CONTROL SYSTEM MCC MOTOR CONTROL CENTER MOTOR OPERATOR F-D1 PRESSURE TRANSMITTER DIFFERENTIAL PRESSURE TRANSMITTER P RCU REMOTE CONTROL UNIT Q TEMPERATURE TRANSMITTER © © ■ OPERATOR WITH POSITIVE POSITIONER , FILTER DIFFERENTIAL PRESSURE SENSOR/TRANSMITTER QM MAIN CONTROL AIR 20 PSIG v1ECHANICAL LEGE\D 1ST CHARACTER: V = VARIABLE AIR VOLUME TERMINAL UNIT 2ND CHARACTER: F = FAN POWERED UNIT C = SHUTOFF UNIT 3RD CHARACTER: E = ELECTRIC HEAT W = HOT WATER HEAT IAA C = NO HEAT COIL D = DUAL DUCT L...41 MARK NUMBER MECHANICAL LEGEND SYMBOL DESCRIPTION HVAC RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN 24/12 24/12 f f 24/I2 DUCT SHOWN IN SECTION, ARROW POINTS TO SIDE CALLED OUT FIRST ROUND DUCT, NUMBER INDICATES DIAMETER b 241 C 241 f f OVAL DUCT, FIRST HUMBER INDICATES MAJOR DIAMETER, SECOND NUMBER INDICATES MINOR DIAMETER 24/121 C 24/121 f f SUPPLY AIR DUCT, SQUARE OR RECTANGULAR ELBOW FACING TOWARDS SUPPLY AIR DUCT, SQUARE OR RECTANGULAR ELBOW FACING AWAY 1L `' 1 x P r ' EXHAUST, RETURN OR SUPPLY AIR DUCT ROUND , ELBOW FACING TOWARDS I-- EXHAUST, RETURN OR SUPPLY DUCT, ROUND, ELBOW FACING AWAY - EXHAUST AIR OR RETURN AIR DUCT SQUARE OR RECTANGULAR, ELBOW FACING TOWARDS 1L /' EXHAUST AIR OR RETURN AIR DUCT, SQUARE OR RECTANGULAR, ELBOW FACING AWAY 1L ; ,,,, " TRANSITION RECTANGULAR TO RECTANGULAR TRANSITION AT TAKE OFF TRANSITION SQUARE OR RECTANGULAR TO ROUND OR OVAL - UP DUCT OFFSET UP OR DOWN I. DOWN OPPOSED BLADE DAMPER PARALLEL BLADE DAMPER VOLUME DAMPER '''1:::4" f R f DUCT (ELECTTRICEOR PNNEUUMARTIC)ATED 11 WI BACK DRAFT DAMPER (ALLOWS FLOW IN DIRECTION OF ARROW) BDD AD OR AP ACCESS DOOR (AD) OR ACCESS PANEL (AP) it. FD FIRE DAMPER ( 1 HOUR ) + I ' f 'FD f FD2 FIRE DAMPER ( 2 HOUR ) iL I ;FD2 f f RECTANGULAR DUCT, SQUARE ELBOW WITH TURNING VANES 11 1L i\"1 RECTANGULAR DUCT, RADIUS VANED ELBOW 'IL I EXTRACTION GRID k. a -+a'' co CO SENSOR CO2IlD SENSOR MECHANICAL LEGEND FLEXIBLE DUCT CONNECTION IL I1 SIDEWALL SUPPLY AIR DIFFUSER, GRILLE, OR REGISTER AND CFM AIR FLOW 1001L SIDEWALL RETURN/EXHAUST AIR GRILLE OR REGISTER AND AIR FLOW IL" 100 CFM SCREENED OPENING AND CFM AIR FLOW ILjam- IOO CFM SUPPLY OUTLET, CEILING TYPE, DIFFUSER OR GRILLE, SQUARE OR RECTANGULAR AND CFM AIR FLOW (SEE NOTE 4) ILItr - - �4 II J1 400 CFM1111 IL SUPPLY OUTLET, CEILING TYPE, ROUND AND CFM AIR FLOW (SEE NOTE 4) 410 CFM LINEAR DIFFUSER AND CFM AIR FLOW (SEE NOTE 4) _ - - - - 100 CFM RETURN/EXHAUST REGISTER OR GRILLE, CEILING DUCT TYPE AND CFM AIR FLOW .I_ IL i k� 100 CFM RETURN/RELIEF GRILLE, CEILING TYPE, NON -DUCTED " ..._Ni_ 1 L --)-- UNIT HEATER, HORIZONTAL R OUNIT , ./ \ HEATER, VERTICAL PROJECTION SUPPLY AIR FLOW DIRECTION RETURN, OUTSIDE OR EXHAUST AIR FLOW DIRECTION ___N___f THERMOSTAT, WALL ON NIGHT THERMOSTAT T THERMOSTAT, CEILING R THERMOSTAT, REMOTE, CEILING eH HUMIDISTAT, WALL I"1 HUMIDISTAT CEILING S D DUCT TYPE SMOKE DETECTOR H I D DUCT TYPE HEAT DETECTOR SRSTATIC PRESSURE REGULATOR T H TEMPERATURE SENSOR , HUMIDITY SENSOR, DUCT MOUNTED LINED DUCT -F-1 SOUND ATTENUATOR _ _ = CENTRIFUGAL FAN FAN, INLET GUIDE VANES (il.!,/-CENTRIFUGAL FLEXIBLE DUCT I'V1'— —14-I SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACAL/ASIC LAB RELOCATION 12787 SAZAN/SS 07.12.12 RECORD DRAWING 12787 SAZAN/SS 08.13.13 A REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 EnE/NG o-- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE MECHANICAL LEGEND REPLACE BUILDING BOILERS BUILDING 09-53 RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER RR JOB NO. DWG NO. WWD FOR ODE CP OMPUANCE APVER !JUL 15 2015 ty ofTukwila DING DIVISION AZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 • 23910 09-053-MOB Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 COMP NO. Expires: 05/02/16 MECHANICAL MASTER DEV. CENTER, WA LEGE\ SYM 10" 3/4" SCH 80 PVC -' INJECTION LINE 3-TYP. 3/4" SOLENOID BLEED VA. GRISWOLD 416-S 1 (3 TYP) LAKOS -11 cp SEPARATOR 3/4" /a 1"-' E �11 CT-2 2„ ■ I II T " 3 CT-1 1" 2„ � CHWR TAPPING FOR FUTURE ANNUBAR FITTING CHWS �•� SURPLUS FLOW FROM COOLING COIL LOAD 11 CHWR TOWER #2 COUPON RACK FUNNEL FLOOR DRAIN 1" CONDENSER TO BE FURNISHED W/ WATER 8" TREATMENT PACKAGE P-2 P-5 SECONDARY 900 GPM 750 GPM 10", CHWR FLOW SWITCH TYP. 1W1/2"-� 8" CCS TYP. FLOW SWITCH TYP. 11 %." DRAIN LINE E—a CHWS CHILLED WATE 1'I 2 >LAKOS CHWR SEPARATOR 8" CCS TYP IW n CHWS CHWS 10" DECOUPLER BY-PASS P PI\G DAGAIV 3/4" CHWR CHW$ 10„ 8" CCR CONDENSER CH-1 EVAPORATOR -+-4 8" CHWR TYP. P-1 SECONDARY 750 GPM CHWR TOWER #1 COUPON RACK UH SCALE: NOT TO SCALE UH A B O D II UH-1, UH-2 3/4" 1" 3/4" 2.5GPM-CV 1.2=4.25#AP P-12 UH-3, UH-4 1" 1 1/4" 1 " 3.5GPM-CV 2.2=2.5#AP P-13 U\IT