Loading...
HomeMy WebLinkAboutPermit M15-0106 - TEAVANA - AIR DEVICESTEAVANA 856 SOUTHCENTER MALL M15-0106 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT 9202470010 Permit Number: 856 SOUTHCENTER MALL Project Name: TEAVANA Issue Date: Permit Expires On: M 15-0106 9/21/2015 3/19/2016 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD, WA, 92013 ANDY PAROLINE 3617 SW CHARLESTOWN ST, SEATTLE, WA, 98126 PRECISE HEATING & COOLING LLC PO BOX 1455, MONROE, WA, [RECOJC891L9 Phone: (206) 719-0339 Phone: (206) 861-2525 Expiration Date: 6/29/2017 DESCRIPTION OF WORK: RELOCATION OF AIR DEVICES SERVICED BY EXISTING VAV WITH ADDITION OF 1.5 TONS SUPPLEMENTAL COOLING WITH 14 SEER SPLIT SYSTEM Valuation of Work: $15,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $389.62 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: P4/d/1 4pet,g I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agre to the conditions attached to this permit. Signature: Print Name: (475 Date: L'et-/ S This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0705 0701 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION REFRIGERATION EQUIP ROUGH -IN MECHANICAL a separate permit issued by the City of Tukwila the job site at the time of inspection. CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. gli.010(p Project No. Date Application Accepted: Date Application Expires: lel 1C° (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address:856 Southcenter Mall Tenant Name: Teavana King Co Assessor's Tax No.: Suite Number:115 5 PROPERTY OWNER Name: Westfield Address: 2800 Southcenter Mall City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Andy Paroline Address: 3617 SW CHARLESTOWN ST City: Seattle State: WA Zip: 98126 Phone: 2 0 6. 719. 0 3 3 9 Fax: Email: andy@parolineassociates.com Floor: New Tenant: ❑ Yes [..No MECHANICAL CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ 15 / Describe the scope of work in detail: Relocation of air devices served by existing VAV with addition of 1.5 tons supplemental cooling with 14 seer split system DDc7 Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ❑ Fuel Type: Electric El Gas ❑ Other: coolink only H: Applications\Porms-Applications On Line \2011 Applications\Mechanical Parmit Application Revised 8-9-11.docx Revised: August 2011 bh Page l of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm 1 Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 1 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR Signature: IZ D AGENT: Print Name: Mailing Address: Day Telephone: Date: --O6 f 99,S City State Zip H:1Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-I I.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY I PAID PermitTRAK $65.00 M15-0106 Address: 856 SOUTHCENTER MALL Apn: 9202470010 $65.00 MECHANICAL $65.00 ADDITIONAL PLAN REVIEW TOTAL FEES PAID BY RECEIPT: R6331 R000.345.830.00.00 1.00 $65.00 $65.00 Date Paid: Monday, October 05, 2015 Paid By: ROBERT HAISLETT Pay Method: CREDIT CARD 005763 Printed: Monday, October 05, 2015 7:43 AM 1 of 1 CRWSYSTEMS Cash Register Receipt City of Tukwila Receipt Number R6202 DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $2,920.57 D15-0204 Address: 856 SOUTHCENTER MALL Apn: 9202470010 $2,171.81 DEVELOPMENT $2,068.60 PERMIT FEE R000.322.100.00.00 0.00 $2,064.10 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $103.21 TECHNOLOGY FEE I R000.322.900.04.00 0.00 $103.21 EL15-0731 Address: 856 SOUTHCENTER MALL Apn: 9202470010 $434.07 ELECTRICAL $413.40 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $413.40 TECHNOLOGY FEE $20.67 TECHNOLOGY FEE R000.322.900.04.00 0.00 $20.67 M15-0106 Address: 856 SOUTHCENTER MALL Apn: 9202470010 $314.69 MECHANICAL $299.70 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $267.20 TECHNOLOGY FEE $14.99 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6202 R000.322.900.04.00 0.00 $14.99 $2,920.57 Date Paid: Monday, September 21, 2015 Paid By: TAD EDWARDS Pay Method: CREDIT CARD 011260 Printed: Monday, September 21, 2015 8:07 AM 1 of 1 tirPW.SYSTEMS Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY I PAID PermitTRAK $74.93 M15-0106 Address: 856 SOUTHCENTER MALL Apn: 9202470010 $74.93 MECHANICAL $74.93 PLAN CHECK FEE TOTAL FEES PAID BY RECEIPT: R5990 R000.322.102.00.00 0.00 $74.93 $74.93 Date Paid: Monday, August 24, 2015 Paid By: ARCVISION Pay Method: CHECK 33361 Printed: Monday, August 24, 2015 3:03 PM 1 of 1 CRW YSTEMS INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 m/s-v/06 Project: '7'1 16. TypeTection: /v Add es eci/� / /�4Ze Called: Sp ialTnstructions: Date Wa a. Requ ster: Phone No: E-Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: fel._ Date REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 IOrll5-0/o6 Proje tom.. (f ,4 v �' l Type of Insp •ec. tion: / t' -,. 77, 47 Addre s: 05— .�eK t? c75^ /,i , Called: Special Instructions: • Date Want r/ / a. Reques r: Phone No: ® p roved per applicable codes. tj Corrections required prior to approval. COMMENTS: Inspector Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Calt to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 4(S ©(0,6 Project: Type f IInnssp ction: 6 A dress: i _ a Date Called: Special Instructions: Avtil Date Wanted: /O ` 7,8 a.m. p.m. ~-(3- Requester: Phone No: LJ Approved per applicable codes. Corrections required prior to approval. COMMENTS: ( tc€/re0C k. Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit TION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 AM- O(a6 Project: reA 1%� a-ol Typepf Inspection;_ KOu +i tot ,, ec-„'1 Addtess� �v t vs Act (1 Date Calle Special Instructions: 4'Vi Date anted: (� —6 ''J ,.� a.m. p.m. Requester: s ; i (e P Pho No: C q 7SZ- Approved per applicable codes. Corrections required prior to approval. OMMENTS: Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection, 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 sto 2.-Ra 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Project Info Project Description Briefly describe mechanical systems in the text box provided ❑ Total Bldg Performance Total Bldg Performance compliance includes all mandatory provisions per C401.2 Option 2. Only MECH-SUM and MECH-CHK forms required. Project Address: 856 SOUTHCENTER MALL 1 DateAPPROVED2015 SPACE 1155 TUKWILA, WA 98188 Applicant Name: TEAVANA Applicant Address: Applicant Phone: ❑ New Building 0 Building Addition ❑ System Upgrad �oLC For Building Dept. Use SEP 0 1 2015 City of Tukwila ;NG DIVI3IOr steaa-6taaages.� Ci T Y OF "I'UK;WILA AUG 242015 PERMIT CENTER Mechanical Systems Summary Equip ID Type of System (Note 1) Space(s) Served Compliance Path Heating and Cooling Fan Flow Controls Air Economizer (Note 2) Ventilation (Note 3) AHU/CU- 1 SPLIT SYSTEM STOCK Cooling only Constant volume (CV) SS Exp1 Not Applicable Energy Recovery Not Applicable Note 1 - Provide basic description of system type, for example: unitary rooftop air handler, built-up centra air handler single -packaged, split system or packaged terminal air conditioner or heat pump; unit heater, warm -air fumace, electric resistance heater, 4-pipe fan coil, VRF system, energy recovery air handler, make-up air system, ground or water -source heat pump, etc. Note 2 - If taking an exception to air economizer, select exception taken from drop down menu and complete MECH-ECONO form. Summary definitions of each exception am listed in MECH-ECONO. Note 3 - If ventilation "Not applicable" is selected, provide explanation in Project Description box above. HVAC Hydronic Systems ❑ Hydronic chilled water ❑ Hydronic heating ❑ Water -loop heat pump O Geothermal 0 No hydronic systems Service Water Heating Systems Mechanical Schedules Equipment Type (s) 0 Hot water heating tank(s) ❑ Dedicated boiler Distribution Type (s) ❑ Circulation System ❑ Instantaneous ❑ Heat exchange from space heat boiler central hot water/steam 0 On -demand ▪ Mechanical Plans ❑ MECH-EQ Form TAIL OF WASHtN TON • Indicate location of equipment compliance information. if provided on plans then MECH-EQ forms are not re•uired, however. include on plans all applicable compliance information listed in MECH-EQ tables. Design Load Calculations O Load calculation summary 0 MECH-LOAD-CALC Form ❑ Equipment retrofit or repair Provide design load calculations for all mechanical systems and equipment serving the building heating. cooling or ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable compliance information then the MECH-LOAD-CALC form is not required. Equipment retrofit and repair projects where design loads in space(s) se have niranged from origi design conditions are not required to perform load calculation FO at? 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Summary, pg. 2 MECH-SUM 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Fan Power Q Air system exceeding Provide a MECH-FANSYS exceeding 5 horsepower. 