HomeMy WebLinkAboutPermit D15-0237 - BOEING EMPLOYEES CREDIT UNION (BECU) - STAIRS REINFORCEMENTSBECU
12770 GATEWAY DR
D15-0237
City of Tukwila
• Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone:206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
DEVELOPMENT PERMIT
Parcel No: 2716000075 Permit Number: D15-0237
Address: 12770 GATEWAY DR Issue Date: 10/19/2015
Permit Expires On: 4/16/2016
Project Name: BOEING EMPLOYEES CREDIT UNION
Owner:
Name: BOEING EMPLOYEES CREDIT UNI
Address: PO BOX 97050, SEATTLE, WA, 98124
Contact Person:
Name: DANIEL SHER
Address: 7036 S 220TH ST , KENT, WA, 98032
Contractor:
Name: DB GENERAL CONTRACTORS INC
Address: 7038 S 220TH ST , KENT, WA, 98032
License No: DBGENGC94309
Lender:
Phone: (253) 736-2980
Phone: (253) 736-2980
Expiration Date: 10/9/2016
Name: BOEING EMPLOYEES CREDIT UNION
Address: 12770 GATEWAY DR, TUKWILA, WA,
98168
DESCRIPTION OF WORK:
INSTALL STRUCTURAL REINFORCEMENTS TO UNDER SIDE OF STAIRS AT PARKING LOT
Project Valuation: $12,000.00 Fees Collected: $557.86
Type of Fire Protection: Sprinklers: NO
Fire Alarm: NO
Type of Construction: Occupancy per IBC:
Electrical Service Provided by: TUKWILA FIRE SERVICE Water District: TUKWILA
Sewer District: TUKWILA SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2012
National Electrical Code:
2014
International Residential Code Edition:
2012
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2012
WAC 296-466:
2014
Uniform Plumbing Code Edition:
2012
WA State Energy Code:
2012
International Fuel Gas Code:
2012
Public Works Activities:
Channelization/Striping:
Curb Cut/Access/Sidewalk:
Fire Loop Hydrant:
Flood Control Zone:
Hauling/Oversize Load:
Land Altering: Volumes: Cut: 0 Fill: 0
Landscape Irrigation:
Sanitary Side Sewer: Number: 0
Sewer Main Extension:
Storm Drainage:
Street Use:
Water Main Extension:
Water Meter: No
r
llqll��
Permit Center Authorized Signature: &AA1 Date: 0
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and a ree to the conditions attached to this permit. �y
Signature: G Date: ® 7
PrintName:
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if
the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: 'BUILDING PERMIT CONDITIONS'
2: Work shall be installed in accordance with the approved construction documents, and any changes made
during construction that are not in accordance with the approved construction documents shall be
resubmitted for approval.
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
4: All construction shall be done in conformance with the Washington State Building Code and the
Washington State Energy Code.
5: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to
any requirements for special inspection.
6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap
the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks,
wells, and other excavations. Final inspection approval will be determined by the building inspector based
on satisfactory completion of this requirement.
7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the
City of Tukwila Building Department (206-431-3670).
8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila
Permit Center.
9: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is
placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice
shall be removed from spaces to be occupied by concrete.
10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the building code or of any other ordinances of the City
of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other
ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction
documents and other data shall not prevent the Building Official from requiring the correction of errors in
the construction documents and other data.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1700 BUILDING FINAL"
0301 CONCRETE SLAB
0201 FOOTING
CITY OF TUK►. .A
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Iq✓ U c
P •..ice,
r °'/�►
'
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
"Please Print"
Name: Boeing Employees Credit Union
Address: 12770 Gateway Drive
City: Tukwila State: WA Zip: 98168
Company Name: db General Contractors
Address: 7038 South 220th Street
City: Kent State: WA Zip: 98032
Phone: (253) 736-2980 Fax: (253) 736-2981
Contr Reg No.: pgrqF,.dC,1t c1Lj50ct Exp Date:1p Iq I Zell
Tukwila Business License No.: 705-15" 513q
g V'
aE..� F _.Company Name:
Company Name: DCI Engineers
Engineer Name: Bruce Zhong
Address: 818 Stewart Street, Suite 1000
City: Seattle State: WA Zip: 98101
Phone: (206) 332-1900 Fax: (206) 332-1600
Email:
M
ElnnPW�Ef✓S
Address:1Z:44c.
