HomeMy WebLinkAboutPermit D15-0169 - BOEING - EQUIPMENT DEMOLITIONBOEING EQUIPMENT
DEMOLITION
8123 E MARGINAL WAY S
EXPIRED
01112116
D15-0169
City of Tukwila
• Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone:206-431-3670
Inspection Request Line: 206-438-9350
Web site: httt)://www.TukwilaWA.eov
DEVELOPMENT PERMIT
Parcel No: 3324049002 Permit Number: D15-0169
Address: 8123 E MARGINAL WAY S Issue Date: 7/16/2015
Permit Expires On: 1/12/2016
Project Name: BOEING EQUIPMENT DEMOLITION
Owner:
Name: BOEING COMPANY THE
Address: PO BOX 3707 M/C 20-00 PROPERTY
TAX DEPT, SEATTLE, WA, 98124
Contact Person:
Name:
JOHN S MURDOCH
Address:
PO BOX 3707 M/C 89-14 , SEATTLE,
WA, 98124
Contractor:
Name:
BOEING COMPANY, THE
Address:
100 N RIVERSIDE, M/C 5003-4027 ,
CHICAGO, IL, 60606-1596
License No:
BOEINC*294ML
Lender:
Name:
BOEING COMPANY
Address:
PO BOX 3707 M/C 89-14 , SEATTLE,
WA, 98124
DESCRIPTION OF WORK:
Phone: (253) 657-0868
Phone: (312) 544-2535
Expiration Date: 1/18/2017
DEMOLITION OF AIR SUPPLY SHERES AND DUCTING AT EXTERIOR OF 2-83 BUILDING
Project Valuation: $217,000.00 Fees Collected: $4,264.88
Type of Fire Protection: Sprinklers: NO
Fire Alarm: NO
Type of Construction: VB Occupancy per IBC: U
Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: SEATTLE,TUKWILA
Sewer District: TUKWILA SEWER SERVICE,SEATTLE
SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2012
National Electrical Code:
2014
International Residential Code Edition:
2012
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2012
WAC 296-46B:
2014
Uniform Plumbing Code Edition:
2012
WA State Energy Code:
2012
International Fuel Gas Code:
2012
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering: Volumes: Cut: 0 Fill: 0
Landscape Irrigation:
Sanitary Side Sewer: Number: 0
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter: No _
Permit Center Authorized Signature: �//%til� .LNG' 7 Date: ® �—S
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The graknnm,ermit does not presume to give authority to violate or cancel the provisions of any other
state oulating construction or the performance of work. I am authorized to sign and obtain this
develond agree to the conditions attached to this permit.
Signatu Date:l cxy 053
Print N � / W 80Rv iV g99?/c /
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: 'BUILDING PERMIT CONDITIONS'
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
8: Temporary erosion control measures shall be implemented as the first order of business to prevent
sedimentation off -site or into existing drainage facilities.
9: The site shall have permanent erosion control measures in place as soon as possible after final grading has
been completed and prior to the Final Inspection.
10: From October 1 through April 30, cover any slopes and stockpiles that are 3H:1V or steeper and have a
vertical rise of 10 feet or more and will be unworked for greater than 12 hours. During this time period,
cover or mulch other disturbed areas, if they will be unworked more than 2 days. Covered material must
be stockpiled on site at the beginning of this period. Inspect and maintain this stabilization weekly and
immediately before, during and following storms.
11: From May 1 through September 30, inspect and maintain temporary erosion prevention and sediment at
least monthly. All disturbed areas of the site shall be permanently stabilized prior to final construction
approval.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL"
0101 PRE -CONSTRUCTION
CITY OF TUKWILA
Community Development Department
• Public Works Department
• Permit Center
6300 Southeenter Blvd., Suite 100
Tukwila, WA 98188
hto://www.Tuk-,vilaWA.gov
Building Permit No. [216 - 01(4
Project No.
Date Application Accepted:
Date Application Expires:
use
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review
Applications will not be accepted through the mail or by fax.