5hp Q No air system exceeds 5hp 0 form for each HVAC system having a total fan system motor nameplate horsepower Refer to Section C403.2.10 and MECH-FANSYS-DOC for requirements and exceptions. Commissioning Exception Summary Describe means of eligibilty for commissioning exception (capacity, etc) for all systems noted as taking exception in Mechanical Systems Summary table. Refer to Section C408.2 and C408.4 for exceptions. be provided for heating Figure completion. all applicable systems 1 Commissioning will Commissioning Exceptions: • Mechanical system(s) 111 Service water system(s) For systems requiring commissioning, code official upon project C408.1.2.1 Commissioning Compliance Checklist shall be submitted to the Low Energy and Semi -Heated Spaces (Note 6 and 7) Space Type Location in Plan(s) Space(s) Served Area Served, square feet Heating Capacity, Btu/h (Note 4) Cooling Capacity, Btu/h (Note 5) Peak Space Conditioning Capacity, Btu/h-sf Compliance Check Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5- Provide total installed cooling capacity of system serving Low Energy space(s) in Btu/h. Not allowed for semi -heated spaces. Enter 0 if no cooling. Note 6 - Refer to Section C101.5.2 Low Energy Building. Intalled peak space conditioning capacity, heating or cooling, may not exceed 3.4 Btu/h-sf. Note 7 - Refer to Section C402.1.4 and Semi -Heated Space definition in Chapter 2. Total heating output capacity may not exceed 8 btuh/sf. Only systems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 1 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and at R1 Revised May 2015 Project Address 856 SOUTHCENTER MALL Date 8/21/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes GENERAL PROVISIONS Equipment Sizing & Performance yes C403.2.1 Load calculations Load calculations performed per ASHRAE Std 183 or equivalent per Chapter 3 M100 yes C403.2.2 Equipment and system sizing Output capacity of heating and cooling equipment and systems do not exceed calculated loads, note exceptions taken M100 na C403.2.5 Minimum ventilation Ventilation (natural or mechanical) provided per IMC; indicate mechanical ventilation is capable of being reduced to minimum requirement per IMC yes C403.2.3 & C403.2.3.2 & C403.2.12.1 Equipment minimum efficiency Provide equipment schedules or complete MECH-SUM tables withtype, capacity, P p city, efficiency, test standard (or other efficiency source) for all mechanical equipment M100 na C403.2.13 Electric motor efficiency Provide equipment schedule with hp, rpm, and efficiency for all motors; note exceptions taken na C403.2.10.1 Fan power limitation For all applicable systems > 5hp, provide system total nameplate hp in MECH-FANSYS-SUM form na C403.2.10.1 Fan power limitation For all applicable fan systems > 5hp, verify fan system motor hp or bhp complies with fan power limits per Table C403.2.10.1(1), provide MECH-FANSYS form for each system na C403.2.10.2 Motor nameplate hp Indicate fan motors specified are the smallest available motor hp size greater than fan bhp, note exceptions taken na C403.2.10.3 & C403.2.13 Fractional hp fan motors Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency req. na C403.2.3 Maximum air cooled chiller capacity Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit na C403.2.3.1 Non-standard water-cooled chillers Full -load and NPLV values for water-cooled centrifugal chiller adjusted for non-standard operational conditions na C403.2.12.1.2 Centrifugal fan cooling towers Large capacity cooling towers with centrifugal fan(s) meet efficiency requirements for axial fan open circuit cooling towers na C403.2.3 Forced air furnace and unit heaters Indicate intermittent ignition or IID, flue/draft damper & jacket loss na C403.2.3.3 Packaged electric heating/cooling equipment Verify all packaged electric equipment that provides > 20,000 Btu/h cooling capacity and heating is a heat pump, note in equipment schedule na C403.2.3.4 Humidification Indicate method of humidification (note requirements for systems with economizer) HVAC System Controls & Criteria yes C403.2.4.1 Thermostatic controls Indicate locations of thermostatic control zones on plans, including perimeter systems M100 na C403.2.4.1.1 Heat pump supplementary heat Indicate staged heating (compression/supplemental) and outdoor lock -out temperature is set to 40°F or less yes C403.2.4.2 Setpoint overlap (deadband) Indicate 5°F deadband minimum for systems controlling both heating & cooling M100 yes C403.2.4.3 Automatic setback and shutdown Indicate zone t-stat controls with required automatic setback & manual override M100 yes C403.2.4.3.3 Automatic (optimum) start Indicate system controls that adjust equip start time to match load conditions M100 na C402.4.5.2 & C403.2.4.4 OSA, exhaust, and relief air dampers Indicate location of outdoor air supply intake, and exhaust and relief outlet dampers; verify Class 1 leakage rating and control type (motorized or gravity); note exceptions taken na C402.4.5.2 Return air dampers Indicate location of retum air dampers; verify motorized control; verify Class 1 leakage rating for all retum air dampers not integral to packaged equipment na C402.4.5.1 Stairway and shaft vents Indicate location of stairway and shaft Vents, verify Class 1 leakage rated motorized dampers and method of activation na C403.2.11 Heating outside a building Indicate radiant heat system and occupancy controls na C403.2.4.5 Snow melt systems Indicate shut-off controls based on outdoor conditions na C403.2.4.6 Combustion heating equipment Indicate modulating or staged control na C403.2.4.7 Group R1 hotel/motel systems Indicate method for guest room temperature automatic setback (heating) & set-up (cooling), confirm adjustment of at least 5°F minimum. na C403.2.4.8 / g Group R2/R3 dwelling and sleeping unit systems Indicate 5-2 programmable thermostats in primary spaces with minimum of two setback periods; note exceptions taken na C403.2.5.1 Demand controlled ventilation Indicate high -occupancy spaces and systems requiring DCV na C403.2.5.2 Occupancy sensors Indicate spaces requiring occupancy -based system control and method; or altemate means provided to automatically reduce OSA when partially occupied 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 2 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Address 856 SOUTHCENTER MALL Date 8/21/2015 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes GENERAL PROVISIONS, CONTINUED HVAC System Controls & Criteria, Continued na C403.2.5.3 Enclosed loading dock/parking garage ventilation Indicate enclosed loadingdock and enclosed parking p g garage ventilation system activation and control method na C403.2.5.4.1 Kitchen exhaust hoods Indicate kitchen hoods requiring make-up air; indicate make-up air source and conditioning method na C403.2.5.4.2 Laboratory exhaust systems Indicate lab exhaust systems requiring heat recovery, method & efficiency; or altemative method taken (VAV, semi -conditioned makeup, or CERM calculation) na C403.2.6.1 Energy recovery (ER) - ventilation systems Indicate ventilations stems requiring ER, method & efficiency; y q 9 note exceptions na C403.2.6.2 Energy recovery (ER) - condensate systems Indicate on -site steam heating systems requiring energy recovery na C403.2.6.3 Energy recovery (ER) - cooler/freezer condensers Indicate remote refrig. condensers requiring ER and use of captured energy na C403.4.6 Energy recovery (ER) - condenser systems Indicate condenser systems requiring ER to pre -heat service water, indicate ER effectiveness; note exceptions taken na C403.2.12 Variable flow control - fans/pumps Indicate fan and pump motors requiring variable flow control and method (VSD or equivalent controls) na C403.2.12.1 Variable flow control - heat rejection equipment Indicate heat rejection equipment and cooling tower fans requiring variable flow control and method na C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and cooling demand; note exceptions taken na C403.2.12.2 Single zone AC systems Indicate method of cooling demand -based fan control for sys. > 110,000 Btu/h na C403.2.4.10 DDC system capabilities Identify at DDC system input/output control points and indicate capability for trending and demand response setpoint adjustment Ducting Systems yes C403.2.7.1 & C403.2.7.3 Duct construction Indicate all ductwork constructed and sealed per IMC, C402 leakage requirements and IBC vapor retarder requirements M100 C403.2.7.3.1- Duct pressure classifications Identify location of low, medium and high pressure ductwork on plans M100 yes C403.2.7.3.3 High pressure duct leakage test Indicate high pressure duct leakage testing requirements on plans; provide test results to jurisdiction when completed yes C403.2.7.1 / 2 Duct insulation Indicate R-value of insulation on ductwork M100 Piping Systems yes C403.2.8 Piping insulation Indicate R-value of insulation on piping M100 na C403.2.8.1 Piping insulation exposed to weather Indicate method of protection from damage/degradation SIMPLE SYSTEMS Qualifying Systems na C403.3 Qualifying single zone systems Verify unitary or packaged equipment does not exceed capacity limits, does not have active humidifcation or simultaneous heating/cooling na C403.3 Qualifying 2-pipe heating systems Verify 2-pipe heating -only system does not exceed capacity limits na C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 Simple System Economizers na C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule na C403.3.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) na C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100% OSA; note exceptions taken na C403.3.1.1.2 Integrated air economizer operation Indicate capability for partial air economizer operation for systems with capacity > 65,000 Btu/h na C403.3.1.1.3 Air economizer high limit controls Indicate high limit shut-off control method per Table C403.3.1.1.3(2) 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 3 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all RI Revised May 2015 Project Address 856 SOUTHCENTER MALL Date 8/21/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes COMPLEX SYSTEMS Complex System Economizers na C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls; note in equipment schedule na C403.4.1 Air economizer exceptions Indicate eligible exception(s) taken and provisions to comply with exception(s) na C403.4.1.1 Water economizer capacity For eligible systems where water economizer may be provided in lieu of air economizer, indicate system is capable of 100% cooling capacity at 50°F db/45°F wb OSA na C403.4.1.2 Water economizer maximum pressure drop Indicate precooling coils and heat exchangers in water economizer system do not exceed pressure drop limit na C403.4.1.3 Integrated economizer operation Indicate capability for partial economizer operation for air or water economizer systems na C403.4.1.4 Economizer heating system impact Verify control method of HVAC systems with economizers does not increase building heating