Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M15-0119 - ANDOVER EXECUTIVE PARK - EXHAUST FAN
ANDOVER EXECUTIVE PARK 611 INDUSTRY DR M15-01 19 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 2523049008 611 INDUSTRY DR MECHANICAL PERMIT Project Name: ANDOVER EXECUTIVE PARK Permit Number: M15-0119 Issue Date: 10/5/2015 Permit Expires On: 4/2/2016 Owner: Name: Address: Contact Person: Name: Address: NCWP ANDOVER EXECUTIVE PARK 810 NW MARSHALLS ST #300 , PORTLAND, WA, 97209 ANDRIY HEICHENKO 1916 220TH ST SE , BOTHELL, WA, 98021 Contractor: Name: PACIFIC AIR CONTROL INC Address: 1916 220TH ST SE SUITE M101, BOTHELL, WA, 98021 License No: PACIFAC230P8 Lender: Name: Address: Phone: (206) 682-6393 Phone: Expiration Date: 10/1/2017 DESCRIPTION OF WORK: INSTALLATION OF ONE NEW EXHAUST FAN Valuation of Work: $1,100.00 Type of Work: NEW Fuel type: Fees Collected: $221.32 Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: Permit Center Authorized Signature: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Date: (Q s��.s I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does no es a to give authority to violate or cancel the provisions of any other state or local laws regulating co struction r the perf f work. I am authorized to sign and obtain this development permit ayio the co permit. Signature: Print Name: 14 �c.L`-f c✓ - 'DFr r2 Date: (a - J ^ ( This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 6: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 7: ***MECHANICAL PERMIT CONDITIONS*** 8: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 9: Manufacturers installation instructions shall be available on the job site at the time of inspection. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1800 MECHANICAL FINAL 0701 ROUGH -IN MECHANICAL Tenant Name: CITY OF TUKW. 1 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. t/i � D Project No. Date Application Accepted: Date Application Expires: or o ice use onl MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION King Co Assessor's Tax No.: 2523049008 Site Address: 611 Industry Drive Tukwila, WA 98188 Suite Number: 611 Floor: 1 Andover Executive Park PROPERTY OWNER Name: NCWP ANDOVER EXECUTIVE PARK* Address: 810 NW MARSHALLS ST #300 City: Portland State: OR Zip: 98209 CONTACT PERSON — person receiving all project communication Name: Andriy Heichenko Address: 1916 220th St SE City: Bothell State: WA Zip: 98021 Phone: (206) 682-6393 Fax: Email: AndriyH@pacificaircontrol.com New Tenant: ❑ Yes O..No MECHANICAL CONTRACTOR INFORMATION Company Name: Pacific Air Control, Inc Address: 1916 220th St Se City: Bothell State: WA Zip: 98021 Phone: (206) 682-6393 Fax: Contr Reg No.: PACIFAC230P8 Exp Date: 10/01/2015 Tukwila Business License No.: BUS-0995096 Valuation of project (contractor's bid price): $ 1,100 Describe the scope of work in detail: Installation of one new exhaust fan Use: Residential: New ❑ Replacement ❑ Commercial: New Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications\Forms-Applications On Line \20I I Applications\Mechanical Permit Application Revised 0-9-1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >l00k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct 1 Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUJ!6RIZED A NT: Signature: �t ' Date: 09/15/2015 Print Name: Andriy Heichenko Day Telephone: (206) 949-8068 Mailing Address: 1916 220th St SE Bothell WA 98021 City State Zip \Applications\Forms-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-1 I.docx Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $221.32 M15-0119 Address: 611 INDUSTRY DR Apn: 2523049008 $221.32 MECHANICAL $212.81 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $137.75 PLAN CHECK FEE R000.322.102.00.00 0.00 $42.56 TECHNOLOGY FEE $8.51 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6198 R000.322.900.04.00 0.00 $8.51 $221.32 Date Paid: Friday, September 18, 2015 Paid By: PACIFIC AIR Pay Method: CHECK 23668 Printed: Friday, September 18, 2015 11:23 AM 1 of 1 CSYSTEMS INSPECTION RECORD Retain a copy with permit INS ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project:40/ ns44, Type of Inspection: Address: J 6 11,��6-ir� Date Called: % 11 / Special Instructions: 4,1 �J cA- 2D �q Date Wanted: I 1 ter Requester: Phone No: y a --9-1/6 --MS" pproved per applicable codes. Corrections required prior to approval. COMMENTS: OK Inspector: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. v INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 11415-0/1 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Proje IHA-rker l eft Type of Insp tjpn: 1eCh tlY*Z Ad/dress: _ / k// airciic/ /r Date Called: �//� Special Instructions: / Date Wanted: �, �% f/ Requester: Phone No: Approved per applicable codes. C ctions required prior to approval. COMMENTS: Inspector: 6.-At57.7(4 Date: //' REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. F� INSPECTION RECORD Retain a copy with permit I ' SPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P ojec �x ear( tie TypKof Inspection_na0 ' Address: b r f YPry Date Ca d: Special Instructions: f ti< g©9 /1-111 Date Wanted: to-6 ` 0-- a.m. p.m. Requeste(: fr cal &V C Lt CA. Phone No: —zit 6 --ct239J Approved per applicable codes. El Corrections required prior to approval. MENTS: "ctouliqr-f nspector: �!I Date( REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0119 DATE: 09/21/15 PROJECT NAME: ANDOVER EXECUTIVE PARK SITE ADDRESS: 611 INDUSTRY DR X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: BOG 046 Building Division Public Works L'1�1 /Rik m/A-- Fire Prevention n Planning Division Structural Permit Coordinator PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/22/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/20/15 Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PACIFIC AIR CONTROL INC Page 1 of 2 Home Inicio en Esj>aiiol Contact. Search L&I SEARCH A-Z Index Help My Secure 1. &I Safety Claims & Insurance Workplace Rights Trades & Licensing 0 Washington State Department of Labor & Industries PACIFIC AIR CONTROL INC Owner or tradesperson Principals RUTTAN, GARY JAMES, PRESIDENT CRAWFORD, LARRY C, SECRETARY (End: 10/05/2011) Doing business as PACIFIC AIR CONTROL INC WA UBI No. 601 298 907 1916 220TH ST SE STE 101 BOTHELL, WA98021-8427 206-682-6393 SNOHOMISH County Business type Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties HeatingNent/Air-Conditioning and Refrig (HVAC/R) License no. PACIFAC230P8 Effective — expiration 10/28/1977-10/01/2017 Bond ................. TRAVELERS CAS & SURETY Bond account no. 104920215 Active. Meets current requirements. $6,000.00 Received by L&I Effective date 05/09/2007 05/26/2007 Expiration date Until Canceled Insurance ........................... PHOENIX INSURANCE COMPANY THE $1,000,000.00 Policy no. 4TC07314N491PHX09 Received by L&I Effective date 06/18/2015 07/01/2010 Expiration date 07/01/2016 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601298907&LIC=PACIFAC230P8&SAW= 10/5/2015 PACIFIC AIR CONTROL INC No L&I tax debts are recorded for this contr license during the previous 6 year period, but somt is may be recorded by other agencies. Page 2 of 2 License Violations ........................................................ No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 378,249-03 ................................ Doing business as PACIFIC AIR CONTROL INC Estimated workers reported Quarter 2 of Year 2015 "51 to 75 Workers" L&I account representative T2 / CHRISTINA SUMMERS (360)902-5148 - Email: SUMC235@Ini.wa.gov Account is current. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Citation issue date 10/14/2009 Inspection no. 313656779 Location 6651 South 216th Kent, WA 98011 Violations © Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601298907&LIC=PACIFAC230P8&SAW= 10/5/2015 GENERAL NOTES ARCH / INTERIOR ABBREVIATIONS BUILDING SUMMARY PROJECT TEAM 1. CONTRACTOR SHALL COMPLY WITH THE CURRENT "GENERAL CONDITIONS," AND BUILDING STANDARDS AS PROVIDED BY THE BUILDING OWNER. 2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF DIFFERENT TRADES. 3. DO NOT SCALE DRAWINGS. CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS. 4. