Loading...
HomeMy WebLinkAboutCOW 2019-11-12 Item 4D - Public Safety Plan - Fire Station 52 Mini-MACC 2 (Maximum Allowable Construction Cost)COUNCIL AGENDA SYNOPSIS ----------------------------------Initials Meeting Date Prepared b Ma ors review Council review 11/12/19 RB 11/18/19 RB ITEM INFORMATION ITEM NO. 4.D. STAFF SPONSOR: RACHEL BIANCHI ORIGINAL AGENDA DATE: 11/ 12/ 18 AGENDA ITEM TITLE FIre Station 52 Mini-MACC2 CATEGORY ® Discussion Mtg Date 11/IZ/19 ® Motion Mtg Date 11/18/19 ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ .Bid Award Mtg Date ❑ Public Hearing Mtg Date ❑ Other Mtg Date SPONSOR ❑Council ®Mayor ❑HR ❑DCD ❑Finance ❑Fire ❑TS ❑P&R ❑Police ❑Ply/ ❑Court SPONSOR's Council is being asked to approve a contract amendment with Lydig Construction for SUMMARY $9,227,381 for the mini-MACC 2 associated with Fire Station 52. This amount would cover the remaining construction of Fire Station 52 and Alternate #1, the build -out of the Fire Department's administrative space. REVIEWED BY ❑ C.O.W. Mtg. ❑ CDN Comm ❑ Finance Comm. ® Public Safety Comm. ❑ Trans &Infrastructure ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 11/4 COMMITTEE CHAIR: ROBERTSON RECOMMENDATIONS: SPONSOR/ADMIN. Administrative Services COMMITTEE Forwarded to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED Fund Source: Comments: MTG. DATE RECORD OF COUNCIL ACTION 11/12/19 11/18/19 MTG. DATE ATTACHMENTS 11/12/19 Informational Memorandum dated November 1, 2019 PowerPoint Contract Amendment Minutes from the 11/4 PS Committee Meeting 11/18/19 65 City of Tukwila Allan Ekberg, Mayor Administrative Services Department- Rachel Bianchi, Deputy CityAdministrator INFORMATIONAL MEMORANDUM TO: Public Safety Committee CC: Mayor Allan Ekberg FROM: Rachel Bianchi, Deputy City Administrator DATE: October 28, 2019 SUBJECT: Fire Station 52 Mini-MACC2 ISSUE The Council is being asked to consider allowing the Mayor to execute an amendment to the contract with Lydig Construction to increase it by $9,227,381. BACKGROUND The new Fire Station 52 is to be located on the City Hall Campus just north of the 6300 Building in the upper parking lot. With Fire Station 51 moving further south, the FACETS study determined that it would be important for Fire Station 52 to move further south to maximize coverage and response times throughout the City. Fire Station 52 will become the new headquarters station and thus is a larger, more complex building than Fire Station 51. Early on, the City chose to use the General Contractor/Construction Management (GCCM), which allows the contractor to join the project early in the design process and inform the City and architects of cost impacts associated with design. City staff have found this to be a very productive delivery model, which has resulted in multiple steps of estimating and checking the budget in real time as decisions are made. The Council previously authorized mini-MACC1 for Fire Station 52, which covers two bid packages: one for earthwork and utilities; the other for structures, which includes retaining walls, steel, and the elevator. Mini-MACC1 also included allowances for long -lead items, including early submittals and early mechanical work that will ensure that these items are addressed in time for mini-MACC2. Fire Station 52 is currently under construction and on.schedule. The remaining services have been bid, and the project is under the newly revised budget by approximately $637,000. Service Total Pre -Construction $ 125,000 Mini-MACC1: Earthwork and utilities; structures (retaining walls, steel, elevator $6,801,879 Mini-MACC2: Concrete, glazing, metal framing, insulation, acoustical ceiling, miscellaneous, flooring, fencing, landscape, electrical, painting, $8,591,342 Tukwila City Hall • 6200 Southcenter Boulevard • Tukwila, WA 98188 • 206-433-1800 • Website: TukwilaWA.gov 67 aluminum paneling and cement fiber board, roofing and flashing, mechanical. Construction cost: $15,518,221 Washington State Sales Tax: $1,551,822 Total without contingency: $17,070,043 Construction contingency: $ 1,503,879 Total with contingency: $18,573,922 The project team has carried the buildout of the Administration space as the only alternate on the project. The total cost of the buildout, including construction, tax, contingency and FF&E (furniture fixtures and equipment) is $845,747. Between the savings achieved in the newly revised budget (just over $637,000), and achievable budget reductions in professional services on the Justice Center and Fire Station 51 the buildout of the Administration space is attainable in the current mini-MACC2. The project team proposes transferring $104,057 each from the Fire Station 51 and Justice Center budgets to fully fund the Administration space buildout. As such, the final budget would be: Service Total Base Fire Station $18,573,922 Alternate #1 — Administration space buildout $ 845,747 Total Fire Station 52: $19,419,669 RECOMMENDATION The project team recommends moving