HomeMy WebLinkAboutPermit M15-0091 - CHEVRON STATION - HEATING AND AIR CONDITIONING UNITSCHEVRON STATION
220 STRANDER BLVD
EL1 5-0091
Parcel No:
Address:
Project Name:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
2623049104
220 STRANDER BLVD
CHEVRON STATION
MECHANICAL PERMIT
Permit Number: M15-0091
Issue Date: 10/6/2015
Permit Expires On: 4/3/2016
Owner:
Name:
Address:
CHEVRON TEXACO
P 0 BOX 1392 PROPERTY TAX DEPT,
BAKERSFIELD, WA, 93302
Contact Person:
Name: KIRAN ASHER
Address:
Contractor:
Name:
Address:
License No:
Lender:
Name:
Address:
203 130 ST, SUITE 101, EVERETT, WA,
98208
SOUND SPECIALIZED SERVICES INC
12433 RUGGS LAKE RD , EVERETT, WA,
98208
SOUNDSS991M0
Phone: (425) 220-7278
Phone: (206) 427-3455
Expiration Date: 7/20/2016
DESCRIPTION OF WORK:
INSTALL NEW HEATING & AIR CONDITIONING WITH TENANT IMPROVEMENT
Valuation of Work: $56,212.00
Type of Work: REPLACEMENT
Fuel type: ELECT
Fees Collected: $949.66
Electrical Service Provided by: PUGET SOUND ENERGY
Water District: TUKWILA
Sewer District: TUKWILA SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2012
2012
2012
2012
2012
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2014
2014
2014
2012
Permit Center Authorized Signature: 1" "�
6?1/1
Date:
I hearby certify that 1 have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
�.
Print Name: WI P� ���—� A/%� � � (J:6),(1-
Date: e3�-- E7 1 f C
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
2: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
3: Readily accessible access to roof mounted equipment is required.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: ***MECHANICAL PERMIT CONDITIONS***
9: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
10: Manufacturers installation instructions shall be available on the job site at the time of inspection.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
0703 MECH EQUIP EFF
1800 MECHANICAL FINAL
0609 PIPE/DUCT INSULATION
0705 REFRIGERATION EQUIP
0701 ROUGH -IN MECHANICAL
CITY OF TUKWI,
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://wwvv.TukwilaWA.gov
Mechanical Permit No. \` l t ,>~ '(' (
Project No.
Date Application Accepted: 7'2-0'15
Date Application Expires: C ' ) 0—e �Q
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
o King Co Assessor's Tax No.:
Site Address: 22'o Bu
g) u), Ivk1iiL4 9g1g8. Suite Number: Floor:
Tenant Name:-T l't c TtA LUG , D %A STRA-ntb42 Ct *.ttQ-e ..1 New Tenant: ❑ Yes [3.,No
PROPERTY OWNER
Name: crf kF30 fi 4 LLC
Address: 203 :30T' S-r SiE, Su 1TE
10 )
City: Ev r n 'rT State: w A.
ZiP:9 g z0SI,
CONTACT PERSON — person receiving all project
communication
Name: 14,1 RA 4 Aso
Address: 203 1 ?I! ST SE , Su i Tl. /0 J
City: State: Zip.c$26
&LC. t t (,.% A &
Phone: 42.S 220• 7278Fax: ..--
Email: K I RA 4 ASH -Gil. a) MS ni. C ,
MECHANICAL CONTRACTOR INFORMATION
Company Name: N4 Spe
c ►A[. tob S6.4. ji erect ING
Address: ( 33 2. a 6tr LA lex �4,,,
City: eivc_p_f_x_r_ State: (N Zip: q 3zoa
Phone: 206 .44,7 •34,SS Fax:
Contr SpuntbSSib8 1. MO Exp Date: q I 2,5 (%6
Tukwila Business License No.: s in 0911 S8-1_2_
Valuation of project (contractor's bid price): $ 5 . 24 2 • Op .
Describe the scope of work in detail: I
Use: Residential: New
Commercial: New
Fuel Type: Electric
Replacement
Replacement
�; t2 (.014 b e n DA) tnK•
Gas ❑ Other:
H:\Applications\Forms-Applications 0n Line\201 I Applications\Mechanical Permit Application Revised 8-9-1 I.docx
Revised: August 2011
bh
Page 1 of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
2
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type
Qty
Fire damper
Diffuser
1 ,
Thermostat
Z,
Wood/gas stove
Emergency generator
Other mechanical
equipment
2.
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
Print Name: K-I. Rt.4 As tiifiL
�` Sut'� 101 (� G
Mailing Address: " 3 k 3 0! STI '�J .�-(T� (..�J� -I 6 zo 8
City
Date: (gADI is
Day Telephone: 4ZS". ZZO • -42-7-2
State Zip
H:\Applications\Forms-Applications On Line \2011 Applications'Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS ACCOUNT QUANTITY
PermitTRAK
PAID
$767.03
M15-0091 Address: 220 STRANDER BLVD Apn: 2623049104
$767.03
MECHANICAL
$730.50
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
PERMIT FEE
R000.322.100.00.00
0.00
$698.00
TECHNOLOGY FEE
$36.53
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R6233
R000.322.900.04.00
0.00
$36.53
$767.03
Date Paid: Wednesday, September 23, 2015
Paid By: KIRAN ASHER
Pay Method: CREDIT CARD 00823D
Printed: Wednesday, September 23, 2015 1:48 1 of 1
PM
CR'SYSTEMS
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
I ACCOUNT I QUANTITY I PAID
PermitTRAK
$182.63
M15-0091 Address: 220 STRANDER BLVD Apn: 2623049104
$182.63
MECHANICAL
$182.63
PLAN CHECK FEE
TOTAL FEES PAID BY RECEIPT: R5761
R000.322.102.00.00
0.00
$182.63
$182.63
Date Paid: Monday, July 20, 2015
Paid By: KIRAN ASHER
Pay Method: CREDIT CARD 06699D
Printed: Monday, July 20, 2015 1:24 PM 1 of 1
CSYSTEMS
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
J
C evict/ '
p Type of Ins e
i n:
J rf
Addr s: � `
_//1',i,t.c er
to Called:
'
Special Instructions:
Date Wanted:
a.m.
p.m.
Requester:
Phone No:
proved per applicable codes. LJ Corrections required prior to approval.
COMMENTS:
Inspector
Date
REINSPECTION FEE REQUIRED. Prior to next inspection, fee fnust be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
E21] INSPECTION RECORD /C7--.19
Retain a copy with permit iT4
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:Projectc /
e.Yr- -
of In
Type of In ectioni.
41
Addreesss:/�
/�
A /q%-ll h
D Called:
Special Instructions:
4t41
Date Wanted:
a.m.
p.m.
Requester:
Phone No:
?Lpproved per applicable codes. Corrections required prior to approval.
COMMENTS: _
Inspector: '
REINSPECTION FEE REQUIRED. Prior to next inspec#ion, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
‘,./C
INSPECTION RECORD
Retain a copy with permit
N&PECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
15— cmiptif
6300 Southcenter Blvd., #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 438-9350
(206) 431-3670
Project: f -de-5
e vr4fro()
Type ofplpectib� �/ J
4
Address:
ago 5lix,vehr&
Da Call
Special Instructions: 424
Date Wanted:
�r
a.m
Requester:
Phone No:
❑ Approved per applicable codes.
COMMENTS:
LJ Corrections required prior to approval.
,dt
Inspector:
REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
n/5 --ooc/
Project; /
CAak<rC2/0
Type of Ins ectl n:
vp 1� / if e/7 Z '
il) .
Address:
-2- SfrAy2ch
�ivc
Dat Called:
Special instructions:
Date Wanted:
a.m._
Requester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
ei.,31e6/
Inspector:
Date:
/ /
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
J
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
,1f5c09/
Project: �4ec'y,
Type of lryspiUion�
N.
Address:
4./-
lDa'te
ailed:
..(
Special Instructions:
Date Wanted:
a.m.
p.m.
Requester:
Phone No:
Approved per applicable codes. ❑ Corrections required prior to approval.
COMMENTS:
A-7/a
41,1, 6Wes CI+
ector:
REI PECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Date:
/
INSPECTION RECORD
Retain a copy with permit
INS ION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
J
6300 Southcenter Blvd., #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 438-9350
(206) 431-3670
Project: !,• �+� /� J
UllAddr
Type of Ins lion:
.-z
s:
Date Calle
Special Instructions:
Date Wanted:
a.m.
p.m.
Requester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:„
y
Inspector:
Date: it/?s.
REINSPECTION FEE REQUIRED. Prior to next inspection. fe must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
11117/1 Retain a copywith permit
INSPE'TION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 438-9350
(206) 431-3670
Project: fir /Ce�
W
Type of e.)4ion:;
90A-
Addres
2.6 St/ateUed.
_etc,
C
r/k
S ecialInstructions: (
p
Date Wanted:
it om p'
Requester
DA-V(
/
Phone N
040, ��7
1 J Approved per applicable codes. LJ Corrections required prior to approval.
COMMENTS:
z
Inspector:
Date: J/ /�
REINSPECTION FEE REQUIRED. Prior to next inspec ion, fee must be
c-r crwd.„,_
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Chevron - Tukwila, WA
Chvac - Full Commercial HVAC Loads Calculation Program
Elite Software Development, Inc.
Abossen Engineering
Bellevue, WA 98004
�J1J�
Page 1
Building Summary Loads
Building peaks in July at 3pm.
Bldg Load Area Sen
%Tot
Lat Sen Net %Net
Descriptions Quan Loss
Loss
Gain Gain Gain Gain
Roof 2,935 12,727
12.40
0 13,061 13,061 13.49
Wall 2,632 11,569
11.27
0 5,618 5,618 5.80
Glass 532 37,921
36.94
0 22,345 22,345 23.07
Floor Slab 0 0
0.00
0 0 0 0.00
Skin Loads 62,217
60.60
0 41,024 41,024 42.36
Lighting 2,935 0
0.00
0 11,016 11,016 11.37
Equipment 5,000 0
0.00
0 18,767 18,767 19.38
People 26 0
0.00
5,200 7,150 12,350 12.75
Partition 0 0
0.00
0 0 0 0.00
Cool. Pret. 0 0
0.00
0 0 0 0.00
Heat. Pret. 0 0
0.00
0 0 0 0.00
Cool. Vent. 330 0
0.00
2,590 4,651 7,241 7.48
Heat. Vent. 440 25,292
24.64
0 0 0 0.00
Cool. Infil. 240 0
0.00
1,880 3,716 5,596 5.78
Heat. Intl'. 240 15,156
14.76
0 0 0 0.00
Draw-Thru Fan 0 0
0.00
0 856 856 0.88
Blow-Thru Fan 0 0
0.00
0 0 0 0.00
Reserve Cap. 0 0
0.00
0 0 0 0.00
Reheat Cap. 0 0
0.00
0 0 0 0.00
Supply Duct 0 0
0.00
0 0 0 0.00
Return Duct 0 0
0.00
0 0 0 0.00
Misc. Supply 0 0
0.00
0 0 0 0.00
Misc. Return 0 0
0.00
0 0 0 0.00
Building Totals 102,665
100.00
9,670 87,181 96,851 100.00
Building Sen %Tot
Lat Sen Net %Net
Summary Loss Loss
Gain Gain _ _ Gain _ Gain
Ventilation 25,292 24.64
2,590 4,651 7,241 7.48
Infiltration 15,156 14.76
1,880 3,716 5,596 5.78
Pretreated Air 0 0.00
0 0 0 0.00
Zone Loads 62,217 60.60
5,200 77,957 83,157 85.86
Plenum Loads 0 0.00
0 0 0 0.00
Fan/Duct/Misc Loads 0 0.00
0 856
aff n
88
Building Totals 102,665 100.00
9,670 87,181
RE 1: i D FORJ1010
CODE 0 MPLIANCE
00
I Check Figures
PPP
Total Building Supply Air (based on a 21° TD):
3,625 CFM
Total Building Vent. Air (9.10% of Supply):
330 CFM
JUL 2 3 2015
Total Conditioned Air Space:
2,935 Sq.ft
'
Supply Air Per Unit Area:
1.2350 CFM/Sq.ft
Area Per Cooling Capacity:
363.7 Sq.ft/Ton
City of Tukwila
Cooling Capacity Per Area:
0.0027 Tons/Sq.ft
BUILDING DIVISION
Heating Capacity Per Area:
34.98 Btuh/Sq.ft
Total Heating Required With Outside Air:
102,665 Btuh
Total Cooling Required With Outside Air:
8.07 Tons RECEIVED
CITY OF TUKWILA
o
JUL 2 0 2C15
( S ... co PERMIT CENTER
S:\215042\Calc-Mech\Chevron Tukwila.CHV
Wednesday, July 08, 2015, 01:34 PM
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Mechanical Summary
MECH-SUM
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Revised June 2013
Project Info
Project Address Chevron
Date 7/15/2015
220 Strander Blvd
For Building Dept. Use
Tukwila, WA
—I
r -
p
,
Applicant Name:
L.