HEATED C3\\ECTIO\ DETAIL 1 SCALE: NOT TO SCALE REVISION BY APPROVED DATE SYM M-227 M-224 REVISION HEATI\ J WATE SCALE: NOT TO SCALE BY APPROVED 3/4" (SCH 80) PPI\G DIAGA DATE CONVERSION FROM MYLAR TO CAD 03.25.13 REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 CHWS " BLEED -OFF CONN. 4" DRAIN LINE TO FUNNEL FLR. DRAIN IW 1%" IW TO COOLING TOWERS IW ROOF IW Iw EXPANSION �►- ET-1 TAN K -o 3/4" HOSE BIBBS 0+� FRO INITIAL WATER REFILL 8" CHWS TYP. CHWS I i; DEFICIT FLOW I TAPPING FOR FUTURE ANNUBAR FITTING CHWS AIR SEPARATOR CHEMICAL FEED TANK CF-1 .RawyrAtv,a® - 1 -H(�HII T 10" ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED 11 IW 3/4 2" WCTI WATER SOFTENER 10" P-7 PRIMARY 1500 GPM DRAWN DATE APPROVED BY DEPT. DATE CHECKED ENGINEER M.WONG 03.25.13 CHECKED APPROVED APPROVED L TO COOLING COIL LOAD P-7A (STANDBY) 1500 GPM SUBTITLE CHILLED & HOT WATER PIPING TITLE REPLACE BUILDING BOILERS BUILDING 09-53 CHWS - CHWR - IW CCS - OCR - HWF - HWR CHILLED WATER SUPPLY CHILLED WATER RETURN INDUSTRIAL WASTE CHILLED WATER SUPPLY CHILLED WATER RETURN HOT WATER FEED HOT WATER RETURN 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD—RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI —PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065—SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUM VALVE PACKAGE. C REMOVE HWG-1 AND HWG-2, PIPING AND APPURTANCES AS SHOWN HATCHED. REMOVE P-8 AND P-8A PUMPS, PIPING AND APPRUTANCES AS SHOWN HATCHED. REMOVE ET-2 EXPANSION TANK AS SHOWN HATCHED. REMOVE AS-2 AIR SEPARATOR AS SHOWN HATCHED. REMOVE CHEMICAL TREATMENT SYSTEM WHOLE AND SAVE FOR REUSE IN THE NEW SYSTEM. EFHE \CE DAWI\ GS 0 ORIGINAL MYLAR RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER vVEo FOR pMPLIANCE APPROVED JUL 15 2015 City o?Ti uil TLDING DIVISION 0• .. SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 • Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 3 2R JOB NO. DWG NO. COMP NO. 23910 09-53-1M312 12/22/2014 8:56:28 AM w CD CD CD Expires: 05/02/16 MECHANICAL MASTER DEV. CENTER, WA SYM 32" PANEL AXIAL FAN MOUNTED 10'-6" TO C A.F.F. 36" x 36" WALL LOUVER WITH BACK DRAFT DAMPER EMERGENCY AIR COMPRESSOR FROM BLDG AIR 100 PSIG REVISION TEF PIP FLA 18"X96" INTAKE AIR LOUVER ABOVE DOOR MINATE 8" CHWR NG W/ 8" BFV AND NGE FOR FUTURE 100 GAL. AIR RECEIVER CO TOOL BY A.6 1M452 M503 2" 0 REFRIGERANT VENT SEE DETAIL 1M452 1M505 rAYLORD #800A 000 CFM MAHU 2"CAP [I%I PW 2-TYPICAL SEE DETAIL 2 1M452 1M505 TERMINATE 10" CHWS PIPING W/ BLIND FLANGE FOR FUTURE CONNECTION TO CH-3 REFRIGERATED AIR DRYER AIR FILTER H Al APPROVED PRV 100/20 PSIG 1-MICRON I IAG A DATE v iM451 SYM P-5 900 GPM CRONE CONTL PENN VENTILATION MODEL #BLL24 WALL EXHAUST FAN, 12" AFF, 1200 CFM, .25" TSP, 1/2 HP, 120 VOLT MOTOR 4" COOLING TOWER DRAIN ( 3� TO FFD 1M452 M503 2"CLWS FROM FILTER PUMP, F-1 (TYP. FOR F-2) - 2"CLWS TO FILTER PUMP, F-1 (TYP. FOR F-2) 8"0 VENT DUCT SEE 1M515 FOR CONTT 8" 0 CWR UP TO COOLING TOWER TYP. �--� &.----1Y4"U P TO TOWER#2 8"0 WS UP -CI TO C OLING TOWER TYP. P-2 750 GPM TAPPING FOR FUTURE ANNUBAR FITTING TO CONTROL PANEL REVISION BY P-4 900 GPM 1M452 1M505 APPROVED DATE CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 E DESIGN SILICA WATER SOFTENER 12337243 M.WONG RWS 11.09.11 A INSTALL (2) CHILLERS 703544-00 KGP 3/09/01 REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 B NEW VENTING PLAN FOR J#703544-00 J#703544-00 KGP 6/05/01 C INSTALL CONDENSER CONTROL VALVES J#315796-00 KGP 05.08.02 B./1 1M452 M5 B5 (THREE COMBUSTION ONE - 36" x 24" ONE - 12" x 24" ONE - 12" x 24" VENT TO b EXPANSION TANK ET-1 AIR SEPARATOR A5-1 P-7 1500 GPM 3" HWS & HWR 10" DECOUPLER BYPASS AIR LOUVER) 4' 10" A.F.F. 14" A.F.F. 12'-0" A.F.F. 2" GAS APPROX. 18" A.F.F. GAS REGULATOR WATER METER BELOW 1`10„ 8" F.D. TP. 10" CHM 10" CHWS 1M452 1M505 B9 1M452 1M505 4" DOM. WATER FOR CONTINUATION OF DOM. WATER, GAS & COMPRESSED AIR, SEE PLUMBING DRAWINGS M-102 & M-108 2 PRESSURE REDUCING VALVE APPROX. 30" A.F.F. 4" DOM. WATER UP 2" PRESSURE REDUCING VALVE (45 PSIG) 2" BACKFLOW P.R.V. 2" VALVE 2" IW FOR HVAC SYSTEMS TEMPERATURE CONTROL PANELS [A IR RECEIVER 100 GAL T'STAT SET AT 65° F SEE CNTL AIR DIAGRAM SEE DETAIL TYP. 1M452 1M505 1 1M452 1M505 1M452 1M505 SEE DETAIL TYP• 1M452 1M505 6"x10" REDUCER 4" C.W. TO BLDG. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN SRL CHECKED DPN ENGINEER DATE 8.4.85 8.4.85 CHECKED APPROVED LEGE\ ID 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD-RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI -PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065-SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUM VALVE PACKAGE. CO\CTIO\ \ OTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206-947-4897 REMOVE GAS FIRED ATMOSPHERIC BOILERS HWG-1 & HWG-2. SHUTOFF AND REMOVE NATURAL GAS PIPING TO BOILERS. REMOVE SUPPLY AND RETURN PIPING AND APPURTANCES BACK TO HORIZONTAL BRANCH CONNECTION SHOWN HATCHED. REMOVE DRAIN PIPING. REMOVE ALL FLUE PIPE. REMOVE HEATING HOT WATER PUMPS P-8 AND P-8A. REMOVE PIPING AND APPURTANCES BACK TO HORIZONTAL BRANCH CONNECTION SHOWN HATCHED. REMOVE EXPANSION TANK, AIR SEPARATOR AND ASSOCIATED PIPING AND APPURTANCES SHOWN HATCHED. MAKE-UP WATER ASSEMBLY LOCATED ON BOILER ROOM WEST WALL TO REMAIN AND RE -USE FOR NEW WORK. REMOVE CF-2 CHEMICAL FEED SYSTEM AND COUPON RACK INTACT AND SET ASIDE FOR RE -USE .IN NEW SYSTEM. �EFHE CE SAW I \ G S 9-53-4200-M6 ORIGINAL MYLAR RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SAZAN . GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-144 SUBTITLE MACHINERY ROOM PARTIAL PIPING PLA TITLE REPLACE BUILDING BOILERS BUILDING 9-53 COL. A.4-C/-2-1 E WED FOR C MFLIANCE A'P lMED • JUL 15 2015 Clty orrukwita ILDING DIVISION KEY PLAN SCALE: 91 1M452R 6 JOB NO. 23910 COMP NO. 12/22/2014 8:56:04 AM w CD CD CD D INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 Expires: 05/02/16 APPROVED MECHANICAL MASTER DEV. CENTER, WA DWG NO. 9-53-1M452R 109-053-1000-M216 & 109-053-4030-M1 EXPANSION TANK ET-1 AIR SEPARATOR A5-1 P-7 1500 GPM 3" HWS & HWR 10" DECOUPLER BYPASS AIR LOUVER) 4' 10" A.F.F. 14" A.F.F. 12'-0" A.F.F. 2" GAS APPROX. 18" A.F.F. GAS REGULATOR WATER METER BELOW 1`10„ 8" F.D. TP. 10" CHM 10" CHWS 1M452 1M505 B9 1M452 1M505 4" DOM. WATER FOR CONTINUATION OF DOM. WATER, GAS & COMPRESSED AIR, SEE PLUMBING DRAWINGS M-102 & M-108 2 PRESSURE REDUCING VALVE APPROX. 30" A.F.F. 4" DOM. WATER UP 2" PRESSURE REDUCING VALVE (45 PSIG) 2" BACKFLOW P.R.V. 2" VALVE 2" IW FOR HVAC SYSTEMS TEMPERATURE CONTROL PANELS [A IR RECEIVER 100 GAL T'STAT SET AT 65° F SEE CNTL AIR DIAGRAM SEE DETAIL TYP. 1M452 1M505 1 1M452 1M505 1M452 1M505 SEE DETAIL TYP• 1M452 1M505 6"x10" REDUCER 4" C.W. TO BLDG. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN SRL CHECKED DPN ENGINEER DATE 8.4.85 8.4.85 CHECKED APPROVED LEGE\ ID 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD-RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI -PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065-SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUM VALVE PACKAGE. CO\CTIO\ \ OTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206-947-4897 REMOVE GAS FIRED ATMOSPHERIC BOILERS HWG-1 & HWG-2. SHUTOFF AND REMOVE NATURAL GAS PIPING TO BOILERS. REMOVE SUPPLY AND RETURN PIPING AND APPURTANCES BACK TO HORIZONTAL BRANCH CONNECTION SHOWN HATCHED. REMOVE DRAIN PIPING. REMOVE ALL FLUE PIPE. REMOVE HEATING HOT WATER PUMPS P-8 AND P-8A. REMOVE PIPING AND APPURTANCES BACK TO HORIZONTAL BRANCH CONNECTION SHOWN HATCHED. REMOVE EXPANSION TANK, AIR SEPARATOR AND ASSOCIATED PIPING AND APPURTANCES SHOWN HATCHED. MAKE-UP WATER ASSEMBLY LOCATED ON BOILER ROOM WEST WALL TO REMAIN AND RE -USE FOR NEW WORK. REMOVE CF-2 CHEMICAL FEED SYSTEM AND COUPON RACK INTACT AND SET ASIDE FOR RE -USE .IN NEW SYSTEM. �EFHE CE SAW I \ G S 9-53-4200-M6 ORIGINAL MYLAR RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SAZAN . GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-144 SUBTITLE MACHINERY ROOM PARTIAL PIPING PLA TITLE REPLACE BUILDING BOILERS BUILDING 9-53 COL. A.4-C/-2-1 E WED FOR C MFLIANCE A'P lMED • JUL 15 2015 Clty orrukwita ILDING DIVISION KEY PLAN SCALE: 91 1M452R 6 JOB NO. 23910 COMP NO. 12/22/2014 8:56:04 AM w CD CD CD D INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 Expires: 05/02/16 APPROVED MECHANICAL MASTER DEV. CENTER, WA DWG NO. 9-53-1M452R 109-053-1000-M216 & 109-053-4030-M1 AA 8" VALVED & BLANKED SPOOL CONN. FROM PHASE II 211 1 1/2" VALVED & BLANKED SPOOLS TO PHASE II SYM H 208 113 B./ B.5 B.9 a CH-2 UP TO MECHANICAL ROCM 20 SEE SHEET 1M451 FUTURE CM-4 ROOM COOLING MODULE C- m F-2 SEE IM452 FOR WATER SOFTENER 0 1 CH-1 2"CLWS-TO FILTER PUMP, F-2 2"CLWS FROM FILTER PUMP, F-2 2"CLWS TO FILTER PUMP, F-1 2"CLWS FROM FILTER PUMP, F-1 QUICK CONNECT 1 1/2" BV's PLUGGED FOR FUTURE CM-4 RCM - - 1 1/2" SEISMIC BRACING LATERAL ICI PCV SET FOR 2 GPM CV = 1.2=2.7#Ap \--1 1/2" 530 \ �8» AAV 212 209 157� 58 5- REVISION ) -0 Hi 6" 210 FCC I 206 CHWR HWR SEISMIC BRACING 531 LATERAL LONGITUDINAL 204 Id' CHWR SEISMIC BRACING LATERAL BY -207 202 APPROVED 203 20 1 1 1/2' CHWR- SEISMIC BRACING LATERAL LONGITUDINAL - PP TO PCV CONTROLLER PANEL IN CHILLER ROOM - HWR SEISMIC BRACING LATERAL ^ � I 200%�� 1 201 PCV SET FOR 35 GPM Ap=10# 8" 0 VALVED