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE OWNER AND ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES SHOWN ON SHOP DRAWING ONLY WILL NOT SATISFY THIS REQUIREMENT. 5. ALL MODIFICATIONS, REQUIRING OWNER OR ARCHITECT APPROVAL WILL NOT BE VALID UNLESS AUTHORIZED IN WRITING BY OWNER AND/OR ARCHITECT. 6. WITHIN FIVE (5) BUSINESS DAYS OF START OF CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY IN WRITING BOTH THE ARCHITECT AND OWNER OF ANY ITEMS WHOSE ESTIMATED DELIVERY TO THE SITE WOULD BE LATER THAN THAT REQUIRED FOR TIMELY INSTALLATION IN THE CONSTRUCTION SEQUENCE SUBSTITUTION OF ALTERNATE ITEMS WITH SHORTER LEAD TIMES, PAYMENT OF RUSH FABRICATION OR DELIVERY CHARGES OUT OF SEQUENCE INSTALLATION, OR DELAY OF INSTALLATION OPTIONS TO BE AT THE SOLE APPROVAL OF OWNER OR ARCHITECT. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL WORK AND MATERIALS IN ACCORDANCE WITH THE LATEST LOCAL BUILDING CODES AND ORDINANCES. 8. CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND CONDITIONS AND SHALL REPORT ANY CONFLICTS OR QUESTIONS FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK. DO NOT SCALE THE DRAWINGS. 9. THE USE OF WORD "PROVIDE" SHALL ALWAYS MEAN, "FURNISH AND INSTALL, CONNECT, OR SECURE" AS REQUIRED. 10. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND TRADE ASSOCIATES ACCEPTED STANDARDS. 11. CONTRACTOR SHALL PROVIDE A WRITTEN CONSTRUCTION SCHEDULE. THIS SCHEDULE SHALL INCLUDE DELIVERY LEAD TIMES OF CONSTRUCTION ITEMS, AND START AND COMPLETION DATES OF EACH PHASE. THE CONTRACTOR SHALL UPDATE AND PROVIDE SUCH SCHEDULE ON A BIWEEKLY BASIS. 12. WORK MUST BE SCHEDULED WITH THE BUILDING MANAGEMENT TO AVOID DISRUPTION TO THE TENANTS. 13. ACCESS TO AND FROM THE PROJECT SITE, SPECIAL CONDITIONS, NOISY WORK, TIMING OF WORK, INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES, RELOCATION OF EXISTING EQUIPMENT, CASEWORK, FIXTURES, FITTINGS, ETC., MUST BE COORDINATED WITH THE BUILDING MANAGEMENT. 14. ADEQUATE CLEANUP, PROTECTION AND PLACEMENT OF ANY CEILING TILES AND/OR OTHER DISRUPTION TO THE ADJACENT TENANT IMPROVEMENTS MUST BE REPLACED BEFORE BUSINESS HOURS OF THAT TENANT IN ORDER THAT THE OCCUPANT WILL NOT BE INCONVENIENCED IN THE NORMAL CONTINUATION OF THEIR OFFICE HOURS. 15. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR SAID DAMAGE AT THEIR OWN EXPENSE. THIS INCLUDES ALL AREAS ON THE PREMISES SUCH AS: COMMON HALLWAYS, FREIGHT ELEVATOR VESTIBULES, ETC. 16. SCHEDULE THE USE OF THE ELEVATOR WITH BUILDING MANAGEMENT. 17. IIPON COMPLETION OF ALL CONSTRUCTION, THE CONTRACTOR SHALL SUPPLY THE LANDLORD WITH ONE SET OF "RECORD" AS -BUILT DRAWINGS. 18. ALL MATERIALS TO BE NEW UON. 19. PATCH ALL DISTURBED AND/OR DAMAGED AREAS AS REQUIRED TO ACCOMPLISH NEW WORK AND AS REQUIRED FOR FINISHED APPEARANCE. 20. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY BACKING, BLOCKING, AND FRAMING FOR LIGHT FIXTURES, ELECTRICAL FIXTURES, CASEWORK AND ALL OTHER ITEMS REQUIRING IT. 21. CONTRACTOR TO COORDINATE ALL FIRE ALARM WORK WITH BUILDING OWNER. 22. ALL PAINT AND FINISH MATERIAL COLORS SHALL MATCH ARCHITECT'S CONTROL SAMPLES AND REQUIRE ARCHITECT'S REVIEW PRIOR TO INSTALLATION. SUBMIT TO ARCHITECT THREE (3) COPIES FOR REVIEW. 23. CONTRACTOR SHALL FURNISH SHOP DRAWINGS FOR REVIEW ON CABINETWORK, MILLWORK AND ANY OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATION. SUBMIT TO ARCHITECT AT LEAST THREE (3) COPIES FOR REVIEW. 24. REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE DRAWINGS SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL. 25. THROUGHOUT THE DRAWINGS ARE ABBREVIATIONS WHICH ARE IN COMMON USE. THE LIST OF ABBREVIATIONS PROVIDED IS NOT INTENDED TO BE A COMPLETE LIST. THE ARCHITECT WILL DEFINE THE INTENT OF ANY IN QUESTION. ADJ AFF ALT ALUM APC - APPROX - ARCH ACT AV BLDG BOT CAB CL CLG • CLR COL CONC CONF DEMO DEPT DF DIA DI FF DIM DTL DW DWG EA EL ELEC ELEV EQ EQUIP EXT FA FD FE FEC FFE FIN - FLUOR - FLR _ FO - FOIC - FTI C FURR GA GC GL GWB HC HDW HM HR INCL INFO INSUL LAV LF MATL MAX MDF ADJUSTABLE ABOVE FINISH FLOOR ALTERNATE ALUMINUM ACOUSTICAL PANEL CEILING APPROXIMATE ARCHITECTURAL ACOUSTICAL CEILING TILE AUDIO VISUAL BUILDING BOTTOM CABINET CENTER LINE CEILING CLEAR COLUMN CONCRETE CONFERENCE DEMOLITION DEPARTMENT DRINKING FOUNTAIN DIAMETER DIFFUSER DIMENSION DETAIL DISHWASHER DRAWING EACH ELEVATOR ELECTRICAL ELEVATION EQUAL EQUIPMENT EXTERIOR FIRE ALARM FLOOR DRAIN FIRE EXTINGUISHER FIRE EXTINGUISHER CABINET FINISH FLOOR ELEVATION FINISH FLUORESCENT FLOOR FACE OF FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FURNISHED BY TENANT, INSTALLED BY CONTRACTOR FURRING GAUGE GENERAL CONTRACTOR GLASS GYPSUM WALLBOARD HANDICAPPED HARDWARE HOLLOW METAL (STEEL FRAME) HOUR INCLUDED OR INCLUDING INFORMATION INSULATION LAVATORY LINEAR FOOT MATERIAL MAXIMUM MEDIUM DENSITY FIBERBOARD MECH M EZZ M FR MIN MISC MTD MTL N/A NIC NTS OC OFF OPNG OVH D P PART PERF PERIM PERP PLAM PLYWD QTY (R) RA RCP REC REF REFR REL REV RM RO RTD SCHED SF SHT SIM SPEC SPKLR SPKR SQ STD STL STOR STRL STRUC SYMM TBD TEL TEMP THK TO TOS TYP UON UPS VCT VIF W/ WC WD W/0 - MECHANICAL - MEZZANINE - MANUFACTURER - MINIMUM - MISCELLANEOUS - MOUNTED - METAL - NOT APPLICABLE - NOT IN CONTRACT - NOT TO SCALE - ON CENTER - OFFICE - OPENING - OVERHEAD - PAINT - PARTITION - PERFORATED - PERIMETER - PERPENDICULAR - PLASTIC LAMINATE - PLYWOOD - QUANTITY - RELOCATED - RETURN AIR - REFLECTED CEILING - RECESSED - REFERENCE - REFRIGERATOR - RELOCATE - REVISION OR REVISED - ROOM - ROUGH OPENING - RATED - SCHEDULE - SQUARE FEET/FOOT - SHEET - SIMILAR - SPECIFICATION - SPRINKLER - SPEAKER - SQUARE - STANDARD - STEEL - STORAGE - STRUCTURAL - STRUCTURAL - SYMMETRICAL - TO BE DETERMINED - TELEPHONE OR TELECOM - TEMPERED - THICKNESS - TOP OF - TOP OF SLAB - TYPICAL - UNLESS OTHERWISE NOTED - UNINTERRUPTED POWER SUPPLY - VINYL COMPOSITION TILE - VERIFY IN FIELD - - WATER CLOSET - WOOD - WITHOUT PLAN EGAL DESCRIPTION / PARCEL NO. PARCEL NUMBER: 0252304-9008 LEGAL DESCRIPTION: POR W 1 /2 OF SEC 25 & E 1/2 OF SEC 26 AS FOLG BEG AT E 1/4 COR SEC 26 TH N 88-06-42 W 105.84 FT TO TPOB TH N 01-47-28 E 2.45 FT TAP OF CURVE TH ALG A CURVE TO RGT RAD 410.28 FT THRU C/A OF 46-46-10 ARC DIST 334.90 FT TH N 48-33-38 E 188.36 FT TH ALG A CURVE TO RGT RAD 410.28 FT THRU C/A OF 72-16-35 ARC DIST 517.55 FT TO AN NXN WITH A LN BEARING S 56-38-20 E TH S 56-38-20 E ALG SD LN 69.93 FT TH S 48-44-23 E 71.30 FT TH S 45-09-27 E 9.91 FT TO WLY MGN OF JAMES CHRISTENSEN RD NO 1479 TH S 37-54-41 W 468.23 FT TH S 32-39-25 W 132.67 FT TH N 88-12-32 W 524.50 FT TH N 01-47-28 E 93.11 FT TO TPOB LESS UP RR OPER R/W 1. PROJECT ADDRESS: 617 INDUSTRY DRIVE, SUITE 611 TUKWILA, WA 98188 2. APPLICABLE CODES & ORDINANCES: 2012 INTERNATIONAL BUILDING CODE 2012 INTERNATIONAL MECHANICAL CODE 2012 INTERNATIONAL FUEL GAS CODE 2012 INTERNATIONAL FIRE CODE 2012 WASHINGTON STATE ENERGY CODE (WAC 51-11) 2012 UNIFORM PLUMBING CODE 2014 NATIONAL ELECTRICAL CODE 2012 WASHINGTON STATE AMENDMENTS 2009 ICC/ANSI 117.1 ACCESSIBLE & USABLE BUILDINGS AND FACILITIES 3. GENERAL BUILDING DESCRIPTION: TYPE OF CONSTRUCTION: TYPE VB FIRE RESISTIVE SYSTEM: NON-SPRINKLERED OCCUPANCY TYPE: F1 AND B, OFFICE 4. FIRE RESISTIVE CONSTRUCTION REQUIREMENTS: SHAFT ENCLOSURES: N/A EXIT STAIR ENCLOSURES: N/A CORRIDORS: N/A 5. EXITS: APPROXIMATE AREA OF CONSTRUCTION: 63 SQ. FT. TOTAL APPROXIMATE SUITE AREA: 2,336 SQ. FT. TOTAL APPROXIMATE FLOOR AREA: 15,174 SOFT OCCUPANT LOAD FACTOR: B=100; F1=500 NUMBER OF TOTAL PROPOSED OCCUPANTS: NO CHANGE NUMBER OF EXITS REQUIRED: 1 REQUIRED; 2 PROVIDED MINIMUM EGRESS WIDTH REQUIRED: 3'-8" 6. PROJECT DESCRIPTION: NON-STRUCTURAL INTERIOR TENANT IMPROVEMENT: INSTALLATION OF A SHOWER ROOM. ITE PLAN -NTS w w. 0• 4 INDUSTRY DRIVE. LOT 7 ARCHITECT/DESIGNER: Burgess Design, Inc. 1326 - 5th Avenue, Suite 400 Seattle, Washington 98101 Tel: 206.587.7120 Fax: 206.587.7122 ATTN: RANDY MORGAN BUILDING PROPERTY MANAGER: Scanlan Kemperbard Companies 617 Industry Drive Tukwila, Washington 98188 Tel: 206.575-6675 Fax: 206.587.7122 ATTN: ROSS BECKLEY GENERAL CONTRACTOR: TBD PLUMBING ENGINEER: TBD - Bidder Design Build by G.C. MECHANICAL ENGINEER: TBD - Bidder Design Build by G.C. ELECTRICAL ENGINEER: TBD - Bidder Design Build by G.C. FIRE/LIFE SAFETY ENGINEER: TBD - Bidder Design Build by G.C. PLUMBING, MECHANICAL, ELECTRICAL, LIFE SAFETY PERMITS UNDER SEPARATE SUBMITTALS. DRAWING INDEX w 0 DRAW' to oo 0 0 NG ISS UED GENERAL X G.0.0 COVER SHEET / PROJECT INFORMATION G.0.1 PROJECT NOTES X ARCHITECTURAL / INTERIORS A.2A.1 CONSTRUCTION PLAN, RCP AND DETAILS PROJECT LOCATION No changes of work tar Tukwil NOTE: Revison1 and may i-::' :. SYMBOLS L ELEVATION REFERENCE SYMBOL U DETAIL ID SHEET NO. D SECTION REFERENCE SYMBOL DETAIL REFERENCE SYMBOL COLUMN AND/OR GRID LINE SYMBOL DIMENSION LINE: 20' - 0" O L ANGLE © AT CENTERLINE INDICATES FINISHED F SURFACES TO ALIGN DRAWING TITLE BAR DETAIL IDENTIFICATION DRAWING TITLE GRAPHICAL SCALE FLOOR ELEVATION SYMBOLS O 92'-0" +1'-0" NOMINAL FLOOR ELEVATION HEIGHT (ABOVE/BELOW) BUILDING SPACE / ROOM ID OFFICE SPACE NAME 1127 DOOR SYMBOL SPACE NUMBER DOCUMENT SHEET SYMBOL KEYED SHEET NOTES GLAZING SYMBOL REVISION NUMBER DEFINITIONS AND DIMENSIONS A. DEFINITIONS: 1. "TYPICAL" OR "TYP" INDICATES IDENTICAL COMPLETE SYSTEM FOR THE CONDITION NOTED. 