Applicant Address: Lr
Applicant Phone:
Project Description
Briefly describe mechanical
system type and features.
Includes Plans
Split A/C with Gas Furnace
Include documentation requiring compliance with commissioning provisions per Section C408.
Compliance Option
® Simple System 0 Complex System 0 Systems Analysis
Equipment Schedules
The following information is required to be incorporated with the mechanical equipment schedules on
the plans. For projects without plans, fill in the required information below.
Cooling Equipment Schedule
Equip.
ID
Equip
Type
Brand Name'
Model No.1
Capacity2
Btu/h
OSA CFM
or Econo?
SEER
or EER
IPLV3
Econmizer
Option or
Exceptions
Heat
Recovery
Y/N
SEE M1.0
Heating Equipment Schedule
Equip.
ID
Equip
Type
Brand Name'
Model No.1
Capacity2
Btu/h
OSA cfm
or Econo?
Input Btuh
Output Btuh
Efficiency4
Heat
Recovery
Y/N
SEE M1.0
FEVS WED FOR
Fan Equipment
Schedule
'
norF
comp] IANC.F
Equip.
ID
Equip
Type
Brand Name'
Model No.'
CFM
Sp'
HP/BHP
Flowontrol5
((��[[��n�/9t�t
��PLbc'a>tiP,ice
SEE M1.0
UL 2 3 2015
City
of Tukwila
Service Water
Heating Equipment Schedule
Ir11ILDING DIVISION
Equip.
ID
Equip
Type
Brand Name'
Model No.1
Input
Capacity
Sub -
Category
EF7
Location f
CITY OF TUKWIL
JUL 202115
' If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 4 COP, HSPF, ConnbustioargiMIToGENIER
applicable. 5 Flow control types: variable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exception number per
IS- 0091
Mechanical Permit Plans Checklist - Page 1 of 3
MECH-CHK
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Revised June 2013
Project Address Chevron
Date 7/15/2015
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
GENERAL PROVISIONS
Equipment Sizing & Performance
YES
C403.2.1
Load calculations
Load calculations performed per ASHRAE Std 183 or equivalent per
Chapter 3
See attached
YES
C403.2.2
Equipment and system
sizing
Output capacity of heating and cooling equipment and systems do not
exceed calculated loads, note exceptions taken
YES
C403.2.5
Minimum ventilation
Ventilation (natural or mechanical) provided per IMC; indicate mechanical
ventilation is capable of being reduced to minimum requirement per IMC
M 1.0
YES
C403.2.3 &
C403.2.3.2 &efficiency
C403.2.12.1
Equipment minimum
Provide equipment schedules or complete MECH-SUM tables with type,
capacity, efficiency, test standard (or other efficiency source) for all
mechanical equipment
M1.0
YES
C403.2.13
Electric motor efficiency
Provide equipment schedule with hp, rpm, efficiency for all motors; note
except.
M1.0
YES
C403.2.10
Fan power limitation
Fan system motor hp or bhp does not exceed limits per Table
C403.2.10.1(1)
M 1.0
YES
C403.2.10.3
& C403.2.13
Fractional hp fan motors
Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency
req.
M 1.0
NA
C403.2.3
Maximum air cooled chiller
capacity
Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit
NA
C40321
..
Non-standard water-cooled
chillers
Full -load and NPLV values for water-cooled centrifugal chiller adjusted for
non-standard operational conditions
NA
C403.2.12.1.2
Centrifugal fan cooling
towers
Large capacity cooling towers with centrifugal fan(s) meet efficiency
requirements for axial fan open circuit cooling towers
NA
C403.2.3
Forced air furnace and unit
heaters
Indicate intermittent ignition or IID, flue/draft damper & jacket loss
C403.2.3.3
Packaged electric
heating/cooling equipment
List equipment required to be heat pumps on schedule
NA
C403.2.3.4
Humidification
Indicate method of humidification (note requirements for systems with
economizer)
HVAC System Controls & Criteria
YES
C403.2.4.1
Thermostatic controls
Indicate locations of thermostatic control zones on plans, including
perimeter systems
M2.0
NA
C403.2.4.1.1
Heat pump supplementary
heat
Indicate staged heating (compression/supplemental) & outdoor lock -out
temp
YES
C403.2.4.2
Setpoint overlap (deadband)
Indicate 5°F deadband minimum for systems controlling both heating &
cooling
M 1.0
YES
C403.2.4.3
Automatic setback and
shutdown
Indicate zone t-stat controls with required automatic setback & manual
override
M1.0
NA
C403.2.4.3.3
Automatic (optimum) start
Indicate system controls that adjust equip start time to match load
conditions
YES
C402.4.5.2 &Dam
C403.2.4.4
Dampers
p
Indicate location of OSA, exhaust, relief and return air dampers; include
AMCA rated leakage and control type (motorized or gravity; note exceptions
M 1.0
NA
C403.2.11
Heating outside a building
Indicate radiant heat system and occupancy controls
NA
C403.2.4.5
Snow melt systems
Indicate shut-off controls based on outdoor conditions
YES
C403.2.4.6
Combustion heating
equipment
Indicate modulating or staged control
M1.0
NA
C403.2.4.7
Group R1 hotel/motel
systems
Indicate method for guest room automatic setback & set-up of 5°F minimum
NA
C403.2.4.8 / g
Group R2/R3 dwelling unit
systems
Indicate 5-2 programmable thermostats in primary spaces with minimum of
two setback periods; note exceptions taken
C403.2.5.1
Demand controlled
ventilation
Indicate high -occupancy spaces and systems requiring DCV
NA
C403.2.5.2
Occupancy sensors
Indicate spaces requiring occupancy -based system control and method; or
alternate means provided to automatically reduce OSA when partially
NA
C403.2.5.3
Enclosed loading
dock/parkinggarage
ventilationsystem
Indicate enclosed loading dock and enclosed parking garage ventilation
activation and control method
C403.2.5.4.1
Kitchen exhaust hoods
Indicate kitchen hoods requiring make-up air; indicate make-up air source
and conditioning method
NA
C403.2.5.4.2
Laboratory exhaust systems
Indicate lab exhaust systems requiring heat recovery, method & efficiency;
or alternative method taken (VAV, semi -conditioned makeup, or CERM
calculation)
NA
C403.2.6.1
Energy recovery -
ventilation systems
Indicate ventilation systems requiring ER, method & efficiency; note
exceptions
NA
C403.2.6.2
Energy recovery -
condensate systems
Indicate on -site steam heating systems requiring energy recovery
NA
C403.2.6.3
Energy recovery -
condenser systems
Indicate remote refrig. condensers requiring ER and use of captured energy
Mt:chanical Permit Plans Checklist - Page 2 of 3
' 2012 Washington State Energy Code Compliance Forms for Commercial Group R1 and > 3 story R2 and R3
MECH-CHK
Revised June 2013
Project Address Chevron
Date 7/15/2015
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
GENERAL PROVISIONS, CONTINUED
HVAC System Controls & Criteria, Continued
NA
C403.2.12
Variable flow control -
fans/pumps
Indicate fan & pump motors requiring VF control & method (VSD or equiv
controls)
NA
C403.2.12.1
Variable flow control -
cooling towers
Indicate cooling tower fans requiring variable flow control and method
NAcooling
C403.2.12.2
Large volume fan systems
Indicate fan systems requiring airflow reduction based on heating and
demand; or exception taken
NA
C403.2.12.2
Single zone AC systems
Indicate method of cooling demand -based fan control for sys. > 110,000
btuh
NA
C403.2.4.10
DDC system capabilities
Identify all DDC system input/output control points and indicate capability
for trending and demand response setooint adjustment
Ducting Systems
YES
C403.2.7.1 &Duct
C403.2.7.3
construction
Indicate all ductwork constructed and sealed per IMC, C402 leakage
requirements and IBC vapor retarder requirements
M 1.0
YES
7:,403.2.7.3.1
Duct pressure classifications
Identify location of low, medium and high pressure ductwork on plans
M 1.0
NAtest
C403.2.7.3.3
High pressure duct leakage
Indicate high pressure duct leakage testing requirements on plans; provide
test results to jurisdiction when completed
YES
C403.2.7.1 / 2
Duct insulation
Indicate R-value of insulation on ductwork
M 1.0
Piping Systems
YES
C403.2.8
Piping insulation
Indicate R-value of insulation on piping
M 1.0
NA
C403.2.8.1
Piping insulation exposed to
weather
Indicate method of protection from damage/degredation
SIMPLE SYSTEMS
Qualifying Systems
YES
C403.3
Qualifying single zone
systems
Verify unitary or packaged equipment does not exceed capacity limits, does
not have active humidifcation or simultaneous heating/cooling
YES
C403.3
Qualifying 2-pipe heating
systems
systems
Verify2-pipe heating -only system does not exceed capacity limits
g y y p tY
NA
C403.3.2
Hydronic system controls
Refer to Complex Systems Section C403.4.3
Simple System Economizers
YES
C403.3.1
Air economizer required
Indicate cooling systems requiring economizer controls; note in equip
sched.
M 1.0
YES C403.3.1.1.1
Air economizer capacity
Indicate modulating OSA control capability up to 100% OSA, or exception
M 1.0
YES C403.3.1.1.3
Air economizer high limit
controls
Indicate high limit shut-off control method per Table C403.3.1.1.3(2)
M1.0
YES C403.1.1.2
Integrated air economizer
operation
Indicate capability for partial air economizer operation for systems with
capacity > 65,000 btuh
M 1.0
NA
C403.3.1
Air economizer exceptions
Indicate eligible exception(s) taken and provisions to comply with
exceotion(s)
COMPLEX SYSTEMS
Complex System Economizers
NA
C403.4.1
Air economizer required
Indicate cooling systems requiring economizer controls; note in equip
sched.
NA
C403.4.1.4
Economizer heating system
impact
Verify control method of HVAC systems with economizers does not
increase building heating energy usage during normal operation
NA
C403.4.1.3
Integrated economizer
operation
Indicate capability for partial economizer operation for air or water econo
systems
NA
Moved
Water economizer capacity
Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb
OSA
NA
C403.4.1.2
Water economizer maximum
pressure drop
Indicate precooling coils and heat exchangers do not exceed pressure drop
limit
NA
C403.3.1
Air economizer exceptions
Indicate eligible exception(s) taken and provisions to comply with
exceotion(s)
'Mechanical
Permit Plans Checklist - Page 3 of 3
Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
MECH-CHK
Revised June 2013
2012 Washington State Energy
Project Address Chevron
Date 7/15/2015
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
COMPLEX SYSTEMS, CONTINUED
Specific System Requirements
NA
C403&
.2.1
C403.2.12
Variable flow control - fans
Indicate fans requiring variable flow control and method
NA
C403.4.2.1
VAV fan static pressure
sensors
Indicate sensor locations on plans; include at least one sensor per major
duct branch
NA
C403.4.2.2
VAV fan static pressure
setpoint
Indicate fan system static pressure setpoint based on zone requiring most
pressure
NA
C403.4.5
VAV systems serving multi-
zones
Indicate supply air systems serving multiple zones that are required to be
VAV, method of primary air control, and zones served; note exceptions
taken
NA
C403.4.5.4
VAV system supply air reset
Indicate controls that automatically reset supply air temp in response to
loads
NA
C403.4
Large capacity cooling
systems
Indicate method of multi -stage or variable control for building cooling
system capacity > 300 tons
NA
C403.4.7
Hot gas bypass limitation
Indicate cooling equipment unloading or capacity modulation method
NA
C403.4.3
Large capacity boiler
systems
Indicate multi -stage or modulating burner for single boilers > 500,000 btuh
NA
C403.4.3
Boiler sequencing
Indicate automatic controls that sequence operation of multiple boilers
NAisolation
C403.4.3.5
Chiller / boiler plant pump
Indicate capability to automatically reduce overall plant flow and shut-off
flow through chillers & boilers when not in use
NA
C403.4.2 &
C403.4.3.6
Variable flow control -
pumps
Indicate pumps requiring variable flow control & method
4
CNA C403.4.4
& 03
&
Variable flow control -
coaling towers
Indicate cooling tower fans requiring variable flow control and method
NA
C403.4.3.4
Hydronic system part load
controls
Indicate heating & chilled water systems have the capability to automatically
reset supply water temp AND reduce flow by z 50% for systems > 300,000
NA
C403.4.3.2
Two -pipe changeover
systems
Indicate deadband, heating/cooling mode scheduling and changeover
temperature range
NA
C403.4.3.3.1
Water loop heat pump -
deadband
Indicate capability of central equipment to provide min. 20°F water supply
temp deadband between heat rejection and heat addition modes
NA
C403.4.3.3
Water loop heat pump -
heat rejection
Provide heat exchanger that separates cooling tower and heat pump loop in
Climate Zone 5
NA
C403.4.3.3.3
Water loop heat pump -
isolation
Indicate 2-way isolation valve on each heat pump and variable flow control
for systems with total pump power > 10 hp
NA
C403.4.6
Condenser water heat
recovery
Indicate system provided to pre -heat service water and efficiency
NA
C403.5
Cooler / freezer - anti -sweat
heaters
Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat
heaters
NA
C403.5 / 6
Cooler / freezer - evaporator
and condenser fans
Indicate motor type for evaporator and condenser fans < 1 hp
SERVICE WATER HEATING
Service Water Systems
C404.2
Water -heating equip min.