TEE WITH BLIND FLANGE (TYP) UNLESS OTHERWISE NOTED DATE SYM REVISION " 1 1M60 M2 11111 I r.ixe-No/t///r',i ►. r 3" FCO 0 A 3" Y XJ XJ cl CHW CHW 8" i1 1/4" /AAV C/1 C.5 C.8 SEE SHEET 1M452 FOR, BOILER ROOM ENLARGEID PLAN FOR PENETRATION THROUGH GROUNDING PLANE, SEE SHEET 1M507 3 2 1/2" CHWS & R I IN RAISED FLOOR REMOVE 3" BLIND FLANGES AND CONNECT NEW 3" CI-WS & R TO EXISTING BFV'S 2" BV'S PLUGGED OR FUTURE CM-7 RCM 3" CHWS & R DROPS TO IN RAISED FLOOR 0 RELOCA H S & D CTWO E EX 3/4" R CLEAR OF E.5 CHWS -FUTUR CM- ROOM COOLING MODULE 0 0 0 0 0 / O/ HWR+- H - 192 196- BY �-193 APPROVED DATE 0 0 0 0 0 0 x r_ CHWR 33 FCH-1 31 32 11 FIST FLO0DLA SCALE: 1 /8"=1 -0" CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 A REMOVE CHW A/C #AC1C01A 2870761 HARR 08/17/06 B REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 Q,BOE/NG® c'— CM-7 29 30 26 PIPING UNDER RAISED FLOOR (TYP 2" CHWR 23 �3 2»_ U + 2" 2" A Expires: 05/02/16 0 0 MATCHLINE-FOR CONTINUATION ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED LIEBERT 1 S0007502027 SEE SHT 1M61 DRAWN AR DATE 7.23.85 APPROVED BY DEPT. DATE CHECKED DPN ENGINEER 10.10.85 CHECKED DPN 3.26.90 APPROVED APPROVED SUBTITLE TITLE PUMP COND BELOW FLR TYP 3 LEGE\ GE\PAL \OTES -2 C0\STRUCTIC\ \ 1.6 2 1/2" BV'S TO CEMC 20 UNIT W/DRAIN COCKS 2 1/2" CHWS & R DROPS TO IN FLOOR DOWN IN WALL TO CM-7 UNITS CONTEMPO S0007502028 1 2" BV'S TO CONTEMP CEMC 12 UNIT WITH DRAIN COCKS 2"CHWS & R DROP TO IN FLOOR OTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206-947-4897 • RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 CHILLED & HOT WATER PIPING PLA MECHANICAL MASTER REPLACE BUILDING BOILERS BUILDING 9-53 COL. A-G/1-4 3 SAW 1 GS REVWED FOR 9CtDE CQQM14.1ANCE APPROVED • JUL 15 2015 City ofTukwila BUILDING DIVISION CD 1M63 1M61 1M64 1M62 KEY PLAN SCALE: NONE .16.15 12/22/2014 8:57:40 AM LEGE\ J SYM 10" CT-2 2 n 1- 1 II LsZTfr 8" 3"7 1»� CT-1 -OHO- 2" n I II " BLEED -OFF CONN. 4" DRAIN LINE TO FUNNEL FLR. DRAIN ROOF 3/4" SCH 80 PVC INJECTION LINE 3-TYP. 3/4" SOLENOID BLEED VA. GRISWOLD 416-S1 (3 TYP) LAKOS SEPARATOR 3/4" CHWR TAPPING FOR FUTURE ANNUBAR FITTIN CHWS SURPLUS FLOW FROM COOLING COIL LOAD Le- CHWR cI -e� Le- CONDENSER CH-2 EVAPORATOR I I'II1 Icci I i TO BE FURNISHED W/ WATER 8" TREATMENT PACKAGE P-2 P-5 SECONDARY 900 GPM 750 GPM 10" 4,1 TOWER #2 COUPON RACK FUNNEL FLOOR DRAIN FLOW SWITCH TYP. CHWR 3/4" DRAIN LINE UH CH CHWS 1w1/2"-� 8" CCS TYP. FLOW JSWITCH TYP. --CHWR I'I w ►LAKOS� SEPARATOR 8" CCS TYP -' CHWS CHWS 10" DECOUPLER BY-PASS LLED WATER PIPI\ G IAG BAN 3/4" 8" CCR 4>+ CONDENSER CH -1 rEVAPoRATOR -1-C11 w 1Y2" IW TO COOLING TOWERS 8" CHWR TYP. 8" CHWS TYP. P-4 900 GPM CHWR 7 CHWR cHW5 10„ TOWER #1 COUPON RACK SCALE: NOT TO SCALE UH A B O D CS UH-1, UH-2 3/4" 1" 3/4" 2.5GPM-CV 1.2=4.25#AP P-12 UH-3, UH-4 1" 1 1/4" 1 " 3.5GPM-CV 2.2=2.5#AP P-13 \IT EATEN CO\ \ ECTI O \ DETAIL 1 SCALE: NOT TO SCALE REVISION BY APPROVED DATE M-227 M-224 SYM P-1 SECONDARY 750 GPM CHWS 3/4" (SCH 80) 1. 1" NPT MINIMUM NEUTRALIZATION TANK HEADER SIZE (PVC PIPE). 2. SLOPE CONDENSATE DRAIN PIPING AT MIN. 1/8" PER FT. 3. COMBINE 3/4" DRAINS FROM HWG-1, 2 AND FLUE STACK INTO 1" TANK HEADER. 4. INSTALL UNIONS AT INLET AND OUTLET OF TANK FOR MAINTENANCE. REVISION CONDENSATE NEUTRALIZER TANK 1 "OUT BY APPROVED DATE CONVERSION FROM MYLAR TO CAD 03.25.13 A REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 CHWS 1=1-1-49 DEFICIT FLOW TAPPING FOR FUTURE ANNUBAR FITTING CHWS [ w IW Iw EXPANSION �- ET-1 TANK 3/4" HOSE BIBBS FRO INITIAL WATER REFILL AIR SEPARATOR CHEMICAL FEED TANK CF-1 CONDENSATE NEUTRALIZER TANK (SEE DETAIL 2 THIS SHEET) SCALE: NOT TO SCALE �BOE/NG° ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE Iw 3/4" P-7 PRIMARY 1500 GPM DRAWN DATE WCTI WATER SOFTENER 10" CHECKED Le - SUBTITLE TO COOLING COIL LOAD P-7A (STANDBY) 1500 GPM A CHILLED & HOT WATER PIPING CHWS - CHWR IW - CCS - CCR HWF - HWR CHILLED WATER SUPPLY CHILLED WATER RETURN INDUSTRIAL WASTE CHILLED WATER SUPPLY CHILLED WATER RETURN HOT WATER FEED HOT WATER RETURN 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD—RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI —PORT CONTROL VALVES 2 > LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL# TBX-0065—SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, INE: EMI VA 'AC AXIOM INDUSTRIES MODEL NT25 CONDENSATE NEUTRALIZATION TANK, 4.8 GAL. TANK, 45 GAL/HR CAPACITY, (2) 1" NPT INLET/OUTLET CONNECTIONS. CORROSION RESISTANT POLYPROPYLENE TANK AND LID. PROVIDE NEW BOILERS HWG-1 AND HWG-2, PIPING AND APPURTANCES. PROVIDE NEW PUMPS P-8 AND P-8A, PIPING AND APPURTANCES. PROVIDE NEW EXPANSION TANK ET-2. RE —INSTALL EXISTING CHEMICAL TREATMENT SYSTEM. PROVIDE NEW CONDENSATE NEUTRALIZATION TANK. 