energy usage during normal operation Specific System Requirements na C403.4.2 & C403.2.12 VAV fan control Indicate fans requiring variable flow control and method na C403.4.2.1 VAV fan static pressure sensors Indicate sensor locations on plans; include at least one sensor per major duct branch na C403.4.2.2 VAV fan static pressure setpoint Indicate fan system static pressure setpoint based on zone requiring most pressure na C403.4.5 VAV systems serving multiple zones Indicate supply air systems serving multiple zones, method of primary air control, and zones served; Indicate VAV or note exceptions taken na C403.4.5 VAV systems serving multiple zones For each air system terminal, indicate the maximum air flow rate of primary supply air during zone peak cooling and the maximum air flow rates during zone peak heating. na C403.4.5.4 VAV system supply air reset Indicate controls that automatically reset supply air temp in response to loads na C403.4 Large capacity cooling systems Indicate method of multi -stage or variable control for building cooling system capacity > 300 tons na C403.4.7 Hot gas bypass limitation Indicate cooling equipment unloading or capacity modulation method na C403.4.3 Large capacity boiler systems Indicate multi -stage or modulating bumer for single boilers > 500,000 Btu/h na C403.4.3 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers na C403.4.3.5 Chiller / boiler plant pump isolation Indicate capability to automaticallyreduce overall plant flow and shut-off flow through chillers & boilers when not in use na C403.4.3.6 & C403.2.12 Variable flow control - pumps Indicate pumps requiring variable flow control & method na C403.2.12.1 & C403.4.4 Variable flow control - cooling towers Indicate cooling tower fans requiring variable flow control and method na C403.4.3.4 Hydronic system part load controls Indicate heating & chilled water systems have the capability to automatically reset supply water temp AND reduce flow by ? 50% for systems > 300,000 Btu/h na C403.4.3.2 Two -pipe changeover systems Indicate deadband, heating/cooling mode scheduling and changeover temperature range na C403.4.3.3.1 Water loop heat pump - deadband Indicate capability of central equipment to provide min. 20°F water supply temp deadband between heat rejection and heat addition modes na C403.4.3.3.2.1 Water loop heat pump - heat rejection, Zone 4 Indicate method used to limit system heat loss when heat rejections is not needed na C403.4.3.3.2.2 Water loop heat pump - heat rejection, Zone 5 Provide heat exchanger that separates cooling tower and heat pump loop na C403.4.3.3.3 Water loop heat pump - isolation Indicate 2-way isolation valve on each heat pump and variable flow control for systems with total pump power> 10 hp na C403.5 Walk-in cooler /freezer - anti -sweat heaters Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat heaters na C403.5 / 6 Cooler / freezer - evaporator and condenser fans Indicate motor type for evaporator and condenser fans < 1 hp 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Mechanical Permit Plans Checklist - Page 4 of 4 MECH-CHK 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all Revised May 2015 Project Address 856 SOUTHCENTER MALL Date 8/21/2015 The following information is necessary to check a permit application for compliance with the mechanicial systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable (yes,no,na) Code Section Code Provision Information Required - Must be in permit documents Location in Documents Building Department Notes SERVICE WATER HEATING Service Wa erSystems na C404.2 Water -heating equip min. efficiency Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency source M100 na C404.3 Temperature controls Indicate temperature controls have required setpoint capability na C404.4 Heat traps Indicate piping connected to equipment have heat traps on supply & discharge na C404.5 Insulation under water heater Indicate R-10 insulation under electric water heater tanks yes C404.6 Service water piping insulation Indicate R-value of insulation on piping; note exceptions taken P100 na C404.7 / 8 Circulation systems and heat trace shut-off Indicate shut-off capability based on occupancy and periods of limited demand na C404.9 Group R-2 service hot water meters Indicate method of usage metering for dwelling units served by a central service hot water system Pools & In -Ground Permanently Installed Spas na C404.10.1 Pool heating equip min. efficiency Provide equipment schedule with type, capacity, efficiency, test standard or other efficiency source na C404.10.1 / 2 Pool heater on / off controls Indicate automatic on/off control based on scheduling & accessible on/off switch on heater that operates independent of thermostat setting; note exceptions taken na C404.10.3 Pool covers Indicate vapor retardant cover and insulation rating as required na C404.10.3 Pool assembly insulation Indicate rating of insulation on sides and bottom of pools heated to > 90'F na C404.10.4 Heat recovery Indicate method, exhaust air temperature reduction and recovered energy use; note exceptions taken COMMISSIONING Specific System Requirements na C408.2 Mechanical systems commissioning Indicate all mechanical systems to be commissioned; for those that will not be commissioned, note exception taken na C408.4 Service water heating systems commissioning Indicate all service water heating systems to be commissioned; for those that will not be commissioned, note exception taken na C408.1.1 Commissioning plan Provide commissioning plan for all systems requiring commissioning; include in plan all required items per this section na C408.2.2.1 & C408.2.2.2 Air system and hydronic system balancing Include in commissioning plan that air and hydronic systems shall be balanced in a manner to first minimize throttling losses, then adjust to meet design flow conditions na C408.2.2.1 Air system balancing devices Indicate devices that provide the capability to balance all supply air outlets, zone terminals and equipment requiring system balancing na C408.2.2.2 Hydronic system balancing devices Indicate devices that provide the capability to isolate, balance and measure flow for at hydronic equipment requiring system balancing na C408.2.3 Mechanical systems functional performance testing Provide description of functional performance testing procedures for all applicable systems including: equipment, controls, economizers na C408.4.1 Service water heating functional performance testing Provide description of functional performance testing procedures for at applicable systems including: equipment, controls, pools and spas na C408.1.4 Systems operation training Indicate required systems operation training measures to be provided na C408.1.2 & C403.1.3 Documentation Indicate required documentation including: record documents, manuals, balancing reports, commissioning preliminary and final reports na C408.1.2.1 Acceptance report Indicate that Commissioning Compliance Checklist (Figure C408.1.2.1) is required upon completion of preliminary commissioning report 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Design Load Calculation Summary MECH-LOAD-CALC 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info The following information shall be included in the load calculation program summary submitted with the permit documents. If a load calculation summary is not available, provide the required information below. Project Address: 856 SOUTHCENTER MALL Date 8/21/2015 SPACE 1155 For Building Dept. Use TUKWILA, WA 98188 Applicant Name: TEAVANA Applicant Address: Applicant Phone: Equip. ID Area(s) Served Heating Design Load - Btu/h (Note 1) Cooling Design Load - Btu/h (Note 1) Calculation Method (Note 2) Notes AHU/CU-1 STOCK 18,000 18,000 CHVAC 18981 PROVIDED THRU VAV Note 1 - Design load shall account for the building envelope, lighting, ventilation and occupancy loads of the space(s) served by the mechanical .system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer load calculation program, worksheet (identify source), or equivalent computation procedure in accordance with ASHRAE Standard 183. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Cooling & Heating Equipment Schedule, Page 1 MECH-EQ 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including:R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info The following information shall be included in the mechanical equipment schedules in the permit documents. For projects without plans, provide the required information below. Project Address: 856 SOUTHCENTER MALL Date 8/21/2015 SPACE 1155 For Building Dept. Use TUKWILA, WA 98188 Applicant Name: TEAVANA Applicant Address: Applicant Phone: Heating and/or Cooling Systems (Note 1) Coolin9 System Equip. ID Make & Model Area(s) Served WSEC Efficiency Table Equipment Type Condenser or Sub- Type Cooling Capacity, Btu/h (Note 2) Rated Efficiency (Note 3) Rated Part Load Efficiency (Note 4) Economizer exception - required higher efficiency AHU/C U 1 MITSUBISHI PUY-A18NHA STOCK SUPPLEMENTAL C403.2.3(1)AAirConditioners and Condensing Units Air conditioner Alrcooled,Elec. Res. or No Heat 18,000 14.20 Note - Enter Equip ID, Make & Model, and Location of Service in this section for all heating & cooing, cooling only and heating only equipment. Note 2 - Provide listed rated cooling capaaty for rated equipment or design cooling capaaty for unrated equipment. Note 3 - For rated equipment, provide listed rated efficiency in the units defined for the equipment in the WSEC efficiency table - SEER, EER, SCOP, COP 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Cooling & Heating Equipment Schedule, Page 2 MECH-EQ 2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised May 2015 Project Info The following information shall be included in the mechanical equipment schedules in the permit documents. For projects without plans, provide the required information below. Project Address: 856 SOUTHCENTER MALL Date 8/21/2015 SPACE 1155 For Building Dept. Use TUKWILA, WA 98188 Applicant Name: TEAVANA Applicant Address: Applicant Phone: Heating System Air System Equip. ID WSEC Efficiency Table Equipment Type Sub -type or Fuel Capacity, Btu/h (Note 5) Rated Efficiency (Note 6) Supply CFM Ventilation CFM Zone DCV or Occ. Sensors (Indicate type & zones(s) if required) Ventilation Energy Recovery (Yes or Not required) AHU/CU- 1 None Note 4 - For rated equipment, provide listed rated part load efficiency IEER if required by code Provide the ra ed low temperature EER for water source water -to -water heat pumps. Note 5- Enter the rated cooling capacity for heat pumps, the listed rated heating capacity for all other rated equipment, or the design hea ing capacity for unrated equipment. Note 6 - For rated equipment, provide listed rated efficiency and, if applicable, the low temperature rated efficiency in the units defined for the heating equipment in the WSEC efficiency table - HSPF, COP, AFUE, E-t, E-c Precise Heating & Cooling LLC P.O. Box 1455 Monroe Washington 98272 Phone: 206-510-4250 Project: . \ u c V10\ Location AIR OUTLET — TEST REPORT H,V.A.C. System or Unit: V crk\/ — 1 Outlet Manufacturer: AREA SERVED CC tAc1'- tf`00 j 24 25 2 OUTLET No. TYPE SIZE 22 - 5_I ..._........