efficiency
Provide equipment schedule or complete MECH-SUM table with type,
capacity, efficiency, test standard (or other efficiency source)
C404.3
Temperature controls
Indicate temperature controls have required setpoint capability
C404.4
Heat traps
Indicate piping connected to equipment have heat traps on supply &
discharge
C404.5
Insulation under water
heater
Indicate R-10 insulation under tank
C404.6
Service water piping
insulation
Indicate R-value of insulation on piping; note exceptions taken
C404.7 / 8
Circulation systems and
heat trace shut-off
Indicate shut-off capability based on occupancy and periods of limited
demand
C404.9
Group R-2 service hot water
meters
Indicate method of usage metering for dwell. units served by central HW
system
Pools & In -Ground Permanently Installed Spas
NA
C404.10.1
Pool heating equip min.
efficiency
Provide equipment schedule or complete MECH-SUM table with type,
capacity, efficiency, test standard (or other eff. source); heat pump heaters
4 COP
NA
C404.10.1 / 2
Pool heater on / off controls
Indicate automatic on/off control based on scheduling & accessible on/off
switch on heater that operates independent of thermostat setting; or
NA
C404.10.3
Pool covers
Indicate vapor retardant cover and insulation rating as required
NA
C404.10.3
Pool assembly insulation
Indicate rating of insulation on sides and bottom of pools heated to > 90°F
NA
C404.10.4
Heat recovery
Indicate method, exhaust air temperature reduction and recovered energy
use
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M15-0091 DATE: 07/20/15
PROJECT NAME: CHEVRON STATION
SITE ADDRESS: 220 STRANDER BLVD
X Original Plan Submittal Revision # before Permit Issued
Response to Correction Letter # Revision # after Permit Issued
DEPARTMENTS:
Building Division RN
Public Works
44/\ AJ%A
Fire Prevention III
Structural
Planning Division
Permit Coordinator
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
DATE: 07/21/15
Structural Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
(corrections entered in Reviews)
• DUE DATE: 08/18/15
Approved with Conditions ❑
Denied
(ie: Zoning Issues)
n
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping 0 PW ❑ Staff Initials:
12/18/2013
Sound Specialized Services Inc
Page 1 of 2
Home lnicio en Espanol Contact
Search L&I
A-Z Index Help My Secure I.,&I
Safety Claims & Insurance Workplace Rights Trades & Licensing
0 Washington State Department of
Labor & Industries
Sound Specialized Services Inc
Owner or tradesperson
Principals
Waite, David Lee, MEMBER
Doing business as
Sound Specialized Services Inc
WA UBI No.
603 213 378
12433 Ruggs Lake Road
EVERETT, WA98208
206-427-3455
SNOHOMISH County
Business type
Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
...........................................................................
Meets current requirements.
License specialties
GENERAL
License no.
SOUNDSS881M0
Effective — expiration
07/20/2012— 07/20/2016
Bond
.................
Contractors Bonding & Insurance Co
Bond account no.
SJ6993
$12,000.00
Received by L&I Effective date
07/20/2012 07/17/2012
Expiration date
Until Canceled
Insurance
.......................
Ohio Security Ins Co
Policy no.
BKS5655598
$1,000,000.00
Received by L&I Effective date
07/27/2015 02/20/2015
Expiration date
02/20/2016
Insurance history
Savings
......................
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
........................
No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violations
........................................................
No license violations during the previous 6 year period.
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603213378&LIC=SOUNDSS881MO&SAW= 10/6/2015
GENERAL NOTES
1) COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE MOST CURRENT BUILDING,
MECHANICAL, ENERGY, PLUMBING, FIRE AND HEALTH CODES AND REGULATIONS AS ADOPTED BY THE
LOCAL JURISDICTIONS.
2) ALL AIR-CONDITIONING UNITS WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP FOR THE CONDENSATE
PAN WITH PLUG TEES FOR CLEANING AND CONDENSATE PIPES SHALL BE DISCHARGED TO EXISTING
CONDENSATE WASTE PIPING. VERIFY SIZE AND LOCATION AT SITE.
3) MECHANICAL CONTRACTOR SHALL COORDINATE DIFFUSER LOCATIONS AND DUCT ROUTING CLEARANCES
WITH THE STRUCTURAL, REFLECTED CEILING AND LIGHTING PLANS.
4) PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING VENT STACKS WITH THE EQUIPMENT TO MAINTAIN
A MINIMUM OF 10 FT. FROM THE OUTSIDE AIR INTAKES.
5) ALL FIRE RATED STRUCTURE SHALL BE FIRE DAMPERED. VERIFY WITH THE ARCHITECTURAL AND INSTALL
PER THE LOCAL JURISDICTIONS.
6) ALL AIR DISTRIBUTION OUTLETS SHALL HAVE VOLUME CONTROL DEVICES.
7) ALL VOLUME DAMPERS IN NON -ACCESSIBLE CEILINGS SHALL HAVE A CONTROL ARM EXTENDED TO AN
ACCESSIBLE LOCATION ("YOUNG REGULATOR' BOWDEN CABLE, ROTOTWIST OR EQUAL). EXACT LOCATION OF
CONTROL DEVICES VISIBLE IN FINISHED SPACES SHALL BE COORDINATED WITH THE ARCHITECT.
8) ALL 90 DEGREE TRUNK DUCT ELBOWS SHALL BE SMOOTH -ROUND OR SQUARE WITH TURNING VANES.
9) MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE EXACT LOCATION OF PIPING AND DUCTWORK
AND PENETRATIONS WITH THE STRUCTURE.
10) MAXIMUM LENGTH OF FLEXIBLE DUCTS SHALL BE 6' OR AS SHOWN ON DRAWINGS.
11) ALL DUCTWORK, EQUIPMENT AND PIPING SHALL BE SEISMICALLY SUPPORTED PER SMACNA AND LOCAL
REGULATIONS.
12) ALL AIR FILTERS SHALL HAVE EFFICIENCY BASED ON THE ASHRAE STANDARD 52-76 (ATMOSPHERIC DUST
SPOT).
13) ALL MECHANICAL EQUIPMENT SHALL CONFORM TO SMACNA AND LOCAL REGULATIONS FOR SEISMIC
RESTRAINT (INCLUDING PIPING AND DUCTWORK).
14) ALL EQUIPMENT AND ACCESSORIES IN CONCEALED SPACES REQUIRING ACCESS SHALL HAVE ACCESS
DOORS.
15) TOTAL SYSTEM SHALL BE WARRANTED FOR ONE YEAR; STARTING FROM THE TIME OF OWNER/ENGINEER'S
FINAL ACCEPTANCE.
16) HVAC NOTES:
A) PROVIDE FLEXIBLE CONNECTION IN ALL DUCTS CONNECTING TO AIR MOVING EQUIPMENT AS CLOSE
TO FAN AS POSSIBLE. FLEXIBLE CONNECTION SHALL CONSIST OF 6" OR MORE OF AIR TIGHT,
ARE PROOF FLEXIBLE NEOPRENE COATED WOVEN FIBROUS GLASS MATERIAL VENT FABRICS, INC.
OR APPROVED EQUAL
B) ALL DUCTWORK SHALL BE SHEET METAL SOUND UNE RECTANGULAR SUPPLY AND RETURN DUCTS
WITHIN 10 FEET FROM THE UNIT OPENINGS.
C) ALL SUPPLY AND RETURN FLEXIBLE DUCTS SHALL BE CONSTRUCTED OF DOUBLE LAMINATION OF
POLYESTER ENCAPSULATED STEEL WIRE HELIX FOR INNER CORE HIGH DENSITY FIBERGLASS
INSULATION AND GRAY POLYESTER FILM WITH SPIRAL REINFORCEMENTS EQUAL TO 'ATCO-70
SERIES" (MIN. POS. PRESS. = 6" W.G., NEG. PRESS = 0.75" W.C.). FLEXIBLE DUCTS AND CONNECTORS
SHALL BE U.L. 181 LISTED AND MEET ALL REQUIREMENTS OF IMC 603.6.
D) PROVIDE LOCKABLE VOLUME DAMPERS IN ALL AIR DISTRIBUTION OUTLETS.
E) DUCT HANGERS, SUPPORTS AND METHODS OF INSTALLATION SHALL CONFORM TO ASHRAE AND
SMACNA RECOMMENDATIONS.
F) DUCT SIZES SHOWN ON PLANS INDICATE INSIDE FREE AREA.
G) ALL DUCTWORK SHALL BE CLASS 1 AIR DUCT AS APPROVED BY U.L-181.
H) DUCTS - SHEET METAL DUCTS SHALL BE INSULATED WITH THE INSULATION AND THICKNESSES AS
SHOWN HEREIN (REDUCE THE INSULATION THICKNESS BY THERMAL VALUE OF SOUND LINING).
1. SUPPLY AIR DUCTS IN HEATED SPACE; NO INSULATION REQUIRED IF SOUNDUNED,
OTHERWISE 1" THICK K = 0.23 0 75 DEGREES F.
2. SUPPLY AIR DUCTS IN NON -HEATED SPACE APPROXIMATELY 3" THICK K=0.23 0 75
DEGREES F., TO PROVIDE A MINIMUM THERMAL RESISTANCE VALUE OF MINIMUM R-11.
3. SUPPLY AIR DUCTS OUTSIDE OF BUILDING SAME AS CONDITIONED SPACE EXCEPT
WITH WEATHERPROOF BARRIER.
4. RETURN AIR DUCTS; SHALL HAVE SAME INSULATION AS THE SUPPLY AIR DUCTS.
5. EXHAUST AIR DUCTS; NO INSULATION REQUIRED.
6. INDOOR DUCTS HANDLING OUTSIDE AIR SHALL HAVE FIBERGLASS BLANKET WITH VAPOR
BARRIER JACKET ASJ, 1" THICK, K = 0.23 0 75 DEGREES F. (ALL DUCTWORK FOR
THE BUILDING SUPPLY FAN AND OUTSIDE AIR INTAKES TO INDMDUAL HEAT PUMPS).
17) DUCTWORK
ALL DUCT SIZES SHOWN ON PLANS INDICATED INSIDE FREE AREA. ALL DUCTWORK SHALL BE
CLASS 1 AIR DUCT AS APPROVED BY U.L-181.
A. INSTALL ALL DUCTWORK IN COMPLETE CONFORMANCE WITH RECOMMENDED CONSTRUCTION STANDARDS
FOR RECTANGULAR AND ROUND SHEET METAL AND FLEXIBLE DUCTS IN ACCORDANCE WITH SMACNA
DUCT CONSTRUCTION STANDARDS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. MINIMUM SHEET
METAL THICKNESS SHALL BE 26 GA.
B. ALL DUCT JOINTS LONGITUDINAL AND TRANSVERSE ARE TO BE SEALED USING 181A OR 181B
LISTED TAPES AND MASTICS. MECHANICAL FASTENERS MUST BE USED TO FASTEN DUCTS.
C. STRAP HANGERS SHALL NOT BE LESS THAN 1" BY 1/8" THICK ON SIX (6) FOOT CENTERS
AND ATTACHED TO SIDE OF DUCT WITH SHEET METAL SCREWS. INSULATED FLEXIBLE DUCT
MAY BE USED FOR LOW PRESSURE RUN OUTS TO INDMDUAL DIFFUSERS IN LENGTHS NOT TO
EXCEED FIVE (5) FEET FOR EACH DIFFUSER. SEAL ALL SHEET METAL SCREW PENETRATIONS.
