Loading...
HomeMy WebLinkAboutPermit M15-0091 - CHEVRON STATION - HEATING AND AIR CONDITIONING UNITSCHEVRON STATION 220 STRANDER BLVD EL1 5-0091 Parcel No: Address: Project Name: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 2623049104 220 STRANDER BLVD CHEVRON STATION MECHANICAL PERMIT Permit Number: M15-0091 Issue Date: 10/6/2015 Permit Expires On: 4/3/2016 Owner: Name: Address: CHEVRON TEXACO P 0 BOX 1392 PROPERTY TAX DEPT, BAKERSFIELD, WA, 93302 Contact Person: Name: KIRAN ASHER Address: Contractor: Name: Address: License No: Lender: Name: Address: 203 130 ST, SUITE 101, EVERETT, WA, 98208 SOUND SPECIALIZED SERVICES INC 12433 RUGGS LAKE RD , EVERETT, WA, 98208 SOUNDSS991M0 Phone: (425) 220-7278 Phone: (206) 427-3455 Expiration Date: 7/20/2016 DESCRIPTION OF WORK: INSTALL NEW HEATING & AIR CONDITIONING WITH TENANT IMPROVEMENT Valuation of Work: $56,212.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $949.66 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: 1" "� 6?1/1 Date: I hearby certify that 1 have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: �. Print Name: WI P� ���—� A/%� � � (J:6),(1- Date: e3�-- E7 1 f C This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKWI, Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://wwvv.TukwilaWA.gov Mechanical Permit No. \` l t ,>~ '(' ( Project No. Date Application Accepted: 7'2-0'15 Date Application Expires: C ' ) 0—e �Q (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION o King Co Assessor's Tax No.: Site Address: 22'o Bu g) u), Ivk1iiL4 9g1g8. Suite Number: Floor: Tenant Name:-T l't c TtA LUG , D %A STRA-ntb42 Ct *.ttQ-e ..1 New Tenant: ❑ Yes [3.,No PROPERTY OWNER Name: crf kF30 fi 4 LLC Address: 203 :30T' S-r SiE, Su 1TE 10 ) City: Ev r n 'rT State: w A. ZiP:9 g z0SI, CONTACT PERSON — person receiving all project communication Name: 14,1 RA 4 Aso Address: 203 1 ?I! ST SE , Su i Tl. /0 J City: State: Zip.c$26 &LC. t t (,.% A & Phone: 42.S 220• 7278Fax: ..-- Email: K I RA 4 ASH -Gil. a) MS ni. C , MECHANICAL CONTRACTOR INFORMATION Company Name: N4 Spe c ►A[. tob S6.4. ji erect ING Address: ( 33 2. a 6tr LA lex �4,,, City: eivc_p_f_x_r_ State: (N Zip: q 3zoa Phone: 206 .44,7 •34,SS Fax: Contr SpuntbSSib8 1. MO Exp Date: q I 2,5 (%6 Tukwila Business License No.: s in 0911 S8-1_2_ Valuation of project (contractor's bid price): $ 5 . 24 2 • Op . Describe the scope of work in detail: I Use: Residential: New Commercial: New Fuel Type: Electric Replacement Replacement �; t2 (.014 b e n DA) tnK• Gas ❑ Other: H:\Applications\Forms-Applications 0n Line\201 I Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu 2 Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 1 , Thermostat Z, Wood/gas stove Emergency generator Other mechanical equipment 2. Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Print Name: K-I. Rt.4 As tiifiL �` Sut'� 101 (� G Mailing Address: " 3 k 3 0! STI '�J .�-(T� (..�J� -I 6 zo 8 City Date: (gADI is Day Telephone: 4ZS". ZZO • -42-7-2 State Zip H:\Applications\Forms-Applications On Line \2011 Applications'Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $767.03 M15-0091 Address: 220 STRANDER BLVD Apn: 2623049104 $767.03 MECHANICAL $730.50 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $698.00 TECHNOLOGY FEE $36.53 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6233 R000.322.900.04.00 0.00 $36.53 $767.03 Date Paid: Wednesday, September 23, 2015 Paid By: KIRAN ASHER Pay Method: CREDIT CARD 00823D Printed: Wednesday, September 23, 2015 1:48 1 of 1 PM CR'SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY I PAID PermitTRAK $182.63 M15-0091 Address: 220 STRANDER BLVD Apn: 2623049104 $182.63 MECHANICAL $182.63 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R5761 R000.322.102.00.00 0.00 $182.63 $182.63 Date Paid: Monday, July 20, 2015 Paid By: KIRAN ASHER Pay Method: CREDIT CARD 06699D Printed: Monday, July 20, 2015 1:24 PM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: J C evict/ ' p Type of Ins e i n: J rf Addr s: � ` _//1',i,t.c er to Called: ' Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: proved per applicable codes. LJ Corrections required prior to approval. COMMENTS: Inspector Date REINSPECTION FEE REQUIRED. Prior to next inspection, fee fnust be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. E21] INSPECTION RECORD /C7--.19 Retain a copy with permit iT4 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project:Projectc / e.Yr- - of In Type of In ectioni. 41 Addreesss:/� /� A /q%-ll h D Called: Special Instructions: 4t41 Date Wanted: a.m. p.m. Requester: Phone No: ?Lpproved per applicable codes. Corrections required prior to approval. COMMENTS: _ Inspector: ' REINSPECTION FEE REQUIRED. Prior to next inspec#ion, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. ‘,./C INSPECTION RECORD Retain a copy with permit N&PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 15— cmiptif 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: f -de-5 e vr4fro() Type ofplpectib� �/ J 4 Address: ago 5lix,vehr& Da Call Special Instructions: 424 Date Wanted: �r a.m Requester: Phone No: ❑ Approved per applicable codes. COMMENTS: LJ Corrections required prior to approval. ,dt Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 n/5 --ooc/ Project; / CAak<rC2/0 Type of Ins ectl n: vp 1� / if e/7 Z ' il) . Address: -2- SfrAy2ch �ivc Dat Called: Special instructions: Date Wanted: a.m._ Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ei.,31e6/ Inspector: Date: / / REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. J INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 ,1f5c09/ Project: �4ec'y, Type of lryspiUion� N. Address: 4./- lDa'te ailed: ..( Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: A-7/a 41,1, 6Wes CI+ ector: REI PECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: / INSPECTION RECORD Retain a copy with permit INS ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION J 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: !,• �+� /� J UllAddr Type of Ins lion: .-z s: Date Calle Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS:„ y Inspector: Date: it/?s. REINSPECTION FEE REQUIRED. Prior to next inspection. fe must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD 11117/1 Retain a copywith permit INSPE'TION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: fir /Ce� W Type of e.)4ion:; 90A- Addres 2.6 St/ateUed. _etc, C r/k S ecialInstructions: ( p Date Wanted: it om p' Requester DA-V( / Phone N 040, ��7 1 J Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: z Inspector: Date: J/ /� REINSPECTION FEE REQUIRED. Prior to next inspec ion, fee must be c-r crwd.„,_ paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Chevron - Tukwila, WA Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. Abossen Engineering Bellevue, WA 98004 �J1J� Page 1 Building Summary Loads Building peaks in July at 3pm. Bldg Load Area Sen %Tot Lat Sen Net %Net Descriptions Quan Loss Loss Gain Gain Gain Gain Roof 2,935 12,727 12.40 0 13,061 13,061 13.49 Wall 2,632 11,569 11.27 0 5,618 5,618 5.80 Glass 532 37,921 36.94 0 22,345 22,345 23.07 Floor Slab 0 0 0.00 0 0 0 0.00 Skin Loads 62,217 60.60 0 41,024 41,024 42.36 Lighting 2,935 0 0.00 0 11,016 11,016 11.37 Equipment 5,000 0 0.00 0 18,767 18,767 19.38 People 26 0 0.00 5,200 7,150 12,350 12.75 Partition 0 0 0.00 0 0 0 0.00 Cool. Pret. 0 0 0.00 0 0 0 0.00 Heat. Pret. 0 0 0.00 0 0 0 0.00 Cool. Vent. 330 0 0.00 2,590 4,651 7,241 7.48 Heat. Vent. 440 25,292 24.64 0 0 0 0.00 Cool. Infil. 240 0 0.00 1,880 3,716 5,596 5.78 Heat. Intl'. 