Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M15-0104 - LOLLI & POPS - ROOFTOP CONDENSOR, AIR HANDLER AND DUCTWORK
LOLLI & POPS 251 S 0 UTH CEN i'ER MALL M15-0104 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 9202470010 Permit Number: M15-0104 251 SOUTHCENTER MALL Issue Date: Permit Expires On: Project Name: LOLLI & POPS 11/4/2015 5/2/2016 Owner: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, CA, 92013 Contact Person: Name: MARY RYAN Address: PO BOX 3749 , MISSION VIEJO, CA, 92690 Contractor: Name: DIRECT MECHANICAL CNTRCTRS LLC Address: PO BOX 872472 , VANCOUVER, WA, 98687 License No: DIRECMC913K0 Lender: Name: Address: Phone: (949) 582-3735 Phone: (360) 921-2175 Expiration Date: 6/24/2017 DESCRIPTION OF WORK: PROVIDE NEW ROOFTOP CONDENSOR, NEW INDOOR AIR HANDLER WITH ECONOMIZER, NEW DUCTWORK. PROVIDE TESTING AND BALANCING OF NEW EQUIPMENT Valuation of Work: $20,000.00 Type of Work: REPLACEMENT Fuel type: ELECT Fees Collected: $454.94 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: Date: 5 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: ( vlov Date: I I'll-U. This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 2: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 3: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 4: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 6: ***MECHANICAL PERMIT CONDITIONS*** 7: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 8: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0609 PIPE/DUCT INSULATION 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. M t' OI04 Project No. Date Application Accepted: 6 1�1yy,' 19- Date Application Expires: 2 12,1 I (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 2800 Southcenter Mall!, Tukwila, WA 98188 Lolli & Pops PROPERTY OWNER Name: Westfield LLC Address: 11601 Wilshire Blvd city: Los Angeles State: CA Zip: 90025 CONTACT PERSON — person receiving all project communication Name: Mary Ryan Address: P.O. Box 3749 City: Mission Viejo State: CA Zip: 92690 Phone: (949) 582-3735 Fax: (949) 768-8436 Email: mary@permitresources.com Suite Number: 652 Floor: New Tenant: ❑ Yes ❑ ..No MECHANICAL CONTRACTOR INFORMATION Company Name: NA -Project has not bid/been awarded Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Provide new roof top condenser, new indoor air -handler with economizer, new ductwork Provide testing and balancing of new equipment. 20,000 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric m Gas ❑ Other: H:\Applications\Forms-Applications On Line \2011 Applications\ Mechanical Permit Application Revised 8-9-I1.docc Revised: August 2011 bh Page 1 of 2 z Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm 1 Unit Type Qty Air handling unit >10,000 cfin Evaporator cooler Ventilation fan connected to single duct Ventilation system 1 Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 10 Thermostat 1 Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Print Name: 1-4_, 4 t -t Mailing Address: p • b,C 34ct Day Telephone: Date: 8. 13 • k 5 at-(°k•ss2.3rS4 (LA:MGr+V. o GPc °12(06'tb City State Zip H:\Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.docc Revised: August 2011 bh Page 2 of 2 DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $367.45 M15-0104 Address: 251 SOUTHCENTER MALL Apn: 9202470010 $367.45 MECHANICAL $349.95 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $317.45 TECHNOLOGY FEE $17.50 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6578 R000.322.900.04.00 0.00 $17.50 $367.45 Date Paid: Wednesday, November 04, 2015 Paid By: DIRECT MECHANICAL CNTRCTRS LLC Pay Method: CREDIT CARD 001116 Printed: Wednesday, November 04, 2015 1:13 PM 1 of 1 rirri'.441MrSYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS I PermitTRAK ACCOUNT I QUANTITY PAID $2,052.25 D15-0207 Address: 251 SOUTHCENTER MALL Apn: 9202470010 $1,258.79 DEVELOPMENT $1,258.79 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,258.79 EL15-0702 Address: 251 SOUTHCENTER MALL Apn: 9202470010 $657.09 ELECTRICAL $625.80 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $625.80 TECHNOLOGY FEE $31.29 TECHNOLOGY FEE R000.322.900.04.00 0.00 $31.29 M15-0104 Address: 251 SOUTHCENTER MALL Apn: 9202470010 $87.49 MECHANICAL $87.49 PLAN CHECK FEE R000.322.102.00.00 0.00 $87.49 PG15-0094 Address: 251 SOUTHCENTER MALL Apn: 9202470010 $48.88 PLUMBING $48.88 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R5934 R000.322.103.00.00 0.00 $48.88 $2,052.25 Date Paid: Thursday, August 13, 2015 Paid By: PERMIT RESOURCES Pay Method: CHECK 23065 Printed: Thursday, August 13, 2015 12:21 PM 1 of 1 er�SYSTEMS INSPECTION RECORD INSPECTION NO. Retain a copy with permit /�f'7 R0( CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project; L/''- �� Type of Inspec � 7 �i� Address: / ��at ailed: Ir Special Instructions: Date Wanted: in Requester: Phone No: iproved per applicable codes. Corrections required prior to approval. COMMENTS: Arirrci-1 Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD? Retain a copy with permit �i-P 0/09 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ie '/ r tC >e- *5 Type of ns ction: ort h�, g ers9 ,,c/ , Address: 257 <o i7 e i/ Oat C I i Special Instructions: ,�1) pi, Date Wanted: 12 �1 m_ Requester: Phone No: ®Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: iv/9-(//-1- REINSPECTION FEE REQUIRED. Prior to next inspection. fe paid at 6300 Southcenter Blvd., Suite 100. Call to schedul INSPECTION RECORD Retain a copy with permit M/5-0/04( PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: % f/ G-6 'Lie ffifs Type of Inspection NeeE Err Address: 7-.57 SoHSA cc/v4--/ D to lied: (/ /,2// Special Instructions: A /- Date Wanted: 2/P a.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: //r 1 REINSPECTION FEE REQUIRED. Prior to next inspect4on, (fee must be paid at 6300 Southcenter Blvd.. Suite 100. Calt to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project /% I- et Type of inspe4tion:n ",,, A Address: a Address: 5c'/cej -- ,dt to C Iled: 1f ?3 Special Instructions: 19044 Date anted: //AV a.m.; Requester: Phone No: 1 1 Approved per applicable codes. L.1 Corrections required prior to approval. COMMENTS: Inspector: Date: . f�/ �S REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. 1 INSPECTION RECORD Retain a copy with permit IN PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 %"I 15-Ok' ( Project J , L e fp Type of Insion: i /kcx Ok5 /i A-r5 f� �tquiLe el^ /[l% yzCalled: 1/447 Special Instructions: ogor Date Wanted: . p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: . Sr gw,,4 ( ( Inspector`—! %f /2 (fit REINSPECTION FEE REQUIRED. Prior to paid at 6300 Southcenter Blvd.. Suite 100. Date: next inspection, fee must be Call to schedule reinspection. I IIwl IN ACTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project /� , iti^1 /3 Type ornspecti r� 'u/ Address: �+ l / Slc/ cep A IIMe Called: ll a , pS erial Instructions: �� Date Wanted: a.m. Requester: Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: IC49' modvi ( %4'; Inspector: 672/ Date: /, / REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 MicThoo9 Project Li I , , e , L Type of Inction: , ,4/ Address: Ai /d Date Called: ///5 Special Instructions: <- Date Wanted: (mom., %I p.m. Requester: Phone No: _/1/O I 1 — /, rci'e AK).roved per applicable codes. LJ Corrections required prior to approval. COMMENTS: w ar/r-( (71:lnve/ateQ._ 9AI 6(_2 44 Inspector:(""" Date: i i h5- REINSF'ECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info Project Address: 2800 Southcenter Mall Suite 652 Date 8/4/2015 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Lolli & Pops Applicant Address: 49 Powell St 6th Floor San Francisco, CA 94102 Applicant Phone: 402-291-1444 Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance Total Bldg Performance compliance includes all mandatory provisions per C401.2 Option 2. Only MECH-SUM and MECH-CHK forms required. ❑ New Building ❑ Building Addition Tenant alteration in mall space. Old equipment is being re.Faced new ductwork. New system will include economizer and venttl ✓ ySysteeiJ;Uti �ad0�- `"�'a—No vv,4, a trees '-to system 2, NCE APPROVED SEP 2015 System Changes heat pump and Mechanical Systems Summary I _ City of Tukwila Equip ID Type of System (Note 1) Space(s) Served Compliance Path Heating and Cooling bUiLL iiNc:a L.)IV'iSION --Air.