_fib 23 (o " " /2 " DESIGN CFM 22S i 3 PRELIMINARY CFM FINAL CFM 27 28 2 0 1 32 33 34 35 36 37 38 39 RECE'VED 42 NOTES: Ud�V O V\ 4 i s er PcA TEST DATE: /0/2a READINGS BY: alb CITY OF TUKWILA NOV 0 2 2015 °ERMIT CENTER PAGE 1 OF Noc0 Precise Heating & Cooling LLC P.O. Box 1455 Monroe Washington 98272 Phone: 206-510-4250 Project: Location AREA SERVED No. 1 2 AIR OUTLET — TEST REPORT H.V.A.C. System or Unit: Outlet Manufacturer: OUTLET DESIGN TYPE ; SIZE CFM PRELIMINARY CFM FINAL CFM 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 18 r 19 20 21 21 18 19 20 21 NOTES: ' r t TEST DATE: READINGS BY: PAGE OF FREDERICK . GOGLIA ARCHITECT, NCARB, ISP PROJECT REVISION NO. Teavana- Southcenter 856 Southcenter Mall Space #1155 Tukwila, WA 98188 Below is a Summary of Changes to the plans per Owner Comments. The changes below are addressed in Revision 3 on the plans. RECEIVED CITY OF TUKWILA DRAWING REVISIONS: SEP 2 8 2015 A000 — Revised Index of Sheets to show sheet S201 — Structural Details. PERMIT CENTER D100 — Sheet note 25 added to indicate existing metro shelving to be located in space. Sheet note 26 added to indicate to salvage sales area flooring for BOH patching. A100 — Revised Penetration Plan at center table. Revised Stub -up details 2 & 3. Revised sheet note 5. A101 — Removed partial wall at center of sales area in plan. Revised wall type 4 to be Not Used and revised wall type 6 to indicate full height plywood on sales floor side in Wall Type Legend. Revised sheet note 5 to indicate correct bottom rail size and note 6 to indicate electrical equipment versus naming specific equipment. Sheet note 11 added to indicate existing in floor grease trap. Sheet note 12 added to indicate existing floor sink. Sheet note 13 added to indicate break metal soffit at storefront. A102 — Revised lighting layout at back of sales area and added track lighting in plan. Removed a total of 4 can lights from front sales area and storefront in plan. Revised soffit finishes at storefront. Revised Ceiling Treatment Schedule — "U". A103 — Revised back wall of sales area in plan per new wall fixtures. Sheet note 1 revised to indicate relocated metro shelving. Revised Furniture Schedule — "F", Data Device Schedule — "A", and Specialty Equipment Schedule — "E". A104 — Revised back wall of sales area in plan per new wall casework. Added casework tags to 2 fixtures in plan. Revised Casework Schedule — "C". A105 — Revised detail 3 to be Not Used. Revised cove base and flooring callouts in details 2, 5, 6, 7, and 8. Revised sales area tile grid start point in plan. Sheet note 7 added to indicate existing floor sink. Sheet note 8 added to indicate existing in floor grease trap. Sheet note 9 added to indicate BOH floor patching to be done with salvaged sales area flooring. Revised Floor Treatment Schedule — "T" and Wall Base Schedule — "B". A106 — Removed partial height wall at center table in plan. Revised floor finish callout in detail 2. Revised wall treatment 3 to be Not Used in Wall Treatment Legend. Revised Wall Treatment (Area) Schedule — "Q". � 1950 Craig Road Suite 300 • St. Louis, MCD I (t9 6-4106 • Phone (314) 415-2400 • Fax (314) 415-2300 • A200 — Signage Schedule updated. Storefront elevation 1 updated to show extended sign eyebrow, monitor location updated, embossed metal panel on right column of storefront, 6" max dimension added, 1/2" tempered glass note added to doors for clarification. Storefront elevation 2 updated to show graphic on right side, glazing and storefront finish tags updated, tile dimension added, embossed metal panel on left side added, %2" tempered glass note added to doors for clarification. Sheet notes updated. Monitor Detail added to show gyp board framing detail/ leave out at storefront monitor. Door Pocket details revised for clarification. Metal panel/ finish details updated and dimensioned for clarification. A201 — Sections updated to show revised eyebrow detailing and framing to allow light recess and 6" max dimension added. Storefront display window section updated to show updated design and heights, embossed metal panel details. Eyebrow construction detail revised per updated design. Sheet notes updated. Staple detail updated per revised design. A202 — Revised neon sign, wet bar casework, and mounting location information on elevation 1. Revised digital monitors and added floating shelve casework on elevation 2. Revised mounting location information on elevation 3. A203 — Revised manager's station layout and added second Fetco on elevation 3. A500 — Revised detail 1 to match revised manager's station layout on sheet.A203.r M100 —Revised the loads to include a higher server load and a lower load for the screen wall which caused the System Load Summary to be changed. Added 75 cfm to the existing VAV. Added a notation that the slats in the staple fixture are %" wide at 10'-0" AFF. P100 — Revised Sanitary Plan to show adjusted location of the floor sink under the center table in sales area and revised sheet note 21 to indicate the water heaters under the center table should be installed in the same cabinet that the floor sink is located under. E100 — Revised Lighting Plan to show additional track at back portion of sales, removed down lights in front of show window, extended the length of the led at the storefront, and j-boxes were moved. Revised Power Plan to show trenching has been split up to two locations to island, monitor arrangement changed and added two quadplex's for charging portable POS. More dimmers added to switch bank, manager's station shifted upward changing all dimensions. E200 — Light fixture schedule was updated per lighting changes which affected panel schedules and timeclock and lighting contactor control diagram. S100 — Re-laid out bracing at staple feature. S200 — Revised details 08 and 09 to match existing beam spacing. S201 — Added sheet to drawing set. Moved 100 and 200 series details to this sheet. Added/modified details 102-105 for the staple feature bracing details. Modified detail 204 to show built up beam attachment in lieu of Unistrut. END OF REVISIONS 1950 Craig Road, Suite 300 • St. Louis, MO 63146 • Phone (314) 415-2400 • Fax (314) 415-2399 L FREDERICK .. GOGLIA ARCHITECT, NCARB, ISP PROJECT REVISION NO. 2 Teavana- Southcenter 856 Southcenter Mall Space #1155 Tukwila, WA 98188 Below is a Summary of Changes to the plans, including Landlord Comments, Health Department, and Owner Comments. The changes below are addressed in Revision 2 on the plans. RECEIVED CITY OF TUtKWILA DRAWING REVISIONS: SEP 2 8 2015 **Store # and Project # added to every sheet. A000 — Health department notes added. Revised Index of Sheets to show MEP sheets. D100 — Note 24 added to indicate existing grease trap to remain. PERMIT CENTER A100 — Dimensions to locate electrical and plumbing stub -ups have been revised. Details 2 and 3 revised to align with engineering drawings. Stub -up for POS removed. Flooring in detail 4 revised to show tile. Plan Note E revised to show Not Used. A101— Updated dimensions and location of knee wall in center of store. Updated dimensions of staple fixture at storefront and glazing, updated dimensions of corner build -out. Updated sheet notes to specify finish. Revised Wall blocking legend for Retail Blocking's height. A102 — Revised Reflected Ceiling Plan per new lighting layout. Revised Sheet Note #5 and added Reflected Ceiling Plan Note "M". Revised Ceiling Treatment Schedule — "U" to show SW Repose Gray. A103 — Central table updated per Store Design. Additional Fetco added to plan in Stockroom. Lockers and coat hook added to stockroom per Health Department comments. Ice Machine spec revised. Plan notes E and F revised. Sheet note 2 shown as Not Used. Sheet note 12 removed. A104 — Casework schedule revised A105 — Floor finish at corner column revised to "C" — N/A. Floor penetration locations updated. Retail area tile pattern added to plan. Location of finish transition from Retail to Stockroom revised. Detail 2 revised to correct finishes and dimensions. Details 3 & 4 revised to show cove height. Detail 5 revised to show stockroom flooring and the correct size of retail flooring. Details 6, 7 & 8 added to the sheet. Floor and Wall Base schedules revised to include more information. Sheet note 6 added to sheet. A106 — Wall finish revised at corner column. Finishes added to storefront/staple feature. Sheet note 8 added to wet bar location. Flooring and cove base size revised in detail 2. Detail 3 removed from sheet. Sheet note 8 revised for location at Wet Bar. Wall treatments 1, 2, 5, 6 and 10 revised. Wall Treatment schedule revised to