City:-- State:V'.) N ZipgC?.l
t U lC v rt..ah',
H:\Applications\Forms-ApplicationsOnLinc\2011 ApplicationsTcrmit Application Revised - 8-9-I l.docx
Revised: August 2011
bh
Pagel of 4
Valuation of Project (contractor's bid price): $ 12,000 Existing Building Valuation: $ 26,115,600
Describe the scope of work (please provide detailed information):
1r.3�1 i •'�t�.� i+ =Tl?n. R-�sa1 S Mr✓,.t— 5 00'D&2 8:r F, O FZ :S 4 v4'ZA4 A"r
Will there be new rack storage? ■ ..... Yes submittal
;.
'^.'ft
p
- -q7-
z ,�,� !
X r�..%..b.+.
i .a W ,#• ;5"3NP`�
�.'
4a+;st qs
rY"
,.u.,.�'�
:x
�'3'^`'S,
iif7 tc�
Ixati�.+,aaw..'sy�>�tslra..�it''r°�5
'���17v
NOV.'
M
10101
5,
ra
a ,r
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑....... Yes ....... No If "yes", explain:
FIRE PROTECTIONMAZARDOUS MATERIALS:
❑ ....... Sprinklers ❑ ....... Automatic Fire Alarm 0 .......None ❑ .......Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ ....... Yes ❑ .......No
If "yes, attach list of materials and storage locations on a separate 8-112 " x 11 "paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ .......On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\Applications\Forms-Applications On Line\2011 ApplicatioasTermit Application Revised - 89-1 Ldocx
Revised: August2011 Page 2 of
hh
Scope of Work (please provide detailed information):
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate_ sheet. ,
Water District
❑ ...Tukwila ❑ ... Water District # 125 ❑ .. Highline ❑ .. Renton
❑ ...Water Availability Provided
Sewer District
❑ ...Tukwila ❑... Valley View ❑ .. Renton ❑ .. Seattle
❑ ...Sewer Use Certificate ❑ ... Sewer Availability Provided
Septic System:
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which aim
❑ ...Civil Plans (Maximum Paper Size — 22" x 34")
❑ ...Technical Information Report (Storm Drainage)
❑ ..
Geotechnical Report ❑ ...Traffic Impact Analysis
❑ ...Bond
❑ .. Insurance ❑ .. Easement(s)
❑ ..
Maintenance Agreement(s) ❑ ... Hold Harmless — (SAO)
❑ ... Hold Harmless — (ROW)
Proposed
Activities (mark boxes that apply):
❑ ...Right-of-way
Use - Nonprofit for less than 72 hours
❑ ..
Right-of-way Use - Profit for less than 72 hours
❑ ...Right-of-way
Use - No Disturbance
❑ ..
Right-of-way Use — Potential Disturbance
❑ ...Construction/Excavation/Fill
- Right-of-way ❑
Non Right-of-way ❑
❑ ...Total
Cut cubic yards
❑ ..
Work in Flood Zone
❑ ...Total
Fill cubic yards
❑ ..
Stone Drainage
❑ ...Sanitary
Side Sewer ❑ .. Abandon Septic Tank
❑ .. Grease Interceptor
❑ ...Cap
or Remove Utilities ❑ .. Curb Cut
❑ .. Channelization
❑ ...Frontage
Improvements ❑ .. Pavement Cut
❑ .. Trench Excavation
❑ ...Traffic
Control ❑ .. Looped Fire Line
❑ .. Utility Undergrounding
❑ ...Backflow
Prevention - Fire Protection "
Irrigation "
Domestic Water "
❑ ...Permanent Water Meter Size... "
❑ ...Temporary Water Meter Size.. "
❑ ...Water Only Meter Size............ "
❑ ...Sewer Main Extension.............Public ❑
❑ ...Water Main Extension.............Public ❑
FINANCE INFORMATION
Fire Line Size at Property Line
❑ ...Water ❑ ...Sewer
Monthly Service Billing to:
WO #_
WO #_
WO #_
Private
Private
❑ ...Deduct Water Meter Size "
Number of Public Fire Hydrant(s)
❑ ...Sewage Treatment
Name: Day Telephone:
Mailing Address:
City State Zip
Water Meter Refund/Billing:
Mailing
Day Telephone:
City
State Zip
H:\Applications\Forms-Applications On Line\201 I ApplicationsTermit Application Revised - 8-9-1 Ldocx
Revised: August 2011 Page 3 of 4
bh
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING
AGENT:
Print Name: �,i,t✓� ��t.�
Mailing Address: 703'T J UO-
Date: (J
Day Telephone:�� �576— 7 317
city
if,
Zip
H:\Applications\Forms-Applications On Line\201 I ApplicationsTermit Application Revised - 9-9-1l.docx
Revised: August 2011
bb
Page 4 of 4
DESCRIPTIONS
PermitTRAK
PAID
$346.28
D15-0237 Address: 12770 GATEWAY DR
Apn: 2716000075
$346.28
DEVELOPMENT
$330.00
PERMIT FEE
R000.322.100.00.00
0.00
$325.50
WASHINGTON STATE SURCHARGE
13640.237.114
0.00
$4.50
TECHNOLOGY FEE
$16.28
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R6462
R000.322.900.04.00 0.00
$16.28
$346.28
Date Paid: Monday, October 19, 2015
Paid By: DANIEL SHER
Pay Method: CREDIT CARD 04924G
Printed: Monday, October 19, 2015 2:19 PM 1 of 1
L! L4 UV SY57EM5
Date Paid: Monday, September 14, 2015
Paid By: ANDREW GATH
Pay Method: CREDIT CARD 03214G
Printed: Monday, September 14, 2015 2:21 PM 1 of 1
SYSTEMS
INSPECTION RECORD.