-- I Energy Recovery Fan Flow Controls Economizer (Note 2) Ventilation (Note 3) HP-1 Split System Heat Pump All Simple single zone system Heating and cooling Constant volume (CV) Yes Minimum per IMC Not Applicable Note 1 - Provide basic description of system type, for example: unitary rooftop air handler, built-up centra air handler; single -packaged, split system or packaged terminal air conditioner or heat pump; unit heater, warm -air furnace, electric resistance heater, 4-pipe fan coil, VRF system, energy recovery air handler, make-up air system, ground or water -source heat pump, etc. Note 2 - If taking an exception to air economizer, select exception taken from drop down menu and complete MECH-ECONO form. Summary definitions of each exception are listed in MECH-ECONO. Note 3 - If ventilation "Not applicable" is selected, provide explanation in Project Description box above. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Water -loop heat pump ❑ No hydronic systems ❑ Hydronic heating ❑ Geothermal Service Water Heating Systems CORRECTION LTR# Equipment Type (s) ❑ Instantaneous atater systems 9 heat boil ❑ space from exchange Heat eCATY OF TU KW I L A central hot water/steam SEP 11 2015 ❑ On -demand ✓ Hot water heating tank(s) ❑ Dedicated boiler Distribution Type (s) ✓ Circulation System Mechanical Schedules ❑ Mechanical Plans ✓ MECH-EO Form PERMIT CENTER Indicate location of equipment compliance information. If provided on plans then MECH-EQ forms are not required. however. include on plans all applicable compliance information listed in MECH-EQ tables. Design Load Calculations g ❑ Load calculation summary Provide design load calculations ventilating needs. If a load compliance information then Equipment retrofit and repair conditions are not required ✓ MECH-LOAD-CALC Form ❑ Equipment retrofit or repair and equipment .serving the building heating. cooling or with the permit documents that includes all applicable is req d. s ry !Schemed chemed n a1 es1411 for all mechanical systems calculation summary is provided the MECH-LOAD-CALC form projects where design loads in to perform load calculations. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary, pg. 2 MECH-SUM State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 2012 Washington Revised May 2015 Fan Power 0 Air system exceeding 5hp Q No air system exceeds 5hp 0 Provide a MECH-FANSYS form for each HVAC system having a total tan system motor nameplate horsepower exceeding 5 horsepower. Refer to Section C403.2.10 and MECH-FANSYS-DOC for requirements and exceptions. Commissioning Exception Summary Describe means of eligibilty for commissioning exception (capacity, etc) for all systems noted as taking exception in Mechanical Systems Summary table. Refer to Section C408.2 and C408.4 for exceptions. Commissioning will Commissioning Exceptions: be provided for Size heating Size Figure completion. all applicable systems ✓Mechanical system(s) ✓ Service water system(s) For systems requiring commissioning, code official upon project C408.1.2.1 Commissioning Compliance Checklist shall be submitted to the Low Energy and Semi -Heated Spaces (Note 6 and 7 Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning Capacity, Btu/h-sf Compliance Check Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C101.5.2 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h-sf. Note 7 - Refer to Section C402.1.4 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 btuh/sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. tEXPIRES 1` 23`ti' 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 1 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address 2800 Southcenter Mall Suite 652 Date 8 / 4 /2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions Applicable Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 MECH- LOAD- CALC yes C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken M1.0 yes C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC M1.0 yes C403.2.3 & C403.2.3.2 & C403.2.12.1 Equipment minimum efficiency Provide equipment schedules or complete MECH-SUM tables with type, capacity, efficiency, test standard (or other efficiency source) for all mechanical equipment M1.0 yes C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, and efficiency for all motors; note exceptions taken M1.0 na C4032.10.1 Fan power limitation For all applicable systems > 5hp, provide system total nameplate hp in MECH-FANSYS-SUM form na C403.2.10.1 Fan power limitation For all applicable fan systems > 5hp, verify fan system motor hp or bhp complies with fan power limits per Table C403.2.10.1(1), provide MECH-FANSYS form for each system na C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken na C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. na C403.2.3 Maximum air cooled chiller capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit na C403.2.3.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions na C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers na C403.2.3 Forced air furnace and unit heaters Indicate intermittent ignition or HD, flue/draft damper & jacket loss yes C403.2.3.3 Packaged electric heating/cooling equipment Verify all packaged electric equipment that provides > 20,000 Btu/h cooling capacty and heating is a heat pump, note in equipment schedule M1.0 na C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones onplans, including g perimeter systems M1.0 na C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) and outdoor lock -out temperature is set to 40°F or less yes C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling M1.0 yes C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override M1.0 na C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions yes C402.4.5.2 & C403.2.4.4 OSA, exhaust, and relief air dampers Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify Class 1 leakage rating and control type (motorized or gravity); note exceptions taken M1.0 yes C402.4.5.2 Return air dampers Indicate location of return air dampers; verify motorized control; verify Class 1 leakage rating for all return air dampers not integral to packaged equipment na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft vents, verify Class 1 leakage rated motorized dampers and method of activation na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls na C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions na C403.2.4.6 Combustion heating equipment Indicate modulating or staged control na C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), confirm adjustment of at least 5°F minimum. na C403.2.4.8 / 9 Group R2/R3 dwelling and sleeping unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken na C403.2.5.1 Demand controlled ventilation Indicate high -occupancy spaces and systems requiring DCV na C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or alternate means provided to automatically reduce OSA when partially occupied 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 2 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address 2800 Southcenter Mall Suite 652 Date 8/9/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued na C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loading dock and enclosed parking garage ventilation system activation and control method na C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method na C403.2.5.4.2 laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or alternative method taken (VAV, semi -conditioned makeup, or GERM