**Please Print**
SITE LOCATION I
King Co Assessor's Tax No.: 0001600020
Site Address: 'F7- East Marginal Way So Suite Number: 2-83 Floor: I
Tenant Name: The Boeing Company New Tenant: ❑ .....Yes L ..No
PROPERTY OWNER
Name: The Boeing Company - John S. Murdoch
Address: P.O. Box 3707 M/C 46-88
City: Seattle State: WA Zip: 98124
CONTACT PERSON — person receiving all project
communication
Name: John S. Murdoch - The Boeing Company
Address: P.O. Box 3707 M/C 46-88
City: Seattle State: WA Zip: 98124
Phone: (253) 740-021.4 Fax: (253) 657-0858
Email: john.s.murdoch@boeing.com,
GENERAL CONTRACTOR INFORMATION
Company Name: The Boeing Company
Address: P.O. Box 3707 M/C 46-88
City: Seattle State: WA Zip: 98124
Phone: (253) 740-0214 Fax: (253) 657-0858
Contr Reg No.: BOEINC*294ML Exp Date: 01/18/2017
Tukwila Business License No.:
HAApplicelionsTom-Appbcations On Line\2011 ApplicationsTennit Application Reviled-8.9-1l.docx
Rcvised: August 2011
bh
ARCHITECT OF RECORD
Company Name:
Architect Name:
Address:
City: State: Zip:
Phone: Fax:
Email:
ENGINEER OF RECORD
Company Name: Sitts & Hill Engineers
Engineer Name: Larry G. Lindell
Address: 4815 Center St.
City: Tacoma State: WA Zip: 98409
Phone: (253) 474-9449 Fax: (253) 474-9449
Email: larrylindell@sitts-hill-engineers.com
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name: The Boeing Company - John S. Murdoch
Address: P.O. Box 3707 M/C 46-88
City: Seattle State: WA Zip: 98124
Pagel of 4
0
BUILDING PERMIT INFORMATION — 206-431-3670
Valuation of Project (contractor's bid price): $ 217,000 Existing Building Valuation: $ 450,000
Describe the scope of work (please provide detailed information):
Demolish Air Supply Spheres & Ducting. Outside Not really a building.
Will there be new rack storage? ❑..... Yes ®.. No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
ExistingInterior
Remodel
Addition to
Existing
Structure
New
Type of
Construction peI
IBG+ �'
Type of
Occupancy per
IBC
I" Floor
2 Floor
3 Floor
Floors thru
Basement
Accessory Structure*
5,750
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑....... Yes m....... No If "yes", explain:
FIRE PROTECTION/RAZARDOUS MATERIALS:
❑ ....... Sprinklers ❑ ....... Automatic Fire Alarm ® .......None ❑ .......Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑....... Yes ❑ .......No
If "yes', attach list of materials and storage locations on a separate 8-112 "x II " paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ ....... On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applicatiom\Fom Applicatiom On Lim\201 t ApplicalionsTcn it Application Rcviscd - 8-9-1 l.docx
Revised: August 2011 Page 2 of 4
bh
PUBLIC WORKS PERMIT INFORMATION — 206-433-0179
Scope of Work (please provide detailed information):
Does Not Apply.
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
❑ ...Tukwila ❑ ... Water District #125 ❑ .. Highline El.. Renton
❑ ...Water Availability Provided
Sewer District
❑ ...Tukwila El ... Valley View ❑ . Renton
El.. Seattle
❑ ...Sewer Use Certificate ❑... Sewer Availability Provided
Septic System:
❑ On -site Septic System— For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which aool
❑ ...Civil Plans (Maximum Paper Size —22" x 34")
❑ ...Technical Information Report (Storm Drainage) ❑ .. Geotechnical Report ❑... Traffic Impact Analysis
❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑ ... Hold Harmless — (SAO)
❑ ... Hold Harmless — (ROW)
Proposed Activities (mark boxes that apply):
❑ ...Right-of-way Use - Nonprofit for less than 72 hours ❑ .. Right-of-way Use - Profit for less than 72 hours
❑ ...Right-of-way Use - No Disturbance ❑ .. Right-of-way Use — Potential Disturbance
❑ ...Construction/Excavation/Fill - Right-of-way ❑
Non Right-of-way ❑
❑ ...Total Cut cubic yards
❑ ...Total Fill cubic yards
❑ ...Sanitary Side Sewer
` ❑ ...Cap or Remove Utilities
❑ ...Frontage Improvements
❑ ...Traffic Control
❑ ...Backflow Prevention - Fire Protection
Irrigation
Domestic Water
El.. Work in Flood Zone
❑ .. Storm Drainage
El..
