Loading...
HomeMy WebLinkAboutPermit M15-0137 - BOEING #9-110 - AHU REPLACEMENTBOEING #9-11O AHU REPLACEMENT 9725 E MARGINAL WAY S M15-0137 City of Tukwila Department of Community Development =v 6300 Southcenter Boulevard, Suite #100 �Tukwila, Washington 98188 j8 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov Parcel No: Address: Project Name: MECHANICAL PERMIT 0003400018 Permit Number: 9725 E MARGINAL WAY S BLDG 9-110 BOEING #9-110 - AHU REPLACEMENT Issue Date: Permit Expires On: M15-0137 10/28/2015 4/25/2016 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS INC 4600 S 134 PL , SEATTLE, WA, 98168 HOLADPI379N0 111 Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2017 DESCRIPTION OF WORK: REPLACE ONE AIR HANDLING UNIT Valuation of Work: $106,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $1,484.74 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE,VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: L),QJ'` Date: IN.-� 'v I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this develop‘permit nd agre to the conditions attached to this permit. Signature: Print Name: (),e cr`.• Date: (U -v _ (J.-- This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: Readily accessible access to roof mounted equipment is required. 4: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ***MECHANICAL PERMIT CONDITIONS*** 10: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 11: Manufacturers installation instructions shall be available on the job site at the time of inspection. 12: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 16: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 18: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 0705 REFRIGERATION EQUIP 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST LNLA47 °Foe.cs' —1fb CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 htto://www.TulcwilaWA.gov Mechanical Permit No. Project No. Date Application Accepted: [ O- Date Application Expires: For oj:ce use onl MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: ace/stud u Tenant Name: 14 'QJYlf./l New Tenant: ❑ Yes i;;I.r1Vo 1/46te,‘: Ct..--1 PROPERTY OWNER Name: !2 Oellt �1r Addressso tool; 07 M L ..0;1 City: C State: Zi Z /L CONTACT PERSON — person receiving all project communication Name: • 121nriP Ha,f'd_tA m, }"' (I Address:4( o smg 1, Sco City: ae ) Zipulio f tark ` Phones• . z0..44S30 Fax?» 2M k slop Email:GiINIY1K 11 0 I eliLtki". rkLikstaiti King Co Assessor's Tax No.: 0003(.1000 i O Suite Number: Floor: MECHANICAL CONTRACTOR INFORMATION Company Name: ` ' Q can .. Dearb Address: S / Pi ""�" City: C State:: Zi i L. 6 Pho�e�0 2 SD tI S-3v Fv%a le I� hod Contr__Reg No14L14bpi 1.11 kftp Date: A , 1451 Tukwila Business License No.: Valuation of project (contractor's bid price): $' 0 6,UOU_ Describe the scope of work in detail: 1 • MIR Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement E Fuel Type: Electric ❑ Gas ❑ Other: H:\Applications1Forms-Applications On Line12011 Applications\Mechanical Permit Application Revised 8-9-11.doca Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <I00k btu Furnace > 100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfrn Unit Type Qty Air handling unit J >10,000 cfin / Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDI ORIZE r ENT: Signature: W - - Date: I Q" 1 c- 1 ' Print Name: Lip In r• t { I'L. 4 . . Mailing Address: 4660 S CSi - J H:\Applications\FonwApplications On Line\2011 Application\Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Day Telephone: ae(o Z SZ) Les 3 () Sew L3 ot_W ( State Zip City Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS I ACCOUNT I QUANTITY PermitTRAK I PAID $1,484.74 M15-0137 Address: 9725 E MARGINAL WAY S BLDG 9-110 Apn: 0003400018 $1,484.74 MECHANICAL $1,427.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $1,109.60 PLAN CHECK FEE R000.322.102.00.00 0.00 $285.53 TECHNOLOGY FEE $57.11 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6440 R000.322.900.04.00 0.00 $57.11 $1,484.74 Date Paid: Thursday, October 15, 2015 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 07189G Printed: Thursday, October 15, 2015 1:50 PM 1 of 1 Cl._S L/ V SYSTEMS INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: Type of Inspection: Address: q72§- E Me1htio 1,j,1 S Date Called: Special Instructions: • 9^ 1-no Date Wanted:f / f 1 Z/7„e�// � rr„ /61 'CO P.m. Requester: ate, Phone No: j_66- 6-0 - VS-3 f ►�, Approved per applicable codes. D Corrections required prior to approval. COMMENTS: Inspector:4 Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Catt to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 mIs=ut3.7 Project: O gF9 —1io Type of Inspection: S o;W. be Tar -- Address: g72S E. ►A► iAt_ I jY S Date Called: Special Instructions. Date Wanted: %% a.rn Requester: IC Phone No: 2)6 -6S-0—gg<31 pproved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 /H /5 6/3 7 Project , Type of Inspection: Address:re��%� f (7 L5 r d' v//11'�jrn� t( Date Cad: '�►1 Special Instructions: ,/ ,f 7 K C C,,L nk D Wanted:I ' �� a.rr °Pe +i/ p.m. Requester: ,d/ fZ .� 7ki Phone No: 65-n eff f y Approved per applicable codes. Corrections requireus prior to approval. COMMENTS: pup q 44 1,ct(ck, 6-4 id/A e A- /f J -r inspector: Date:! 2 _3 ( J5_ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. i INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWIL,A BUILDING DIVISION 6300 Southcenter Blvd_, #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Projec , eve Type of Ins ection: � e4 f-ivA Address: Date Called: Special Instructions: kit Date Wanted: 1p.m. ® a.rn:. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: ( 'F-, � c k or f rots 46 t Tk'f(e- ( i /45 q ff ra ii cf. 1 UL�=— 'cam efe_C_ - +ID Ft r-e 4 afr-b lra tisr f C [f v°1 Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NUMBER /45- -O/S-" I(0- F=--/75> PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: 51,fl mil-// 0 gm-6 04 rr Type of Inspection: --NPt b (ic,?- 7-p-Z- a -- Address: Suite #: Contact Person: Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: , �I �r 7) f` c-r7) 2. ( l d Fr/pp -- d p Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: i 4 -/ - i Date: (2/-6(, Hrs.: f $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. CaII to schedule a reinspection. Billing Address Attn: Address: Company Name: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 SEATTLE ENERGY CODE Project Information Commissioning Plan (Section 141 6.3.1) Systems Balancing (Section 1416.3.2) Functional Testing (Section 1416.3.3) PERMIT # M15-0137 FIGURE 14B COMMISSIONING COMPLIANCE CHECKLIST Project Name: Boeing Building 9-110 AHU Replacement Project Address: 9725 E Marginal Way S. Bldg 9-110 Commissioning Authority: Carrier ® Commissioning Plan was used during construction and included items below • A written schedule including Systems Testing and Balancing, Functional Testing, and Supporting Documentation ▪ Roles and Responsibilities of the commissioning team • Functional Test procedures and forms ❑ Systems Balancing has been completed N/A • Air and Hydronic systems are proportionately balanced in a manner to first minimize throttling losses • Test ports are provided on each pump for measuring pressure across the pump. Supporting Documents (Section 1416.3.4) • HVAC Systems Functional Testing has been completed (Section 1416.3.3) HVAC systems have been tested to ensure that equipment, components, and sub -systems are installed, calibrated, adjusted and operate in accordance with approved plans and specifications HVAC Controls Functional Testing has been completed (Section 1416.3.3) Ongoing HVAC controls have been tested to ensure that control devices are calibrated, adjusted and operate properly. Sequences of operation have been functionally tested to ensure they operate in accordance with approved plans and specifications ❑ Lighting Controls Functional Testing has been completed (Section 1513.8) N/A Lighting controls have been tested to ensure that control devices, components, equipment, and systems are calibrated, adjusted and operate in accordance with approved plans and specifications Systems documentation, record documents and training have been completed or are scheduled • System documentation has been provided to the owner or scheduled date: • Record documents have been submitted to owner or scheduled date: • Training has been completed or scheduled date: Commissioning Report (Section 1416.3.5) Certification ❑ 'Commissioning Report submitted to Owner and includes items below • Completed Functional Tests documentation Final Documentation Due to Owner 12/31/15 • Deficiencies found during testing required by this section which have not been corrected at the time of report preparation and the anticipated date of correction • Deferred tests, which cannot be performed at the time of report preparation due to climatic conditions or other circumstances beyond control of Commissioning Authority. I hereby certify aL all requirements for Commissioning have been completed in accordance with Energy Code, including all items above. er's Representative 12/30/15 Cc i. _.T UKWILA Seattle amendments do not apply to residential spaces. except that procedural requirenrentc 0 i'in onnative notes in boxed text or brackets, and amendments to administrative and enforcement provisions, • r �•�iil`tt/ �atR 104 Effective November 23. 2010/January 1, 2011 EXTENDED WARRANTY CUSTOMER PROTECTION PLAN turn to the expert CARRIER CORPORATION P.O. BOX 4808 Syracuse, NY 13221 Carrier Commercial Service, Seattle 3215 S 116TH ST STE 133 TUKWILA, WA 981681973 RE OWNER: Boeing 9-110 S 96TH PL SEATTLE, WA 98108 November 12, 2015 Registration # IN3271903815 Contract Codes AA Model Number 50A3C030GPG3380 Serial Number 4515U46629 Start up Date 12/06/2015 Extended Warranty 12/07/2015 Start Date End Date 12/06/2016 Tag Below indicates the applicable coverage for the Extended Warranty portion of Carrier's Warranty Plan (i.e., after expiration of the initial standard warranty). Coverage 1st year only the complete unit will have labor only coverage. Carrier will provide the straight time labor to repair or replace any part or materials determined by Carrier to be defective. (quantity) Verification Inspection(s) per year to be performed by Carrier to verify that preventative maintenance is being performed in accordance with Carrier's operating and maintenance instructions. The foregoing is for information purposes only and is not intended to vary or supplement the obligations of the parties which are stated in the contract of sale for the equipment. For complete warranty coverage and conditions, see the applicable terms and conditions covering the sale by Carrier of the above referenced equipment. Procedures: The extended Warranty is based on the condition that good preventative maintenance practices are followed in accordance with Carrier's operating and maintenance manual for each unit. The Extended Warranty is further based on the condition that Carrier is allowed to perform at least one jobsite verification inspection per year and is allowed to review the owner's maintenance logs, service reports, and preventative maintenance records for the equipment under Extended Warranty. The equipment owner should notify Carrier Commercial Service as soon as possible of equipment problems or of any warranty claim. Exclusions: Any damage beyond Carrier's control or due to: unauthorized alterations, improper or lack of preventative maintenance. Damage due to any outside services such as: steam, voltage, water or air conditions. Equipment fluids such as: lithium bromide, oil, refrigerant. Failure caused by: abuse, accident, corrosion, erosion, freezing weather, improper operation, malicious acts, misuse or vandalism. Items not mechanically maintainable such as: cabinets, fixtures, grillage, piping, supports or tubes. Moving of stock, fixtures, walls or partitions needed to perform any warranty or limited maintenance work. Tube cleaning or water box head removal. Maintenance Options: An "X" below indicates the party is responsible to perform the necessary preventative maintenance during the Extended Warranty period. (N/A means Not Applicable) Second Year Annual Limited Maintenance : Third Year Annual Limited Maintenance: Fourth Year Annual Limited Maintenance: Fifth Year Annual Limited Maintenance: Service Performed: Service Performed: Carrier or Owner Carrier or Owner Sixth Year Annual Limited Maintenance: Seventh Year Annual Limited Maintenance: Eighth Year Annual Limited Maintenance: Ninth Year Annual Limited Maintenance: (800) 227-7437 CARRIER CORPORATION Contract Administration Dept P.O. BOX 4808 Syracuse, NY 13221 Carrier Commercial Service, Seattle 3215 S 116TH ST STE 133 TUKWILA, WA 981681973 Attention: Boeing 9-110. Subject: S 96TH PL SEATTLE, WA 98108 turn to the experts Send To: Boeing 9-110 S 96TH PL SEATTLE, WA 98108 Tag: I want to start by thanking you for your purchase of Carrier equipment as well as your use of Carrier Commercial Service for the equipment startup. Our files show that the following equipment, furnished on the subject order, has been placed into operation: MODEL# SERIAL# ORDER # SHIP DATE START UP DATE 50A3C030GPG33800 4515U46629 1639329 11/10/2015 12/06/2015 The Carrier warranty on the above equipment is governed by the terms and conditions on the sales document with Carrier. Our standard warranty period ends 12 months from the date of the initial operation (start-up) or 18 months from the date of shipment, whichever occurs first. Standard warranty includes parts only. Labor is also included during the standard warranty period for equipment model numbers beginning with 16, 17, 18, 19, 23, 30HX, 30MP, 30XA, 30XW, 30RA OR 3ORB. All first year warranty labor must be performed by Carrier Commercial Service. Products other than those listed above may include first year labor coverage if the option was expressly included in the sale of the equipment. Carrier offers several options to maintain and help ensure reliable equipment operation during and after the standard warranty period. If you purchased optional extended warranty coverage with your equipment, you will be receiving a certificate of coverage in a separate letter. If you wish to purchase extended warranty coverage now, Carrier offers optional extended warranties which can be purchased through this office. Carrier also offers several levels of maintenance contracts covering every aspect of equipment preventive maintenance. Preventive maintenance is one of the best ways to help ensure reliable equipment operation. We value your confidence in Carrier and thank you for the opportunity to be of service. My staff and I are available to