HomeMy WebLinkAboutPermit M15-0159 - HAWLEY RESIDENCE - DHP SYSTEMSANDRA HAWLEY
11816 40 AVE S
EXPIRED
05/31/16
M15-0159
Parcel No:
Address:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL OTC PERMIT
7340600065
11816 40TH AVE S Issue Date:
Permit Expires On:
Project Name: SANDRA HAWLEY
Permit Number:
M15-0159
12/3/2015
5/31/2016
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
HAWLEY SANDRA C
11816 40TH AVE S , TUKWILA, WA,
98168
AL NAMAZI
11809 NE 48TH PL, KIRKLAND, WA,
98033
ENERGY TECHNOLOGIES
Address: 11809 NE 48TH PL, KIRKLAND, WA,
98033
License No: ENERGTL916K1
Lender:
Name:
Address:
Phone: (425) 894-4115
Phone: (425) 824-4115
Expiration Date: 7/1/2017
DESCRIPTION OF WORK:
INSTALL A SINGLE HEAD DHP SYSTEM ON EXISTING SFR
Valuation of Work: $0.00
Type of Work:
Fuel type:
Fees Collected: $188.90
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: TUKWILA
Sewer District: VALLEY VIEW SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
International Fuel Gas Code:
2012
2012
2012
2012
2012
National Electrical Code:
WA Cities Electrical Code:
WAC 296-46B:
WA State Energy Code:
2014
2014
2014
2012
Permit Center Authorized Signature: kthhe IL* RA/
Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
Print Name:
t;l..m?4
Date: l 21 c-j //
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***MECHANICAL PERMIT CONDITIONS***
2: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center (206/431-3670).
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: Manufacturers installation instructions shall be available on the job site at the time of inspection.
5: Except for direct -vent appliances that obtain all combustion air directly from the outdoors; fuel -fired
appliances shall not be located in, or obtain combustion air from, any of the following rooms or spaces:
Sleeping rooms, bathrooms, toilet rooms, storage closets, surgical rooms.
6: Equipment and appliances having an ignition source and located in hazardous locations and public garages,
PRIVATE GARAGES, repair garages, automotive motor -fuel dispensing facilities and parking garages shall be
elevated such that the source of ignition is not less than 18 inches above the floor surface on which the
equipment or appliance rests.
7: Type 1 Hoods, the required grease duct leakage test and (light test shall be performed by a special
inspection and testing agency in accordance with I.M.C. Chapter S.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaW A.gov
Mechanical Permit No.
Ml6 OIV
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
King Co Assessor's Tax No.: 734060-0065
Site Address: 11816 40th AVE S Suite Number: Floor:
Tenant Name:
PROPERTY OWNER
Name: Sandra Hawley
Address: 11816 40th AVED S
City: Tukwila State: WA
Zip: 98168
CONTACT PERSON — person receiving all project
communication
Ili In
Name: Al Namazi
Address: 11809 NE 48th PL
City: Kirkland State: WA Zip: 98033
Phone: (425) 822-0801 Fax: (425) 822-0801
Email: ALK@energytechnologies11c.com
New Tenant: ❑ Yes ..No
MECHANICAL CONTRACTOR INFORMATION
Company Name: Energy Technologies LLC
Address: 11809 NE 48th PL
City: Kirkland State: WA Zip: 98033
Phone: (425) 894-4115 Fax: (425) 822-0801
Contr Reg No.: ENERGTL916K1 Exp Date: 05/07/2016
Tukwila Business License No.:
Valuation of project (contractor's bid price): $ 2,400
Describe the scope of work in detail:
Install a single head DHP system on an existing single family home
Use:
Fuel Type:
Residential: New ® Replacement ❑
Commercial: New ❑ Replacement ❑
Electric VI Gas ❑ Other:
H:lApplications\Forms-Applications On Line\201 1 Applcations'Mechsnical Permit Application Revised 8-9-11.dooc
Revised: August 2011
bh
Page I of 2
Indicate type of mechanical work being installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
/
<10,000 cfm
V
Unit Type
Qty
Air handling unit
>10,000 cfm
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type Qty
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/I,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
I1
Print Name: A (. 0 yr ,Q'z (
Mailing Address: )1q..0 9 /Ja
iv K
Date:\Zl1 (!S
Day Telephone: (-('2-� - 8 9 '-{ —9 1
��►�<<� 9g033
City State Zip
H:\Applications\Forms-Applications On Line\201I Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 2 of 2
CITY OF TUKW
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Mechanical Permit No.