Abandon Septic Tank
❑ ..
Curb Cut
❑ ..
Pavement Cut
El..
Looped Fire Line
11
❑ .. Grease Interceptor
❑ .. Channelization
❑ .. Trench Excavation
❑ .. Utility Undergrounding
❑ ...Permanent Water Meter Size... WO #
❑ ...Temporary Water Meter Size.. WO #
❑ ...Water Only Meter Size............ WO # ❑... Deduct Water Meter Size
❑ ...Sewer Main Extension.............Public ❑ Private ❑
❑ ...Water Main Extension.............Public ❑ Private ❑
FINANCE INFORMATION
Fire Line Size at Property Line
❑ ...Water ❑ ...Sewer
Monthly Service Billing to:
Mailing
Water Meter Refund/Billing:
Name:
Number of Public Fire Hydrant(s)
❑ ...Sewage Treatment
Day Telephone:
Day Telephone:
State "Lip
Mailing Address:
City State _ Zip
H:\ApplicationsTorns-Appliestions On Line\2011 Applicatio sTennit Application ReAscd - 8-9-11.docx
Revised: August 2011 Page 3 of 4
bh
PERMIT APPLICATION NOTES —
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF RJURY BY THE LAWS OF THE STATE OF WASHINP�Y AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING O R mo y
Signature: Date: 07/07/2015
Print NameUJohn S. Murdoch - The
Mailing Address: P.O. Box 3707 M/C 46-88
Day Telephone: (253) 740-0214
Seattle WA 98124
City stele Zip
H:WpplicationsTornts-Applications On Line12011 ApplicationsTemilt Application Revised - 8-9-1Ldocx
Revised: August 2011
bh
Page 4 of 4
DESCRIPTIONS
PermitTRAK
ACCOUNT QUANTITY
PAID
$4,264.88
D15-0169 Address: 7755 EAST MARGINAL WAY S Apn: 0001600020
$4,264.88
DEVELOPMENT
$4,139.57
PERMIT FEE
R000.322.100.00.00
0.00
$2,506.10
PLAN CHECK FEE
R000.345.830.00.00
0.00
$1,628.97
WASHINGTON STATE SURCHARGE
13640.237.114
0.00
$4.50
TECHNOLOGY FEE
$125.31
TECHNOLOGY FEE
TOTAL+
R000.322.900.04.00
0.00
$125.31
6i .88
Date Paid: Tuesday, July 07, 2015
Paid By: BOEING COMPANY THE
Pay Method: CREDIT CARD 094302
Printed: Tuesday, July 07, 2015 9:47 AM 1 of 1 CR? SY57EM5
City of Tukwila Jim Haggerton, Ma
Department of Community Development Jack Pace, Director
12/1/2015
JOHN S MURDOCH
PO BOX 3707 M/C 89-14
SEATTLE, WA 98124
RE: Permit No. D15-0169
BOEING EQUIPMENT DEMOLITION
8123 E MARGINAL WAY S
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 1/12/2016.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address
your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 1/12/2016, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
W�&
Rachelle Ripley
Permit Technician
File No: D15-0169
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D 15-0169
DATE: 07/07/15
PROJECT NAME: BOEING EQUIPMENT DEMOLITION
SITE ADDRESS: 8123 E MARGINAL WAY S
X Original Plan Submittal
Response to Correction Letter #
DEPARTMENTS:
Building Division ❑
Public Works U.