2. "SIMILAR" OR "SIM." INDICATES COMPLETE SYSTEM AND COMPONENTS COMPARABLE TO THE CHARACTERISTICS FOR THE CONDITION NOTED. 3. "AS REQUIRED" INDICATES CONTRACTOR SHALL PROVIDE COMPONENTS REQUIRED TO COMPLETE THE NOTED SYSTEM AS INDICATED IN THE PROJECT DOCUMENTS. 4. "ALIGN" INDICATES ACCURATELY PROVIDE FINISH FACES OF MATERIALS IN STRAIGHT, TRUE, AND PLUMB RELATION ADJACENT MATERIALS. 5. "CLEAR" INDICATES CRITICAL DIMENSION AND SHALL SET PRECEDENT FOR LAYOUT OF PARTITIONS. B. DIMENSIONS: 1. DIMENSIONS ARE INDICATED TO THE FACE OF FINISHED SURFACE AT ALL NEW AND EXISTING CONSTRUCTION, CENTER OF COLUMNS OR GRID LINES UNLESS OTHERWISE NOTED. 2. ALIGNMENT OF PARTITIONS AND FINISHES AS SCHEDULED SHALL BE STRAIGHT, TRUE & PLUMB. DIMENSIONAL LAYOUT SHALL BE IN THE FOLLOWING PRIORITY ORDER. A. STRUCTURAL DRAWINGS B. LARGE SCALE DETAILS C. SMALL SCALE DETAILS D. ENLARGED PLANS AND SECTIONS E. FLOOR PLANS 3. MINIMUM DIMENSIONS FOR ACCESSIBILITY CLEARANCES AND BUILDING CODE REQUIREMENTS SHALL BE MAINTAINED. 4. FLOOR ELEVATIONS ARE INDICATED AT THE FACE OF THE STRUCTURAL SLAB, UNLESS OTHERWISE NOTED. 5. VERTICAL DIMENSIONS ARE INDICATED FROM THE FLOOR ELEVATION TO FACE OF FINISHED MATERIAL, UNLESS NOTED ABOVE FINISH FLOOR - "AFF". 6. CEILING HEIGHTS ARE INDICATED FROM THE FLOOR ELEVATION TO THE FACE OF SUSPENDED ACOUSTIC CEILING GRID OR FACE OF FINISH MATERIAL FOR OTHER CEILING TYPES, UNLESS OTHERWISE NOTED. 7. DOCUMENTS ARE DRAWN DIAGRAMMATICALLY, AND SCALED DIMENSIONS ARE APPROXIMATE. DIMENSIONS SHALL INDICATE REQUIRED SIZE, CLEARANCES, AND RELATIONSHIPS ARE INDICATED BY DIMENSIONS AS NOTED. f<EY PLAN/FLOOR PLATE NO CHANGE IN EXITING 1":25' TREET MAP Permit PROJECT LOCATION Plan review approvI i. subject to errors and omissions. Approval of constrt:t,..i documents does not authorize the violation of any .I.pted code or ordinance. Receipt of approved Field Cs, _fie Cy: Date: APezz r :,/rogre"..4"" City of Tukwila BUILDING DIVISION REVIS hall b' made to the scope thr i.t ri for approval of 8,.,►b7:ng Division. .'ill I zi! iirt' a new plan submittal plan review fees. Tenant: SHOWER ROOM ADDITION 617 INDUSTRY DRIVE, SUITE 611 TUKWILA, WA 98188 A Tenant Improvement for: SCANLAN KEMPERBARD COMPANIES 617 INDUSTRY DRIVE TUKWILA, WA 98188 burgess design interiors ® architecture 1326 Fifth Avenue . Su(te 400 . Sea.tle Washington 98101 T: (2061 587.7120 F: (206) 587.7122 All reproduction & intellectual property rights reserved c 2015 Approved by: Date: CONSTRUCTION WORK SHALL NOT PROCEED UNTIL THE BUILDING OWNER / REPRESENTATIVE AND BUILDING TENANT HAVE GIVEN THEIR APPROVAL TO THESE CONSTRUCTION DOCUMENTS. APPROVAL BY THESE PARTIES SHALL BE INTERPRETED AS APPROVAL OF DRAWINGS FOR CONTENT, FINISH SELECTIONS, SCOPE OF WORK, AND ALL DIMENSIONS REGARDED BY EITHER PARTY AS BEING NECESSARY TO THEIR OPERATIONS, USE OF THE SPACE, FURNISHINGS, AND TENANT EQUIPMENT AND FURNITURE INSTALLATIONS. CONSTRUCTION AND/OR INITIATION OF CONSTRUCTION, AUTHORIZED BY THE BUILDING OWNER FROM THESE CONSTRUCTION DOCUMENTS, SHALL BE INTERPRETED BY THE DESIGNER AS APPROVAL IN FULL OF THESE CONSTRUCTION DOCUMENTS BY BOTH THE BUILDING OWNER / REPRESENTATIVE AND THE TENANT. Professional seal SEPARATE PERMIT REQUIRED FOR: i3 Maclhanical Electr1cal .gj'Iumbing Gas Ptptng CIiI,r of Tukwila BUILD Pit A DIVISION No. Issue Description Date REVIEW SET 06.15.15 REVIEW SET 06.26.15 REVIEW SET 07.06.15 PERMIT SET 07.08.15 City Electronic Stamp Location REV/WD FOR CODE CI.�.. M,IANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 18 2015 PERMIT CENTER Drawn by: GG Project Project No: 15-3408-00 Manager: RM COVER SHEET / PROJECT INFORMATION Original drawing is 24" x 36". Scale entities accordingly if reduced PROJECT NOTES 1. THESE PROJECT NOTES ARE GENERIC IN NATURE. CONTRACTORS INSTRUCTIONS FOR CONSTRUCTION ADMINISTRATION MAY VARY BASED ON THE CONTRACT BETWEEN BUILDING MANAGEMENT AND TENANT. VERIFY WITH BUILDING MANAGEMENT ALL CONSTRUCTION REQUIREMENTS AND CONSTRUCTION ADMINISTRATION RESPONSIBILITIES. THE DESIGNER MAY NOT HAVE CONSTRUCTION ADMINISTRATION OBLIGATIONS. 2. PLUMBING, ELECTRICAL, MECHANICAL & UFE SAFETY SHALL BE PERFORMED UNDER THE DESIGN/BUILD CONTRACT, UNO. ALL WORK SHALL BE TO CODE. ANY INFORMATION ON THESE DRAWINGS ARE FOR REFERENCE AND SCHEMATIC DESIGN ONLY. CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF THE DESIGN. VERIFY REQUIREMENTS OF BUILDING MANAGEMENT AND TENANT. REVIEW OF SHOP DRAWINGS, IF APPROPRIATE, IS FOR AESTHETIC REASONS ONLY. 3. VERIFY BUILDING STANDARDS WITH BUILDING MANAGEMENT WHEN WORKING IN SUITES WITH NON BUILDING STANDARD ELEMENTS. VERIFY PREFERRED DETAILING OF THESE ELEMENTS WITH BUILDING MANAGEMENT. 4. VERIFY ALL RULES, GENERAL CONDITIONS AND SPECIAUZED BUILDING REQUIREMENTS WITH THE BUILDING MANAGEMENT. 5. VERIFY LEED REQUIREMENTS WITH BUILDING MANAGEMENT. - GOER& CONDMONS 1. GENERAL DESCRIPTION OF THE PROJECT: NON-STRUCTURAL INTERIOR TENANT IMPROVEMENT OF A COMMERCIAL OFFICE SUITE, UON. 2. WHERE NO BUILDING STANDARDS EXIST FOR MATERIALS CALLED OUT AS "BUILDING STANDARD" ON THE PLANS, THE CONTRACTOR SHALL SO ADVISE BURGESS DESIGN WITHIN TEN (10) DAYS OF THE CONTRACTOR'S RECEIPT OF THE PLANS SO THAT BURGESS DESIGN MAY MAKE ALTERNATE SELECTIONS. 3. CONTRACTOR SHALL VERIFY ALL REQUIREMENTS OF EXACT SIZE AND QUANTITY OF EQUIPMENT FURNISHED BY THE TENANT, INCLUDING REQUIREMENTS FOR MECHANICAL AND ELECTRICAL SERVICES, AND IS RESPONSIBLE FOR ALL ROUGH -IN CONNECTIONS. EACH SUBCONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO ADJACENT WORK AND SHALL REPAIR SAID DAMAGE AT THEIR OWN EXPENSE. 4. FIRE/EMERGENCY SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO, SPRINKLER MODIFICATIONS, FIRE EXTINGUISHER PLACEMENT, AUDIBLE ALARMS, SMOKE AND HEAT DETECTORS, STROBES, AND EXIT SIGN PLACEMENT. 5. ALL DESIGN BUILD INFRASTRUCTURE SHALL BE UNDER A SEPARATE PERMIT BY CONTRACTOR. 6. WORK NOT INCLUDED: CONTRACTOR SHALL PROVIDE THE FOLLOWING ITEMS DESCRIBED IN THE SPECIFICATIONS AND SHOWN ON THE PLANS EXCEPT FOR THE ITEMS INDICATED "N.I.C." (NOT IN CONTRACT), SUCH AS TELEPHONE AND DATA CABLES, OFFICE FURNITURE, EQUIPMENT AND MOBILE KITCHEN APPLIANCES. 7. CONTRACTOR TO PROVIDE ALL FIRE/EMERGENCY SYSTEMS AS REQUIRED BY ALL APPLICABLE CODES. FIRE/EMERGENCY SYSTEMS INCLUDE BUT NOT LIMITED TO SPRINKLER MODIFICATIONS, FIRE EXTINGUISHERS, AUDIBLE ALARMS, STROBES, SPRINKLERS, SMOKE AND HEAT DETECTORS, AND EXIT SIGNS. 8. EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT, AND SHALL BE EQUIPPED WITH PANIC HARDWARE WHERE REQUIRED AND INDICATED. 9. ANY MATERIAL USED IN CONSTRUCTION SHALL MEET CURRENT FLAME CODE REGULATIONS. 10. ALL ELECTRICAL, PLUMBING AND MECHANICAL MATERIAL INSTALLATIONS SHALL COMPLY WITH THE BUILDING SHELL STANDARD SPECIFICATIONS. 11. THE GENERAL CONTRACTOR SHALL LAY OUT THE WORK IN CONFORMITY WITH THE REQUIREMENTS OF CONTRACT DOCUMENTS, AND WILL BE HELD RESPONSIBLE FOR PROPER ESTABLISHMENT AND MAINTENANCE OF ALL UNES AND DIMENSIONS. BEFORE DOING AND WORK, THE GENERAL CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AND CONDITIONS AT THE SITE AND NOTIFY THE ARCHITECTS OF ANY DISCREPANCIES. 