240 15,156 14.76 0 0 0 0.00 Draw-Thru Fan 0 0 0.00 0 856 856 0.88 Blow-Thru Fan 0 0 0.00 0 0 0 0.00 Reserve Cap. 0 0 0.00 0 0 0 0.00 Reheat Cap. 0 0 0.00 0 0 0 0.00 Supply Duct 0 0 0.00 0 0 0 0.00 Return Duct 0 0 0.00 0 0 0 0.00 Misc. Supply 0 0 0.00 0 0 0 0.00 Misc. Return 0 0 0.00 0 0 0 0.00 Building Totals 102,665 100.00 9,670 87,181 96,851 100.00 Building Sen %Tot Lat Sen Net %Net Summary Loss Loss Gain Gain _ _ Gain _ Gain Ventilation 25,292 24.64 2,590 4,651 7,241 7.48 Infiltration 15,156 14.76 1,880 3,716 5,596 5.78 Pretreated Air 0 0.00 0 0 0 0.00 Zone Loads 62,217 60.60 5,200 77,957 83,157 85.86 Plenum Loads 0 0.00 0 0 0 0.00 Fan/Duct/Misc Loads 0 0.00 0 856 aff n 88 Building Totals 102,665 100.00 9,670 87,181 RE 1: i D FORJ1010 CODE 0 MPLIANCE 00 I Check Figures PPP Total Building Supply Air (based on a 21° TD): 3,625 CFM Total Building Vent. Air (9.10% of Supply): 330 CFM JUL 2 3 2015 Total Conditioned Air Space: 2,935 Sq.ft ' Supply Air Per Unit Area: 1.2350 CFM/Sq.ft Area Per Cooling Capacity: 363.7 Sq.ft/Ton City of Tukwila Cooling Capacity Per Area: 0.0027 Tons/Sq.ft BUILDING DIVISION Heating Capacity Per Area: 34.98 Btuh/Sq.ft Total Heating Required With Outside Air: 102,665 Btuh Total Cooling Required With Outside Air: 8.07 Tons RECEIVED CITY OF TUKWILA o JUL 2 0 2C15 ( S ... co PERMIT CENTER S:\215042\Calc-Mech\Chevron Tukwila.CHV Wednesday, July 08, 2015, 01:34 PM 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Info Project Address Chevron Date 7/15/2015 220 Strander Blvd For Building Dept. Use Tukwila, WA —I r - p , Applicant Name: L. Applicant Address: Lr Applicant Phone: Project Description Briefly describe mechanical system type and features. Includes Plans Split A/C with Gas Furnace Include documentation requiring compliance with commissioning provisions per Section C408. Compliance Option ® Simple System 0 Complex System 0 Systems Analysis Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.1 Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exceptions Heat Recovery Y/N SEE M1.0 Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.1 Capacity2 Btu/h OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 Heat Recovery Y/N SEE M1.0 FEVS WED FOR Fan Equipment Schedule ' norF comp] IANC.F Equip. ID Equip Type Brand Name' Model No.' CFM Sp' HP/BHP Flowontrol5 ((��[[��n�/9t�t ��PLbc'a>tiP,ice SEE M1.0 UL 2 3 2015 City of Tukwila Service Water Heating Equipment Schedule Ir11ILDING DIVISION Equip. ID Equip Type Brand Name' Model No.1 Input Capacity Sub - Category EF7 Location f CITY OF TUKWIL JUL 202115 ' If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, ConnbustioargiMIToGENIER applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exception number per IS- 0091 Mechanical Permit Plans Checklist - Page 1 of 3 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 2013 Project Address Chevron Date 7/15/2015 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance YES C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 See attached YES C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken YES C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC M 1.0 YES C403.2.3 & C403.2.3.2 &efficiency C403.2.12.1 Equipment minimum Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment M1.0 YES C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, efficiency for all motors; note except. M1.0 YES C403.2.10 Fan power limitation Fan system motor hp or bhp does not exceed limits per Table C403.2.10.1(1) M 1.0 YES C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. M 1.0 NA C403.2.3 Maximum air cooled chiller capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit NA C40321 .. Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions NA C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers NA C403.2.3 Forced air furnace and unit heaters Indicate intermittent ignition or IID, flue/draft damper & jacket loss C403.2.3.3 Packaged electric heating/cooling equipment List equipment required to be heat pumps on schedule NA C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria YES C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M2.0 NA C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) & outdoor lock -out temp YES C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling M 1.0 YES C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override M1.0 NA C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions YES C402.4.5.2 &Dam C403.2.4.4 Dampers p Indicate location of OSA, exhaust, relief and return air dampers; include AMCA rated leakage and control type (motorized or gravity; note exceptions M 1.0 NA C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls NA C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions YES C403.2.4.6 Combustion heating equipment Indicate modulating or staged control M1.0 NA C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room automatic setback & set-up of 5°F minimum NA C403.2.4.8 / g Group R2/R3 dwelling unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken C403.2.5.1 Demand controlled ventilation Indicate high -occupancy spaces and systems requiring DCV NA C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when partially NA C403.2.5.3 Enclosed loading dock/parkinggarage ventilationsystem Indicate enclosed loading dock and enclosed parking garage ventilation activation and control method C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method NA C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or CERM calculation) NA C403.2.6.1 Energy recovery - ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions NA C403.2.6.2 Energy recovery - condensate systems Indicate on -site steam heating systems requiring energy recovery NA C403.2.6.3 Energy recovery - condenser systems Indicate remote refrig. condensers requiring ER and use of captured energy Mt:chanical Permit Plans Checklist - Page 2 of 3 ' 2012 Washington State Energy Code Compliance Forms for Commercial Group R1 and > 3 story R2 and R3 MECH-CHK Revised June 2013 Project Address Chevron Date 7/15/2015 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued NA C403.2.12 Variable flow control - fans/pumps Indicate fan & pump motors requiring VF control & method (VSD or equiv controls) NA C403.2.12.1 Variable flow control - cooling towers Indicate cooling tower fans requiring variable flow control and method NAcooling C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and demand; or exception taken NA C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 btuh NA C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response setooint adjustment Ducting Systems YES C403.2.7.1 &Duct C403.2.7.3 construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements M 1.0 YES 7:,403.2.7.3.1 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M 1.0 NAtest C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed YES C403.2.7.1 / 2 Duct insulation Indicate R-value of insulation on ductwork M 1.0 Piping Systems YES C403.2.8 Piping insulation Indicate R-value of insulation on piping M 1.0 NA C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems YES C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling YES C403.3 Qualifying 2-pipe heating systems systems Verify2-pipe heating -only system does not exceed capacity limits g y y p tY NA C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers YES C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. M 1.0 YES C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA, or exception M 1.0 YES C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) M1.0 YES C403.