'EFEE\CE D AWI\GS 9-53-42 10- ►1 6 ORIGINAL MYLAR RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER ENGINEER M.WONG CHECKED APPROVED APPROVED 03.25.13 TITLE REPLACE BUILDING BOILERS BUILDING 09-53 • • • WED FOR ODE C MFLIANCE APP QVED 'JUL 15 2015 City of Tukwila BUILDING DIVISION SAZAN SHEET GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 N 910 1M312 JOB NO. 23910 COMP NO. DWG NO. 12:33:33 PM N N 0 Expires: 05/02/16 MECHANICAL MASTER DEV. CENTER, WA 09-53-1 M312 AID HA DLI\G U\ ITS MARK NO. AHU-1 AREA SERVED 1ST FLOOR FAN COOLING COIL HEATING COIL FILTERS TOTAL ELECT CHAR TOTAL STAT HP RPM WHEEL CFN . PRESS DIA V PH CY 47,600 4.0" 50 800 44Y" BTU COOLING CAP 460 3 60 2 X 687790 MAX FACE VEL 495 MIN ROWS 10 AIR COOLING CHILLED WATER MAX E.A.T. L.A.T. FIN/ D3 °F WB °F DB °F WB ° GPM F I1\ 8 71.5 59.50 50.16 49.16 138 45 55 7.7 ENT. °F LVG PRESS °F DROP BTU HEATING CAP AIR MAX MIN MAX ENT FACE ROWS FIN/ °F VEL IN LVG °F HEATI\G HOT WATER GPM ENT. LVG PRESS PREFILTER F F DROP FINAL FILTER HI-FLO 3X95 REMARKS LOCATED IN 2ND FLR MECH RM AHU-2 AHU-3 AHU-4 1ST FLOOR 2ND FLOOR 2ND FLOOR 47,600 64,800 64,800 4.0" 4.25" 4.25" 50 75 75 800 670 670 44'" 54Y4" 54Y4" 460 460 460 3 3 3 60 60 60 x 155,227 475 2 8 68 72 10.3 170 140 0.025" 3 X 624658 496 10 8 71.5 59.50 50.16 49.16 125 45 55 10.9 3 x 158,000 470 2 8 69 75 10.3 170 140 0.25" HI-FLO 3X95 HI-FLO 3X95 HI-FLO 3X95 LOCATED IN 2ND FLR MECH RM LOCATED IN 2ND FLR MECH RM LOCATED IN 2ND FLR MECH RM RF-1 RF-2 AHU-5 1ST FLOOR 2ND FLOOR VESTIBULE 45,000 62,300 1,990 2.0" 1.5" 2.53" 25 25 2.0 465 390 54Y4" 60" 15" 460 460 208 3 3 3 60 60 60 LOCATED IN 2ND FLR MECH RM LOCATED IN 2ND FLR MECH RM 38,540 272 6 11 68 56.50 50.3 49.1 8.2 45 54.4 10.8" 63,642 295 8 65 94.2 4.7 170 142.9 3.6" McQuay SKYLINE OAHOO8GDDM PU v� SCHED,JLE WATER CHILLED SCHEDULE MAR \O. SERVICE GPM TEMP HEAD LIQ °F HP �PH.� REMARKS P-1 SECONDARY CH WATER 750 P-2 SECONDARY CH WATER 750 40 54 40 54 15 15 1ST FLR CHILLER RM V1ARK \O. LOCATION CAP TONS COMPRESSOR MOTOR V 15 P-3 P-4 P-5 P-6 P-7 P-7A SECONDARY CH WATER CONDENSER WATER CONDENSER WATER CONDENSER WATER PRIMARY CH WATER PRIMARY CH WATER 750 900 900 900 1,500 1,500 40 45 45 45 65 65 54 85 85 85 54 54 15 (FUTURE) 20 20 20 40 40 CH-1 CH-2 CH-3 1ST FLR CHILLER RM 1ST FLR CHILLER RM 1ST FLR CHILLER RM 300 300 300 460 460 460 PH 3 3 3 HZ FOUL FACTOR CHILLER 60 0.0005 60 0.0005 GP 750 750 ENT ° LVG °F CONDENSOR P.D. WATER P.D. FT. GPM ENT °FLVG °F FT. REMARKS 54 44 54 44 60 0.0005 750 54 44 26.2 26.2 26.2 900 85 95 900 85 95 900 85 95 21.4 21.4 21.4 FUTURE )1 " (FUTURE) 3 STA 1 BY AIM .irAEI 41111111 rrA111111ft.rr� FA\ COIL HEATHS P-8 HOT WATER HEATING P-8A HOT WATER HEATING 76 60 200 3 460/3 GRUNDFOS 15955LF 76 60 200 3 460/3 GRUNDFOS 15955LF ARK NO. SERVICE BTU IV OTOR ELECT CHAR HEATING RPM HP V PH CY CAPACITY REMARKS -X PA\ S 0 TA\ 'KS MARK LOCATION NO. CAP SYS GAL PRESS PSIG RENARKS ET-1 1ST F R C ILL ' R 20 50 BASIS OF DESIGN: AMTROL AX-100V-150, VERTICAL, FLOOR MTD. HCT WATH CRCULATNS MARK NO. SERVICE GPM FT.THP HEADOF LIQ °EMPF REMARKS FCH-1 UH-2 STAIRWELL COL D/1 STAIRWELL COL. A/11 44,000 75,000 525 1/20 775 1/20 115 115 60 60 P-9 P-10 P-11 AHU-2 AHU-4 AHU-5 21 32 4.7 170 170 170 0.5 0.5 1/25 GRUNDFOS UPS 15-58FC 115V SUPER BRUTE PUMP, SET © SPEED 2. COOLI\G TOWED SC EDULE MAR NO. LOCATIO\ NOM TONS ENT LVG AMB NO. TOTAL GPM WATER WATER WATER OF FAN °F °F °F FANS HP EXT V PH CY S.P. REMARKS CT-1 1ST FLR CHILLER RM CT-2 1 ST FLR CHILLER RM CT-3 1ST FLR CHILLER RM 300 300 300 900 900 900 95 95 95 85 68 3 30 460 3 60 ON ROOF 85 68 3 30 460 3 60 ON ROOF 85 68 3 30 460 3 60 ON ROOF (FUTURE) EX AUST FA\ SCHEDULE MARK AEA SERVED \O. CF STAT M OTO v1 PRESS RPM HP IN. ELEC CHAR V PH CY REvARKS EF-1 EF-2 EF-3 EF- 4 EF-5 EF-6 TOILETS 700MM PROJECTOR 2ND FLOOR MECH RM CHILLER ROOM LIFT STATION ELECTRICAL ROOM 5,000 700 4,080 18,500 155 7,124 0.75 492 0.75 1.0 0.19 1.0 542 1,570 1,750 810 2.0 0.75 2.0 10.0 1/50 3.0 460 115 460 460 115 460 3 1 3 3 3 60 60 60 60 60 60 EXISTING FAN BY OWNER BELTDRIVE PANEL AXIAL VA7A17 VANE AXIAL CENTRIFUGAL ROOF EXHAUST SYM REVISION BY APPROVED DATE SYM REVISION P-12 P-13 UH-1 AND 2 UH-3 AND 4 5 10 170 0.5 7 10 170 0.5 AIR SEPARATOR SCHEDULE vIARK NO. SYSTEM LOCATION SIZE GPM CV REMARKS AS-2 HEATING HW 1STFLR RRM 3 76 80 B & G ROLAIRTROL R-3 t HOT WATER U\ IT HEATERS ARK 0. UH-1 UH-2 UH-3 UH-1 SERVICE CFN CHILLER ROOM CHILLER ROOM 2ND FLR FAN RM CHILLER ROOM 1,004 1,004 1,427 1,427 RPM WATER TEMP ENT °F LVG °F HP 1,550 1,550 1,550 1,550 170 170 170 170 140 