help you. We can be reached at (206)439-0097 Very Truly yours, Peter Cedergreen Carrier Commercial Services Carrier Corporation EXTENDED WARRANTY CUSTOMER PROTECTION PLAN turn to the experts CARRIER CORPORATION P.O. BOX 4808 Syracuse, NY 13221 Carrier Commercial Service, Seattle 3215 S 116TH ST STE 133 TUKWILA, WA 981681973 RE OWNER: Boeing 9-110 S 96TH PL SEATTLE, WA 98108 November 12, 2015 Registration # Contract Codes Model Number Serial Number Start up Date Extended Warranty Start Date End Date Tag IN3271907815 BE 50A3C030GPG3380 4515U46629 12/06/2015 12/06/2016 12/06/2020 Below indicates the applicable coverage for the Extended Warranty portion of Carrier's Warranty Plan (i.e., after expiration of the initial standard warranty). Coverage EXTENDED FOUR YEAR WARRANTY ON COMPRESSOR PARTS ONLY - During the second through fifth years after the expiration of the Standard Product Warranty, Carrier Corporation (hereinafter "Carrier") warrants this product against failure due to defect in materials or workmanship under normal use and maintenance as follows. If a compressor fails due to defect during the applicable warranty period Carrier will provide a new or remanufactured part, at Carrier's option, to replace the failed defective part at no charge for the part. Alternatively, and at its option, Carrier will allow a credit in the amount of the then factory selling price for a new equivalent part toward the retail purchase price of a new Carrier product. (quantity) Verification Inspection(s) per year to be performed by Carrier to verify that preventative maintenance is being performed in accordance with Carrier's operating and maintenance instructions. The foregoing is for information purposes only and is not intended to vary or supplement the obligations of the parties which are stated in the contract of sale for the equipment. For complete warranty coverage and conditions, see the applicable terms and conditions covering the sale by Carrier of the above referenced equipment. Procedures: The extended Warranty is based on the condition that good preventative maintenance practices are followed in accordance with Carrier's operating and maintenance manual for each unit. The Extended Warranty is further based on the condition that Carrier is allowed to perform at least one jobsite verification inspection per year and is allowed to review the owner's maintenance logs, service reports, and preventative maintenance records for the equipment under Extended Warranty. The equipment owner should notify Carrier Commercial Service as soon as possible of equipment problems or of any warranty claim. Exclusions: Any damage beyond Carrier's control or due to: unauthorized alterations, improper or lack of preventative maintenance. Damage due to any outside services such as: steam, voltage, water or air conditions. Equipment fluids such as: lithium bromide, oil, refrigerant. Failure caused by: abuse, accident, corrosion, erosion, freezing weather, improper operation, malicious acts, misuse or vandalism. Items not mechanically maintainable such as: cabinets, fixtures, grillage, piping, supports or tubes. Moving of stock, fixtures, walls or partitions needed to perform any warranty or limited maintenance work. Tube cleaning or water box head removal. Maintenance Options: An "X" below indicates the party is responsible to perform the necessary preventative maintenance during the Extended Warranty period. (N/A means Not Applicable) Second Year Annual Limited Maintenance : Third Year Annual Limited Maintenance: Fourth Year Annual Limited Maintenance: Fifth Year Annual Limited Maintenance: Service Performed: Service Performed: Carrier or Owner Carrier or Owner Sixth Year Annual Limited Maintenance: Seventh Year Annual Limited Maintenance: Eighth Year Annual Limited Maintenance: Ninth Year Annual Limited Maintenance: ,Rewrned Pprts InrormpIIan Airway Bill # / Tracking Number: Shipper Name: Extra Unit Data Starter and/or VFD Drive Manufacturer: Drive Serial Number: Overall Startup Information Were Repairs Required Total time required for Start- If Factory Charged: in order for the Unit to Start and Run? up(hrs): 029. S Total time required for Repairs lbs. Refrigerant added Removed Yes No 1.(hrs): Describe all Repairs and List all defects that required repair and what was done to correct it below (use more sheets as needed): How was defect repaired? Root Cause of Defect (why did it happen?) Qttice [Sfarbuo Data Service Office: 5a0 Startup Date: (.1r Startup'Job Number: V'%$i 1 SSs%r Technician Name (Print):,; {•f r „ &Wie Technicaln e-mail: ✓✓ ' Tech Phone Contact Number: ZO(-5/0+ lS Defect or Symptom Unit jobt Data Model Number:91,0C6245C.P23965 Serial Number: C14573CjSe't34'z9 Job Name: /3456,411Lr et Address: City . State: WO Country: t-s► Part Number Component 0 LL r :° CO a) C O N O oCO o � U cVo c N E '+y .c O c_ c H N co N oe O) i E O Q U (n 1•! -O Q N L N a Us U ' < 2 Z co OCO 0 U) Ecb O L V 1) X Q) co LL. O co cl C O co N C How was defect repaired? How was the problem repaired? Are there any safety issues at the jobsite? if yes, describe: Na Were ail of Carrier's system recommendations followed (eg: Flow control, water loop volume, etc}?* J If no, describe Root Cause of Defect (why did it happen?) Defect or Symptom Where did it leak? Describe any problems with the visual appearance of the unit Part Number c a)o.UCl c 00Enc d .c o o �— a DoU U m 3 o w CO CO N CO v) E CO O O Q U u).6 � O 1:1 o N Q .ter C.)L 0 ' • N Z O . L o (!) co U E N U O o LL O O c O co c c UNIT START-UP CHECKLIST MODEL NO.: 5 (5A' y 7 to p.3 ie.600 SERIAL NO.: 'i' / f C SOFTWARE VERSION Q TECHNICIAN: R. (,4 DATE: I a-../0 -5 PRE -START-UP: ErVER1FY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT I- REMOVE ALL COMPRESSOR SHIPPING HOLDDOWN BOLTS AND BRACKETS PER INSTRUCTIONS Q4 RIFY INSTALLATION OF ECONOMIZER HOOD PER INSTRUCTIONS (including relocation of OAT sensor if necessary) la<RIFY INSTALLATION OF ALL OPTIONS AND ACCESSORIES E ERIFY PROPER INSTALLATION AND LOCATION OF STATIC PRESSURE TRANSDUCERS (Supply Duct and Building Pressure when applicable) Bl." RIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT O�j1 RIFY INSTALLATION AND LOCATION OF LAT SENSORS (multi -staged gas, SCR electric, hydronic heat only) CYCHECK GAS PIPING FOR LEAKS (48A ONLY) a -CHECK THAT RETURN -AIR FILTER AND OUTDOOR -AIR FILTERS ARE CLEAN AND IN PLACE [1:14tRIFY THAT UNIT IS LEVEL WITHIN TOLERANCES FOR PROPER CONDENSATE DRAINAGE IlktilECK FAN WHEELS AND PROPELLERS FOR LOCATION IN HOUSING/ORIFICE, AND SETSCREW IS TIGHT 1:g4ERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED I4ERIFY THAT SUCTION, DISCHARGE, AND LIQUID SERVICE VALVES ON EACH CIRCUIT ARE OPEN F34ERIFY THAT CRANKCASE HEATERS HAVE BEEN ON 24 HOURS BEFORE START-UP START-UP: ELECTRICAL SUPPLY VOLTAGE Ll-L2 "J% L2-L3 7/ L3-LI //(-2 COMPRESSOR AMPS — COMPRESSOR NO.1 LI COMPRESSOR AMPS — COMPRESSOR NO. 2 L 1 SUPPLY FANS AMPS (CV/SAV) (VAV) ,9 `, i, // 3 *VAV fan supply amps reading must be taken with a true RMS meter for accurate readings. TEMPERATURES OUTDOOR -AIR TEMPERATURE RETURN -AIR TEMPERATURE COOLING SUPPLY AIR GAS HEAT SUPPLY AIR ELECTRIC HEAT SUPPLY AIR PRESSURES GAS INLET PRESSURE GAS MANIFOLD PRESSURE REFRIGERANT SUCTION REFRIGERANT DISCHARGE L2 (S,( S7 GG /O 1 ./ L2 EXHAUST FAN AMPS F DB (Dry Bulb) F DB G- F WB (Wet Bulb) /V fA F (48A ONLY) F (50A ONLY, IF EQUIPPED) AVIS' IN. WG (48A ONLY) STAGE NO. 1 it•V IN. WG CIRCUIT NO. 1 / U 7 PSIG CIRCUIT NO. / PSIG VERIFY REFRIGERANT CHARGE. 0 Carrier Corporation 2015 L3 C'Z C.07' L36 STAGE NO. 2 111/7 IN. WG (48A ONLY) CIRCUIT NO. 2 / 1%3 - PSIG CIRCUIT NO. 2 47-__ 7 PSIG Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice arx7 without incurring obligations. Catalog No. 04-53480119-01 Printed in U.S.A. Form 48/50A-12T Pg CL-6 4-15 Replaces: NEW CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE MODEL NUMBER: SERIAL NUMBER: DATE: TECHNICIAN: CONTROLS SETPOINT AND CONFIGURATION LOG g►,�,,,�} O Software Version ,�,/Sf 4W.4 MBB CESR131343-- (1'.J) Q li•rj / RCBCESR131465-- if i ECB CE$R73/465 p. r— b NAVI CESR131227-- SCS CEM MARO CESR131226- CESR131174-- CESR131171- ITEM EXPANSION RANGE DEFAULT ENTRY UNIT UNIT CONFIGURATION (/tlV pert- C.TYP - Machine Control Type 1 - 6 (multi -text strings} 4 CNFN Fan Mode (0-Auto, 1=Cont) 0 -1 (multi -text strings) 1 r-Q,ryM�{�. , RM.CF Remote Switch'Config 0- 3 (multi -text Strings) 0 CEM CEM Module Installed Yes/No No /�% TCS.0 Temp.Cfnp.Strt.Cool Far 0 - 60 min 0 n TCS.H Temp.Cmp.Stft.Heat Factr 0 - 60 min _ 0 /1 SFS.S Fan Fail Shuts Down Unit Yes/No No Ai SFS M Fan Stat Monitoring Type _ 0 - 2 (mufti -text strings) 0 /I% .$ .. VAV.S VAV Unocc.Fan Retry Time 0 - 720 min 50 6 0 SIZE Unit Size (20.60) _ 20 - 60 20 _ Disch.Press. Transducers Yes/No No ),./DP.XR SPJXR Suet. Pres. Trans. Type 0 -1 multi -text steins) 0 f-- RFG.T Refrig:0=R22 1=R410A 0 -1 ,multi -text strings) 1 r CND.T Cnd HX Typ:O=RTPF 1=MCHX 0 -1 multi -text strings) 0 t MAT.S MAT Cale Config 0 - 2 (mufti -text strings) 1 Ci//t , t j /,a,,ct AIAT.R Reset MAT Table Entries? Yes/No No N MAT.() MAT Outside Air Default 0-100% 20 . ,I) ALTI Altitude in feet: 0 - 60000 0 DLAV I Startup Delay Time 0 - 900 sec 0 STAT 1 TSTAT_Both Heat and Cool Yes/No No N AUX.R Auxiliary Relay Config , 0 - 3 0 /1/s1...1-- . Is Is SENS INPUT SENSOR CONFIG SPT.S Space Temp Sensor Enable/Disable Disable 1 SP.O.S Space Temp Offset Sensor _ Enable/Disable Disable 47 SP.O.R Space Temp Offset Range 1 -10 5 5 RRH.S Retum Air RH Sensor Enable/Disable Disable 46 FLT.S Filter Stat.Sw.Enabled ? Enable/Disable Disable COOL COOLING CONFIGURATION ZGN Capacity Threshold.AOst -10 -10 _ 1 / MC.LO Compressor Lockout Temp -20 to 55 dF 40 y¢ C FOD Fan -off Delay, Mech Cool 0 - 600 sec 60 GO - MLV Min. Load Valve? (HGBP) - Yes/No No N M.M. Motor Master Control? Yes/No No DS.EN Enable Digital Scroll? _ Yes/No No J i'V DS.MC DS Min Digital Capacity 25 -100% 50 4"; U DS.AP Dig Scroll Adjust Delta 0 - 100% 100 / i 01 DS.AD Dig Scroll Adjust Delay 15 - 60 sec 20 DS.RP Dig Scroll Reduce Delta 0 - 100% r 6 .(s _ DS RD Dig Scroll Reduce Delay 15 - 60 sec 30 "'s. O DS.RO Dig Scroll Reduction OAT 70 -120 dF 95 9. i DS.MO - Dig Scroll Max .Only OAT 70 -120 dF 105 , U c- HPSP Head Pressure Setpoint 80 - 150 dF 110 !/{t - A1.EN Enable Compressor Al Enable/Disable Enable E A2.EN Enable Compressor A2 'Enable/Disable Enable - B1.EN ' Enable Compressor B1 Enable/Disable Enable B2.EN Enable Compressor B2 Enable/Disable Enable CS.A1 CSB Al Feedback Alarm Enable/Disable Enable CS.A2 CSB A2 Feedback Alarm Enable/Disable Enable CS.BI CSB 81 Feedback Alarm Enable/Disable Enable CS.B2 CSB 82 Feedback Alarm Enable/Disable - _ Enable - Catalog No. 04-53480119-01 nutacturer reserves t)te right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations. Pg CL-1 4-15 Printed in U.S.A. Form 48/50A-12T Replaces: NEW 7Ur ITEM EXPANSION RANGE DEFAULT ENTRY COOL (cent) COOLING CONFIGURATION REV.R Rev Rotation Verified? Yes/No - No/ H.SST Hi SST Alert Delay Time 5 -30 min 10 30 EDT.R EVAP.DISCHRGE TEMP RESET /t/4i-e.g0d. V. RS.CF EDT Reset Configuration 0 - 3 (multi -text' Strings) 0 RT/O Reset Ratio 0 - 10 2 L/MT Reset Limit 0 - 20 If 10 f RES.S EDT 4-20 ma Reset Input Enable/Disable Disable HEAT HEATING CONFIGURATION HT.CF Heating Control Type 0 - 4 0 2 HT.SP Heating Supply Air Setpt 80 120 dF 85 1 OC.EN Occupied Heating Enabled Yes/No No _ LAT.M MBB Sensor Heat Relocate Yes/No No Ai G.FOD ' Fan -Off Delay, Gas Heat 45-600 45 'i5 EFOD Fan -Off Delay, Elec Heat 10-600 30 ,?{a SG.CF STAGED GAS CONFIGS HT.ST Staged Gas Heat Type 0 - 4 0 2 5"" CAP.M Max Cap Change per Cycle 5 - 45 45 V5 M.R.DB S.Gas DB min.dF/PID Rate 0 - 5 0.5 , S S.G.DB St.Gas Temp.Dead Band 0 5 AF 2 RISE Heat Rise dF/sec Clamp 0.05 - 0.2 0.06 , LAT.L LAT Limit Config 0 - 20 AF 10 /0 LIM.M Limit Switch Monitoring? Yes/No No /'V SW.H.T Limit Switch High Temp 110 - 180 dF 170 7 0 SW.L.T Limit Switch Low Temp 100 - 170 dF 160 r (k 0 HT.P Heat Control Prop. Gain 0 -1.5 1 f HT.D Heat Control Derv. Gain 0 -1.5 1 / HT.SM Heat PID Rate Config 60 - 300 sec 90 5'0 SP SUPPLY STATIC PRESS.CFG. SP.CF Static Pressure Config 0 - 1 (multi -text strings) No Wrj) ce. j, f CV.FD Constant Vol IDF is VFD? Yes/No No /A/ SP.FN Static Pres.Fan Control? Yes Yes SP.S Static Pressure Sensor Enable/Disable Disable I--; SP.LO Static Press. Low Range - -10 - 0 0 SP.HI Static Press. High Range 0 - 10 5 5 SP.SP Static Pressure Setpoint - 0 - 5 "H20 - - 1.5 Y SP.MN VFD Minimum Speed 0 - 100 % 20 ,,2 l9 SP.MX VFD Maximum Speed 0 - 100 % 100 l 0'0 SP-FS VFD Fire Speed Override 0 - 100 % 100 - , 0 HT.VM VFD Heating Min Speed 75 - 100 % 75 '0 SP.RS Stat. Pres. Reset Config 0 - 4 (multi -text strings) 0 /V1.. SP.RT SP Reset Ratio ("/dF) 0 - 2.00 in. wg/dF 0.2 _ n '2.- o SP.LM SP Reset Limit in iwc (") 0 - 2.00 in. wg 0.75 ,, S SP.EC SP Reset Econo. Position 0 - 100 % 5 1 S.PID STAT.PRESS.PID CONFIGS SP.TM Stat.Pres.PID Run Rate 1 - 200 sec 2 7;1_ SP.P Static Press. Prop. Gain 0 -100 20 -7-0 SP.I Static Pressure Intg. Gain 0 - 50 2 ""J o— SP.D Static Pressure Derv. Gain 0 - 50 0 0 SP.SG Static Press.System Gain 0 - 50 1 ECON ECONOMIZER CONFIGURATION ' EC.EN Economizer Installed? _ Yes/No Yes �5 EC.MN Economizer Min.Position 0- 100 % 5 EC.MX Economizer Max.Position 0 - 100 % - 98 j EP.MS Economizer Position at Min. VFD 0 -100 % 5 EP.XS Economizer Position at Max. VFD - 0 - 100 % 5 ETRM Economzr Trim For SumZ ? Yes/No Yes! E.SEL Econ Changeover Select 0 - 3 (multi -text strings) 1 rt ,�; �. 1A- 1 DDB.0 Diff Dry Bulb RAT Offset 0 - 3 0 y e1��' OA.E.0 OA Enthalpy ChgOvr Selct 1 5 (multi -text strings) 4 c-. 0 i, OCEN Outdr.Enth ,Compare Value 18 - 32 24 Ze,/ / OAT.L High OAT Lockout Temp -40 - 120 dF 60 (j D.DEW OA Dewpoint Temp Limit 50 - 62 dF 55 SS ORH.S Outside Air RH Sensor Enable/Disable Disable - ,,b CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE CL-2 ITEM EXPANSION RANGE DEFAULT ENTRY ECON (cont) ECONOMIZER CONFIGURATION - ETYP Economizer Control Type 1-3 (mufti -text strings) 1 D,V, £iArt EC.SW Economizer Switch COnfig 0 - 2 (multi -text strings) 0 ECFG ECON.OPERATION CONFIGS EP.GN Economizer Prop:Gain 0.7 - 3.0 1 i ERNG Economizer Range Adjust 0.5 - 5.0 AF _ 2.5 , E SPD Economizer Speed Adjust 0.1 -10:0 0.75 4.'7 V - EDBD Economizer Deadband 0.1 - 2.0 AF 0.5 .. S OEFC UNOCC.ECON.FREE COOUNG AIS 6-41.h.z...41 / 9..1) FOCF Unoc Econ Free Cool Cfg 0-2 (multi -text strings) 0 FC.TM Unoc Econ Free Cool lime 0 - 720 min 1 120 FC.LO Un.Ec.Free Cool OAT Lock 40 - 70 dF 50 b T.24.0 TITLE 24 FDD LOG.F Log Title 24 Faults Yes/No No Al EC.MD T24 Econ Move Detect 1 - 10 dF 1 / EC.ST T24 Econ Move SAT Test. - 10 - 20 % 10 / 0 S.CHG T24 Eoen Move SAT Change 0 - 5 dF - 0.2 . , E.SOD T24 Econ RAT -OAT Oiff 5.20 dF 15 / 5 ECHD T24 Heat/Cool End Delay 0 - 60 min 25 2.