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 btuh M 1.0 NA C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) COMPLEX SYSTEMS Complex System Economizers NA C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equip sched. NA C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation NA C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water econo systems NA Moved Water economizer capacity Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb OSA NA C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers do not exceed pressure drop limit NA C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exceotion(s) 'Mechanical Permit Plans Checklist - Page 3 of 3 Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 MECH-CHK Revised June 2013 2012 Washington State Energy Project Address Chevron Date 7/15/2015 The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages. Applicability (yes,no,na) Code Section Code Provision Information Required Location on Plans Building Department Notes COMPLEX SYSTEMS, CONTINUED Specific System Requirements NA C403& .2.1 C403.2.12 Variable flow control - fans Indicate fans requiring variable flow control and method NA C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch NA C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure NA C403.4.5 VAV systems serving multi- zones Indicate supply air systems serving multiple zones that are required to be VAV, method of primary air control, and zones served; note exceptions taken NA C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads NA C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons NA C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method NA C403.4.3 Large capacity boiler systems Indicate multi -stage or modulating burner for single boilers > 500,000 btuh NA C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NAisolation C403.4.3.5 Chiller / boiler plant pump Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use NA C403.4.2 & C403.4.3.6 Variable flow control - pumps Indicate pumps requiring variable flow control & method 4 CNA C403.4.4 & 03 & Variable flow control - coaling towers Indicate cooling tower fans requiring variable flow control and method NA C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by z 50% for systems > 300,000 NA C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range NA C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat rejection and heat addition modes NA C403.4.3.3 Water loop heat pump - heat rejection Provide heat exchanger that separates cooling tower and heat pump loop in Climate Zone 5 NA C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heat pump and variable flow control for systems with total pump power > 10 hp NA C403.4.6 Condenser water heat recovery Indicate system provided to pre -heat service water and efficiency NA C403.5 Cooler / freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters NA C403.5 / 6 Cooler / freezer - evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp SERVICE WATER HEATING Service Water Systems C404.2 Water -heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other efficiency source) C404.3 Temperature controls Indicate temperature controls have required setpoint capability C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge C404.5 Insulation under water heater Indicate R-10 insulation under tank C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken C404.7 / 8 Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwell. units served by central HW system Pools & In -Ground Permanently Installed Spas NA C404.10.1 Pool heating equip min. efficiency Provide equipment schedule or complete MECH-SUM table with type, capacity, efficiency, test standard (or other eff. source); heat pump heaters 4 COP NA C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; or NA C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required NA C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90°F NA C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0091 DATE: 07/20/15 PROJECT NAME: CHEVRON STATION SITE ADDRESS: 220 STRANDER BLVD X Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Building Division RN Public Works 44/\ AJ%A Fire Prevention III Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 07/21/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required (corrections entered in Reviews) • DUE DATE: 08/18/15 Approved with Conditions ❑ Denied (ie: Zoning Issues) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW ❑ Staff Initials: 12/18/2013 Sound Specialized Services Inc Page 1 of 2 Home lnicio en Espanol Contact Search L&I A-Z Index Help My Secure I.,&I Safety Claims & Insurance Workplace Rights Trades & Licensing 0 Washington State Department of Labor & Industries Sound Specialized Services Inc Owner or tradesperson Principals Waite, David Lee, MEMBER Doing business as Sound Specialized Services Inc WA UBI No. 603 213 378 12433 Ruggs Lake Road EVERETT, WA98208 206-427-3455 SNOHOMISH County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ........................................................................... Meets current requirements. License specialties GENERAL License no. SOUNDSS881M0 Effective — expiration 07/20/2012— 07/20/2016 Bond ................. Contractors Bonding & Insurance Co Bond account no. SJ6993 $12,000.00 Received by L&I Effective date 07/20/2012 07/17/2012 Expiration date Until Canceled Insurance ....................... Ohio Security Ins Co Policy no. BKS5655598 $1,000,000.00 Received by L&I Effective date 07/27/2015 02/20/2015 Expiration date 02/20/2016 Insurance history Savings ...................... No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ........................ No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations ........................................................ No license violations during the previous 6 year period. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603213378&LIC=SOUNDSS881MO&SAW= 10/6/2015 GENERAL NOTES 1) COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE MOST CURRENT BUILDING, MECHANICAL, ENERGY, PLUMBING, FIRE AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE LOCAL JURISDICTIONS. 2) ALL AIR-CONDITIONING UNITS WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP FOR THE CONDENSATE PAN WITH PLUG TEES FOR CLEANING AND CONDENSATE PIPES SHALL BE DISCHARGED TO EXISTING CONDENSATE WASTE PIPING. VERIFY SIZE AND LOCATION AT SITE. 3) MECHANICAL CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS AND DUCT ROUTING CLEARANCES WITH THE STRUCTURAL, REFLECTED CEILING AND LIGHTING PLANS. 4) PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING VENT STACKS WITH THE EQUIPMENT TO MAINTAIN A MINIMUM OF 10 FT. FROM THE OUTSIDE AIR INTAKES. 5) ALL FIRE RATED STRUCTURE SHALL BE FIRE DAMPERED. VERIFY WITH THE ARCHITECTURAL AND INSTALL PER THE LOCAL JURISDICTIONS. 6) ALL AIR DISTRIBUTION OUTLETS SHALL HAVE VOLUME CONTROL DEVICES. 7) ALL VOLUME DAMPERS IN NON -ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM EXTENDED TO AN ACCESSIBLE LOCATION ("YOUNG REGULATOR' BOWDEN CABLE, ROTOTWIST OR EQUAL). EXACT LOCATION OF CONTROL DEVICES VISIBLE IN FINISHED SPACES SHALL BE COORDINATED WITH THE ARCHITECT. 8) ALL 90 DEGREE TRUNK DUCT ELBOWS SHALL BE SMOOTH -ROUND OR SQUARE WITH TURNING VANES. 9) MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT LOCATION OF PIPING AND DUCTWORK AND PENETRATIONS WITH THE STRUCTURE. 10) MAXIMUM LENGTH OF FLEXIBLE DUCTS SHALL BE 6' OR AS SHOWN ON DRAWINGS. 11) ALL DUCTWORK, EQUIPMENT AND PIPING SHALL BE SEISMICALLY SUPPORTED PER SMACNA AND LOCAL REGULATIONS. 12) ALL AIR FILTERS SHALL HAVE EFFICIENCY BASED ON THE ASHRAE STANDARD 52-76 (ATMOSPHERIC DUST SPOT). 13) ALL MECHANICAL EQUIPMENT SHALL CONFORM TO SMACNA AND LOCAL REGULATIONS FOR SEISMIC RESTRAINT (INCLUDING PIPING AND DUCTWORK). 14) ALL EQUIPMENT AND ACCESSORIES IN CONCEALED SPACES REQUIRING ACCESS SHALL HAVE ACCESS DOORS. 15) TOTAL SYSTEM SHALL BE WARRANTED FOR ONE YEAR; STARTING FROM THE TIME OF OWNER/ENGINEER'S FINAL ACCEPTANCE. 16) HVAC NOTES: A) PROVIDE FLEXIBLE CONNECTION IN ALL DUCTS CONNECTING TO AIR MOVING EQUIPMENT AS CLOSE TO FAN AS POSSIBLE. FLEXIBLE CONNECTION SHALL CONSIST OF 6" OR MORE OF AIR TIGHT, ARE PROOF FLEXIBLE NEOPRENE COATED WOVEN FIBROUS GLASS MATERIAL VENT FABRICS, INC. OR APPROVED EQUAL B) ALL DUCTWORK SHALL BE SHEET METAL SOUND UNE RECTANGULAR SUPPLY AND RETURN DUCTS WITHIN 10 FEET FROM THE UNIT OPENINGS. C) ALL SUPPLY AND RETURN FLEXIBLE DUCTS SHALL BE CONSTRUCTED OF DOUBLE LAMINATION OF POLYESTER ENCAPSULATED STEEL WIRE HELIX FOR INNER CORE HIGH DENSITY FIBERGLASS INSULATION AND GRAY POLYESTER FILM WITH SPIRAL REINFORCEMENTS EQUAL TO 'ATCO-70 SERIES" (MIN. POS. PRESS. = 6" W.G., NEG. PRESS = 0.75" W.C.). FLEXIBLE DUCTS AND CONNECTORS SHALL BE U.L. 181 LISTED AND MEET ALL REQUIREMENTS OF IMC 603.6. D) PROVIDE LOCKABLE VOLUME DAMPERS IN ALL AIR DISTRIBUTION OUTLETS. E) DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION SHALL CONFORM TO ASHRAE AND SMACNA RECOMMENDATIONS. F) DUCT SIZES SHOWN ON PLANS INDICATE INSIDE FREE AREA. G) ALL DUCTWORK SHALL BE CLASS 1 AIR DUCT AS APPROVED BY U.L-181. H) DUCTS - SHEET METAL DUCTS SHALL BE INSULATED WITH THE INSULATION AND THICKNESSES AS SHOWN HEREIN (REDUCE THE INSULATION THICKNESS BY THERMAL VALUE OF SOUND LINING). 