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
REVIEWER'S INITIALS:
Revision # before Permit Issued
Revision # after Permit Issued
AM 14 -?-q-f 3- \j L- 9�-
Fire Prevention ❑ Planning Division 131
Structural ❑ Permit Coordinator P
DATE: 07/09/15
Structural Review Required ❑
DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 08/06/15
Approved ❑ Approved with Conditions ❑
Corrections Required ❑ Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS:
DATE:
Perfnit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
BOEING COMPANY, THE
inWashington State Department of
Labor & Industries
BOEING COMPANY, THE
Owner or tradesperson
MCNERNEY, W (JAMES)
Principals
MCNERNEY, W (JAMES), PRESIDENT
LOHR, MICHAEL, SECRETARY
WOLTER, CHRISTOPHER, TREASURER
(End: 01 /16/2015)
READ, PAUL, SECRETARY
(End: 02/07/2013)
SHRONTZ, F A, SECRETARY
(End: 02/07/2013)
GIVAN, B E, SECRETARY
(End: 02/07/2013)
KING, C G, SECRETARY
(End: 02/07/2013)
BEIGHLE, D P, TREASURER
(End: 02/07/2013)
COLLINS, T J, TREASURER
(End: 02/07/2013)
BUDINICH, T M, TREASURER
(End: 02/07/2013)
WOODARD, R B, TREASURER
(End: 02/07/2013)
CRUZE, D D, TREASURER
(End: 02/07/2013)
CONDIT, P M, TREASURER
(End: 02/07/2013)
Page 1 of 8
Home Inicio cn l,'Spauol Contact Search L&I
A-Z Index Help My Secure 1: &I
Safety Claims & Insurance Workplace Rights Trades & Licensing
100 N RIVERSIDE
M/C 5003-4027
CHICAGO, IL60606-1596
312-544-2536
WA UBI No. Business type
178 005 030 Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor Active.
Meets current requirements.
License specialties
GENERAL
License no.
BOEINC*294ML
Effective — expiration
07/13/1971— 01/18/2017
Bond
.................
FEDERAL INS CO
$12,000.00
https:Hsecure.lni.wa.gov/verify/Detail.aspx?UBI=l78005030&LIC=BOEINC*294ML&SAW= 7/16/2015
TO EVERETT
UKILTEO
EVERETT
W
?OD0
THELL
SYM
REVISION
BY
APPROVED
DATE
SYM
--
BOEING SUPERSONIC WIND TUNNEL REMOVAL
W3281256
SITTS
MEB
06.15.15
KIR LAND RE MOND
.91 rfr.1- i
KENT
5 181 ®AUBURN
TO TA MA AUBURN
REVISION
BY I APPROVED I DATE
VICINITY MAP
2-41
2-40
J
z
Q
w
�
¢
w
V)
2-44
2-45
0
2-64
2-51 GATE B-18
2-49 a SITE ACCESS
2-55 0
2-65 2-63
2-66
2-Q5 2 62
2-85
2-81 2-80 z
Egg
PROJECT SITE
W
/nn BUILDING 2-83
2-84
2-117 2-88
2-126
G. LI
® a
85 99
ISTL4
�S`glONAL E��1�
PROJECTSUMMARY
DESCRIPTION OF WORK: DEMOLISH AIR SUPPLY SPHERES AND DUCTING
SITE ADDRESS:
775 EAST MARGINAL WAY SOUTH
OWNER:
THE BOEING COMPANY
FACILITIES SERVICES — SHARED SERVICES GROUP
P.O. BOX 3707, M/C 46-88
SEATTLE, WASHINGTON 98124-2207
ATTENTION: JOHN
MURDOCH
PERMIT ADMINISTOR
(253) 657-0868
EARTHWORK:
EXCAVATION = 250 C.Y.
BACKFILL = 70 C.Y.