calculation) na C403.2.6.1 Energy recovery (ER) ventilation systems Indicate ventilation systems requiring ER, method & efficiency; note exceptions na C403.2.6.2 Energy recovery (ER) condensate systems Indicate on -site steam heating systems requiring energy recovery na C403.2.6.3 Energy recovery (ER) cooler/freezer condensers Indicate remote refrig. condensers requiring ER and use of captured energy na C403.4.6 Energy recovery (ER) - condenser systems Indicate condenser systems requiring ER to pre -heat service water; indicate ER effectiveness; note exceptions taken na C403.2.12 Variable flow control - fans/pumps Indicate fan and pump motors requiring variable flow control and method (VSD or equivalent controls) na C403.2.12.1 Variable flow control - heat rejection equipment Indicate heat rejection equipment and cooling tower fans requiring variable flow control and method na C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; note exceptions taken na C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 Btu/h na C403.2.4.10 DDC system capabilities Identify all DDC system input/output control points and indicate capability for trending and demand response setpoint adjustment Ducting Systems y C403.2.7.1 &Duct C403.2.7.3 construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements MP0.1 y 3403.2.7.3.1 Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M1.0 no C403.2.7.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed y C403.2.7.1 / 2Duct insulation Indicate R-value of insulation on ductwork MP0.1 Piping Systems C403.2.8 Piping insulation Indicate R-value of insulation on piping C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degredation SIMPLE SYSTEMS Qualifying Systems yes C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidification or simultaneous heating/cooling M1.0 na C403.3 Qualifying 2-pipe heating systems Verify 2-pipe heating -only system does not exceed capacity limits na C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers yes C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule M1.0 no C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) yes C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken M1.0 na C403.3.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 Btu/h yes C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) M1.0 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 3 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address 2800 Southcenter Mall Suite 652 Date 8/4/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule na C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) na C403.4.1.1 Water economizer capacity For eligible systems where water economizer may be provided in lieu of air economizer, indicate system is capable of 100% cooling capacity at 50¶ db/45¶ wb OSA na C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit na C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water economizer systems na C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation Specific System Requirements na C403.4.2 & C403.2.12 VAV fan control Indicate fans requiring variable flow control and method na C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch na C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure na C403.4.5 VAV systems serving multiple zones Indicate supply air systems serving multiple zones, method of primary air control, and zones served; Indicate VAV or note exceptions taken na C403.4.5 VAV systems serving multiple zones For each air system terminal, indicate the maximum air flow rate of primary supply air during zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads na C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler systems Indicate multi -stage or modulating burner for single boilers > 500,000 Btu/h na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers na C403.4.3.5 Chiller / boiler plant pump isolation Indicate capability to automatically reduce overall plant flow and shut-off flow through chillers & boilers when not in use na C403.4.3.6 & C403.2.12 Variable flow control pumps Indicate pumps requiring variable flow control & method na C403.2.12.1 & C403.4.4 Variable flow control - cooling towers Indicate cooling tower fans requiring variable flow control and method na C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by z 50% for systems > 300,000 Btu/h na C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range na C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat rejection and heat addition modes na C403.4.3.3.2.1 Water loop heat pump heat rejection, Zone 4 Indicate method used to limit system heat loss when heat rejections is not needed na C403.4.3.3.2.2 Water loop heat pump - heat rejection, Zone 5 Provide heat exchanger that separates cooling tower and heat pump loop na C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heal pump and variable flow control for systems with total pump power > 10 hp na C403.5 Walk-in cooler / freezer anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters na C403.5 / 6 Cooler / freezer - evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 4 of 4 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stori daIIR MECH-CHK Revised May 2015 Project Address 2800 Southcenter Mall Suite 652 Date 8/4/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes SERVICE WATER HEATING Service Water Systems yes C404.2 Water -heating equip min. efficiency Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency source P1.0 yes C404.3 Temperature controls Indicate temperature controls have required setpoint capability P1 0 yes C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge P1.0 yes C404.5 Insulation under water heater Indicate R-10 insulation under electric water heater tanks P1.0 yes C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken MP0.1 yes C404.7 / 8 Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand P1.0 na C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwelling units served by a central service hot water system Pools & In -Ground Permanently Installed Spas na C404.10.1 Pool heating equip min. efficiency Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency source na C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; note exceptions taken na C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated 10 > 90 °F na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note exceptions taken COMMISSIONING Specific System Requirements na C408.2 Mechanical systems commissioning Indicate all mechanical systems to be commissioned; for those that will not be commissioned, note exception taken na C408.4 Service water heating systems commissioning Indicate all service water heating systems to be commissioned; for those that will not be commissioned, note exception taken na C408.1.1 Commissioning plan Provide commissioning plan for all systems requiring commissioning; include in plan all required items per this section na C408.2.2.1 & C408.2.2.2 Air system and hydronic system balancing Include in commissioning plan that air and hydronic systems shall be balanced in a manner to first minimize throttling losses, then adjust to meet design flow conditions yes C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and equipment requiring system balancing MP0.1 na C408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow for all hydronic equipment requiring system balancing na C408.2.3 Mechanical systems functional performance testing Provide description of functional performance testing procedures for all applicable systems including: equipment, controls, economizers na C408.4.1 Service water heating functional performance testing Provide description of functional performance testing procedures for all applicable systems including: equipment, controls, pools and spas na C408.1.4 Systems operation training Indicate required systems operation training measures to be provided na C408.1.2 & C403.1.3 Documentation