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
King Co Assessor's Tax No.:
Site Address: Suite Number: Floor:
Tenant Name:
PROPERTY OWNER
Name:
Address:
City:
State:
Zip:
CONTACT 'PERSON — person receiving all project
communication
Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
New Tenant: ❑ Yes ❑.. No
MECHANICAL CONTRACTOR INFORMATION
Company Name:
Address:
City: State: Zip:
Phone: Fax:
Contr Reg No.: Exp Date:
Tukwila Business License No.:
Valuation of project (contractor's bid price): $
Describe the scope of work in detail:
Use: Residential: New ❑ Replacement ❑
Commercial: New ❑ Replacement ❑
Fuel Type: Electric ❑
Gas ❑
Other:
H:\Applications\Forms-Applications On Line\201I Applications\Mechanical Permit Application Revised 8-9-11.docx
Revised: August 2011
bh
Page 1 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
I ACCOUNT QUANTITY
PAID
$188.90
M15-0159 Address: 11816 40TH AVE S
Apn: 7340600065
$188.90
MECHANICAL
$179.90
PERMIT FEE
R000.322.100.00.00
0.00
$147.40
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
0.00
$32.50
TECHNOLOGY FEE
$9.00
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R6776
R000.322.900.04.00 0.00
$9.00
$188.90
Date Paid: Thursday, December 03, 2015
Paid By: ENERGY TECHNOLOGIES
Pay Method: CREDIT CARD 05970G
Printed: Thursday, December 03, 2015 12:15 PM 1 of 1
CRSYSTEMS
City of Tukwila
Department of Community Development
4/ 1 /2016
AL NAMAZI
11809 NE 48TH PL
KIRKLAND, WA 98033
RE: Permit No. M15-0159
SANDRA HAWLEY
11816 40TH AVE S
Dear Permit Holder:
Allan Ekberg, Mayor
Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 5/31/2016.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 5/31/2016, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File No: M15-0159
--4•1
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
ENERGY TECHNOLOGIES LLC
Home lnicio en Espanol Contact
Page 1 of 2
A-Z Index Help My Secure L&I
Safety Claims & Insurance Workplace Rights Trades & Licensing
0 Washington State Department of
Labor & Industries
ENERGY TECHNOLOGIES LLC
Owner or tradesperson
Principals
KHAMNEIAN, SARA, MANAGER
NAMAZI, AHMAD, MANAGER
Doing business as
ENERGY TECHNOLOGIES LLC
WA UBI No.
602 918 720
11809 NE 48TH PL
KIRKLAND, WA98033
425-824-4115
KING County
Business type
Limited Liability Company
Governing persons
AL
NAMAZI
SARA KHAMNEIAN;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
......................................... _ ...............................
Meets current requirements.
License specialties
HeatingNent/Air-Conditioning and Refrig
(HVAC/R)
License no.
ENERGTL916K1
Effective — expiration
05/2112009— 07/01/2017
Bond
.................
CBIC
Bond account no.
SI2931
$6,000.00
Received by L&I Effective date
05/21/2009 05/14/2009
Expiration date
Until Canceled
Insurance
..........................
Ohio Security Ins Co $1,000,000.00
Policy no.
BLS55104940
Received by L&I Effective date
05/13/2015 05/27/2014
Expiration date
05/27/2016
Insurance history
Savings
No savings accounts during the previous 6 year period.
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602918720&LIC=ENERGTL916K1 &SAW= 12/3/2015