Loading...
HomeMy WebLinkAboutPermit D15-0169 - BOEING - EQUIPMENT DEMOLITIONBOEING EQUIPMENT DEMOLITION 8123 E MARGINAL WAY S EXPIRED 01112116 D15-0169 City of Tukwila • Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone:206-431-3670 Inspection Request Line: 206-438-9350 Web site: httt)://www.TukwilaWA.eov DEVELOPMENT PERMIT Parcel No: 3324049002 Permit Number: D15-0169 Address: 8123 E MARGINAL WAY S Issue Date: 7/16/2015 Permit Expires On: 1/12/2016 Project Name: BOEING EQUIPMENT DEMOLITION Owner: Name: BOEING COMPANY THE Address: PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 Contact Person: Name: JOHN S MURDOCH Address: PO BOX 3707 M/C 89-14 , SEATTLE, WA, 98124 Contractor: Name: BOEING COMPANY, THE Address: 100 N RIVERSIDE, M/C 5003-4027 , CHICAGO, IL, 60606-1596 License No: BOEINC*294ML Lender: Name: BOEING COMPANY Address: PO BOX 3707 M/C 89-14 , SEATTLE, WA, 98124 DESCRIPTION OF WORK: Phone: (253) 657-0868 Phone: (312) 544-2535 Expiration Date: 1/18/2017 DEMOLITION OF AIR SUPPLY SHERES AND DUCTING AT EXTERIOR OF 2-83 BUILDING Project Valuation: $217,000.00 Fees Collected: $4,264.88 Type of Fire Protection: Sprinklers: NO Fire Alarm: NO Type of Construction: VB Occupancy per IBC: U Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: SEATTLE,TUKWILA Sewer District: TUKWILA SEWER SERVICE,SEATTLE SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-46B: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Volumes: Cut: 0 Fill: 0 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: No _ Permit Center Authorized Signature: �//%til� .LNG' 7 Date: ® �—S I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The graknnm,ermit does not presume to give authority to violate or cancel the provisions of any other state oulating construction or the performance of work. I am authorized to sign and obtain this develond agree to the conditions attached to this permit. Signatu Date:l cxy 053 Print N � / W 80Rv iV g99?/c / This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'BUILDING PERMIT CONDITIONS' 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off -site or into existing drainage facilities. 9: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 10: From October 1 through April 30, cover any slopes and stockpiles that are 3H:1V or steeper and have a vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period, cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and immediately before, during and following storms. 11: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction approval. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL" 0101 PRE -CONSTRUCTION CITY OF TUKWILA Community Development Department • Public Works Department • Permit Center 6300 Southeenter Blvd., Suite 100 Tukwila, WA 98188 hto://www.Tuk-,vilaWA.gov Building Permit No. [216 - 01(4 Project No. Date Application Accepted: Date Application Expires: use CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION I King Co Assessor's Tax No.: 0001600020 Site Address: 'F7- East Marginal Way So Suite Number: 2-83 Floor: I Tenant Name: The Boeing Company New Tenant: ❑ .....Yes L ..No PROPERTY OWNER Name: The Boeing Company - John S. Murdoch Address: P.O. Box 3707 M/C 46-88 City: Seattle State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: John S. Murdoch - The Boeing Company Address: P.O. Box 3707 M/C 46-88 City: Seattle State: WA Zip: 98124 Phone: (253) 740-021.4 Fax: (253) 657-0858 Email: john.s.murdoch@boeing.com, GENERAL CONTRACTOR INFORMATION Company Name: The Boeing Company Address: P.O. Box 3707 M/C 46-88 City: Seattle State: WA Zip: 98124 Phone: (253) 740-0214 Fax: (253) 657-0858 Contr Reg No.: BOEINC*294ML Exp Date: 01/18/2017 Tukwila Business License No.: HAApplicelionsTom-Appbcations On Line\2011 ApplicationsTennit Application Reviled-8.9-1l.docx Rcvised: August 2011 bh ARCHITECT OF RECORD Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Sitts & Hill Engineers Engineer Name: Larry G. Lindell Address: 4815 Center St. City: Tacoma State: WA Zip: 98409 Phone: (253) 474-9449 Fax: (253) 474-9449 Email: larrylindell@sitts-hill-engineers.com LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: The Boeing Company - John S. Murdoch Address: P.O. Box 3707 M/C 46-88 City: Seattle State: WA Zip: 98124 Pagel of 4 0 BUILDING PERMIT INFORMATION — 206-431-3670 Valuation of Project (contractor's bid price): $ 217,000 Existing Building Valuation: $ 450,000 Describe the scope of work (please provide detailed information): Demolish Air Supply Spheres & Ducting. Outside Not really a building. Will there be new rack storage? ❑..... Yes ®.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below ExistingInterior Remodel Addition to Existing Structure New Type of Construction peI IBG+ �' Type of Occupancy per IBC I" Floor 2 Floor 3 Floor Floors thru Basement Accessory Structure* 5,750 Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑....... Yes m....... No If "yes", explain: FIRE PROTECTION/RAZARDOUS MATERIALS: ❑ ....... Sprinklers ❑ ....... Automatic Fire Alarm ® .......None ❑ .......Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑....... Yes ❑ .......No If "yes', attach list of materials and storage locations on a separate 8-112 "x II " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ ....... On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applicatiom\Fom Applicatiom On Lim\201 t ApplicalionsTcn it Application Rcviscd - 8-9-1 l.docx Revised: August 2011 Page 2 of 4 bh PUBLIC WORKS PERMIT INFORMATION — 206-433-0179 Scope of Work (please provide detailed information): Does Not Apply. Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila ❑ ... Water District #125 ❑ .. Highline El.. Renton ❑ ...Water Availability Provided Sewer District ❑ ...Tukwila El ... Valley View ❑ . Renton El.. Seattle ❑ ...Sewer Use Certificate ❑... Sewer Availability Provided Septic System: ❑ On -site Septic System— For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which aool ❑ ...Civil Plans (Maximum Paper Size —22" x 34") ❑ ...Technical Information Report (Storm Drainage) ❑ .. Geotechnical Report ❑... Traffic Impact Analysis ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑ ... Hold Harmless — (SAO) ❑ ... Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ ...Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - Profit for less than 72 hours ❑ ...Right-of-way Use - No Disturbance ❑ .. Right-of-way Use — Potential Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way ❑ Non Right-of-way ❑ ❑ ...Total Cut cubic yards ❑ ...Total Fill cubic yards ❑ ...Sanitary Side Sewer ` ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water El.. Work in Flood Zone ❑ .. Storm Drainage El.. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut El.. Looped Fire Line 11 ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Permanent Water Meter Size... WO # ❑ ...Temporary Water Meter Size.. WO # ❑ ...Water Only Meter Size............ WO # ❑... Deduct Water Meter Size ❑ ...Sewer Main Extension.............Public ❑ Private ❑ ❑ ...Water Main Extension.............Public ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer Monthly Service Billing to: Mailing Water Meter Refund/Billing: Name: Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment Day Telephone: Day Telephone: State "Lip Mailing Address: City State _ Zip H:\ApplicationsTorns-Appliestions On Line\2011 Applicatio sTennit Application ReAscd - 8-9-11.docx Revised: August 2011 Page 3 of 4 bh PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF RJURY BY THE LAWS OF THE STATE OF WASHINP�Y AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O R mo y Signature: Date: 07/07/2015 Print NameUJohn S. Murdoch - The Mailing Address: P.O. Box 3707 M/C 46-88 Day Telephone: (253) 740-0214 Seattle WA 98124 City stele Zip H:WpplicationsTornts-Applications On Line12011 ApplicationsTemilt Application Revised - 8-9-1Ldocx Revised: August 2011 bh Page 4 of 4 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $4,264.88 D15-0169 Address: 7755 EAST MARGINAL WAY S Apn: 0001600020 $4,264.88 DEVELOPMENT $4,139.57 PERMIT FEE R000.322.100.00.00 0.00 $2,506.10 PLAN CHECK FEE R000.345.830.00.00 0.00 $1,628.97 WASHINGTON STATE SURCHARGE 13640.237.114 0.00 $4.50 TECHNOLOGY FEE $125.31 TECHNOLOGY FEE TOTAL+ R000.322.900.04.00 0.00 $125.31 6i .88 Date Paid: Tuesday, July 07, 2015 Paid By: BOEING COMPANY THE Pay Method: CREDIT CARD 094302 Printed: Tuesday, July 07, 2015 9:47 AM 1 of 1 CR? SY57EM5 City of Tukwila Jim Haggerton, Ma Department of Community Development Jack Pace, Director 12/1/2015 JOHN S MURDOCH PO BOX 3707 M/C 89-14 SEATTLE, WA 98124 RE: Permit No. D15-0169 BOEING EQUIPMENT DEMOLITION 8123 E MARGINAL WAY S Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 1/12/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 1/12/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, W�& Rachelle Ripley Permit Technician File No: D15-0169 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D 15-0169 DATE: 07/07/15 PROJECT NAME: BOEING EQUIPMENT DEMOLITION SITE ADDRESS: 8123 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: Building Division ❑ Public Works U. PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: Revision # before Permit Issued Revision # after Permit Issued AM 14 -?