Indicate required documentation including: record documents, manuals, balancing reports, commissioning preliminary and final reports na C408.1.2.1 Acceptance report Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon completion of preliminary commissioning report _ pri 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Fan System Power Allowance MECH-FANSYS-SUM 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised M Project Info Project Address: 2800 Southcenter Mall Suite 652 Date 8/4/2015 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Lolli & Pops Applicant Address: 49 Powell St 6th Floor San Francisco, CA 94102 Applicant Phone: 402-291-1444 HVAC Air Distribution System Schedule List all HVAC systems that have the capability to provide heating and/or cooling to the spaces they serve. Fan System ID Speed Control (Note 1) Description System Total Nameplate HP (Note 2) Fan Power Calculation (Note 3) AHU-1 < 5 hp Note 1 - Constant Volume (CV), Variable Air Volume (VAV), or Hospital/Lab CV system that qualifies for VAV budget per C403.2.10.1 Exception 1 Note 2 - Enter the total nameplate hp of all fans associated with the delivery and removal of conditioned air by the system. Include all supply, return/relief, exhaust and exhaust hoods (>1 hp), make-up air, dedicated outside air (DOAS), booster fans, and series fan -powered terminals. VAV parallel fan -powered terminals and economizer relief fans do not need to be included if the fans do not operate at peak conditions. Note 3 - Indicate if MECH-FANSYS form is required (Yes), or the system is not required to provide this information because it has a combined total nameplate motor hp less than 5 hp (< 5 hp) or the system is ventilation only and thus has no heating or cooling capacity (No). MECH-FANSYS Forms A MECH-FANSYS form shall be provided for each system with total nameplate hp greater than 5 hp. Select (Add Fan System Form) to generate an additional form. Added forms can be deleted with button in cell E38 of the added 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Design Load Calculation Summary MECH-LOAD-CALC 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info The following information shall be included in the load calculation program summary submitted with the permit documents. If a load calculation summary is not available, provide the required information below. Project Address: 2800 Southcenter Mall Suite 652 Date 8/9/2015 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Lolli & Pops Applicant Address: 49 Powell St 6th Floor San Francisco, CA 9410: Applicant Phone: 402-291-1444 Equip. ID Area(s) Served Heating Design Load - B1u/h (Note 1) Cooling Design Load - Btu/h (Note 1) Calculation Method (Note 2) Notes HP-1 Stock Room 3,500 6,000 Trane TRACE HP-1 Sales Floor 23,700 42,700 Trane TRACE .P 44'o 1EXPRES ZZ. 1 Note 1 - Design load shall account for the building envelope, lighting, ventilation and occupancy loads of the space(s) served by the mechanical system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer load calculation program, worksheet (identify source), or equivalent computation procedure in accordance with ASHRAE Standard 183. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Cooling & Heating Equipment Schedule, Page 1 MECH-EQ 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R Project Info The following information shall be included in the mechanical equipment schedules in the permit documents. For projects without plans, provide the required information below. Project Address: 2800 Southcenter Mall Suite 652 Date 8/4/2015 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Lolll & Pops Applicant Address: 49 Powell St 6th Floor San Francisco, CA 94102 Applicant Phone: 402-291-1444 Heating and/or Cooling Systems (Note 1) Cooling System Equip. ID Make & Model Area(s) Served WSEC Efficiency Table Equipment Type Condenser or Sub- Type Cooling Capacity, Btu/h (Note 2) Rated Efficiency (Note 3) Rated Part Load Efficiency (Note 4) Economizer exception - required higher efficiency HP-1 TRANS 4TWA3 ALL SPACES C403.2.3(2) Unitary & Applied Heat Pumps Heat pump Air-cooled, Non- electric heat 69,500 13 SEER Note - Enter Equip ID, Make 8 Model, and Location of Service in this section for all heating & coo ing, cooling only and hea ing only equipment. Note 2 - Provide listed rated cooling capacity for rated equipment or design cooling capacity for unrated equipment. Note 3 - For rated equipment, provide listed rated efficiency in the units defined for the equipment in the WSEC efficiency table - SEER, EER, SCOP, COP 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Cooling & Heating Equipment Schedule, Page 2 MECH-EQ 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 201 Project Info The following information shall be included in the mechanical equipment schedules in the permit documents. For projects without plans, provide the required information below. Project Address: 2800 Southcenter Mall Suite 652 Date 8/4/2015 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Lolli & Pops Applicant Address: 49 Powell St 6th Floor San Francisco, CA 94102 Applicant Phone: 402-291-1444 Heating System Air System Equip. ID WSEC Efficiency Table Equipment Type Sub -type or Fuel Capacity, Btu/h (Note 5) Rated Efficiency (Note 6) Supply CFM Ventilation CFM Zone DCV or Occ. Sensors (Indicate type & zones(s) if required) Ventilation Energy Recovery (Yes or Not required) HP-155,700 C403.2.3(2) Unitary & Applied Heat Pumps Heat pump Air-cooled, Non- electric heat 7.7 HSPF 2,000 490 NA Note 4 - For rated equipment, provide listed rated part load efficiency IEER it required by code Provide the ra ed low temperature EER for water source water -to -water heat pumps. Note 5 - Enter the rated cooling capacity for heat pumps, the listed rated heating capacity for all other rated equipment, or the design heating capacity or unrated equipmen Note 6 - For rated equipment, provide listed rated efficiency and, if applicable, the low temperature rated efficiency in the units defined for the heating equipment in the WSEC efficiency table - HSPF, COP, AFUE, E-t, E-c { EXPIRES 1 2.3 -. t City of Tukwila Department of Community Development August 27, 2015 MARY RYAN PO BOX 3749 MISSION VIEJO, CA 92690 RE: Correction Letter # 1 MECHANICAL Permit Application Number M15-0104 LOLLI & POPS - Dear MARY RYAN, Jim Haggerton, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - M DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) All Structural Drawings and structural calculations sheets to be stamped (original signed wet stamp, not copied) by Washington State licensed architect, structural engineer or civil engineer. (BUILDING REVIEW NOTES) 1. Provide details for seismic tie -downs for the roof mounted heat pump and air handler. Include details for all roof repairs and penetrations. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. M15-0104 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0104 DATE: 09/11/15 PROJECT NAME: LOLLI & POPS SITE ADDRESS: 251 SOUTHCENTER MALL Original Plan Submittal X Response to Correction Letter # 1 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: hIJU k4 01%., Building Division mg Public Works n Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 09/15/15 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required n (corrections entered in Reviews) Approved with Conditions Denied (ie: Zoning Issues) DUE DATE: 10/13/15 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PEINIT coonD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0104 DATE: 08/18/15 PROJECT NAME: LOLLI & POPS SITE ADDRESS: 251 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: A Building Division Public Works ❑ AAA /Of g A-17 Fire Prevention Structural Planning Division Permit Coordinator C PRELIMINARY REVIEW: Not Applicable ri (no approval/review required) DATE: 08/20/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required tN- Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: DUE DATE: 09/17/15 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 09/08/2015 Plan Check/Permit Number: M15-0104 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued 12 Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: LOLLI & POPS Project Address: 251 SOUTHCENTER MALL Contact Person: Trevor Huffaker Phone Number: 402-291-1444 Summary of Revision: 1.Added Detail 2/M1.0 for seismic bracing of ceiling mounted air handler. 