D. ALL RECTANGULAR AND ROUND SUPPLY DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A
MINIMUM THICKNESS THAT CONFORMS TO THE STANDARD OF THE LOCAL CODE AND SHALL
AND SHALL HAVE A CONTINUOUS VAPOR BARRIER JACKET W/ALL JOINTS TAPED AND SEALED.
FRESH AIR DUCT SHALL HAVE 2" INTERNAL DUCT UNER FROM POINT OF OUTSIDE AIR
CONNECTION TO POINT OF CONNECTION AT PLENUM BOX OR MIXING BOX. ALL EXPOSED SPIRAL
DUCT SHALL HAVE INTERNAL DUCT LINER.
E. ALL INSULATION, JOINING MATERIALS, SEALER, ETC.. SHALL HAVE A U.L FLAME SPREAD
CLASSIFICATION OF NO MORE THAN 25 AND A SMOKE DEVELOPMENT RATING NOT MORE
THAN 50.
18) MECHANICAL CONTRACTOR SHALL LOCATE AND COORDINATE THE EXACT LOCATION OF DUCTWORK
WITHIN THE STRUCTURE WITH STRUCTURAL AND GENERAL CONTRACTOR PRIOR TO INSTALLATION
OF ANY STRUCTURE OR EQUIPMENT.
19) ALL DUCT PENETRATIONS THROUGH RATED ENCLOSURES SHALL BE FIRE AND/OR SMOKE DAMPERED.
20) ALL ROOF PENETRATIONS SHALL BE MIN. OF 5 FEET AWAY FROM THE 2-HR AREA SEPARATION
WALLS. ALL PIPE, DUCT AND CONDUIT PENETRATIONS THROUGH RATED ASSEMBLIES SHALL BE
FIRE AND SMOKE STOPPED PER CODE.
21) ALL MECHANICAL EQUIPMENT SHALL CONFORM TO SMACNA AND LOCAL REGULATIONS FOR SEISMIC
RESTRAINT (INCL PIPING AND DUCTWORK).
22) THE CONTRACTOR SHALL NOT OPERATE THE EQUIPMENT FOR TEMPORARY HEATING OR VENTILATION
DURING THE CONSTRUCTION. (ALL EQUIPMENT SHALL RUN FOR TESTING AND BALANCING PURPOSES
ONLY). NOTIFY THE ENGINEER 48 HOURS (MINIMUM) IN ADVANCE TO ARRANGE A FINAL FIELD
INSPECTION PRIOR TO COVERING UP THE CEILING.
23) EACH FAN UNIT OVER 2000 CFM SHALL HAVE A DUCT/SMOKE DETECTOR PER 2012 IMC 606
IN RETURN DUCTS AS REQUIRED BY THE JURISDICTIONS. UNIT SHALL SHUT DOWN UPON SMOKE
DETECTION (COORDINATE WITH FIRE ALARM CONSULTANT/CONTRACTOR PRIOR TO BIDDING/
CONSTRUCTION).
24) CONTRACTOR IS TO BRING UP THE DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED
FOR OR SHOWN BUT ARE REQUIRED FOR A COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT
PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH, ITEMS
REQUIRED FOR A COMPLETE SYSTEM READY FOR THE OWNER'S BENEFICIAL USE SHALL BE FURNISHED
AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDRIONAL COST
TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPUCABLE
STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL
25) ALL EQUIPMENT SUPPLIED FOR THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL,
WORKMANSHIP, AND TITLE, AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT
APPEARS WITHIN ONE YEAR FROM DATE OF FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE
WARRANTIES ABOVE, THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE
THE SYSTEM TO THE ORIGINAL SATISFACTORY CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY
IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY.
NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL
START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.)
26) ENTIRE INSTALLATION OF ALL EQUIPMENT, CONTROL, PIPING, DUCTWORK AND RELATED ACCESSORIES
SHALL BE PER BASIC OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WITH
THESE STANDARDS.
27) MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE ROUTING AND INSTALLATION FEASIBILITY
OF ALL EQUIPMENT, PIPING AND DUCTWORK PRIOR TO SUBMITTING HIS BID AND INCLUDE IN HIS BID
ADDITIONAL PIPING, DUCTWORK, FITTINGS, OFFSETS, ETC. WHICH MIGHT BE REQUIRED FOR A COMPLETE
SYSTEM READY FOR OWNER'S BENEFICIAL USE.
28) COORDINATE THE CONSTRUCTION SCHEDULE WITH THE ARCHITECT AND PERFORM ALL REQUIRED WORK IN
STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE.
29) MECHANICAL CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES
REQUIRED BY THE AUTHORITIES HAVING JURISDICTION.
30) ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE AIR -BALANCING AND PUT ALL MECHANICAL SYSTEMS
IN OPERATION AND SUBMIT MINIMUM 4 COPIES OF BALANCING REPORTS TO THE OWNER/ARCHITECT.
INDUCED COMBUSITON GAS FURNACE SCHEDULE
DESIGIATION:F-1
F-2
ZONE
STORE
STORE
CARRIER
CARRIER
MAMFACTINER
MODEL:
58PHA-090-16
58PHA-090-16
TYPE
HORIZONTAL
HORIZONTAL
NAT.
NAT.
GAS TYPE
I I- 1 .: ):
84
84
OUTPUT(MBH):
69
69
ARE VENT):
80%
80%
FAN (1om):
3/4 HP
3/4 HP
CFIlIk
1600
1600
ESP. (1V-H20):
0.60"
0.60"
MCA/MOCP
10.3/15.0
10.3/15.0
VOLTAGE:
115
115
PHASE:
1
1
VVEICHT (LBS):
150
150
RBAARKS
(1)(2)
(1)(2)
(1) WITH ECM MOTOR, FILTER RETAINERS, FILTERS AND ALL STANDARD SAFETY FEATURES AND INSTALLATION
ACCESSORIES, INTERMITTENT IGNITION DEVICE, MFG CONCENTRIC VENT TERMINATION KIT, MOTORIZED
OUTSIDE DAMPER, SPRING ISOLATORS/UNI-STRUT/ALL-THREAD ROD, CONDENSATE FREEZE PROTECTION
KIT..
(2) A.G.A. LISTED.
INDOOR COOLING COIL/OUTDOOR CONDENSING UNIT SCHEDULE
DON:
CC-1
CU-1
CC-2
CU-2
Z
STORE
STORE
STORE
STORE
MAMA
CARRIER
CARRIER
CARRIER
CARRIER
MODEL:
CNPH6024A
24ABC660-30
CNPH6024A
24A8C660-30
COIL
COIL
COIL
COIL
•,a vl TONS
--
5.0
--
- 5.0
MATPINNACE:
F-1
F-1
F-2
F-2
COOLNG o AN ):
--
52.0
--
52.0
CFM:
1600
--
1600
--
ESP. (NV-H20):
0.5"
--
0.5"
--
SEER:
--
15.0
--
15.0
OUTDOOR FAN MOTOR (FLA):
1.20
--
1.20
r-- - --
coeFEssat RLA/LRA:
--
21.4/135.0
--
21.4/135.0
MC
--
28.0/40.0
--
28.0/40.0
VOLTAGE:
--
208
--
208
PHASE:
--
1
--
1
NOISE (CBA):
--
--
--
--
(LBO:
53
143
53
143
REMAIWS
(1)(2)
(2)
(1)(2)
(2)
(1) COORD. CONDENSATE DRAIN W/PLUMBER.
(2) INSTALL REFRIGERATION PIPING SUCTION/UQUID LINES BETWEEN INDOOR/OUTDOOR COIL/UNIT PER MANUFACTURER GUIDELINES. INSULATE SUCTION ONES WITH
1" ARMAFLEX OR EQUAL. INSTALL OTHER ACCESSORIES AS REQUIRED AND AS RECOMMENDED PER THE MANUFACTURER
Minimum Outside Air Ventilation Schedule
I I
Ventilation Rate per 2012 IMC 403 (based on ASHRAE Std. 62.1-2007)
Equip. Tag
Zone
Occupancy
Category
Area (sf)
People Outdoor
Air Rate
(cfm/person)
Table 403.3
Zone
Population.
Number of
people in
space.*
Area Outdoor
Air Rate
(cfm/sf)
(Table 403.3)
Occupant
Density
(#/1000 sf)
Breathing
Zone
Outdoor Air
Flow
Vbz/(CFM)
Zone Air
Distribution
Effectiveness
Ez (Table
403.3.1.2)
Zone
Outdoor Air
Flow
(Voz/(CFM)
System
Ventilation
EfficiencyEv
(Table
403.3.2.3.2
Minimum
Outdoor Air
Intake Flow
Vot/(CFM)
Proposesd
Design
Outdoor Air
Intake Flow
Vot/(CFM)
HP-1/HP-2
Retail
Retail
1685
7.5
25
0.12
15
389.70
1.00
389.70
0.90
351
400
Storage Room
Storage Rms
226
0.0
0
0.12
0
27.12
1.00
27.12
0.90
24
25
Storage Room
Storage Rms
122
0.0
0
0.12
0
14.64
1.00
14.64
0.90
13
25
Total
388
450
Total
388
450
* In some cases occupancy is less than maximums as allowed per 403.3 exception, in no case shall the occupancy De less than one half per Table 403.3.
UNED RETURN AIR
PLENUM
RA DUCT
OA DUCT -
MOUNT UPSTREAM
OF RA DU
ACCESS
PANEL
SEE FLOOR PLAN
FOR DUCT SIZE do
ROUTING,
DUCT SHALL BE
SAME SIZE AS UN
INLET.
LTER SECTION WITH SIDE
ACCESS; ENSURE
CLEARANCES ARE
MAINTAINED. DO NOT BLOCK
FILTER PULL WITH
-
CONDENSATE
TRAP AND VENT III O
SECONDARY DRAIN PAN - 1.5"
DEEP AND 2' LARGER THAN
UNIT IN BOTH DIRECTIONS
FLEXIBLE CONNECTION AT
SUPPLY AND RETURN. .
DUCT UNER
RIMARY CONDENSATE
DRAIN, SEE FLOOR PLAN
FOR ROUTING
ELECT OVERFLOW CUT-OFF
SWITCH AT CONDENSATE
OVERFLOW OUTLET; EQUAL TO
MODEL EZT-222 MANUFACTURED
BY "EZ-TRAP INC' OR EQUAL
QQ CONDENSATE DRAIN SHALL BE 1" FOR ALL UNITS SLOPE AT r PER FOOT (MIN).
0 ALL THREAD ROD SHALL BE MIN 1 'DIAMETER. ATTACH TO STRUCTURE
ABOVE AS NOTED IN SMACNA CHAPTER 4. MIN OF 4 RODS.
0 PROVIDE STEEL ANGLE IRON MINIMUM SIZE FOR ALL UNITS 5 TONS AND LESS:
1.5"x1.5'4". MAXIMUM LENGTH 4FT.
0 NEOPRENE/SPRING VIBRATION ISOLATER: 0.3" DEFLECTION. MASON 30N VIBRATION
HANGER OR EQUAL
0 UNE SUPPLY DUCT FIRST TEN FEET FROM UNIT OR UP TO FIRST TRANSITION OR
ELBOW.
HORIZONTAL INDOOR FAN COIL DETAIL
NO SCALE
A
M 1.0
DROP. CEIL'G,
COORD. WITH
ARCH'L
FRAME TO SUIT
CLG. (TYP.)
CEILING RETURN GRILLE DETAIL
NO SCALE
USE SMOOTH RADIUS SHEET METAL
ELBOW WHERE 12" STRAIGHT
FLEX IS NOT FEASIBLE
MAINTAIN 12" OF STRAIGI
FLEX DUCT BEFORE CONN
TO DIFFUSER 1
STRAIGHTENING
GRID
I II I
FLEX DUCT
ADAPTER WHERE APPLICABLE
L
CEILING DIFFUSER DETAIL
CEIL'G (COORD.
WITH ARCH'L)
- FRAME TO SUIT
CLG. (TYP.)
C
NO SCALE
M1.0
LEGEND
SThEOL
ABNEVIAT1ON
DEBEICFMON
QQ /Qs
T'STAT/SENSOR
THERMOSTAT/SENSOR
el
--
DUCTWORK W/ TURNING
VANE AND FLEX CONN.
-J
VD
VOLUME DAMPER
--
RIGID DUCT
--
FLEXIBLE DUCT
I:h
--
ROUND SPIN -IN WITH V.D.
FD
FIRE DAMPER
-.
SFD
SMOKE FIRE DAMPER
*
CFD
CEIUNG RADIATION FIRE DAMPER
CD
ROUND CEIUNG DIFFUSER
•
CG
ROUND CEIUNG GRILLE
171
CD
SQUARE CEIUNG DIFFUSER
CG
SQUARE CEIUNG GRILLE
CD
CONDENSATE DRAIN UNE
-CD-
MI
--
SMOKE DUCT DETECTOR
A.F.F.