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd.., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Projeg:.,
&6* 8Ec�-&(
Type of Ins Dctloq�
9(,
1 A.AA
Address:
191-7 70, GAiL-i4
—
Date Called:
Special Instructions:
Date Wanted:
a.m.
p.m.
Reques r:
Phone'r4j,!:*:2',��:.,
Ga'Approved per applicable codes. El Corrections required prior to approval.
COMMENTS:
ok
Inspector: Date:
3/45
El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
%ram -
INSPECTION FtECOIRD.
I Retain a copy with permi, JP 15-- Oz--3 7
INR'SlffrTION NO. PERMIT NO.
CITY OFTUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350 Poo 1-t "mol -f -
Project: k
Type of Inspection: 1-i
V-5
t-
Address:
f-2-?70 6qkLU Pr.
Da-te CeAed:
Special Instructiohs: I
Date Wanted: a.m.
/T/q
16 -'24 - p.m.
LRequester:
1
one No:
76 't
JInspector: A,,- /' JDate:JA _-�p /_/C-- I
El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection,
of —
VIC
INSPECTION RECORD
Retain a copy with pE mi . t I P/y
INSPECTION NO. PERMIT NO.
CITY OFTUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Prxct.
i?-&q
Type pf Inspectign:
n!��Al
Address:
I 2-7-Zo
hr.
Date Called:
S�ecial Instructions:'
T
Date Wanted:
to— —1 -F
a.m.
p.m.
Re ster*
, 0 P
& 69-
Phq2ne No:
__ � -67
3 t 6-113(q
El REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I
2
INSPECTION RECORD
Retain a copy with permit 7
INSPECTION NO. PERMIT NO.
CITY OFTUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Pro-wct:
&E-C-Q
IlDat�
Typ o In
40
pection:
( "
Address:
1.2,720 t,--q&LjC1V
Called-
S6ecial Instructions:'
AM
Date Wanted: a.m.
/0 -7-0::jL p.m.
Requester:
Phone No:
El Approved per applicable codes. Corrections required prior to approval.
CA An
COMMENTS:
a E-L
.................
INK
ff X71 RVA71 �-
I I M, omn -
a 0 WAF KOKMAL02
fi�l
-M=W-XV
rgff�4 �,, 619WA0,0 _X=WA
EJ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection.
�5
Mo 73?
D-K 0 021
su�w'�J
l�n si.,tiCPXWdfo s;v%,:m to Can Mai cralc !-A0.
ARx—zSi o? cQ7t tII91 IIS �?t `III ft QujhEat
R cc
�,V_
Dlr- 7=- ;- f
an:
0 � VET
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE. Revisions will require a new plan submittal
C� 131p1
0
AS o�
G`O`�GO
CITY OF Tvr.V'VILA
SEP 14 2015
3ERMIT CENTER
b l � 0/1;;/l
-
r�
awyp Y
Airffff
lip tA
l
- n;7 bI— D
-'
i "
CITY OF T V/!< ILA
SEP 14 2015
-3ERMIT CENTER
or
EnE3inEERS
DATE:
PROJECT:
LOCATION:
GENERAL
CONTRACTOR:
PRESENT:
5-21-2015
field report
JOB #: 15011-0204
BECU Parking Garage Stairs WEATHER: Sunny
12770 Gateway Drive, Tukwila, WA 98168
N/A
Matt Boone/BECU, Bruce Zhong/DCI, Tom Krause/DCI
On Friday May 15, 2015, per BECU request, our office visited the BECU parking garage at
12770 Gateway Drive, Tukwila, WA 98168. It was reported that the north stairs of the garage
show cracks and concrete spall off under the stairs.