-q-f 3- \j L- 9�- Fire Prevention ❑ Planning Division 131 Structural ❑ Permit Coordinator P DATE: 07/09/15 Structural Review Required ❑ DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08/06/15 Approved ❑ Approved with Conditions ❑ Corrections Required ❑ Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Perfnit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 BOEING COMPANY, THE inWashington State Department of Labor & Industries BOEING COMPANY, THE Owner or tradesperson MCNERNEY, W (JAMES) Principals MCNERNEY, W (JAMES), PRESIDENT LOHR, MICHAEL, SECRETARY WOLTER, CHRISTOPHER, TREASURER (End: 01 /16/2015) READ, PAUL, SECRETARY (End: 02/07/2013) SHRONTZ, F A, SECRETARY (End: 02/07/2013) GIVAN, B E, SECRETARY (End: 02/07/2013) KING, C G, SECRETARY (End: 02/07/2013) BEIGHLE, D P, TREASURER (End: 02/07/2013) COLLINS, T J, TREASURER (End: 02/07/2013) BUDINICH, T M, TREASURER (End: 02/07/2013) WOODARD, R B, TREASURER (End: 02/07/2013) CRUZE, D D, TREASURER (End: 02/07/2013) CONDIT, P M, TREASURER (End: 02/07/2013) Page 1 of 8 Home Inicio cn l,'Spauol Contact Search L&I A-Z Index Help My Secure 1: &I Safety Claims & Insurance Workplace Rights Trades & Licensing 100 N RIVERSIDE M/C 5003-4027 CHICAGO, IL60606-1596 312-544-2536 WA UBI No. Business type 178 005 030 Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. BOEINC*294ML Effective — expiration 07/13/1971— 01/18/2017 Bond ................. FEDERAL INS CO $12,000.00 https:Hsecure.lni.wa.gov/verify/Detail.aspx?UBI=l78005030&LIC=BOEINC*294ML&SAW= 7/16/2015 TO EVERETT UKILTEO EVERETT W ?OD0 THELL SYM REVISION BY APPROVED DATE SYM -- BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15 KIR LAND RE MOND .91 rfr.1- i KENT 5 181 ®AUBURN TO TA MA AUBURN REVISION BY I APPROVED I DATE VICINITY MAP 2-41 2-40 J z Q w � ¢ w V) 2-44 2-45 0 2-64 2-51 GATE B-18 2-49 a SITE ACCESS 2-55 0 2-65 2-63 2-66 2-Q5 2 62 2-85 2-81 2-80 z Egg PROJECT SITE W /nn BUILDING 2-83 2-84 2-117 2-88 2-126 G. LI ® a 85 99 ISTL4 �S`glONAL E��1� PROJECTSUMMARY DESCRIPTION OF WORK: DEMOLISH AIR SUPPLY SPHERES AND DUCTING SITE ADDRESS: 775 EAST MARGINAL WAY SOUTH OWNER: THE BOEING COMPANY FACILITIES SERVICES — SHARED SERVICES GROUP P.O. BOX 3707, M/C 46-88 SEATTLE, WASHINGTON 98124-2207 ATTENTION: JOHN MURDOCH PERMIT ADMINISTOR (253) 657-0868 EARTHWORK: EXCAVATION = 250 C.Y. BACKFILL = 70 C.Y. 320 C.Y. PER TUKWILA MUNICIPAL CODE 21.04.110.A.5- NO SEPA REQUIRED PROJECT CODES 1. 