12. THE CONTRACTORS SHALL USE DIMENSIONS ONLY. DO NOT SCALE PLANS. ALL DIMENSIONS ARE TO FINISHED FACE UNLESS OTHERWISE NOTED. 13. MATERIALS: ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPUED AS RECOMMENDED BY MANUFACTURERS. ALL LIKE MATERIALS USED SHALL BE OF THE SAME MANUFACTURER AND QUALITY UNLESS OTHERWISE SPECIFIED. ALL MATERIAL, EQUIPMENT AND FIXTURES SHALL BE CODE WORTHY WITH ALL PROPER JURISDICTIONAL APPROVALS. 14. CONFIRM LONG LEAD ITEMS AT THE START OF THE JOB AND REPORT TO DESIGNER AND BUILDING MANAGEMENT ANY SCHEDULE CONFLICTS. 15. CONFIRM ALL WARRANTEE PERIOD WITH BUILDING MANAGEMENT. IN LIEU OF STANDARD ALL WORK SHALL BE WARRANTED FOR ONE YEAR. 16. CONFIRM STRUCTURAL SYSTEM OF BUILDING AND USE APPROPRIATE CONNECTION TECHNICS. UTILIZE REBAR OR TENDON DETECTION TECHNOLOGY TO LOCATE EXISTING STRUCTURE IN CONCRETE SLABS AND OTHER ON SITE CONDITIONS. 01, Ilt�u 1. FURNISH ALL LABOR, MATERIALS AND EQUIPMENT AS REQUIRED TO COMPLETE THE DEMOUTION AND REMOVAL OF ALL ITEMS LOCATED IN THE CONSTRUCTION AREAS. UPON COMPLETION OF ALL DEMOLITION WORK, ALL AREAS SHALL BE LEFT BROOM CLEAN. 2. DEMOLITION OF TELEPHONES, ELECTRICAL, VOICE/DATA AND PANELS ARE TO BE REMOVED BACK TO ORIGINATING SOURCE. DEMOLITION OF CORES AND RELATED CABUNG TO BE REMOVED FROM TENANT SPACES BELOW. 3. DURING THE REMOVAL OF ANY ENVIRONMENTALLY HAZARDOUS MATERIALS, PROTECTION GUIDELINES SHOULD BE STRICTLY FOLLOWED BY CODE OR LOCAL GOVERNING AUTHORITY. VERIFY ALL REQUIREMENTS WITH BUILDING OWNER. 4. ALL EXISTING CONSTRUCTION ITEMS THAT INTERFERE WITH THE CONSTRUCTION NEGOTIATED BY THE PRICING PLAN / SPACE PLAN WITH WORK LETTER SHALL BE REMOVED, RELOCATED, OR KEPT FLUSH IN CEIUNG, WALL, OR FLOOR AS REQUIRED. 5. ALL DAMAGED, ALTERED OR REWORKED AREAS SHALL BE PATCHED AS REQUIRED AND FINISHED TO MATCH EXISTING ADJACENT AREAS OR AS SPECIFIED TO PROVIDE A "LIKE -NEW FINISH". 6. CONTRACTOR SHALL PROVIDE PLASTIC SHEETING OR OTHER APPROPRIATE BARRIER TO CONTROL DUST AND DEBRIS SUCH THAT IT DOES NOT AFFECT AREAS OUTSIDE THE AREA OF WORK. 7. CONTRACTOR SHALL PROVIDE ALL DUE CAUTION FOR SITE WORK. CALL 811 BEFORE STARTING ANY SITE WORK. :.ith• 113,141 i:, -Zf 3eIIZ1 . ) • 1. ROUGH CARPENTRY TO INCLUDE ANY WOOD STUDS, FURRING, BLOCKING, ROUGH FRAMING, WOOD CURBS, BUCKS, NAILERS, BACKING, FIXTURE FRAMING, EQUIPMENT SUPPORTS, ETC. AS DETAILED. 1. FINISH CARPENTRY TO INCLUDE INSTALLATION OF ALL FIXTURES AND ASSOCIATED TRIMS, HARDWARE AND NOSINGS. 2. PROVIDE INTERIOR DOOR AND SIDELIGHT FRAMES AS SCHEDULED. 3. CABINET CONSTRUCTION: COMPLY WITH THE A.W.I. ARCHITECTURAL WOODWORK QUALITY STANDARDS FOR CUSTOM GRADE WORK. CABINETS SHALL BE FLUSH CONSTRUCTION. 4. PROVIDE PARTICLE BOARD, MED. DENSITY, WEIGHING <40 LB./CU. Fr., AT LEAST 3/4" THICK. 5. CABINET HARDWARE: FULL EXTENSION DRAWER GLIDES, STAINLESS STEEL CABINET PULLS, US32D FINISH, AND CONCEALED DOOR HINGES, SHELF HARDWARE AND OTHER REQUIRED ITEMS, UON IN ELEVATIONS / DETAILS, OR PER BUILDING STANDARD. 6. PLASTIC LAMINATE: HIGH-PRESSURE DECORATIVE LAMINATE SELECTED FROM WILSONART, NEVAMAR, AND FORMICA, UON. LAMINATE TO BE GENERAL-PURPOSE GRADE .050" HORIZONTAL AND .030" VERTICAL. SHELVING SHALL COMPLY WITH AWI SECTION 600. 7. CABINET HINGES SHALL BE 135 DEGREE FRAMELESS CONCEALED EUROPEAN STYLE HINGEE AND FULL EXTENSION HEAVEY DURTY DRAWER GLIDES, UNO. CORNER UNITS SHALL BE 94 DEGREE HINGES. 8. INTERIOR CABINET SURFACES & SHELVES TO BE OF PREFINISHED BOARD WITH POLYESTER OVERLAY, UON. 9. SHELF EDGING TO BE P-LAM, UON. 10. SUBMIT SHOP DRAWING SUBMITTALS FOR ARCHITECT REVIEW. I 2 1:t1:1, 2 irt. 1. WHEN PROJECT CONSISTS OF NEW RESTROOMS OR SHOWERS OR OTHER TYPES OF BUILD OUT. GC SHALL VERIFY ALL WATERPROOFING REQUIREMENTS WITH BUILDING MANAGEMENT. PROVIDE WATERPROOFING PER MANUFACTURE'S SPECIFICATION. 2. ROOF WORK SHALL BE DONE UNDER BUILDING MANAGEMENTS WARRANTEE POUCY. VERIFY ALL REQUIREMENTS WITH BUILDING MANAGEMENT. hlP:1,114r 1 - 1,ail .t;ll d,�,-'1l SI 11t,ji.tlltl;C 1. PROVIDE AND INSTALL INTERIOR SUITE DOORS AS INDICATED ON DRAWINGS. 2. DOOR SCHEDULE SPECIFIES FINISH (BOTH SIDES OF DOOR) AND FRAME, UON. 3. DOORS SHALL BE PRE -MACHINED FOR HARDWARE PER HARDWARE SCHEDULE. 4. SUBMIT SHOP DRAWING SUBMITTALS FOR ARCHITECT REVIEW. 5. CONTRACTOR SHALL REVIEW SUITE FOR DOOR STYLE CHANGES AND VERIFY WITH ARCHITECT AND BUILDING MANAGEMENT THE DOOR AND SIDEUGHT STYLE TO MATCH IF A VARIATION IS PRESENT. 6. PROVIDE FIRE PROTECTION IN ALL PENETRATIONS IN RATED ASSEMBLIES. 7. iN OPEN CEILING CONDITIONS REPAIR OR REPLACE FIRE PROTECTION AS NEEDED. 8. IF SPRAY ON FIREPROOFING IS VISIBLE AND TO RECEIVE PAINT FINISH PROVIDE A SMALL AREA MOCK UP OF BOTH FIRE PROOFING AND WALL SURFACE SO THAT THE COLOR CAN BE CORRECTED DUE TO THE SUBSURFACE CONDITIONS OF DISSIMILAR MATERIALS. 9. PATCH AND REPAIR ANY FIREPROOFING AT SHAFTS, CORRIDORS AND OTHER RATED ASSEMBLIES AS NEEDED. MATCH EXISTING RATINGS AND CONDITIONS. PROVIDE FIRESTOPPPING, SEALANT AND OTHER FIRE RATED ASSEMBLIES AS NEEDED. VERIFY WITH BUILDING MANAGEMENT PREFERRED METHODS AND MATERIALS. 6. FINISH AND SPECIALTY HARDWARE INCLUDES ALL ACCESSORIES, TOOLS, AND FASTENERS REQUIRED FOR HARDWARE INSTALLATION AND MAINTENANCE. ITEMS NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO COMPLETE THE WORK, SHALL BE FURNISHED MATCHING IN QUALITY AND FINISH OF SPECIFIED IN SIMILAR LOCATIONS. 7. PROVIDE ALL HARDWARE AS SPECIFIED PER THE HARDWARE SCHEDULE. 8. ALL LOCK SETS SHALL CONFORM TO THE BUILDING'S GRAND MASTER KEYING SYSTEMS. PROVIDE AT LEAST TWO (2) KEYS FOR EACH LOCK AND TWO (2) MASTER KEYS FOR THE SUITE. ALL KEYS TO BE TAGGED WITH ROOM NUMBERS. CONFIRM QUANTITY WITH BUILDING MANAGEMENT. 9. SUBMIT HARDWARE SCHEDULE WITH CATALOGUE CUT SHEETS FOR ARCHITECT REVIEW. 10. ALL DOORS SHALL HAVE A MINIMUM OF 1-1/2 PAIR OF BUTT HINGES, ONE LATCHSET OR LOCK SET, AND ONE DOOR STOP TO MEET ACCESSIBILITY REQUIREMENTS. 11. ALL HARDWARE SHALL BE COMMERCIAL GRADE AND RATED AT REQUIRED ASSEMBLIES. 12. PROVIDE CLOSERS PER HARDWARE SCHEDULE AND AT ALL RATED ASSEMBLIES. 13. ALL HARDWARE SHALL MATCH BUILDING STANDARD IN STYLE AND FINISH. 14. SET UNITS LEVEL, PLUMB AND TRUE TO UNE AND LOCATION. ADJUST AND REINFORCE THE ATTACHMENT SUBSTRATE AS NECESSARY FOR PROPER INSTALLATION AND OPERATION. 15. ADJUST AND CHECK EACH OPERATING ITEM OF HARDP WARE AND EACH DOOR TO ENSURE PROPER OPERATION OR FUNCTION OF EVERY UNIT. REPLACE UNITS WHICH CANNOT BE ADJUSTED TO OPERATE FREELY AND SMOOTHLY AS INTENDED FOR THE APPLICATION MADE. 16. PROVIDE PROPER SMOKE GASKETS AT RATED ASSEMBLIES. 17. THE FOLLOWING UL USTINGS ARE REQUIRED ON THE FOLLOWING HARDWARE: PANIC HARDWARE - UL #305 FIRE EXIT HARDWARE - UL #106 & UL #305 ELECTROMAGNETIC LOCK HARDWARE - UL # FWAX-S-A-6635 THE CRASH BAR MUST BE AT LEAST 1/2 OF THE DOOR WIDTH AND OPEN FORCE NO MORE THAN 5 LBS. VERIFY WITH BUILDING STANDARD & MANAGEMENT AND INFORM ARCHITECT IF BUILDING STANDARD DOESN'T COMPLY. 18. ALL EXTEIOR DOORS SHALL HAVE CODE REQUIRED U VALUE AND WEATHER STRIPPING. 19. ALL GLASS AT SIDELIGHTS AND DOORS SHALL BE 1/4" TEMPERED SAFETY GLAZING, UON. 20. CONTRACTOR SHALL VERIFY GLASS THICKNESS IS APPROPRIATE FOR DIMENSIONS AND SPANS. 21. THIS PROJECT MAY CONTAIN GLAZING THAT WILL BE SUBJECT TO FEDERAL GLAZING STANDARDS. GLAZING SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ADHERENCE TO THE REQUIREMENTS. IF GLAZING SUBCONTRACTOR FINDS ANYTHING IN THE DOCUMENTS NOT IN COMPUANCE WITH THE STANDARD, THEY SHALL BRING DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 22. RATED GLASS (CERAMIC) RECITE SHALL BE PREMIUM POUSHED FINISH. GLAZING SHALL COMPLY WITH IBC 716.3 DMSION IX - FINISHES 1. INCLUDE NECESSARY MATERIALS, LABOR AND ACCESSORIES FOR THE INSTALLATION OF ALL PARTITIONS AS SHOWN IN THE PLANS. 2. "WALL SURFACES" MEAN ALL VERTICAL SURFACES INCLUDING COLUMNS WHERE EXPOSED, CONVECTOR OR RADIATOR ENCLOSURES, FASCIAS, RETURNS, PLYWOOD BACKBOARDS, ETC. 3. ALL PARTITION HEADS SHALL MATCH BUILDING STANDARD, UON. 4. WALLS SHOWN ALIGNED WITH BASE BUILDING STRUCTURE SHALL BE FLUSH AND SMOOTH WITH BASE BUILDING STRUCTURE, UON. 5. SEISMIC BRACING: PROVIDE SEISMIC BRACING AS REQUIRED PER THE LATEST BUILDING CODES TO THE PARTITION HEADS AND CEIUNG GRID. 6. FRAMING STUDS: GALVANIZED STEEL STUDS PER CONSTRUCTION PLANS. PROVIDE WITH SHEET METAL BACKING WITHIN ALL WALLS RECEMNG CASEWORK (CABINETS, BOOKSHELVES, ETC.). VERIFY STUD SIZE MATCHES DOOR FRAMES IN STOCK IF APPLICABLE. 