1. SUPPLY AIR DUCTS IN HEATED SPACE; NO INSULATION REQUIRED IF SOUNDUNED, OTHERWISE 1" THICK K = 0.23 0 75 DEGREES F. 2. SUPPLY AIR DUCTS IN NON -HEATED SPACE APPROXIMATELY 3" THICK K=0.23 0 75 DEGREES F., TO PROVIDE A MINIMUM THERMAL RESISTANCE VALUE OF MINIMUM R-11. 3. SUPPLY AIR DUCTS OUTSIDE OF BUILDING SAME AS CONDITIONED SPACE EXCEPT WITH WEATHERPROOF BARRIER. 4. RETURN AIR DUCTS; SHALL HAVE SAME INSULATION AS THE SUPPLY AIR DUCTS. 5. EXHAUST AIR DUCTS; NO INSULATION REQUIRED. 6. INDOOR DUCTS HANDLING OUTSIDE AIR SHALL HAVE FIBERGLASS BLANKET WITH VAPOR BARRIER JACKET ASJ, 1" THICK, K = 0.23 0 75 DEGREES F. (ALL DUCTWORK FOR THE BUILDING SUPPLY FAN AND OUTSIDE AIR INTAKES TO INDMDUAL HEAT PUMPS). 17) DUCTWORK ALL DUCT SIZES SHOWN ON PLANS INDICATED INSIDE FREE AREA. ALL DUCTWORK SHALL BE CLASS 1 AIR DUCT AS APPROVED BY U.L-181. A. INSTALL ALL DUCTWORK IN COMPLETE CONFORMANCE WITH RECOMMENDED CONSTRUCTION STANDARDS FOR RECTANGULAR AND ROUND SHEET METAL AND FLEXIBLE DUCTS IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. MINIMUM SHEET METAL THICKNESS SHALL BE 26 GA. B. ALL DUCT JOINTS LONGITUDINAL AND TRANSVERSE ARE TO BE SEALED USING 181A OR 181B LISTED TAPES AND MASTICS. MECHANICAL FASTENERS MUST BE USED TO FASTEN DUCTS. C. STRAP HANGERS SHALL NOT BE LESS THAN 1" BY 1/8" THICK ON SIX (6) FOOT CENTERS AND ATTACHED TO SIDE OF DUCT WITH SHEET METAL SCREWS. INSULATED FLEXIBLE DUCT MAY BE USED FOR LOW PRESSURE RUN OUTS TO INDMDUAL DIFFUSERS IN LENGTHS NOT TO EXCEED FIVE (5) FEET FOR EACH DIFFUSER. SEAL ALL SHEET METAL SCREW PENETRATIONS. D. ALL RECTANGULAR AND ROUND SUPPLY DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM THICKNESS THAT CONFORMS TO THE STANDARD OF THE LOCAL CODE AND SHALL AND SHALL HAVE A CONTINUOUS VAPOR BARRIER JACKET W/ALL JOINTS TAPED AND SEALED. FRESH AIR DUCT SHALL HAVE 2" INTERNAL DUCT UNER FROM POINT OF OUTSIDE AIR CONNECTION TO POINT OF CONNECTION AT PLENUM BOX OR MIXING BOX. ALL EXPOSED SPIRAL DUCT SHALL HAVE INTERNAL DUCT LINER. E. ALL INSULATION, JOINING MATERIALS, SEALER, ETC.. SHALL HAVE A U.L FLAME SPREAD CLASSIFICATION OF NO MORE THAN 25 AND A SMOKE DEVELOPMENT RATING NOT MORE THAN 50. 18) MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE THE EXACT LOCATION OF DUCTWORK WITHIN THE STRUCTURE WITH STRUCTURAL AND GENERAL CONTRACTOR PRIOR TO INSTALLATION OF ANY STRUCTURE OR EQUIPMENT. 19) ALL DUCT PENETRATIONS THROUGH RATED ENCLOSURES SHALL BE FIRE AND/OR SMOKE DAMPERED. 20) ALL ROOF PENETRATIONS SHALL BE MIN. OF 5 FEET AWAY FROM THE 2-HR AREA SEPARATION WALLS. ALL PIPE, DUCT AND CONDUIT PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE FIRE AND SMOKE STOPPED PER CODE. 21) ALL MECHANICAL EQUIPMENT SHALL CONFORM TO SMACNA AND LOCAL REGULATIONS FOR SEISMIC RESTRAINT (INCL PIPING AND DUCTWORK). 22) THE CONTRACTOR SHALL NOT OPERATE THE EQUIPMENT FOR TEMPORARY HEATING OR VENTILATION DURING THE CONSTRUCTION. (ALL EQUIPMENT SHALL RUN FOR TESTING AND BALANCING PURPOSES ONLY). NOTIFY THE ENGINEER 48 HOURS (MINIMUM) IN ADVANCE TO ARRANGE A FINAL FIELD INSPECTION PRIOR TO COVERING UP THE CEILING. 23) EACH FAN UNIT OVER 2000 CFM SHALL HAVE A DUCT/SMOKE DETECTOR PER 2012 IMC 606 IN RETURN DUCTS AS REQUIRED BY THE JURISDICTIONS. UNIT SHALL SHUT DOWN UPON SMOKE DETECTION (COORDINATE WITH FIRE ALARM CONSULTANT/CONTRACTOR PRIOR TO BIDDING/ CONSTRUCTION). 24) CONTRACTOR IS TO BRING UP THE DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED FOR OR SHOWN BUT ARE REQUIRED FOR A COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH, ITEMS REQUIRED FOR A COMPLETE SYSTEM READY FOR THE OWNER'S BENEFICIAL USE SHALL BE FURNISHED AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDRIONAL COST TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPUCABLE STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL 25) ALL EQUIPMENT SUPPLIED FOR THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, WORKMANSHIP, AND TITLE, AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT APPEARS WITHIN ONE YEAR FROM DATE OF FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE WARRANTIES ABOVE, THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE THE SYSTEM TO THE ORIGINAL SATISFACTORY CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY. NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.) 26) ENTIRE INSTALLATION OF ALL EQUIPMENT, CONTROL, PIPING, DUCTWORK AND RELATED ACCESSORIES SHALL BE PER BASIC OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WITH THESE STANDARDS. 27) MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ROUTING AND INSTALLATION FEASIBILITY OF ALL EQUIPMENT, PIPING AND DUCTWORK PRIOR TO SUBMITTING HIS BID AND INCLUDE IN HIS BID ADDITIONAL PIPING, DUCTWORK, FITTINGS, OFFSETS, ETC. WHICH MIGHT BE REQUIRED FOR A COMPLETE SYSTEM READY FOR OWNER'S BENEFICIAL USE. 28) COORDINATE THE CONSTRUCTION SCHEDULE WITH THE ARCHITECT AND PERFORM ALL REQUIRED WORK IN STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE. 29) MECHANICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES REQUIRED BY THE AUTHORITIES HAVING JURISDICTION. 30) ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE AIR -BALANCING AND PUT ALL MECHANICAL SYSTEMS IN OPERATION AND SUBMIT MINIMUM 4 COPIES OF BALANCING REPORTS TO THE OWNER/ARCHITECT. INDUCED COMBUSITON GAS FURNACE SCHEDULE DESIGIATION:F-1 F-2 ZONE STORE STORE CARRIER CARRIER MAMFACTINER MODEL: 58PHA-090-16 58PHA-090-16 TYPE HORIZONTAL HORIZONTAL NAT. NAT. GAS TYPE I I- 1 .: ): 84 84 OUTPUT(MBH): 69 69 ARE VENT): 80% 80% FAN (1om): 3/4 HP 3/4 HP CFIlIk 1600 1600 ESP. (1V-H20): 0.60" 0.60" MCA/MOCP 10.3/15.0 10.3/15.0 VOLTAGE: 115 115 PHASE: 1 1 VVEICHT (LBS): 150 150 RBAARKS (1)(2) (1)(2) (1) WITH ECM MOTOR, FILTER RETAINERS, FILTERS AND ALL STANDARD SAFETY FEATURES AND INSTALLATION ACCESSORIES, INTERMITTENT IGNITION DEVICE, MFG CONCENTRIC VENT TERMINATION KIT, MOTORIZED OUTSIDE DAMPER, SPRING ISOLATORS/UNI-STRUT/ALL-THREAD ROD, CONDENSATE FREEZE PROTECTION KIT.. (2) A.G.A. LISTED. INDOOR COOLING COIL/OUTDOOR CONDENSING UNIT SCHEDULE DON: CC-1 CU-1 CC-2 CU-2 Z STORE STORE STORE STORE MAMA CARRIER CARRIER CARRIER CARRIER MODEL: CNPH6024A 24ABC660-30 CNPH6024A 24A8C660-30 COIL COIL COIL COIL •,a vl TONS -- 5.0 -- - 5.0 MATPINNACE: F-1 F-1 F-2 F-2 COOLNG o AN ): -- 52.0 -- 52.0 CFM: 1600 -- 1600 -- ESP. (NV-H20): 0.5" -- 0.5" -- SEER: -- 15.0 -- 15.0 OUTDOOR FAN MOTOR (FLA): 1.20 -- 1.20 r-- - -- coeFEssat RLA/LRA: -- 21.4/135.0 -- 21.4/135.0 MC -- 28.0/40.0 -- 28.0/40.0 VOLTAGE: -- 208 -- 208 PHASE: -- 1 -- 1 NOISE (CBA): -- -- -- -- (LBO: 53 143 53 143 REMAIWS (1)(2) (2) (1)(2) (2) (1) COORD. CONDENSATE DRAIN W/PLUMBER. (2) INSTALL REFRIGERATION PIPING SUCTION/UQUID LINES BETWEEN INDOOR/OUTDOOR COIL/UNIT PER MANUFACTURER GUIDELINES. INSULATE SUCTION ONES WITH 1" ARMAFLEX OR EQUAL. INSTALL OTHER ACCESSORIES AS REQUIRED AND AS RECOMMENDED PER THE MANUFACTURER Minimum Outside Air Ventilation Schedule I I Ventilation Rate per 2012 IMC 403 (based on ASHRAE Std. 62.1-2007) Equip. Tag Zone Occupancy Category Area (sf) People Outdoor Air Rate (cfm/person) Table 403.3 Zone Population. Number of people in space.* Area Outdoor Air Rate (cfm/sf) (Table 403.3) Occupant Density (#/1000 sf) Breathing Zone Outdoor Air Flow Vbz/(CFM) Zone Air Distribution Effectiveness Ez (Table 403.3.1.2) Zone Outdoor Air Flow (Voz/(CFM) System Ventilation EfficiencyEv (Table 403.3.2.3.2 Minimum Outdoor Air Intake Flow Vot/(CFM) Proposesd Design Outdoor Air Intake Flow Vot/(CFM) HP-1/HP-2 Retail Retail 1685 7.5 25 0.12 15 389.70 1.00 389.70 0.90 351 400 Storage Room Storage Rms 226 0.0 0 0.12 0 27.12 1.00 27.12 0.90 24 25 Storage Room Storage Rms 122 0.0 0 0.12 0 14.64 1.00 14.64 0.90 13 25 Total 388 450 Total 388 450 * In some cases occupancy is less than maximums as allowed per 403.3 exception, in no case shall the occupancy De less than one half per Table 403.3. UNED RETURN AIR PLENUM RA DUCT OA DUCT - MOUNT UPSTREAM OF RA DU ACCESS PANEL SEE FLOOR PLAN FOR DUCT SIZE do ROUTING, DUCT SHALL BE SAME SIZE AS UN INLET. LTER SECTION WITH SIDE ACCESS; ENSURE CLEARANCES ARE MAINTAINED. DO NOT BLOCK FILTER PULL WITH - CONDENSATE TRAP AND VENT III O SECONDARY DRAIN PAN - 1.5" DEEP AND 2' LARGER THAN UNIT IN BOTH DIRECTIONS FLEXIBLE CONNECTION AT SUPPLY AND RETURN. . DUCT UNER RIMARY CONDENSATE DRAIN, SEE FLOOR PLAN FOR ROUTING ELECT OVERFLOW CUT-OFF SWITCH AT CONDENSATE OVERFLOW OUTLET; EQUAL TO MODEL EZT-222 MANUFACTURED BY "EZ-TRAP INC' OR EQUAL QQ CONDENSATE DRAIN SHALL BE 1" FOR ALL UNITS SLOPE AT r PER FOOT (MIN). 