ABOVE FINISHED FLOOR
//////
(D)
DEMOUTION WORK
(E)
EXISTING DUCTWORK
(N)
NEW DUCTWORK
POC
POINT OF CONNECTION
e It o $A1coOI
Plan review approval is subjfmt to errors and omissions.
Approval of construction documents d . = not authorize
the vlota of any adopted ado or ordinance. Receipt
of approved Field Copy and conditions is acknowledged:
Date: ' )CT P--412mt C •
City of Tukwila
BUILDING DIVISION
ENERGY CODE NOTES:
1) THERMOSTATS SHALL BE A 7 DAY PROGRAMMABLE TYPE
WITH A 5 DEGREE DEADBAND AND AUTOMATIC SETBACK
CONTROL PER C403.3.4.2 2012 WSEC.
2) HVAC EQUIPMENT SHALL MEET THE MINIMUM ENERGY
EFFICIENCY RATINGS PER TABLES C403 OF THE WSEC.
3) DUCT INSULATION AND SEALING SHALL MEET WSEC
SECTION C403.2.7 REQUIREMENTS.
4) SUPPLY AND RETURN DUCTS IN UNCONDITIONED SPACES
SHALL BE INSULATED TO MIN. R-6. ROOFTOP HVAC
DUCTWORK SHALL HAVE A WEATHER BARRIER AND
INSULATED TO R-8 PER WSEC C403.2.7.
5) SUPPLY AND RETURN DUCTS IN CONDITIONED SPACES
SHALL BE INSULATED TO MIN. R-5 PER C403.2.7 WSEC.
6) PIPING INSULATION SHALL MEET THE REQUIREMENTS
OF WSEC 403.2.8.
7) OUTSIDE AIR DUCTS SHALL BE INSULATED PER WSEC
C403.2.7. OUTSIDE AIR DUCTS SHALL HAVE A MOTORIZEC
DAMPERS OR AUTOMATIC DAMPER FOR ALL OUTSIDE AIR
INTAKES,
8) HVAC SYSTEMS SHALL BE COMMISSIONED PER
WSEC C408.2.
9) HVAC SYSTEM INTAKE, EXHAUST AND RELIEF DAMPERS
LEAKAGE SHALL COMPLY WITH V"WS'E'CU4OZ4 5 EV1SIONS
No changes st(dll be made `o the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will reauiro .a new plan submittal
DESIGN 4sessiude additional plan re.vIevi fees
ALL CODES WITH WASHINGTON STATE AMENDMENTS
2012 WASHINGTON STATE ENERGY CODE
2012 INTERNATIONAL MECHANICAL CODE
2012 UNIFORM PLUMBING C
PARATE PERMIT
2012 INTERNATIONAL FIRE CD@ECUIRED FOR:
❑ Mechanical
EVIEWED FOR
000E COMPLIANCE
` APPROVED
JUL 2 3 2015
.As)
City of Tukwila
BTU LOING DIVISION
.,B'"Electrical
..ErPlumbing
,Eilt4s Piping
City of Tuk, i'a
PI III 1.1,. t ^err;
e
PLAN INDEX -
GENERAL NOTES, SCHEDULES AND LEGEND
FLOOR PLAN - HVAC
SPECIFICATIONS
RECEIVED
CITY OF TUKWILA
JUL 2 U 2015
PERMIT CENTER
• 1..1
(it,
Architects
19401 40th
Lynnwood,
Ph.
dwallace@PMDGinc.com
Kenneth
Ave. West, Suite
Wa. 98036
(425) 405-7746
e-mail:
McCracken, Architect
300
►(1
Seal
��. Cie
I
ABOSSEIN
ENGINEERING
L.L.C.
MECHANICAL
LEED
2100
BELLEVUE,
PHONE:
I ELECTRICAL
I FIRE PROTECTION
112TH AVE. NE
WA 98004
(425) 462-9441
I CML
REVISION
PLANNING PRELIMINARY REVIEW
PROGRESS SET
HEALTH SUBMITTAL - EQUIPMENT REVS
HEALTH COMMENTS
BUILDING PERMIT SUBMITTAL
ELECTRICAL PERMIT SUBMITTAL
w
o
2/25/15
0
\
\
ro
4/23/15
LO
\
\
to
\
co
in
\
N
N4
as««<
z
O
CO
Er
0
W
Zm
00
J o2
CDo
O
V
W
Lu
ol
� J
-J
-
il:
co he
N
'
FF-
N
X
W
Project Number
215042
Sheet
GENERAL
NOTES,
SCHEDULES
AND
Name
LEGEND
Sheet Number
MI.O
•"y
KEYED NOTES:
0 FAN COIL UNIT HUNG FROM STRUCTURE WITH VIBRATION ISOLATORS
WITH ALL THREAD ROD, ANGLE IRON/UNI-STRUT. MOUNT AS HIGH
AS FEASIBLE IN ORDER TO MINIMIZE DUCT DUCT OFFSET TO HIGHER
CEILING. SEE DETAIL A/M1.0..
0 1" SOUNDLINING FOR SUPPLY AIR AND RETURN AIR DROPS.
SOUNDLINE FOR THE FIRST 10 FT, ROUTE DUCTWORK ABOVE
CEILING SPACE. VERIFY EXACT LOCATIONS OF JOISTS AND JOIST
SPACING AT SITE IN ORDER TO INSTALL THE DUCTS BETWEEN THE
STRUCTURE. TRANSITION AT THE UNIT OPENING AS REQUIRED. (TYP.)
OSUPPLY DUCT AND RETURN DUCT WITH 1" EXTERIOR INSULATION
(MIN. R-6)
OSPIN -IN VOLUME DAMPER (TYPICAL)
0 FLEX DUCT - MAIXIMUM 6 FT. (TYP.)
O7-DAY PROGRAMMABLE WSEC COMPLIANT T'STAT WITH
SUB -BASE, TAMPERPROOF FEATURES AND REMOTE SENSOR
CAPABILITY
OG EXISTING BATHROOM EXHAUST FAN TO REMAIN.
ODUCTWORK INSTALLED ABOVE CEILING SPACE. INSTALLATION
SHALL BE PER SMACNA "HVAC DUCT CONSTRUCTION STANDARDS",
LATEST EDITION (TYPICAL).
0 SEE AIR DISTRIBUTION SCHEDULE, THIS SHEET. (TYP.).
OSEE DIFFUSER AND RETURN GRILLE DETAIL B/M1.0 & C/M1.0. (TYP.).
OWALL MOUNTED REMOTE SENSOR.
OOFFSET DUCTWORK UP.
OOUTDOOR HEAT PUMP MOUNTED OVER EXISTING ROOF SUPPORT
SYSTEM FOR REMOVED ROOFTOP AIR HANDLERS. MODIFY AS REQUIRED
TO SUPPORT NEW UNIT. INCLUDE SPRING ISOLATORS (MIN 1" DEFLECTION).
OROUTE CONDENSATE TO TAILPIECE OF LAVATORY AND PER
LOCAL JURISDICTION REQUIREMENTS.
O4" 0 B-VENT UP TO ROOF WITH U.L. LISTED CAP AND 4" COMBUSTION
AIR VENT. TERMINATE AND SEPARATE PER IMC, NFPA 54 AND
MANUFACTURERS INSTALLATION GUIDELINES..
� ECONOMIZER MIXING BOX WITH CONTROLS, ACTUATORS, FILTER BOX AND
RACK/FILTER, 1" PLEATED FILTER, ETC. (MICROMETL, CANFAB OR EQUAL).
N ROOF)
100CFM-
STII► .!` GE
OMEN
ACCESS PLATFORM
PER IMC. ACCESS
VIA T-BAR CEILING
OFFSET UP 160QCFM-D
24X12
ECONO
RELIEF
LVR (F2
ROOF) 200CFM-B
SIO AGE
126X12
K
ACC S DOOR
- ABOVE_::;CE•1 LI:N G_=-
SALES AREA
STORAGE
r
r-r
WALK IN COOLER
16X12
10"0
r
r
is
10"0 1
325C
10-0 r
16X12
1
I\
0
!tJ
—10 oli
1i
11
III ; 325CFM `A
r3
10" 0
1..................
i
ill
I!
AREA —
320CFM-A
20CFM-A
AIR DISTRIBUTION
SCHEDULE
TYPE
DESCRIPTION
CFM
NECK SIZE
KRUEGER MODEL
TITUS MODEL
REMARKS
A
T-BAR DIFFUSER
PER PLAN
PER BELOW
6200
PCS
PERFORATED
B
SOLID CEILING DIFFUSER
PER PLAN
PER BELOW
SH
TDC
AIR DIST. 4-WAY UNLESS SHOWN OTHERWISE
C
SOLID CLG. RETURN/EXH. GRILLES
PER PLAN
PER BELOW
S8OH
350RL
BOTTOM/TOP WALL GRILLE
D
TOP WALL REGISTER
PER PLAN
PER BELOW
880H
300RS
E
T-BAR RETURN/EXHAUST GRILLE
PER PLAN
PER BELOW
EGC5
50F3
F
LINEAR SLOT DIFFUSER
PER PLAN
48" - 2 SLOTS (1" SLOT)
1950
ML39
G
LINEAR SLOT DIFFUSER
PER PLAN
48" - 2 SLOTS (1" SLOT)
PTBS
MPI
DUCT SIZE FEEDING THE AIR DISTRIBUTION
NECK
NECK
NECK
NECK
NECK
SIZE (ROUND)
CFM (MIN.)
CFM (MAX)
TYPE- A (6200)
TYPE- B (SH)
TYPE- C (S8OH)
TYPE- D (880H)
TYPE- E
(EGC5)
4"
0
35
6 X 6
6 X 6
6 X 6
6 X 6
6 X
6
5"
36
60
6 X 6
6 X 6
6 X 6
6 X 6
6 X
6
6"
61
95
6 X 6
6 X 6
6 X 6
6 X 6
6 X
6
7"
96
145
6 X 6
6 X 6
8 X 6
8 X 6
8 X
6
8"
146
200
6 X 6
6 X 6
10 X 6
10 X 6
10 X
6
9"
201
280
10 X 10
9 X 9
10 X 6
10 X 6
10 X
6
10"
281
380
10 X 10
9 X 9
12 X 10
18 X 8
12 X
10
12"
381
600
12 X 12
12 X 12
18 X 10
20 X 8
18 X
10
14"
601
900
15 X 15
15 X 15
24 X 12
28 X 10
24 X
12
16"
901
1300
24 X 18
32 X 10
24 X
18
18"
1301
1750
24 X 24
36 X 16
24 X
24
20"
1751
2045
24 X 24
24 X
24
20"
2046
2310
30 X 24
30 X 24
22"
2311
3000
30 X 30
30 X 30
NOTES:
1) CEILING DIFFUSERS, REGISTERS AND GRILLES SHALL BE KRUEGER OR EQUAL.
2) CD=CEILING DIFFUSER, RG=RETURN GRILLE, TG=TRANSFER GRILLE, LVR=LOUVER, TWR=TOP WALL REGISTER, TWG=TOP WALL GRILLE.
3) ALL SUPPLY AIR DISTRIBUTION OUTLETS WITHOUT VOLUME DAMPERS SHALL HAVE OPPOSED BLADE VOLUME CONTROL DAMPERS.
4) FASTENING METHOD SHALL BE AS SELECTED BY ARCHITECT AND SHALL BE COMPATIBLE WITH THE WALL OR CEILING STRUCTURE THAT IS BEING INSTALLED TOO.
5) MANUFACTURER MUST MATCH MATERIALS, TYPE, AND PERFORMANCE OF LISTED DEVICE. COORDINATE FINISH WITH ARCHITECT.
30CFM-A
FLOOR PLAN — HVAC
320CFM-A I
SCALE: 1/4" = 1'-0"
NORTH
.3200 FM 4•
1-
24X12
-EC0 I0
RELIEF
LVR (F1)
REVtWED FOR
CODE COMPLIANCE
APPROVED
JUL 2 3 2015
City of Tukwila
BUILDING DIVISION
RECEIVED
CI OF TUKWILA
15
T
group
Architects
19401 40th Ave. West, Suite 300
Lynnwood, Wa. 98036
Ph. (425) 405-7746
e-mail:
dwallace@PMDGinc.com
Kenneth McCracken, Architect
‘ '•
1 5-1..!_, /
V
Seal
0
1
l c
ABOSSEIN ENGINEERING
L.L.C.