include more detail. �, �:�15" 0 I 1950 Craig Road Suite 300 • St. Louis, MO 63146-4106 • Phone (314) 415-2400 • Fax (314) 415-2300 A200 - Notes added for tile base to align with base of door/glazing system. Digital tile removed from design. Large format tile pattern revised. Note to align seams in glazing with vertical members of Staple fixture. Protective window box added to digital tile at corner. Closure doors added to pocket doors at storefront. Detail 3 revised to show pocket door cover. Detail 4 revised to show pocket door cover, window box at corner and dimensions adjusted on build -out. Signage schedule updated. Sheet notes 1, 2, 3, 4, 6 and 9 revised. A201 - Detail 9 added for Staple Fixture Detail. Finishes and eyebrow details updated on sections 1, 2, 3, 4 & 5. Digital tile removed from sections above the eyebrow. Details 9 & 10 added to sheet. Sheet note 7 revised. A202 - General notes added to coordinate locations with Teavana PM. Backsplash removed from wet bar in elevation 1. Fixture X9401 revised in elevation 1. Rear wall digital display revised in elevation 2. Note added to elevation 3 to show blank space as "open to mall". - -- M100 -Added sprinkler head to HVAC Symbol Legend and revised the last Mechanical General Note. -, - - P100 - Revised Plumbing Fixture Schedule, New Plumbing Fixture Calculations, Water Plan, Sanitary Plan, and Plumbing Keyed Notes #1, 9, 12, 21-25. P200 - Revised Waste Riser with removal of floor sink and Water Riser with addition of new hot water machine. E100 - Revised Lighting Plan per new lighting layout. Revised Power Plan, Switch Bank, Symbol Legend, Manager's Station Detail, and Manager's Station Keyed Note #6. Revised Electrical Keyed Notes #6-15 & 24-31. E200 - Revised Light Fixture Schedule, Lamp Schedule, Panel LP Demand, Service Demand, Panel LP Breaker Schedule, & Timeclock and Lighting Contractor Control Diagram. S100 - Soffit support on the right side of the space has been adjusted to remove the middle columns. The beam sizes have been modified to accommodate the longer spans. S200 - The beams in detail 10 have been spread out to match the new soffit size. Detail 11 has been added to accommodate the new beam configuration END OF REVISIONS 1950 Craig Road, Suite 300 • St. Louis, MO 63146 • Phone (314) 415-2400 • Fax (314) 415-2399 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0106 PROJECT NAME: TEAVANA DATE: 09/28/15 SITE ADDRESS: 856 SOUTHCENTER MALL Original Plan Submittal Revision # before Permit Issued Response to Correction Letter # X Revision # 1 after Permit Issued DEPARTMENTS: hyl- Building Division Public Works ❑ t•W AV1 Fire Prevention 1111 Structural n Planning Division Permit Coordinator M PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/29/15 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required n Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 10/27/15 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0106 DATE: 08/24/15 PROJECT NAME: TEAVANA SITE ADDRESS: 856 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: AtAl Building Division Public Works r Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 08/25/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 09/21/15 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2(113 PROJECT NAME:Tfa u/Ac,, PERMIT NO: MIS — 0100 SITE ADDRESS: its (p Soh} .e*A41-e-- rya 11 ORIGINAL ISSUE DATE: -(S REVISION IL REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITI LS L 9-.2-81I 0 ,1,_ Summary of Revision: w� 4c.c„,- - vAr el t c S Lde/i- -1 Received by: c, -ktS c.., REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS _ Summary of Revision: Received by: please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please nrintl City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://w w.'I'ukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 09/28/2015 Plan Check/Permit Number: M15-0106 Response to Incomplete Letter # Response to Correction Letter # y/ Revision # 1 after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Teavana South Center Project Address: 856 South Center Mall Contact Person: Andy Paroline Summary of Revision: see attached revision narrative Sheet Number(s): see attached revision narrative Phone Number: (206) 719-0339 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: ---Entered in Permits Plus on 94- 111TV OF TUKWILA p 2 8 2015 PERMIT CENTER H:\Application \Forms -Application On Line \2010 Applications \7--2010 - Revision Submittal. doe Revised: May 2011 PRECISE HEATING & COOLING T LC Page 1 of 2 Mane Inicio en Espan& Contact Search L&I A-% Index Help My Secure 11 Safety Claims & Insurance Workplace Rights Trades & Licensing 0 Washington State Department of Labor & industries PRECISE HEATING & COOLING LLC Owner or tradesperson Principals MOORE, LAMAR RALPH, PARTNER/MEMBER STRINGER, MICHAEL LEE, PARTNER/MEMBER (End: 04/24/2015) Doing business as PRECISE HEATING & COOLING LLC WA UBI No. 603 122 887 PO BOX 1455 MONROE, WA 206-861-2525 SNOHOMISH County Business type Limited Liability Company Governing persons LAMAR MOORE MICHAEL L STRINGER; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. ........................................................................... Meets current requirements. License specialties Heating/Vent/Air-Conditioning and Refrig (HVAC/R) License no. PRECIHC891 L9 Effective — expiration 06/29/2011— 06/29/2017 Bond ................. Wesco Insurance Co Bond account no. 46WB043501 $6,000.00 Received by L&i Effective date 04/07/2014 04/20/2014 Expiration date Until Canceled Bond history Insurance ....................... Ohio Security Ins Co $1,000,000.00 Policy no. BKS55371340 Received by L&I Effective date 12/03/2014 11/29/2014 Expiration date 11/29/2015 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=603122887&LIC=PRECIHC891 L9&SAW= 9/21/2015 Date/Time Stamp MECHANICAL SPECIFICATIONS ORDINANCES. PERMITS. AND CERTIFICATES ALL WORK UNDER THIS DIVISION OF THE SPECIFICATIONS SHALL BE INSTALLED IN FULL ACCORDANCE WITH ALL LAWS, ORDINANCES AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES (LOCAL, STATE, AND FEDERAL) HAVING JURISDICTION WHICH IN ANY WAY WILL AFFECT THIS WORK. THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED BY THE FOREGOING GOVERNMENTAL AUTHORITIES. ALL WORK SHALL BE INSTALLED IN FULL ACCORDANCE WITH REGULATIONS OF THE UNDERWRITERS HAVING JURISDICTION. VISIT JOB SITE VISIT JOB SITE AND BE FAMILIAR WITH LANDLORD'S REQUIREMENTS. NO ALLOWANCE WILL BE MADE FOR EXTRAS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE ALL CONDITIONS IMPOSED BY THE LANDLORD OR OTHER AUTHORITIES. GUARANTEE ALL LABOR AND MATERIAL FURNISHED UNDER THIS CONTRACT WILL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY THE TENANT. DURING THIS TIME, THIS CONTRACTOR SHALL REPAIR ALL LEAKS AND CORRECT ALL DISCREPANCIES WITH CODES OR THE SPECIFICATIONS AT HIS OWN EXPENSE DUCTWORK PRESSURE CLASS: 1" W.G., SEAL CLASS: B, ALL NEW SUPPLY AIR DUCTS SHALL BE MADE OF GALVANIZED SHEET METAL WRAPPED WITH 2" OF INSULATION (UNLESS OTHERWISE NOTED). NEW DUCTWORK SHALL BE INSTALLED ACCORDING TO SMACNA AND ASHRAE CURRENT STANDARDS DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT/ENGINEER. ALL DUCTS WILL BE MADE AIRTIGHT WITH THE USE OF APPROVED DUCT JOINTS, CAULKING AND SHEET METAL SCREWS. ALL DUCT TAPE OR SIMILAR MATERIALS WILL BE REJECTED BY THE TENANT. NO GLASS FIBER OR SIMILAR MATERIALS WILL BE ACCEPTED AS A SUBSTITUTE FOR SHEET METAL DUCTWORK. FLEXIBLE INSULATED, ROUND DUCT WILL BE PERMITTED FOR FINAL CONNECTIONS TO DIFFUSERS AND OUTLETS PROVIDED THAT IN NO CASE SHALL THIS FLEXIBLE DUCT EXCEED 5'-0" IN LENGTH. CONNECTIONS BETWEEN DIFFUSERS AND OUTLETS, AND BETWEEN FLEXIBLE DUCT AND SHEET METAL DUCTS, SHALL BE MADE WITH HOSE CLAMPS, OR COLLARS SECURED WITH SHEET METAL SCREWS. SHORT RADIUS BEND WILL BE MADE WITH ADJUSTABLE SHEET METAL ELBOWS. DO NOT ATTEMPT SHORT RADIUS BENDS USING FLEXIBLE DUCT. ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS, AND CONNECTIONS IN DUCTWORK MUST BE SECURELY SEALED USING WELDMENTS; MECHANICAL FASTENERS WITH SEALS, GASKETS, OR MASTICS; MESH AND MASTIC SEALING SYSTEMS; OR TAPES. TAPES AND MASTICS MUST BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A OR UL 181B. ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND CONNECTIONS OF SUPPLY AND RETURN DUCTS OPERATING AT STATIC PRESSURES LESS THAN OR EQUAL TO 2" W.G. SHALL BE SECURELY FASTENED AND SEALED WITH WELDS GASKETS, MASTICS (ADHESIVES), MASTIC -PLUS -EMBEDDED FABRIC SYSTEMS OR TAPES INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. MECHANICAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE USED WHEN CONNECTING DUCTS TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT. INSULATION SUPPLY DUCTWORK CONCEALED ABOVE CEILING SHALL HAVE 2" FIBERGLASS "Owens-Corning" DUAL TEMP TYPE 100 WITH REINFORCED ALUMINUM FOIL FACING, APPLIED WITH ADHESIVE AND STRAPPED 8'-0" ON CENTERS WITH STICK CLIPS. AIR DISTRIBUTION CEILING OUTLETS, REGISTER AND GRILLES SHALL BE MADE BY TITUS COMPANY OF SIZE AND TYPE SHOWN ON THE DRAWINGS AND ACCORDING TO THE AIR DEVICE SCHEDULE WITH BAKED WITH ENAMEL FINISH, UNLESS OTHERWISE NOTED. EACH OUTLET SHALL BE COMPLETE WITH INTEGRAL OPPOSED BLADE DAMPER. AIR BALANCE WHEN THE AIR DISTRIBUTION SYSTEM IS 100% COMPLETE ENTIRE SYSTEM MUST BE BALANCED TO THE AIR QUANTITIES AS INDICATED ON THE PLANS, IN ACCORDANCE WITH THE AABC OR NEBB SPECIFICATIONS. REPORTS MUST BE SUBMITTED (4) COPIES FOR EACH SYSTEM FOR APPROVAL TO THE TENANT AND ARCHITECT. COPY OF REPORT MUST ALSO BE SUBMITTED TO MALL LANDLORD. BALANCING COMPANY SHALL BE AN INDEPENDENT COMPANY AFFILIATED WITH THE AMERICAN AIR BALANCING COUNCIL. TESTING AND ADJUSTING CONTRACTOR SHALL DEMONSTRATE OPERATION OF SYSTEM TO FULL SATISFACTION OF TENANT, SHALL BALANCE AIR FLOW IN ACCORDANCE WITH AIR QUANTITIES ON DRAWINGS AND SHALL RECORD VOLUME READINGS IN ACCORDANCE WITH ASHRAE AND PROVIDE SAME TO TENANT. OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE OWNER THAT INCLUDES AT LEAST THE FOLLOWING INFORMATION: A. EQUIPMENT CAPACITY (INPUT AND OUTPUT) AND REQUIRED MAINTENANCE ACTIONS. B. EQUIPMENT OPERATION AND MAINTENANCE MANUALS. C. HVAC SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL SEQUENCE DESCRIPTIONS; DESIRED OR FIELD- DETERMINED SET POINTS MUST BE PERMANENTLY RECORDED ON CONTROL DRAWINGS, AT CONTROL DEVICES, OR, FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING COMMENTS. D. COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. DRAWINGS THIS CONTRACTOR SHALL SUBMIT 4 COPIES OF RECORD DRAWINGS SHOWING EXACT LOCATIONS OF THE UNIT, DUCTS, DIFFUSERS, ETC., FOR FUTURE REFERENCE. , ve-,....