0 ALL THREAD ROD SHALL BE MIN 1 'DIAMETER. ATTACH TO STRUCTURE ABOVE AS NOTED IN SMACNA CHAPTER 4. MIN OF 4 RODS. 0 PROVIDE STEEL ANGLE IRON MINIMUM SIZE FOR ALL UNITS 5 TONS AND LESS: 1.5"x1.5'4". MAXIMUM LENGTH 4FT. 0 NEOPRENE/SPRING VIBRATION ISOLATER: 0.3" DEFLECTION. MASON 30N VIBRATION HANGER OR EQUAL 0 UNE SUPPLY DUCT FIRST TEN FEET FROM UNIT OR UP TO FIRST TRANSITION OR ELBOW. HORIZONTAL INDOOR FAN COIL DETAIL NO SCALE A M 1.0 DROP. CEIL'G, COORD. WITH ARCH'L FRAME TO SUIT CLG. (TYP.) CEILING RETURN GRILLE DETAIL NO SCALE USE SMOOTH RADIUS SHEET METAL ELBOW WHERE 12" STRAIGHT FLEX IS NOT FEASIBLE MAINTAIN 12" OF STRAIGI FLEX DUCT BEFORE CONN TO DIFFUSER 1 STRAIGHTENING GRID I II I FLEX DUCT ADAPTER WHERE APPLICABLE L CEILING DIFFUSER DETAIL CEIL'G (COORD. WITH ARCH'L) - FRAME TO SUIT CLG. (TYP.) C NO SCALE M1.0 LEGEND SThEOL ABNEVIAT1ON DEBEICFMON QQ /Qs T'STAT/SENSOR THERMOSTAT/SENSOR el -- DUCTWORK W/ TURNING VANE AND FLEX CONN. -J VD VOLUME DAMPER -- RIGID DUCT -- FLEXIBLE DUCT I:h -- ROUND SPIN -IN WITH V.D. FD FIRE DAMPER -. SFD SMOKE FIRE DAMPER * CFD CEIUNG RADIATION FIRE DAMPER CD ROUND CEIUNG DIFFUSER • CG ROUND CEIUNG GRILLE 171 CD SQUARE CEIUNG DIFFUSER CG SQUARE CEIUNG GRILLE CD CONDENSATE DRAIN UNE -CD- MI -- SMOKE DUCT DETECTOR A.F.F. ABOVE FINISHED FLOOR ////// (D) DEMOUTION WORK (E) EXISTING DUCTWORK (N) NEW DUCTWORK POC POINT OF CONNECTION e It o $A1coOI Plan review approval is subjfmt to errors and omissions. Approval of construction documents d . = not authorize the vlota of any adopted ado or ordinance. Receipt of approved Field Copy and conditions is acknowledged: Date: ' )CT P--412mt C • City of Tukwila BUILDING DIVISION ENERGY CODE NOTES: 1) THERMOSTATS SHALL BE A 7 DAY PROGRAMMABLE TYPE WITH A 5 DEGREE DEADBAND AND AUTOMATIC SETBACK CONTROL PER C403.3.4.2 2012 WSEC. 2) HVAC EQUIPMENT SHALL MEET THE MINIMUM ENERGY EFFICIENCY RATINGS PER TABLES C403 OF THE WSEC. 3) DUCT INSULATION AND SEALING SHALL MEET WSEC SECTION C403.2.7 REQUIREMENTS. 4) SUPPLY AND RETURN DUCTS IN UNCONDITIONED SPACES SHALL BE INSULATED TO MIN. R-6. ROOFTOP HVAC DUCTWORK SHALL HAVE A WEATHER BARRIER AND INSULATED TO R-8 PER WSEC C403.2.7. 5) SUPPLY AND RETURN DUCTS IN CONDITIONED SPACES SHALL BE INSULATED TO MIN. R-5 PER C403.2.7 WSEC. 6) PIPING INSULATION SHALL MEET THE REQUIREMENTS OF WSEC 403.2.8. 7) OUTSIDE AIR DUCTS SHALL BE INSULATED PER WSEC C403.2.7. OUTSIDE AIR DUCTS SHALL HAVE A MOTORIZEC DAMPERS OR AUTOMATIC DAMPER FOR ALL OUTSIDE AIR INTAKES, 8) HVAC SYSTEMS SHALL BE COMMISSIONED PER WSEC C408.2. 9) HVAC SYSTEM INTAKE, EXHAUST AND RELIEF DAMPERS LEAKAGE SHALL COMPLY WITH V"WS'E'CU4OZ4 5 EV1SIONS No changes st(dll be made `o the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will reauiro .a new plan submittal DESIGN 4sessiude additional plan re.vIevi fees ALL CODES WITH WASHINGTON STATE AMENDMENTS 2012 WASHINGTON STATE ENERGY CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 UNIFORM PLUMBING C PARATE PERMIT 2012 INTERNATIONAL FIRE CD@ECUIRED FOR: ❑ Mechanical EVIEWED FOR 000E COMPLIANCE ` APPROVED JUL 2 3 2015 .As) City of Tukwila BTU LOING DIVISION .,B'"Electrical ..ErPlumbing ,Eilt4s Piping City of Tuk, i'a PI III 1.1,. t ^err; e PLAN INDEX - GENERAL NOTES, SCHEDULES AND LEGEND FLOOR PLAN - HVAC SPECIFICATIONS RECEIVED CITY OF TUKWILA JUL 2 U 2015 PERMIT CENTER • 1..1 (it, Architects 19401 40th Lynnwood, Ph. dwallace@PMDGinc.com Kenneth Ave. West, Suite Wa. 98036 (425) 405-7746 e-mail: McCracken, Architect 300 ►(1 Seal ��. Cie I ABOSSEIN ENGINEERING L.L.C. MECHANICAL LEED 2100 BELLEVUE, PHONE: I ELECTRICAL I FIRE PROTECTION 112TH AVE. NE WA 98004 (425) 462-9441 I CML REVISION PLANNING PRELIMINARY REVIEW PROGRESS SET HEALTH SUBMITTAL - EQUIPMENT REVS HEALTH COMMENTS BUILDING PERMIT SUBMITTAL ELECTRICAL PERMIT SUBMITTAL w o 2/25/15 0 \ \ ro 4/23/15 LO \ \ to \ co in \ N N4 as««< z O CO Er 0 W Zm 00 J o2 CDo O V W Lu ol � J -J - il: co he N ' FF- N X W Project Number 215042 Sheet GENERAL NOTES, SCHEDULES AND Name LEGEND Sheet Number MI.O •"y KEYED NOTES: 0 FAN COIL UNIT HUNG FROM STRUCTURE WITH VIBRATION ISOLATORS WITH ALL THREAD ROD, ANGLE IRON/UNI-STRUT. MOUNT AS HIGH AS FEASIBLE IN ORDER TO MINIMIZE DUCT DUCT OFFSET TO HIGHER CEILING. SEE DETAIL A/M1.0.. 0 1" SOUNDLINING FOR SUPPLY AIR AND RETURN AIR DROPS. SOUNDLINE FOR THE FIRST 10 FT, ROUTE DUCTWORK ABOVE CEILING SPACE. VERIFY EXACT LOCATIONS OF JOISTS AND JOIST SPACING AT SITE IN ORDER TO INSTALL THE DUCTS BETWEEN THE STRUCTURE. TRANSITION AT THE UNIT OPENING AS REQUIRED. (TYP.) OSUPPLY DUCT AND RETURN DUCT WITH 1" EXTERIOR INSULATION (MIN. R-6) OSPIN -IN VOLUME DAMPER (TYPICAL) 0 FLEX DUCT - MAIXIMUM 6 FT. (TYP.) O7-DAY PROGRAMMABLE WSEC COMPLIANT T'STAT WITH SUB -BASE, TAMPERPROOF FEATURES AND REMOTE SENSOR CAPABILITY OG EXISTING BATHROOM EXHAUST FAN TO REMAIN. ODUCTWORK INSTALLED ABOVE CEILING SPACE. INSTALLATION SHALL BE PER SMACNA "HVAC DUCT CONSTRUCTION STANDARDS", LATEST EDITION (TYPICAL). 0 SEE AIR DISTRIBUTION SCHEDULE, THIS SHEET. (TYP.). OSEE DIFFUSER AND RETURN GRILLE DETAIL B/M1.0 & C/M1.0. (TYP.). OWALL MOUNTED REMOTE SENSOR. OOFFSET DUCTWORK UP. OOUTDOOR HEAT PUMP MOUNTED OVER EXISTING ROOF SUPPORT SYSTEM FOR REMOVED ROOFTOP AIR HANDLERS. MODIFY AS REQUIRED TO SUPPORT NEW UNIT. INCLUDE SPRING ISOLATORS (MIN 1" DEFLECTION). OROUTE CONDENSATE TO TAILPIECE OF LAVATORY AND PER LOCAL JURISDICTION REQUIREMENTS. O4" 0 B-VENT UP TO ROOF WITH U.L. LISTED CAP AND 4" COMBUSTION AIR VENT. TERMINATE AND SEPARATE PER IMC, NFPA 54 AND MANUFACTURERS INSTALLATION GUIDELINES.. � ECONOMIZER MIXING BOX WITH CONTROLS, ACTUATORS, FILTER BOX AND RACK/FILTER, 1" PLEATED FILTER, ETC. (MICROMETL, CANFAB OR EQUAL). N ROOF) 100CFM- STII► .!` GE OMEN ACCESS PLATFORM PER IMC. ACCESS VIA T-BAR CEILING OFFSET UP 160QCFM-D 24X12 ECONO RELIEF LVR (F2 ROOF) 200CFM-B SIO AGE 126X12 K ACC S DOOR - ABOVE_::;CE•1 LI:N G_=- SALES AREA STORAGE r r-r WALK IN COOLER 16X12 10"0 r r is 10"0 1 325C 10-0 r 16X12 1 I\ 0 !tJ —10 oli 1i 11 III ; 325CFM `A r3 10" 0 1.................. i ill I! AREA — 320CFM-A 20CFM-A AIR DISTRIBUTION SCHEDULE TYPE DESCRIPTION CFM NECK SIZE KRUEGER MODEL TITUS MODEL REMARKS A T-BAR DIFFUSER PER PLAN PER BELOW 6200 PCS PERFORATED B SOLID CEILING DIFFUSER PER PLAN PER BELOW SH TDC AIR DIST. 4-WAY UNLESS SHOWN OTHERWISE C SOLID CLG. RETURN/EXH. GRILLES PER PLAN PER BELOW S8OH 350RL BOTTOM/TOP WALL GRILLE D TOP WALL REGISTER PER PLAN PER BELOW 880H 300RS E T-BAR RETURN/EXHAUST GRILLE PER PLAN PER BELOW EGC5 50F3 F LINEAR SLOT DIFFUSER PER PLAN 48" - 2 SLOTS (1" SLOT) 1950 ML39 G LINEAR SLOT DIFFUSER PER PLAN 48" - 2 SLOTS (1" SLOT) PTBS MPI DUCT SIZE FEEDING THE AIR DISTRIBUTION NECK NECK NECK NECK NECK SIZE (ROUND) CFM (MIN.) CFM (MAX) TYPE- A (6200) TYPE- B (SH) TYPE- C (S8OH) TYPE- D (880H) TYPE- E (EGC5) 4" 0 35 6 X 6 6 X 6 6 X 6 6 X 6 6 X 6 5" 36 60 6 X 6 6 X 6 6 X 6 6 X 6 6 X 6 6" 61 95 6 X 6 6 X 6 6 X 6 6 X 6 6 X 6 7" 96 145 6 X 6 6 X 6 8 X 6 8 X 6 8 X 6 8" 146 200 6 X 6 6 X 6 10 X 6 10 X 6 10 X 6 9" 201 280 10 X 10 9 X 9 10 X 6 10 X 6 10 X 6 10" 281 380 10 X 10 9 X 9 12 X 10 18 X 8 12 X 10 12" 381 600 12 X 12 12 X 12 18 X 10 20 X 8 18 X 10 14" 601 900 15 X 15 15 X 15 24 X 12 28 X 10 24 X 12 16" 901 1300 24 X 18 32 X 10 24 X 18 18" 1301 1750 24 X 24 36 X 16 24 X 24 20" 1751 2045 24 X 24 24 X 24 20" 2046 2310 30 X 24 30 X 24 22" 2311 3000 30 X 30 30 X 30 NOTES: 1) CEILING DIFFUSERS, REGISTERS AND GRILLES SHALL BE KRUEGER OR EQUAL. 2) CD=CEILING DIFFUSER, RG=RETURN GRILLE, TG=TRANSFER GRILLE, LVR=LOUVER, TWR=TOP WALL REGISTER, TWG=TOP WALL GRILLE. 3) ALL SUPPLY AIR DISTRIBUTION OUTLETS WITHOUT VOLUME DAMPERS SHALL HAVE OPPOSED BLADE VOLUME CONTROL DAMPERS. 