7. CONTRACTOR SHALL PROVIDE AND LOCATE ACCESS PANELS AS REQUIRED AFTER INSTALLATION OF MECHANICAL DUCTS, PLUMBING, AND ELECTRICAL WORK. FIRE RATE AS REQUIRED. 8. ALL DRYWALL TO BE 5/8" TYPE "X" UNLESS OTHERWISE NOTED. PROVIDE "M/R" TYPE DRYWALL OR CEMENT BOARD WHERE REQUIRED BY CODE AND AT ALL TOILET ROOMS, AND BEHIND CERAMIC TILES, UON. 9. INSTALL CORNER BEADS AT ALL EXTERNAL CORNERS. INSTALL METAL EDGE TRIM WHENEVER EDGE OF GYPSUM BOARD WOULD OTHERWISE BE EXPOSED OR SEMI -EXPOSED. 10. PRIOR TO RECEMNG FINISH, ALL SURFACES SHALL BE PROPERLY PREPARED AS REQUIRED TO RECEIVE FINAL FINISHING AS SPECIFIED. 11. EXTEND ALL SOFFIT FRAMING TO STRUCTURE ABOVE. PROVIDE STRUCTURAL DIAGONAL BRACING AS NECESSARY. , 12. PROVIDE FRAMING FOR SUSPENDED CEILING WITH SEISMIC BRACING IN ACCORDANCE WITH REQUIREMENTS OF APPUCABLE CODES AND AS SHOWN ON DRAWINGS. 13. USE ACOUSTICAL SEALANT AROUND ALL PIPES, DUCTS, CONDUIT, OUTLETS, SWITCHES, ETC. ON BOTH SIDES OF CROSSING/PENETRATING WALLS WITH ACOUSTICAL INSULATION. PENETRATIONS OF FIRE -RATED WALLS SHALL BE PROTECTED BY APPUCABLE FIRE -RATED ASSEMBUES AND MATERIALS. 14. FIRE AND SMOKE SEPARATION ASSEMBUES SHALL BE MARKED AS REQUIRED IN IBC SECTION 703.7. 15. PROVIDE NEW CEILING TILE, CEILING GRID AND ALL ACCESSORIES AS REQUIRED TO INSTALL SUSPENDED ACOUSTICAL CEILINGS AS INDICATED ON DRAWINGS. 16. PROVIDE SEISMIC BRACING AS REQUIRED BY CODE AT NEW CEILING WORK ONLY. VERIFY WITH BUILDING MANAGEMENT IF EXISTING CONDITIONS ARE SEISMICALLY BRACED OR PROVIDE PER CODE. 17. COORDINATE WORK WITH OTHER TRADES HAVING WORK IN THE CEIUNG AND THE TELEPHONE AND DATA CABLE COMPANIES WHEREVER THEIR RESPECTIVE WORK IS CONTIGUOUS. 18. PROVIDE CUTOUTS AND OTHER SPECIAL PROVISIONS IN ACOUSTICAL WORK AS REQUIRED FOR LIGHTING FIXTURES, REGISTERS, DIFFUSERS, SPRINKLERS, AND OTHER INSERTED ITEMS. 19. ALL CUTOUTS SHALL BE CENTERED WITHIN ACOUSTIC CEILING TILE, UON. 20. ALL MATERIALS SHALL HAVE CLASS 1 FLAME SPREAD RATING AND BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATION AND CODES. 21. ALL JOINTS IN THE TILE FIELD SHALL BE SQUARE, LEVEL AND PERFECTLY ALIGNED WITH EACH OTHER. 22. INSTALLED SUSPENDED CEIUNGS TO BE LEVEL WITHIN A TOLERANCE OF 1/8" IN 12'-0". ANCHOR AS REQUIRED. 23. IN AREAS OF ALTERATIONS CONTRACTOR SHALL MATCH CONDITIONS AND MAKE EVERY EFFORT TO ALIGN, LEVEL AND MATCH NEW CEILING TO OLD. CONTRACTOR SHALL REVIEW ALL CEIUNGS UPON COMMENCEMENT OF THE PROJECT AND INFORM THE BUILDING MANAGEMENT OF ANY DISCONTINUITIES IN THE CEIUNG WITHIN 10 DAYS. 24. ADJUST PARTITION HEAD DETAIL TO MATCH EXISTING CEIUNG CONDITIONS IF NECESSARY. 25. IN OPEN CEIUNG CONDTiIONS OR IF CLOUDS ARE SPECIFIED, PROVIDE ALL WORK SUITABLE FOR AN EXPOSED AND VISIBLE CONDn1ON. HANGING, CONDUIT, DUCTWORK AND OTHER ITEMS SHALL BE PLUM AND TRUE. VERIFY ALL REQUIREMENTS WITH BUIDLING OWNER CONCERNING MAINTAINING THE RETURN AIR PLENUM. PROJECTS THAT CONVERT ACT SPACE INTO OPEN SPACE SHALL HAVE THE FINISH OF THE OLD INTERSTITIAL SPACE FINISHED WITH GWB TO A LEVEL FLOOR FINISH, UNO. THIS MAY REQUIRE FURRING OR STUDS EXTENDED TO THE UNDERSIDE OF STRUCTURE. 26. PROVIDE ACOUSTICAL INSULATION BETWEEN FRAMING STUDS AND EXTENDING TWO FEET ON EACH SIDE OF PARTITION HEAD ABOVE CEILINGS FOR ALL WALLS NOTED PER PLANS. 27. NEW DEMISING WALL CONSTRUCTION TO HAVE SOUND BATT INSULATION BETWEEN FRAMING STUDS AND TWO FEET OF INSULATION ON EITHER SIDE OF THE PARTITION HEAD ABOVE CEIUNG GRID, UON. 28. PROVIDE VCT, SHEET LINOLEUM, SHEET VINYL AND RUBBER BASE AS INDICATED IN DRAWINGS. COLOR AND MANUFACTURER PER FINISH SCHEDULE. 29. PROVIDE RUBBER -REDUCING STRIPS IN COLOR TO MATCH SPECIFIED BASE, UNO. REDUCING STRIPS TO OCCUR AT ALL AREAS OF FLOOR MATERIAL TRANSITION. USE STAINLESS STEEL TRANSITION AT TILE TO DISSIMILAR MATERIAL, UNO. 30. BASE TO BE INSTALLED IN LONGEST AVAILABLE LENGTH WITH NO PIECE LESS THAN 12". NO JOINTS AT OUTSIDE CORNERS OR WITHIN 6" OF CORNERS. VERFY HEIGHT OF RUBBER BASE REQUIRED WITH BUILDING MANAGEMENT. 4.5" MAY BE NECESSARY. 31. PATCH, LEVEL AND PREPARE SUB FLOORING WITH CEMENTITIOUS UNDERLAY PER MFR'S WRITTEN INSTRUCTIONS IN AREAS TO RECEIVE NEW FLOORING. MAX. ALLOWABLE TOLERANCE = 1/4" OVER 10'. 32. GENERAL CONTRACTOR SHILL APPLY FLOOR WAX TO NEW FLOORING AREAS PER MANUFACTURERS SPECIFICATION, UON. 33. UNLESS SPECIFIED ALL RUBBER BASE SHALL BE COVED BASE. 34. PROVIDE AND INSTALL COMMERCIAL GRADE CARPET AS INDICATED IN DRAWINGS. 35. PROVIDE SEAMING DIAGRAMS FOR ARCHITECT'S REVIEW. 36. UNLESS OTHERWISE NOTED, PRIME ALL GWB WALL SURFACES AND PAINT WITH MINIMUM OF TWO (2) FINISH COATS OF BENJAMIN MOORE EGGSHELL FNISH LATEX PAINT OR APPROVED EQUAL, UON. PROVIDE FOR NUMBER OF PAINT COLORS AS INDICATED IN DRAWINGS. VERIFY STANDARD LEVEL OF FINISH WITH BUILDING MANAGEMENT. 37. FINISH DOORS, DOOR FRAMES, AND SIDELIGHT FRAMES AS INDICATED IN DRAWINGS. A) PAINTED WOODWORK TO BE FINISHED WITH ONE (1) COAT PRIMER AND TWO (2) FINISH COATS. B) SEALED WOODWORK "0 BE STAINED PER FINISH SCHEDULE AND SEALED WITH A COMMERCIAL GRACE CLEAR SATIN VARNISH. 38. PAINT FOR THE LIGHT SURFACES TO CONFORM TO THE REQUIREMENTS OF THE "ARCHITECTURAL SPECIFICATIONS MANUAL" (AWS) FOR PAINT SYSTEMS. LATEX PAINT: AWS SYSTEM 3-B "CUSTOM" (1) COAT PRIMER AND TWO (2) FINISH COATS. GRADE UGHT COLOR PAINT FINISH ON GYPSUM BOARD SURFACES. 39. PAINT FOR THE DARK SURFACES TO CONFORM TO THE REQUIREMENTS FOR THE "ARCHITECTURAL SPECIFICATIONS MANUAL" (AWS) FOR PAINT SYSTEMS. LATEX PAINT: AWS SYSTEM 3-B "CUSTOM" (1) COAT PRIMER AND TWO (2) FINISH COATS. GRADE DEEP TONE PAINT FINISH ON GYPSUM BOARD SURFACES. 40. UPON COMPLETION OF WORK, REMOVE EXCESS PAINT, STAIN, VARNISH, ADHESIVE, CAULK, ETC. FROM ALL OTHER SURFACES THAT WERE NOT SPECIFIED TO RECEIVE SAME. 41. TOUCH-UP AND PATCH SURFACES AS REQUIRED AFTER THE COMPLETION OF WORK BY OTHER TRADES. 42. WHERE COLUMNS OCCUR N AREAS SCHEDULED TO BE FINISHED, THEY SHALL RECEIVE THE SAME FINISH AS THE ROOM, UON. 43. ALL PAINTED SURFACES SHALL BE PREPARED IN STRICT ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS (ESPECIALLY IN REGARD TO THE PRIMING OF EXISTING SURFACES). 44. PUTTY ALL NAIL HOLES, COUNTERSUNK SCREWS, BOLTS, CRACKS, ETC. BEFORE APPLYING FINISH. 45. SAND ALL WOOD SURFACES SMOOTH AND EVEN BEFORE APPLYING FINISH. 46. SAND ENAMELED FINISHES APPUED TO WOODS OR METAL BETWEEN COATS WITH FINE SANDPAPER TO PRODUCE SMOOTH FINISH. 47. MAKE FINISH WORK UNIFORM AND SMOOTH, FREE OF RUNS, SAGS, DEFECTIVE BRUSHING AND CLOGGING. MAKE EDGES OF PAINT ADJOINING OTHER MATERALS OR COLORS SHARP AND CLEAN WITHOUT OVERLAPPING. 48. CHANGE PAINT FORMULATICN AS REQUIRED FOR DIFFERENT ENVIRONMENTS, MATERIALS AND SURFACE PREPARATIONS. 49. VERIFY ATTIC STOCK REQUREMENTS OF ALL FINISH MATERIALS WITH BUILDING MANAGEMENT AND TENANT. DIVA XII - FURNISHINGS 1. ALL EXISTING INTERIOR AND PERIMETER MINI BUNDS TO BE BAGGED AND CLEANED TO LIKE -NEW CONDITION. 2. ALL PERIMETER GLAZING TO RECEIVE BUNDS AS INDICATED IN DRAWINGS. COORDINATE WITH BUILDING MANAGEMENT. MATCH EXISTING CONDITIONS UON. 3. ALL INTERIOR SIDELIGHTS TO RECEIVE 1" MINI-BUNDS WHERE INDICATED IN DRAWINGS. 4. PROVIDE SAMPLE AND CUT SHEET TO ARCHITECT FOR REVIEW. 5. PROVIDE AND INSTALL ALL CODE REQUIRED SIGNAGE. 6. TENANT'S FURNITURE SHALL BE THE RESPONSIBUTLY OF THE TENANT AND THEIR VENDOR. GC SHALL INVITE AND COORDINATE TENANTS VENDOR FOR FIELD MEASUREMENTS AND VERIFICATION OF LAYOUT AND ALL ELECTRICAL AND VOICE DATA REQUIREMENTS. 7. FURNITURE SYSTEMS CONNECTIONS (WHIPS) SHALL BE PROVIDED BY TENANT'S FURNITURE VENDOR AND INSTALLED BY THE GC, UNO. GC TO COORDINATE. VERIFY ALL ELECTRICAL AND VOICE DATA CONNECTIONS. DMSION XXI - FIRE SUPPRESSION 1. ALTER OR INSTALL FIRE PROTECTION SYSTEM PER BUILDING STANDARD, LOCAL REGULATIONS AND ORDINANCES. 