-.....---.....-.....-.....--..........--.....-4.4-QQNIENIAIMMABY.4.--....---......--....---......--.....--...---,...--... DESIGN COOLING DESIGN HEATING. .. COOLING DATA AT Jan 0900 .:: COOLING OA DB /:WB 55.8 °F / 49.3 °F . HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F I 1 ZONE LOADS Details Sensible (BTU/hr) Latent (BTUIhr) .... Details Sensible (BTU/hr) Latent (BTU/hr) 1 Window & Skylight Solar Loads 0 ft2 0 - 0 ft2 - - I Wall Transmission 0 ft2 0 - 0 ft2 0 - Roof Transmission 0 ft2 0 - 0 ft2 0 - Window Transmission 0 ft2 0 - 0 ft2 0 - Skylight Transmission 0 ft2 0 - 0 ft2 0 - Door Loads 0 ft2 0 - 0 ft2 0 - Floor Transmission 701 ft2 0 - 701 ft2 0 - Partitions 0 ft2 0 - 0 ft2 0 - I Ceiling 0 ft2 0 - 0 ft2 0 - Overhead Lighting 1146 W 1934 - 0 0 - Task Lighting 0 W 0 - 0 0 - Electric Equipment 500 W 1480 - 0 0 - N People 13 2024 2730 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 17884 2680 - 0 0 i Safety Factor 10% / 10% 2332 541 10% 0 0 1 >> Total Zone Loads 25654 5951 0 0 1 Zone Conditioning - 28385 5951 - 0 0 1 Plenum Wall Load 0% 0 - 0 0 - I I Plenum Roof Load 70% 0 - 0 0 - I Plenum Lighting Load 30% 1173 - 0 0 - Return Fan Load 1640 CFM 0 - 1640 CFM 0 - I Ventilation Load 0 CFM 0 0 0 CFM 0 0 Supply Fan Load 1640 CFM 1262 - 1640 CFM -1262 - Space Fan Coil Fans - 0 - - 0 - I Duct Heat Gain / Loss 5% 1283 - 5% 0 - I »Total System Loads 32103 '::' 5951 -1262 0 Central Cooling Coil - 32103 5951 - -1262 0 Central Heating Coil - 0 - - 0 - I > Total Conditioning 32103 5951 : -1262 0 Key: Positive values are clg Toads Negative values are htg Toads .:; Positive values are, htg Toads Negative values are clg loads City Name Tukwila Location Washington Latitude 47.3 Deg. Longitude 122.2 Deg. Elevation 138.0 ft Summer Design Dry -Bulb 85.0 °F Summer Coincident Wet -Bulb 65.0 °F Summer Daily Range 18.3 °F Winter Design Dry -Bulb 23.0 °F Winter Design Wet -Bulb 19.2 °F Atmospheric Clearness Number 1 05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 BTU/(hr-ft-°F) Local Time Zone (GMT +/- N hours) 8.0 hours Consider Daylight Savings Time No Simulation Weather Data N/A Current Data is User Modified Design Cooling Months January to December HVAC + SPRINKLER KEYED NOTES 0 ® EXISTING LANDLORD SUPPLY AIR MAIN WITH VOLUME DAMPER. ADJUST DUCTWORK AS REQUIRED FOR ACTUAL LOCATION OF LANDLORD'S SUPPLY AIR MAIN. COORDINATE WITH LANDLORD. ®EXISITNG VAV BOX TO REMAIN. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION AND CFM. ®EXISTING THERMOSTAT WITH SUB -BASE AND LOCKING COVER TO BE RELOCATED AS SHOWN. COORDINATE WITH ELECTRICAL CONTRACTOR. MOUNTING HEIGHT 48" A.F.F. ® EXISTING SPRINKLER SYSTEM MAIN. FIELD VERIFY EXACT SIZE AND LOCATION. ® PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEAD AS REQUIRED (TYP). COORDINATE EXACT LOCATION WITH NEW CEILING FIXTURES AND LIGHTS. MODIFY SUPPLY PIPING AS REQUIRED. ® EXISTING SUPPLY AIR DUCT TO REMAIN. INSPECT AND REPAIR/REPLACE DUCT AND/OR INSULATION AS REQUIRED. ® NEW LOW PRESSURE SUPPLY AIR DUCT WITH 2" THICK EXTERNAL INSULATION (MIN. R-5) SUPPLIED AND INSTALLED BY MECHANICAL CONTRACTOR. PROVIDE TRANSITIONS AS REQUIRED. DUCT DIMENSIONS ARE CLEAR INTERNAL AIR PATH DIMENSIONS. HOLD ALL DUCTWORK AS HIGH AS POSSIBLE AND/OR PRACTICAL IN JOIST SPACE. ® PROVIDE AND INSTALL NEW MANUAL VOLUME DAMPER AT ALL DIFFUSERS (TYPICAL). ® 6" CLEAR HEIGHT ABOVE DEMISING WALLS TO BE USED AS PASSAGE FOR RETURN AIR BACK TO MALL'S ROOFTOP UNIT. .0 NEW CEILING CASSETTE MINI DUCTLESS AR HANDLING UNIT SUPPLIED AND INSTALLED BY HVAC CONTRACTOR FOR STOCK AREA. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION. 0 NEW MINI CONDENSING UNIT SUPPLIED AND INSTALLED BY HVAC CONTRACTOR. MOUNT ABOVE STOCK CEILING WITH UNISTRUT SUPPORT SYSTEM. SEE SCHEDULE AND DETAIL FOR ADDITIONAL INFORMATION. 12 NEW REFRIGERANT LIQUID AND SUCTION LINES ROUTED TO CONDENSING UNIT. COORDINATE ROUTING WITH OTHER FIELDS. INSULATE AS REQUIRED. SEE SCHEDULE FOR PIPE SIZES. 13 CONDENSATE DRAIN FROM NEW AIR HANDLING UNIT PROVIDED AND INSTALLED BY HVAC CONTRACTOR. PROVIDE CONDENSATE PUMP IF REQUIRED, P-TRAP, AND DISCHARGE INTO MOP SINK AS REQUIRED. 0 PROVIDE AND INSTALL NEW WALL MOUNT PROGRAMMABLE THERMOSTAT SET 3T. HIGHER THAT THE THERMOSTAT FOR VAV-1. SEE NEW CASSETTE AIR HANDLING UNIT SCHEDULE. MECHANICAL CONTRACTOR'S NOTES ALL OF THE MECHANICAL & SPRINKLER WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THE CONTRACTORS SHALL VISIT THE JOB SITE AND VERIFY ALL EXISTING CONDITIONS RELATED TO THE WORK PRIOR TO BIDDING. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE OWNER OR HIS REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT. THE SUBMISSION OF THE PRO- POSALS SHALL BE CONSIDERED AS EVIDENCE THAT THE CONTRACTORS HAVE VISITED THE SITE. NO EXTRA PAYMENTS WILL BE ALLOWED, DUE TO EXTRA WORK MADE NECESSARY BY THE CONTRACTOR'S FAILURE TO VISIT THE JOB SITE. MECHANICAL GENERAL NOTES PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT THE SITE AND THOROUGHLY INSPECT EXISTING CONDITIONS TO ENSURE THAT WOR< REPRESENTED ON DRAWINGS CAN BE INSTALLED AS INDICATED. COORDINATE DISCREPANCIES BETWEEN DOCUMENTS AND FIELD CONDITIONS WITH THE TENANT OR HIS AUTHORIZED AGENT. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. ARRANGE WITH LOCAL AND STATE AUTHORITIES AND UTILITY COMPANIES FOR PERMITS, FEES, AND SERVICE CONNECTIONS FOR TEMPORARY AND PERMANENT WATER, SANITARY SEWER, STORM AND INDUSTRIAL WASTE SERVICES IF APPLICABLE, VERIFYING LOCATIONS AND ARRANGEMENT, AND PAY ALL CHARGES INCLUDING INSPECTIONS. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND ARE INTENDED TO ENCOMPASS A SYSTEM THAT WILL NOT INTERFERE WITH THE STRUCTURAL AND ARCHITECTURAL DESIGN OF THE BUILDING. COORDINATE WORK TO AVOID INTERFERENCE BETWEEN PIPING, EQUIPMENT, ARCHITECTURAL, AND STRUCTURAL WORK. NO COMPONENTS MAY BE ABANDONED IN PLACE. ALL COMPONENTS THAT ARE NOT REUSED MUST BE REMOVED AND DISPOSED OF. COORDINATE DISPOSAL OF ALL REMOVED EQUIPMENT WITH THE LANDLORD. PROVIDE THE ENTIRE OPERATING SYSTEM AND ITS COMPONENT ITEMS OF EQUIPMENT FREE OF OBJECTIONABLE VIBRATION OR NOISES. REFER TO ASHRAE HANDBOOK FOR RECOMMENDED NOISE CRITERIA (NC) UNLESS OTHERWISE NOTED. STATICALLY AND DYNAMICALLY BALANCE ROTATING EQUIPMENT, AND MOUNT OR FASTEN SO NO VIBRATION IS PRODUCED OR TRANSMITTED TO OR THROUGH THE BUILDING. IF OBJECTIONABLE NOISE OR VIBRATION IS PRODUCED OR TRANSMITTED TO OR THROUGHOUT THE BUILDING STRUCTURE BY EQUIPMENT, PIPING, DUCTS OR OTHER PARTS OF WORK, RECTIFY SUCH CONDITIONS AT NO ADDITIONAL COMPENSATION. PROVIDE ADDITIONAL BALANCING DEVICES REQUIRED FOR COMPLETE SYSTEM BALANCING INCLUDING BUT NOT LIMITED TO VOLUME DAMPERS, VALVES, AND SHEAVES OR PULLEYS AT FANS. VERIFY THE SIZE, LOCATION, AND CONDITION OF THE EXISTING PIPING BUILDING MANAGEMENT SYSTEM CONNECTION POINTS, AND OUTSIDE AIR CONNECTIONS. REPLACE EXISTING COMPONENTS IF THEY ARE INADEQUATE FOR THE NEW REQUIREMENTS. COORDINATE ACCESS TO LANDLORD'S EQUIPMENT (VAV BOXES, FIRE DAMPERS, VOLUME DAMPERS, ETC) WITH LANDLORD'S REPRESENTATIVE AND G.C. G.C. TO PROVIDE AND INSTALL ACCESS PANEL(S) AS REQUIRED. SPRINKLER HEAD NOTES: SPRINKLER HEADS SHALL BE PLACED A MINIMUM OF 18" FROM FACE OF STOCKROOM SHELVING. COORDINATE PLACEMENT WITH ARCHITECTURAL DRAWINGS AND GENERAL CONTRACTOR. ALL SPRINKLER HEADS AT STOREFRONT GYP. BOARD CEILINGS SHALL BE 100% RECESSED, CONCEALED TYPE. CAPS SHALL MATCH CEILING COLOR. SPRINKLER HEADS IN LAY -IN CEILINGS SHALL BE SEMI -RECESSED CHROME WITH CHROME TRIM. ALL HEADS TO BE CENTERED IN CEILING TILES. ALL SPRINKLER HEADS SHALL BE UL LABELED. LANDLORDS NOTES HVAC SYMBOLS LEGEND R.A.G. RETURN AIR GRILLE 1 SUPPLY AIR DIFFUSER Z RETURN AIR GRILLE DIFF. DIFFUSER CONDENSATE DRAIN LINE R.D. REFRIGERANT DISCHARGE LINE M.D. MANUAL DAMPER -D- R.S. REFRIGERANT SUCTION LINE M MOTORIZED DAMPER F.C. FLEXIBLE CONNECTION 0.A. OUTDOOR AIR S SMOKE DETECTION DEVICE (t)AIR DEVICE TYPE R.A. RETURN AIR Q THERMOSTAT AIR VOLUME IN S.A. SUPPLY AIR CUBIC FEET/MNUT (CFM) T.E. TOILET EXHAUST SD SMOKE DETECTOR 0 SPRINKLER HEAD EXISTING VAV BOX SCHEDULE (VAV) MANUFACTURER MODEL NO. MINIMUM AIR CFM TOTAL CFM INLET SIZE DISCHARGE SIZE BASE UNIT WEIGHT TRANE VPFC12 200 3.1000 12" 19"x16" 85 LBS COOLING CAPACITY HEATING CAPACITY FAN SIZE FAN HP VOLTS PH HZ FLA REMARKS OUTSIDE AIR PROVIDED THROUGH MALL UNIT SERVING VAV. 3 20 100 BTUH N/A 3SQ 1/3 115 1 60 5.5 NEW HANDLING UNIT SCHEDULE (AHU-1) CASSETTE AIR MANUFACTURER MODEL NO. VOLTS HZ PH MCA TOTAL CFM FAN MOTOR (TONS)SIZE BASE WEIGHT UNIT MITSUBISHI PLA-A18BA 208 60 1 1 640 50 W 1.5 49 LBS DIMENSIONS W x H x D inches ACCESSORIES REMOTE CONTROLLER PAR-21MAA 33-1/16" x 10-3/16" x 33-1/16" 1) WIRED PROGRAMMABLE NEW CONDENSING UNIT SCHEDULE (CU-1) MANUFACTURER MODEL NO. REFRIG. VOLTAGE PH HZ MCA SIZE (TONS) BASE UNIT WEIGHT LIQUID LINE SUCTION LINE MITSUBISHI PUY-A18NHA 410A 208 1 60 15 1.5 97 LBS 1/4"0.D. 1"O.D. COMBINED CAPACITY SEER REMARKS REFER TO MANUFACTURER'S DIRECTION FOR SIZES OF LIQUID AND SUCTION LINES PER ACTUAL FIELD DISTANCES. COOLING 18,000 BTUH 13 6 • 1. LANDLORD PROVIDED A TENANT FIRE SERVICE MAIN WITH BRANCH PIPING STUBBED INTO EACH TENANT'S FILE COPY SPACE. LANDLORD'S SPRINKLER SYSTEM IS DESIGNED PER ORDINARY HAZARD GROUP 2 AND THE LATEST REQUIREMENTS OF NFPA-13. NO ISOLATION VALVES WILL BE PROVIDED OR PERMITTED. Permit No. 2. TENANT SHALL CONNECT A FIRE SPRINKLER SYSTEM TO LANDLORD'S SPRINKLER SYSTEM WITHIN THE DEMISED 0 0 EL 7 EX 12" 0 PREMISES USING APPROVED MECHANICAL FITTINGS. TENANT SHALL PROVIDE AND INSTALL ALL BRANCH PIPLIIIG AND SPRINKLERS REQUIRED TO COMPLETE THE SPRINKLER SYSTEM WITHIN THE TENANT SPACE. TENANT'S an review approval is subject to errors and omissi4ri. SPRINKLER SYSTEM DESIGNS SHALL BE BASED UPON THE REQUIREMENTS OF THE STATE OF WASHINGTON sr� al of construction documents does not authorizer', THE CITY OF TUKWILA FIRE DEPARTMENT. TENANT SHALL ENGAGE THE SERVICES OF A LANDLORD PREFER' :�vi�etion of anyadoptedi FIRE SPRINKLER CONTRACTOR TO DESIGN, PERMIT AND INSTALL TENANT'S FIRE SPRINKLER SYSTEM IN code or ordinance. Re' s ACCORDANCE WITH THE BASE BUILDING ACCORDING TO ORDINARY HAZARD GROUP 2 AND THE LATEST of appl ovedBy.