2012 INTERNATIONAL BUILDING CODE (IBC) PROJECT DRAWING LIST DRAWING NO. SHEET NO. DRAWING TITLE REV DATE 2-YD-GO GO COVER SHEET 06.15.15 2-YD-Cl13R C113R SITE PLAN - REMOVAL D 06.15.15 2-YD-C719R C719R ENLARGED SITE PLAN - REMOVAL -- 06.15.15 2-YD-C719 C719 ENLARGED SITE PLAN -- 06.15.15__, ReavIED OR 900E C%MPLIANCE t A OVED >, JUL 15 2015 City ofTu ! . DING DIVISION 'JUL 08 2015 FE�— TUKVY"- , PUBL,IO WORKS LEGAL DESCRIPTIO APN: 000160-0020 A TRACT OF LAND BETWEEN THE DUWAMISH WATERWAY AS ESTABLISHED BY COMMERCIAL WATERWAY DISTRICT #1 OF KING COUNTY, WASHINGTON AND EAST MARGINAL WAY IN SECTION 33, TOWNSHIP 24 NORTH, RANGE 4 EAST, W.M., AND IN THE JOHN 01b BUCKLEY DONATION CLAIM NO. 42; SAID TRACT ALSO BEING THE SOUTHERLY PORTION OF A LARGER TRACT COMMONLY CALLED THE BOEING COMPANY'S PLANT NUMBER TWO SITE, DESCRIBED AS FOLLOWS: BEGINNING AT THE SECTION CORNER COMMON TO SECTIONS 28, 29, 32 AND 33; THENCE SOUTH 88'08'07" EAST ALONG THE NORTH LINE OF SAID SECTION 33, A DISTANCE OF 982.00 FEET TO AN INTERSECTION WITH THE SOUTHWESTERLY MARGIN OF EAST RECEIVED MARGINAL WAY, THENCE SOUTH 47'51'53" EAST ALONG SOUTHWESTERLY MARGIN 684.62 FEET TO THE TRUE POINT OF BEGINNING CITY OF TUKWILA OF THE TRACT HEREIN DESCRIBED, THENCE SOUTH 42'25'24" WEST 1215.02 FEET MORE OR LESS TO A POINT ON THE NORTHEASTERLY MARGIN OF SAID DUWAMISH WATERWAY, SAID POINT BEING ON A CURVE, FROM WHENCE THE CENTER BEARS, JUL 0 7 2015 SOUTH 42'16'23" WEST 1969.12 FEET, THENCE, SOUTHEASTERLY ALONG SAID CURVE, A DISTANCE OF 397.99 FEET TO THE POINT OF INTERSECTION WITH A LINE LYING 825.00 FEET SOUTH, AS MEASURED AT RIGHT ANGLES, OF THE NORTH LINE OF THE JOHN PERMIT CENTER BUKCLEY DONATION LAND CLAIM NO. 42. THENCE SOUTH 89'09'36" EAST ALONG SAID LINE, PARALLEL WITH THE NORTH LINE OF SAID DONATION LAND CLAIM NO. 42, A DISTANCE OF 1387.45 FEET TO THE WESTERLY MARGIN OF EAST MARGINAL WAY, THENCE NORTH 2232'15" WEST 160.30 FEET, FOLLOWING SAID WESTERLY MARGIN TO THE POINT OF CURVATURE OF A CURVE HAVING A RADIUS 2828.00 FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, A DISTANCE OF 1250.10 FEET TO THE POINT OF TANGENCY OF SAID CURVE; THENCE NORTH 47'51'53" WEST 76.82 FEET TO THE TRUE POINT OF BEGINNING: THIS TRACT CONTAINING AN AREA OF 2,897,955 SQUARE FEET, MORE OR LESS. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN B. Johnson DATE 06.15.15 SUBTITLE CHECKED B. Leslie 06.15.15 ERGINEER M. Bock 06.15.15 TITLE GENERAL APPROVED BY DEPT. DATE CHECKED B. Leslie 06.15.15 APPROVED APPROVED ISSUED FOR PERMIT JUNE 15,2015 SITTS & HILL ENGINEERS, INC. CIVIL ■ STRUCTURAL ■ SURVEYING 4815 CENTER STREET I TACOMA, WA. 98409 PHONE: (253) 474.9449 I FAX: (253) 474-9"9 http://vvww.sitts-hill-engineers.coml Project No.: 16509 Project Mgr.: BKL Proj. Engineer: MEB Proj. Drafter: LAM CURRENT REVISION SYMBOL DATE COVER SHEET W3281256 — — 06.15.15 SHEET BOEING SUPERSONIC WIND TUNNEL REMOVAL GO PLANT JOB N0. COMP. NO. W3281256 DWG NO. PLANT 2, WA. 2-YD-GO MATCH LINE -CONTINUATION SEE SHEET C104_ _ __ __ I P-i:F-NIn PC(,HF- nl II F' TT -- 7;;;E o o a o o - -- -- -- - - -- ❑o 0 0 ❑ ° ° SAN MH SANITARY SEWER MANHOLE ❑ ❑ Lv • HEAT EXCHANGERS a ,� 2 — 8 5 I ❑ CB CATCH BASIN ' ( 0 WMH WATER MANHOLE 70 . PIV POST INDICATOR VALVE DO WV WATER VALVE 0 ❑ WM WATER METER ® 1 ° 0 FH FIRE HYDRANT 00 O co CLEAN OUT o o �O �00 o I GENERAL NOTES. 