We reviewed the original as -built structural drawings of the structure. While the main BECU
building was supported on auger cast piles, the garage structure was not. It is a cast in place
concrete structure with spread footings only. The drawings we have didn't show the stairs
structure and foundations. But based on our observation on site, the stair is cast in place
concrete as well.
During our site visit, we noticed the bottom of the stairs show sign of settlement. The side walk
slab is cracked. The underside of the stairs at the top also show big cracks and concrete spall
off. On the surface, there was a big crack between the stairs and the garage rim beam. It was
repaired and sealed but new cracks are noticed again.
It is obvious the stair foundation is settling. Since the stair is a stiff and heavy element, the
settlement pulled the stair away from the parking structure. This explains why the stair cracks
along the supporting rim beam. Once the connection cracks, moisture went into the concrete
and rebar and steel connectors started rusting. Rusting rebar and steel expanded and spall off
concrete cover. Since we don't have the as -built drawings of the stairs, we don't know about
the reinforcing and connection between the stairs and the rim beam. This is a safety concern.
DCI recommend block out and stop using the stairs right away until it is temporary supported.
Please refer to attached SK-1 for temporary support, and SK-2 for permanent fixed. If you have
any question, please do not hesitate to contact our office.
Bruce Zhong — DCI Principal
Disclaimer:
The opinions and recommendations contained in this report are based on limited cursory visual
observations. There is no claim, either stated or implied that all conditions were observed or
analytically evaluated. This report does not address any other portion of the structure other
than those areas mentioned, nor does it provide any warranty, either expressed or implied for
any portion of the building. Our observations should not be construed as a quality control
inspection. Conversations held with personnel on the site do not constitute agreements by DCI
unless confirmed in writing or in other documents signed by a representative of DCI.
CORRE TIOfiI
LTR#__�____
0
-p 0 fn
ZOO
�.
;00 t
C
C
N
v .
0
Q D
00
z
n;X1
m
RECEIVED
CITY OF TUKWILA
OCT 0 2 2015
818 Stewart Street, Suite 1000 Seattle, Washington, 98101 Phone (206) 332-1900 PERMIT CENTER
S e r v i c e I n n o v a t i o n V a I u e
�� YANG 2�t1
WAS�,��
34493,
ZAL
S`S�c1i-i�yL��
=DCI
enEineeRs
Project
Cr Subject
C
cn
o �mm
Zo�0
+n p
o O9a
c$
O
o ,n
n
O
Z
=-
Project No. Sheet No.
Date
/Z16(�p S lkfg 5 ii-(
By
lop
�ofr� SIbE
I 1
r
� L
� r
w
R
-1-oo (f') :5TKI R S .
(z) � T SST
e4 )-Ott a .C, .
�aLf,)
R EIVED
CITY F TUKWILA
OCT 0 2 2015
PERMIT CENTER
a
mEDC I Project No. Sheet No.
nc IfIEEFiS
Project Date
C,
Subject � � � fl,
BI if
1
01,
3..
v
-
k-
RECEIVE
CITY OF TUKWIL
OCT 0 2 2-
PERMIT CENTER
c
vm
�n
v_,
o
�m
v 0
o�
G
N
o
�00
v O
s
O
m
z
City of Tukwila
Department of Community Development
September 18, 2015
DANIEL SHER
7036 S 220TH ST
KENT, WA 98032
RE: Correction Letter # 1
DEVELOPMENT Permit Application Number D15-0237
BOEING EMPLOYEES CREDIT UNION -
Dear DANIEL SHER,
Jim Haggerton, Mayor
Jack Pace, Director
This letter is to inform you of corrections that must be addressed before your development permit can be approved. All
correction requests from each department must be addressed at the same time and reflected on your drawings. I have
enclosed comments from the following departments:
BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments.
• (BUILDING REVIEW NOTES)
1. All plan sheets and structural calculation produced by a Washington State licensed architect, structural engineer
or civil engineer shall have on those sheets the original wet stamp with wet signatures. (Electronic copies shall not
be approved.) Please provide revised copies stamped and signed as indicated above.
Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other
documentation. The City requires that four (4) sets of revised plan pages, specifications and/or other documentation be
resubmitted with the appropriate revision block.
In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. T_ have
enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail
or by a messenger service.
If you have any questions, I can be reached at (206)431-3665.