-.S ET.MN T24 Test Minimum Pos. 0 - 50 % 15 . $ ET.MX _ T24 Test Maximum Pos. 50-100 % 65 SAT.T SAT Settling Time 10 - 900 sec 240 , BP BUILDING PRESS. CONFIG BP.CF Building Press. Config 0-2 0 i�. BP.RT lldg.Pres.PlD Run Rate - 5-120 sec 10 / O BP.P Bldg. Press. Prop. Gain 0-5 0.5 u S BP.! BIdg.Pressinteg.Gain 0-2 . c BP.D BIdg.Press.Deriv.Gain 0-5 _ _ _0.5 0.3 1 3 BP.SO BP Setpoirtt Offset 0.0 - 0.5 "H20 0.05 OS BP.MN BP VFD Minimum Speed 0-100% 10 - / p BP.MX BP VFD Maximum Speed 0-100% 100 / 0-0 BP.FS VFD/Act. Fire Speed/Pos. 0-100% 100 1 OD BP.MT Power Exhaust Motors 1-2 1 41 ji tz BP.S Building Pressure Sensor Enable/Dsable Dsable 7) BAR Bldg Press (+1-) Range. 0 -1.00 "H20 0.25 ,,2 S BP.SP Building Pressure Setp. -0.25 - 0.25 "H20 0.05 . 17 S BP.P1 Power Exhaust On'Setp.1 0 -100 % 35 IS BP.P2 Power Exhaust On Setp.2 0 -100 % 75 -7S B.CFG BP ALGORITHM CONFIGS BP.SL Modulating PE Alg. Slot. 1-3 1 / kr.i.% AA ) BP.TM BP PID Evaluation lime 0 - 10 min 1 BP.ZG BP Threshold Adjustment 0.1 -10.0 "H20 1 pp BP.HP High BP Level 0 - 1.000 "M20 0.05 c! Co- BP.LP Low BP Level 0 -1.000 "H20 0.04 J. . Oy/ D.LV.T COOUHEAT SETPT. OFFSETS LH.ON Dmd Level Lo Heat On -1 - 2 AF 1.5 /. 5 H.H.ON _ Dmd Level(+) Hi Heat On 0.5 - 20.0 AF 0.5 • 5 L.H.OF Dmd Level(-) Lo Heat Off 0.5 - 2 AF 1 J L.C.ON Dmd Level Lo Cool On -1 - 2 AF 1.5 I , S H.C.ON Dmd Level(+) Hi Cool On 0.5 - 20.0 AF 0.5 - LC.OF - Dmd Level(-) Lo Cool Off 0.5 - 2 AF 1 J C.T.LV Cool Trend Demand Level - 0.1 - 5 AF - 0.1 , ) H.T.LV Heat Trend Demand Level - 0.1 - 5 AF 0.1 . J C.T.TM Cool Trend Time 30 - 600 sec 120 + .0 H.T.Ti4/ Heat Trend Time 30 - 600 sec - 120 1.0 DMD.L _ DEMAND UMIT CONFIG, DM.L.S Demand Limit Select _ 0 - 3 (multi -text strings) 0 /L/s-1, ._ D.L.20 Demand Limit at 20 ma 0- 100 % 100 i G b SH.NM Loadshed Group Number 0 - 99 0 0 SH.DL Loadshed Demand Delta 0 - 60 % 0 0 SH.TM Maximum Loadshed Time 0 - 120 min _ 60 >3 0 D.LS1 - Demand Limit Sw.1 Setpt. 0 - 100 % 80 _ e 0 D.L.S2 Demand Limit Sw.2 Setpt. 0 - 100 % 50 5 0 CL-3 ITEM EXPANSION RANGE DEFAULT ENTRY IAQ IND OR AIR QUALITY CFG. DCV.0 OCV ECONOMIZER SETPOINTS. EC.MN Economizer Min.Position 0.-100 % 5 /3— IAQ.M IAQ Demand Vent Min.Pos. 0-100 % - _ 0 {) AQ.CF AIR QUAL11Y CONFIGS IQ.A.0 IAQ Analog Sensor Config 0 - 4 (multi -text strings) 0 _., IQ.A.F IAQ 4-20 ma Fan Config 0 - 2 (multi -text strings) 0 WIC IAQ Discrete Input Config 0 - 2 (multi -text strings) 0 IQ.LF IAQ Disc.ln. Fan Coring 0 - 2 (multi -text strings) 0 OQ.A.0 OAQ 4-20ma Sensor Config 0 - 2 (multi -text strings) 0 AQ.SP AIR QUAUTY SETPOINTS IQ.O.P IAQ Econ Override Pos. 0 -100.% 100 / o v DAQ.L Diff.Air Quality LoUmit 0 -1000 - - 100 /0 V DAQ.H DIIf.Air Quality HiUmit 100 - 2000 700, -7 t7Q D.F.OF DAQ PPM Fan Off Setpoint 0 -2000 _ 200 0 DF.ON DAQ PPM Fan On Setpoint 0 - 2000 _400 Si Q 0 IAQ.R D1fi. AQ Responsiveness —5 - 5 0 d OAQ.L OAQ Lockout Value 0 -2000 0 n _ OAQ.0 User Determined OAQ 0 - 5000 400 'V 00 ,AQ.S.R AIR QUALITY SENSOR RANGE IQ.R L IAQ Low Reference 0 - 5000 0 0 IQ.R.H 'IAQ High Reference 0 - 5000 2000 -_ O-0D OQ.R.L OAQ Low Reference 0 - 5000 0 i! "OQ.R.H OAQ High Reference 0 - 5000 2000 _ ^2,.- o'W IAQ.P IAQ PRE -OCCUPIED PURGE IQ.PG IAQ Purge Yes/No No /i/ 1Q.P.T IAQ Purge -Duration 5-60 min 15' IQ.P.L IAQ Purge LoTemp Min Pos 0-100 % 10 lb IQ.P.H IAQ Purge HiTemp'Min Pos 0=100 % 35 I$ IQ.LO IAQ Purge OAT Lockout 35-70 dF .50 50 DEHU DEHUMIDIFICATION CONFIG. D-SEL Dehumidification Config 043(niulti-text strings) 0 p D.SEN Dehumidification Sensor 1-2(muiti-text strings) 1 1 4-f D EC.D Econ disable in DH mode? Yes/No Yes Y D.VCF - Vent Reheat Setpt Select - 0-1(muiti-text strings) 0 RM.' ioe.fa, Q D V.RA 1 Vent Reheat RAT offset 0-8 AF 0 D.V.HT Vent Reheat Setpoint . 55-95 dP 70 (I__ D.C.SP Dehumidify Cool Setpoint 40-55 dF 45 D.RH.S Dehumidify RH Setpoint 10-90 % 55 � S HZRT Humidimtzer Adjust Rate 5-120 30 2,0 HZPG Hurnidimizer Prop. Gain ' 0-10 0.8 . 8 HZOR Enable HMZR ST Oil Ret Disable/Enable Enable .6 CCN CCN CONFIGURATION CCNA CCN Address 1 - 239 1 - / CCNB CCN Bus Number 0.239 0 JO BAUD - CCN Baud Rate 1 - 5 (multi -text strings) 3 'i ( BROD CCN BROADCST DEFINITIONS TROT CCN Time/Date Broadcast ON/OFF On 60' OATS CCN OAT Broadcast ON/OFF Off ORH.B CCN OARH Broadcast ON/OFF Off OAQ.B CCN OAQ Broadcast ON/OFF Off t"a.S.B Global Schedule Broadest ON/OFF Off BACK CCN Broadcast Acker ON/OFF Off SC.OV CCN SCHEDULES -OVERRIDES SCH.N Schedule Number 0 - 99 1 HOL.T Accept Global Holidays? YES/NO No Ai O. TL Override Time Limit 0- 4 HAS 1 0 OV.EX Timed Override Hours 0 - 4 HRS 0 ,(, SPT..O SPT Override Enabled ? YES/NO Yes d T58.0 T58 Override Enabled ? YES/NO Yes j/ GL.OV Global Sched. Override ? YES/NO No - Al CUT ALONG DOTTED LINE CUT ALONG DOTTED LINE CL-4 ITEM EXPANSION RANGE DEFAULT ENTRY ALLM ALERT LIMIT CONFfG. SP.L.O SPT lo alert limit/occ —10-245 dF 60 G SP.H.O SPT hi alert limit/occ —10-245 dF 85 F SP.L.0 SPT to alert limit/unocc —10-245 dF 45 V SP,H U SPT hi alert ffmit/unocc —10-245 dF 100 f L7t1. SA.L.O EDT to alert limit/occ —40-245 dF 40 y c- SA.H.O EDT hi alert limit/occ —40-245 dF 100 ,e0_ SA.L.0 EDT lo alert Iimit/unocc —40-245 dF 40 / SA.H.0 EDT hi alert limit/unocc —40-245 dF 100 / (2,0 RA.L.O RAT lo alert limit/occ 1 —40-245 dF 60 Go RA.H.O RAT hi alert limit/occ —40-245 dF 90 ,h RA.L U RAT to alert limit/unocc —40-245 dF _ 40 RA.H.0 RAT hi alert Iimit/unocc —40-245 dF 100 R.RH.L RARH low alert limit 0-100 % 0 /j R.RH.H RARH high alert limit 0-100 % 100 / cm) SP.L SP low alert limit 0-5 `-i20 _ 0 0 SP.H SP high alert limit 0-5 `H20 2 - , , BP.L BP to alert limit —0.25-0.25 1420 -0.25 ,. .;..5 BP.H BP high alert limit —0.25-0.25 "H2O 0.25 ,. 2.. IAQ,H IAQ high alert limit 0-5000 1200' y(TU TRIM SENSOR TRIM CONFIG. SAT.T Air Temp Lvg SF Trim —10 -10 AF 0 , O RAT.T RAT Trim —10-10^F 0 OAT.T OATTrim —10 1-0 ^F 0' SPT..T SPT Trim —10 10 ^F 0 CTA.T Cir A Sat.Cond.Temp Trim —30 - 30 ^F 0 CTB.T Cir B Sat.Cond.Temp Trim —30 - 30 ^F 0 SPAT ' SuctPress.Circ.A Trim —50 - 50 PSIG 0 SP.B,T SuctPress Circ.B Trim —50 - 50 PSIG 0 DP.B.T Dis.Press.Circ.A Trim —50 - 50 PSIG 0 DP.B.T 1 Dis.Press.Circ.B Trim ' —50 - 50 PSIG 0 SW.LG 'SWITCH LOGIC: NO / NC FTS.L Filter Status Inpt-Clean Open/Close Open .. IGC.L IGC Feedback - Off Open/Close Open 1 RMLL _ RemSw Off-Unoc-Strt-No0v Open/Close Open ECC.L Economizer Switch - No Open/Close Open SFS.L Fan Status Sw. - Off Open/Close Open DL1.L Dmd.Lmt.Sw.1 - Off Open/Close Open DL2.L Dmd.Lmt-Dehumid - Off Open/Close Open _ - WQ.L IAQ Disc.input - Low Open/Close Open FSD.L Fire Shutdown - Off - - Open/Close - Open PRS.L Pressurization Sw. - Off Open/Close Open EVC.L Evacuation Sw. - Off Open/Close Open PRG.L Smoke Purge Sw. - Off Open/Close Open DISP DISPLAY CONFIGURATION TEST Test Display LEDs ON/OFF Off - METR Metric Display ON/OFF Off f1 LANG Language Selection 0-1(multi-text strings) 0 r ,,. / i - r - PAS.E Password Enable ENABLE/DISABLE Enable a F- PASS Service Password 0000-9999 1111 /) CL-5 ERG 3 R E E Seattle Portland Spokane San Diego Austin Irvine Eugene San Francisco Anchorage 5 rt BOEING 9-110 ROOFTOP AHU SEATTLE, WASHINGTON STRUCTURAL CALCULATIONS AHU ANCHORAGE OCTOBER 08, 2015 PREPARED FOR Holaday Parks MiS DCI Job # 15011-0403 137 REVIEWED FOR CODE COMPLIANCE APPROVED OCT 2 6 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA OM 5 2015 PERMIT CENTER 818 Stewart Street, Suite 1000 Seattle, Washington 98101 Phone (206) 332-1900 Service Innovation Value ct3. Er Hr) 6' fry,/ 9110 th Cu ( 16"" 7,1.) LDC/ITE D T E 4:CE 't:r1V6 CO/i5 5 A \ ; 1,/64 CLIP p2L/'?.e. /(z) 12 -Pi 7E16 talety SCREWS 5,4 LEG Cuk 505 3CgEij (6) 4 V1O.C. LoLJGOZ. 5 ) I " o C r arm. EK.I.S-T.1./1:6 Sketch # SSK-#1 Project Name: Boeing 9-110 ROOFTOP AHU mum= 'EflG(flEER 818 Stewart Street, Suite 1000 1 Seattle, WA 98101 (206) 332-1900 Project #: I By: 15011-0403 jAJS Date: 10/8/2015 Field Sketch: AHU ATTACHMENT DETAIL IN 0 :> cc 73. .02 FE 0 Gs 0� 3 certified Drawing for AHU-1 0 O W I---u cs Wrn CC 0.2 w=4 Pa CG W 2 r W 2 0 cc O .t L 0V> 0 V cWK• 0 .4 02 .- W u 0 0 Qr.l0— - 0 2 _0 �..V.r-OO 0,•4v r G W :� o n,00Or• - r -=p`—!:! V :iiI:!: �Ou01 00 ,<c4I,'Y V d O — CO 1,1 03. Mc, w 4+ a 0 VI 0 0z 7,2 G. o 50EJ500549 21`.: CFI 11, 00 0 0 0 t6 Applied Rooftop Builder 3.19f § ) w \ DESCRIPTION / ) CHANGED HEIGHT TO 16" \ 4 ( CO co EXISTING CURB LAYOUT CO Zo 40 } ''"' 1-4545-4030 / 0 0 /\ 0 9:58:43 AM { 7 | tz �� EENE N. / �� ;. §i hI enstrieRs Project # : 15011-0403 Page # : 1 Proj. Name : BOEING 9-110 ROOFTOP AHU Engineer : AJS Date : 10/8/2015 Subject : EQUIPMENT SUMMARY 1)11 C.1W- Design Criteria: Codes 2012 IBC ASCE 7-10 Equipment Summary, Loads & Anchorage Equipment Height (ft) Long Length (ft) Short Length (ft) Total Wgt. (kip) Curb Ht. (ft) Uplift Shear AHU-1 W/O CURB 6.00 13.75 7.33 4.28 0.0 0 Ib 1,216 Ib AHU-1 W/ CURB 6.00 13.75 7.33 5.02 1 -141 Ib 1,500 lb Wind Load Ex 110 MPH C k, 0.85 kn 1.0 kJ 0.85 qZ 22.4 psf F =g2GCfAt G 0.85 Cf 1.55 F 29.5 psf B/s 0.5 s/h 1.0 UNIT IS ROOFTOP moms [Dio mommiss 1= I. Seismic Ground Motion Values: LAT LONG Ss S1 SITE Fa FA/ SMS SMl Project # : 15011-0403 Page # : 2 Proj. Name : BOEING 9-110 ROOFTOP AHU Engineer : AJS Date : 10/8/2015 Subject : Seismic Coefficients = Site Latitude: = Site Longitude: = MCE Spectral Accel @ 0.2 Sec: = MCE Spectral Accel © 1.0 Sec: = Site Class: ( Default is D) = Spectral Accel © 0.2 Sec for Site = Spectral Accel © 1.0 Sec for Site = MCE Spectral Resp (Short Period) = MCE Spectral Resp (Long Period) 47.534 -122.314 1.514 0.579 E 0.90 2.40 1.36 1.39 SDS = Design Spectral Accel 0 0.2 Sec 0.91 SD1 = Design Spectral Accel @ 1.0 Sec = 0.93 = Fa Ss = 2/3 Saks = 2/3 SM1 [JSGS Design Maps Summary Report User -Specified Input Report Title Boeing 2-122 ITV Labs Thu September 10, 2015 17:17:26 UTC Building Code Reference Document 2012 International Building Code (which utirzes USGS hazard data available In 2008) 47.53418°N, 122.31437°W Site Class E - "Soft Clay Soil" I/II/III Site Coordinates Site Soil Classification Risk Category I'So i= mapquest USGS-Provided Output Ss = 1.514 g Si = 0.579 g 2002 USGS Mapped Value for Default Site Class B 2002 USGS Mapped Value for Default Site Class B per Geotech or Table 20.3-1 - ASCE 7, pg 205 Table 11.4-1 - ASCE 7, pg 115 Table 11.4-2 - ASCE 7, pg 115 Eqn 11.4-1 Eqn 11.4-2 Eqn 11.4-3 Eqn 11.4-4 SMs = 1.363 g Son = 1.389 g SDs = 0.909 g SDI = 0.926 g t= f-1 G I n e a R S Project # : Proj. Name : Engineer : Subject : 15011-0403 Page*: 3 BOEING 9-110 ROOFTOP AHU AJS Date : 10/8/2015 AHU-1 W/O CURB Seismic Design Requirements for Nonstructural Components - ASCE 7-10 Chapter 13 Equipment: AHU-1 W/O CURB Cabinet Geometry: H,a, = 6.0 ft Weight h_s = h_w = D= N= NOT = Overall height 3.0 ft Seis. Centroid1/2(Unit) + Curb 3.0 ft Wind Centroid= 1/2(H_tot) 7.33 ft Dist between attachment 2 Attachments supporting weight 1 Attachments resisting OT Wp = 4.28 kip Wind Load Wind Pressure= Wind Width= Wind Load= Center of Wind 29.5 psf LRFD Level 13.75 ft 2.43 kip 3.000 Wp = 4.3 kip Seismic Coefficients SDC= D Sos = 0.91 ap = 2.5 Rp = 6.0 Ip = 1.0 z= 1.0ft h= 1.oft Seismic Calculations Seismic Design Category Design spectral acceleration ASCE 7-10 - Table 13.6-1 ASCE 7-10 - Table 13.6-1 Component Importance Height of building 0.4*ap*SDS*Wpl Z` Fp.calc - Rp/ 1+2h Ip Fp.max = 1.6 * SDS * Ip* Wp Fp.m[n = 0.3 * SDS * Ip* Wp Wind Load Fpck = Fp.max = Fp.min = 1.94 kips Equation 13.3-1 6.2 kips Equation 13.3-2 1.17 kips Equation 13.3-3 2.433 kip Controlling Design Shear Force Controlled by Wind Fp:= Fp,ASD = 0.6*Fp .2.43 kips 1.46 kips Reactions N = (2) Attachments supporting weight/ resisting shear NOT = (1) Attachments resisting OT Lateral Load in the X-direction (+ value equa compression Point A Point C Dead + 2.1 kip + 2.1 kip Wind - 1.0 kip + 1.0 kip Seismic - 0.8 kip + 0.8 kip Max EQ Min EQ 1.85 kips 2.97 kips 0.45 kips 1.57 kips Max Wind Min Wind 1.54 kips 2.74 kips 0.69 kips 1.88 kips Max EQ Min EQ 2.16 kips 3.75 kips 0.10 kips 1.69 kips Max Wind Min Wind 1.57 kips 3.56 kips 0.69 kips 1.88 kips Rx=Wp/N Rx=Fp*h/D (1.0+.14SDS)D+0.7EQ (0.6-.14SDS)D+0.7EQ D+0.6W 0.6D+0.6 W (1.2+.2SDS)D+1.0EQ (0.6-.2SDS)D+1.0EQ 1.2D+1.0W 0.6D+0.6W Max. . Loads ` Tension Compression Shear LRFD 3.75 kips 1.22 kips 0.00 kip ... (No Tension) 1.22 kips sommeas Project # : 15011-0403 Page # : 4 Proj. Name : BOEING 9-110 ROOFTOP AHU Engineer : AJS Date : 10/8/2015 Subject : BBU Cabinet Anchorage Seismic Design Requirements for Nonstructural Components - ASCE 7-10 Chapter 13 Equipment: AHU-1 W/ CURB Cabinet Geometry: Weight H,,, = 6.0 ft h_s = 3.83 ft h_w= 3.oft D= 7.33 ft N= 2 NoT= 1 Wp = 5.02 kip Overall height Seis. Centroid= 1/2(Unit) + Curb Wind Centroid=1/2(H_tot) Dist between attachment Attachments supporting weight Attachments resisting OT Wind Load Wind Pressure= 29.5 psf LRFD Level Wind Width= 13.75 ft Wind Load= 2.43 kip Center of Wind 3.000 Wp = 5.0 kip Seismic Coefficients SDC = Sias = ap = Rp = Ip = z= h= D Seismic Design Category 0.91 Design spectral acceleration 2.5 ASCE 7-10 - Table 13.6-1 6.0 ASCE 7-10 - Table 13.6-1 1.0 Component importance 1.0 ft 1.0 ft Seismic Calculations Mounted to the roof Height of building 0.4*aP*Sns*WP/ 21 FP.cn[c = R i + 2 P P FP.max = 1.6*Sps*/p* Wp FP.min=0.3 *Sin *IP*WP Wind Load Fp.culc = Fpmax = Fp.mn = 2.28 kips Equation 13.3-1 7.3 kips Equation 13.3-2 1.37 kips Equation 13.3-3 2.433 kip Controlling Design Shear Force Controlled by Seismic Fp = 3.00 kips Fp,ASD = 0.7*Fp = 2.10 kips Reactions N = (2) Attachments supporting weight/ resisting shear NOT = (1) Attachments resisting OT Lateral Load in the X-direction k+ value equa compression Point A Point C Dead + 2.5 kip + 2.5 kip Seismic -1.6 kip + 1.6 kip Seismic - 1.2 kip + 1.2 kip Max EQ Min EQ 2.00 kips 3.66 kips 0.35 kips 2.02 kips Max Wind Min Wind 1.57 kips 3.45 kips 0.57 kips 2.45 kips Max EQ Min EQ 2.28 kips 4.66 kips -0.14 kips 2.24 kips Max Wind Min Wind 1.44 kips 4.58 kips 0.57 kips 2.45 kips Rx=Wp/N Rx=Fp*h/D (1.0+.14SDS)D+0.7EQ (0.6-.14SDS)D+0.7EQ D+0.6W 0.6D+0.6W (1.2+.2SDS)D+1.0EQ (0.6-.2SDS)D+1.0EQ 1.2D+1.0W 0.6D+0.6W Max Loads Tension Compression Shear LRFD 4.66 kips 1.50 kips - 0.14 kip 1.50 kips DCI E n G I n E E R S Project QDEI4/6 9-110 492 Project No. Sheet No. Subject /1 C(,' /iHHO c).' /IHv to 436.se e c/,:a/ . de.. Ill o r1(,i' Lallera deirt 04 6 2fi3 2. &6 ¢atgl El/CS HIVH $crr..a ecpcietly (Sher -2 I o) 96 9 (./Ser'e i US E /NGfi atp w/ (t) *12-/'/ 7EKS-HWH Sercw56 241'0.L ✓!T i i C E/ll���.2�� rct. era( c/e:7I0.. y,: LG 3000 1.6 Date �G�ifz By 4,75 1'1 Gab, 5-tea SDS . c/cu/ (2 14" FTdUPott) Hew/-,4r C,rb (C:TCtCp 4„)6'4 ;c'.) w=we., et cr c,,)()ko�) Jhen r (c n `,1Y 1:-..