000 . D o 0 I I �0 0 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE G- L j� ACCEPTABILITY B. Johnson waskj THIS DESIGN AND/OR cH c ED -- BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15��'�' ��oC�SPECIFICATION IS APPROVED B. Leslie ® C" APPROVED BY DEPT. DATE M. Bock .,.,.. CHECKED B. Leslie 35 99 j APPROVED ISTEg�9 �SSjONAL E��1 APPROVED ® .R CONSTRUCTION NOTES: 1. CONTRACTOR RESPONSIBLE FOR PROTECTING ADJACENT STRUCTURES a ® I AND BUILDING COMPONENTS NOT BEING DEMOLISHED. ., 2. IN ADDITION TO THOSE ITEMS SPECIFICALLY MENTIONED, CONTRACTOR DATE SUBTITLE 06.15.15 06.15.15 TITLE 06.15.15 06.15.15 CIVIL 0 0 IS RESPONSIBLE FOR PROVIDING TEMPORARY WEATHER PROTECTION OF ANY PENETRATIONS TO THE BUILDING OR UNDER GROUND. PIPING CUT OFF AT GRADE. DEMOLISH IN PLACE AND REMOVE AIR SUPPLY TANKS, INTERNAL BAFFLES AS OCCUR, SUPPORT LEGS AND BRACING, AND ACCESS STAIRS. DEMOLISH EXISTING CONCRETE CURB WALLS AND GRIND FOOTINGS C7 DOWN TO HIGHEST SURROUNDING GRADE. IN DEMOLISH AIR SUPPLY DUCTING TO AND INCLUDING THE FLEXIBLE DUCT CONNECTION AT THE BUILDING FACE. INSTALL TEMPORARY r WEATHER PROOFING TO OPENING. DEMOLISH ALL PIPING, PLATFORMS, U VALVES AND ANCILLARY UTILITIES IN PIT. DEMOLISH AIR DRYER AND ASSOCIATED PIPING TO INTERFACES WITH Ld = THE BUILDING. V) w � DEMOLISH. EXISTING GUARD RAIL. ERECT TEMPORARY GUARDRAIL OR Lu FENCING TO BE COORDINATED WITH BOEING. Z B,-�::> DEMOLISH ROOF ACCESS STAIR AND SUPPORTS. O - 9. CONTRACTOR TO COORDINATE WITH BOEING CONSTRUCTION MANAGER I� FOR HAZARDOUS MATERIAL REMEDIATION NECESSARY FOR DEMOLITION. Iz RESPONSIBILITY FOR REMEDIATION IS PER BOEING CONTRACT DOCUMENTS. Z O U Iw Iz _ REFERENCE DRAWINGS Q E WED FOR 00DE C MP LIAINC APPROVED JUL 15 2015 rvity OtTukvAla (LDING DIVIS12N mmmmmmmmm mmmmmmmmm mmm s FEB 1 1 20'ij* KEY PLAN N RECEIVED JUL 9 6i i PERMIT CENTER CURRENT REVISION SYMBOL DATE SITE PLAN - REMOVAL W3281256 06.15.15 SHEET BOEING SUPERSONIC WIND TUNNEL REMOVAL C113R PLANT 2 JOB NO. COMP NO. W3281256 YARD PLANT 2, WA. DWG NO, 2-YD-Cl13R - CONSTRUCTION NOTES: -------- --- ---- __.............. ❑ 1� REMOVE PLANTINGS, TREES AND OTHER LANDSCAPING FROM ENTIRE AREA SHOWN. TREES WITH TRUNKS OVER 6" SHALL BE SALVAGED. EXISTING IRRIGATION PIPING TO BE DEMOLISHED. EXCAVATE AREA AS ❑ REQUIRED PER CONSTRUCTION SHOWN ON C719. DEMOLISH LANDSCAPING PLANTER WALL AND FOOTING TO EXTENTS SHOWN. WEST LANDSCAPING WALL AND FOOTING TO REMAIN. i PROTECT STRUCTURES MOUNTED TO OR NEAR WEST LANDSCAPING RETAINING WALL AND DRAINS/CLEAN—OUTS AS OCCUR. WALL TO BE DEMOLISHED FROM EXISTING CONTROL JOINT EASTWARD. \� VERIFY LOCATION OF JOINT. RETAIN SOIL IN THESE AREAS AS REQUIRED TO PRESERVE IRRIGATION \ CONTROL VALVE BOXES AND PIPING FOR RE —CONNECTION AFTER DEMOLITION. 6� FIELD VERIFY LOCATION AND FINISH EXCAVATION BY HAND AT DRAIN. FIELD LOCATE AND PROTECT UTILITIES DURING EXCAVATION. _.