� Field Copy and cone�ditions1(� is acknowledg .' 1 REQUIREMENTS OF NFPA-13. 3. ALL SPRINKLER HEADS IN THE FORWARD SELLING AREA ARE TO BE CONCEALED POP OFF COVER TYPE. ^<'O jf 4. ALL SUPPORTS SHALL BE FROM STRUCTURAL BEAMS AND JOISTS, NOT FROM FLOOR OR ROOF DECK ABOVE. 5. TENANT'S CONTRACTOR SHALL INSTALL AN INSPECTORS TEST CONNECTION, PIPED TO A FLOOR SINK, MOUNTED Date: ( C --5 --- lS'' 3'-O" A.F.F.. INSTALL A 1" CORROSION RESISTANT SHUT-OFF VALVE. 6. TENANT SHALL INSTALL A VANE TYPE WATER FLOW DETECTOR IN THE MAIN SPRINKLER LINE IMMEDIATELY AFTER CONNECTION TO THE LANDLORD'S MAIN, WHICH IS CONNECTED TO THE LANDLORD'S FIRE ALARM SYSTEM. BUILDING DIVISION City of Tukwila 'C7 • V VAV-1 /� --.1111111.1 cV w \SP,/1 . 8'o I NE %/Fi "I AHU ''A W� (TYP) ;3 • u o.: MECHANICAL PLAN SCALE yr - 1-0' O l0 TEAVANA 2401 Utah Avenue South Seattle, Washington 98134 (206) 318-1575 THESE DRAWINGS AND SPECIFICATIONS ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORP. WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT AS STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. THIS DRAWING PREPARED UNDER MY SUPERVISION, AND I DISCLAIM ANY RESPONSIBILITY FOR THE EXISTING BUILDING, CONSTRUCTION ELEMENTS, SITE CONDITIONS, OR ANY DOCUMENT WHICH DOES NOT BEAR MY SEAL. 6897 REGISTE ARCHIT FREDERICK J. GOGLIA STATE OF WASHINGTON �1 _ Architect: Frederick Goglia ARC VISION, INC. 1950 CRAIG RD. SUITE 300 • ST. LOUIS, MO 63146 Rev Date 2 oq/I5/I5 Revision Schedule ;AP . rD :. 5 �......._.SEP-..3..Q 2015.... U EL -DING -DIVISION, ION,REC. CITY OF TUKWILA SEP 2 8.2015 PERMIT CENTER REVISIONS i change all be made to the scope of workHhout prior approval of TukBuilding Divisien. : Revisioill require a new planigibmittai may incZ additional plan revises. 2 LLI Uiii _ E ca I"-' U D 10O �/� 0 vJ Project Address: N Q U � > Tjk O U 00(3 gal -4 I� - co c Project #: Store #: Project #: Issue Date: Design Manager: LEED® AP: 150384 28357 67553-002 08/07/15 LISA DOYLE N/A Construction Documents: SLP Checked by: SLP Sheet Title: MECHANICAL PLAN Scale: As noted Sheet Number: M-100 Date/Time Stamp MECHANICAL SPECIFICATIONS ORDINANCES. PERMITS. AND CERTIFICATES ALL WORK UNDER THIS DIVISION OF THE SPECIFICATIONS SHALL BE INSTALLED IN FULL ACCORDANCE WITH ALL LAWS, ORDINANCES AND REGULATIONS OF ALL GOVERNMENTAL AUTHORITIES (LOCAL, STATE, AND FEDERAL) HAVING JURISDICTION WHICH IN ANY WAY WILL AFFECT THIS WORK. THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED BY THE FOREGOING GOVERNMENTAL AUTHORITIES. ALL WORK SHALL BE INSTALLED IN FULL ACCORDANCE WITH REGULATIONS OF THE UNDERWRITERS HAVING JURISDICTION. VISIT JOB SITE VISIT JOB SITE AND BE FAMILIAR WITH LANDLORD'S REQUIREMENTS. NO ALLOWANCE WILL BE MADE FOR EXTRAS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE ALL CONDITIONS IMPOSED BY THE LANDLORD OR OTHER AUTHORITIES. GUARANTEE ALL LABOR AND MATERIAL FURNISHED UNDER THIS CONTRACT WILL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY THE TENANT. DURING THIS TIME, THIS CONTRACTOR SHALL REPAIR ALL LEAKS AND CORRECT ALL DISCREPANCIES WITH CODES OR THE SPECIFICATIONS AT HIS OWN EXPENSE DUCTWORK PRESSURE CLASS: 1" W.G., SEAL CLASS: B, ALL NEW SUPPLY AIR DUCTS SHALL BE MADE OF GALVANIZED SHEET METAL WRAPPED WITH 2" OF INSULATION (UNLESS OTHERWISE NOTED). NEW DUCTWORK SHALL BE INSTALLED ACCORDING TO SMACNA AND ASHRAE CURRENT STANDARDS DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT/ENGINEER. ALL DUCTS WILL BE MADE AIRTIGHT WITH THE USE OF APPROVED DUCT JOINTS, CAULKING AND SHEET METAL SCREWS. ALL DUCT TAPE OR SIMILAR MATERIALS WILL BE REJECTED BY THE TENANT. NO GLASS FIBER OR SIMILAR MATERIALS WILL BE ACCEPTED AS A SUBSTITUTE FOR SHEET METAL DUCTWORK. FLEXIBLE INSULATED, ROUND DUCT WILL BE PERMITTED FOR FINAL CONNECTIONS TO DIFFUSERS AND OUTLETS PROVIDED THAT IN NO CASE SHALL THIS FLEXIBLE DUCT EXCEED 5'-0" IN LENGTH. CONNECTIONS BETWEEN DIFFUSERS AND OUTLETS, AND BETWEEN FLEXIBLE DUCT AND SHEET METAL DUCTS, SHALL BE MADE WITH HOSE CLAMPS, OR COLLARS SECURED WITH SHEET METAL SCREWS. SHORT RADIUS BEND WILL BE MADE WITH ADJUSTABLE SHEET METAL ELBOWS. DO NOT ATTEMPT SHORT RADIUS BENDS USING FLEXIBLE DUCT. ALL JOINTS, LONGITUDINAL AND TRANSVERSE SEAMS, AND CONNECTIONS IN DUCTWORK MUST BE SECURELY SEALED USING WELDMENTS; MECHANICAL FASTENERS WITH SEALS, GASKETS, OR MASTICS; MESH AND MASTIC SEALING SYSTEMS; OR TAPES. TAPES AND MASTICS MUST BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A OR UL 181B. ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND CONNECTIONS OF SUPPLY AND RETURN DUCTS OPERATING AT STATIC PRESSURES LESS THAN OR EQUAL TO 2" W.G. SHALL BE SECURELY FASTENED AND SEALED WITH WELDS GASKETS, MASTICS (ADHESIVES), MASTIC —PLUS —EMBEDDED FABRIC SYSTEMS OR TAPES INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. MECHANICAL FASTENERS AND SEALS, MASTICS, OR GASKETS MUST BE USED WHEN CONNECTING DUCTS TO FANS AND OTHER AIR DISTRIBUTION EQUIPMENT. INSULATION SUPPLY DUCTWORK CONCEALED ABOVE CEILING SHALL HAVE 2" FIBERGLASS "Owens—Corning" DUAL TEMP TYPE 100 WITH REINFORCED ALUMINUM FOIL FACING, APPLIED WITH ADHESIVE AND STRAPPED 8'-0" ON CENTERS WITH STICK CLIPS. AIR DISTRIBUTION CEILING OUTLETS, REGISTER AND GRILLES SHALL BE MADE BY TITUS COMPANY OF SIZE AND TYPE SHOWN ON THE DRAWINGS AND ACCORDING TO THE AIR DEVICE SCHEDULE WITH BAKED WITH ENAMEL FINISH, UNLESS OTHERWISE NOTED. EACH OUTLET SHALL BE COMPLETE WITH INTEGRAL OPPOSED BLADE DAMPER. AIR BALANCE WHEN THE AIR DISTRIBUTION SYSTEM IS 100% COMPLETE ENTIRE SYSTEM MUST BE BALANCED TO THE AIR QUANTITIES AS INDICATED ON THE PLANS, IN ACCORDANCE WITH THE AABC OR NEBB SPECIFICATIONS. REPORTS MUST BE SUBMITTED (4) COPIES FOR EACH SYSTEM FOR APPROVAL TO THE TENANT AND ARCHITECT. COPY OF REPORT MUST ALSO BE SUBMITTED TO MALL LANDLORD. BALANCING COMPANY SHALL BE AN INDEPENDENT COMPANY AFFILIATED WITH THE AMERICAN AIR BALANCING COUNCIL. TESTING AND ADJUSTING CONTRACTOR SHALL DEMONSTRATE OPERATION OF SYSTEM TO FULL SATISFACTION OF TENANT, SHALL BALANCE AIR FLOW IN ACCORDANCE WITH AIR QUANTITIES ON DRAWINGS AND SHALL RECORD VOLUME READINGS IN ACCORDANCE WITH ASHRAE AND PROVIDE SAME TO TENANT. OPERATION AND MAINTENANCE DOCUMENTATION MUST BE PROVIDED TO THE OWNER THAT INCLUDES AT LEAST THE FOLLOWING INFORMATION: A. EQUIPMENT CAPACITY (INPUT AND OUTPUT) AND REQUIRED MAINTENANCE ACTIONS. B. EQUIPMENT OPERATION AND MAINTENANCE MANUALS. C. HVAC SYSTEM CONTROL MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL SEQUENCE DESCRIPTIONS; DESIRED OR FIELD— DETERMINED SET POINTS MUST BE PERMANENTLY RECORDED ON CONTROL DRAWINGS, AT CONTROL DEVICES, OR, FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING COMMENTS. D. COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. DRAWINGS THIS CONTRACTOR SHALL SUBMIT 4 COPIES OF RECORD DRAWINGS SHOWING EXACT LOCATIONS OF THE UNIT, DUCTS, DIFFUSERS, ETC., FOR FUTURE REFERENCE. LOAD COMPONENT SUMMARY DESIGN COOLING DESIGN HEATING COOLING DATA AT Jan 0900 COOLING OADa/WB 55.8°F/49.3°F HEATING':DATA AT DES HTG HEATING OA DB / WB .. 23�0 °F / 19 2 °F Sensible (BTU/hr) Latent (BTU/hr) Details Sensible (BTU/hr) Latent (BTU/hr) Window & Skylight Solar Loads 0 ft2 0 0 ft2 Wall Transmission 0 ft2 0 0 ft2 0 Roof Transmission 0 ft2 0 0 ft2 0 Window Transmission 0 ft2 0 0 ft2 0 Skylight Transmission 0 ft2 0 0 ft2 0 Door Loads 0 ft2 0 0 ft2 0 Floor Transmission 701 ft2 0 701 ft2 0 Partitions 0 ft2 0 0 ft2 0 Ceiling 0 ft2 0 0 ft2 0 Overhead Lighting 1111 W 1874 0 0 Task Lighting 0w 0 0 0 Electric Equipment 0w 0 0 0 People 13 2024 2730 0 0 0 Infiltration 0 0 0 0 Miscellaneous 18194 2680 0 0 Safety Factor »;Total Zone Loads 10% / 10% 2209 24302 541 5951 10% 0 0 0 0 Zone Conditioning 26582 5951 0 0 Plenum Wall Load 0% 0 0 0 Plenum Roof Load 0% 0 0 0 Plenum Lighting Load 30% 1137 0 0 Return Fan Load 1565 CFM 0 1565 CFM 0 Ventilation Load 0 CFM 0 0 0 CFM 0 0 Supply Fan Load 1565 CFM 1262 1565 CFM -1262 Space Fan Coil Fans 0 0 Duct Heat Gain / Loss 5% 1215 5% 0 » Total System Loads 30.197 5951 -1262 Central Cooling Coil 30197 5951 -1262 0 Central Heating Coil 0 0 » Total Conditioning 30197 5951 -1262 Key Positive values are' clg loads Negative values are htg:loads Positive values are htg.loads Negative values are clg loads WEATH ER City Name Tukwila Location Washington Latitude 47.3 Longitude 122.2 Elevation 138.0 Summer Design Dry -Bulb 85.0 Summer Coincident Wet -Bulb 65.0 Summer Daily Range 18.3 Winter Design Dry -Bulb 23.0 Winter Design Wet -Bulb 19.2 1 05 Atmospheric Clearness Number Average Ground Reflectance D.20 Soil Conductivity D.800 Local Time Zone (GMT +/- N hours) 8.0 Consider Daylight Savings Time No Simulation Weather Data N/A Current Data is User Modified Design Cooling Months January to December Deg. Deg. ft °F °F °F °F °F BTU/(hr-ft °F) hours HVAC + SPRINKLER KEYED NOTES 0 O EXISTING LANDLORD SUPPLY AIR MAIN WITH VOLUME DAMPER. ADJUST DUCTWORK AS REQUIRED FOR ACTUAL LOCATION OF LANDLORD'S SUPPLY AIR MAIN. COORDINATE WITH LANDLORD. 