forward with mini-MACC2 and Alternate #1 to complete Fire Station 52. The Council is being asked to provide the Mayor the authority for the following: •To sign a contract amendment with Lydig Construction for $16,154,260 for the full construction of Fire Station 52, including the buildout of the Administration space. •To spend $1,615,426 in sales tax associated with the full project. •To spend, if needed, the project's contingency for change orders, up to $1,567,483 •Transfer $104,057 each from the Fire Station 51 and Justice Center budgets to fully cover the cost of the Administration space buildout. Steve Goldblatt, the Council's Project Management Quality Assurance consultant, has reviewed the project status and agrees with this recommendation. ATTACHMENTS Fire Station 52 mini-MACC2 presentation Amended contract with Lydig Construction 68 Phone: 206-433-1800 • Email: Mayor@TukwilaWA.gov • Website: TukwilaWA.gov City of Tukwila O (a ( � PUBLIC SAFETY PLAN Fire Station 52 Mini-MACC2 M. O Bottom Line City of Tukwila O S O PUBLIC SAFETY PLAN • Fire Station 52 is below the amended budget by approximately $637,000 • Fire Station 52 alternate for the Administrative space buildout came in at $845,747, including FF&E (furniture, fixtures and equipment), sales tax and 10% contingency • The Public Safety Plan existing budget can cover the delta between the savings in the base bid and the cost of the alternate so that the Administrative space can be built out during construction of the station. Fire Station 52 City of Tukwila O B O PUBLIC SAFETY PLAN • Council previously authorized $6,801,879 for mini-MACC1 to capitalize on the summer months. • Mini-MACC1 covered earthwork and utilities, as well as structures. • The project is on schedule at this time. • Mini-MACC2 is for all remaining bid packages. N Fire Station 52 Construction Costs City of Tukwila O S O PUBLIC SAFETY PLAN Preconstruction $ 125,000 Mini-MACC1 Earthwork and utilities; structures (retaining walls, steel, elevator) $6,801,879 ini-MACC2 Concrete, glazing, metal framing, insulation, acoustical ceiling, miscellaneous, flooring, fencing, landscape, electrical, painting, aluminum paneling and cement fiber board, roofing and flashing, mechanical. $8,591,342 Total Construction Cost $15,518,221 Sales Tax $ 1 822 Total without contingency $17,070,043 Contingency $ 9 Total with contingency $18,573,922 J Fire Station 52 Construction Budget City of Tukwila O 9 O PUBLIC SAFETY PLAN A/E Services $1,770,172 Land Acquisition* $25,160 Permits/Fees 0 Construction (Pre -Con, Const & Tax) $17,707,676 Construction Related Costs (incl. bond & FF&E) $1,090,840 PM Services (incl other prof services) $737,000 Contingency $1,756,152 Tota 1 $23,490,000 7 * While the cost of the land was free, this amount reflects the proportional amount of fees associated with the City's property acquisition firm, Heartland, LLC. w rI Fire Station 52 Alternate — Admin Buildout City of Tukwila O B O PUBLIC SAFETY PLAN Construction cost $636,039 Sales tax $63,604 Additional furniture fixtures and equipment (FF&E) with 10% contingency $82,500 Construction contingency $63,604 Total $845,747 Fire Station 52 Alternate Suggested Funding City of Tukwila O B O PUBLIC SAFETY PLAN Savings from FS 52 Mini-MACC2 $637 633 Fire Station 51 budget reduction in remaining A/E, $104,057 permit fees, printing, reimbursables and project management Justice Center budget reduction in remaining A/E, $104,057 permit fees and professional services Tota 1 $845,747 Cn Fire Station 52 Council Consideration: City of Tukwo�a O B O PUBLIC SAFETY PLAN • The Council is being asked to provide the mayor the authority to: • To sign a contract with Lydig Construction for $16,1541260 for the remaining construction of Fire Station 521 including the Admin buildout • To spend $1,615,,426 in sales tax associated with the contract discussed above • To spend, if needed, the full project's contingency for change orders, budgeted at up to $1,567,483 • Transfer $104,.057 each from the Fire Station 51 and Justice Center budgets to fully cover the cost of the Admin space buildout Fire Station 52 s City of Tukwila O B O PUBLIC SAFETY PLAN Questions? � AIADocument A133" - 2009 Exhibit A Guaranteed Maximum Price Amendment AMENDMENT NO. 5 for the following PROJECT: (Name and address or location) ADDITIONS AND DELETIONS: The author of this document has Tukwila Fire Stations 51 and 52 added information needed for its Tukwila WA completion. The author may also have revised the text of the original Note: THIS AMENDMENT IS FOR THE BALANCE OF FIRE STATION 52 ONLY, AIA standard form. An Additions and EXCEPT AS SPECIFICALLY NOTED IN ARTICLE A.4 BELOW. PREVIOUS Deletions Report that notes added information as well as revisions to the AMENDMENTS ADDRESSED INITIAL FIRE STATION 52 SCOPES AND FIRE standard form text is available from STATION 51 SCOPE. the author and should be reviewed. A vertical line in the left margin of this WORK RELATED TO FIRE