2.Added Detail 3/M1.0 for roof mounted equipment support. 3.Added Detail 4/M1.0 for roof penetration for piping/electrical. 4.Added Detail 5/M1.0 for seismic tie down of roof mounted equipment. Sheet Number(s): M1.0 "Cloud" or highlight all areas of revision including date of r Received at the City of Tukwila Permit Center by: J— Entered in TRAKiT on q '-1 RECEIVED CITY OF TUKWILA SEP 11 2015 PERMIT CENTER H:'395-005 LP - South Center WA\Data'Mech\M15-0104 Responses to Building Review Notes.doc Revised: August 2015 DIRECT MECHANICAL CNTRCT" S LLC Page 1 of 3 lfiome Irncio fay Iisl>afiel Contact Search L&1 A-7, .Index Help My Secure I Szl Safety Claims & Insurance Workplace Rights Trades & Licensing Washington State Department of Labor & Industries DIRECT MECHANICAL CNTRCTRS LLC Owner or tradesperson Principals PAVLOV, SERGEY VIKTOR, PARTNER/MEMBER PAVLOV, MARK VIKTOR, PARTNER/MEMBER PAVLOV, DANIIL VIKTOR, PARTNER/MEMBER PAVLOV, VIKTOR N, PARTNER/MEMBER Doing business as DIRECT MECHANICAL CNTRCTRS LLC WA UBI No. 602 922 445 PO BOX 872472 VANCOUVER, WA98687 360-921-2175 CLARK County Business type Limited Liability Company License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. DIRECMC913KO Effective — expiration 05/20/2009— 06/24/2017 Bond Wesco Insurance Co Bond account no. 46WB001062 $12,000.00 Received by L&I Effective date 07/26/2012 07/18/2012 Expiration date Until Canceled Bond history Insurance ............................. Mid -Century Ins Co $1,000,000.00 Policy no. 605067968 Received by L&I Effective date 12/22/2014 01/10/2014 Expiration date 01/10/2016 Insurance history https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602922445&LIC=DIRECMC913KO&SAW= 11/4/2015 PRE -BID INSTRUCTIONS 1. CONTRACTOR SHALL VIS1T SITE PRIOR TO BID AND CAREFULLY EXAMINE THE EXISTING CONDITIONS. CONTRACTOR SHALL NOT BE ALLOWED EXTRA COST DUE TO FAILURE TO VISIT SITE OR TO INQUIRE WITH OWNER AND DESIGN PROFESSIONALS AS TO CLARIFICATIONS OF DISCREPANCIES AND UNKNOWNS. 2. CONTRACTOR SHALL REVIEW ENTIRE SET OF DRAWINGS AND SPECIFICATIONS TO DETERMINE THE SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTS INCLUDING ARCHITECTURAL AND ELECTRICAL DRAWINGS. EXTRA COST SHALL NOT BE ALLOWED DUE TO FAILURE TO REVIEW ENTIRE SET OF DRAWINGS AND SPECIFICATIONS. 3. DATA PRESENTED ON THE DRAWINGS ARE AS ACCURATE AS PRELIMINARY SURVEYS AND PLANNING CAN DETERMINE, BUT ACCURACY IS NOT GUARANTEED AND FIELD VERIFICATION OF ALL DIMENSIONS IS DIRECTED. SPECIFICATIONS, DISTANCES AND LEVELS WILL BE GOVERNED BY ACTUAL FIELD CONDITIONS. REVIEW ARCHITECTURAL AND ELECTRICAL PLANS AND ADJUST WORK TO CONFORM TO ALL CONDIONS SHOWN THEREON. ACTUAL QUANTITY AND LOCATION OF DEVICES MAY VARY BASED ON CONDmONS ENCOUNTERED DURING ORIGINAL CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REMOVING OR REUSING EXISTING DEVICES. UNUSED EXISTING DEVICES, ASSOCIATED WIRING, CONDUIT AND FITTINGS SHALL BE REMOVED. 4. CONTRACTOR SHALL REFERENCE SPECIFICATIONS FOR CONSTRUCTION MATERIALS AND INSTALLATION PROCEDURES. THE SPECIFICATIONS ARE PART:OF THE CONSTRUCTION DOCUMENTS.. IN THE EVENT OF CONFLICT BETWEEN SPECIFICATIONS AND DRAWINGS, SUCH CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT / ENGINEER FOR RESOLUTION. THESE DOCUMENTS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW MATERIALS FOR COMPLETE INSTALLATION. PROVIDE COMPLETE. COMPUANT AND OPERATIONAL SYSTEMS; 1. DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO COMPLEMENT EACH OTHER. PROVIDE ITEMS. SHOWN ON ONE AND NOT THE OTHER AS THOUGH SHOWN AND CALLED OUT IN BOTH. IF. AN APPARENT CONFUCT EXISTS WITHIN THE CONSTRUCTION DOCUMENTS, PRESUME TO PROVIDE THE MORE COSTLY CHOICE, AND REQUEST CLARIFICATION FROM ARCHITECT / ENGINEER IN wRmNG. 2. PROVIDE, LABOR, MATERIALS, EQUIPMENT, FEES, AND PERMITS NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE CONSTRUCTION DOCUMENTS. 3. CONSTRUCTION DOCUMENTS PRESENT THE GENERAL DESIGN. ARRANGEMENT AND . EXTENT OF SYSTEMS. COMPLETE DETAIL IS NOT PRESENTED. DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THEIR SMALL SCALE, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION. PROVIDE SYSTEMS COMPLETE AND OPERATIONAL AND IN COMPLIANCE WITH DESIGN INTENT. OBTAIN PERMISSION FROM ENGINEER PRIOR TO MAKING MAJOR DEVIATIONS FROM CONSTRUCTION DOCUMENTS. EXAMPLES OF MAJOR DEVIATIONS ARE CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIALS. 4. INSTALL EQUIPMENT IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S WRITTEN RECOMMENDATIONS. PROVIDE FITTINGS AND OTHER SIMILAR DEVICES AND ACCESSORIES. REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION. 5. REPAIR OR REPLACE PARTS OF THIS WORK THAT FAIL, ARE UNFIT, OR BECOME DAMAGED DURING CONSTRUCTION WITH NO CHANGE TO THE CONTRACT PRICE. PAY FEES; 1. OBTAIN AND PAY FOR N.L PERMITS AND INSPECTIONS REQUIRED FOR THE ELECTRICAL WORK; ARRANGE FOR INSPECTIONS REQUIRED FOR THE ELECTRICAL WORK; FURNISH A CERTIFICATE OF FINAL INSPECTION AND APPROVAL BY ENFORCEMENT AUTHORmES. 2. WHEN ADJUSTMENTS, ALTERATIONS, OR CHANGES TO THE PROJECT ARE REQUIRED TO ACCOMMODATE PRODUCTS OTHER THAN "BASIS OF DESIGN", PAY ENGINEERING/DESIGN FEES REQUIRED TO MAKE SUCH ADJUSTMENTS, ALTERATIONS, OR CHANGES (INCLUDING BUT NOT UMITT D TO MECHANICAL, STRUCTURAL SUPPORT, AND CHANGES TO ACCOMMODATE MAINTENANCE NEEDS AND DESIGN INTENT). 3. PAY PROFESSIONAL ENGINEERING AND DESIGN FEES ASSOCIATED WITH CONTRACTOR -INITIATED CHANGES OCCURRING AFTER SEALED CONSTRUCTION DOCUMENTSS ARE SUBMITTED FOR APPROVAL TO AUTHORITY . HAVING JURISDICTION. 4. PAY PROFESSIONAL ENGINEERING FEES ASSOCIATED WITH CONTRACTOR'S FAILURE TO FOLLOW SUBMITTAL REQUIREMENTS. MAKE SUBMITTALS: 1. INDIVIDUAL SUBMITTALS ATE TO BE PREPARED ELECTRONICALLY IN 'PDF' FORMAT. ELECTRONIC FILES SHALL BE ORIGINAL VENDOR -PREPARED ELECTRONIC FILES AND NOT SCANNED COPIES OF CATALOG PAGES OR FACSIMILES. INDMDUAL EQUIPMENT ITEMS SHALL BE TAGGED WITH EQUIPMENT IDENTIFIERS AS SHOWN ON THESE DRAWINGS. ILLEGIBLE ELECTRONIC FILES ARE SUBJECT TO "REVISE AND REsustar ACTION. 2. INCLUDE WITH SUBMITTALS, SPECIFIC WRITTEN NOTICE OF EACH VARIATION A SUBMITTAL HAS FROM THE REQUIREMENTS OF CONSTRUCTION DOCUMENTS. ENGINEER'S REVIEW OF SUBMITTALS SHALL NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FROM COMPLIANCE WITH CONSTRUCTION DOCUMENTS UNLESS THE ENGINEER HAS SPECIFICALLY ACCEPTED THE VARIATION IN WRmNG. 3. SUBMIT SUBSTITUTION REQUESTS FOR APPROVAL SUBSTITUTED EQUIPMENT SHALL MEET OR EXCEED STANDARDS SET BY ITEMS SPECIFIED. 4. SUBMIT A SCHEDULE OF CONSTRUCTION DOCUMENT CHANGES REQUIRED DUE TO 1) DIFFERENCES (BETWEEN PREUMINARY DESIGN DATA AND SUBMITTAL DATA) IN "BASIS OF DESIGN" EQUIPMENT OR 2) SUBSTITUTED EQUIPMENT FOR REVIEW PRIOR TO INITIATING WORK. WHEN ADJUSTMENTS, ALTERATIONS, OR CHANGES TO THE PROJECT ARE REQUIRED TO ACCOMMODATE SUBSTITUTED PRODUCTS, PAY ENGINEERING/DESIGN FEES REQUIRED TO MAKE SUCH ADJUSTMENTS, ALTERATIONS, OR CHANGES. 5. SUBSTITUTION REQUESTS SHALL SHOW ENERGY CONSERVATION FEATURES OF SUBSTITUTED EQUIPMENT EQUAL OR EXCEED THAT OF SPECIFIED EQUIPMENT. KEEP RECORDS: 1. DURING CONSTRUCTION, MAINTAIN A SET OF AS -BUILT, REDUNED, RECORD DRAWINGS AT THE PROJECT SITE. RECORD ALL CHANGES FROM, BUT NOT LIMITED TO, ADDENDA, CHANGE ORDERS, SUPPLEMENTAL INSTRUCTIONS, AND DESIGN CLARIFICATIONS. RECORD CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES. RECORD CHANGES DUE TO CHANGES IN SUPPUED EQUIPMENT. AFTER ENGINEER'S FINAL INSPECTION PROVIDE RECORD DRAWINGS TO ENGINEER. 