-4 14 cif ;,le,C etwoe,, y Anz Tqh I1K Z,= ! HO 14 ?1 = 100 IV- 17? („'.-`;,, /rV5 >>L'e il. Z.[. Col ' 1 al = 2 . $ Ls sfi r✓ 6,., =1 2 =1 " _ 3o z � T/t,ri✓ tli f d) t,.ii. J'ile- y KF=3.3Z 0=0.65 3 e6 U//., e,'i,I ea( t,., - -5 4-/L JSe (? s+/t`, X 3 a4,,SDS S6`c4,.,3 e' !$�U.L'./i/oy -5/?rte.,. e rE USt IA) '�� �:.✓ L Zxe":tl:' �f - ""' C{:ry 2y ".),C. 'FtA,t:� �GrTc• �.7'rC !i- —:r xP is SERVICICC EVAELUATION tt Most Widely Accepted and Trusted ICC-ES Evaluation Report ESR-3223 Reissued August 2014 This report is subject to renewal November 1, 2015. www.icc-es.orq I (800) 423-6587 I (562) 699-0543 A Subsidiary of the International Code Council® DIVISION: 05 00 00—METALS Section: 05 05 23—Metal Fastenings REPORT HOLDER: ITW BUILDEX 700 HIGH GROVE BOULEVARD GLENDALE HEIGHTS, ILLiNOI S 60139 (800) 848-5611 www.itwbuildex.com technicai(E Itwccna.com EVALUATION SUBJECT: ITW BUILDEX TEKS SELECT"' SELF -DRILLING STRUCTURAL FASTENERS 1.0 EVALUATION SCOPE Compliance with the following codes: • 2012, 2009 and 2006 international Building Code• (IBC) • 2012 and 2009 intemaiional Residential Code® (IRC) Property evaluated: Structural 2.0 USES The ITW Buildex Teks SelectT"' Structural Fasteners are used in engineered connections of cold -formed steel members. The fasteners may be used under the IRC when an engineered design is submitted for review in accordance with IRC Section R301.1.3. 3.0 DESCRIPTION 3.1 General: ITW Buildex Teks SelectT"" Structural Fasteners are proprietary self -drilling tapping screws which have a dual heat treatment and are coated with a corrosion preventive coating identified as Ciimaseal ACM'''. The drill point and lead threads of the screws are heat -treated to a relatively high hardness to facilitate drilling and thread forming. The balance of the fastener is treated to a lower hardness complying with the hardness limits for SAE J 429 Grade 5 screws and the hardness limits for ASTM A449-10 Type 1 screws. The threaded portion of the screw with the lower hardness is considered the Toad -bearing area, used to transfer loads between connected elements. Table 1 provides screw descriptions (size, tpi, length), nominal diameters, head style, head diameters, point style, drilling capacities and length of load -bearing area. 3.2 Material: The screws are formed from steel wire complying with the manufacturer's specifications. The drilling point and lead threads are heat -treated to a minimum through -hardness of 55 HRC. The remainder of the screw is heat -treated to a through -hardness of 30 to 34 HRC. 4.0 DESIGN AND INSTALLATION 4.1 Design: tTW Buildex TEKS Selector Structural Fasteners are recognized for use in engineered connections of cold - formed steel construction. Design of the connections must comply with Section E4 of AISI S100 (A1Si-NAS for the 2006 IBC). Nominal and allowable fastener tension and shear strengths for the screws are shown in Table 4. Allowable connection capacities for use in Allowable Strength Design (ASD), for pull-out, pull -over, and shear (bearing), are provided in Tables 2, 3 and 5, respectively, based upon laboratory testing. Instructions on how to determine connection design capacities for use in Load and Resistance Factor Design (LRFD) are found in the footnotes of Tables 2, 3 and 5. For steel -to -steel connections subject to tension, the least of the allowable pull-out capacity, pull -over capacity, and fastener tension strength found in Tables 2, 3, and 4, respectively, must be used for design. For steel -to -steel connections subject to shear, the lesser of the allowable fastener shear strength and the allowable shear (bearing) capacity found in Tables 4 and 5, respectively, must be used for design. Connections subject to combined tension and shear loading must be designed in accordance with Section E4.5 of AISI S100 (AISI-NAS for the 2006 IBC). Connected members must be checked for rupture in accordance with Section E5 of AISI S100-07/52-10, The values in the tables are based on a minimum spacing between the centers of fasteners of three times the nominal diameter of the screw, and a minimum distance from the center of a fastener to the edge of any connected part of 1.5 times the nominal diameter of the screw. Minimum edge distance when connecting cold - formed framing members must be three times the diameter of the screw, in accordance with Section D1.5 of AISI S200 (AISI-General for 2006 IBC). Under the 2009 and 2006 IBC, when the distance to the end of the connected part is parallel to the line of the applied force, the allowable connection shear strength determined in accordance with Section E4.3.2 of Appendix A of AISI S100 (AISI-NAS for 2006 IBC) must be considered. When tested for corrosion resistance in accordance with ASTM B117, the screws meet the minimum requirement listed in ASTM F1941, as required by ASTM C1513, with no white corrosion after three hours and no red rust after 12 hours. 4.2 Installation: Installation of tTW Buildex Teks SelectT"' Structural Fasteners must be in accordance with the manufacturers ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed nor are they 10 be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as to any finding or other matter in this report or as to any product covered by the report. filvtWOM =axe man cormkno Copyright © 2014 Page 1 of 3 ESR-3223 j Most Widely Accepted and Trusted published installation instructions and this report. The manufacturers published installation instructions must be available at the jobsite at all times during installation. The screws must be installed perpendicular to the work surface using a screw driving tool. The installation speed for 14-inch screws should not exceed 1,800 rpm. The installation speed for all other screws should not exceed 2,500 rpm. Screw length and point style must be selected by considering, respectively, the length of load -bearing area and the drilling capacities shown in Table 1. The screw must penetrate through the supporting metal with a minimum of three threads protruding past the back side of the supporting metal. 5.0 CONDITIONS OF USE The ITW Buildex Teks Select"' Structural Fasteners described in this report comply with, or are suitable alternatives to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 The fasteners must be installed in accordance with the manufacturer's published installation instructions and this report. If there is a conflict between the manufacturer's published installation instructions and this report, this report govems. Page 2 of 3 5.2 The allowable connection capacities specified in Section 4.1 are not to be increased when the fasteners are used to resist wind or seismic forces. 5.3 The utilization of the nominal connection capacities contained in this evaluation report, for the design of cold -formed steel diaphragms, is outside the scope of this report. 5.4 Drawings and calculations verifying compliance with this report and the applicable code must be submitted to the code official for approval. The drawings and calculations are to be prepared by a registered design professional when required by the statutes of the jurisdiction in which the project is to be constructed. 6.0 EVIDENCE SUBMITTED Data in accordance with the ICC-ES Acceptance Criteria for Tapping Screw Fasteners (AC118), dated June 2012. 7.0 IDENTIFICATION The heads of the ITW Buildex Teks Select"' Structural Fasteners are marked with 'EX" as shown in Figure 1. Each box of the fasteners has a label bearing the company name (ITW Buildex), product name, part number, size, lot number and the evaluation report number (ESR-3223). TABLE 1-ITW BUILDEX TEKS SELECTTM' STRUCTURAL FASTENERS DESCRIPTION (nom. size-tpi x Length) NOMINAL DIAMETER (in.) HEAD STYLE' HEADDRILLING DIAMETER (in.) DRILL POINT CAPACITY LENGTH OF LOAD- BEARING AREA2 COATING Min. Max. #10-16x3/4" 0.190 HWH 0.400 Tek/3 0.036" 0.150" 0.500" Climaseal ACR #12-1408' 0.216 HWH 0.415 Tek/3 0.036" 0.187" 0.470" Climaseal ACR #12-14x1" 0.216 HWH 0.415 Tek/3 0.036" 0.187" 0.500" Climaseal ACR #12-14x1" 0.216 UPFH 0.418 Tek/3 0.036" 0.187" 0.500" Climaseal ACR #12-14x11/2" 0.216 HWH 0.415 Tek/3 0.036" 0.187" 1.000" Climaseal ACR #12-14x2" 0.216 HWH 0.415 Tek/3 0.036" 0.187" 1.500" Climaseal ACR 1/4-14x1" 0.250 HWH 0.510 Tek/3 0.036" 0.210" 0.450" Climaseal ACR 114-14x1112 0.250 HWH 0.510 Tek/3 0.036" 0.210" 0.950" Climaseal ACR 1/4-20x11/6" 0.250 HWH 0.510 Tek/4 0.210" 0.312" 0.500" Climaseal ACR 1/4-20x11/2" 0.250 HWH 0.510 Tek/4 0.210" 0.312" 0.830" Climaseal ACR 1/4-20x2" 0.250 HWH 0.510 Tek/4 0.210" 0.312" 1.330" Climaseal ACR 1/4-20x21/2" 0.250 HWH 0.510 Tek/4 0.210" 0.312" 1.830" Climaseal ACR For SI: 1 inch = 25.4 mm. 'Head styles: HWH = hex washer head; UPFH = undercut Phillips flat head. 2The load -bearing area is the threaded portion of the screw that is heat -treated to HRC 30-34. See Sections 3.0 and 4.2 and Figures 1 and 2 for further clarification. TABLE 2-ALLOWABLE TENSILE PULL-OUT LOADS (pounds-force)1.2'34.5 SCREW DESIGNATION NOMINAL DIAMETER (in.) DESIGN THICKNESS OF STEEL SHEET NOT IN CONTACT WITH THE SCREW HEAD (inch) 0.048 0.060 0.075 0.105 1/8 3/16 1/4 #10-16 HWH 0.190 139 181 211 388 404 - - #12-14 HWH 0.216 138 186 229 481 496 808 - #12-14 UPFH 0.216 140 218 250 473 507 836 - 1/4-14 HWH 0.250 169 224 273 431 582 971 - 1/4-20 HWH 0.250 157 231 281 427 571 1065 1422 For SI: 1 inch = 25.4 mm, 1 lbf = 4.4 N, 1 ksi = 6.89 MPa. 'For tension connections, the lower of the allowable pull-out, pull -over, and fastener tension strength found in Tables 2, 3, and 4, respectively, must be used for design. 2Nominal strengths are based on laboratory tests. 3Steel must comply with AISI S100 (AISI-NAS for the 2006 IBC) and have a minimum tensile strength of'58 ksi. 4To calculate LRFD values, multiply values in the table by the ASD safety factor of 3.0 and multiply again with the LRFD resistance factor of 0.5. 5The "-" symbol denotes pull-out not tested. ESR-3223 ► Most Widely Accepted and Trusted Page 3 of 3 TABLE 3—ALLOWABLE TENSILE PULL -OVER LOADS (pounds-force)"'3'"'s SCREW DESIGNATION NOMINAL DIAMETER (in.) NOMINAL EFFECTIVE PULL- OVER DIAMETER (in.) DESIGN THICKNESS OF STEEL SHEET IN CONTACT WITH SCREW HEAD (inch) 0.048 0.060 0.075 0.105 "/8 #10-16 HWH 0.190 0.400 557 641 714 — — #12-14 HWH 0.216 0.415 619 793 893 1092 — #12-14 UPFH 0.216 0.418 489 620 712 — — 1/4-14 HWH 0.250 0.510 661 952 1069 1515 — '/4-20 HWH 0.250 0.510 667 910 1070 1568 — For SI: 1 inch = 25.4 mm, 1 Ibf = 4.4 N, 1 ksi = 6.89 MPa. "For tension connections, the lower of the allowable pull-out, pull -over, and fastener tension strength found in Tables 2, 3, and 4, respectively, must be used for design. gNominal strengths are based on laboratory tests. aSteel must comply with AISI S100 (AISI-NAS for 2006 IBC) and have a minimum tensile strength of 58 ksi. 4To calculate LRFD values, multiply values in the table by the ASD safety factor of 3.0 and multiply again with the LRFD resistance factor of 0.5. 5The "—" symbol denotes pull -over not tested. TABLE 4—FASTENER STRENGTH (pounds-force)"m SCREW DESIGNATION NOMINAL FASTENER STRENGTH (TESTED) ALLOWABLE FASTENER STRENGTH, S! = 3 Tensile, P". Shear, P„ Tensile, PJC1 Shear, P.m #10-16 HWH 2598 1607 866 536 #12-14 HWH 3227 2091 1076 697 #12-14 UPFH 3118 1935 1039 645 '/4-14 HWH 4400 2727 1467 909 1/4-20 HWH 4490 2725 1497 908 For SI: 1 inch = 25.4 mm, 1 Ibf = 4.4 N. 'For tension connections, the lower of the allowable pull-out, pull -over, and fastener tension strength found in Tables 2, 3, and 4, respectively, must be used for design. 2For shear connections, the lower of the allowable fastener shear strength and the allowable shear (bearing) capacity found in Tables 4 and 5, respectively, must be used for design. 3Nominal strengths are based on laboratory tests; 4To calculate LRFD values, multiply nominal values in the table by the LRFD resistance factor of 0.5. TABLE 5—ALLOWABLE SHEAR (BEARING) CAPACITY (pounds-force)1'2'3'.,s SCREW DESIGNATION NOMINAL DIAMETER (in.) THICKNESS OF TOP SHEET — THICKNESS OF BOTTOM SHEET (inch4nch)6 0.048-0.048 0.048-0.075 0.060-0.060 0.075-0.075 1/8 - 3116 0.105 - 1/4 3/18 -1/4 #10-16 HWH 0.190 331 583 475 — — — — #12-14 HWH 0.216 372 646 520 646 — — — #12-14 UPFH 0.216 375 662 542 636 — — — '/4-14 HWH 0.250 376 622 536 785 841 — — 1/4-20 HWH 0.250 356 687 520 760 858 860 — For SI: 1 inch = 25.4 mm, 1 Ibf = 4.4 N, 1 ksi = 6.89 MPa. 'For shear connections, the lower of the allowable fastener shear strength and the allowable shear (bearing) capacity found in Tables 4 and 5, respectively, must be used for design. 2Nominal strengths are based on laboratory tests. 3Steel must comply with AISI S100 (AISI-NAS for the 2006 IBC) and have a minimum tensile strength of 58 ksi. 4To calculate LRFD values, multiply values in the table by the ASD safety factor of 3.0 and multiply again with the LRFD resistance factor of 0.5. 5The "—" symbol denotes shear capacity not tested. `The top sheet is in contact with the fastener head, while the bottom sheet is not. FIGURE 1—TEKS SELECT HEX WASHER HEAD (HWH) FASTENER FIGURE 2—TEKS SELECT UNDERCUT PHILLIPS FLAT HEAD (UPFH) FASTENER • 9-110 AHU Replacement Cr United Technologies SUBMITTAL Project BOEING 9-110 7-15 Date Friday, July 17, 2015 r---- -1 , F., J •.Markup',wltfiiiVetifiediiptesfroni : . Release r productionHP/KS field visit 9-3-15 9-4_15 ... - ... . . • •••-• • . : - . . • . . • . • . • '•• . . . . • ...• . : • . .. • , • • • .. • . " . • . • • r r . . • • • • 13 7 EV 'IkrED FOR 510DE. CONTLIAMCE nPFV,V,410 OCT 2 6 2015 ©Kr onifiviic DUILDiNG DIVISION RECEIVED CITY OF TUKWILA OcT i 5 2015 PERM I7 CEKCE2 Table Of Contents Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM AHU-1 Unit Report Certified Drawing Guide Specifications 3 4 6 10 Applied Rooftop Builder 3.19f Page 2 of 15 AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM AHU-1 Tag Cover Sheet Unit Report Certified Drawing Performance Report Guide Specification Applied Rooftop Builder 3.19f Page 3 of 15 Unit Report For AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM Unit Parameters Unit Size:._._... 030 (30 Tons) Volts -Phase -Hertz 460-3-60 Supply / Return: VerticaiNertical Configuration• VAV Evaporator Coil Type. Standard Heating Capacity. High Electric Heat Stainless Steel: Drain Pan• Selected Shipping Dimensions Unit Length. 13' 9" Unit Width. 7' 10" Unit Height. 6' 1" Unit Shipping Weight '""Ittleights and Dimensions include curbs and accessories. provided primarily for shipping refer to certified drawings. Shipping Weight does not weight. 