MECHANICAL I ELECTRICAL I CML
LEED I ARE PROTECTION
2100 112TH AVE NE
BELLEVUE, WA 98004
PHONE: (425) 462-9441
REVISION
PLANNING PRELIMINARY REVIEW
PROGRESS SET
HEALTH SUBMITTAL - EQUIPMENT REVS
HEALTH COMMENTS
BUILDING PERMIT SUBMITTAL
ELECTRICAL PERMIT SUBMITTAL
<
p
t)
N
N
N
�—
rO
N
\
N
6/3/15
v....7...
.—
Nz
\<l<a
\
l
\<
Z
O
CAim CD
411011
hal
9 c0
WIllo Z °J 0O
0
O)
W
O
U
W
J
lib Q
oIC �
Q<
��
he
P
< CMCN
Er
w
Project Number
215042
Sheet Name
FLOOR PLAN
HVAC
Sheet Number
M2.0
HVAC SPECIFICATIONS - DIVISION #23
3.08 ALL WORK SHALL BE DONE IN A FIRST-CLASS MANNER BY WORKMEN SKILLED IN THE TRADE AFFECTED.
3.33 VALVES: NIBCO BALL VALVES OR EQUAL.
3.34 AIR CONDITIONING UNITS:
PART 1.00 GENERAL
1.01 LOCAL CONDITIONS: VISIT AND INSPECT THE PREMISES TO ASCERTAIN THE EXISTING CONDITIONS BEFORE
3.09 CLEANING PIPING, DUCTS, EQUIPMENT: THOROUGHLY CLEAN ALL DUCTS AND EQUIPMENT OF DIRT, CUTTINGS,
AND OTHER FOREIGN SUBSTANCES. REMOVE FROM PREMISES ALL RUBBISH AND DEBRIS, LEAVING THE AREA
CLEAN AND READY FOR USE.
PER EQUIPMENT SCHEDULE WITH CAPACITY AS INDICATED. UNIT SHALL BE AN AIR-COOLED CONDENSING UNIT,
AIR HANDLING UNIT WITH DX -COILS OR HEAT PUMPS OR GAS FURNACE OR HOT WATER COILS, FILTER MIXIMG
BOX AND VIBRATION ISOLATORS. TOTAL CAPACITY OF EACH UNIT SHALL BE AS SCHEDULED ON THE DRAWINGS.
SUBMITTING A BID. NO EXTRA PAYMENT WILL BE ALLOWED FOR THE LACK OF KNOWLEDGE OF THESE
CONDITIONS.
3.10 EQUIPMENT START-UP: ADJUST ALL BELTS, OR OTHER DRIVES AND CHECK MOTOR ROTATIONS.
3.35 CONTROLS - THE COOLING SYSTEM SHALL BE PROTECTED WITH HIGH PRESSURE STAT, LOW PRESSURE STATS,
LOSS -OF -CHARGE PROTECTION, INDOOR COIL FREEZESTATS, CURRENT AND TEMPERATURE SENSITIVE OVERLOAD
DEVICES.
1.02 CODES: STRICTLY COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
3.11 INSTALL TEMPORARY AIR FILTERS IN AIR HANDLING EQUIPMENT THAT IS BEING USED FOR HEATING OR
VENTILATION DURING CONSTRUCTION. INSTALL A NEW SET OF THE SPECIFIED AIR FILTERS FOR THE
3.36 PROVIDE PRODUCTS OF COMBUSTION DETECTOR IN SUPPLY AND RETURN AIR IN ALL UNITS 2000 CFM OR OVER
IMC - MECHANICAL CODE
EQUIPMENT AT THE COMPLETION OF THE JOB.
TO SHUT DOWN UNIT OCONDITION.
IPC - PLUMBING CODE
3.37 EXHAUST FANS: FANS SHALL MEET CAPACITIES SCHEDULED AND NOT EXCEED SOUND LIMITATIONS SPECIFIED.
IFGC - FUEL GAS CODE
3.12 COMPLETION: OPERATE ALL MECHANICAL SYSTEMS, INCLUDING ALL EQUIPMENT FURNISHED UNDER THIS
DIVISION FOR A PERIOD OF TIME NOT TO EXCEED 5 DAYS OR AS MAY BE REQUIRED AT THE DIRECTION ON
3.38 GRILLES & REGISTERS: SCHEDULED ON DRAWINGS. TITUS, KRUEGER OR EQUAL.
1.03 STANDARDS: THE FOLLOWING PUBLICATIONS (LATEST EDITION) FORMA PART OF THESE REQUIREMENTS TO
THE EXTENT INDICATED BY THE REFERENCES THERETO:
THE ARCHITECT/ENGINEER TO PROVE THAT ALL COMPONENTS ARE PROPERLY OPERATING AND THAT THE
COMPLETE INSTALLATION IS FUNCTIONING SMOOTHLY AND NOISELESSLY TO THE FULL EXTENT OF PLANS AND
3.39 DUCT LINING: 1/2" THICKNESS, 3 PCF DENSITY, NEOPRENE COATED DUCT LINER MEETING FIRE HAZARD
rRATING REQUIREMENTS FOR INSULATION. INSTALL WITHIN MINIMUM 10' DUCT LENGTH FROM FANS.
SPECIFICATIONS, ANY REBALANCING, READJUSTING OF SYSTEM ELEMENTS FOUND NECESSARY WHEN THE
3.40 DUCTWORK: SHEET METAL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL. DUCTS SHALL CONFORM
SHEET METAL AND AIR CONDITIONING CONTRACTOR NATIONAL ASSOCIATION (SMACNA)
SYSTEMS ARE SUBJECT TO ACTUAL OPERATING CONDITIONS SHALL BE DONE BY THE CONTRACTOR AT NO EXTRA
ACCURATELY TO THE DIMENSIONS INDICATED AND SHALL BE STRAIGHT AND SMOOTH ON THE INSIDE WITH
LOW VELOCITY DUCT MANUAL
COST TO THE OWNER.
JOINTS NEATLY FINISHED. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH SMACNA LOW PRESSURE DUCT
MANUAL, 2" WG FOR SUPPLY & 1" WG FOR EXHAUST DUCTS. ELBOWS, FITTINGS AND BRANCH TAKE -OFFS
1.04 PLANS AND SPECIFICATIONS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN CHARACTER INTENDED TO
3.13 OPERATING INSTRUCTIONS: SUBMIT 30 DAYS PRIOR TO COMPLETION OF THE PROJECT, FOUR (4) SETS OF
SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED AS RECOMMENDED IN SMACNA "DUCT CONSTRUCTION
COVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT, DUCTS, PIPING, ETC.,
AND APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS. DETERMINE THE EXACT LOCATION OF
OPERATING BROCHURES. EACH BROCHURE SHALL INCLUDE OPERATING INSTRUCTIONS, MAINTENANCE
INSTRUCTIONS, INSTALLATION INSTRUCTIONS, PARTS LISTS AND WIRING DIAGRAMS FOR EACH ITEM OF
STANDARDS" WITH THE USE OF TURNING VANES OR RADIUS ELBOWS. FLEXIBLE RUNOUTS FROM BRANCHES,
RISERS OR MAINS TO AIR TERMINAL UNITS, AND OUTLETS SHALL BE FACTORY -FABRICATED, CLASS I, VAPOR
THE ELEMENTS OF THE SYSTEM FROM THE STRUCTURE AND FROM THE EQUIPMENT, NOT FROM THE DRAWINGS.
MECHANICAL EQUIPMENT WITH MIXING OR MOVABLE PARTS. THE BROCHURE SHALL ALSO INCLUDE
BARRIER INSULATED FLEXIBLE CONNECTORS COMPLYING WITH NFPA STANDARD NO. 90A AND UL 181. FLEXIBLE
DO NOT SCALE DRAWINGS FOR MEASUREMENTS NOR USE AS SHOP DRAWINGS.
OPERATIONAL AND DIAGRAMS OF TEMPERATURE CONTROL SYSTEMS.
CONNECTORS SHALL NOT EXCEED 10' IN LENGTH. PRESSURE RATING SHALL BE 4" W.G. FLEXIBLE DUCT
1.05 PROVIDE ALL ITEMS, EQUIPMENT, MATERIALS, OPERATIONS, OR METHODS LISTED, MENTIONED OR SCHEDULED
ON THEIDDRAWINGS, AND/OR HEREIN INCLUDING ALL INCIDENTALS AND ACCESSORIES NEOR AND REQUIRED
/
3.14 PROVIDE TYPEWRITTEN OPERATING INSTRUCTIONS IN THE BROCHURE COVERING EACH PIECE OF MOTORIZED
MECHANICAL EQUIPMENT, GIVE NORMAL STARTING AND STOPPING PROCEDURES, ALONG WITH PROPER PARTIES
CONNECTIONS TO EQUIPMENT AND OTHER DUCTS SHALL BE MADE WITH DRAW BANDS.' PROVIDE DAMPER IN RUN
OUT TO AIR OUTLETS.
3.41 HINGED DUCT ACCESS DOORS SHALL BE PROVIDED AT ALL AUTOMATIC DAMPERS, FIRE DAMPERS, AND OTHER
FOR INSTALLATION OR MOUNTING, OR NORMALLY SUPPLIED BY COMMON PRACTICE WHETHER SPECIFICALLY
TO CONTACT IN THE EVENT OF EMERGENCY, FAILURE OF CONTROLS OR EQUIPMENT. OUTLINE OF
APPARATUS REQUIRING. SERVICE AND INSPECTION IN THE DUCT SYSTEM. DOORS SHALL BE 15 X 18 INCHES
MENTIONED OR NOT, TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS.
INSTRUCTIONS AS FOLLOWS:
UNLESS OTHERWISE INDICATED. WHERE SIZE OF DUCT WILL NOT ACCOMMODATE THIS SIZE, THE DOOR SHALL
1.06 BRING ANY NON -COMPLIANCES WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS,
CONFLICTS AND DISCREPANCIES TO THE ENGINEER'S ATTENTION BEFORE SUBMITTING BID. A CORRECT,
COMPLETE AND EASILY MAINTAINED SYSTEM IS INTENDED.
NORMAL STARTING, STOPPING AND EMERGENCY SHUT -DOWN OF EACH PIECE OF MOTORIZED EQUIPMENT.
PROVIDE LUBRICATION INSTRUCTIONS FOR EACH MOTOR BEARING OR OPERABLE PIECE OF EQUIPMENT.
BE MADE AS LARGE AS PRACTICAL. DOORS SHALL BE PROVIDED WITH AIRTIGHT GASKETS, GALVANIZED
HINGES AND APPROVED BRASS FASTENERS. DOORS IN INSULATED DUCTS SHALL BE OF THE INSULATED TYPE.
DOORS SHALL SO SWING THAT FAN PRESSURE OR SUCTION HOLD DOOR CLOSED.
GIVE FREQUENCY OF LUBRICATION, TYPE AND BRAND OF OIL OR GREASE.
3.42 PROVIDE NON-COMBUSTIBLE APPARATUS FLEXIBLE CONNECTIONS OF NOT LESS THAN 15 OUNCE WOVEN FABRIC
1.07 THE CONTRACTOR'S BID WILL BE CONSTRUED AS AN AGREEMENT TO COMPLETE THE WORK WITHOUT ADDITIONAL
APPROVED MATERIAL WHERE SHEET METAL DUCTS ARE CONNECTED TO FANS OR OTHER MOVING EQUIPMENT.
COST TO THE OWNER. WHERE CONFLICTS BETWEEN PLANS AND SPECIFICATIONS OR CONFLICTING INFORMATION
INCLUDE CALIBRATION, CLEANING AND ADJUSTMENT SCHEDULES AND PROCEDURES.
THE FLEXIBLE CONNECTIONS SHALL BE SECURELY FASTENED.
ON THE PLANS OCCURS, THE CONFLICTS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO BIDDING. THE
MORE COSTLY ALTERNATIVE SHALL BE INCLUDED IN THE BID PRICE.
INCLUDE COPIES OF MANUFACTURER'S LITERATURE ON MAINTENANCE AND OPERATION OF EACH PIECE OF
3.43 DUCT LINER INSULATION: INSULATE INTERIOR SURFACES OF ALL SUPPLY DUCTS FROM AIR
1.08 MAKE NO CHANGES IN THE WORK SPECIFIED, UNLESS SUCH CHANGES ARE AUTHORIZED IN WRITING BY THE
EQUIPMENT, INCLUDING INSTALLATION INSTRUCTIONS, DIAGRAMS, AND PARTS LISTS, IN EACH
BROCHURE.
CONDITIONING UNIT SUPPLY FANS TO AIR OUTLETS AND INDICATED RETURN OR EXHAUST DUCTS WITH
ACOUSTICAL MATERIAL.