2. AT COMPLETION OF PROJECT PROVIDE NEW PANEL DIRECTORIES INDICATING WHICH BREAKERS ARE NOW SPARE. INCLUDE USTING OF BREAKERS FROM OLD PANEL DIRECTORIES FOR CIRCUITS NOT DISTURBED. CONSULT WITH OWNER FOR CIRCUITS NOT ADEQUATELY MARKED. pEFINmONS: 1. ACTION SUBMITTALS: WRITTEN AND GRAPHIC INFORMATION REQUIRING DESIGN PROFESSIONAL'S RESPONSIVE ACTION. ACTION SUBMITTALS INCLUDE PRODUCT DATA, SHOP DRAWINGS, SAMPLES, PRODUCT SCHEDULE OR UST. 2. INFORMATIONAL SUBMITTALS: WRITTEN INFORMATION NOT REQUIRING DESIGN PROFESSIONAL'S RESPONSIVE ACTION. SUBMITTALS MAY BE REJECTED FOR NOT COMPLYING WITH REQUIREMENTS. INFORMATION SUBMITTALS INCLUDE COORDINATION DRAWINGS, WELDING CERTIFICATES, QUALIFICATION DATA, INSTALLER CERTIFICATES, MANUFACTURER CERTIFICATES, PRODUCT CERTIFICATES, MATERIAL CERTIFICATIONS, MATERIAL TEST REPORTS, PRODUCT TEST REPORTS, FIELD TEST REPORTS, OPERATION AND MAINTENANCE DATA, MANUFACTURER'S INSTRUCTIONS, MANUFACTURER'S REID REPORTS, INSURANCE CERTIFICATES AND BONDS, MATERIAL SAFELY DATA SHEETS AND RECOMMENDED SPARE PARTS USTS. 3. FURNISH: OBTAIN AND DELIVER TO ON -SITE STORAGE IN ORIGINAL FACTORY PACKAGING. 4. INSTALL: UNPACK, MOVE TO FINAL LOCATION, MAKE CONNECTIONS, AND PLACE INTO FINAL SERVICE ACCORDING TO PROCEDURES IDENTIFIED IN PART 3 OF APPLICABLE SECTION(S). 5. PROVIDE: FURNISH AND INSTALL COMPLETE AND READY FOR THE INTENDED USE. PROTECT; 1. PROTECT EXISTING STRUCTURES AND EQUIPMENT DURING THE EXECUTION OF THIS CONTRACT. 2. REPAIR AREAS AFFECTED BY WORK TO THEIR ORIGINAL CONDIGN OR BETTER. COORDINATE: 1. PRIOR TO ORDERING, FABRICATING, OR INSTALLING WORK, COORDINATE WORK WITH WORK OF OTHER SUBCONTRACTORS AND WITH CONTRACTORS HIRED DIRECTLY BY THE OWNER. WHERE CONFLICTS OCCUR, RESOLVE THEM PRIOR TO FABRICATION AND INSTALLATION. 2. DURING INSTALLATION, RESOLVE CONFLICTS AND MAKE CHANGES RESULTING FROM LACK OF CONTRACTOR COORDINATION WITH NO CHANGE TO THE CONTRACT PRICE. 3. NOTIFY THE ENGINEER IN WRITING OF EXISTING CONDITIONS DIFFERING FROM THOSE SHOWN IN CONTRACT DOCUMENTS. THE ENGINEER WILL EVALUATE THE DIFFERENCES, AND IF NECESSARY, REDESIGN FOR THE CONDIONS FOUND. 4. DO NOT SCALE OFF CONSTRUCTION DOCUMENTS. COORDINATE INSTALLATION WITH FIELD CONDmONS. 5. WHERE BUILDING ELEMENTS (FOR EXAMPLE, DOOR FRAMES, PORTIONS OF WALLS, PORTIONS OF FLOORS, ETC.) HINDER REMOVAL OF EXISTING OR INSTALLATION OF NEW EQUIPMENT, REMOVE AND. REPLACE SUCH ELEMENTS. UPON SUBSTANTIAL COMPLETION, ENSURE BUILDING ELEMENTS MATCH THEIR ORIGINAL CONDmONS. PROVIDE SERVICEABILITY: 1. PROVIDE CEIUNG ACCESS PANELS TO ENABLE ACCESS TO EQUIPMENT REQUIRING SERVICE OR OPERATION. COORDINATE LOCATION OF ACCESS PANELS AND DOORS FOR ITEMS THAT ARE BEHIND FINISHED SURFACES OR OTHERWISE CONCEAIED. 2. PROVIDE SERVICE CLEARANCES AROUND EQUIPMENT AS RECOMMENDED BY EQUIPMENT MANUFACTURER. ADDRESS PENETRATIONS: 1. IN FIRE RATED BARRIERS, PROVIDE FIRE STOPPING ASSEMBUES USTED BY A RECOGNIZED INDEPENDENT TESTING LABORATORY AND MATCHED TO FIELD CONDmONS. MAINTAIN FIRE RATING OF SURFACE PENETRATED. CONTROL QUALITY: 1. RECORD ALL DRAWING MODIFICATIONS AND SPECIFICATION MODIFICATIONS IN ADDENDUM(S) ON THE APPROPRIATE DRAWING(S) AND IN THE APPROPRIATE SPECIFICATION SECTION(S), RESPECTIVELY. 2. TAKE RESPONSIBILITY FOR EQUIPMENT CHECK -IN, SAFEKEEPING, AND DAMAGE PREVENTION. 3. UNSPECIFIED EQUIPMENT OR SYSTEMS SHALL BE REPRESENTED BY DULY AUTHORIZED DISTRIBUTORS WITH SERVICE DEPARTMENTS REGULARLY ENGAGED IN THE MAINTENANCE AND INSTALLATION OF THESE SYSTEMS AND EQUIPMENT. SUCH SERVICE DEPARTMENTS SHALL REGULARLY STOCK STANDARD REPLACEMENT PARTS AND EQUIPMENT AND SHALL BE LOCATED WITHIN A REASONABLE DISTANCE FROM THE INSTALLATION SITE. 4. WHENEVER A MATERIAL ARTICLE, OR PIECE OF EQUIPMENT IS IDENTIFIED ON THE DRAWINGS 8Y REFERENCE TO MANUFACTURERS, VENDORS NAMES, TRADE NAMES, CATALOG NUMBERS, OR THE LIKE, IT 1S SO IDENTIFIED FOR THE PURPOSE OF ESTABUSHING A STANDARD. MATERIALS, ARTICLES, OR PIECES OF EQUIPMENT FROM OTHER MANUFACTURERS OR VENDORS, WHICH WILL ADEQUATELY PERFORM THE DUTIES IMPOSED BY THE GENERAL DESIGN, WILL BE CONSIDERED EQUALLY ACCEPTABLE PROVIDED THEY ARE OF EQUAL SUBSTANCE, APPEARANCE, AND FUNCTION. CLOSEOUT: 1. GUARANTEE SYSTEMS (PARTS AND LABOR) FOR A MINIMUM PERIOD OF ONE YEAR AFTER THE DATE OF SUBSTANTIAL COMPLETION. 2. PROVIDE OPERATING AND MAINTENANCE MANUALS IN PDF FORMAT. MANUALS SHALL INCLUDE, BUT ARE NOT UMITED TO, PRODUCT DATA SHEETS, SHOP DRAWINGS, WIRING DIAGRAMS, OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT, ACCESSORIES, UGHTING FIXTURES, OCCUPANCY CONTROLS AND RECOMMENDED SPARE PARTS USTS. 3. IMMEDIATELY BEFORE TURNING SYSTEMS OVER TO OWNER, DEMONSTRATE FULL AND PROPER SYSTEMS OPERATIONS TO ENGINEER AND OWNER. IMMEDIATELY BEFORE. DEMONSTRATION, PROPERLY AND FULLY RE -LUBRICATE EQUIPMENT. 4. UPON COMPLETION OF WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK THAT YOU DAMAGED. LEAVE THE PREMISES IN A CLEAN AND ORDERLY CONDmON. SPECIFICATIONS DMSION 15 - MECHANICAL MECHANICAL GENERAL REQUIREMENTS 1. DESCRIPTION OF WORK: THE WORK DESCRIBED HEREIN SHALL INCLUDE ALL THE WORK INDICATED ON THE DRAWINGS, SPECIFIED AND/OR REQUIRED FOR A COMPLETE AND OPERATING PROJECT. A. THE INSTALLATION AND MATERIALS FURNISHED SHALL BE IN ACCORDANCE WITH THE LATEST ADDITION TO THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL PLUMBING CODE, AND CODES AND STANDARDS HAVING JURISDICTION. ANY REQUIREMENTS IN EXCESS OF CODE REQUIREMENTS AND PERMITTED UNDER THE CODE SHALL TAKE PREFERENCE. ALL MATERIALS SHALL BE AS SPECIFIED OR AS APPROVED EQUAL 2. RELATED DOCUMENTS: DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDIONS AND DMSION 16 SPECIFICATION SECTIONS, APPLY TO THIS SPECIFICATION. 3. CODES AND PERMITS: ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL CODES. ALL FEES AND PERMITS SHALL BE PAID BY THE CONTRACTOR. 4. WORKMANSHIP: ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH ACCEPTED GOOD PRACTICE OF THE INDUSTRY. 5. COORDINATION: COORDINATE THE MECHANICAL WORK WITH THE WORK OF ALL OTHER TRADES. 6. DIMENSIONS: VERIFY ALL DIMENSIONS AND CONDIONS IN THE FIELD. 7. CUTTING AND PATCHING: PERFORM CUTTING AND PATCHING IN ACCORDANCE WITH THE GENERAL SPECIFICATIONS. 8. STORAGE: STORE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS WITH SEALS AND LABELS INTACT AND PROTECT UNTIL INSTALLED. STORE IN LOCATION DESIGNATED BY THE OWNER. 9. PROTECTION OF EQUIPMENT: PROTECT EQUIPMENT FROM DAMAGE, SOIUNG, MARRING, BENDING OR STRESSING. PROVIDE PROTECTION ADEQUATE TO SERVE THE PURPOSE AND IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 10. MATERIALS AND EQUIPMENT: MATERIALS AND EQUIPMENT SHALL BE NEW AND UNUSED. 11. PAINTING: TOUCH UP FACTORY PAINT FINISHES. 12. ACCESSIBIUTY: ALL VALVES, CONTROLS AND EQUIPMENT ITEMS SHALL BE ACCESSIBLE FOR OPERATION, MAINTENANCE AND REPAIR. 13. INSTALLATION: INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND AS SPECIFIED. A. PIPING AND EQUIPMENT SHALL BE SECURELY SUPPORTED BY MEANS OF HANGERS, ANCHORS AND SUPPORTS. PROVIDE FOR PIPING EXPANSION. ANCHORS SHALL PROPERLY DISTRIBUTE STRESSES. 14. QUALITY ASSURANCE: EQUIPMENT AND INSTAUATON SHALL COMPLY WITH LOCAL AND NATIONAL BUILDING CODES, LOCAL UTIUTY REGULATIONS AND ASHRAE, ASME, ASTM, ARI, UL AND NFPA STANDARDS. 15. CLEANING: CLEAN ALL PIPING, DUCTWORK, FIXTURES, FINNED ELEMENTS, EQUIPMENT AND SYSTEMS. 16. SYSTEM TESTING AND OPERATION: TEST SYSTEMS FOR PROPER OPERATION AND OPERATE TO THE SATISFACTION OF' THE OWNER. 17. GUARANTEE: ALL MATERIAL AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR FROM DATE OF OWNER ACCEPTANCE, UNLESS OTHERWISE INDICATED. PLUMBING 1. SLEEVES: PROVIDE #22 GAGE GALVANIZED IRON PIPE SLEEVES FOR PIPING THROUGH WALLS AND FLOOR, PACK WITH NON -ASBESTOS ROPE AND FILL WITH EXPAND() NON -SHRINKING CEMENT. 2. ESCUTCHEONS: PROVIDE EXPOSED PIPING, BOTH BARE AND COVERED, WITH CP CAST BRASS ESCUTCHEONS WHERE PASSING THROUGH FLOORS, CEIUNGS, WALLS OR PARTITIONS. 