2. PROVIDE ALL EMERGENCY LIGHTING, EXIT SIGNS, ARE ALARM SPEAKERS, STROBES AND BELLS AS REQUIRED BY CODE. DESIGN AND INSTALL THL: SAME IN COMPLIANCE WITH THE AMERICANS WITH DISABIUTIES ACT. 3. PROVIDE SPRINKLERS, FIRE RATED DOORS AND FRAMES, FIRE EXTINGUISHERS, ETC. AS REQUIRED BY APPUCABLE LOCAL CODES AND LAWS. 4. ARE EXTINGUISHERS SHALL BE BY UNDERWRITER'S LABORATORY 2A-10BC 5-LB, MULTIPURPOSE EXTINGUISHER WITH SQUEEZE -TYPE HANDLE AND FLEXIBLE DISCHARGE HOSE WITH VISIBLE PRESSURE GAUGE, UON. 5. FIRE EXTINGUISHERS SHALL BE INSTALLED PER BUILDING STANDARD REQUIREMENTS, UON. VERIFY LOCATION WITH FIRE MARSHALL. WHEN REQUIRED BY CODE, PROVIDE 1 WALL MOUNT TYPE IN EACH SERVER ROOM OR LABORATORY. 6. A B. C. D. E. DESIGN BUILD FIRE PROT_CTION DRAWINGS SHALL INDICATE: LAYOUT, LOCATION, AND SIZE OF SPRINKLER ONES AND HEADS. PRESSURE REQUIREMENTS. SPRINKLER HEAD SPECIFTATIONS. LOCATION OF FIRE PROTECTION RISERS AND WALL HYDRANTS CHANGES OF USE SHALL BE RESOLVED FOR NEW OCCUPANCY FIRE FLOW. 7. CONTRACTOR TO PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. INCLUDE HORNS AND STROBES. 8. ALL SPRINKLER HEADS S-IALL BE CENTERED IN ACOUSTICAL CEIUNG TILE, UON. 9. USE OF NFPA 13 QUICK RESPONSE HEADS MAY BE REQUIRED. CONTRACTOR SHALL VERIFY EXTENT OF QUICK RESPONSE HEADS BY CITY FOR THIS PROJECT. 10. IF CEIUNG IS DESIGNED FOR AN OPEN CEIUNG CONDITION, GC SHALL PROVIDE SPRINKLER HEADS IN AN UPRIGHT CONDITION. WORK SHALL BE VISIBLE AND SUITABLY CONSTRUCTED. DIVISION XXII - PLU 1. PROVIDE SUPPLY, WASTE AID VENT ONES, VALVES, FITTINGS, ETC. REQUIRED FOR KITCHEN SINKS, DISHWASHER, REFRIGERATOR, AIR CONDITIONING UNIT(S), VENDING MACHINES, COFFEE MAKER, WATER HEATERS, ETC. 2. ALL FIXTURE INSTALLATIONS SHALL CONFORM TO THE AMERICANS WITH DISABILITIES ACT. 3. PROVIDE NEW PLUMBING FI)TURES AS SPECIFIED PER DRAWINGS, OR PER BUILDING STANDARD, UON. 4. PROVIDE HOT AND COLD WATER TO SINKS/DISHWASHERS IF APPLICABLE. 5. ALL NEW WATER HEATERS ARE TO BE INSTALLED WITH DRIP PAN CONNECTED TO WASTE UNE. VERIFY LOCATIONS WITH BUILDING MANAGEMENT AND INSPECTORS. 6. ALL PLUMBING FIXTURES AFE TO BE INSTALLED TO MEET CURRENT GOVERNING LOCAL AND FEDERAL CODES. 7. CONTRACTOR SHALL PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 8. VERIFY WATER SUPPLY & SEWER DRAIN CAPACITY FOR ENURE BUILDING WILL MEET NEW CAPACITY WHEN NEW RESTROOMS ARE ADDED TO BUILDING. DMS QN XXIU - MECHANICAL 1. PROVIDE BUILDING STANDARD HVAC SYSTEM WITH ALL MATERIALS, LABOR AND ACCESSORIES FOR COMPLETE OPERATION OF SYSTEM. CONTRACTOR TO BALANCE HVAC SYSTEM AS REQUIRED. 2. DESIGN BUILD MECHANICAL ENGINEERING DRAWINGS INDICATE: A. DUCTS, AIR MOVEMENT REQUIREMENTS, & SIZES OF GRILLES & REGISTERS. 3. CONTRACTOR TO PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 4. HVAC CONTRACTOR TO CLEAN, REPAIR OR REPLACE SOILED OR DAMAGED HVAC GRILLS, FILTERS AND THERMOSTATS. 5. RE -ZONE, ALTER OR SEPARATE HVAC AS NECESSARY AS DIRECTED BY BUILDING MANAGEMENT FOR ALTERED SUITES. 6. IN OPEN CEILING CONDITIONS DESIGN OF HVAC WILL ACCOUNT FOR CHANGES IN THE RETURN AIR PLENUM. ALL HVAC WILL BE VISABLE AND OF SUITABLE MATERIAL AND INSTALLATION METHOD. 7. IN HIGHRISE BUILDINGS CONTRACTOR SHALL VERIFY METHOD OF SMOKE CONTROL AND PROVIDE DESIGN CONSIDERATIONS IF NEEDED. 1 XXVI - ELECTRICAL AND TELECOMMUNICATIONS 1. REUSE EXISTING ELECTRICAL AND DATA AS APPROPRIATE TO MEET THE TENANT'S REQUIREMENTS. REPLACE OUTLET COVER PLATES TO MATCH NEW FINISH IF APPLICABLE. 2. PROVIDE ALL WORK, EQUIPMENT AND LABOR FOR A COMPLETE AND OPERABLE ELECTRICAL SYSTEM. PROVIDE ELECTRICAL OUTLETS PER POWER AND DATA PLAN. 3. PROVIDE MUD RING FOR DATA AND COMMUNICATION AS SHOWN ON THE POWER AND DATA PLAN. EACH MUD RING TO HAVE A MINIMUM NUMBER OF WIRE PULLS AS INDICATED ON DRAWINGS. COORDINATE DATA CABLE CONFIGURATION WITH THE TENANT. 4. ALL OUTLETS AND MUD RINGS TO BE LOCATED AT 18" AFF TO THE CENTER UNE, UON. 5. WHERE MULTIPLE DEVISES OCCUR IN A SINGLE LOCATION, ALL DEVICES SHALL BE GANGED UON. 6. ALL ELECTRICAL OUTLETS WITHIN THE CODE REQUIRED DISTANCE FROM A SINK SHALL BE ON A GROUND FAULT INTERRUPTED CIRCUIT. 7. ALL WIRING DEVICES: SHALL BE BUILDING STANDARD EXCEPT: "ISOLATED GROUND" OUTLETS SHALL BE ORANGE, "HOSPITAL GRADE ISOLATED GROUND" OUTLETS SHALL BE ORANGE WITH A GREEN DOT, "EMERGENCY" OUTLETS SHALL BE RED, AND "DEDICATED" OUTLETS FOR "CLEAN CIRCUIT" FIXTURES SHALL BE GRAY (UNLESS BUILDING STANDARD DICTATES OTHERWISE). ALL COVER PLATES SHALL BE BUILDING STANDARD FINISH, UON. VERIFY WITH BUILDING MANAGEMENT. 8. PROVIDE SEPARATE CIRCUITS FOR TENANT'S EQUIPMENT (INCLUDING THE TELEPHONE SWITCH, COPIERS, COMPUTERS, ETC.) WHEN NOTED ON THE CONSTRUCTION DOCUMENTS. 9. COORDINATE SCHEDULE WITH FURNITURE VENDOR FOR THE USE OF ELECTRICIANS DURING THE INSTALLATION OF TENANT'S NEW FURNITURE. 10. ALL ELECTRICAL WIRING, TELEPHONE AND COMPUTER CABLING, AND CONDUIT SHALL BE CONCEALED IN FLOORS, WALLS, OR CEILINGS. CABUNG FOR VOICE AND DATA TO BE PROVIDED BY TENANT'S VENDORS AND SHALL BE COORDINATED BY THE BUILDING MANAGER, UNO. 11. THE CONTRACTOR IS TO COORDINATE WITH THE TENANTS SUPPUED FURNITURE SYSTEMS TO INCLUDE BUT NOT LIMITED TO: ELECTRICAL AND DATA WIRING LOCATIONS, J-BOX LOCATIONS, CONNECTIONS AND WALL MOUNTED REQUIREMENTS. 12. THE CONTRACTOR IS TO VERIFY EXISTING ABANDONED CORE DRILL LOCATIONS AND FILL AS REQUIRED WITH MATERIAL TO MEET CURRENT FLAME SPREAD REGULATIONS. LOCATIONS TO BE PREPARED TO RECEIVE NEW FLOOR FINISH AS REQUIRED. FLOOR SHALL BE LEFT FLUSH. 13. ARCHITECTURAL DRAWINGS INDICATE LOCATION ONLY OF DEVICES SHOWN. SWITCHING AND CIRCUn1NG SHALL BE INDICATED ON SEPARATE ELECTRICAL ENGINEERING AS -BUILT DRAWINGS AND SHALL MEET OWNER'S GUIDELINES. 14. ALL TELEPHONE, ELECTRICAL, COMMUNICATION AND SECURITY WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE CODES. 15. DRAWINGS INDICATE ALL DIMENSIONS TO CENTERLINE OF TELEPHONE, ELECTRICAL, AND COMMUNICATION COVER PLATE. OUTLETS SHOWN GROUPED TOGETHER ON PLAN SHALL BE SET TO A MINIMUM DIMENSION BETWEEN EACH DEVICE. 16. BACK-TO-BACK OUTLETS ARE NOT PERMITTED. OFFSET OUTLETS THE MINIMUM DIMENSION REQUIRED FOR ACOUSTICAL CONTROL. 17. LOCATION OF ALL WALL MOUNTED POWER AND DATA DEVICES SHALL BE FIELD REVIEWED BY THE TENANT BEFORE INSTALLATION. 18. ELECTRICAL ENGINEER TO PROVIDE DESIGN/BUILD PACKAGE TO ARCHITECT FOR REVIEW PRIOR TO INSTALLATION. 19. THE LAYOUT DIAGRAMS COORDINATE LOCATION OF POWER & DATA DEVICES. REFER TO DESIGN/BUILD DOCUMENTS FOR SCOPE, TECHNICAL LAYOUT AND SPECIFICATIONS FOR EACH DISCIPLINE. 20. ARCHITECTS DOCUMENTS INDICATE LOCATION AND RELATIONSHIP OF DEVICES. COORDINATE EXACT LOCATION WITH FURNITURE VENDOR. 21. COORDINATE POWER/DATA, FIRE SAFETY DEVICES & LIGHT FIXTURE MOUNTING LOCATIONS WITH INTERIOR ELEVATIONS, SYSTEM FURNITURE, FINISHES & CASEWORK. 22. PROVIDE EXTENSION RINGS AND MOUNTING ACCESSORIES WHERE REQUIRED FOR POWER/DATA DEVICES AND UGHT FIXTURES. COORDINATE WITH INTERIOR FINISHES AND CASEWORK. 23. CONTRACTOR TO PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 24. RECIRCUIT, ALTER OR SEPARATE ELECTRICAL AND VOICE SYSTEM AS NECESSARY AND AS DIRECTED BY BUILDING MANAGEMENT FOR ALTERED SUITES. 25. IN AN OPEN CEIUNG CONDITION ALL ELECTRICAL AND VOICE DATA SHALL BE VISIBLE AND SUITABLE INSTALLATION METHODS SHALL BE USED. 26. LOCATION OF SWITCHES SHALL BE SHOWN ON THE REFLECTED CEIUNG PLAN. ALL SWITCHES SHALL BE MOUNTED AT A MAXIMUM HEIGHT OF 48" A.F.F. TO MEET THE LATEST ACCESSIBILITY CODES AND REGULATIONS. 27. WHERE MULTIPLE SWITCHES OCCUR IN A SINGLE LOCATION, ALL SWITCHES SHALL BE GANGED UON. 28. WHEN WORKING IN PUBUC CORRIDOR OR COMMON AREAS VERIFY SWITCHING REQUIREMENTS WITH BUILDING MANAGEMENT. 29. VERIFY WITH BUILDING MANAGEMENT SEPARATION OF SUITE SWITCHING WHEN DEMISING CONFIGURATIONS CHANGE. 30. DOWN LIGHTS SHOWN IN THE CENTER OF CEILING TILE WITHOUT DIMENSIONS ARE TO BE LOCATED IN THE CENTER OF CEILING 11LE OR CENTER OF 2X2 PORTION OF 2X4 SECOND LOOK TILE. UON. 31. REUSE ALL EXISTING BUILDING STANDARD FLUORESCENT FIXTURES AS NEEDED PER DESIGN LAYOUT AND TO MEET LOCAL ENERGY CODE COMPLIANCE. VERIFY OR PROVIDE NEW LAMPS AND REPLACE FAULTY BALLASTS. 