4276 lb are approximate. Weight does not Approximate dimensions are purposes. For exact dimensions include extended ieadtime options' Controls Application Type. VAV Smoke Detector. Selected Return Air Smoke Detector. .. Selected Plugged Filter indicator Selected Exhaust/Economizer Exhaust/Economizer: .__._ No Exhaust Supply Fan Supply Fan Type• Forward Curve Supply Fan Motor HP. 15 HP Condenser Coil Cond. Coil Fin Coating:. MCHX Cond, At/Cu Evap Mixed -Air and Outdoor Filters Mixed -Air Filter: Standard Efficiency Throwaway (10)20x24x2 Outdoor Filter Economizer Filter: (8) 16 x 25 x 2, (4) 20 x 25 x 2 Warranty Information First Year - Parts Only (Standard) Complete Unit lst Year Carrier CCS Labor Start-up, First Unit Compressor Years 2-5 Parts Only An uncoated Novation condenser coil was selected for this product. This is based on an installed location with postal code: 98004 and a non -corrosive localized environment. NOTE: Please see Warranty Catalog 808-218 for explanation of policies and ordering methods. Ordering Information Part Number Description Quantity 1 50A3C030GPG62AEF Rooftop Unit Base Unit Differential Enthalpy Ultra Low Leak Economizer Stainless Steel Drain Pan High Electric Heat Premium Efficiency 15 HP Plugged Filter Indicator and Retum Air Smoke Detector Domestic w/BACnet Communication Accessories Accessory Part # Description Quantity Applied Rooftop Builder 3.19f Page 4 of 15 Unit Report For AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM CRHUMDSNOO1800 Outdoor or Return Air RH Sensor 2 Extended Leadtime Options Blanket Control # Description Quantity 1 B15-0034 Extended Lube Lines B15-0108 Access Door Retainers 1 B15-0114 Install Shaft Grounding Ring 1 B15-0115 Phase Loss Monitor 1 Applied Rooftop Builder 3.1.9f Page 5 of 15 Certified Drawing for AHU-1 AO. O. CFI 0 O O It- 000 Of m N M n> co m> r, eMo hr VI IN, a, •ten` CCrIER WEIriNT Cri Ith �a- 41 4 a>^�ar ha CC rh -'o CO2 yr c>!>vav - Cc ha 12 1; rVawrV •C,�vr�a L -C u C J _ 2 V 0 ✓rat- �20 ~2�Js _a 04r-00Om- JVdzGC..+S.'<VSVU Grp ,IN CGNIfi I BOX 0 04 w 2 2 0 -a O o 42 O 2 c w W 0 r 01 12 1 ST'_NPAril OU1 i)N FA Ccar CO O w Cc 0 0 2 0 - io 40 a �O 4.0 13 0 Trc Cm VI 50EJ500549 0 0- G 1 rirC m CO. • 0 O v 00 Applied Rooftop Builder 3.19f Project: BOEING 9-110 7-15 Prepared By: Performance Summary For AHU-1 07/17/2015 05:03PM Part Number: 50A3C030GPG62AEF Unit Refrigerant• R410A EER (ARI 360)• 10.1 IEER 12.4 Shipping Dimensions Unit Length- 13' 9" Unit Width. T 10" Unit Height. 6' 1" Unit Shipping Weight 4276 lb Unit Heating Type- E Supply/Return- VerticalNerticat Application Type' VAV Voltage:._ 460-3-60 Cooling Airflow. 8900 CFM Attitude- 250 ft Cond. Ent. Air Temp:. 95.0 F Ent Air Dry Bulb. 80.0 F Ent. Air Wet Bulb. 64.0 F Ent. Air Enthalpy 29.25 BTU/lb Lvg. Air Dry Bulb. 53.1 F Lvg. Air Wet Bulb- 51 9 F Lvg. Air Enthalpy 21.39 BTU/Ib Gross Cooling Capacity 312.13 MBH Gross Sensible Clg. Cap' 255.82 MBH Compressor Power. 25.5 kW Coil Bypass Factor 0.123 Part Load(%) Operation Standard Capacity Steps' 25,50,75,100 Electric Heating Data: Heating Airflow. 6000 CFM Heating Ent. Air Temp' 68.0 F Heating Lvg, Air Temp: 106.3 F Heating Capacity' 72.0 kW Supply Fan Information: Ext.Static Pressure: 2.50 in wg Selection Static Pressure: 2.50 in wg Supply Fan RPM- 959 * Supply Fan BHP• 5.91 BHP Supply Fan Motor HP• 15 HP *Field supplied and installed sheave package may be required* Electrical Data Compressor #A1 RLA' 11.2 Compressor #A1 LRA. 75 Compressor #A2 RLA. 11.2 Compressor #A2 LRA- 75 Compressor #B1 RLA' 11.2 Compressor#B1 LRA. 75 Compressor #B2 RLA. 11.2 Compressor #B2 LRA: 75 Actual Electric Heater kW• 72 Electric Heater FLA. 86.6 indoor Fan Motor HP. 15 Indoor Fan Motor FLA: 21 Applied Rooftop Builder 3,19f Page 7 of 15 Project: BOEING 9-110 7-15 Prepared By: Performance Summary For AHU-1 07/17/2015 05:03PM Condenser Fan Motor Qty. Condenser Fan Motor FLA (ea) - Power Supply MCA: Power Supply MOCP (Fuse or HACR): Electrical Convenience Outlet Convenience Outlet FLA* 2 13 ......................12 5. on An uncoated Novation condenser coil was selected for this product. This is based on an installed location with postal code: 98004 and a non -corrosive localized environment. Acoustic Information 63 Hz 125 Hz 250 Hz 500 Hz 1000 Hz 2000 Hz 4000 Hz 8000 Hz Discharge, Lw 94.3 81.9 79.7 84.6 86.1 81.7 77.7 70.1 Inlet, Lw 89.5 73.4 69.4 64.4 65.5 59.6 55.5 52.0 Discharge and inlet data tested per AHRI 260 standards Outdoor, Lw 65.8 79.6 86.5 89.7 90.5 86.0 82.9 77.7 !Verified existing 125AMP disconnect with Sequoyah Electric lonsite 9/3/15 . Calculation methods used in this program are patterned after the ASHRAE Guide; other ASHRAE Publications and the AHRI Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an Acoustical Engineer ma person with sound prediction expertise should be consulted. Advanced Acoustics Advanced Accoustics Parameters 1. Unit height above ground: 30.0 ft 2. Horizontal distance from unit to receiver. 50.0 ft 3. Receiver height above ground. 5.7 ft Detailed Acoustics Information Octave Band Center Freq. Hz 63 125 250 500 1 k 2k 4k 8k Overall A 65.8 79.6 86.5 89.7 90.5 86.0 82.9 77.7 95.1 Lw B 39.6 63.5 77.9 86.5 90.5 87.2 83.9 76.6 93.9 LwA C 32.546.353.256.457.252.749.644.461.8Lp 6.3 30.2 44.6 53.2 57.2 53.9 50.6 43.3 60.6 LpA D Applied Rooftop Builder 3.19f Page 8 of 15 Project: BOEING 9-110 7-15 Prepared By: Performance Summary For AHU-1 07/17/2015 05:03PM Legend A Sound Power Levels at Unit's Acoustic Center, Lw B A -Weighted Sound Power Levels at Unit's Acoustic Center, LwA C Sound Pressure Levels at Specific Distance from Unit, Lp D A -Weighted Sound Pressure Levels at Specific Distance from Unit, LpA Supply System Curve 900 — 800 3—aPM RPM .\\,1000 RPM 100 RPM \ 17J0 RPM 700 RPM. .. \ BOO 500 RPM RP / \--............7 \\\ \ 5.0 $ ' a BhP BHP —400 RPM 300 RPM 200 RPM : 2.05 \\ B 3 00 B 5 0 HP 7. BHP 10. HP 1500BH" Airflow (CFM - thousands) RPM = 959 BHP = 5.91 Maximum RPM = 1200 Maximum HP = 23.40 SC - System Curve RP - Rated Point 19 20 Applied Rooftop Builder 3.19f Page 9 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM United Technologies HVAC Guide Specifications — Section 48/50A3,A5 Packaged Rooftop Cooling Unit and Packaged Rooftop Cooling Unit with Gas Heat — Variable Air Volume Application Size Range: 20 to 60 Tons,. Nominal (Cooling) Carrier Model Number: 48A3,:48A5, 50A3, 50A5 Part 1 -General • 1:01 SYSTEM DESCRIPTION • Outdoor roof curb or slab mounted, electronically controlled heating and cooling unit utilizing hermetic scroll compressors with crankcase heaters for cooling duty and gas heat or electric heat. Units shall discharge supply and return air vertically or horizontally as shown on contract drawings. EER (energy efficiency ratios) shall meet requirements of ASHRAE (American Society of Heating, Refrigeration, and Air Conditioning) Standard 90.1-2010. 1.02 QUALITY ASSURANCE A. Unit shall be rated in accordance with AHRI (Air -Conditioning, Heating, and Refrigeration Institute) Standard 340/360, latest edition. B. Unit shall be designed to conform to ANSI/ASHRAE 15 (latest edition), ASHRAE 62, and UL (Underwriters Laboratories) Standard 1995. C. Unit shall be listed by ETL and ETL, Canada as a total package. D. 48A3,A5 units shall be designed to conform with ANSI (American National Standards Institute) Standard Z21.47 (U.S.A.) / CSA (Canadian Standards Association) Standard 2.3, Gas -Fired Central Furnaces. E. Roof curb shall be designed to NRCA (National Roofing Contractors Association) criteria per Bulletin B-1986. F. Insulation and adhesive shall meet NFPA (National Fire Protection Association) 90A requirements for flame spread and smoke. generation. G. Unit shall be manufactured in a facility registered to the ISO 9001 manufacturing quality standard. 1.03 DELIVERY, STORAGE AND HANDLING Unit shall be stored and handled per manufacturer's recommendations. Part 2 — Products 2.01 EQUIPMENT A. General: Factory -assembled, single -piece heating and cooling unit. Contained within the unit enclosure shall be all factory wiring, piping, refrigerant charge (R-410A), operating oil charge, dual refrigerant circuits, microprocessor based control system and associated hardware, and all special features required prior to field start-up. B. Unit Cabinet: 1. Constructed of galvanized steel, bonderized and pre -coated with a baked enamel finish. a. Top cover shall be 18-gage sheet metal with 0.75-in. thick, 1.5-lb density, fiberglass insulation. b. Access panels and doors shall be 20-gage sheet metal with 0.5-in. thick, 1.5-lb density, fiberglass insulation. c. Corner and center posts shall be 16-gage galvanized steel. d. Basepans in the heating and return air sections shall be 16-gage galvanized steel. Applied Rooftop Builder 3.19f Page 1.0 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM e. Basepans in the condenser section shall be 16-gage galvanized steel. f. Compressor rail shall be 12-gage galvanized steel. g. Condensate pan shall be 16-gage aluminized steel. h. Air baffles shall be 18-gage galvanized steel with 0.5-in. thick, 1.5-lb density, fiberglass insulation. i. Base rail shall be 14-gage galvanized steel. j. Fan deck (indoor and outdoor section) shall be 16-gage galvanized steel. 2. Unit casing shall be capable of withstanding 500-hour salt spray exposure per ASTM (American Society for Testing and Materials) B117 (scribed specimen). 3. Sides shall have person -sized insulated hinged access doors for easy access to the control box and other areas requiring servicing. Each door shall seal against a rubber gasket to help prevent air and water leakage and be equipped to permit ease and safety during servicing. 4. Interior cabinet surfaces shall be sheet metal lined or insulated with flexible fire -retardant material, coated on the air side. 5. Unit shall have a factory -installed sloped condensate drain connection made from an aluminized steel or optional stainless steel. 6. Equipped with lifting lugs to facilitate overhead rigging. 7. Filters shall be accessible through a hinged access_ panel without requiring any special tools. C. Fans: 1 Indoor Evaporator Fans: a. Double-width/double-inlet, centrifugal, belt driven, forward -curved type with single outlet discharge. • b. Fan shaft bearings shall be of the pillowblock type with positive locking collar and lubrication provisions. c. Statically and dynamically balanced. d. Evaporator fan shaft bearings shall have a life of 200,000 hours at design operating conditions in accordance with ANSI B3.15. e. Solid fan shaft construction for size 020-050 units and two-piece solid fan shaft construction on the size 060 unit. 2. Condenser Fans: a. Fans shall be direct -driven propeller type only, with corrosion -resistant blades riveted to corrosion resistant steel supports for all size 020-050 units and the size 060 unit with optional condenser coil. Size 060 units with the microchannel condenser coil shall have a direct driven, 9-blade airfoil cross section, reinforced polymer construction, and shrouded -axial type fans with inherent corrosion resistance. b. Discharge air vertically upward and protected by PVC coated steel wire safety guards. c. Statically and dynamically balanced. 3. Supply Fan Drive: Unit shall be equipped with variable frequency drive (VFD) inverter. The VFD shall be installed inside the unit cabinet and shall be factory -mounted, wired and tested. The VFD shall control motor speed to maintain set point static pressure at the sensor tube location of the supply duct pressure transducer (transducer is factory - provided and installed; sensor tube must be field -routed). The control system may be field -adjusted to maintain supply duct static pressure set points from 0 in. wg to 3.5 in. wg. The variable frequency drive shall include the following features: a. Full digital control with direct control from the unit ComforlLink controls. b. Insulated Gate Bi-Polar Transistors (IGBT) used to produce the output pulse width modulated (PWM) waveform, allowing for quiet motor operation. c. Inverters capable of operation at a frequency of 8 kHz, so no acoustic noise shall be produced by the motor. d. Self diagnostics. e. Personal lockout code for additional security. f. Critical frequency avoidance. g. RS485 capability standard. h. Electronic thermal overload protection. i. 5% swinging chokes for harmonic reduction and improved power factor. j. All printed circuit boards shall be conformal coated. D. Compressors: 1. Fully hermetic, scroll type compressors with overload protection and short cycle protection with minimum on and off timers. 2. Factory rubber -in -shear mounted for vibration isolation. Applied Rooftop Builder 3.19f Page 11 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM 3. Reverse rotation protection capability. 4. Crankcase heaters shall only be activated during compressor off mode. E. Coils: 1. Standard evaporator coil shall have aluminum plate fins mechanically bonded to seamless internally grooved copper tubes with all joints brazed. 2. Standard condenser coil shall be microchannel design. The coil shall have a series of flat tubes containing a series of multiple, parallel flow microchannels layered between the refrigerant manifolds. Microchannel coils shall consist of a two -pass arrangement. Coil construction shall consist of aluminum alloys for the fins, tubes and manifolds. 3. Coils shall be leak tested at 150 psig and pressure tested at 650 psig. - 4. Optional condenser coil shall have aluminum plate fins mechanically bonded to seamless internally grooved copper tubes with all joints brazed. 5. Optional pre -coated aluminum -fin coils shall have a durable epoxy -phenolic coating to provide protection in mildly corrosive coastal environments. Coating shall be applied to the aluminum fin stock prior to the fin stamping process to create an inert barrier between the aluminum fin and copper tube. Epoxy -phenolic barrier shall minimize galvanic action between dissimilar metals. Copper -fin coils shall beconstructed of copper fins mechanically bonded -to copper tubes and copper tube sheets. Galvanized steel tube sheets shall not be acceptable. A polymer strip shall prevent coil assembly from contacting the sheet metal coil pan to minimize potential -for galvanic corrosion between coil and pan. All copper construction shall provide protection in moderate coastal environments: 7. E-coated aluminum -fin coils shall have a flexible epoxy polymer coating uniformly applied to all coil surface areas without material bridging between fins. Coating process shall ensure complete coil encapsulation. Color shall be high gloss black with gloss — 60 deg of 65 to 90% per ASTM D523-89. Uniform dry film thickness from 0.8 to 1.2 mil on all surface areas including fin edges. Superior hardness characteristics of 2H per ASTM D3363-92A and cross -hatch adhesion of 4B-5B per ASTM D3359-93. Impact resistance shall be up to 160 in./lb (ASTM D2794-93). Humidity and water immersion resistance shall be up to minimum 1000 and 250 hours respectively (ASTM D2247-92 and ASTM D870-92). Corrosion durability shall be confirmed through testing to be no less than 1000 hours salt spray per ASTM B117-90. Coil construction shall be aluminum fins mechanically bonded to copper tubes. F. Gas Heating Section (48 Series Only): 1. Induced -draft combustion type with energy saving direct spark ignition systems and redundant main gas valves. 