320 C.Y.
PER TUKWILA MUNICIPAL CODE 21.04.110.A.5- NO SEPA REQUIRED
PROJECT CODES
1. 2012 INTERNATIONAL BUILDING CODE (IBC)
PROJECT DRAWING LIST
DRAWING NO.
SHEET NO.
DRAWING TITLE
REV
DATE
2-YD-GO
GO
COVER SHEET
06.15.15
2-YD-Cl13R
C113R
SITE PLAN - REMOVAL
D
06.15.15
2-YD-C719R
C719R
ENLARGED SITE PLAN - REMOVAL
--
06.15.15
2-YD-C719
C719
ENLARGED SITE PLAN
--
06.15.15__,
ReavIED OR
900E C%MPLIANCE
t A OVED
>, JUL 15 2015
City ofTu ! .
DING DIVISION
'JUL 08 2015
FE�— TUKVY"- ,
PUBL,IO WORKS
LEGAL DESCRIPTIO
APN: 000160-0020
A TRACT OF LAND BETWEEN THE DUWAMISH WATERWAY AS ESTABLISHED BY COMMERCIAL WATERWAY DISTRICT #1 OF KING
COUNTY, WASHINGTON AND EAST MARGINAL WAY IN SECTION 33, TOWNSHIP 24 NORTH, RANGE 4 EAST, W.M., AND IN THE JOHN 01b
BUCKLEY DONATION CLAIM NO. 42; SAID TRACT ALSO BEING THE SOUTHERLY PORTION OF A LARGER TRACT COMMONLY CALLED
THE BOEING COMPANY'S PLANT NUMBER TWO SITE, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SECTION CORNER COMMON TO SECTIONS 28, 29, 32 AND 33; THENCE SOUTH 88'08'07" EAST ALONG THE
NORTH LINE OF SAID SECTION 33, A DISTANCE OF 982.00 FEET TO AN INTERSECTION WITH THE SOUTHWESTERLY MARGIN OF EAST RECEIVED
MARGINAL WAY, THENCE SOUTH 47'51'53" EAST ALONG SOUTHWESTERLY MARGIN 684.62 FEET TO THE TRUE POINT OF BEGINNING CITY OF TUKWILA
OF THE TRACT HEREIN DESCRIBED, THENCE SOUTH 42'25'24" WEST 1215.02 FEET MORE OR LESS TO A POINT ON THE
NORTHEASTERLY MARGIN OF SAID DUWAMISH WATERWAY, SAID POINT BEING ON A CURVE, FROM WHENCE THE CENTER BEARS, JUL 0 7 2015
SOUTH 42'16'23" WEST 1969.12 FEET, THENCE, SOUTHEASTERLY ALONG SAID CURVE, A DISTANCE OF 397.99 FEET TO THE POINT
OF INTERSECTION WITH A LINE LYING 825.00 FEET SOUTH, AS MEASURED AT RIGHT ANGLES, OF THE NORTH LINE OF THE JOHN PERMIT CENTER
BUKCLEY DONATION LAND CLAIM NO. 42. THENCE SOUTH 89'09'36" EAST ALONG SAID LINE, PARALLEL WITH THE NORTH LINE OF
SAID DONATION LAND CLAIM NO. 42, A DISTANCE OF 1387.45 FEET TO THE WESTERLY MARGIN OF EAST MARGINAL WAY, THENCE
NORTH 2232'15" WEST 160.30 FEET, FOLLOWING SAID WESTERLY MARGIN TO THE POINT OF CURVATURE OF A CURVE HAVING A
RADIUS 2828.00 FEET; THENCE NORTHWESTERLY ALONG SAID CURVE, A DISTANCE OF 1250.10 FEET TO THE POINT OF TANGENCY
OF SAID CURVE; THENCE NORTH 47'51'53" WEST 76.82 FEET TO THE TRUE POINT OF BEGINNING: THIS TRACT CONTAINING AN
AREA OF 2,897,955 SQUARE FEET, MORE OR LESS.