3. HANGERS AND SUPPORTS: SUPPORT HORIZONTAL DRAINAGE PIPING AT LEAST EVERY 5 FEET OR AT EVERY HUB, COPPER TUBING EVERY 7 FEET AND STEEL PIPE EVERY 10 FEET WITH "CLEVIS' HANGERS AND INSULATION PROTECTION SHIELDS. PIPING SHALL NOT BE SUPPORTED FROM BRIDGING OR OTHER PIPING. ONLY SUPPORT FROM TOP FLANGES OF BEAMS AND TOP CHORDS AT PANELS OF JOIST AND TRUSSES. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. 4. TEST: TEST PIPING AND PROVE TIGHT FOR AT LEAST TWO HOURS IN ACCORDANCE WITH REQUIREMENTS OF AUTHORIES HAVING JURISDICTION AND/OR AS SPECIFIED. TEST SHALL BE PERFORMED IN THE PRESENCE OF OWNER'S REPRESENTATIVE AND LOCAL INSPECTOR. TEST SHALL BE REPEATED IF NECESSARY UNTIL FINAL APPROVAL OF SYSTEM IS OBTAINED. 5. STRIUZA11ON OF DOMESTIC WATER SYSTEM: BEFORE BEING PLACED IN SERVICE, ALL WATER UNES SHALL BE CHLORINATED TO THE SATISFACTION OF THE ARCHITECT OR LANDLORD'S REPRESENTATIVE, IN ACCORDANCE WITH A.W.W.A. SPECIFICATION C651-05. 6. SLOPE WASTE UNES 2 INCHES AND SMALLER NOT LESS THAN 1/4 INCH PER FOOT. SLOPE LARGER MAINS NOT LESS THAN 1/8 INCH PER FOOT. 7. INSTALL A CLEANOUT AT BASE OF EACH SOIL STACK, AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET AND ELSEWHERE AS SHOWN ON DRAWINGS OR REQUIRED BY LOCAL CODE. CLEANOUTS SHALL NOT BE INSTALLED IN PUBUC AREAS WITHOUT SPECIFIC PERMISSION BY TENANT'S CONSTRUCTION MANAGER. MATERIALS 1. DRAINAGE AND VENT PIPING: EXTRA HEAVY HUB AND SPIGOT CAST IRON SOIL WITH RUBBER GASKETS CONFORMING TO ASTM C564. NO -HUB CAST IRON TO HAVE HEAVY DUTY, TYPE 304 STAINLESS STEEL COUPUNGS CONFORMING TO ASTM A 666. 2. WATER PIPING BELOW SLAB: TYPE K HARD COPPER TUBING, WITH CAST BRONZE OR WROUGHT COPPER SOLDER JOINT FITTINGS USING 95-5 SOLDER. WATER PIPING ABOVE SLAB: TYPE L HARD COPPER TUBING USING SILVER SOLDER. ALL WATER SUPPLY PIPING TO CONFORM TO NSF/ANSI 61 AND ASTM 8 75, ASTM B 88, ASTM B 251, OR ASTM B 447. ALL PIPE FITTINGS SHALL CONFORM TO ASSE 1061, ASME B 16.15, ASME 8 16.18, ASME B 16.22, ASME B 16.23, ASME B 16.26, AND ASME B 16.29. INSULATION 1. ALL HOT AND COLD WATER PIPING AND FITTINGS SHALL BE INSULATED WITH 1" THICK (MAX CONDUCTIVITY 0.27 BTU PER INCH/H*F12*'F)RIGID FIBERGLASS WITH VAPOR BARRIER UNIVERSAL JACKET PASTED WITH VAPOR BARRIER CEMENT. VAPOR BARRIER NOT REQUIRED ON HOT WATER PIPING. 2. ALL ADA CONFORMING, WHEELCHAIR ACCESSIBLE LAVATORY P-TRAP AND ANGLE VALVE ASSEMBLES TO BE COVERED WITH THE MOLDED, ANTIMICROBIAL TRUBRO, INC UV -GUARD" UNDERSINK PROTECTIVE PIPE COVER MODEL #103. SPECIFIC PLUMBING SPECIFICATIONS 1. INSTALL NEW ONLY IF EXISTING DOES NOT MEET CURRENT ADA/CABO-ANSI (AS APPLICABLE) STANDARDS, OR IS DAMAGED, NOT IN WORKING ORDER OR NOT EXISTING AS APPLICABLE 2. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO SUPPLY HANDICAPPED TOILET FIXTURES, IF REQUIRED BY CODE OR NOTED ON THE DRAWINGS, UTIUZING THE SPECIFICATION ABOVE AS A STANDARD AND MEETING CODE REQUIREMENTS. SPACING OF FIXTURES TO BE COORDINATED WITH THE GENERAL CONTRACTOR AS WELL AS THE PLUMBING INSPECTOR'S REQUIREMENTS. LANDLORD'S CRITERIA 1. THE PLUMBING CONTRACTOR IS TO BECOME FAMIUARIZED WITH LANDLORD'S CRITERIA FOR THIS LOCATION AND INCLUDE ANY WORK REQUIRED OF THIS CRITERIA, WHICH IS NOT SPECIFICALLY NOTED IN THESE DRAWINGS AND SPECIFICATIONS. HEATING. VENTILATION AND AIR CONDmONI(1G 1. DUCTWORK: FABRICATE DUCTWORK IN ACCORDANCE WITH SMACNA TABLE 1-4, 1 INCH STATIC PRESSURE, POSITIVE AND NEGATIVE. DIMENSION FOR LINED DUCTWORK IS INSIDE CLEAR. INSULATED FLEXIBLE DUCTWORK MAY BE INSTALLED AT DIFFUSER CONNECTIONS, 6'-0" LONG MAXIMUM AND SHALL BE RATED AT 3 INCH W.C. MINIMUM. INSTALL DUCTWORK IN ACCORDANCE WITH SMACNA, NFPA 90 AND ASHRAE STANDARDS. 2. DUCTWORK ACCESSORIES: COMPLY WITH ASHRAE AND SMACNA INSTALLATION STANDARDS. PROVIDE VOLUME DAMPERS, STANDARD TURNING VANES. ACCESS DOORS, FLEXIBLE CONNECTIONS, TRANSmONS, OFT' -SETS AND ELBOWS FOR A COMPLETE OPERATING SYSTEM. 3. DUCT LINER: FIBROUS GLASS, 1/2 INCH THICK AND COMPLY WITH THE "THERMAL INSULATION MANUFACTURES ASSOCIATION" (TWA) AHC-101. INSTALL PER SMACNA STANDARDS. ALL NEW RECTANGULAR SUPPLY AIR DUCTWORK AND RETURN AIR DUCTWORK. 4. DIFFUSERS, REGISTERS, GRILLES, & DAMPERS: ALL DIFFUSERS AND GRILLES SHALL HAVE A BAKED ENAMEL OFF-WHITE FINISH, EXCEPT AS NOTED. PROVIDE A BUTTERFLY DAMPER IN EACH DIFFUSER SUPPLY DUCT. PROVIDE A VOLUME DAMPER AT EACH NEW GRILLE. EQUIPMENT SHALL BE AS SPECIFIED OR AN APPROVED EQUAL FRAME TYPES SHALL BE FIELD VERIFIED. PROVIDE GASKETS. ACCEPTABLE MANUFACTURERS: CARNES, KRUEGER, TUTTLE & BAILY AND TITUS. 5. HANGERS AND SUPPORTS: HANG AND SUPPORT DUCTWORK IN ACCORDANCE WITH SMACNA STANDARDS. 6. DUCT INSULATION: PROVIDE 1-1/2 INCH, 3/4 LB. DENSITY BLANKET INSULATION ON ALL ROUND SUPPLY AIR DUCTWORK. PROVIDE ALL PURPOSE JACKET WITH VAPOR BARRIER. 7. TESTING AND BALANCING: BALANCE AIR SYSTEMS TO CFM VALUES INDICATED. MAKE FINAL BALANCING FOR PERSONAL COMFORT CONDITIONS. PROVIDE TAB REPORT TO OWNER. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal c.nrf rn^y imsude additional plan review is;,; FILE CO Permit NoM Our Plan review approval is subject to errors and omissions. Approval of construction &Currants does not authorize the violation of any adopted code Or ordinance. Receipt of approved Field Copy and conditions Is acknowledged: By:0� C_' _. 11- ` -'s SEPA 7AT:: PERMIT REQUIRED FOR: CI Mot nical „ia Electra( l . Plumbing ' its Piping ...jot Tukwila SUITING DIVISION GENERAL MECHANICAL El> EO-# FLAG NOTE FIELD DISCONNECTION FIELD CONNECTION EQUIPMENT MARK NUMBER (WITHOUT ELECT. CONNECTION) EQUIPMENT MARK NUMBER (WITH ELECT. CONNECTION) EXISTING WORK (LIGHT) / NEW WORK (BOLD) PLUMBING SANITARY DRAIN (ON THIS LEVEL) SANITARY FORCE MAIN DRAIN FM - - - - S .- - - - SANITARY DRAIN (BELOW THIS LEVEL) .- - VENT. LINE COLD WATER (POTABLE) - - - HOT WATER SUPPLY (110' F) -- - HOT WATER RETURN (110' F) --- ----- -of,Q,,--iQ,Q,. CLEAN OUT El 2" FD-1 FLOOR DRAIN SIZE - TYPE 0 4" VTR SANITARY VENT THRU ROOF' ON RISER VALVES AND FITTINGS SYMBOL DESCRIPTION SYMBOL DESCRIPTION Dd SHUTOFF VALVE -o--- CONCENTRIC REDUCER N CHECK VALVE ECCENTRIC REDUCER -1.- 0 WJRIQ KI VALVE -3 CAP M THROTTUta VALVE 1 BUSHING MC QUICK CONNECT C HOSE COUPLING / THREADS Ii 2-WAY CONTROL VALVE -III- UNION lb 3-WAY CONTROL VALVE -I i 1- ORIFICE PLATE PRESSURE REDWING VALVE E3 D PANSION JOINT (SEE SPECS RIR TYPE) 1.- RA BALL VALVE t ELBOW DOWN OR MAY FUMBLE CONNECTION EXI + TO FODDER DRAIN -�- HVAC - AIR SIDE SYMBOL SYMBOL DESCRIPTION(1- LINE) (2 - LINE) 10" ,i + 10" ROUND DUCT SIZE - DIAMETER + 10/6 RECTANGULAR CT SIZE - 10/6 UDIMENSION S S 1ST NUMBER IS OF SIDE SHOWING 10/6 + 10 6 FLAT -OVAL DUCT SIZE - S s + 1ST NUMBER IS DIMENSION OF SIDE SHOWING •S 7 SPLITTER TRANSMON - SIZE CHANGE (RECTANGULAR, ROUND, S--DIS OR FLAT -OVAL) RECTANGULAR TO ROUND, OR S--® ; i3C TRANSITION - RECTANGULAR TO FLAT -OVAL S RECTANGULAR DUCT TAKE -OFF 1 45' FLEXIBLE DUCT CONNECTION S--IhlI-i 00 RECEIVED SIZE TYPE CITY OF TUKWILA XXX C DIFFUSER (CEILING MOUNTED) SEP 1 1 2015 CENT,.; PERMIT RISER OR END OF DUCT - QSUPPLY AIR (SA) SIZE ME XX CFM RETURN OR EXHAUST REGISTER OR GRILLE (CEILING MOUNTED) Pri RISER OR END OF DUCT - RETURN AIR (RA) OR EXHAUST AIR (EA) i VOLUME DAMPER Q THERMOSTAT HisoiO'-' DATE: 09/08/2015 JOB NO: 395-008 SCALE: AS NOTED CHECKED: 09/08/2015 PE ENGINEERS - ARCHITECTS FORENSIC EXPERTS 1501 J. F. KENNEDY DR. BELLEVUE, NEBRASKA 68005 PHONE: (402)-291-1444 WEB SITE: www.kpe-inc.com © 2015 A&E NATIONAL, INC. THESE PLANS ARE COPY RIGHTED AND ARE SPECIFICALLY PROVIDED FOR USE OF THE OWNER AND. DESIGNED FOR CONSTRUCTION BY A & E NATIONAL, INC. AND ARE INTENDED FOR NO OTHER PURPOSE. PERMISSION FOR USE OF THIS DOCUMENT IN PART OR WHOLE WITHOUT WRITTEN CONSENT OF A & E NATIONAL, INC. IS PROHIBITED. filLOCh A & E NATIONAL, INC. A & E NATO NAL, INC. 1812 NORTH 203rd STREET ELKHORN, NE 68022 PH: 402-614-4434 FAX: 402-614-4431 CL, 9-4 STAME E W 0 Z � ■ Or. !1;1): . z CC NA J III 7261:REA:\RNEovDIFEDOR CODOMPLIANCE SEP 15 2015 City of Tukwil I I 4 G DIVISION EXPIRES i Z3 •• I R 1 WESTFIELD SOUTHCENTER 2800 SOUTHCENTER MALL, SPACE 652 TUKWILA, WA 98188 SUBMITTAL TENANT REVIEW BID SET &PERMIT SET ©PLUMBING REVISIONS ©MECHANICAL REVISIONS ©BUILDING REVISIONS 07/29/2015 08/06/2015 08/10/2015 09/04/2015 09/04/2015 09/08/2015 GENERAL MECHANICAL NOTES, SPECS, & SYMBOLS SHEET NUMBER MPO.1 GENERAL NOTES: • 1 DEMOLITION NOTES: HEAT PUMP I �-- ATTACH TIE DOWN TO UNIT BASE FRAME. �-- NO 12. SELF DRIWNG SCREW W/ NEOPRENE WASHERS EACH END OF HOLD-DOWN. 