140 140 140 ELECT CHAR V PH CY 115 115 115 115 60 60 60 60 HOT WATER CO\DE\SI\ - 3" - 30ILE - - SCHEDULE - _ _ _ = 7 = 7 7 7 7 r ` NARK NO. LOCATIO\ SERVICE BASIS DESIGN MANUF OF TYPE FUEL GAS INPUT (MBH) NOMINA_ OUTPUT (MBH) GPH WATER CONN. SIZE (IN.) GAS CON SIZE (IN.) N. FLUE (IN.) ELECTRICAL AFUE (%) OPERATING WEIGHT (LBS) REMARKS FLA V/PH/HZ HWG-1 MECH. RM HEATING HW CLEAVER BROOKS CONDENSING NAT. GAS 1,000 915 1500 3 1 6 13 120/1/60 96.5 2545 1,2,3,4,5,6,7,8 HWG-2 MECH. RM HEATING HW CLEAVER BROOKS CONDENSING NAT. GAS 1,000 915 1500 3 1 6 13 120/1/60 96.5 2545 1,2,3,4,5,6,7,8 REMARKS: 1. TESTED IN STRICT ACCORDANCE WITH PROVISIONS OF ALL APPLICABLE SECTIONS OF ANSI/ASME, NFPA, AGA, UL, AND ABMA CODES AND STANDARDS. 2. COMPLIANT WITH STATE, FEDERAL, AND LOCAL CODE REQUIREMENTS. 3. MAXIMUM OPERATING PRESSURE: 125 PSIG. 4. GAS SUPPLY PRESSURE 7" W.C. MINIMUM, 14" W.C. MAXIMUM. : RECEIVED 5. PROVIDE BOILER MANUFACTURER'S "PROTO-NODE" PROTOCOL TRANSLATOR (MODBUS TO BACnet). CITY or TUKWILA 6. PROVIDE BOILER WITH BURNER GAS TRAIN (MAX. 11" W.C.) JUL 10 2015 7. PROVIDE (1) CONDENSATE NEUTRALIZATION TANK ASSEMBLY TO ACCOMODATE BOTH BOILERS. SEE 1M312 FOR MAKE 8c MODEL. �8. PROVIDE MANUFACTURER'S 11" HIGH SUPPORT PLATFORM. PERMIT CENThR BY APPROVED DATE A REPLACE LOBBY A/C UNIT 11914189 M.WONG RWS 06.28.11 REPLACE BUILDING BOILERS 23910 SAZAN/GB 12.18.14 QBOE/NCO G�- Expires: 05/02/16 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE SCHEDULE - MECHANICAL EQUIPMENT TITLE MECHANICAL MASTER REPLACE BUILDING BOILERS BUILDING 9-53 DEV. CENTER, WA REMARKS VV8 FOR CQQMPLIANCE. PPP OVF IJUL 15 2015 Clty of Tukwila (LDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 2 ',..:' 0 M362 Tel 206.267.1700 7 1 . .14 COMP NO. 23910 9-53-M362 CL CO N N SYM 32" PANEL AXIAL FAN MOUNTED 10'-6" TO C A.F.F. 36" x 36" WALL LOUVER WITH BACK DRAFT DAMPER EMERGENCY AIR COMPRESSOR REVISION FROM BLDG AIR 100 PSIG A. /1 TE PIP FL 18"X96" INTAKE AIR LOUVER ABOVE DOOR MINATE 8" CHWR NG W/ 8" BFV AND NGE FOR FUTURE 100 GAL. AIR RECEIVER CO\TROL BY A APPROVED A.6 1M452 M503 2" 0 REFRIGERANT VENT SEE DETAIL 1 GAYLORD #800A 1000 CFM MAHU 2-TYPICAL SEE DETAIL 2 1M452 TERMINATE 10" CHWS PIPING W/ BLIND FLANGE FOR FUTURE CONNECTION TO CH-3 /REFRIGERATED AIR DRYER AIR FILTER PRV 1-MICRON 100/20 PSIG R DIAGRAV 1M451 DATE SYM 1M505 P-5 900 GPM REVISION A.9 B CRIME CONTL PENN VENTILATION MODEL #BLL24 WALL EXHAUST FAN, 12" AFF, 2"CLWS FROM FILTER 1200 CFM, .25" TSP, PUMP, F-1 (-YP. 1/2 HP, 120 VOLT FOR F-2) MOTOR 2"CLWS TO FILTER PUMP, F-1 (TYP. FOR F-2) 4" COOLING TOWER DRAIN ( 3� TO FFD 1M452 M503 8"0 VENT DUCT SEE 1M515 FOR CON'T 8" 0 CWR UP TO COOLING TOWER TYP. cam' 1%4"U P TO ! TOWER#2 8"o WS UP TO C OLING TOWER TYP. P-2 750 GPM TAPPING FOR FUTURE ANNUBAR FITTING PANEL TO CONTROL BY P-4 900 GPM 1M452 1M505 APPROVED DATE CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 E DESIGN SILICA WATER SOFTENER 12337243 M.WONG RWS 1 1.09.1 1 A INSTALL (2) CHILLERS 703544-00 KGP 3/09/01 F REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 B NEW VENTING PLAN FOR J#703544-00 J#703544-00 KGP 6/05/01 C INSTALL CONDENSER CONTROL VALVES J#315796-00 KGP 05.08.02 B.! B.5 P-7 1500 GPM HWS & HWR (THREE COMBUSTION AIR LOUVER) ONE - 36" x 24" @ 4' 10" A.F.F. ONE - 12" x 24" @ 14" A.F.F. ONE - 12" x 24" @ 12'-0" A.F.F. 2" GAS APPROX. 18" A.F.F. GAS REGULATOR 3"HWS&R MTER IvETER BELOW I1I!'I 10" CHWR 10" CHWS 10" DECOUPLER BYPASS Q� BOE/NG c'— 1 V1452\\11M505 B.9 (-3-) 1M452 1M505 4" DOM. WATER FOR CONTINUATION OF DOM. WATER, GAS & COMPRESSED AIR, SEE PLUMBING DRAWINGS M-102 & M-108 PRESSURE REDUCING VALVE APPROX. 30" A.F.F. 4" DOM. WATER UP 2" PRESSURE REDUCING VALVE (45 PSIG) 2" BACKFLOW P.R.V. 2" VALVE 2" IW FOR HVAC SYSTEMS DDC CONTROL PANELS fAIR RECEIVER 100 GAL 1.6 T'STAT SET AT 65°F SEE CNTL AIR DIAGRAM SEE DETAIL TYP. 1M452 1M505 f C� 1M452 1M505 � 1M452 1 v1505 SEE DETAIL TYP. 1M452 1M505 6"x10" REDUCER 4" C.W. TO BLDG. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN SRL CHECKED DPN DATE 8.4.85 8.4.85 SUBTITLE L IC \� 23 GPM WCTI WATER SOFTENER, WATER CONSERVATION TECHNOLOGY INTERNATIONAL MODEL HESD-RPA 23, INCLUDES DUAL ALTERNATING COLUMNS OF POLYSLYRENE RESIN OPERATED BY BRASS MULTI -PORT CONTROL VALVES LAKO PACKAGED CENTRIFUGAL SEPARATOR MODEL TBX-0065-SRV, 208V, 3PH, 60HZ, SOLIDS RECOVERY VESSEL WITH SPOOL, ACCESSIBLE SEPARATOR, DEC, PREMINUM EFFICIENCY PUMP MOTOR, STRAINER, PREMINUM VALVE PACKAGE. BELL AND GOSSETT ROLAIRTROL MODEL# R3 AIR SEPARATOR, 3" INLET/OUTLET. 4 > AXIOM INDUSTRIES MODEL NT25 CONDENSATE NEUTRALIZATION TANK, 4.8 GAL. TANK, 45 GAL/HR CAPACITY, (2) 1 " NPT INLET/OUTLET CONNECTIONS. CORROSION RESISTANT POLYPROPYLENE TANK AND LID. G-\ -PAL \OTES 1. SEE VOA FOR GENERAL NOTES. 