32. PERMIT DRAWINGS TO BE REVIEWED AND APPROVED IN WRITING BY LANDLORD PRIOR TO COMMENCEMENT OF WORK. 33. ALL OFFICE AREAS LESS THAN 300 SQ. FT. ENCLOSED BY WALLS OR CEILING -HEIGHT PARTITIONS, AND ALL MEETING AND CONFERENCE ROOMS, SHALL BE EQUIPPED WITH OCCUPANCY SENSORS, PER CODE. 34. DESIGN BUILD ELECTRICAL ENGINEERING DRAWINGS INDICATE: A. CIRCUITING AND WIRING OF UGHT FIXTURES, AND SWITCHES. B. LIFE SAFETY EQUIPMENT. C. LOCATION OF REQUIRED EMERGENCY LIGHT FIXTURES. D. UGHT FIXTURE SPECIFICATIONS 35. CONTRACTOR TO PROVIDE INSTALLATION DESIGN DOCUMENTS TO ARCHITECT AND BUILDING OWNER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 36. CONTRACTOR SHALL RE -CIRCUIT AND RE -SWITCH ALL ASPECTS OF TENANT SUITE AND ADJOINING SUITES AS NECESSARY TO FULLY SEPARATE TENANT SUITE FROM OTHERS, AND PROVIDE NEW CORRIDOR, HALLWAY AND OPEN OFFICE SWITCHES AS NEEDED. 37. VERIFY SWITCHING WITH TENANT AND BUILDING MANAGEMENT. VERIFY APPROVED ENERGY CODE REQUIREMENTS OR ENERGY MANAGEMENT SYSTEM AS PART OF THE DESIGN BUILD CONTRACT. 38. PROVIDE, ALTER OR VERIFY ALL EMERGENCY EXIT UGHTING AND ACCESS PATHWAY UGHTING AS DIRECTED BY EXISTING CONDITIONS AND CODE REQUIREMENTS. 39. EXIT SIGNS SHALL HAVE UL #924. 40. PROJECT MAY HAVE MULTIPLE UGHT SOURCES AND LAMPS. CONTRACTOR SHALL PROVIDE CONSISTENT LAMPING FOR ALL UGHT FIXTURE AND BETWEEN FIXTURE TYPES. 3,500K IS PREFERRED. NOTIFY DESIGNER IF CONSISTENT LAMPING IS UNOBTAINABLE AT THE START OF THE PROJECT. 41. VERIFY ALL ENERGY CODE REQUIREMENTS WITH JURISDICTION OF RECORD. VERIFY UGHT SWITCHING WITH TENANT AND BUILDING MANAGEMENT. 42. PROJECT MAY HAVE LED UGHTS SPECIFIED. PROVIDE LIGHTING LEVEL ANALYSIS (IN FOOT CANDLES) FOR DESIGNER'S REVIEW BEFORE ORDERING PRODUCT. VERIFY CONTROLS WITH DESIGNER. ALL LED FIXTURES SHALL HAVE DIMMING CAPIBUTIES SO THAT AS FIXTURE DIMINISHES THE POWER CAN BE INCREASED SO THAT LIGHTING LEVELS REMAIN CONSTANT AT 70% OVER THE LIFE OF THE FIXTURE (10 YEARS). 43. GC SHALL VERIFY ALL CARD ACCESS AND SECURITY REQUIREMENTS WITH BUILDING MANAGEMENT AND TEANNT. DETERMINE IF A BUILDING WIDE SYSTEM IS AVAILABLE AT THE START OF THE PROJECT. IF SO AL WORK SHALL BE DONE SO THAT THE BUILDINGS WARRANTEE AND OPERATION IS MAINTAINED. Tenant: SHOWER ROOM ADDITION 617 INDUSTRY DRIVE, SUITE 611 TUKWILA, WA 98188 A Tenant Improvement for: SCANLAN KEMPERBARD COMPANIES 617 INDUSTRY DRIVE TUKWILA, WA 98188 burgess design interiors 0 architecture 1326 Fifth Avenue . Suite 100, Seattle Washington 98101 T: (206) 587.7120 F:1206) 587.7122 All reproduction & intellectual property rights reserved c 2015 Professional seal No. Issue Description Date REVIEW SET 06.15.15 REVIEW SET 06.26.15 REVIEW SET 07.06.15 PERMIT SET 07.08.15 city, Electronic Station REVIEWED FOR CODE COMCE APPROVED SEP 3 0 2015 City of Tukwila BUtLDtNG DIVISION RECEIVED CITY OF TUKWILA SEP 1 8 2015 PERMIT CENTER Drawn by: GG Project Manager: RM Project No: 15-3408-00 PROJECT NOTES Original drawing is 24" x 36". Scale entities accordingly if reduced .0.1 2012 Washington Steto Energy Code Compliance Forms for Commercial, Graup R1, and > 3 story 112 and R3 ntor 2012 Washington State Energy Code Compliance Forms for Commercial, Group Ftl, and 3 story R2 and R3 •:RevisedJarie20t3 Project Info .. Project Address 617 7:t3Au00r.RY 3 RIVE; SUITE 611 Dater 15 j . 6 .201.5 / 'rinse„ WA 38188 For Building Department Use Applicant Name: BJRc3Fs.s Dzslorr A hcant Address: pp �1326.571r AVENUE sEATTLEr TdA 96u52- Applicant Phonea- 206-587-7120.: .... Project Description ( New Building � . Addition L. Alteration i__I Plan5 Included Lighting Compliance Path L) Lighting Power Density Calculations ) Total Building Performance (If Total Building Pettormcrnce. then only .1,81 CH-fK is required) Interior Lighting Compliance Option !') Building Area Method ( Space -by -space Method Interior Lighting System Description Briefly describe lighting system type and features. With occupancy sensor, Additions and. Change of Space Use: (C101.4.3' & C1014.4) L.} Addition area or Change, of Space Use area complies with au apptio:1bie provisions as stand alone project CAddition area or Change of Space Use area is combined with 'existing building lighting Systems to demon trate compliance with all applic<tblo provisions Provide Building Area Method (LTG (NT-BLD) or Space-By-Space:Muthod (L.TG-(NT: SPACE) Compliance Form. Document maximum allowed and proposed (including existing if applicable) lighting wattage of Addition or CI:tinge of Use scope_ Provide applicable lighting controls per G405.2'and commissioning of iighting:i:ontro(s perC405.13. Alterations, Renovattorts and Repairs (CI.02,4.3.1) 0 60°b:or more of luminaires in space replaced Provide Building Area Method (t. ft,-1NT-BI.D) or Spa.' -Ay -Space Method (LTG:INT-SPACE) compliance Form: Document maximum allowed and proposed (lauding existing) lighting wattage of project scope g Less than 60% of luminaires in space replaced Provide Space -by -space Method (LTG-INT-SPACE) Compliance Feint. Document existing total wattage in space and proposed (including existing) lighting wattage of project scope Li Lamp and/or ballast'repfacement within existing luminaires only -existing totatinterior building wattage not increased F.71 New wiring Installed to serve added fixtures and/or fixtures relocated to new circuit Provide applicable manual lighting controls (C405.2.1), occupancy sensors(C405.2.2:2), daylight zone controls (C405.2.2.3), specific: application eontiols (C405. 2.3), and commissioning of lighting Controls per 0405.13 0 New or moved lighting panel: Provide all applicable lighting controls as noted for New Wiatnti automatic time switch controls (C405.2.2.1), and commissioning of lighting controls perC405:13, . . 0 Space is reconfigured - luminaires unchanged or moved only Provide all applicable lighting controls as noted for New Wiring and coirilnis ioning of lighting controls per C405.13. D,No changes are being made to the intericrlighting and space use not changed.:. 20.12 Washington State Energy Code Compliance Forms for Commercial, Group P1, and> 3 story R2 and R3:.: 2012 Washington State Energy CodeComp!ienca Fantle for CAArnmetokli; Group R1,and 3 story R2 and 113 Project Address Applicant Name:- 617 .x.npu .TSII DIME, : ;✓RITE. .'�.'Ttr5i XLLA--WA 90125 atReess omen': Maximum Allowed Lighting Wattage .. Location (plan 4f, loom k; or ALL) saaonwa ROOLA - :. P. isrx e.eonsn: Space Type* Allowed Watts per le 0.98 -Date Revised dune 2.0'13 5/3.5/203.5 For Building Department: Use Gress intenoC Area in ie 58 Watts Allowed (watts/te x area) 57 AMqlitt I nteS�lhj+' a13.a+�exac+s t LE�r 'SA'7 rzr#rr Select Table L,405.5.2(2) category from drop down trlenu. '" Foratriums, indicate height.Atlowed wattage for first 40 feet is 0.03 W/ft. ht., • above 40 feet fs 0.02 W,'ft. ht. Proposed Lighting Wattage Location (plan #, room #, or ALL) 9aOWER ROOM Fixture Description (include exempt equipment per Note 3, oOWNY2027-..coMPAcr. YL'ORBe0E07.: aes&tA oieelray r , o� =sT 13tT 0Y51'LS4;Y Total Number of Fixtures .: Area 58 Allowed Watts: 57 . �� Total Proposed Wa.tts.rnay not exceed Total Allowed Watts: for lnfi rior Lighting :Teta! Proposed Watts Watts. Proposed Notes: 1. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T-8), number of lamps in the fixture, and ballast type (if Included). For track lighting, list the length of the track (in feet) in addition to me fixture, tamp; and ballast information, . 