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
DRAWN
B. Johnson
DATE
06.15.15
SUBTITLE
CHECKED
B. Leslie
06.15.15
ERGINEER
M. Bock
06.15.15
TITLE
GENERAL
APPROVED BY
DEPT.
DATE
CHECKED
B. Leslie
06.15.15
APPROVED
APPROVED
ISSUED FOR PERMIT
JUNE 15,2015
SITTS & HILL
ENGINEERS, INC.
CIVIL ■ STRUCTURAL ■ SURVEYING
4815 CENTER STREET I TACOMA, WA. 98409
PHONE: (253) 474.9449 I FAX: (253) 474-9"9
http://vvww.sitts-hill-engineers.coml
Project No.: 16509 Project Mgr.: BKL
Proj. Engineer: MEB Proj. Drafter: LAM
CURRENT REVISION SYMBOL DATE
COVER SHEET W3281256 — — 06.15.15
SHEET
BOEING SUPERSONIC WIND TUNNEL REMOVAL
GO
PLANT JOB N0. COMP. NO.
W3281256
DWG NO.
PLANT 2, WA. 2-YD-GO
MATCH LINE -CONTINUATION SEE SHEET C104_ _ __ __ I P-i:F-NIn PC(,HF- nl II F'
TT
-- 7;;;E
o o a o o - -- -- -- - - --
❑o 0 0 ❑ ° ° SAN MH SANITARY SEWER MANHOLE
❑ ❑ Lv
• HEAT EXCHANGERS a ,� 2 — 8 5 I ❑ CB CATCH BASIN
' ( 0 WMH WATER MANHOLE
70 . PIV POST INDICATOR VALVE
DO WV WATER VALVE
0 ❑ WM WATER METER
® 1
° 0 FH FIRE HYDRANT
00 O co CLEAN OUT
o o �O
�00 o I GENERAL NOTES.
000
. D
o 0
I
I
�0
0
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE G- L j� ACCEPTABILITY B. Johnson
waskj THIS DESIGN AND/OR cH c ED
-- BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15��'�' ��oC�SPECIFICATION IS APPROVED B. Leslie
® C" APPROVED BY DEPT. DATE M. Bock
.,.,.. CHECKED
B. Leslie
35 99 j APPROVED
ISTEg�9
�SSjONAL E��1 APPROVED
® .R
CONSTRUCTION NOTES:
1. CONTRACTOR RESPONSIBLE FOR PROTECTING ADJACENT STRUCTURES
a ® I AND BUILDING COMPONENTS NOT BEING DEMOLISHED.
., 2. IN ADDITION TO THOSE ITEMS SPECIFICALLY MENTIONED, CONTRACTOR
DATE SUBTITLE
06.15.15
06.15.15
TITLE
06.15.15
06.15.15
CIVIL
0
0
IS RESPONSIBLE FOR PROVIDING TEMPORARY WEATHER PROTECTION OF
ANY PENETRATIONS TO THE BUILDING OR UNDER GROUND. PIPING CUT
OFF AT GRADE.
DEMOLISH IN PLACE AND REMOVE AIR SUPPLY TANKS, INTERNAL
BAFFLES AS OCCUR, SUPPORT LEGS AND BRACING, AND ACCESS
STAIRS.
DEMOLISH EXISTING CONCRETE CURB WALLS AND GRIND FOOTINGS
C7 DOWN TO HIGHEST SURROUNDING GRADE.
IN DEMOLISH AIR SUPPLY DUCTING TO AND INCLUDING THE FLEXIBLE
DUCT CONNECTION AT THE BUILDING FACE. INSTALL TEMPORARY
r WEATHER PROOFING TO OPENING. DEMOLISH ALL PIPING, PLATFORMS,
U VALVES AND ANCILLARY UTILITIES IN PIT.
DEMOLISH AIR DRYER AND ASSOCIATED PIPING TO INTERFACES WITH
Ld
= THE BUILDING.