Sincerely, o
Bill Rambo2
Permit Technician
File No. D15-0237
6300 Southcenter Boulevard Suite #100 • Tukwila Washineton 98188 • Phone 206-431-3670 • Fax 206-431-3665
PERMIT COOPD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D15-0237 DATE: 10/02/15
PROJECT NAME: BOEING EMPLOYEES CREDIT UNION
SITE ADDRESS: 12770 GATEWAY DR
Original Plan Submittal Revision # before Permit Issued
X Response to Correction Letter # 1 Revision # after Permit Issued
DEPARTMENTS:
A4W � lo-
Bui�lin Division Fire Prevention Planning Division
g ❑ g ❑
Public Works ❑ Structural ❑ Permit Coordinator
PRELIMINARY REVIEW: DATE: 10/06/15
Not Applicable ❑ Structural Review Required ❑
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 11/03/15
Approved ❑ Approved with Conditions
Corrections Required ❑ Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
rERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: D15-0237 DATE: 09/16/15
PROJECT NAME: BECU
SITE ADDRESS: 12770 GATEWAY DR
X Original Plan Submittal
Response to Correction Letter #
DEPARTMENTS:
&Or IZ
Su ding Division
Public Wor s
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
REVIEWER'S INITIALS:
Revision # before Permit Issued
Revision # after Permit Issued
F re Preverit�on Planning Division
® g o
Structural ❑ Permit Coordinator ❑
DATE: 09/17/15
Structural Review Required ❑
DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 10/15/15
Approved ❑ Approved with Conditions ❑
Corrections Required Denied ❑
(corrections entered in Reviews) (ie: Zoning Issues)
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED: 9-4 L
Departments issued corrections: Bldg Fire ❑ Plug ❑ PW ❑ Staff Initials:
12/18/2013
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206-431-3665
Web site: hqp://www.ci.tukwila.wa.us
REVISION SUBMITTAL
Revision submittals must be submitted in person at the Permit Center. Revisions will not he accepted through
the mail, fax, etc.
Date: /G " Z-- 1 �� Plan ChecWPermit Number: D 15-0237
❑ Response to Incomplete Letter #
RECEM
® Response to Correction Letter # 1 MY Or Tok9NtLA
❑ Revision # after Permit is Issued OCT 0 2 2015
❑ Revision requested by a City Building Inspector or Plans Examiner OFP44 Cphf k:
Project Name: Boeing Employees Credit Union
Project Address: 12770 Gateway Dr
Contact Person: f)A-j jr- 1�77C_ -SM Phone Number: o?5 -3 - 7-S 6- d �t
Summary of Revision: Ape 2.2 b In C- '04 6lM s
Sheet Number(s):
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit Center by: f` �(,)
Entered in TRAKiT on t'd 2,�
\applications\forms-applications on line\revision submittal
Created: 8-13-2004
Revised:
DB GENERAL CONTRACTORS INC
Page 1 of 2
Home Inicio en tspanol ] Contact
Safety
GOWashington State Department of
Labor & Industries
DB GENERAL CONTRACTORS INC
Owner or tradesperson
Principals
BEDNARIK, DEWAINE, PRESIDENT
Doing business as
DB GENERAL CONTRACTORS INC
WA UBI No.
602 650 709
License
!Search L&I ni
A-Z Index Help My Seel Ire L&I
Claims & Insurance Workplace Rights Trades & Licensing
7038 SOUTH 220TH ST
KENT, WA98032
253-736-2980
KING County
Business type
Corporation
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor. .............._........._.................................... Active.
Meets current requirements.
License specialties
GENERAL
License no.
DBGENGC94309
Effective — expiration
09/29/2006-10/09/2016
Bond
DEVELOPERS SURETY & INDEM CO
$12,000.00
Bond account no.
743855C
Received by L&I
Effective date
09/29/2006
09/28/2006
Expiration date
Until Canceled
In........sura....nc.....e
.........
Nationwide Mutual Ins Co
$1,000,000.00
Policy no.
ACP7545276908
Received by L&I
Effective date
09/15/2015
09/28/2015
Expiration date
09/28/2016
Insurance history
Sa........vings
..........
No savings accounts during the previous 6 year period.
Lawsuits against the bond or savings
No lawsuits against the bond or savings accounts during the previous 6 year period.
L&I Tax debts
_._................................ .
No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts
may be recorded by other agencies.
License Violations
No license violations during the previous 6 year period.
https://secure.Ini.wa.gov/verify/Detail.aspx?UBI=602650709&LIC=DBGENGC94309&SAW= 10/16/2015