'NN-- MOUNTING RAIL SEISMIC TIE -DOWN FOR ROOFTOP EQUIPMENT NO SCALE L1-1/4x1-1/4x3/16" ANGLE IRON SUPPORTS. L1-1/4x1-1/4x3/16" ANGLE IRON SEISMIC BRACE. NOTE: 1. PROVIDE 4 TOTAL TIE DOWNS ATTACHING HEAT PUMP TO RAILS, 2 PER SIDE. 2. TIE DOWNS ARE TO BE 3/16X7X19 STAINLESS STEEL AIRCRAFT CABLE COMPLYING WITH MIL-DTL-83420 SPECIFICATIONS. FITTINGS: SWAGED STEEL PLATED EYELET FITTINGS, SAVA INDUSTRIES NO. 340P500 OR APPROVED EQUAL SCREWS: NO. 12 TEKS3 BY ITW BUILDEX OR APPROVED EQUAL CUMASEAL FINISH. 3 ROOF MOUNTED HEAT PUMP DETAIL MI.0 NO SCALE EXISTING PENETRATION MAY BE REUSED IF ADEQUATE AND WITH PERMISSION. FIELD VERIFY. REINFORCED INSULATED SHEET METAL CAULK ALL JOINTS, AND POSITION TO SHED WATER -- COUNTERFLASHING WITH FASTENERS 0 24" O.C. BASE FLASHING W/ FASTENERS 0 8" O.C. �IIIIII"'' ROOF STRUCTURE 4 LANDLORD'S - SLOPE TOP 0 1/4" PER FOOT r- DEKTITE NEOPRENE COLLAR. SECURE IN PLACE WITH SCREWS TO HOOD ANC) METAL BANDS ] AROUND THE PIPES. SEAL WATER TIGHT. 30" ANGLE - WOOD BLOCKING •-- CANT STRIP ROOF INSULATION ROOF PIIPE PENETRATION DETAIL M 1 ...01 NO SCALE NOTE: ALL ROOF WORK MUST BE COORDINATED WITH WESTFIELD MANAGEMENT. GENERAL CONTRACTORS SHALL HIRE LANDLORD'S DESIGNATED ROOFING CONTRACTOR AND ROOF WATER PROOFING CONTRACTOR. GENERAL CONTRACTOR SHALL PROVIDE ADEQUATE STRUCTURAL SUPPORT FOR ALL ROOF OPENINGS. GENERAL CONTRACTOR SHALL INSTALL NON -FADING, DURABLE AND PERMANENT LABEL WITH TENANT'S SUITE NUMBER TO ALL ROOF TOP EQUIPMENT SERVING THEIR SPACE. THIS SHALL INCLUDE BUT MAY NOT BE LIMITED TO HVAC EQUIPMENT. LABELS SHALL BE ATTACHED TO MAINTENANCE PANEL COVERS. v k L- CD err 18/14 RA 18/16 RLFA 18/16 RA 18/14 SA L1-1/4x1-1/4x3/16" ANGLE IRON SUPPORTS. GUMMI ROOM 104 -NUTS MD WASHERS BOTH SIDES OF ANGLE (TYP). tlo -STRUCTURAL ivJOIST 1/2" BOLT AND NUT W/ 2" 1/2 WASHER. MOUNT CLOSE TO STRUCTURE 1/2" THREADED ROD (TYP). EQUIPMENT MOUNTING DETAIL NO SCALE ANY EXISTING CONDITIONS INDICATED ARE BASED ON INFORMATION PROVIDED BY OTHERS AND POSSIBLE LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER. THE CONTRACTOR SHALL VISIT THE PROJECT SITE, REVIEW EXISTING CONDITIONS AGAINST THE PLANS, AND FAMILIARIZE HIMSELF WITH THE WORK PRIOR TO BIDDING AND START OF THE WORK. CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH LANDLORD'S TENANT CRITERIA MANUAL INCLUDING MALL MANAGEMENT'S RULES AND REGULATIONS. LIGHT -LINED ITEMS ARE EXISTING TO REMAIN, WITH REQUIREMENTS AS NOTED. HEAVY -LINED ITEMS INDICATE NEW WORK AS INDICATED. . SEE ALSO SYMBOLS, NOTES AND ABBREVIATIONS SHEET. COORDINATE DUCT, DIFFUSER, GRILLE, REGISTER, AND DAMPER LOCATIONS WITH STRUCTURAL ELECTRICAL AND ARCHITECTURAL DUCT SIZING IS CLEAR INSIDE DIMENSIONS. INSULATED FLEXIBLE ROUND DUCT SHALL NOT EXCEED 5'0" IN TOTAL LENGTH. PROVIDE VOLUME DAMPER FOR EACH SUPPLY AND RETURN, AND INSTALL FOR ACCESSIBILITY THROUGH CEIUNG AWAY FROM OBSTRUCTIONS. 1. REMOVE EXISTING MECHANICAL UNITS AND DUCTWORK ABOVE THE CEILING AND CONDENSING UNITS ON ROOF. 2. MODIFY AND/OR REMOVE SUPPLY, RETURN AND RESTROOM EXHAUST DUCTWORK AS NECESSARY TO PROVIDE SYSTEM AS SHOWN. FLAG NOTES: 1. PROVIDE NEW 7-DAY PROGRAMMABLE T-STAT, HONEYWELL PRESTIGE IAQ 2.0 WITH EQUIPMENT INTERFACE MODULE AND TOTAL CONNECT COMFORT SERVICES. PROVIDE ACCESSORY HONEYWELL PORTABLE COMFORT CONTROL REM5000R1001. SEE CONTROL SEQUENCE ON THIS SHEET. 2. NOT USED. 3. NEW AIR HANDLER, SEE EQUIPMENT SCHEDULE THIS SHEET. ROUTE CONDENSATE TO MOP SINK. 4. PROVIDE OUTDOOR AIR AND RELIEF DUCTS TO ROOF. COORDINATE WITH LANDLORD REQUIREMENTS FOR LOCATION OF DUCT ROUTING AND OUTDOOR AIR GRILLES. SET DAMPER TO 490 CFM MINIMUM OA. . ECONOMIZER MIXING BOX WITH MODULATING CAPABILITY UP TO 100% OA. /3\ 10. CONTRACTOR TO LABEL CONDENSER ON ROOF WITH TENANT NAME AND SUITE #. ALSO VERIFY PENETRATIONS FOR TENANT SPACE ARE SEALED AND WEATHER TIGHT. COORDINATE THIS WITH LANDLORD'S ROOFER. 11. VERIFY EXISTING SMOKE EXHAUST SYSTEM COMPONENTS. COORDINATE CHANGES WITH LANDLORD AND LANDLORD ENGINEER. ANY MODIFICATIONS TO SMOKE EXHAUST SYSTEM MUST BE BY LANDLORD ENGINEER. 12. NEW HVAC SYSTEM SHALL COMPLY WITH WASHINGTON STATE ENERGY CODES. SPLIT -SYSTEM HEAT PUMP SCHEDULE _ MARK SERVES COOLING HEATING ELECTRICAL DATA BASIS OF DESIGN WEIGHT (LB) MECH NOTES TOTAL SENS. SEER (MBH) (VIBH) (MBH) HSPF V PH UNIT MCA HP-1 AHU-1 69.5 51.2 1 13 55.7 7.7 480 3 '10 TRANE 4TWA3 244 1-5 MECHANICAL NOTES: 1. REFRIGE:RANT PIPE QUANTITIES ANC SIZE TO BE PER MANUFACTURER'S PIPING SCHEMATIC. 2. INSTALL HEAT PUMP ON ROOF IN APPROVED LANDLORD LOCATION, ROUTE REFRIGERANT LINES THROUGH LANDLORD PROVIDED CHASE. 3. PROVIDE DISCONNECT. 4. PROVIDE STARTERS FOR ALL MOTORS. 5. PROVIDE LQUID LINE FILTER DRYER AND SIGHT GLASS. . HEAT PUMP TO BE INSTALLED ON ROOF, SEE EQUIPMENT SCHEDULE THIS SHEET. COORDINATE WITH LANDLORD FOR LOCATION. PROVIDE PLATFORM MOUNTING RAIL AND SEISMIC TIE DOWNS PER DETAILS. DIFFUSER, REGISTER AND GRILLE SCHEDULE [I-1: 24"X24", STEEL CONSTRUCTICIN, RECESS MOUNT, ROUND NECK WITH OUTLETS AS SHOWN, HORIZONTAL 4-WAY, 3-CONE. PAINT TO MATCH CEILING IN RETAIL AREA ONLY. COORDINATE WITH PAINTING CONTRACTOR. EXAMPLE: TITUS TMS. G-1: 24"X24", STEEL BORDER, ALUMINUM GRID, EGGCRATE RETURN. PAINT TO MATCH CEILING. COORDINATE WITH PAINTING CONTRACTOR. EXAMPLE: TITUS 55R. R-1S: STEEL CONSTRUCTION, 2-WAY, 3/4 X DOUBLE, ADJUSTABLE THROW DIRECTION. EXAMPLE: TITUS 300 RS. R-1R: STEEL CONSTRUCTION, 3/4 X 35, HORIZONTAL BLADES. EXAMPLE: TITUS 350RL. AIR HANDLING UNIT SCHEDULE MARK SERVES SUPPLY FAN CFM ESP (IN) COOLING HEATING MIN OA ELECTRICAL DATA BASIS OF DESIGN WEIGHT (LB) MECH NOTES TOTAL SENS. (MBH) (MBH) (MBH) CFM V UNIT PH MCA AHU-1 HP-1 2000 - 0.5 69.5 51.2 55.7 490 480 3 3.1 TRANE BCXDO54G2 185 1-5 MECHANICAL NOTES: 1. PROVIDE WITH TWO SETS OF THROW -AWAY FILTERS. 2. PROVIDE WITH FACTORY MOUNTED DISCCNNECT. 3. PROVIDE SECONDARY DRAIN PAN WITH FLOAT SWITCH, UNIT SHALL SHUT DOWN UPON ALARM FROM FLOAT SWITCH. 4. SUSPEND UNIT FROM STRUCTURE, PROVDE VIBRATIONS ISOLATORS AND SEISMC BRACING PER CBC. 5. FIELD INSTALLED, FACTORY PROVIDED MIXING BOX WITH DRY BULB CONTROLLER FOR ECONOMIZER CONTROL. 840 2 PL CHOCOLATE ROOM 103 r MECHANICAL PLAN SCALE: 1 /4" = I'-0" VINTAGE ROOM 102 16/12 SA / L /I I I I ADJACENT TENANT AREA AIL 11 a MALL COMMON AREA RECEIVED CITY OF TUKWI - A SEP 11 2015 PERMIT CENTER DATE: 09/08/2015 JOB NO: 395-008 SCALE: AS NOTED CHECKED: 09/08/2015 ENGINEERS - ARCHITECTS FORENSIC EXPERTS 1501 J. F. KENNEDY DR. BELLEVUE, NEB:RASKA 68005 PHONE: (402)-291-1444 WEB SITE: www.kpe-inc.com C> 2015 A&E NATIONAL, INC. THESE PLANS ARE COPY RIGHTED AND ARE SPECIFICALLY PROVIDED FOR USE OF THE OWNER AND DESIGNED FOR CONSTRUCTION BY A & E NATIONAL, INC. AND ARE INTENDED FOR NO OTHER PURPOSE. PERMISSION FOR USE OF THIS DOCUMENT IN PART OR WHOLE WITHOUT WRITTEN CONSENT OF A & E NATIONAL, INC. IS PROHIBITED. A & E NATIONAL, INC. A & E NATIONAL, INC. 1812 NORTH 203rd STREET ELKHORN, NE 68022 PH: 402-614-4434 FAX: 402-614-4431 STAN Cia CiPJ LU torna Cta fois LIU ICC .; :'./1-z. /VE D FOR CODE. CO :;PLIANCE APPROVED www.LOLLIANDPOPS.com SEP 15 2015 m IP City of Tukwila r„-1LDING DIVISION ii EX�PI ES 1,Z3 WESTFEELD SOUTHCENTER 2800 SOUTHCENTER MALL, SPACE 652 TUKWILA, WA 98188 SUBMITTAL TENANT REVIEW BID SET &PERMIT SET 2&PLUMBING REVISIONS 03 MECHANICAL REVISIONS &4 BUILDING REVISIONS n 07/29/2015 08/06/2015 08/10/2015 09/04/2015 09/04/2015 09/08/2015 MECHANICAL PLAN DETAILS SHEET NUMBER MI.10 m