V)
w � DEMOLISH. EXISTING GUARD RAIL. ERECT TEMPORARY GUARDRAIL OR
Lu FENCING TO BE COORDINATED WITH BOEING.
Z B,-�::> DEMOLISH ROOF ACCESS STAIR AND SUPPORTS.
O
- 9. CONTRACTOR TO COORDINATE WITH BOEING CONSTRUCTION MANAGER
I� FOR HAZARDOUS MATERIAL REMEDIATION NECESSARY FOR DEMOLITION.
Iz RESPONSIBILITY FOR REMEDIATION IS PER BOEING CONTRACT
DOCUMENTS.
Z
O
U
Iw
Iz
_
REFERENCE DRAWINGS
Q
E WED FOR
00DE C MP LIAINC
APPROVED
JUL 15 2015
rvity OtTukvAla
(LDING DIVIS12N
mmmmmmmmm
mmmmmmmmm
mmm
s
FEB
1 1 20'ij*
KEY
PLAN
N
RECEIVED
JUL 9
6i i
PERMIT CENTER
CURRENT REVISION SYMBOL DATE
SITE PLAN - REMOVAL W3281256 06.15.15
SHEET
BOEING SUPERSONIC WIND TUNNEL REMOVAL
C113R
PLANT 2 JOB NO. COMP NO.
W3281256
YARD PLANT 2, WA. DWG NO, 2-YD-Cl13R
- CONSTRUCTION NOTES:
-------- --- ---- __..............
❑
1� REMOVE PLANTINGS, TREES AND OTHER LANDSCAPING FROM ENTIRE
AREA SHOWN. TREES WITH TRUNKS OVER 6" SHALL BE SALVAGED.
EXISTING IRRIGATION PIPING TO BE DEMOLISHED. EXCAVATE AREA AS
❑ REQUIRED PER CONSTRUCTION SHOWN ON C719.
DEMOLISH LANDSCAPING PLANTER WALL AND FOOTING TO EXTENTS
SHOWN. WEST LANDSCAPING WALL AND FOOTING TO REMAIN.
i
PROTECT STRUCTURES MOUNTED TO OR NEAR WEST LANDSCAPING
RETAINING WALL AND DRAINS/CLEAN—OUTS AS OCCUR.
WALL TO BE DEMOLISHED FROM EXISTING CONTROL JOINT EASTWARD.
\� VERIFY LOCATION OF JOINT.
RETAIN SOIL IN THESE AREAS AS REQUIRED TO PRESERVE IRRIGATION
\ CONTROL VALVE BOXES AND PIPING FOR RE —CONNECTION AFTER
DEMOLITION.
6� FIELD VERIFY LOCATION AND FINISH EXCAVATION BY HAND AT DRAIN.
FIELD LOCATE AND PROTECT UTILITIES DURING EXCAVATION.
_.�.. _ I-----._ ........ _........I t._.......... -._._......a
cw j
_`•_•_ _-- ° ° °' ° '.-��� ` _ `__` '-- i . ° ° , - REFERENCE DRAWINGS
Z�e
0
C)
--- - -- - ---------
<- E-- ---- -- (-
_ - WEDFOR
- - _- % _ _ Cl..lAiVGE
r , VAL JUL 15 2015
- - -_ _ _ _ - _10
-
-bUtLOING DIVISION
_ '•-.....r- � `_.' -_-__-_-- "---`-.•_ _ _ _ ___� __ `_ __ ''tom � i
----- - �� _ _ FEB 0120e"�
__- !RECEIVED
Lr =; _-- _--_ _ CITY OF TUKWILA
-_-- ----=_- __ _ --'JUL 0 7
2015
- _ PERMIT CENTER
SCALE: 1 "=10'—O"
ENLARGED SITE PLAN - REMOVAL
SCALE: 1 = 10'
SYM REVISION BY APPROVED DATE SYM
-- BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15
REVISION BY APPROVED DATE
❑ __ ---------_
❑
❑
❑
____ _ - --
❑
._--- ❑ _--__ --
---------- -- ----------------
❑
--------- ---- -
❑
- --------------.---- -
❑
❑
❑
❑
n
n
n
n
n
F1
I "w
, *" mk'315sr'rla�'
SITTS & HILL
ENGINEERS, INC.