OWNER, ARCHITECT AND/OR ENGINEER. NO CHARGES FOR EXTRA WORK WILL BE PAID UNLESS SUCH EXTRA
WORK HAS BEEN AUTHORIZED AND THE AUTHORIZATION CONTAINS A STATEMENT OF THE WORK TO BE
315 AS -BUILT DRAWINGS: SUBMIT AS -BUILT DRAWINGS AT COMPLETION OF WORK.
3.44 APPLY AND SECURE INSULATION AS RECOMMENDED BY MANUFACTURER AND AS APPROVED. ANY LOOSENING OF
ACCOMPLISHED AND THE CHARGES TO BE MADE FOR THE WORK.
INSULATION LINER WILL REQUIRE REMOVAL AND REINSTALLATION OF ALL DUCT WORK, AT NO EXTRA COST.
1.09 IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A MECHANICAL SYSTEM COMPLETE, FULLY
3.16 GUARANTEE: THE MECHANICAL SYSTEM SHALL BE LEFT IN PROPER WORKING ORDER. REPLACE ANY WORK,
MATERIAL OR EQUIPMENT PROVIDED UNDER THIS CONTRACT WHICH DEVELOPS DEFECTS WITHIN ONE (1) YEAR
3.45 INCREASE INDICATED DUCT SIZES TO COMPENSATE FOR THICKNESS OF DUCT LINER INSULATION.
"HARDCAST"
ADJUSTED, AND READY TO USE.
FROM DATE OF SUBSTANTIAL COMPLETION WITHOUT ADDITIONAL CHARGES. ,S NEW ONE (1) YEAR GUARANTEE
SEALING: ALL TRANSVERSE JOINTS ON THE LOW PRESSURE SYSTEM SHALL BE SEALED WITH DUCT
ON THE AFFECTED ITEM OR ITEMS SHALL BE PROVIDED COMMENCING ON THE DATE OF THE APPROVED REPAIR
TAPE SYSTEM APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS OR OTHER APPROVED SYSTEM.
1.10 IT IS THE INTENTION OF THESE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, TESTED,
AND READY FOR OPERATION. WHEREVER THE WORK "PROVIDE"IS USED, IT SHALL MEAN "FURNISH
AND INSTALL COMPLETE AND READY TO USE."
OR REPLACEMENT.
3.17 MECHANICAL EQUIPMENT WIRING AND CONNECTIONS:
RECTANGULAR DUCT INSULATED WITH VAPOR BARRIER DUCT WRAP
3.46 IN LIEU OF RECTANGULAR LINED DUCT,1"
OR ROUND DUCT OF EQUIVALENT CROSS SECTIONAL AREA AND INSULATED WITH 1" VAPOR BARRIER
INSULATION, MAY BE USED. ALL HP-1, HP-2 SUPPLY DUCTS SHALL BE LINED OR EXTERNALLY INSULATED.
MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED, BUT NECESSARY FOR THE PROPER INSTALLATION
FURNISHED INSTALLED BY WIRED AND/OR
3.47 GREASE DUCT FROM RANGE HOODS WHERE APPLICABLE TO EXHAUST FAN - 16 GAUGE BLACK IRON - WITH
AND OPERATION, SHALL BE INCLUDED IN THE WORK, THE SAME AS IF HEREIN SPECIFIED OR SHOWN.
ITEM BY OR MOUNTED BY CONNECTED BY
WELDED SEAMS AND JOINTS. WRAP DUCT WITH 2 LAYERS OF THERMAL CERAMICS FIREMASTER DUCT WRAP
APPLIED AS RECOMMENDED BY THE MFR. TO MAKE A 2 HOUR RATED INSTALLATION. WRAP TO EXTEND FROM HOOD
1.11 THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL
EQUIPMENT MOTORS MC MC EC
TO EXHAUST FAN.
GOVERNMENT SALES TAXES, FEES AND OTHER COSTS, INCLUDING UTILITY CONNECTIONS OR
EXTENSIONS, IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DOCUMENTS
MOTOR CONTROLLERS, PUSHBUTTON
3.48 DESCRIPTION: PERFORM TESTING AND BALANCING IN ACCORDANCE WITH THE PROCEDURE OF THE ASSOCIATED
AIR BALANCE COUNCIL'S "NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION TOTAL
AND OBTAIN ALL NECESSARY APPROVALS OF ALL GOVERNMENTAL DEPARTMENTS HAVING
STATIONS, PILOT LIGHTS, ETC. MC EC EC
SYSTEM BALANCE."
JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF HIS WORK AND DELIVER SAME
TO THE ARCHITECT BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR WORK.
MULTI -SPEED SWITCHES
3.49 USE ACCURATE INSTRUMENTS FOR BALANCING AIR SYSTEMS THAT HAVE BEEN CALIBRATED WITHIN 6 MONTHS
LINE VOLTAGE THERMOSTATS MC EC ECPRIOR
TO BALANCING. TYPES, SERIAL NUMBERS, AND DATE OF CALIBRATION OF ALL INSTRUMENTS SHALL BE
1.12 THE CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST TO THE OWNER, ANY LABOR,
MATERIALS, SERVICES, APPARATUS, DRAWINGS, IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS,
ORDINANCES, RULES AND REGULATIONS, WHETHER OR NOT SHOWN ON DRAWINGS AND/OR SPECIFIED.
DISCONNECT SWITCHES, (FUSED
OR UNFUSED), HP RATED SWITCHES,
THERMAL OVERLOAD SWITCHES, ETC. MC EC EC
LISTED IN THE FINAL AIR BALANCE REPORTS.
3.50 MAKE AIR QUANTITY MEASUREMENTS IN MAIN AND BRANCH DUCTS BY PITOT TUBE TRAVERSE OF THE ENTIRE
CROSS SECTIONAL AREA OF THE DUCT. DUCTS HAVING VELOCITIES OF 1000 OR MORE FEET PER MINUTE
PART 2.00 PRODUCTS
SHALL BE MEASURED WITH INCLINED MANOMETERS (DRAFT GAUGE) OR MAGNEHELIC GAUGES. DUCTS HAVING
2.01 MATERIALS AND EQUIPMENT SUBSTITUTIONS:
THE BID PRICE SHALL BE BASED ON THE MATERIALS, EQUIPMENT AND/OR SERVICES AS SCHEDULED ON THE
LOW VOLTAGE THERMOSTATS,
CONTROL RELAYS, TIME CLOCKS,
CONTROL TRANSFORMER, CONTROL
VELOCITIES OF LESS THAN 1000 FT. PER MINUTE SHALL BE MEASURED WITH MICROMANOMETERS, HOOD GAUGES
OR SIMILAR LOW PRESSURE INSTRUMENTS. OPENINGS IN DUCTS FOR PITOT TUBE INSERTION SHALL BE
SEALED WITH SNAP -IN PLUGS AFTER AIR BALANCE IS COMPLETE. OUTLET AND INLET AIR QUANTITIES SHALL
DRAWINGS AND/OR SPECIFIED HEREIN, AND/OR AS ACCEPTED PRIOR TO BIDDING.
PANELS, PRESURESTATS, MOTOR
BE DETERMINED BY AN APPROVED METHOD.
VALVES, DAMPER MOTORS, SOLENOID
2.02 REQUESTS FOR ACCEPTANCE OF ALTERNATIVES SHALL BE SUBMITTED TEN (10) DAYS PRIOR TO BID.
VALVES, EP & PE SWITCHES, ETC.
3.51 TOTAL AIR QUANTITIES SHALL BE OBTAINED BY ADJUSTMENT OF FAN SPEEDS. THE BALANCING CONTRACTOR
AND ALL INTERLOCK WIRING MC MC MC
SHALL FURNISH AND INSTALL ANY REQUIRED FAN DRIVE CHANGES AS PART OF THIS CONTRACT.
2.03 ACCEPTANCE OF ALTERNATE OR SUBSTITUTE EQUIPMENT IN NO WAY VOIDS MATERIAL OR PERFORMANCE
REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ANY MATERIAL OR
EQUIPMENT SUBSTITUTED FOR SPECIFIED ITEMS ACCEPTED BY THE ARCHITECT AND/OR ENGINEER BEFORE OR
AFTER THE BID DATE. CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING ANY SUBSTITUTE EQUIPMENT
MC - MECHANICAL CONTRACT
EC - ELECTRICAL CONTRACT
SHALL FURNISH ALL MAGNETIC STARTERS OR CONTACTORS.
3.52 VOLUME ADJUSTERS MAY BE USED TO BALANCE AIR QUANTITIES AT OUTLETS AND INLETS PROVIDING FINAL
ADJUSTMENTS ARE MINOR AND DO NOT PRODUCE OBJECTIONABLE DRAFTS OR EXCESSIVE SOUND LEVELS.
IN THE SYSTEM DESIGN.
THE MECHANICAL CONTRACTOR
3.53 CERTIFIED BALANCE REPORTS: THREE (3) COPIES OF THE AIR AND WATER BALANCE REPORT, CERTIFIED BY
2.04 CONTRACTOR SHALL PAY FOR ALL EXTRA COSTS BY ANY TRADE FOR CHANGES NECESSITATED BY MATERIAL OR
EQUIPMENT SUBSTITUTIONS REGARDLESS OF ACCEPTANCE WITHOUT FURTHER COST TO THE CLIENT.
3.18 ALL MANUAL OR AUTOMATIC CONTROL AND PROTECTIVE OR SIGNAL DEVICES REQUIRED BUT NOT INDICATED ON
ELECTRICAL PLANS SHALL BE FURNISHED AND INSTALLED UNDER THIS DIVISION OF THE SPECIFICATIONS.
THE WIRING INSTALLATION SHALL CONFORM TO ELECTRICAL DIVISION.
THE BALANCING FIRM, SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER SEVEN (7) DAYS PRIOR TO FINAL
ACCEPTANCE OF THE PROJECT. THE REPORT SHALL INCLUDE ALL AIRAND WATER BALANCE DATE AND HEAT
TRANSFER EQUIPMENT TEST DATA LISTED BELOW, AND OTHER DATA AS REQUIRED BY THE "NATIONAL
2.05 REVIEW OF MATERIALS AND EQUIPMENT: WITHIN 30 DAYS OF CONTRACT AWARD, SUBMIT FIVE COPIES OF EACH
3.19 ALL WIRING CONNECTIONS TO CONTROLS ATTACHED TO DUCT WORK, OR MECHANICAL EQUIPMENT SHALL BE MADE
STANDARD FOR FIELD MEASUREMENTS AND INSTRUMENTATION".
2.06 GENERAL MATERIALS AND EQUIPMENT: ALL MATERIAL AND EQUIPMENT SHALL BE NEW AND OF THE BEST OF
CATALOG GRADE INDICATED AND/OR SPECIFIED AND SHALL BE FREE FROM ALL DEFECTS.
WITH FLEXIBLE CONNECTIONS TO PREVENT VIBRATION.
3.20 COORDINATE WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING MOTORS AND/OR OTHER ELECTRICAL
3.54 A.C. UNIT: CFM, STATIC PRESSURE, MOTOR HP, RPM, AND AMPS, PERCENT OF OUTSIDE AIR (OR CFM AS
APPLICABLE), FAN RPM, FAN BHP, INLET AND OUTLET DRY AND WET BULB TEMPERATURE, FAN DRIVE TYPE
AND SIZE, WATER FLOW -
2.07 MATERIAL AND EQUIPMENT SPECIFIED HEREIN SHALL BE GUARANTEED BY THE MANUFACTURER TO PERFORM TO
EQUIPMENT TO ASSURE ELECTRICAL EQUIPMENT BEING OF PROPER ELECTRICAL CHARACTERISTICS.
INDIVIDUAL OUTLET AND INLET TEST RESULTS: OUTLET AND INLET IDENTIFICATION AND NUMBER
STANDARDS INDICATED OR INFERRED IN PUBLISHED LITERATURE OR CATALOG DATA. MANUFACTURER'S
3.55 (LOCATION
RECOMMENDATIONS SHALL BE CLOSELY FOLLOWED ON INSTALLATION.
3.21 FURNISH PROPER NEMA TYPE ENCLOSURES FOR ALL STARTERS AND/OR CONTACTORS AS REQUIRED BY USAGE OR
DESIGNATION).
2.08 REFRIGERANT PIPING: TYPE "L" OR TYPE "K" WITH BRAZED HIGH TEMPERATURE SOLDER JOINTS. PIPE
CODE.
3.56 FOLLOWING FINAL ACCEPTANCE OF THE SYSTEM BALANCE BY THE OWNER, THE CONTRACTOR SHALL PERMANENTLY
MARK THE SETTINGS OF ALL VALVES, SPLITTERS, DAMPERS, AND OTHER ADJUSTMENT DEVICES SO THAT
ADJUSTMENT CAN BE RESTORED IF DISTURBED AT ANY TIME. DEVICES SHALL NOT BE MARKED BEFORE FINAL
ACCEPTANCE.