2. The heat exchanger shall be of the tubular section type constructed of a minimum of 20-gage steel coated with a nominal 1.2 mil aluminum -silicone alloy for corrosion resistance. Optional stainless steel heat exchangers shall be available. 3. Burners shall be of the in -shot type constructed of aluminum coated steel. 4. All gas piping shall enter the unit cabinet at a single location. 5. Induced Draft Fans: a. Direct -driven, single inlet, forward -curved centrifugal type. b. Statically and dynamically balanced. c. Made from steel witha corrosion -resistant finish. 6. High -corrosion areas such as flue gas collection and exhaust areas shall be lined with corrosion resistant material. G. Refrigerant Components: Unit shall be equipped with dual refrigerant circuits each containing: 1. Solid core filter drier. 2. Thermostatic expansion valve. 3. Fusible plug. H. Filter Section: Standard filter section shall be supplied with 2-in. thick disposable fiberglass filters. I. Controls and Safeties: 1. Unit ComfortLink Controls: a. Scrolling marquee display. b. CCN (Carrier Comfort Networke) capable. c. Unit control with standard suction pressure and condensing pressure transducers. d. Shall provide a 5° F temperature difference between cooling and heating set points to meet ASHRAE Applied Rooftop Builder 3.19f Page 12 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM 90.1, energy standard. e. Shall provide and display a current alarm list and an alarm history list. f. Automatic compressor redundancy. g. Service run test capability. h. Shall accept input from a CO2 sensor (both indoor and outdoor). i. Configurable alarm light shall be .provided which activates when certain types of alarms occur. j. Compressor minimum run time (3 minutes) and minimum off time (3 minutes) are provided. k. Service diagnostic mode. 1. Optional integrated economizer control or two -position self -closing adjustable outside -air damper. m. Minimum of 3 capacity stages of mechanical capacity control (excluding hot gas bypass) controlled with logic to maintain supply air temperature set point. n. Optional minimum load valve for additional capacity stage. o. Unit shall be complete with self-contained low voltage control circuit. Safeties: a. Unit shall incorporate a solid-state compressor lockout which provides optional reset capability at the space thermostat should any of the following safety devices trip and shut off compressor: 1) Compressor lockout protection provided for either internal or external overload_ 2)• . Low-pressure protection. 3) Freeze protection (evaporator coil). 4) High-pressure protection (high pressure switch or internal). 5) Compressor reverse rotation protection. 6) Loss of charge protection. 7) Welded contactor protection. b. Supply -air sensor shall be located in the unit and should be used for economizer control and compressor stage control. c. Induced draft heating section (48 Series) shall be provided with the following minimum protections: 1) High -temperature limit switch. 2) induced -draft motor speed sensor, 3) Flame rollout switch. 4) Flame proving controls. 5) Redundant gas valve. J. Operating Characteristics: 1. Unit shall be capable of starting and running at 115 F ambient outdoor temperature per maximum load criteria of AHRI Standard 340/360. 2. Unit with standard controls will operate in cooling down to an outdoor ambient temperature of 32 F. 3. Unit shall be provided with fan time delay to prevent cold air delivery. K. Electrical Requirements: All unit power wiring shall enter unit cabinet at a single location. L. Motors: 1. Compressor motors shall be cooled by refrigerant gas passing through motor windings and shall have either internal line break thermal and current overload protection or external current overload modules with compressor temperature sensors. 2. All condenser -fan motors shall be totally enclosed 3-phase type with permanently lubricated ball bearings, class F insulation and internal, automatic -reset thermal overload protection or manual reset calibrated circuit breakers. 3. All indoor fan and power exhaust motors 5 hp and larger shall meet the minimum efficiency requirements as established by the Energy Independence and Security Act (EISA) of 2007. M, Special Features: Certain features are not applicable when the features designated * are specified. For assistance in amending the specifications, contact your local Carrier Sales Office. * 1. Ultra Low Leak Economizer: Dry bulb, differential dry bulb temperature, optional enthalpy, or optionaldifferential enthalpy controlled integrated type consisting of dampers, actuator, and linkages in conjunction with control system to provide primary cooling using outdoor air, conditions permitting, supplemented with mechanical cooling when necessary. a. Economizer shall meet the requirements of the California Energy Commission Title 24 economizer Applied Rooftop Builder 3.19f Page 13 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM requirements. • b. Dampers shall be a gear driven ultra low leakage type with blade and edge seals. Dampers shall exhibit a maximum leakage rate of 3 cfm per square foot of area at 1 in. wg pressure differential when tested in accordance with. AMCA (Air Movement and Control Association) Standard 500. * 2. Barometric Relief Damper Package: a. Package shall include damper, seals, hardware, and hoods to relieve excess internal pressure. b. Damper shall close due to gravity upon unit shutdown. * 3. Power Exhaust: Package shall include a multiple exhaust fan (centrifugal style) fan, 1 Hp 208-230, 460 v direct -drive motor, and damper for vertical flow units with economizer to control over -pressurization of building. Control shall be through ComfortLink controls based on optional building pressure sensor.: On size 020- 050 units, 4 stages of control shall be available. On size; 060 units, 6 stages of control shall be available. *4. Liquefied Propane Conversion Kit (48 Series): Kit shall contain all the necessary hardware and instructions to convert a standard natural gas unit for use with liquefied propane gas. * 5. Convenience Outlet: -Shall be factory -installed and internally mounted with an externally accessible 115-v, 15 amp GFI (ground fault interrupter), female receptacle with hinged cover. A step-down transformer and overload protection shall be included so no additional wiring is necessary unless the field wired outlet has been requested. When applied with a unit -mounted disconnect, the outlet shall be wired to the load side of the disconnect so the outlet will shut off with the disconnect. * 6. Non -Fused Disconnect Switch: Shall be factory -installed, internally mounted, and UL approved. Non -fused switch shall provide unit power shutoff. Shall be accessible from outside the unit and shall provide power off lockout capability. * 7. Electric Heater (50 Series Units Only): Electric resistance heaters shall be factory -installed, nichrome element type, open wire coils with 0.29 in. inside diameter, insulated with ceramic bushings, and include operating and safety controls. Coil ends are staked and welded to terminal screw slots. * 8. Hail Guard, Condenser Coil Grille: Shall protect the condenser coil from hail, flying debris, and damage by large objects without increasing unit clearances. * 9. CO2 Sensor: The CO2 sensor shall have the ability to monitor CO2 levels and relay information to the controller. The controller will use CO2 level information to modulate the economizer and provide demand control ventilation. The sensor shall be available as field installed or factory -installed return air sensor or a remote space sensor. *10.Return Air Smoke Detector: The smoke detector shall send input to the controller to shut down the unit in case smoke is detected. The smoke detector shall be factory installed in the return air section or shall be available as a field -installed accessory. *11.Filter Status: The filter status switch shall be a pressure differential switch and will indicate a dirty filter. The switch shall be available as field or factory installed. *12.Humidity Sensor: A humidity sensor will allow for outside air enthalpy changeover control using the standard outside air dry bulb sensor and the accessory humidity sensor. When both an outside and return air humidity sensor are used then differential enthalpy changeover can be supported. *13.Two-Position Damper: A two -position damper shall admit up to 25% outdoor air during fan operation and shall close when the fan is off. The damper position shall be mechanically adjustable. *14.4-Inch Filters: Optional filter section shall be supplied with 4-in. thick MERV (Minimum Efficiency Reporting Value) 7 pleated fiberglass filters. *15.Controi Expansion Module (CEM.): Shall provide the following additional optional features: a. Remote set point. b. Demand limit control. Applied Rooftop Builder 3.19f Page 14 of 15 Guide Specification for AHU-1 Project: BOEING 9-110 7-15 Prepared By: 07/17/2015 05:03PM c. Remote economizer position. d. Fire and smoke control override control. e. Remote sensor monitoring. f. Fan status switch monitoring. 16. Bypass for Supply Fan VFD (Variable Frequency Drive): Units may be equipped with an optional manual bypass switch which allows the supply fan VFD to be electrically bypassed. 17. BACnet Communication Option: Shall provide factory -installed communication capability with a BACnet MS/TP network. Allows integration with i-Vu® Open Control System or a BACnet Building Automation System. 18. MODBUS Protocol Translator: A controller -based module shall provide CCN to MODBUS Remote Terminal Unit (RTU) protocol conversion. 19. LonWorks Protocol Translator: A controller -based module shall provide CCN to LON FT-10A ANSI/EIA-709.1 protocol conversion, 20. NavigatorTM Display Module: The Navigator display module shall be a portable hand-held display module with a minimum of 4 lines and 20 characters per line, of clear English, Spanish, Portuguese or French language. Display menus shall provide clear Language descriptions of all menu items, operating modes, configuration points and alarm diagnostics. Reference to factory codes shall not be accepted. An industrial grade coiled extension cord shall allow the display module to be moved around the chiller. Magnets shall hold the display module to any sheet metal panel to allow hands -free operation. Display module shall have NEMA (National Electrical Manufacturers Association) 4x housing suitable for use in outdoor environments. Display shall have back light and contrast adjustment for easy viewing in bright sunlight or night conditions. The display module shall have raised surface buttons with positive tactile response. *21.Staged Gas Heat (48A3,A5 only): The control shall have the option for control of the gas heat to a discharge air temperature by sequencing on the gas cells to provide up to 11 stages of capacity. The control shall be integrated directly into the main unit controls and shall include leaving air temperature sensors to ensure that high temperatures do not occur during the operation of the staged gas heat. 22. Full Perimeter Roof Curbs (Horizontal and Vertical): Shall be formed of 14-gage galvanized steel with wood nailer strip and shall be capable of supporting entire unit weight. 23. Security Grille (48/50A060 Unit with MCHX jmicrochannel heat exchanger] Only): Factory -installed grille shall limit access to compressor and condenser coil area to authorized personnel only. 24. Double Wall Option: Unit cabinet shall have double wall construction featuring flexible fire retardant fiberglass insulation sandwiched between pre -painted exterior panels and galvanized steel inner panels. 25. Low Outdoor Sound Accessory: Field -installed accessory, consisting of compressor sound blankets which are used to mitigate the level of outdoor sound. Available in both single and tandem arrangements. 26. Low Outdoor Sound Condenser Fans: Low sound condenser fan system shall be provided to reduce outdoor sound levels. Applied Rooftop Builder 3.19f Page 15 of 15 Model number nomenclature (cont) 50A2,A3,A4.A5 UNITS 50 A2 E 050 F E G 6 21 GN 50 - Cooling Unit Configuration A2 - CV/SAV Vertical with ComforlLInk Controls and Puron:, Refrigerant (R-410A) A3 - VAV Vertical with ComfortLink Controls and Puron Reirigerant (R-410A) • A4 - CV/SAV Horizontal with GomfcrtUnk Controls . and Puron Refrigerant (R-410A) A5 VAV Horizontal with ComiortUnk Controls and Puron Refrigerant (R-410A) Heat Options - - No heat • B - 36/27 kW C - 72/54 kW - 54/42 kW -108;81kW F - No heat with Humidi-MiZer G - 36/27 kW with Humidi-MiZer H - 72/54 kW with Humidi-MiZer J - 54/42 kW with Humidi-Miler K - 108/81 kW with Humid:-MiZer • Unit Size - Nominal Torts 020 - 20 025 - 25 027 - 27 030 - 30 035 - 35 040 - 40 050 - 50 060 - 60 Control Options - -No Options A - Controls Expansion Module only B - CO, Sensor C - Smoke Detector D - co, Sensor and Srnoke Detector (return section mounted) E - Plugged Fitter Indicator F - Plugged F4ter Indicator and CO, Sensor G - Plugged Fitter Indicator and Srnoke Deledur4 H - Plugged Filler Indicator, CO, and Smoke Detector J - CO; Sensor with Controls Expansion Module K - Smoke Detector with Controls Expansion Module L - CO. Sensor and Srnoke Detector wan Controls .anion Module M - Pugged Filter Indicator with Controls Expansion Module N - Plugged Filter Indicator and CO, Sensor with Controls Expansion Module P - Plugged Fitter Indicator end Smoke Detector with Controls Expansion Module Q - Plugged Filer Indicator, CO; and Smoke Detector with Controls Expansion Module LEGEND AI — Aluminum Cu — Copper CV — Constant Volume MCHX— Microchannel Heat Exchanger SAVT6,— Staged Air Volume VAV — Variable Air Volume VFDB — Variable Frequency Drive Bypass Factory -Installed Options Refer to price pages for available option codes. Packaging/Communication 1 - Domestic 3 .