0 EXISITNG VAV BOX TO REMAIN. REFER TO SCHEDULE FOR ADDITIONAL INFORMATION AND CFM. O3 EXISTING THERMOSTAT WITH SUB —BASE AND LOCKING COVER TO BE RELOCATED AS SHOWN. COORDINATE WITH ELECTRICAL CONTRACTOR. MOUNTING HEIGHT 48" A.F.F. ® EXISTING SPRINKLER SYSTEM MAIN. FIELD VERIFY EXACT SIZE AND LOCATION. O5 PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEAD AS REQUIRED (TYP). COORDINATE EXACT LOCATION WITH NEW CEILING FIXTURES AND LIGHTS. MODIFY SUPPLY PIPING AS REQUIRED. ()EXISTING SUPPLY AIR DUCT TO REMAIN. INSPECT AND REPAIR/REPLACE DUCT AND/OR INSULATION AS REQUIRED. 0 0 0 10 NEW LOW PRESSURE SUPPLY AIR DUCT WITH 2" THICK EXTERNAL INSULATION (MIN. R-5) SUPPLIED AND INSTALLED BY MECHANICAL CONTRACTOR. PROVIDE TRANSITIONS AS REQUIRED. DUCT DIMENSIONS ARE CLEAR INTERNAL AIR PATH DIMENSIONS. HOLD ALL DUCTWORK AS HIGH AS POSSIBLE AND/OR PRACTICAL IN JOIST SPACE. PROVIDE AND INSTALL NEW MANUAL VOLUME DAMPER AT ALL DIFFUSERS (TYPICAL). 6" CLEAR HEIGHT ABOVE DEMISING WALLS TO BE USED AS PASSAGE FOR RETURN AIR BACK TO MALL'S ROOFTOP UNIT. NEW CEILING CASSETTE MINI DUCTLESS AIR HANDLING UNIT SUPPLIED AND INSTALLED BY HVAC CONTRACTOR FOR STOCK AREA. REFER TD SCHEDULE FOR ADDITIONAL INFORMATION. 0.NIEW MINI CONDENSING UNIT SUPPLIED AND INSTALLED BY HVAC CONTRACTOR. MOUNT ABOVE STOCK CEILING WITH UNISTRUT SUPPORT SYSTEM. SEE SCHEDULE AND DETAIL FOR ADDITIONAL INFORMATION. 0 NEW REFRIGERANT LIQUID AND SUCTION LINES ROUTED TO CONDENSING UNIT. COORDINATE ROUTING WITH OTHER FIELDS. INSULATE AS REQUIRED. SEE SCHEDULE FOR PIPE SIZES. 13 CONDENSATE DRAIN FROM NEW AIR HANDLING UNIT PROVIDED AND INSTALLED BY HVAC CONTRACTOR. PROVIDE CONDENSATE PUMP IF REQUIRED, P—TRAP, AND DISCHARGE INTO MOP SINK AS REQUIRED. 14 PROVIDE AND INSTALL NEW WALL MOUNT PROGRAMMABLE THERMOSTAT SET 3'F. HIGHER THAT THE THERMOSTAT FOR VAV-1. SEE NEW CASSETTE AIR HANDLING UNIT SCHEDULE. MECHANICAL CONTRACTOR'S NOTES ALL OF THE MECHANICAL & SPRINKLER WORK IS NOT NECESSARILY SHOWN OR NOTED ON THESE DRAWINGS. THE CONTRACTORS SHALL VISIT THE JOB SITE AND VERIFY ALL EXISTING CONDITIONS RELATED TO THE WORK PRIOR TO BIDDING. THOSE ITEMS NOT SHOWN OR NOTED, BUT ARE DEEMED NECESSARY FOR REMOVAL OR RELOCATION BY THE OWNER OR HIS REPRESENTATIVE, SHALL BE PART OF THIS CONTRACT. THE SUBMISSION OF THE PRO— POSALS SHALL BE CONSIDERED AS EVIDENCE THAT THE CONTRACTORS HAVE VISITED THE SITE. NO EXTRA PAYMENTS WILL BE ALLOWED, DUE TO EXTRA WORK MADE NECESSARY BY THE CONTRACTOR'S FAILURE TO VISIT THE JOB SITE. MECHANICAL GENERAL NOTES PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT THE SITE AND THOROUGHLY INSPECT EXISTING CONDITIONS TO ENSURE THAT WORK REPRESENTED ON DRAWINGS CAN BE INSTALLED AS INDICATED. COORDINATE DISCREPANCIES BETWEEN DOCUMENTS AND FIELD CONDITIONS WITH THE TENANT OR HIS AUTHORIZED AGENT. COORDINATE THE EXTENSION, MODIFICATION, FINAL CONNECTION AND TESTING OF ALL UTILITIES OR INTERFACED SYSTEMS WITH THE LANDLORD'S FIELD REPRESENTATIVE. ARRANGE WITH LOCAL AND STATE AUTHORITIES AND UTILITY COMPANIES FOR PERMITS, FEES, AND SERVICE CONNECTIONS FOR TEMPORARY AND PERMANENT WATER, SANITARY SEWER, STORM AND INDUSTRIAL WASTE SERVICES IF APPLICABLE, VERIFYING LOCATIONS AND ARRANGEMENT, AND PAY ALL CHARGES INCLUDING INSPECTIONS. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND ARE INTENDED TO ENCOMPASS A SYSTEM THAT WILL NOT INTERFERE WITH THE STRUCTURAL AND ARCHITECTURAL DESIGN OF THE BUILDING. COORDINATE WORK TO AVOID INTERFERENCE BETWEEN PIPING, EQUIPMENT, ARCHITECTURAL, AND STRUCTURAL WORK. NO COMPONENTS MAY BE ABANDONED IN PLACE. ALL COMPONENTS THAT ARE NOT REUSED MUST BE REMOVED AND DISPOSED OF. COORDINATE DISPOSAL OF ALL REMOVED EQUIPMENT WITH THE LANDLORD. PROVIDE THE ENTIRE OPERATING SYSTEM AND ITS COMPONENT ITEMS OF EQUIPMENT FREE OF OBJECTIONABLE VIBRATION OR NOISES. REFER TO ASHRAE HANDBOOK FOR RECOMMENDED NOISE CRITERIA (NC) UNLESS OTHERWISE NOTED. STATICALLY AND DYNAMICALLY BALANCE ROTATING EQUIPMENT, AND MOUNT OR FASTEN SO NO VIBRATION IS PRODUCED OR TRANSMITTED TO OR THROUGH THE BUILDING. IF OBJECTIONABLE NOISE OR VIBRATION IS PRODUCED OR TRANSMITTED TO OR THROUGHOUT THE BUILDING STRUCTURE BY EQUIPMENT, PIPING, DUCTS OR OTHER PARTS OF WORK, RECTIFY SUCH CONDITIONS AT NO ADDITIONAL COMPENSATION. PROVIDE ADDITIONAL BALANCING DEVICES REQUIRED FOR COMPLETE SYSTEM BALANCING INCLUDING BUT NOT LIMITED TO VOLUME DAMPERS, VALVES, AND SHEAVES OR PULLEYS AT FANS. VERIFY THE SIZE, LOCATION, AND CONDITION OF THE EXISTING PIPING BUILDING MANAGEMENT SYSTEM CONNECTION POINTS, AND OUTSIDE AIR CONNECTIONS. REPLACE EXISTING COMPONENTS IF THEY ARE INADEQUATE FOR THE NEW REQUIREMENTS. COORDINATE ACCESS TO LANDLORD'S EQUIPMENT (VAV BOXES, FIRE DAMPERS, VOLUME DAMPERS, ETC) WITH LANDLORD'S GENERAL CONTRACTOR/REPRESENTATIVE SPRINKLER HEAD NOTES: SPRINKLER HEADS SHALL BE PLACED A MINIMUM OF 18" FROM FACE OF STOCKROOM SHELVING. COORDINATE PLACEMENT WITH ARCHITECTURAL DRAWINGS AND GENERAL CONTRACTOR. ALL SPRINKLER HEADS AT STOREFRONT GYP. BOARD CEILINGS SHALL BE 100% RECESSED, CONCEALED TYPE. CAPS SHALL MATCH CEILING COLOR. SPRINKLER HEADS IN LAY —IN CEILINGS SHALL BE SEMI —RECESSED CHROME WITH CHROME TRIM. ALL HEADS TO BE CENTERED IN CEILING TILES. ALL SPRINKLER HEADS SHALL BE UL LABELED. LANDLORDS NOTES 1. LANDLORD PROVIDED A TENANT FIRE SERVICE MAIN WITH BRANCH PIPING STUBBED INTO EACH TENANT'S SPACE. LANDLORD'S SPRINKLER SYSTEM IS DESIGNED PER ORDINARY HAZARD GROUP 2 AND THE LATEST REQUIREMENTS OF NFPA-13. NO ISOLATION VALVES WILL BE PROVIDED OR PERMITTED. 2. TENANT SHALL CONNECT A FIRE SPRINKLER SYSTEM TO LANDLORD'S SPRINKLER SYSTEM WITHIN THE DEMISED PREMISES USING APPROVED MECHANICAL FITTINGS. TENANT SHALL PROVIDE AND INSTALL ALL BRANCH PIPING AND SPRINKLERS REQUIRED TO COMPLETE THE SPRINKLER SYSTEM WITHIN THE TENANT SPACE. TENANT'S SPRINKLER SYSTEM DESIGNS SHALL BE BASED UPON THE REQUIREMENTS OF THE STATE OF WASHINGTON AND THE CITY OF TUKWILA FIRE DEPARTMENT. TENANT SHALL ENGAGE THE SERVICES OF A LANDLORD PREFERRED FIRE SPRINKLER CONTRACTOR TO DESIGN, PERMIT AND INSTALL TENANT'S FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH THE BASE BUILDING ACCORDING TO ORDINARY HAZARD GROUP 2 AND THE LATEST REQUIREMENTS OF NFPA-13. 3. ALL SPRINKLER HEADS IN THE FORWARD SELLING AREA ARE TO BE CONCEALED POP OFF COVER TYPE. 4. ALL SUPPORTS SHALL BE FROM STRUCTURAL BEAMS AND JOISTS, NOT FROM FLOOR OR ROOF DECK ABOVE. 5. TENANT'S CONTRACTOR SHALL INSTALL AN INSPECTORS TEST CONNECTION, PIPED TO A FLOOR SINK, MOUNTED 3'-0" A.F.F.. INSTALL A 1" CORROSION FESISTANT SHUT—OFF VALVE. 6. TENANT SHALL INSTALL A VANE TYPE WATER FLOW DETECTOR IN THE MAIN SPRINKLER LINE IMMEDIATELY AFTER CONNECTION TO THE LANDLORD'S MAIN, WHICH IS CONNECTED TO THE LANDLORD'S FIRE ALARM SYSTEM. HVAC SYMBOLS LEGEND SUPPLY AIR DIFFUSER R.A.G. RETURN AIR GRILLE V RETURN AIR GRILLE R.D. REFRIGERANT DISCHARGE LINE CONDENSATE DRAIN LINE DIFF. DIFFUSER —D— R.S. REFRIGERANT SUCTION LINE M MOTORIZED DAMPER M.D. MANUAL DAMPER O.A. OUTDOOR AIR F.C. FLEXIBLE CONNECTION S SMOKE DEFECTION DEVICE R.A. RETURN AIR AIR DEVICE TYPE S.A. SUPPLY AIR 0THERMOSTAT AIR VOLUME IN T.E. TOILET EXHAUST SD SMOKE DETECTOR CUBIC FEET/MINUTE (CFM) EXISTING VAV BOX SCHEDULE (VAV) MANUFACTURER MODEL NO. MINIMUM AIR CFM TOTAL CFM INLET SIZE DISCHARGE SIZE BASE UNIT WEIGHT TRANE VPFC12 200 925 12" 19"x16" 85 LBS COOLING CAPACITY HEATING CAPACITY FAN SIZE FAN HP VOLTS PH HZ FLA REMARKS OUTSIDE AIR PROVIDED THROUGH MALL UNIT SERVING VAV. 18,981 BTUH N/A 3SQ 1/3 115 1 60 5.5 NEW HANDLING UNIT SCHEDULE (AHU-1) CASSETTE AIR MANUFACTURER MODEL NO. VOLTS HZ PH MCA TOTAL CFM FAN MOTOR SIZE (TONS) BASE UNIT WEIGHT MITSUBISHI PLA—A18BA 208 60 1 1 640 50 W 1.5 49 LBS DIMENSIONS W x H x. D inches ACCESSORIES REMOTE CONTROLLER PAR-21MAA 33-1/16" x 10-3/16" x 33-1/16" 1) WIRED PROGRAMMABLE NEW CONDENSING UNIT SCHEDULE (CU-1) MANUFACTURER MODEL NO. REFRIG. VOLTAGE PH HZ MCA SIZE (TONS) BASE UNIT WEIGHT LIQUID LINE SUCTION LINE MITSUBISHI PUY—A18NHA 410A 208 1 60 15 1.5 97 LBS %4'O.D. 3"O.D. COMBINED CAPACITY SEER REMARKS REFER TO MANUFACTURER'S DIRECTION FOR SIZES OF LIQUID AND SUCTION LINES PER ACTUAL FIELD DISTANCES. COOLING 18,000 H BTUH 14.2 VAV-1 0 t ;et LI EL 00 REVISIONS No changes shall be made to the Scope of work without prior approval of Tukwila Building Division. l NOTE: Revisions will require a new plan submitte► 'r nf :. i;; !ude additional plan rview fees EX 12"0 i r, EL 200 I\'•SPj/I r EX 8'" TY.P) (TYP) jl t<: isss 71 • MECHANICAL PLA SCAM 1/4' - ra TEAVANA 2401 Utah Avenue South Seattle, Washington 98134 (206) 318-1575 THESE DRAWINGS AND SPECIFICATIONS ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS CORP. WHICH IS THE OWNER OF THE COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A PROTOTYPICAL STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT AS STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. PI t it FIL CiP ' permsitNo,_M1 'OwO ons. )rite •eipt of approved Field Copy and oonditiona is ackno'.V.adgod: By: Data: City of Tukwila BUILDING DIVISION an review approval is subject to errors and omits proves of construction documents does not auth violation of any adopted code or ordinance. Re... THIS DRAWING PREPARED UNDER MY SUPERVISION, AND I DISCLAIM ANY RESPONSIBILITY FOR THE EXISTING BUILDING, CONSTRUCTION ELEMENTS, SITE CONDITIONS, OR ANY DOCUMENT WHICH DOES NOT BEAR MY SEAL. Architect: Frederick Goglia ARC VISION, INC. 1950 CRAIG RD. SUITE 300 • ST. LOUIS, MO 63146 Rev r Date Revision Schedule By Description ..-;..w.:: ,:::._.. -. :..:. —REVIEWED-FOR— CODE-COMPLIANCE ._................_..-_................_ APPROVED SEARA REEQUIP 7)-Tent 0 Mec r nical Elec.ri ;al 'Plun b ng --.12rbas Ping City of 't kwila I tiil_l rti'.a�J� IVI ION Project Name: LU 0 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA P E RAMU I GT 2;E 2N1:11T5ER 2 co 03 (15 03- 1.0 CLS Project Address: Project #: Store #: Project #: Issue Date: Design Manager: LEEDO AP: Construction Documents: SLP Checked by: 150384 08/07/15 LISA DOYLE N/A SLP Sheet Title: Scale: MECHANICAL PLAN As noted