SHALL BE CLEAN AND TESTED FOR LEAKS. INSULATE SUCTION PIPING WITH 1 INCH THICK FIBERGLASS WITH
FRJ JACKET SEALED WATER TIGHT. COVER OUTDOOR INSULATION WITH ALUMINUM OR PLASTIC JACKET
3.22 PROVIDE HEAVY DUTY SPEED SELECTOR SWITCHES, THERMAL MAGNETIC SWITCHES, START STOP PUSH BUTTON
STATIONS ETC. AS REQUIRED.
APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
3.23 CUTTING AND PATCHING: CAREFULLY PERFORM ALL WORK WHERE CUTTING, CHANNELING, CHASING, OR
3.57 NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ARCHITECT, AND ALL
2.09 ALL INSULATION SHALL HAVE A COMPOSITE (INSULATION, JACKET OR FACING, AND ADHESIVE) FIRE
DRILLING OF FLOORS, WALLS, PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR PROPER
OR OTHER MECHANICAL EQUIPMEN T.
SUCH CUTTING SHALL BE DONE IN A MANNER DIRECTED BY HIM.
HAZARD RATING AS TESTED BY ASTM E-84, NFPA 255, OR UL 723, NOT TO EXCEED 25 FLAME SPREAD AND
INSTALLATION OR SUPPORT OF DUCTS, PIPINGS,
3.58 PROVIDE WEATHER-PROOF FLASHING AT ALL DUCT, PIPE, ETC. MECHANICAL PENETRATIONS
50 SMOKE DEVELOPED. ACCESSORIES SUCH AS COATINGS, TAPES, AND ADHESIVES SHALL HAVE THE
3.24 ANY DAMAGE TO BUILDING, PIPING, EQUIPMENT, PLASTER, WOODWORK OR METAL WORK SHALL BE REPAIRED BY
THROUGH THE BUILDING WALLS AND ROOF. FLASHING SHALL BE DESIGNED AND INSTALLED PER
SAME COMPONENT RATINGS. ALL INSULATING MATERIALS OR THEIR CONTAINERS SHALL HAVE A
SKILLED MECHANICS OF TRADES INVOLVED, AT NO ADDITIONAL COST TO THE OWNER.
SMACNA AND SHALL BE GUARANTEED WEATHER PROOF FOR THE DURATION OF THE GUARANTEE.
LABEL INDICATING COMPLIANCE WITH THE ABOVE RATING. REFERENCE STANDARDS: NFPA D-255,
A.S.T.M. E-84, UL-723, ASHRAE 90-75 AND THE STATE ENERGY CODE. ACCEPTABLE MANUFACTURERS:
CERTAINTEED, OWENS-CORNING, KNAUF AND MANVILLE.
3.25 DO NOT CUT, CHANNEL, CHASE OR DRILL MASONRY OR TILE; OR CUT, DRILL OR WELD STRUCTURAL MEMBERS
OF THE BUILDING, ETC., WITHOUT FIRST OBTAINING ARCHITECT'S PERMISSION, IF PERMISSION IS
3.59 FIRE AND/OR
OR SMOKE DAMPER
1. FURNISH AND INSTALL AT LOCATION SHOWN ON PLANS FIRE/SMOKE DAMPERS MEETING OR EXCEEDING THE
GRANTED, PERFORM THIS WORK IN A MANNER APPROVED BY THE ARCHITECT.
FOLLOWING SPECIFICATIONS: FRAME SHALL BE A MINIMUM OF 16 GAUGE GALVANIZED STEEL FORMED INTO A
PART 3.00 EXECUTION
3.26 CAULKING & WATERPROOFING: CAULK AROUND ALL PIPES, ETC. TO PREVENT AIR AND MOISTURE LEAKAGE
STRUCTURAL HAT CHANNEL SHAPE WITH TABBED CORNERS FOR REINFORCEMENT. THE BLADES SHALL BE SINGLE
3.01 PERMITS AND INSPECTIONS: APPLY AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED
WITH COMPOUND APPROVED BY ARCHITECT/ENGINEER.
SKIN 16 GAUGE MINIMUM GALVANIZED WITH THREE LONGITUDINAL GROOVES FOR REINFORCEMENT. BEARING
FOR THE WORK, AND AT COMPLETION, PRESENT THE OWNER WITH THE SIGNED CERTIFICATES OF FINAL
SHALL BE STAINLESS STEEL SLEEVE TURNING IN AN EXTRUDED HOLE IN THE FRAME. BLADE EDGE SEALS
INSPECTION.
3.27 SEAL AROUND ALL PIPES AND DUCTS WITH FIREPROOF CAULKING OR GROUT WHERE THEY PASS THROUGH
SHALL BEW SILICON RUBBER MECHANICALLY LOCKED IN BLADE EDGE (ADHESIVE OR CLIP FASTENED SEALS ARE
FLOORS, FIREWALLS, AND SHAFTS.
NOT ACCEPTABLE). JAMB SEALS SHALL BE STAINLESS STEEL FLEXIBLE METAL COMPRESSION TYPE.
3.02 UTILITIES: CHARGES BY UTILITY COMPANIES FOR PROVIDING SERVICES SHALL BE PAID BY OWNER AND WILL
2. EACH COMBINATION FIRE/SMOKE DAMPER SHALL BE RATED FOR 1.5 HOURS UNDER UL STANDARD 555 AND
NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL DO INSTALLATION WORK NORMALLY PROVIDED IN
THIS CONTRACT.
3.28 PROVIDE FLASHINGS WHERE ALL PIPES AND DUCTS PIERCE OUTSIDE WALLS OR ROOF AS NECESSARY TO
PREVENT MOISTURE ENTRY.
SHALL FURTHER BE CLASSIFIED BY UL AS A LEAKAGE RATED DAMPER FOR USE IN SMOKE CONTROL SYSTEMS
UNDER UL 555S AND BEAR THE UL LABELS FOR BOTH UL 555 AND UL 555S. FIRE/SMOKE DAMPERS IN TUNNEL
3.03 PLACE AND ARRANGE EQUIPMENT, PIPING, DUCTS, CONTROLS, ETC., TO FIT THE SPACE AVAILABLE.
3.29 INSERTS, SLEEVES & BLOCKOUTS: FURNISH AND INSTALL, PRIOR TO CONCRETE POURING OR OTHER
CORRIDOR SHALL BE UL LISTED FOR TUNNEL CORRIDOR CONSTRUCTION
INCLUDING ALL OFFSETS IN PIPING OR DUCTS, DUCT TRANSFORMATIONS, ETC. REQUIRED.
CONSTRUCTION, INSERTS, SLEEVES, OR BLOCKOUTS IN WALLS, FLOOR SLABS, ROOFS AND PARTITIONS FOR
PASSAGE OF ALL WORK INSTALLED UNDER THIS DIVISION.
3. IN ADDITION TO THE LEAKAGE RATING ALREADY SPECIFIED HEREIN,THE DAMPERS AND THEIR ACTUATORS
SHALL BE QUALIFIED UNDER UL 555S TO MINIMUM ELEVATED TEMPERATURE OF 250 DEGREES (F).
4• FOR
ODE COMPLIANCE
3.04 SUBMIT SHOP DRAWINGS FOR TEMPERATURE CONTROL SYSTEMS, MECHANICAL EQUIPMENT WIRING, MECHANICAL
3.30 PROVIDE GALVANIZED IRON AND STEEL PIPE SLEEVES FOR IRON PIPES. USE COPPER SLEEVES FOR COPPER
APPROPRIATE 120 VOLT ELECTRIC ACTUATORS SHALL BE INSTALLED BY THE DAMPER MANUFACTURER AT
!:
APPROVED
EQUIPMENT AND MATERIALS WHICH CANNOT BE ADEQUATELY DESCRIBED BY MANUFACTURER'S PRINTED SHEETS,
AND FOR SUCH ADDITIONAL ITEMS AS THE ARCHITECT/ENGINEER MAY DIRECT.
PIPES. PROVIDE WOOD OR STEEL BLOCKOUTS FOR LARGE OPENINGS. SECURE ALL SUCH ITEMS FIRMLY IN
POSITION.
THE TIME OF DAMPER FABRICATION. DAMPER AND ACTUATOR SHALL BE INSTALLED AS A SINGLE ENTITY
WHICH MEETS ALL APPLICABLE UL 555 AND UL 555S QUALIFICATIONS FOR BOTH DAMPERS AND ACTUATORS.
ACTUATORS. DAMPERS MUST OPEN AND CLOSE WITHIN 15 SECONDS OF APPROPRIATE SIGNAL AND DAMPERS
I ° ` JUL 2 3 2015
'
3.05 CLEARLY MARK SUBMITTALS AS TO PLAN CODE, SPECIFIC ITEM PROPOSED, CATALOG NUMBERS, RECESS
3.31 VIBRATION -ABSORBING MOUNTINGS AND CONNECTIONS: ISOLATE EACH ITEM OF EQUIPMENT WITH MOVING
MUST CLOSE UPON LACK OF POWER.
OPENINGS, DIMENSIONS, CAPACITIES, ELECTRICAL CHARACTERISTICS, ETC.. SUBMITTALS WHICH ARE
PARTS FROM THE BUILDING STRUCTURE ALONG WITH ANY PIPING, CONDUITS, OR DUCTS ATTACHED THERETO.
4. FIRE ALARM CONTRACTOR SHALL PROVIDE ALL NECESSARY SWITCHES AND RELAYS ETC. TO INTERFACE
INCOMPLETE WILL BE REJECTED.
UNLESS OTHERWISE INDICATED, UNITS ISOLATING EQUIPMENT FROM STRUC TURF SHALL BE PROPERLY
DAMPER BUILDING FIRE ALARM AND CONTROL SYSTEM AS REQUIRED.
City of Tukwila
3.06 THE ENGINEER'S CHECK SHALL BE GENERAL, AND DOES NOT RELIEVE THE CONTRACTOR OF FINAL
DESIGNED SPRING -TYPE ISOLATORS.
5. IN SYSTEMS REQUIRING A SMOKE CONTROL SYSTEM, PROVIDE REMOTE SENSING OF DAMPER POSITION
JLD NG DIVISION
RESPONSIBILITY OF COMPLIANCE TO THE INTENT OF THE PLANS AND SPECIFICATIONS.
AND DAMPER OVERRIDE OF DAMPER CLOSURE TO PERMIT CONTROLLED OPERATION IN A DYNAMIC SMOKE
3.32 BELT DRIVE GUARDS: PROVIDE BELT DRIVE GUARDS FOR ALL EQUIPMENT AND SAFETY SCREENS ON EXPOSED
MANAGEMENT SYSTEM. DEVICE SHALL BE RUSKIN MODEL TS 150 FIRE STAT OR APPROVED.
3.07 SUPERVISION AND WORKMANSHIP: QUALIFIED SUPERVISION FOR EACH TRADE SHALL BE IN CHARGE OF THE
WORK AT ALL TIMES AND SHALL BE ON THE JOB SITE WHENEVER WORK IN THAT TRADE IS BEING
FAN INLETS.
6. COMBINATION SMOKE/FIRE DAMPERS SHALL BE MANUFACTURED BY SAFEAIR, RUSKIN, GREENHECK,
AIR BALANCE, NATIONAL CONTROLLED AIR AND PREFCO.
` RECEIVED
CITY OF TUKWILA
ACCOMPLISHED.
\\
//
\�
U` 01
?V
01)
•F
group
Architects
19401 40th Ave. West, Suite 300
Lynnwood, Wa. 98036
Ph. (425) 405-7746
e-mail:
dwallace@PMDGinc.com
Kenneth McCracken, Architect
ABOSSEIN ENGINEERING
L.L.C.
MECHANICAL I ELECTRICAL I CML
LEED I HIRE PROTECTION
2100 112TH AVE. NE
BELLEVUE, WA 98004
PHONE (425) 462-9441
REVISION
PLANNING PRELIMINARY REVIEW
PROGRESS SET
HEALTH SUBMITTAL - EQUIPMENT REVS
HEALTH COMMENTS
BUILDING PERMIT SUBMITTAL
ELECTRICAL PERMIT SUBMITTAL
MIMI
w
¢0
In
\
N
N
3/12/15
In
\
N
Ni-i
0
N
if
'-
PO
�
`-
N
Nz
i
<1<<<<KK
c 0
Cf:%
Z
43) �03
w a
(13
aCC
X
Project Number
215042
Sheet Name
SPECIFICATION
heet Number
M3.0