2. For proposed i~Jatts,Flxture,. use manufacturers listed maximum input wattage of the fixture. (not simply the lamp wattage) and other criteria as specified in Section C405.51: For line voltage track lighting, fist the greater of actual luminaire wattage or length of track multiplied by 50, or as applicable, the wattage of curranttimiting devices or of the transformer. For low voltage track lighting list the transformer rated wattage 3. List all fixtures. For lighting equipment eligible for exemption perC405.5.1, note exception number and leaveWalts/Fixture blank. REFLECTED CEILING PLAN 0 4' 8' NEW 2X6 LEDGER, PROVIDE (3) # 10 METAL SCREWS 0 EACH EXISTING STUD REMOVE GWB AS REQUIRED TO RECEIVE NEW 2X6 LEDGER, PROVIDE BLOCKING AS REQUIRED F EXISTING METAL -FRAMED INSULATED DEMISING WALL EXISTING OFFICE WALL DETAIL 0 12' 24" SUP -RESISTANT SURFACE 2 1/2" MAX. 20"-24" C ADA BENCH DIAGRAM 0 2' 1 /4" = 1'- 0„ NEW 5/8" GWB WITH VAPOR -RETARDANT PAINT SHOWER PROVIDE SEALANT 1 1 /2" = 1'_ 0" z CID a) N 1 1 1/2"=1,_0„ ri s: I'1 z CD EXISTING WAREHOUSE /4 LEAR SPAC 0:J CONSTRUCTION PLAN 0 4' 2"it7P1-aRocDr' "EX fS l{)C. To2 Nm-n EXISTING OFFICE R-49 INSULATION TOTAL, MEETS THE PRESCRIPTIVE METHOD OF 2012 WASHINGTON STATE ENERGY CODE, SECTION 402, TABLE C402.2 2X6 © 16" O.C. CEILING JOIST 5/8" GWB 8'-0" BOTTOM OF CEILING 2X6 LEDGER WITH (3) 20D NAILS ® EACH STUD 2X6 ® 16" O.C. WITH R-21 BAT1- INSULATION (INTERMEDIATE FRAMING) - MEETS THE PRESCRIPTIVE METHOD OF 2012 WASHINGTON STATE ENERGY CODE, SECTION 402, TABLE C402.2 POWDER DRIVEN FASTENER ® 24" O.C. 2X4 PRESSURE -TREATED PLATE FASTENED TO CONCRETE 0 EXISTING WAREHOUSE J SEE ACCESSORY SPECIFICATIONS FOR SHOWER HEAD/VALVE. ADA ACCESSIBLE SHOWER, FIBER FAB / ASSISTED LIVING MODEL #38H1/WHITE OR APPROVED EQUAL. TRANSFER SIDE 18" VERITCAL GRAB BAR B/S GRAB BAR MIN. 33" / MAX. 36" A.F.F. FOLDING SEAT OTHER STALLS WITHOUT ADA COMPLIANCE SHALL BE SIMILAR IN DESIGN WITH FIXED HEAD ASSEMBLY. MAX. SYMBOL LEGEND EXISTING CONSTRUCTION TO REMAIN NEW NON -INSULATED INTERIOR PARTITION CONSTRUCTION WITH 2X4 FRAMING AND 5/8" GWB. PROVIDE HARDIE BACKERBOARD 500 0 INSIDE FACE OF SHOWER WALL COMPARTMENT NEW INTERIOR PARTITION CONSTRUCTION WITH 2X6 FRAMING ® 1 6"O.C., 5/8" GWB AND R21 BATT INSULATION NEW SWITCH LOCATION WITH OCCUPANCY SENSOR N NEW RECESSED CAN LIGHT. N=NEW GENERAL CONSTRUCTION NOTES 1. REFER TO PROJECT NOTES FOR CONSTRUCTION REQUIREMENTS. 2. GENERAL CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK. 3. ALL INTERIOR PARTITION, PENETRATIONS, AND OTHER OPENINGS IN THE BUILDING SHELL SHALL BE SEALED, GASKETED, OR WEATHER STRIPPED AS REQUIRED TO MEET PARTFON RATINGS. 4. WHERE PARTITION LAYOUT INTERSECTS EXISTING SHELL/CORE GYPSUM BOARD, REMOVE EXISTING CORNER BEADS AND OTHER ACCESSORIES, ALIGN FACE OF PARTITIONS, TAPE & SAND SMOOTH FOR NEW FINISH. ATTACHED TO PARTITIONS. 5. PROVIDE PARTITION ANCHOR BRACKETS FOR ALL CASEWORK, FIXTURES, EQUIPMENT, & DEVICES MOUNTED ON OR 6. PARTITIONS ARE TO BE BUILDING STANDARD FLOOR TO CEILING PARTITIONS, UON. SEE TYPICAL WALL DETAIL SHEET FOR MORE INFORMATION. 7. DOORS AND CASED OPENINGS WITHOUT DIMENSIONS OR DETAILS ARE TO BE LOCATED 4" FROM ADJACENT WALL OR MATCH EXISTING SUITE STANDARD. 8. PROVIDE AN EXHAUST FAN FOR VENTILATION AS REQUIRED BY MECHANICAL CODE. 9. PROVIDE A SPACE -HEATING SYSTEM THAT CAN PROVIDE AN AVERAGE TEMPERATURE OF 68 DEGREES (NO PORTABLE SPACE HEATERS) FOR HUMAN COMFORT. KEYED FLOOR NOTES NEW ADA TRANSFER SHOWER UNIT WITH FOLDING SEAT BY FREEDOM SHOWERS OR EQUAL, WITH MINIMUM INSIDE DIMENSION OF 36" X 36' AND WITH BARRIER -FREE THRESHOLD - INSTALL UNIT PER MANUFACTURER'S INSTRUCTIONS. ALSO, SEE ELEVATIONS L/A.2A.1. FOR ADA REQUIRED MOUNTING HEIGHTS AND DIMENSIONS. PROVIDE SHOWER CURTAIN WITH ALUM. ROD. NEW RESIDENTIAL TYPE 50-GALLON ELECTRIC WATER HEATER (NOT FOR SPACE HEATING) BY A.O. SMITH. SHOWER ROOM FLOOR SHALL BE SHEET VINYL AND HAVE 6" INTEGRAL COVED BASE. COORDINATE INSTALLATION WITH THE SHOWER UNIT TO PREVENT MOISTURE DAMAGE. ALL WALLS SHALL HAVE AN IMPERVIOUS SURFACE (PLAM) UP TO 48" MIN A.F.F. WITH EXTRUDED ALUMINUM TRIM ® THE TOP AND BOTTOM, ABOVE THE FLOOR BASE. NEW 3'-0" X 7'-0" BUILDING STANDARD DOOR WITH ADA ACCESSIBLE DOOR HANDLE AND PRIVACY LOCK. WiTH A U-FACTOR OF 0.37 - PROVIDE GASKETS. ROD FOR HANGING CLOTHES. NEW PLUMBING WALL - PROVIDE MOLD -RESISTANT FIBERGLASS BATT INSULATION AT THIS WALL EXISTING DEMISING WALL BETWEEN OFFICE SPACE AND EXISTING WAREHOUSE (SUITE 611). NEW FRAMELESS 60" X 36" MIRROR. BASE BOARD HEATER LOCATION METAL THRESHOLD. 42" LONG ADA COMPLIANT FREESTANDING BENCH FURNITURE BY TENANT. WITH SUP -RESISTANT SURFACE. BENCH SHALL NO ACCUMULATE WATER, AND THE ALLOWABLE STRESSES SHALL NOT BE EXCEEDED FOR MATERIALS USED WHERE A VERTICAL OR HORIZONTAL FORCE OF 250 LBS. IS APPLIED AT ANY POINT ON THE SEAT, FASTENER MOUNTING DEVICE, OR SUPPORTING STRUCTURE. SEE DIAGRAM FOR REQUIRED DIMENSIONS, DETAIL K/A.2A.1. KEYED CEILING NOTES 21 NEW GWB CEILING Q NEW 50 CFM EXHAUST FAN ONE PIECE LUXERY SHOWER, FIBER FAB / MODEL #36 / WHITE OR APPROVED EQUAL. 1'-3" MAX EA. SIDE CONTROL WALL ADA SHOWER ELEVATIONS • 0 I, 8 3/8" = 1,- 0" • 4'-0" MAX. CONTROLS & HANDSHOWERS LOCATION Tenant: SHOWER ROOM ADDITION 617 INDUSTRY DRIVE, SUITE 611 TUKWILA, WA 98188 A Tenant Improvement for: SCANLAN KEMPERBARD COMPANIES 617 INDUSTRY DRIVE TUKWILA, WA 98188 burgess design interiors 0 architecture 1326 Fifth Avenue . Suite 400 . Sea de Washington 98101 T: (2061587,7120 F: (206) 587.7122 All reproduction & intellectual property rights reserved c 2015 Professional seal No. Issue Description Date REVIEW SET 06.15.15 REVIEW SET 06.26.15 REVIEW SET 07.06.15 PERMIT SET 07.08.15 City Electronic Stamp -REVIEWED FOR CORE COMPLIANCE APPROVED SEP 3 0 2015 City ot Tukwila BUILDING DIVISION Location RECEIVED Cite OF TUKWILA SEP 1 8 2015 PERMIT CENTER Drawn by: GG Project Manager: Project No: 15-3408-00 RM CONSTRUCTION PLAN Original drawing is 24" x 36". Scale entities accordingly if reduced A.2A.1 .xa...-rYt..'Fx'.s+riauSK'GS.Tt�.^F+#3G:LSD'mPii�tt'S:tll'..^[kZ�1SCA'xtfU�S4L2T:tp3:Le.oa..Nii'f"N.:3NV*a.L+FAWx:3.1Vr.SR?C.9'-VC�WR+_fiiu:+sF��n22M^ iL'LW , am':5tv_Sn�r:.ti' ,.l ^ •• _. '^F" � •• '" :'• 3YTG'.6.;':C/.1Si9YPS�Fv^..Yiw,F`»wP'cFES.'-C:'�.azf>i��'P: ICS:'^.+�44LTc:fT4Y:>^i=�Y.['2:L5„1v r�.a..,C'`�^�WSF.1:[."^:G' A.":..;.'T .�"... �. �'S�'^�1+."�^ 2 1.5ID.YJYf�1Y�'"eS.�SPf.SSSSC�.ra'fLS.AY2 Ai+x3.t24'+LSY'ffis'M'm�^IDk't�..i:.Hitf �'A'S[.tiaar+9'1'1.iSct4m�.'�T,..MRGn➢lc�iS'969.F�.RYriti.,K@.eaYTJSe(sT_dAS•SaC2'1'QfS^�'��R".n"lVr: :T3G? 3tiYYR�.tNCF.J.4�9AY.�S:RT.`: N:Lei+Y"'T."tY+G�tLM:3f'�"v�3CC6w:e �C'LR'.14SL W GSR.F't. dta L�.f?! EXISTING WAREHOUSE 12"x12" existing up to 7—roof termination 6" 93-yam PERFORMANCE RATINGS QTXEN SERIES FANS Hill PERFORMANCE Static Fan Model Pressure (Ps) CFM Sones Watts 9.19 69 <D.3 19.7 9.2 9.7 22.2 33 5 TXEN150 0.10 150 1.4 51.3 HVI CERTIFIED AMPS HVI-2100 CERTIFIED RATINGS comply with new testing technologies and procedures prescribed by the Horne Ventilating Institute, for off -the -shelf products, as they are available to consumers. Product performance is rated at 0.1 in. static pressure, based on tests conducted in a state-of-the-art test laboratory. Sones are a measu re of humanly-perceivedd loudness, based on laboratory measurements. Model Amps _92 QTXEN150 0.5 ENERG ' STAG WEIGHT --- Model Shipping Weight CITXEN15O 13.6 Ibs L1 EF-1 EXISTING OFFICE 1/2" 1' 0" EF-1 QTXEN Series Fans MODELS-Q QTX" XEN1403 QTXEN15O PARCEL NUMBER: 0252304-9008 LEGAL DESCRIPTION: POR W 1/2 OF SEC 25 & E 1/2 OF SEC 26 AS FOLG BEG AT E 1/4 COR SEC 26 TH N 88-06-42 W 105.84 FT TO TPOB TH N 01-47-28 E 2.45 FT TAP OF CURVE TH ALG A CURVE TO RGT RAD 410.28 FT THRU C/A OF 46-46-10 ARC DIST 334.90 FT TH N 48-33-38 E 188.36 FT TH ALG A CURVE TO RGT RAD 410.28 FT THRU C/A OF 72-16-35 ARC DIST 517.55 FT TO AN NXN WITH A LN BEARING S 56-38-20 E TH S 56-38-20 E ALG SD LN 69.93 FT TH S 48-44-23 E 71.30 FT TH S 45-09-27 E 9.91 FT TO WLY MGN OF JAMES CHRISTENSEN RD NO 1479 TH S 37-54-41 W 468.23 FT TH S 32-39-25 W 132.67 FT TH N 88-12-32 W 524.50 FT TH N 01-47-28 E 93.11 FT TO TPOB LESS UP RR OPER R/W SITE PLAN —NTS ANDOVER PARK EAST 4 INDUSTRY DRIVE RAIL RUAD • LOT 7 1 rr 17 13 12 9 16 14 PROJECT LOCATION KEY PLAN/FLOOR PLATE "e25' STREET MAP NO CHANGE IN EXITING EXIT AREA OF WORK EXISTING OFFICE EXISTING WAREHOUSE PROJECT LOCATION Air Conditioning Heating Controls Sales Service Installation "QUALITY ASSURED") pacific air control, inc. 11812 Northcreek Parkway N., Suite 104 Bothell, WA 98011 ph: (206) 682-6393 fax: (206) 340-2270 Contractor's License No.: PACIFAC230P8 PROJECT FOR: W Cr) 0 IZ www.pacificaircontrol.com 00121. co Clu a) aysi= ca) N x W L a3 0 umusi CO 00 00 rn • MINN ri) 'CD c grim - Timm CSD .;a ldO.... ;Z\ DATE ._ 09/17/15 - ,,er+rs.+it .as'., ,C,. xs,,,,,. rrm.•.al DESCRIPTION PERMIT_ISSUE F" Q A A THIS DRAWING IS THE SOLE CONTROL, INC. ANY REPRODUCTION, ADDITIONS AND/OR MODIFICATIONS WRITTEN APPROVAL OF PACIFIC PROJECT MANAGER KC PROPERTY OF PACIFIC AIR DUPLICATION, REQUIRE THE AIR CONTROL, INC. r5Mi DESIGNED BY KC/AH DRAWN BY AH CHECKED BY KC SCALE AS_NOTED PROJECT NO. T150908 ORAVr9NG 711LES M,.�»R4�..aW,�-.�,�> v..�.fl,. EXHAUST_FAN k 0 REVIEWED FOR - -CODE-COMPLIANCE- APPROVED k� SEP 3 0 2015 . _City of Tukwila BUILDING DIVISION SHEET NUMBER 1 1 of 1 COPYRIGHT 02001 PACIFIC AIR CONTROL, INC.