- Export . A Domestic with BACnet Communication Option C - Export with BACnet Communication Option Design Series 2 A Series Voltage 1 - 575-3-60 2 - 380-3-60 - 5 - 208/230-3-60^, 6 - 460-3-60 Coil Options - AVCu Cond, AVCu Evap A - AI/Cu Cond, AI(Cu Evap with Variable Compressor B - Cu/Cu Cond, Al/Cu Evap with Variable Compressor C - Cu/Cu Cond, Al/Cu Evap D - Al/Cu Cond Precoat, AVCu Evap with Variable Compressor E - AI/Cu Cond Precoat, Ai/Cu Evap F - E-coated AVCu, Al/Cu Evap G - MCHX Cond, AVCu Evap tf - E-coated MCHX Cond, At/Cu Evap J - MCHX Cond with Security Gate, AI/Cu Evap K - E-coated MCHX Cond with Security Grille, AVCu Evap L - E-coated Al/Cu Cond. AVCu Evap with Variable Compressor M - MCHX Cond, Ai/Cu Evap with Variable Compressor N - E-coated MCHX Cond, Al/Cu Evap with Variable Compressor P - MCHX Cond with SecurityGrille, AVCu Evap with Variable Compressor Q - AVCu Cond, AYCu Evap with Hot Gas Bypass R - Cu/Cu Cond, AI/Cu Evap with Hot Gas Bypass S - AVCu Cond Precoat, Al/Cu Evap with Hot Gas Bypass T - E-coated AI/Cu,AVCu Evap with Hot Gas Bypass V - MCHX Cond, Al/Cu Evap with Hot Gas Bypass W - E-coated MCHX Cond, AVCu Evap with Hot Gas Bypass X - MCHX Cond with Security Grille, AI/Cu Evap with Hot Gas Bypass Y - E-coated MCHX Cond with Security Grille, AI/Cu Evap with Hot Gas Bypass Z - E-coated MCHX Cond with Security Grille: AVCu Evap with Variable Compressor Motor Options No VFD VFDB VFD A- 5HP J- SHP L - 5HP C- 10HP 1 - 10HP N - 10HP D- 15HP 2- 15HP P - 15HP air". E - 20 HP 3 - 20 HP Q - 20 HP F - 25 HP 4 - 25 HP R - 25HP G - 30 HP 5 - 30 HP S - 30 HP H - 40 HP 6 - 40 HP T - 40 HP NOTES: 1. VAV and SAV models are equipped with a supply fan motor variable frequency drive (VFD). 2. All indoor fan motors meet the minimum efficiency requirements as established by the Energy Independence and Security Act (EISA) 2007. Quality Assurance Certified to ISO 9001 6 Physical data -- 50A unfits UNIT 50A2,A3,A4.A5 020 025 027 030 NOMINAL CAPACITY (tons) 20 25 27 30 BASE UNIT See Unil Weights Tabie OPERATING WEIGHT 16) COMPRESSOR Quantity ... Type (Ckt. 'Mkt 2) 2 ... ZP67/1...ZP91 2 ... ZP91/1...ZP91 2 ... ZP91/1...ZP91 2...ZP72, 2.,.ZP72 Number of Refrigerant Circuits 2 2 2 2 Oil Prechareed Precharged Prechar•ed Prechareed REFRIGERANT R-410A Operating Charge (Ib), Ckt 1/Ckt 2. RTPF Coils MCHX Coils 26.2/18.8 14.9/11,8 30. /15.2 20.4112.8 32.8/16.5 20.4/12.8 15.11/1155..3 NMCHX Coils with Humidi-Mizer 22.1/11.8 27,e/12.8 27.8112.8 46-17'r MCHX CONDENSER' Quantity 1 1 1 • 1 Total Face Area (sq ft) 32.9 • 32.9 `. 32.9 32.9 RTPF CONDENSER Quantity 1 1 1 1 Rows...Finelrn. • 2...15 3...15 3...15 4...15 Total Face Area (sq ft) 33.3 . 33.3 33.3 33.3 CONDENSER FAN Propeiier Type Nominal Cfm 19,500 19,500 19,500 19,500 Quantity.:: Diameter (in.) 2 ... 30 2 ... 30 2 .,. 30 2 30 Motor ttp 1 1 ... 1 1 EVAPORATOR COIL Cross -Hatched Copper Tubes, Aiuminum Plate Fins with Intertwined Circuis Tube Size (in.) a,,, 5,,, 3°a 51,8 Rows ... Finslin. 3 ... 15 4 ... 14 4 ... 15 4 .., 15 Total Face Area (sq ft) 31.7 31.7 31.7 31.7 HUMIDI-MIZER COIL Quantity 1 1 1 Face Area (sq ft) 14.4 14.4 14,4 EVAPORATOR FAN Centrifugal Type Quantity ... Size (in.) 2 ... 20 X 15 . 2 ... 20 X 15 2 ... 20 X 15 2 ... 20 X 15 Type Drive Belt Belt Belt Belt Nominal Cfm 8,000 10,000 11,000 12,000 Motor Hp 5 10 15 5 10 f 15 10 j 15 20 10 15 20 Motor Frame Size 184T 215T 254T 184T 215T l 254T I 215T j 254T 256T 2157 254T 256T Motor Bearing Type Bail Ball Ball Bali Maximum Allowable Rpm 1200 1200 1200 1200 Motor Pulley Pitch Diameter Nominal Motor Shaft Diameter (in.) 4.8 11/5 4.4 1a/6 5.7 15/g 5.2 11/6 6.1 lais. 5.5 15/g 4.4 13Ia 4.9 15/8 5.9 15/s 4.4 13/e 5.7 15/$ 5.9 13i6 Fan Pulley Pitch Diameter (in.) 12.4 6.6 9.1 12.4 11.1 8.7 9.4 8.1 8.7 9.0 9.1 8.7 Nominal Fan Shaft Diameter (in.) Belt Quantity 1 1 en/tp 2 2 1 1 t=,•',r. 1 2 2 1 15/ rc 2 2 2 115/t6 2 2 Belt Type BX56 BX50 5VX530 BX56 5VX570 5VX530 BX50 5VX500 5VX530 BX50 5VX530 5VX530 Belt Length (in.) 56 63 53 56 57 53 50 50 53 50 53 53 Pulley Center Line Distance (in.) 16,0- 15.6- 15.0• 15.6-18., 15.6-18.4 15.0-17.9 15.6-18.4 15.0-15.0- .0 15.6- t5.0- .0 .0 15.0- 18.7 • 18.4 17.9 1 17.9 186 17.9 17.9 Factory Speed Setting (rpm) 717 924 1096 773 962 1106 848 1059 1187 856 1096 1187 HIGH-PRESSURE SWITCH (psig) Cutout 650 650 650 650 Reset (Auto.) 500 500 500 500 MIXED -MR FILTERS Quantity ._ Size (in.) Standard 10 ... 20 x 24 x 2 10 ... 20 x 24 x 2 10 ... 20 x 24 x 2 10 ... 20 x 24 x 2 Pleated 5...20x20x4 5...20x20x4 5...20x20x4 5...20x20x4 5...20x24x4 5...20x24x4 5...20x24x4 5...20x24x4 OUTDOOR -AIR FILTERS Quantity...Size (in.) 8..,16 x 25 x 2 ,.,20x25x2 POWER EXHAUST Motor, Quantity...Hp Fan, Diameter...Width (in.) :sect Drive, Single -Phase Motors (Factory -Wired for High Speed Operation), Forward -Curved Fan Wheels with Backdraft Dampers on Each Fan Housing 4...1 11 x 10 LEGEND Al - Aluminum Cu - Copper MCHX- Microthannel Heat Exchanger RTPF - Round Tube Plate Fin 'Sizes 020 to 027: Circuit 1 uses the lower portion of condenser coil, Circuit 2 uses the upper portion. Sizes 030 and 035: Circuit 1 uses the upper portion o1 condenser coil, Circuit 2 uses the lower portion. Sizes 040 and 050: Circuit 1 uses the left condenser cat, Circuit 2 the right. Size 080: Circuit A uses the two MCHX colts near the bulkhead, Circuit B uses the hvo MCHX coif; near the cortrol box. 12 § \ 2 \ DESCRIPTION INITIAL DRAWING CHANGED HEIGHT TO 16" re ■ � k k « EXISTING CURB LAYOUT Q. ""°` 1-4545-4030 7 \ | / p / 0 O EN in P. / | m /% Attn: DIMENSIONED AND TOLERENCED PER ANSI Y14.5M•1E82 4 3/4" - i CARRIER 48/50 AJ/EJ/EK/EW/EY 024-034 580 G, H 558 G,H 240-360 162 7/16" Tag: e 28 3/4" RETURN AIR 44 13/16" 68 13/16" SUPPLY AIR WREN I ISAREA IS USED AS A PLENUM FOR THE NEW ADAPTER, A COVER MUST BE ADDED HERE 2" TYP, 81 1/4" 40 1/2" 100 1/2" 116 3/8" 05 ADDED COVER NOTE 11/21/11 MWG 04 UPDATED BRACES 10/6/11 MWG ORR;NsIOME ARE A&FOLLOWE: nEA4 mmI STEDMIOLE PROJECTION APPROVALS * Verify existing curb OD * Verify supply and return openings * Note any changes * Cali with any questions * Fax back if drawing is OK as is DATE 03 UPDATED ADDRESS 6/29/06 AL mgreenwood CNEONEO: 11/21/201 02 CHANGED DIMENSION STYLE TO INSIDE OF R & S OPENINGS 12/8/04 MOMT: TRLE: CARRIER/BRYANT ROOF CURB 01 INITIAL DESIGN 11/26/01 MG REV. DESCRIPTION DATE APPROVED CD 7560 TYLER ST NW ELK RIVER, MN 55330 63)391-779D R76313917651 FILE NAME: 4030 ECO#: DRAWING NO.: 4030 REV 05 SCALE:1:2B SNEET:1 OF Attn: DIMENSIONED AND TOLERENCED PER ANSI Y14.5M-1882 CARRIER 48/50 DD/DF. 034 198 5/8" Tag: O+ � 81 1/4" SUPPLY AIR RETURN AIR 1 3/4" TYP. 113 3/8" 5 3/8",-- 41 3/8" 22 3i/8" T 5 3/8" d 4ENS ONS ARE', R AHGIE AS FOLLOWS: f PRDJECIIM! f.RRG is APPROVALS * Verify existing curb OD * Verify supply and return openings * Note any changes * Call with any questions * Fax back if drawing is OK as is DATE °RAIN"' A. LUTTINEN 6/30/06 GHECRED: 02 01 Pam/ UPDAIED ADDRESS 1JJlA1 DESIGN r)FcrR1PTION _6/30/06 11/7/01 IIATF MG APARc7\/Ffl MGM% 121L CARRIER ROOF CURB cDELK IVER, ST NW �g®® {{77ELK REVER, PAN 55330 63)391.7790 (76313917851 FILE NAN E: 4545 iECG s DRAWING NC.: 4545 REV: 2 SCALE:1:355 SHEET;'( GE 1 Lon Haberlach From: Lon Haberlach Sent: Monday, July 20, 2015 10:39 AM To: 'Brian.P.Harr@boeing.com'; Jim Pechan Subject: RE: 9-110 Rooftop AHU - Existing Carrier Model 50 DF Attachments: BOEING 9-110 CARRIER PRELIM SUBMITTAL 50A3030 7-20-15.pdf Brian, Jim is off to a factory for training most of this week and asked me to assist with this project in his absence. Buried in the mech. equipment schedule are notes is an old Carrier Model SODF 034 with 55 KW electric heat potentially installed as 33 KW ? Actual can only be field determined By catalog notes it would be 113 MCA / 125 MOCP @ 460/3/60 .., this should be confirmed to know what electrical is really, available Jm said that the equipment nameplate was not easily readable but I would recommend taking another attempt to obtain this detail. The current replacement unit can use the same original curb with a CD! transition curb adapter so the original ducts and be used also. The new model Carrier 50AS VAV unit with electric heat has two size options 36 KW OR 72 KW Staging is 2 Step on both sizes Current production is 7-8 weeks + 1 week truck freight from North Carolina Attached is a preliminary submittal based on original schedule air flows etc. for your review and comment we can finalize pricing after we explore what features and options you currently need. Feel free to call any questions, Lon Haberlach P.E. I Norby Company 425-828-6636 I Fax 425-828-3982 I Cell 425-442-0803 I www.norbyco.com ----Original Message ---- From: Jim Pechan Sent: Friday, July 17, 2015 12:21 PM To: Lon Haberlach <lonh@norbyco.com> Subject: FW: 9-110 Rooftop AHU Regards, Jim Pechan Norby Company PH: 425-828-6636 CELL: 206-953-5516 Original Message---- t 1 City of Tukwila Department of Community Development 11/1/2016 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Permit No. M15-0137 BOEING #9-110 - AHU REPLACEMENT 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on• 12/28/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 12/28/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 1:),-(1) Bill Rambo Permit Technician File No: M15-0137 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director May 16, 2016 Connie Hardin 4600 S 134th P1 Seattle, WA 98168 RE: Request for Extension #1 Permit Number M15-0137 Dear Ms. Hardin, This letter is in response to your written request for an extension to Permit M15-0137. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through December 28, 2016. If you should have any questions, please contact our office at (206) 431-7165. Sincerely, Meiro Rachelle Riple Permit Technician File: Permit No. M15-0137 W:\Permit Center\Extension Letters\Permits\2015\11415-0099 Permit Extension .docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Rachelle Ripley From: Connie Hardin <connieh@holadayparks.com> Sent: Monday, May 09, 2016 2:19 PM To: Jerry Hight Cc: Rachelle Ripley Subject: Permit # M15-0137 Boeing 9-110/AHU Replacement Hi Jerry. I received notification last week that this permit will be expiring soon. Due to construction delays, we are requesting an extension. Thank you for your consideration. Connie Hardin Holaday Parks RECEIVED CITY OF TUKWiLA MAY 0 9 2016 PERMIT CENTER Request for Extension # Current Expiration Date: (i Extension Request: (Approved for days Denied (provide explanation) Sign ure/Initials 1 City of Tukwila Department of Community Development 5/3/2016 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Permit No. M15-0137 BOEING #9-110 - AHU REPLACEMENT 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 6/28/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 6/28/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: M15-0137 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PLAN KTWIfi MING SLIP PERMIT NUMBER: M15-0137 DATE: 10/15/15 PROJECT NAME: BOEING #9-110 - AHU REPLACEMENT SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: f1 Building Division 1111 Public Works n Fire Prevention Structural 10 Planning Division Permit Coordinator ■ PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 10/20/15 Structural Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved Corrections Required n Denied (ie: Zoning Issues) (corrections entered in Reviews) Approved with Conditions DUE DATE: 11/17/15 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 HOLADAY PARKS INC Page 1 of 3 Home Inicio en Espanol Contact Search L&I jai A-Z Index Help My Secure 1.,&1 Safety Claims & Insurance Workplace Rights Trades & Licensing 0 Washington State Department of Labor & Industries HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL SEATTLE, WA98168 206-248-9700 KING County Business type Corporation License https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/28/2015 HOLADAY PARKS INC Verify the contractor's active registration / licen: )rtification (depending on trade) and any past violations Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2017 Bond ................. LIBERTY MUTUAL INS CO Bond account no. 23000452 $12,000.00 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance .......... .................. Charter Oak Fire Ins Co Policy no. DTCO1F465357C0F14 $1,000,000.00 Received by L&I Effective date 10/28/2014 11/01/2014 Expiration date 11/01/2015 Insurance history Savings ..................... No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts ........................................ No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations ......................................................... No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID Account is current. 177,231-00 ................................. Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 2 of Year 2015 "Greater than 100 Workers" L&I account representative T4 / CARIE PICKETT (360)902-5592 - Email: PICC235@Ini.wa.gov Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 Inspection results date 05/08/2014 No violations No violations Page 2 of 3 https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/28/2015 HOLADAY PARKS INC Inspection no. 317278497 Location 2nd and 110th Ave Bellevue, WA 98004 Inspection results date 09/04/2012 Inspection no. 316256841 Location 3003 W Casino Rd Everett, WA 98204 Inspection results date 01/12/2010 Inspection no. 313668006 Location 11065 NE 8th Bellevue, WA 98004 Inspection results date 12/15/2009 Inspection no. 313884884 Location 14925 Interurban Avenue S. Tukwila, WA 98168 Violations No violations No violations Page 3 of 3 © Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/28/2015 VICINITY MAP OXBOW RKIN^ LOI DEVELOPMENTAL CENTER REVISh7N ORIC1NAL ISSUE 20368-10 NO SCALE APPPOVED DATE CMM 01.15.14 11 i L cDEI o VELOPiETAL CE 1"" 9725 EAST ARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 APPROVED RATE AC TABILITY Riffs D :' aN ANn/oa SPECiE(CA110N IS APPROVED CHECKEDr E11:11Rax r,CO3n Ilbrroveo APPRVIED SUt3TflLE TITLE PERMIT MASTER COVER SHEET BUILDING 09-110 #17:CU FOR: 0 rpcthanicaI ant- ectricaf Pprnbing as Piping City of Tukwila (BUILDING DIVISION! REVISIONS No changes shall he r rd+e to the scope of work without prior G.pp ovc:i of Tukwila Bui:dinj Q;i►i�if3;1. NOTE: Revisiom will acquire a rc 4 Wan submittal and may include additional plan review fees. f 1.- _.21,.✓__ 1 Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fie : Copy d • lions icknowIedged: By : ..._ Date: ... 15 City of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED OCT 2 2015 City of ukwila BUILDING,DIVISION RM, DEV. CL.N1ER, WA CURRENT REVISION 20368-10 'ORIG JO$ NO. 20368-10 DWG 140. DATE 01.15.14 COMP NO. 09-110-A0 RECEIVED CITY OF TUKWILA eci- 1 5 2015 PERMIT CENTER Vol • 480 CFM 60 w/3' ORIFICE ® 220 CFM W/4' ORIFICE 6"0 W/3" ORIFICE 150 CFM 150 CFM W/3" ORIFICE 150 CFM TYPICAL TRANSFER AIR DUCT. SEE NOTE 6. 