4) FASTENING METHOD SHALL BE AS SELECTED BY ARCHITECT AND SHALL BE COMPATIBLE WITH THE WALL OR CEILING STRUCTURE THAT IS BEING INSTALLED TOO. 5) MANUFACTURER MUST MATCH MATERIALS, TYPE, AND PERFORMANCE OF LISTED DEVICE. COORDINATE FINISH WITH ARCHITECT. 30CFM-A FLOOR PLAN — HVAC 320CFM-A I SCALE: 1/4" = 1'-0" NORTH .3200 FM 4• 1- 24X12 -EC0 I0 RELIEF LVR (F1) REVtWED FOR CODE COMPLIANCE APPROVED JUL 2 3 2015 City of Tukwila BUILDING DIVISION RECEIVED CI OF TUKWILA 15 T group Architects 19401 40th Ave. West, Suite 300 Lynnwood, Wa. 98036 Ph. (425) 405-7746 e-mail: dwallace@PMDGinc.com Kenneth McCracken, Architect ‘ '• 1 5-1..!_, / V Seal 0 1 l c ABOSSEIN ENGINEERING L.L.C. MECHANICAL I ELECTRICAL I CML LEED I ARE PROTECTION 2100 112TH AVE NE BELLEVUE, WA 98004 PHONE: (425) 462-9441 REVISION PLANNING PRELIMINARY REVIEW PROGRESS SET HEALTH SUBMITTAL - EQUIPMENT REVS HEALTH COMMENTS BUILDING PERMIT SUBMITTAL ELECTRICAL PERMIT SUBMITTAL < p t) N N N �— rO N \ N 6/3/15 v....7... .— Nz \<l<a \ l \< Z O CAim CD 411011 hal 9 c0 WIllo Z °J 0O 0 O) W O U W J lib Q oIC � Q< �� he P < CMCN Er w Project Number 215042 Sheet Name FLOOR PLAN HVAC Sheet Number M2.0 HVAC SPECIFICATIONS - DIVISION #23 3.08 ALL WORK SHALL BE DONE IN A FIRST-CLASS MANNER BY WORKMEN SKILLED IN THE TRADE AFFECTED. 3.33 VALVES: NIBCO BALL VALVES OR EQUAL. 3.34 AIR CONDITIONING UNITS: PART 1.00 GENERAL 1.01 LOCAL CONDITIONS: VISIT AND INSPECT THE PREMISES TO ASCERTAIN THE EXISTING CONDITIONS BEFORE 3.09 CLEANING PIPING, DUCTS, EQUIPMENT: THOROUGHLY CLEAN ALL DUCTS AND EQUIPMENT OF DIRT, CUTTINGS, AND OTHER FOREIGN SUBSTANCES. REMOVE FROM PREMISES ALL RUBBISH AND DEBRIS, LEAVING THE AREA CLEAN AND READY FOR USE. PER EQUIPMENT SCHEDULE WITH CAPACITY AS INDICATED. UNIT SHALL BE AN AIR-COOLED CONDENSING UNIT, AIR HANDLING UNIT WITH DX -COILS OR HEAT PUMPS OR GAS FURNACE OR HOT WATER COILS, FILTER MIXIMG BOX AND VIBRATION ISOLATORS. TOTAL CAPACITY OF EACH UNIT SHALL BE AS SCHEDULED ON THE DRAWINGS. SUBMITTING A BID. NO EXTRA PAYMENT WILL BE ALLOWED FOR THE LACK OF KNOWLEDGE OF THESE CONDITIONS. 3.10 EQUIPMENT START-UP: ADJUST ALL BELTS, OR OTHER DRIVES AND CHECK MOTOR ROTATIONS. 3.35 CONTROLS - THE COOLING SYSTEM SHALL BE PROTECTED WITH HIGH PRESSURE STAT, LOW PRESSURE STATS, LOSS -OF -CHARGE PROTECTION, INDOOR COIL FREEZESTATS, CURRENT AND TEMPERATURE SENSITIVE OVERLOAD DEVICES. 1.02 CODES: STRICTLY COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS. 3.11 INSTALL TEMPORARY AIR FILTERS IN AIR HANDLING EQUIPMENT THAT IS BEING USED FOR HEATING OR VENTILATION DURING CONSTRUCTION. INSTALL A NEW SET OF THE SPECIFIED AIR FILTERS FOR THE 3.36 PROVIDE PRODUCTS OF COMBUSTION DETECTOR IN SUPPLY AND RETURN AIR IN ALL UNITS 2000 CFM OR OVER IMC - MECHANICAL CODE EQUIPMENT AT THE COMPLETION OF THE JOB. TO SHUT DOWN UNIT OCONDITION. IPC - PLUMBING CODE 3.37 EXHAUST FANS: FANS SHALL MEET CAPACITIES SCHEDULED AND NOT EXCEED SOUND LIMITATIONS SPECIFIED. IFGC - FUEL GAS CODE 3.12 COMPLETION: OPERATE ALL MECHANICAL SYSTEMS, INCLUDING ALL EQUIPMENT FURNISHED UNDER THIS DIVISION FOR A PERIOD OF TIME NOT TO EXCEED 5 DAYS OR AS MAY BE REQUIRED AT THE DIRECTION ON 3.38 GRILLES & REGISTERS: SCHEDULED ON DRAWINGS. TITUS, KRUEGER OR EQUAL. 1.03 STANDARDS: THE FOLLOWING PUBLICATIONS (LATEST EDITION) FORMA PART OF THESE REQUIREMENTS TO THE EXTENT INDICATED BY THE REFERENCES THERETO: THE ARCHITECT/ENGINEER TO PROVE THAT ALL COMPONENTS ARE PROPERLY OPERATING AND THAT THE COMPLETE INSTALLATION IS FUNCTIONING SMOOTHLY AND NOISELESSLY TO THE FULL EXTENT OF PLANS AND 3.39 DUCT LINING: 1/2" THICKNESS, 3 PCF DENSITY, NEOPRENE COATED DUCT LINER MEETING FIRE HAZARD rRATING REQUIREMENTS FOR INSULATION. INSTALL WITHIN MINIMUM 10' DUCT LENGTH FROM FANS. SPECIFICATIONS, ANY REBALANCING, READJUSTING OF SYSTEM ELEMENTS FOUND NECESSARY WHEN THE 3.40 DUCTWORK: SHEET METAL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL. DUCTS SHALL CONFORM SHEET METAL AND AIR CONDITIONING CONTRACTOR NATIONAL ASSOCIATION (SMACNA) SYSTEMS ARE SUBJECT TO ACTUAL OPERATING CONDITIONS SHALL BE DONE BY THE CONTRACTOR AT NO EXTRA ACCURATELY TO THE DIMENSIONS INDICATED AND SHALL BE STRAIGHT AND SMOOTH ON THE INSIDE WITH LOW VELOCITY DUCT MANUAL COST TO THE OWNER. JOINTS NEATLY FINISHED. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH SMACNA LOW PRESSURE DUCT MANUAL, 2" WG FOR SUPPLY & 1" WG FOR EXHAUST DUCTS. ELBOWS, FITTINGS AND BRANCH TAKE -OFFS 1.04 PLANS AND SPECIFICATIONS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN CHARACTER INTENDED TO 3.13 OPERATING INSTRUCTIONS: SUBMIT 30 DAYS PRIOR TO COMPLETION OF THE PROJECT, FOUR (4) SETS OF SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED AS RECOMMENDED IN SMACNA "DUCT CONSTRUCTION COVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT, DUCTS, PIPING, ETC., AND APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS. DETERMINE THE EXACT LOCATION OF OPERATING BROCHURES. EACH BROCHURE SHALL INCLUDE OPERATING INSTRUCTIONS, MAINTENANCE INSTRUCTIONS, INSTALLATION INSTRUCTIONS, PARTS LISTS AND WIRING DIAGRAMS FOR EACH ITEM OF STANDARDS" WITH THE USE OF TURNING VANES OR RADIUS ELBOWS. FLEXIBLE RUNOUTS FROM BRANCHES, RISERS OR MAINS TO AIR TERMINAL UNITS, AND OUTLETS SHALL BE FACTORY -FABRICATED, CLASS I, VAPOR THE ELEMENTS OF THE SYSTEM FROM THE STRUCTURE AND FROM THE EQUIPMENT, NOT FROM THE DRAWINGS. MECHANICAL EQUIPMENT WITH MIXING OR MOVABLE PARTS. THE BROCHURE SHALL ALSO INCLUDE BARRIER INSULATED FLEXIBLE CONNECTORS COMPLYING WITH NFPA STANDARD NO. 90A AND UL 181. FLEXIBLE DO NOT SCALE DRAWINGS FOR MEASUREMENTS NOR USE AS SHOP DRAWINGS. OPERATIONAL AND DIAGRAMS OF TEMPERATURE CONTROL SYSTEMS. CONNECTORS SHALL NOT EXCEED 10' IN LENGTH. PRESSURE RATING SHALL BE 4" W.G. FLEXIBLE DUCT 1.05 PROVIDE ALL ITEMS, EQUIPMENT, MATERIALS, OPERATIONS, OR METHODS LISTED, MENTIONED OR SCHEDULED ON THEIDDRAWINGS, AND/OR HEREIN INCLUDING ALL INCIDENTALS AND ACCESSORIES NEOR AND REQUIRED / 3.14 PROVIDE TYPEWRITTEN OPERATING INSTRUCTIONS IN THE BROCHURE COVERING EACH PIECE OF MOTORIZED MECHANICAL EQUIPMENT, GIVE NORMAL STARTING AND STOPPING PROCEDURES, ALONG WITH PROPER PARTIES CONNECTIONS TO EQUIPMENT AND OTHER DUCTS SHALL BE MADE WITH DRAW BANDS.' PROVIDE DAMPER IN RUN OUT TO AIR OUTLETS. 3.41 HINGED DUCT ACCESS DOORS SHALL BE PROVIDED AT ALL AUTOMATIC DAMPERS, FIRE DAMPERS, AND OTHER FOR INSTALLATION OR MOUNTING, OR NORMALLY SUPPLIED BY COMMON PRACTICE WHETHER SPECIFICALLY TO CONTACT IN THE EVENT OF EMERGENCY, FAILURE OF CONTROLS OR EQUIPMENT. OUTLINE OF APPARATUS REQUIRING. SERVICE AND INSPECTION IN THE DUCT SYSTEM. DOORS SHALL BE 15 X 18 INCHES MENTIONED OR NOT, TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS. INSTRUCTIONS AS FOLLOWS: UNLESS OTHERWISE INDICATED. WHERE SIZE OF DUCT WILL NOT ACCOMMODATE THIS SIZE, THE DOOR SHALL 1.06 BRING ANY NON -COMPLIANCES WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, CONFLICTS AND DISCREPANCIES TO THE ENGINEER'S ATTENTION BEFORE SUBMITTING BID. A CORRECT, COMPLETE AND EASILY MAINTAINED SYSTEM IS INTENDED. NORMAL STARTING, STOPPING AND EMERGENCY SHUT -DOWN OF EACH PIECE OF MOTORIZED EQUIPMENT. PROVIDE LUBRICATION INSTRUCTIONS FOR EACH MOTOR BEARING OR OPERABLE PIECE OF EQUIPMENT. BE MADE AS LARGE AS PRACTICAL. DOORS SHALL BE PROVIDED WITH AIRTIGHT GASKETS, GALVANIZED HINGES AND APPROVED BRASS FASTENERS. DOORS IN INSULATED DUCTS SHALL BE OF THE INSULATED TYPE. DOORS SHALL SO SWING THAT FAN PRESSURE OR SUCTION HOLD DOOR CLOSED. GIVE FREQUENCY OF LUBRICATION, TYPE AND BRAND OF OIL OR GREASE. 