2. SEE HEATING WATER PIPING DIAGRAM ON SHEET M312. CO \STR CT 0\ \OTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. ON NG. 206-•47- 97 • NEW HEATING HOT WATER CONDENSING BOILERS HWG-1 & HWG-2. ANCHOR BOILERS THROUGH MANUFACTURER -PROVIDED 1/2" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 1/2" DIAMETER HILTI KB-TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-5/8 IN. EMBEDMENT (3-1/4" EFFECTIVE). INSTALLATION AND MINIMUM EDGE DISTANCES PER ESR-1917. ROUTE NEW 6" STAINLESS STEEL FLUE UP THROUGH EXISTING ROOF OPENINGS. ROOF REPAIR, FLASHING AND SEALING BY G.C. NEW HEATING HOT WATER PUMPS P-8 AND P-8A. PROVIDE PUMPS • SIMILAR IN SIZE TO EXISTING. SEE PUMP SCHEDULE FOR REVISED WATER GPM. ANCHOR PUMPS THROUGH MANUFACTURER -PROVIDED 5/8" DIAMETER HOLES TO EXISTING CONCRETE PAD WITH 5/8" DIAMETER HILTI KB-TZ EXPANSION ANCHORS EACH LEG (4 TOTAL) WITH 3-9/16 IN. EN BEDMENT (3-1/8" EFFECTIVE). INSTALLATION AND MINIMUM EDGE DISTANCES PER ESR-1917. PROVIDE NEW FLOOR MOUNTED EXPANSION TANK ET-2. PROVIDE NEW AIR SEPARATOR AS-2. PROVIDE NEW CONDENSATE NEUTRALIZER TANK. SEE 1M312 .FOR DETAIL. REFER CE DRAW \CS 9-53-1M312 CHILLED & HOT WATER PIPING 9-53-M362 SCHEDULE - MECHANICAL EQUIPMENT 9-53-1M505 MACHINERY ROOM SECTIONS & DETAILS RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 2 67. ' 1 SAZAN #4 MACHINERY ROOM PARTIAL PIPING PLA ENGINEER CHECKED APPROVED APPROVED TITLE REPLACE BUILDING BOILERS BUILDING 9-53 COL. A.4-C/-2-1 SHE 1 M452 .` . WED FOR 900E CQMPtIANCE APP QVED JUL 15 2015 City ofTukwila BUILDING DIVISION JOB NO. 23910 COMP NO. DEV. CENTER, WA DWG NO. GBOGGIE: 12/22/2014 9:38:06 AM D INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 Expires: 05/02/16 MECHANICAL MASTER 9-53-1M452 inn nRz 1nnn WO1 P inn nRz Anzn kA1 I -BEAM LOCK NUT LOCK NUT CONDENSATE PIPING SUPPORT DETAIL 1 SCALE: NTS 3"HWS&R 10" CHWR 10" CWHS SYM GRINNELL FIG. 265 SIDE I -BEAM CLAMP W/HOOK ROD - GRINNELL FIG. 260 ADJUSTABLE CLEVIS 1 M452 1 M505 PIPE INSULATION GRINNEL FIG. 165 PROTECTION SADDLE GRINNEL FIG. 167 INSULATION PROTECTION SHIELD 1M507 1M505 P-7A 10" CHWS THERMOMETER TYPICAL 6 "x 10" REDUCER- 1r 10" CWHR 343 10x8 (STANDBY) 12" CONCRETE BASE BASKET STRAINER TYP. REVISION GRINNEL FIG. 87, FIG 265 AND FIG 266 BEAM CLAMPS SHALL BE USED FOR ALL DUCTWORK SUPPORTS LOCK NUT CHWS & R 2'-0" CHILLED WATER PIPING SUPPORT DETAIL M SCALE: NTS 1M45211M505 Iwl- BLDG. AIR_016 ET-1 AS-1 -10" CHWS -BUTTERFLY VA. TYP AIR DRYER - PIPE SUPPORT SEE TYP. DETAIL 1M505 EMERGENCY AIR COMPRESSOR BY AIR RECEIVER 10" VENT STACK -� WATER METER S ECTI O \ (B� SCALE: 1/4" = 1 '-0" 1M45211M505 APPROVED DATE SYM REVISION GRINNELL FIG 266 CHANNEL CLAMP W/HOOK ROD GRINNELL FIG 175 ROLLER CHAIR 3/4"DRAIN �--- 6" FLU CHANNEL EXIST. SHUTOFF DIA. OF PIPE 1/4" PLATE STEEL (3Dx3D SQUARE) GROUT SUCTION ELBOW SUPPORT DETAIL SCALE: NTS 1M505 REINSTALLED REGULATOR 2„ 1-1/2" PACIFIC SEISMIC PRODUCTS MODEL 313 SEISMIC VALVE EXISTING DOWNSTREAM SHUTOFF VALVE REMOVED GAS 'EcuLarc. DETAIL J-GAS REGULATOR (EXIST) 9 EXIST 12" CONCRETE BASE (TYP 2) CONDENSATE NEUTRALIZATION TANK BY APPROVED DATE 1M45211M505 ELBOW SUCTION SIDE OF PUMP -1 /4" PLATE STEEL ALL WELDED CONSTRUCTION 4 1 /2" 0 ANCHOR BOLTS 4-TYP. L 2 1/2 x 2 1/2 GUARD EMERGENCY AIR COMPRESSOR MOUNT ON FLOOR AS PER SHT M-1 QUINCY MODEL # D216 1 1/2 HP, 460V, 30, 6 SCFM©100PSIG �0\STRUCTIO \ \ OTES DOUBLE WALL FLUE VENT, CLEARANCE TO COMBUSTABLES: 1'', MATERIAL: AL29-4C, THICKNESS: 0.015", CASING: ALUMINIZED STEEL 0.018". ROUTE DRAIN TO CONDENSATE NEUTRALIZATION TANK. SEE DETAIL #2 ON 1M312. PROVIDE FULL PROTECTION RAIN CAP. ASSIGN EXISTING VALVE NUMBER TAGGING TO NEW VALVES (TYP). CUT, PATCH, AND REPAIR OF ROOF BY G.C. 3 INSTALL 9 - 53' WATER METER #792379-02 SLB RWS 8.25.99 CONVERSION FROM MYLAR TO CAD CCSI 12.10.00 INSTALL SEISMIC GAS SHUTOFF VALVE 56755500 HARR 04/01/07 J REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 1 M452 1 M505 ellaratEr,Ardm® 2" HWF & HWR \ EXPANSION TAN K 10" CHWR 10" CHWS 1" ICW 4" C.W. MOTOR CONTROL CENTER - THERMOMETER TYPICAL 7 10" DECOUPLER BYPASS ROOF ET -1 10" CHWR TO RECEIVER TANK DETAIL n SCALE: NTS 1M505 SAZA\ GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ROOF) 8" CHWR C5 8"x4" REDUCER P-2 DRAWN S.REYNOLDS 10" CHWS VIBRATION MOUNT 12" CONCRETE BASE DATE 4.17.91 CHECKED SUBTITLE 6"x 10" P-7A (STANDBY) 345 P-7 FLOOR DRAIN SPTIC\ C AS-1 SCALE: 1/4" = 1'-0"1 M452 1 M505 1" BLEED OFF CONN W/BALLVALVE & CAPPED HOSE UNION 8" CS 10"' CHWS 8" CHWS- 6" CS THERMOMETER TYP. BUTTERFLY VA. TYP