CIVIL ■ STRUCTURAL ■ SURVEYING
4815 CENTER STREET I TACOMA, WA. 98409
PHONE: (253) 4749449 I FAX: (253) 474.9449
ISSUED FOR PERMIT
httP:,,.gl��hlll-engineess.com/
n
roject No. / ri BKL
r1
N
JUNE 15,2015.,
raft LAM
C719R
ACCEPTABILITY
DRAWN
B. Johnson
DATE
06.15.15
SUBTITLE
ENLARGED SITE PLAN -REMOVAL
CURRENT REVISION
W3281256
SYMBOL
- -
DATE
06.15.15
THIS DESIGN AND/OR
CHECKED
'„
SPECIFICATION IS APPROVED
B. Leslie
06.15.15
SHEET
C'
APPROVED BY
DEPT.
DATE
INEER
M. Bock
06.15.15
TITLE
BOEING SUPERSONIC WIND TUNNEL REMOVAL
C719R
CHECKED
B. Leslie
06.15.15
PLANT
A
��
JOB N0.
COMP N0.
zr
APPROVED
r /`�' V
W3281256
APPROVED
CIVIL
YARD PLANT 2,
WA.
°wc No. 2-YD-C719R
LEGEND/SCHEDULE:
GENERAL NOTES:
4" LAYER OF COMPACTED PERMEABLE BALLAST PER WSDOT
SPECIFICATION 9-03.9(2) OVER 4" TO 8" AGGREGATE (QUARRY
SPALLS), MIN. 12" THICK.
3'-0" DIAMETER AREA OF 2"(—) RIVER ROCK USED IN LIEU OF
BALLAST AND QUARRY SPALLS AT DRAIN.
4" LAYER PERMEABLE BALLAST OVER TOP SOIL AT AREAS WHERE
PRESERVING IRRIGATION CONTROL VALVE BOXES.
CONSTRUCTION NOTES:
t FIELD VERIFY DRAIN LOCATION
REFERENCE DRAWINGS
__ -_-_ -- _-- _—,�\----_-,`;
--- -- --- - - - - --__ � D
_ _--- --- CODE CM tANt
�C
E
\I APPROVED
soJUL 15 2015
RE
Cif ofTu
BUILDING
W
FED 0 i Zat RECEIVED
�--- — CITY OF TUKWILA
JUL 0 7 2015
PERMIT CENTER
-- -- 0 5 10 20 30
SCALE: 1 "=10'—O"
SITTS & HILL
ENGINEERS, INC.
CIVIL STRUCTURAL SURVEYING
4815 CENTER STREET I TACOMA, WA. 98409
PHONE: (253) 474.9449 I FAX: (253) 4749449
httpa/wwwsitts•hlll•engineers.com/
ISSUED FOR PERMIT
ENLARGED SITE PLAN AJUNEt r L
SCALE: 1 " = 10' N I,
C719
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
ACCEPTABILITY B. Johnson 06.15.15 W3281256 — — 06.15.15
-- ��' G. .W �;�d THIS DESIGN AND/OR — ENLARGED SITE PLAN
BOEING SUPERSONIC WIND TUNNEL REMOVAL W3281256 SITTS MEB 06.15.15 �' ���' �a SPECIFICATION IS APPROVED B. Leslie 06.15.15 SHEET
ERGINEER r APPROVED BY DEPT. DATE M. Bock 06.15.15 TITLE BOEING SUPERSONIC WIND TUNNEL REMOVAL C719
CHECKED
B. Leslie 06.15.15 COMP NO.
PLANT 2 JOB NO.
o as7999w� APPROVED W3281256
�s`SIONALF��Gti APPROVED DWG NO.
CIVIL YARD PLANT 2, WA. 2—YD—C719