3.42 PROVIDE NON-COMBUSTIBLE APPARATUS FLEXIBLE CONNECTIONS OF NOT LESS THAN 15 OUNCE WOVEN FABRIC 1.07 THE CONTRACTOR'S BID WILL BE CONSTRUED AS AN AGREEMENT TO COMPLETE THE WORK WITHOUT ADDITIONAL APPROVED MATERIAL WHERE SHEET METAL DUCTS ARE CONNECTED TO FANS OR OTHER MOVING EQUIPMENT. COST TO THE OWNER. WHERE CONFLICTS BETWEEN PLANS AND SPECIFICATIONS OR CONFLICTING INFORMATION INCLUDE CALIBRATION, CLEANING AND ADJUSTMENT SCHEDULES AND PROCEDURES. THE FLEXIBLE CONNECTIONS SHALL BE SECURELY FASTENED. ON THE PLANS OCCURS, THE CONFLICTS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO BIDDING. THE MORE COSTLY ALTERNATIVE SHALL BE INCLUDED IN THE BID PRICE. INCLUDE COPIES OF MANUFACTURER'S LITERATURE ON MAINTENANCE AND OPERATION OF EACH PIECE OF 3.43 DUCT LINER INSULATION: INSULATE INTERIOR SURFACES OF ALL SUPPLY DUCTS FROM AIR 1.08 MAKE NO CHANGES IN THE WORK SPECIFIED, UNLESS SUCH CHANGES ARE AUTHORIZED IN WRITING BY THE EQUIPMENT, INCLUDING INSTALLATION INSTRUCTIONS, DIAGRAMS, AND PARTS LISTS, IN EACH BROCHURE. CONDITIONING UNIT SUPPLY FANS TO AIR OUTLETS AND INDICATED RETURN OR EXHAUST DUCTS WITH ACOUSTICAL MATERIAL. OWNER, ARCHITECT AND/OR ENGINEER. NO CHARGES FOR EXTRA WORK WILL BE PAID UNLESS SUCH EXTRA WORK HAS BEEN AUTHORIZED AND THE AUTHORIZATION CONTAINS A STATEMENT OF THE WORK TO BE 315 AS -BUILT DRAWINGS: SUBMIT AS -BUILT DRAWINGS AT COMPLETION OF WORK. 3.44 APPLY AND SECURE INSULATION AS RECOMMENDED BY MANUFACTURER AND AS APPROVED. ANY LOOSENING OF ACCOMPLISHED AND THE CHARGES TO BE MADE FOR THE WORK. INSULATION LINER WILL REQUIRE REMOVAL AND REINSTALLATION OF ALL DUCT WORK, AT NO EXTRA COST. 1.09 IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A MECHANICAL SYSTEM COMPLETE, FULLY 3.16 GUARANTEE: THE MECHANICAL SYSTEM SHALL BE LEFT IN PROPER WORKING ORDER. REPLACE ANY WORK, MATERIAL OR EQUIPMENT PROVIDED UNDER THIS CONTRACT WHICH DEVELOPS DEFECTS WITHIN ONE (1) YEAR 3.45 INCREASE INDICATED DUCT SIZES TO COMPENSATE FOR THICKNESS OF DUCT LINER INSULATION. "HARDCAST" ADJUSTED, AND READY TO USE. FROM DATE OF SUBSTANTIAL COMPLETION WITHOUT ADDITIONAL CHARGES. ,S NEW ONE (1) YEAR GUARANTEE SEALING: ALL TRANSVERSE JOINTS ON THE LOW PRESSURE SYSTEM SHALL BE SEALED WITH DUCT ON THE AFFECTED ITEM OR ITEMS SHALL BE PROVIDED COMMENCING ON THE DATE OF THE APPROVED REPAIR TAPE SYSTEM APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS OR OTHER APPROVED SYSTEM. 1.10 IT IS THE INTENTION OF THESE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, TESTED, AND READY FOR OPERATION. WHEREVER THE WORK "PROVIDE"IS USED, IT SHALL MEAN "FURNISH AND INSTALL COMPLETE AND READY TO USE." OR REPLACEMENT. 3.17 MECHANICAL EQUIPMENT WIRING AND CONNECTIONS: RECTANGULAR DUCT INSULATED WITH VAPOR BARRIER DUCT WRAP 3.46 IN LIEU OF RECTANGULAR LINED DUCT,1" OR ROUND DUCT OF EQUIVALENT CROSS SECTIONAL AREA AND INSULATED WITH 1" VAPOR BARRIER INSULATION, MAY BE USED. ALL HP-1, HP-2 SUPPLY DUCTS SHALL BE LINED OR EXTERNALLY INSULATED. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR THE PROPER INSTALLATION FURNISHED INSTALLED BY WIRED AND/OR 3.47 GREASE DUCT FROM RANGE HOODS WHERE APPLICABLE TO EXHAUST FAN - 16 GAUGE BLACK IRON - WITH AND OPERATION, SHALL BE INCLUDED IN THE WORK, THE SAME AS IF HEREIN SPECIFIED OR SHOWN. ITEM BY OR MOUNTED BY CONNECTED BY WELDED SEAMS AND JOINTS. WRAP DUCT WITH 2 LAYERS OF THERMAL CERAMICS FIREMASTER DUCT WRAP APPLIED AS RECOMMENDED BY THE MFR. TO MAKE A 2 HOUR RATED INSTALLATION. WRAP TO EXTEND FROM HOOD 1.11 THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL EQUIPMENT MOTORS MC MC EC TO EXHAUST FAN. GOVERNMENT SALES TAXES, FEES AND OTHER COSTS, INCLUDING UTILITY CONNECTIONS OR EXTENSIONS, IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DOCUMENTS MOTOR CONTROLLERS, PUSHBUTTON 3.48 DESCRIPTION: PERFORM TESTING AND BALANCING IN ACCORDANCE WITH THE PROCEDURE OF THE ASSOCIATED AIR BALANCE COUNCIL'S "NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION TOTAL AND OBTAIN ALL NECESSARY APPROVALS OF ALL GOVERNMENTAL DEPARTMENTS HAVING STATIONS, PILOT LIGHTS, ETC. MC EC EC SYSTEM BALANCE." JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF HIS WORK AND DELIVER SAME TO THE ARCHITECT BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR WORK. MULTI -SPEED SWITCHES 3.49 USE ACCURATE INSTRUMENTS FOR BALANCING AIR SYSTEMS THAT HAVE BEEN CALIBRATED WITHIN 6 MONTHS LINE VOLTAGE THERMOSTATS MC EC ECPRIOR TO BALANCING. TYPES, SERIAL NUMBERS, AND DATE OF CALIBRATION OF ALL INSTRUMENTS SHALL BE 1.12 THE CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST TO THE OWNER, ANY LABOR, MATERIALS, SERVICES, APPARATUS, DRAWINGS, IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES AND REGULATIONS, WHETHER OR NOT SHOWN ON DRAWINGS AND/OR SPECIFIED. DISCONNECT SWITCHES, (FUSED OR UNFUSED), HP RATED SWITCHES, THERMAL OVERLOAD SWITCHES, ETC. MC EC EC LISTED IN THE FINAL AIR BALANCE REPORTS. 3.50 MAKE AIR QUANTITY MEASUREMENTS IN MAIN AND BRANCH DUCTS BY PITOT TUBE TRAVERSE OF THE ENTIRE CROSS SECTIONAL AREA OF THE DUCT. DUCTS HAVING VELOCITIES OF 1000 OR MORE FEET PER MINUTE PART 2.00 PRODUCTS SHALL BE MEASURED WITH INCLINED MANOMETERS (DRAFT GAUGE) OR MAGNEHELIC GAUGES. DUCTS HAVING 2.01 MATERIALS AND EQUIPMENT SUBSTITUTIONS: THE BID PRICE SHALL BE BASED ON THE MATERIALS, EQUIPMENT AND/OR SERVICES AS SCHEDULED ON THE LOW VOLTAGE THERMOSTATS, CONTROL RELAYS, TIME CLOCKS, CONTROL TRANSFORMER, CONTROL VELOCITIES OF LESS THAN 1000 FT. PER MINUTE SHALL BE MEASURED WITH MICROMANOMETERS, HOOD GAUGES OR SIMILAR LOW PRESSURE INSTRUMENTS. OPENINGS IN DUCTS FOR PITOT TUBE INSERTION SHALL BE SEALED WITH SNAP -IN PLUGS AFTER AIR BALANCE IS COMPLETE. OUTLET AND INLET AIR QUANTITIES SHALL DRAWINGS AND/OR SPECIFIED HEREIN, AND/OR AS ACCEPTED PRIOR TO BIDDING. PANELS, PRESURESTATS, MOTOR BE DETERMINED BY AN APPROVED METHOD. VALVES, DAMPER MOTORS, SOLENOID 2.02 REQUESTS FOR ACCEPTANCE OF ALTERNATIVES SHALL BE SUBMITTED TEN (10) DAYS PRIOR TO BID. VALVES, EP & PE SWITCHES, ETC. 3.51 TOTAL AIR QUANTITIES SHALL BE OBTAINED BY ADJUSTMENT OF FAN SPEEDS. THE BALANCING CONTRACTOR AND ALL INTERLOCK WIRING MC MC MC SHALL FURNISH AND INSTALL ANY REQUIRED FAN DRIVE CHANGES AS PART OF THIS CONTRACT. 2.03 ACCEPTANCE OF ALTERNATE OR SUBSTITUTE EQUIPMENT IN NO WAY VOIDS MATERIAL OR PERFORMANCE REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ANY MATERIAL OR EQUIPMENT SUBSTITUTED FOR SPECIFIED ITEMS ACCEPTED BY THE ARCHITECT AND/OR ENGINEER BEFORE OR AFTER THE BID DATE. CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING ANY SUBSTITUTE EQUIPMENT MC - MECHANICAL CONTRACT EC - ELECTRICAL CONTRACT SHALL FURNISH ALL MAGNETIC STARTERS OR CONTACTORS. 3.52 VOLUME ADJUSTERS MAY BE USED TO BALANCE AIR QUANTITIES AT OUTLETS AND INLETS PROVIDING FINAL ADJUSTMENTS ARE MINOR AND DO NOT PRODUCE OBJECTIONABLE DRAFTS OR EXCESSIVE SOUND LEVELS. IN THE SYSTEM DESIGN. THE MECHANICAL CONTRACTOR 3.53 CERTIFIED BALANCE REPORTS: THREE (3) COPIES OF THE AIR AND WATER BALANCE REPORT, CERTIFIED BY 2.04 CONTRACTOR SHALL PAY FOR ALL EXTRA COSTS BY ANY TRADE FOR CHANGES NECESSITATED BY MATERIAL OR EQUIPMENT SUBSTITUTIONS REGARDLESS OF ACCEPTANCE WITHOUT FURTHER COST TO THE CLIENT. 3.18 ALL MANUAL OR AUTOMATIC CONTROL AND PROTECTIVE OR SIGNAL DEVICES REQUIRED BUT NOT INDICATED ON ELECTRICAL PLANS SHALL BE FURNISHED AND INSTALLED UNDER THIS DIVISION OF THE SPECIFICATIONS. THE WIRING INSTALLATION SHALL CONFORM TO ELECTRICAL DIVISION. THE BALANCING FIRM, SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER SEVEN (7) DAYS PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. THE REPORT SHALL INCLUDE ALL AIRAND WATER BALANCE DATE AND HEAT TRANSFER EQUIPMENT TEST DATA LISTED BELOW, AND OTHER DATA AS REQUIRED BY THE "NATIONAL 2.05 REVIEW OF MATERIALS AND EQUIPMENT: WITHIN 30 DAYS OF CONTRACT AWARD, SUBMIT FIVE COPIES OF EACH 3.19 ALL WIRING CONNECTIONS TO CONTROLS ATTACHED TO DUCT WORK, OR MECHANICAL EQUIPMENT SHALL BE MADE STANDARD FOR FIELD MEASUREMENTS AND INSTRUMENTATION". 2.06 GENERAL MATERIALS AND EQUIPMENT: ALL MATERIAL AND EQUIPMENT SHALL BE NEW AND OF THE BEST OF CATALOG GRADE INDICATED AND/OR SPECIFIED AND SHALL BE FREE FROM ALL DEFECTS. WITH FLEXIBLE CONNECTIONS TO PREVENT VIBRATION. 3.20 COORDINATE WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING MOTORS AND/OR OTHER ELECTRICAL 3.54 A.C. UNIT: CFM, STATIC PRESSURE, MOTOR HP, RPM, AND AMPS, PERCENT OF OUTSIDE AIR (OR CFM AS APPLICABLE), FAN RPM, FAN BHP, INLET AND OUTLET DRY AND WET BULB TEMPERATURE, FAN DRIVE TYPE AND SIZE, WATER FLOW - 2.07 MATERIAL AND EQUIPMENT SPECIFIED HEREIN SHALL BE GUARANTEED BY THE MANUFACTURER TO PERFORM TO EQUIPMENT TO ASSURE ELECTRICAL EQUIPMENT BEING OF PROPER ELECTRICAL CHARACTERISTICS. INDIVIDUAL OUTLET AND INLET TEST RESULTS: OUTLET AND INLET IDENTIFICATION AND NUMBER STANDARDS INDICATED OR INFERRED IN PUBLISHED LITERATURE OR CATALOG DATA. MANUFACTURER'S 3.55 (LOCATION RECOMMENDATIONS SHALL BE CLOSELY FOLLOWED ON INSTALLATION. 