PIPE SUPPORT TYP. BASKET STRAINER TYP. 8" CHWS 8" CHWR FLOOR DRAIN SAFETY RAJ L 3" DRAINLINE 6" CONC. HOUSEKEEPING PAD SECTIG\ (A SCALE: 1/4° = 1'-0"1 M452 1 M505 MACHINERY ROOM SECTIONS & DETAILS APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED TITLE REPLACE BUILDING BOILERS BUILDING 9-53 SHEET 1 M505 10"CHWS 8" CS -8" CR BUTTERFLY VALVE TYP. NON -SLAM CHECK 12" CONCRETTYPICAL TYP. r%kwIIa 1NQ DIVISION( 12"x 12" EAG-1 W/ MANBAR SIMILAR TO DETAIL 1M505 1M517 EXHAUST FAN EF-5 8"O VENT DUCT RECEIVED CITY OF TUKWILA JUL 0 JOB NO. 23910 COMP NO. CO w CD CD Expires: 05/02/16 APPROVED MECHANICAL MASTER D.C. DWG NO. 9-53-1 M505 WAS 109-053-4030-M4 &109-053-1000-M220 SYM TO BUILDING HEATING SYSTEM FROM BUILDING HEATING SYSTEM REVISION DPT 14 - - - 1_J LEGE\3 DDC pP BY VSD CONTROL CONTACTS --f DIRECT DIGITAL CONTROLS DDC DEVICE SUMMARY ALARM (FAULT) DIFFERENTIAL PRESSURE SENSOR/ TRANSMITTER SPEED COMMAND (CONTROL) SPEED FEEDBACK START/STOP TEMPERATURE SETPOINT OUTLET WATER TEMPERATURE INLET WATER TEMPERATURE CIRCULATION PUMP DIFFERENTIAL PRESSURE TRANSMITTER APPROVED DATE SYM P-8 0 —J HEATI 7 -r P-8A 0 —J 3 HOT WATE 1 CO L_ TROL DIAGRAVV SCALE: NTS REVISION BY APPROVED DATE CONVERSION FROM MYLAR TO CAD 03.25.13 A REPLACE BUILDING BOILERS 23910 SAZAN/GB 01.16.15 INTEGRAL BOILER CONTROL PANEL EXISTING DDC CONNECTION TO BUILDING 9-50 EXISTING TRIDIUM AX DDC PANEL IN BOILER ROOM Expires: 05/02/16 HEATING HOT WATER SYSTEM BOILERS HWG-1, HWG-2 EACH BOILER IS SIZED FOR APPROXIMATELY 80% OF THE DESIGN HEATING LOAD. THE BOILERS WILL OPERATE IN A LEAD/LAG FASHION. THE LEAD BOILER WILL BE CHANGED ON A DAILY BASIS. THE BOILER SYSTEM IS ENABLED WHENEVER THE SUPPLY AIR TEMPERATURE IS LESS THAN 2°F (ADJUSTABLE) BELOW THE HOT DECK SUPPLY AIR SETPOINT TEMPERATURE (AT AHU-2 AND AHU-4). THE LEAD BOILER ENABLE WILL ALSO ENABLE THE LEAD HEATING HOT WATER PUMP (P-8 OR P-8A). THE LEAD BOILER WILL START AFTER THE INTERNAL SAFETIES HAVE BEEN SATISFIED. THE HOT WATER SETPOINT WILL BE CONTROLLED BY THE SUPPLY AIR TEMPERATURE SETPOINT (AT AHU-2 AND AHU-4). THE HOT WATER SETPOINT WILL BE DETERMINED BY THE OUTDOOR AIR TEMPERATURE SENSOR AND THE RETURN HEATING HOT WATER TEMPERATURE (IWT). AT 12°F OUTDOOR AIR TEMPERATURE THE HEATING HOT WATER SETPOINT TEMPERATURE SHALL BE 140°F (ADJUSTABLE). THE SETPOINT SHALL LOWER LINEARLY WITH THE OUTSIDE AIR TEMPERATURE SUCH THAT WHEN THE OUTDOOR AIR TEMPERATURE IS 55 THE HEATING WATER TEMPERATURE SETPOINT SHALL BE 110°F (ADJUSTABLE). VALVES AT AIR HANDLING UNITS MODULATE TO MAINTAIN THE SUPPLY AIR TEMPERATURE . ZONE SETPOINTS. TEMPERATURE SENSOR T-1 RESETS THE HEATING HOT WATER SUPPLY TEMPERATURE SETPOINT SUCH THAT THE RETURN HEATING HOT WATER TEMPERATURE IS ALWAYS GREATER THAN 80°F. BOILERS SHALL BE CAPABLE OF OPERATING TOGETHER IN UNISON AT LOW FIRING RATES TO MAXIMIZE THE ENERGY SAVINGS DUE TO CONDENSING. THE ONBOARD BOILER CONTROL SYSTEM SHALL BE THE PRIMARY CONTROL FOR THE BOILERS AND THE PUMPS. THE EXISTING DDC CONTROL SYSTEM SHALL BE CAPABLE OF REMOTE BOILER START/STOP FROM BLDG. 9-50 BOILER ROOM. THE BOILER SYSTEM IS DISABLED WHENEVER THERE IS NO CALL FOR HEATING. MAKEUP WATER VALVE STATUS: OPEN/CLOSED SHALL BE MONITORED BY THE EXISTING DDC SYSTEM. HEATING HOT WATER PUMPS (P-8, P-8A) P-8 AND P-8A ARE EACH SIZED FOR 100% OF THE REQUIRED HEATING HOT WATER FLOW. AT ANY TIME THERE WILL BE A LEAD AND A LAG PUMP. THE LEAD PUMP WILL BE CHANGED ON A DAILY BASIS. PROOF OF FLOW FOR P-8 IS THE DIFFERENTIAL PRESSURE AROUND THE PUMP AS SENSED BY DP-1. PROOF OF FLOW FOR P-8A IS THE DIFFERENTIAL PRESSURE AROUND THE PUMP AS SENSED BY DP-2. INITIAL SETTING FOR PROOF OF FLOW IS 38 F. H2O (ADJUSTABLE) FOR BOTH PUMPS. PUMP SPEED: MODULATE TO MAINTAIN DIFFERENTIAL PRESSURE (MINIMUM 25 PSI) AT BYPASS, BUT NOT LESS THAN THE MINIMUM FLOWRATE REQUIRED BY BOILERS. ON A FAILURE OF FLOW FOR THE LEAD PUMP, THE LAG PUMP SHALL BE STARTED, THE LEAD PUMP SHALL BE STOPPED, AND AN ALARM SHALL BE GENERATED AT THE ONBOARD BOILER CONTROL SYSTEM WHICH IS ALSO DETECTED BY THE ECMS. PUMPS SHALL BE CONTROLLED BY THE ONBOARD BOILER CONTROL SYSTEM AND MONITORED BY THE DDC SYSTEM. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN CHECKED ENGINEER CHECKED DATE APPROVED APPROVED RECEIVED CITY OF TUKWILA JUL 10 2015 PERMIT CENTER SUBTITLE BOILER SYSTEM CONTROLS TITLE MECHANICAL MASTER REPLACE BUILDING BOILERS BUILDING 09-53 WED FOUR x,,aC.MFLLAICE, ,> OVED 'JUL 15 2015 f l� ° City &Tukwila TIDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 1 Tel 206.267.1700 Fax 206.267.1701 SAZAN #444-1441 JOB NO. DEV. CENTER, WA DWG NO. M507 COMP NO. 23910 09-53-M507 0 M N 0 04 w CD CD CD