�.. _ I-----._ ........ _........I t._.......... -._._......a cw j _`•_•_ _-- ° ° °' ° '.-��� ` _ `__` '-- i . ° ° , - REFERENCE DRAWINGS Z�e 0 C) --- - -- - --------- <- E-- ---- -- (- _ - WEDFOR - - _- % _ _ Cl..lAiVGE r , VAL JUL 15 2015 - - -_ _ _ _ - _10 - -bUtLOING DIVISION _ '•-.....r- � `_.' -_-__-_-- "---`-.•_ _ _ _ ___� __ `_ __ ''tom � i ----- - �� _ _ FEB 0120e"� __- !RECEIVED Lr =; _-- _--_ _ CITY OF TUKWILA -_-- ----=_- __ _ --'JUL 0 7 2015 - _ PERMIT CENTER SCALE: 1 "=10'—O" ENLARGED SITE PLAN - REMOVAL SCALE: 1 = 10' SYM REVISION BY APPROVED DATE SYM -- BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15 REVISION BY APPROVED DATE ❑ __ ---------_ ❑ ❑ ❑ ____ _ - -- ❑ ._--- ❑ _--__ -- ---------- -- ---------------- ❑ --------- ---- - ❑ - --------------.---- - ❑ ❑ ❑ ❑ n n n n n F1 I "w , *" mk'315sr'rla�' SITTS & HILL ENGINEERS, INC. CIVIL ■ STRUCTURAL ■ SURVEYING 4815 CENTER STREET I TACOMA, WA. 98409 PHONE: (253) 4749449 I FAX: (253) 474.9449 ISSUED FOR PERMIT httP:,,.gl��hlll-engineess.com/ n roject No. / ri BKL r1 N JUNE 15,2015., raft LAM C719R ACCEPTABILITY DRAWN B. Johnson DATE 06.15.15 SUBTITLE ENLARGED SITE PLAN -REMOVAL CURRENT REVISION W3281256 SYMBOL - - DATE 06.15.15 THIS DESIGN AND/OR CHECKED '„ SPECIFICATION IS APPROVED B. Leslie 06.15.15 SHEET C' APPROVED BY DEPT. DATE INEER M. Bock 06.15.15 TITLE BOEING SUPERSONIC WIND TUNNEL REMOVAL C719R CHECKED B. Leslie 06.15.15 PLANT A �� JOB N0. COMP N0. zr APPROVED r /`�' V W3281256 APPROVED CIVIL YARD PLANT 2, WA. °wc No. 2-YD-C719R LEGEND/SCHEDULE: GENERAL NOTES: 4" LAYER OF COMPACTED PERMEABLE BALLAST PER WSDOT SPECIFICATION 9-03.9(2) OVER 4" TO 8" AGGREGATE (QUARRY SPALLS), MIN. 12" THICK. 3'-0" DIAMETER AREA OF 2"(—) RIVER ROCK USED IN LIEU OF BALLAST AND QUARRY SPALLS AT DRAIN. 4" LAYER PERMEABLE BALLAST OVER TOP SOIL AT AREAS WHERE PRESERVING IRRIGATION CONTROL VALVE BOXES. CONSTRUCTION NOTES: t FIELD VERIFY DRAIN LOCATION REFERENCE DRAWINGS __ -_-_ -- _-- _—,�\----_-,`; --- -- --- - - - - --__ � D _ _--- --- CODE CM tANt �C E \I APPROVED soJUL 15 2015 RE Cif ofTu BUILDING W FED 0 i Zat RECEIVED �--- — CITY OF TUKWILA JUL 0 7 2015 PERMIT CENTER -- -- 0 5 10 20 30 SCALE: 1 "=10'—O" SITTS & HILL ENGINEERS, INC. CIVIL STRUCTURAL SURVEYING 4815 CENTER STREET I TACOMA, WA. 98409 PHONE: (253) 474.9449 I FAX: (253) 4749449 httpa/wwwsitts•hlll•engineers.com/ ISSUED FOR PERMIT ENLARGED SITE PLAN AJUNEt r L SCALE: 1 " = 10' N I, C719 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE ACCEPTABILITY B. Johnson 06.15.15 W3281256 — — 06.15.15 -- ��' G. .W �;�d THIS DESIGN AND/OR — ENLARGED SITE PLAN BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15 �' ���' �a SPECIFICATION IS APPROVED B. Leslie 06.15.15 SHEET ERGINEER r APPROVED BY DEPT. DATE M. Bock 06.15.15 TITLE BOEING SUPERSONIC WIND TUNNEL REMOVAL C719 CHECKED B. Leslie 06.15.15 COMP NO. PLANT 2 JOB NO. o as7999w� APPROVED W3281256 �s`SIONALF��Gti APPROVED DWG NO. CIVIL YARD PLANT 2, WA. 2—YD—C719