3.21 FURNISH PROPER NEMA TYPE ENCLOSURES FOR ALL STARTERS AND/OR CONTACTORS AS REQUIRED BY USAGE OR DESIGNATION). 2.08 REFRIGERANT PIPING: TYPE "L" OR TYPE "K" WITH BRAZED HIGH TEMPERATURE SOLDER JOINTS. PIPE CODE. 3.56 FOLLOWING FINAL ACCEPTANCE OF THE SYSTEM BALANCE BY THE OWNER, THE CONTRACTOR SHALL PERMANENTLY MARK THE SETTINGS OF ALL VALVES, SPLITTERS, DAMPERS, AND OTHER ADJUSTMENT DEVICES SO THAT ADJUSTMENT CAN BE RESTORED IF DISTURBED AT ANY TIME. DEVICES SHALL NOT BE MARKED BEFORE FINAL ACCEPTANCE. SHALL BE CLEAN AND TESTED FOR LEAKS. INSULATE SUCTION PIPING WITH 1 INCH THICK FIBERGLASS WITH FRJ JACKET SEALED WATER TIGHT. COVER OUTDOOR INSULATION WITH ALUMINUM OR PLASTIC JACKET 3.22 PROVIDE HEAVY DUTY SPEED SELECTOR SWITCHES, THERMAL MAGNETIC SWITCHES, START STOP PUSH BUTTON STATIONS ETC. AS REQUIRED. APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 3.23 CUTTING AND PATCHING: CAREFULLY PERFORM ALL WORK WHERE CUTTING, CHANNELING, CHASING, OR 3.57 NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ARCHITECT, AND ALL 2.09 ALL INSULATION SHALL HAVE A COMPOSITE (INSULATION, JACKET OR FACING, AND ADHESIVE) FIRE DRILLING OF FLOORS, WALLS, PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR PROPER OR OTHER MECHANICAL EQUIPMEN T. SUCH CUTTING SHALL BE DONE IN A MANNER DIRECTED BY HIM. HAZARD RATING AS TESTED BY ASTM E-84, NFPA 255, OR UL 723, NOT TO EXCEED 25 FLAME SPREAD AND INSTALLATION OR SUPPORT OF DUCTS, PIPINGS, 3.58 PROVIDE WEATHER-PROOF FLASHING AT ALL DUCT, PIPE, ETC. MECHANICAL PENETRATIONS 50 SMOKE DEVELOPED. ACCESSORIES SUCH AS COATINGS, TAPES, AND ADHESIVES SHALL HAVE THE 3.24 ANY DAMAGE TO BUILDING, PIPING, EQUIPMENT, PLASTER, WOODWORK OR METAL WORK SHALL BE REPAIRED BY THROUGH THE BUILDING WALLS AND ROOF. FLASHING SHALL BE DESIGNED AND INSTALLED PER SAME COMPONENT RATINGS. ALL INSULATING MATERIALS OR THEIR CONTAINERS SHALL HAVE A SKILLED MECHANICS OF TRADES INVOLVED, AT NO ADDITIONAL COST TO THE OWNER. SMACNA AND SHALL BE GUARANTEED WEATHER PROOF FOR THE DURATION OF THE GUARANTEE. LABEL INDICATING COMPLIANCE WITH THE ABOVE RATING. REFERENCE STANDARDS: NFPA D-255, A.S.T.M. E-84, UL-723, ASHRAE 90-75 AND THE STATE ENERGY CODE. ACCEPTABLE MANUFACTURERS: CERTAINTEED, OWENS-CORNING, KNAUF AND MANVILLE. 3.25 DO NOT CUT, CHANNEL, CHASE OR DRILL MASONRY OR TILE; OR CUT, DRILL OR WELD STRUCTURAL MEMBERS OF THE BUILDING, ETC., WITHOUT FIRST OBTAINING ARCHITECT'S PERMISSION, IF PERMISSION IS 3.59 FIRE AND/OR OR SMOKE DAMPER 1. FURNISH AND INSTALL AT LOCATION SHOWN ON PLANS FIRE/SMOKE DAMPERS MEETING OR EXCEEDING THE GRANTED, PERFORM THIS WORK IN A MANNER APPROVED BY THE ARCHITECT. FOLLOWING SPECIFICATIONS: FRAME SHALL BE A MINIMUM OF 16 GAUGE GALVANIZED STEEL FORMED INTO A PART 3.00 EXECUTION 3.26 CAULKING & WATERPROOFING: CAULK AROUND ALL PIPES, ETC. TO PREVENT AIR AND MOISTURE LEAKAGE STRUCTURAL HAT CHANNEL SHAPE WITH TABBED CORNERS FOR REINFORCEMENT. THE BLADES SHALL BE SINGLE 3.01 PERMITS AND INSPECTIONS: APPLY AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED WITH COMPOUND APPROVED BY ARCHITECT/ENGINEER. SKIN 16 GAUGE MINIMUM GALVANIZED WITH THREE LONGITUDINAL GROOVES FOR REINFORCEMENT. BEARING FOR THE WORK, AND AT COMPLETION, PRESENT THE OWNER WITH THE SIGNED CERTIFICATES OF FINAL SHALL BE STAINLESS STEEL SLEEVE TURNING IN AN EXTRUDED HOLE IN THE FRAME. BLADE EDGE SEALS INSPECTION. 3.27 SEAL AROUND ALL PIPES AND DUCTS WITH FIREPROOF CAULKING OR GROUT WHERE THEY PASS THROUGH SHALL BEW SILICON RUBBER MECHANICALLY LOCKED IN BLADE EDGE (ADHESIVE OR CLIP FASTENED SEALS ARE FLOORS, FIREWALLS, AND SHAFTS. NOT ACCEPTABLE). JAMB SEALS SHALL BE STAINLESS STEEL FLEXIBLE METAL COMPRESSION TYPE. 3.02 UTILITIES: CHARGES BY UTILITY COMPANIES FOR PROVIDING SERVICES SHALL BE PAID BY OWNER AND WILL 2. EACH COMBINATION FIRE/SMOKE DAMPER SHALL BE RATED FOR 1.5 HOURS UNDER UL STANDARD 555 AND NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL DO INSTALLATION WORK NORMALLY PROVIDED IN THIS CONTRACT. 3.28 PROVIDE FLASHINGS WHERE ALL PIPES AND DUCTS PIERCE OUTSIDE WALLS OR ROOF AS NECESSARY TO PREVENT MOISTURE ENTRY. SHALL FURTHER BE CLASSIFIED BY UL AS A LEAKAGE RATED DAMPER FOR USE IN SMOKE CONTROL SYSTEMS UNDER UL 555S AND BEAR THE UL LABELS FOR BOTH UL 555 AND UL 555S. FIRE/SMOKE DAMPERS IN TUNNEL 3.03 PLACE AND ARRANGE EQUIPMENT, PIPING, DUCTS, CONTROLS, ETC., TO FIT THE SPACE AVAILABLE. 3.29 INSERTS, SLEEVES & BLOCKOUTS: FURNISH AND INSTALL, PRIOR TO CONCRETE POURING OR OTHER CORRIDOR SHALL BE UL LISTED FOR TUNNEL CORRIDOR CONSTRUCTION INCLUDING ALL OFFSETS IN PIPING OR DUCTS, DUCT TRANSFORMATIONS, ETC. REQUIRED. CONSTRUCTION, INSERTS, SLEEVES, OR BLOCKOUTS IN WALLS, FLOOR SLABS, ROOFS AND PARTITIONS FOR PASSAGE OF ALL WORK INSTALLED UNDER THIS DIVISION. 3. IN ADDITION TO THE LEAKAGE RATING ALREADY SPECIFIED HEREIN,THE DAMPERS AND THEIR ACTUATORS SHALL BE QUALIFIED UNDER UL 555S TO MINIMUM ELEVATED TEMPERATURE OF 250 DEGREES (F). 4• FOR ODE COMPLIANCE 3.04 SUBMIT SHOP DRAWINGS FOR TEMPERATURE CONTROL SYSTEMS, MECHANICAL EQUIPMENT WIRING, MECHANICAL 3.30 PROVIDE GALVANIZED IRON AND STEEL PIPE SLEEVES FOR IRON PIPES. USE COPPER SLEEVES FOR COPPER APPROPRIATE 120 VOLT ELECTRIC ACTUATORS SHALL BE INSTALLED BY THE DAMPER MANUFACTURER AT !: APPROVED EQUIPMENT AND MATERIALS WHICH CANNOT BE ADEQUATELY DESCRIBED BY MANUFACTURER'S PRINTED SHEETS, AND FOR SUCH ADDITIONAL ITEMS AS THE ARCHITECT/ENGINEER MAY DIRECT. PIPES. PROVIDE WOOD OR STEEL BLOCKOUTS FOR LARGE OPENINGS. SECURE ALL SUCH ITEMS FIRMLY IN POSITION. THE TIME OF DAMPER FABRICATION. DAMPER AND ACTUATOR SHALL BE INSTALLED AS A SINGLE ENTITY WHICH MEETS ALL APPLICABLE UL 555 AND UL 555S QUALIFICATIONS FOR BOTH DAMPERS AND ACTUATORS. ACTUATORS. DAMPERS MUST OPEN AND CLOSE WITHIN 15 SECONDS OF APPROPRIATE SIGNAL AND DAMPERS I ° ` JUL 2 3 2015 ' 3.05 CLEARLY MARK SUBMITTALS AS TO PLAN CODE, SPECIFIC ITEM PROPOSED, CATALOG NUMBERS, RECESS 3.31 VIBRATION -ABSORBING MOUNTINGS AND CONNECTIONS: ISOLATE EACH ITEM OF EQUIPMENT WITH MOVING MUST CLOSE UPON LACK OF POWER. OPENINGS, DIMENSIONS, CAPACITIES, ELECTRICAL CHARACTERISTICS, ETC.. SUBMITTALS WHICH ARE PARTS FROM THE BUILDING STRUCTURE ALONG WITH ANY PIPING, CONDUITS, OR DUCTS ATTACHED THERETO. 4. FIRE ALARM CONTRACTOR SHALL PROVIDE ALL NECESSARY SWITCHES AND RELAYS ETC. TO INTERFACE INCOMPLETE WILL BE REJECTED. UNLESS OTHERWISE INDICATED, UNITS ISOLATING EQUIPMENT FROM STRUC TURF SHALL BE PROPERLY DAMPER BUILDING FIRE ALARM AND CONTROL SYSTEM AS REQUIRED. City of Tukwila 3.06 THE ENGINEER'S CHECK SHALL BE GENERAL, AND DOES NOT RELIEVE THE CONTRACTOR OF FINAL DESIGNED SPRING -TYPE ISOLATORS. 5. IN SYSTEMS REQUIRING A SMOKE CONTROL SYSTEM, PROVIDE REMOTE SENSING OF DAMPER POSITION JLD NG DIVISION RESPONSIBILITY OF COMPLIANCE TO THE INTENT OF THE PLANS AND SPECIFICATIONS. AND DAMPER OVERRIDE OF DAMPER CLOSURE TO PERMIT CONTROLLED OPERATION IN A DYNAMIC SMOKE 3.32 BELT DRIVE GUARDS: PROVIDE BELT DRIVE GUARDS FOR ALL EQUIPMENT AND SAFETY SCREENS ON EXPOSED MANAGEMENT SYSTEM. DEVICE SHALL BE RUSKIN MODEL TS 150 FIRE STAT OR APPROVED. 3.07 SUPERVISION AND WORKMANSHIP: QUALIFIED SUPERVISION FOR EACH TRADE SHALL BE IN CHARGE OF THE WORK AT ALL TIMES AND SHALL BE ON THE JOB SITE WHENEVER WORK IN THAT TRADE IS BEING FAN INLETS. 6. COMBINATION SMOKE/FIRE DAMPERS SHALL BE MANUFACTURED BY SAFEAIR, RUSKIN, GREENHECK, AIR BALANCE, NATIONAL CONTROLLED AIR AND PREFCO. ` RECEIVED CITY OF TUKWILA ACCOMPLISHED. \\ // \� U` 01 ?V 01) •F group Architects 19401 40th Ave. West, Suite 300 Lynnwood, Wa. 98036 Ph. (425) 405-7746 e-mail: dwallace@PMDGinc.com Kenneth McCracken, Architect ABOSSEIN ENGINEERING L.L.C. MECHANICAL I ELECTRICAL I CML LEED I HIRE PROTECTION 2100 112TH AVE. NE BELLEVUE, WA 98004 PHONE (425) 462-9441 REVISION PLANNING PRELIMINARY REVIEW PROGRESS SET HEALTH SUBMITTAL - EQUIPMENT REVS HEALTH COMMENTS BUILDING PERMIT SUBMITTAL ELECTRICAL PERMIT SUBMITTAL MIMI w ¢0 In \ N N 3/12/15 In \ N Ni-i 0 N if '- PO � `- N Nz i <1<<<<KK c 0 Cf:% Z 43) �03 w a (13 aCC X Project Number 215042 Sheet Name SPECIFICATION heet Number M3.0