6.0 W/3.5" ORIFICE 240 CFM RELOCATE FLOOR DRAIN 240 CFM CONNECT TO EXIST. VENT - F.D. PLUG IN PLACE An 100 CFM v HI -Ross OUTSIDE AIR BLOWER 280 CFM 100 Cf M 14 • ttotrtlt (AIR ou �Co EW M wN. (MR IN) Co IN, 920 CFM (TYP. 3) 1' ��.EL t1114C 310 CF)A EA. �m��■ �I�lii'i�6—Mc ���Irri�i�/Y% eimML IME VIKA Ilk 8,m��■I tom■►/■ _ii■,r i At All ■r��s111l _ "1"11 -* Pw. ESL ! ;ja�.t.�� ■r�`�•ar .,;11 in 4.4 11111111111111111■[s�iT�I 12/ 16 -Moon imis isammuilmmommanimaigliiimi I D i�tl- C>• M , 1 ...m1,4/01 bilori ME" gill SINE1111111111, 1:0112011. 1111020-mill weIMPIRIlir 0,4Eq21110. ermiman pat ��■��� .��� ��r��,. �. �..rs,i..� �I � � � � Ism 11411110 k.4.40.51 Ili la 111 litiL4Wra 111417.40:640114FiliMilh 11111 6.1trakie. P2i1L, ■®ill■h►■■1 y���=��` _ �' win ri 1.2.mm Ift.N PIMP WAIN ■ .,,m+ ram■ ■11117wI■ �11 EC INS 10 C/Agym ;- Ism ..�.r■� p 1� 4 �1T ylrwTwiriiiioi1I ��.,,... I Nhimirh1►�. 1111Vm:111 FAN /RR r'fT�TI� CF ,j1 ,too AdIM 11111111111M IQ I Pr alluTIMMIll %IF ■Ira.psi mrimpwreamilimmapho NE. • 1114IN a 51-01-111-2111110E1ter 11111 11111111 • woo mmi _________ I�wi : • * room MECHANICAL PLAN 1/8" ± I'-0- 3.5"- ORIFI 300 AW L • 4EOV 10) 230 CFM 10/8 PLENUM 25'-0" LONG (TYP. 2) 810 CFM TOTAL LENGTH 50'-0" TOTAL CFM 1400 270 CFM (TYP. 3) ID/a. ION SOUND ABSORPTION PLENUM 10'-O"x 4'-8"x 3'-2' 700 CFM Ala v TYP.2 250 CFM TOP OF GRILLE IN CONFERENCE ROOM IS 7'-0" A.F.F. BOTTOM OF GRILLE AREA IS I'-6" A.F.F. 250 CFM Krq> 48 • 'ILON ST-kUGTION__ N OThs czt), 04€ EX?S-rvNf A1, (to%.. a iuNC-I, Maw vi ?O SIG UN IT W rrit pa:4J.. U V.Igcltfi MdotZ `a~L WO' T- 71115 I, ,4 w E n 4 Cr PIA (N?-eAMC f,c4kftfy-travr- 1ti.Aorti `! z`W t1ffIS i4"c? Cor P lsE1l, LtN + r 06(01 uo _LTD M. 7 04 Lt P W+ IA NEW L I G 3t T co J tr_ . i SukPPcxt T ez tAck re) ,Act ) 01 I N rct w1.5 01 of V' WIDF 14jc44 pr►GT Sit417S Arr-AcMtp 7D 274b. rRboF S`'TZtAcriA 7. f'AgQ.tc Tt Rio \NS'rIR.u__ l+) fl"Kto Tom... t4"4) ANC Q) 4 1' 201` To 14"4 271..64, Q+;�.` T-t.A,Ns 1.1tc.,(Q Tit*NstTtort.> \,.i%kc �C 7,4" 6).' I. o•43 Will tii&LE Gx1sr, \4"(1) OAcTS GE ATTAC.tiCC "tb THE r)C--.4 Co o oc.m. t Q, REVIEWED FOR CODE COMPLIANCE APPROVED OCT 2 6 2015 -City of Tukwila RUILDINGIDNISIO " & JERAT NIMS RECEIVED CITY OF TUKWILA vC; 4. 15 2015 PERMIT -CENTER. 2. RETURN AIR DUCTS TO BE INSTALLED AS HIGH AS POSSIBLE WITH TOP OF DUCT TIGHT TO BOTTOM OF ROOF STRUCTURE. SUPPLY AIR DUCTS TO BE INSTALLED BENEATH RETURN AIR DUCTS. CARE.SHOULD BE TAKEN TO AVOID EXISTING SPRINKLER SYSTEM. 5, ALL RETURN AIR DUCTS ARE ACOUSTICALLY LINED, AND ALL SUPPLY AIR DUCTS FROM THE OUTLET OF AHU-I TO THE TERMINAL BOXES ARE ACOUSTICALLY LINED. SEE SPECIFICATIONS SHEET M-2. 4: DUCT SIZES ARE CLEAR INSIDE DIMENSIONS. S. THE SIZE OF DUCTS TO INDIVIDUAL DIFFUSERS SHALL BE THE SAME SIZE AS THE INLET/NECK SIZE INDICATED ON THE SCHEDULE SHEET M-3 UNLESS OTHERWISE NOTED. 6, FOR DETAIL OF TRANSFER AIR DUCTS, SEE 1, RIGID, DUCTS DOWNSTREAM OF VAV TERMINAL BOXES TO BE SAME SIZE AS VAV TERMINAL BOX OUTLET UNLESS OTHERWISE NOTED. MINIMUM HEIGHT OF RIGID DUCTS DOWNSTREAM OF FA BOXES TO BE ID'. ALL LINEAR SLOT DIFFUSERS TO BE TYPE Q. ALL RETURN AIR GRILLES TO BE TYPE UNLESS OTHERWISE NOTED. UNLESS OTHERWISE NOTED. 10. THIS MECHANICAL PLAN WAS COMPLETED PRIOR TO THE C ET I ON OF DRAWING E-I0, LIGHTING PLAN. THE RELOCATION OF RETURN GRILLES 2'-0' IN ANY DIRECTION TO AVOID INTERFERENCES WITH LIGHTING IS PERMISSIBLE. IL THE TWO EXISTING 12/12 PENETRATIONS IN THE TOP OF THE CONFERENCE ROOM (PREVIOUSLY THE VAULT) ARE TO BE USED FOR NEW DISTRIBUTION DUCTWORK. 12. RELOCATE GAS WATER HEATER AND TIE-IN GAS, COLD WATER, AND HOT WATER PIPING AND VENT INTO EXISTING SERVICES. - ,1 / �IIjM L I'LL1.di BE&C ENGINEERS SY11 J H G F REVISION LOTLochi,TE SPOT GooLER NY. J(t # I47O 2-0) I3w OPGwAO `:105110 `& I, Ol-'CKATTuN Fru Toe. 1 00,3443 -02. 'N5TAL.c. 3 kW UNIrNe-Ar /11 .A - „:)11,11-- BY DMV ora APPROVED I DATE r SY1A REVISION k /r'•/'1/1(> , L vtiflikct: ('a,'L;-f/vn,h.x, GN ,) 7132-i4 BY APPROVED DATE • �r��oac� FACILITIES DEPARTMENT El AUBURN, WA. 98002 ❑ BELLEVUE, WA. 98007 ❑ EVERETT, WA. 98201 ❑ KENT WA. 98031 ❑ PORTLAND, OR. 97220 O RENTON WA. 98055 SEATTLE, WA. 98124 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE ORA" BYRUBECK `DAZE, 8 j CHECKED RAMSEY ENCIN & I MA, 4tHICKED APPROVED APPROVED SUBTITLE TITLE MECHANICAL PLAN MECHANICAL MASTER BLDG. 9.110 D.C. } RECORD 10,DRAWING LAS(REVISION tYTA DATE SHEET OF JOB NO. 87128 DWG. NO. 109-110-4002 • • FLEX CONN. (TYP.) ROOF 16/54 M6 M6 22"a DUCT HVAC UNIT INSTALL STATIC PRESSURE REGULATOR BEFORE UNIT IS SET IN PLACE PREFABRICATED VIBRATION ISOLATION CURB EXISTING 2x6' 024" QC 16/54 BEL TH 1 1:. 20"(6 DUCT // TOP OF LIGHTS jREF) SUSPENDED CEILING 4$ THICK UNFACED FIBERGLASS ACOUSTIC LINER TYPE 703 ALL INTERIOR SURFACES TRANSFER AIR FLEX DUCT ACOUSTICALLY LINED T-BAR (TYP.) SUSPENDED CEILING RETURN AIR GRILLE SOUND ABSORPTION PLENUM FOR SECTION A I/2" 1'-0' 1I1InI1IILIIIIIUIII$ ki-41M-6 I11{IIIII1,1(IHtll ACOUSTIC LINING (TYP.) FOR DETAIL OF SOUND ENCLOSURE, SEE ARCHITECTURAL DRAWINGS. TEMPORARY STUD WALL RETURN AIR GRILLE TRANSFER AIR DUCT DETAIL rl 1 SCALE NOTE: SOUND ABSORPTION PLENUM TO BE HUNG FROM NEW 4xI2 ROOF FRAMING (SEE STRUCTURAL DRAWINGS). U 114 1.14 1, TOP OF_L IGHTS_LREF,L________`___ CEILING HVAC UNIT PLENUM HANGER ROD (TYP 4 PLACES) r ACOUSTIC PLENUM L FOR DETAIL OF SOUND ENCLOSURE, SEE ARCHITECTURAL DRAWINGS, SECTION 1 1 (B� M 61 M-6 1 J J 20„4 DUCT REVIIEVVED FOR (CODE COMPLIANCE APPROVED OCT 2 6 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA C�cT 15 2015 PERMIT CENTER BE&C ENGINEERS RECORD DRAWING C 6-15-8E REVISION BY AB APPROVED DATE SYbt REVISION BY APPROVED DATE r C RECORD DRAWING AR 6-15-88 B A REVISED STATIC PRESS. REGULATOR NOTE ISSUE FOR CONSTRUCTION AR AR 12-9-87 11-25-87 ISSUED FOR SECTION 'A' AR 11-19-87 OlgEllk70 FACILITIES DEPARTMENT ❑ AUBURN, WA. 98002 ❑ BELLEVUE, WA. 98007 ❑ EVERETT, WA. 98201 ❑ KENT, WA. 98031 ❑ PORTLAND, OR. 97220 ❑ RENTON WA. 98055 SEATTLE, WA. 98124 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE wN BYRUBECK CHECKED RAMSEY 4NGIN> SECTIONS AND DETAILS LAST REVISION I SYM CHECKED I I MA APPROVED APPROVED TITLE MECHANICAL MASTER BLDG. 9.110 D.C. SHEET 'JOB NO. 87128 OF DWG. Na 109-110-4002 ROOF DECK 240 CFM FOR DETAIL OF hODUNTING , SEE SECT I ON A 4-4.14-6 1 240 CFM 360 C.FM FINISHED FLOOR • ROOF DECK D TA L 10/8 PLENUM x25'-0" LONG SECTION 1/4*=1' -Oa SOUND ABSORPTION SUPP I R PLENUM. SEE SECTION MH6 8/10 SUPPLY AIR DUCT SUSPENDED.CEILING DETAIL 8/10 SUPPLY AIR PLENUM STRIP LIGHT FIXTURE REVIEWED FOR CODE COMPLIANCE APPROVED OCT 2 6 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA ocl 1 5 2015 PERMIT CENTER BE&C ENGINEERS RECORD DRAWING B 6-15-88 REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 4• B RECORD DRAWING AR 6-15-88 A ISSUE FOR CONSTRUCTION AR 12-2-87 FACILITIES DEPARTMENT • AUBURN, WA. 98002 O BELLEVUE, WA. 98007 • EVERETT, WA. 98201 O KENT, WA. 98031 o PORTLAND, OR. 97220 O RENTON, WA. 98055 SEATTLE, WA. 98124 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. 'DATE "AWN OY. TRACEY NECKED RAMSEY ""Mkpagril MA \CHECKED DATE APPROVED APPROVED SUBTITLE SECTIONS AND DETAILS TITLE MECHANICAL MASTER BLDG. 9. I 10 D . C . LAST REVISION 'SHEET SYM DATE ',JOB Na 87128 Cf DWG. Na 109-110-4002 4 ROOF DECK 240 CFM FOR DETAIL OF IMUNT I NG , SEE SECT ION A • ker-4,24-6 360 CFM FINISHED FLOOR 1 20" S.A. I I 16" S I 2" 8/22 ROOF DEC.K DETAIL 14.7.11_17 10/8 PLENUM x25'-0" LONG SECTION 1/4.=11 -0" SOUND ABSORPTION SUPP IR MAW. SEE SECTION 13-4 M1-8 8/10 SUPPLY AIR DUCT SUSPENDED.CEILING 111 1111 1111114i DETAIL 1/2-w-o- REVIEWED FOR CODE COMPLIAN,M APPROVED UL I 2 6 2015 8/10 SUPPLY AIR PLENiAil STRIP LIGHT FIXTURE • RECEIVED CITY OF TUKWILA Or. 1 5 2015 PERMIT CENTER BE&C ENGINEERS REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RECORD DRAW I NG AR 6-15-88 A ISSUE FOR CONSTRUCTION AR 12-2-87 FACILITIES DEPARTMENT CI AUBURN, WA. 98002 • BELLEVUE, WA. 98007 • EVERETT, WA. 98201 O KENT, WA. 98031 I=1 PORTLAND, OR. 97220 O RENTON, WA. 98055 SEATTLE, WA. 98124 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE "AWN V. TRACEY DATE -SUBIITLE SECTIONS AND DETAILS CHECKED RAMSEY • RECORD DRAW I NC B 6-15-88 LAST REVISION SYM DATE NGINj1 MA CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BLDG, 9,110 D . C . SHEET OF JOB Na 87128 DWG. Na 109- I 10-4002 • SELF J MARK NUMBER ACU-1 CONTAINED ROOF TOP AIR CONDITIONING UNIT (ACU> SCHEDULE FLAN FAN MOTOR LOCATION (ROOM NUMBER) ROOF NOMINAL CAPACITY TONS DRIVE CAPACITY ESP TYPE (OEMIN WG HP VOLTS PHASE HERTZ NO VOLTS PHASE COMPRESSOR 30 BELT 8900 2.5 15 460 3 60 2 . HE RT Z 460 3 60 • FLA • 27.5 EA. VAPORATOR COOLING CAPACITY CAPACITY MBH(1) SENSIBLE TOTAL RM TEMP °F DB WB CONDENSER FAN/MOTOR NO. 196.7 269.7 75.0 • 61.5 < 1) MINIMUM 3 DRIVE TYPE DIRECT NOMINAL CFM 21,000 HP 1 VOLTS PHASE 460 3 HE RT Z 60 <2) HEATING ELEMENTS SHIPPED SEPARATELY,5 ELEMENTS TOTAL,INSTALL 3 ELEMENTS ANDVERIFY THAT THE TOTAL RATING IS 50 KW MIN.-55 KW MAX. THE REMAINING 2 ELEMENT TO BE TURNED (3) PROVIDE ACU-1 CARRIER ROOF TOP VAV PACKAGED UNIT MODEL 50 DF034 WITH ROOF CURB.PROVIDE MICROPROCESSOR CONTROL PACKAGE INCLUDING; REMOTE PANEL,MORNING OVER TO BOEING. WARMUP THERMOSTAT , 7 DAY PROGRAMMABLE TIME CLOCK ,MODULATING OUTDOOR AIR CONTROL CONTROL PACKAGE , SAFETY CONTROLS , STAT I C PRESSURE CONTROLS AND DAMPER ASSEMBLY AND HEAD PRESSURE CONTROL. ELECTRIC HEATER RPM KW(2) VOLTS PHASE HERTZ FLA 1050 55 460 i 3 60 AIR FILTER TYPE & EFFIGfENCY MAX REMARKS DEPTH PER ASHRAE FINAL 52-76 SP WG 69 2" FARR 30/30 30% 0.9 COMPUTER ROOM COOLING UNIT MARK NO. CRU-1 CRU-2 LOCATION COMPUTER ROOM TYPE CEILING MOUNTED NOMI NA L CAPACITY TONS DRIVE TYPE FAN CAPACITY (CFM) ESP IN. W.G. HP FAN MOTOR VOLT PHASE HERTZ COIL COOLING CAPACITY CAPACITY MBH RM TEMP. °F SENSIBLE TOTAL DB CHILLED WATER FLOW GPM EWT °F MAX PD MAXIB► FLOW CAP O/HR VOLT HUMIDIFIER PHASE HERTZ AIR FILTER KW 2 DIRECT 800 2/3 277 1 60 19.9 • 25.1 80 67 2 277 60 .45 ELECTRIC REHEAT COIL KW 5 TYPE & DEPTH NOTE 1: HILANDER AIR COOLED MODEL NO. CB06A WITH ELECTRIC REHEAT, HUMIDIFIER, 1/2"REMOTE BLOWER UNIT. 1° FARR 30/30 EFFICIENCY PER ASHRAE 52-76 30% MAX INITIAL SP WG REIRKS SEE NOTE 1 FORCED AIR CABINET HEATER SCHEDULE MARK NUMBER CBH-1 LOCATION CFM VESTIBULE 1 200 ELECTRIC HEATER FAN MOTOR K1I 3.75 VOLT 277 PHASE HZ so HP 1/60 RPM 1100 m VOLTS PHASE 277 1 60 REMARKS SEE NOTE 1 NOTE 1: HORIZONTAL CEILING SURFACE MOUNTED FORCED AIR CABINET HEATER TRANE MODEL D46 SIZE 02 PROVIDE DISCONNECT SWITCH ,SINGLE HEAT SWITCH AND MOTOR SWITCH 14173 WITH UNIT MOUNTED THERMOSTAT AND PROVIDE FILTER. SOUND AT T E NUAT OR (SA) SCHEDULE MARK NUMBER SA-1 SERVICE • CONFERENCE ROOM • SEE NOTE 3 LENGTH FEET 5'-6 MAXIMUM PD IN/H20 0.10 AIR QUANTITY CFM 360 REMARKS INDUSTRIAL ACOUSTICS CO. QUIET VENT SI LENCER, TYPE W,MODEL 430 INSTALL W/GRILLES AND PAINT OFF-WHITE VARIABLE AIR VOLUME TERMINAL UNIT SCHEDULE MARK NUMBER AIR QUANTITY RANGE MIN.- MAX NC LEVEL 0 1 .5" WG INLET INLET SIZE (INCH) + HEATING AIR FLOW HEAT COIL - ELECTRICAL CFM SPIN WG FAN MOTOR PHASE HERTZ REMARKS HP VOLTSVOLTS PHASE HERTZ FV-1 100-920 35 10 830 0.3 1/6 277 1 60 4.5 277 1 60 METALAIRE MODEL NO.410FV FV-2 20-225 35 6 200 0.2 1/6 277 1 60 2.0 277 1 60 METALAIRE MODEL NO.406FV FV-4A 20-250 35 6 250 0.28 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-4B 20-250 35 6 250 0.28 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-5 30-290 35 6 275 0.2 1/6 277 1 60 2.0 277 1 60 METALAIRE MODEL NO.406FV FV-6 , 20-200 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 a ~ METALAIRE MODEL NO.406FV FV-7 10-100 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-8 20-200 35 6 200 0.2 1/6 277 1 60 2.0 277 1 60 METALAIRE MODEL NO.406FV FV-9 15-150 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-10 15-150 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-11 15-150 35 6 200 j 0.2 V 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-12 20-215 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-13 40-470 35 8 550 0.22 1/6 277 1 60 3.0 277 1 60 METALAIRE MODEL NO.408FV FV-14 10-100 35 6 200 0.2 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FV-15 20-274 35 6 250 0.28 1/6 277 1 60 1.0 277 1 60 METALAIRE MODEL NO.406FV FC-1 100-700 35 10 700 0.25 1/2 277 1 60 5.0 480 3 60 METALAIRE MODEL NO.410FC FC-2 100-700 35 10 700 " 0.25 1/2 277 1 60 5.0 480 3 60 METALAIRE MODEL NO.410FC FA-1 • NOT USED ,-- 1 _ FA-2 0-800 35 8 - - - - - - - - - - ANEMOSTAT FA - SIZE 8 FA-3 0-820 35 10 - - - - - - - - - - - ANEMOSTAT FA - SIZE 10 FA-4 0-120 35 5 - - - - - - - , - - - ANEMOSTAT FA - SIZE 5 FA-5 0-355 35 6 - - - - - - - - - - ANEMOSTAT FA - SIZE 6 FA-6 0-533 35 8 jr - - - - I - - - - - - - ANEMOSTAT FA - SIZE 8 FA-7 0-480 35 8 - _ - - - - - - . - . - a - - - -„, ANEMOSTAT FA - SIZE 8 FA-8 0-240 35 6 - - - - - - - - - - - 4 ANEMOSTAT FA - SIZE 6 FA-9 0-240 35 6 - - - - - - - - - - ANEMOSTAT FA - SIZE 6 (1) PROVIDE DISCONNECT SWITCH AND MAGNETIC CONTACT (2) FV-3 NOT USED 11 STtl REVISION BY APPROVED DATE STY REVISION BY APPROVED DATE IMP B A RECORD DRAWING ISSUE FOR CONSTRUCTION AR GN KMR 06.15.88 11.25.87 1 ISSUE FOR PROCUREMENT GN KMR 11.19.87 FACILITIES DEPARTMENT AIR DIFFUSER / REGISTER / GRILLE SCHEDULE MARK NUMBER 4 LD-1 TYPE LINEAR DIFFUSER • MATERIAL ALUMI NUM -I NL ET/NECK FINISH SIZE INCHES WHITE 8"0 r LD-2 LINEAR DIFFUSER ALUMINUM WHITE 8"0 LD-3 ADJUSTABLE L I NEAR DIFFUSER ALUMINUM WHITE 4"X LENGTH SD-1 SUPPLY DIFFUSER ALUMI NUM WHITE 12"X 6" MAXIMUM SET CFM SEE PLAN SEE PLAN SEE PLAN SEE PLAN REMARKS TRANE MODEL VDLC4HD10-02-2 SLOT ,2 WAY TRANE MODEL VDLC4HD30-02-2 SLOT ,2 WAY NOTCHED CARNES CHANNEL-AIRE MODEL 487335 3-1/2"SLOTS 10-5'-0" LONG SECTIONS. MOUNTED END TO END TO APPEAR CONTINUOUS TITUS MODEL SERIES S-202FD RG-1 RG-2 RR-1 RETURN GRILLE ALUMI NUM WHITE 12"X 24" SEE PLAN TITUS MODEL 50-MLR RETURN GRILLE ALUMI NUM WHITE 24"X 24" SEE PLAN TITUS MODEL 50-MLR RETURN REGISTER ALUMINUM WHITE 24"X 24" • • SEE PLAN TITUS MODEL 4-FLOG5 WITH FILTER AND DAMPER ❑ AUBURN, WA. 98002 ❑ BELLEVUE, WA. 98007 ❑ EVERETT, WA. 98201 ❑ KENT, WA. 98031 ❑ PORTLAND, OR. 97220 ❑ RENT ON, WA. 98055 SEATTLE, WA. 98124 ACCEPTABILITY Irri AND ftT17.87, THIS DESIGN AND/OR SPECIFICATION IS APPROVED - APPROVED BY EPT. i ATE ttin sir 0AsESylilltiA APPROVED APPROVED • SUBTITLE REVIEWED FOR CODE COMPLIANCE j APPROVED OCT 2 6 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA QC'' 15 2015 PERMIT CENTER BE&C ENGINEERS EQUI PMENT SCHEDULES TITLE MECHANICAL MASTER RECORD DRAWING T REVISION 06.15.88 LAST SYIi SHEET DATE EMI OF M JOB NO. bwl. Ho. 87128 ILQQ. 1.110 D.C. 109-110-4002