STATION 54, EXCEPT FOR THE DEMOLITION OF document indicates where the author THE EXISTING STRUCTURE, WAS DELETED IN THE FIRST AND SECOND has added necessary information AMENDMENTS BETWEEN THE PARTIES. and where the author has added to or deleted from the original AIA text. THE OWNER: (Name, legal status and address) City of Tukwila 6200 Southcenter Boulevard Tukwila WA 98188 THE CONSTRUCTION MANAGER: (Name, legal status and address) Lydig Construction 3180 139th Ave SE Suite 110 Bellevue WA 98005 ARTICLE A.1 § A.1.1 Total Contract Cost Pursuant to Section 2.2 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Maximum Allowable Construction Cost (MACC) and Total Contract Cost (TCC) for the balance of Fire Station 52. Without limiting the foregoing, this Amendment includes bid packages for site concrete; masonry; glazing, gypsum wall board, metal framing, insulation, and acoustical ceilings; miscellaneous package, floor finishes and tiling; fencing and gates; landscaping and irrigation; electrical; painting and coatings; exterior enclosure; roofmg and roof flashing for Fire Station 52. As agreed by the Owner and Construction Manager, the Total Contract Cost is an amount that the Contract Sum shall not exceed. The Total Contract Cost consists of the MACC (including the Construction Cost, Negotiated Support Services, Subcontractor Bonds, and MACC Contingency); the Fixed Fee; the Fixed Amount for Specified General Conditions work; and applicable Washington State sales tax (although the TCC for this Fifth Amendment does not include WSST). This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 TM-2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. Init. AIA Document A133T" — 2009 Exhibit A. Copyright© 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was / produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 79 § A.1.1.1 The Total Contract Cost for the Fire Station 52 scope described above is guaranteed by the Construction Manager not to exceed Nine Million Two Hundred Twenty -Seven Thousand Three Hundred Eighty -One Dollars ($9,227,381) ),subject to additions and deductions by Change Order as provided in the Contract Documents. Thus, the full Total Contract Cost for Fire Station 52 is guaranteed by the Construction Manager not to exceed Sixteen Million Twenty -Nine Thousand Two Hundred Sixty Dollars ($16,029,260) ), and the full Total Contract Cost for fort he Agreement is guaranteed by the Construction Manager not to exceed Twenty -Five Million Nine Hundred Eighty -Eight Thousand Five Hundred Seventy -Four Dollars ($25,988,574) ), both subject to additions and deductions by Change Order as provided in the Contract Documents. Notwithstanding the references to "Construction Total' and "Total Contract Cost," the parties understand this amount is only for the scope described in this Amendment and not for the full and final scope of Fire Station 52. § A.1.1.2 Itemized Statement of the Total Contract Cost. Provided below is an itemized statement of the Total Contract Cost organized by its component parts: TOTALS FOR THIS AMENDMENT #5 ONLY -Specified General Conditions $417,539 Maximum Allowable Construction Contract MACC Construction Total $8,018,692 Negotiated Support Services (NSS) $169,064 Subcontractor Bonds Included MACC Contingency 3.0% $240,561 GC/CM Fixed Fee @ 4.5% (Fee is not allowed on the Specified General Conditions, or Preconstruction Allowance $381,525 TOTAL AMENDMENT #5 CONTRACT COST(Excluding WSST $9,227,381 TOTALS FOR FIRE STATION 52 Specified General Conditions $752,784 Maximum Allowable Construction Contract MACC Construction Total $13,804,692 Negotiated Support Services (NSS) $399,804 Subcontractor Bonds Included MACC Contingency 3.0% $414,141 GC/CM Fixed Fee @ 4.5% (Fee is not allowed on the Specified General Conditions, or Preconstruction Allowance $657,839 TOTAL FIRE STATION 52 CONTRACT COST(Excluding WSST $16,029,260 For the Total Project Scope: -Original Contract Sum FS51, FS52, FS54 $372,000 Amendment No. 1 FS54 $0 Amendment No. 2 FS54 $0 Amendment No. 3 FS51 $9,587,314 Amendment No. 4 FS52 $6,801,879 Amendment No. 5 FS52 $9,227,381 TOTAL CONTRACT COST(Excluding WSST $25,988,574 § A.1.1.2.1 The Preconstruction Services NTE Limit for the entire Contract, as previously agreed to by the parties, is: Three Hundred Seventy -Two Thousand Dollars ($372,000) Init. AIA Document A133Tm — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. 80 User Notes: (911554625) § A.1.1.3 The Total Contract Cost is based on the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If the Contract Documents permit the Owner to accept other alternates subsequent to the execution of this Amendment, attach a schedule of such other alternates showing the amount for each and the date when the amount expires.) Alternate 1 - Full Tenant Build of 2nd Floor Administrative Spaces: $636,039 (included in the Amendment #5 MACC above) § A.1.1.4 Allowances included in the Total Contract Cost, if any: (Identijy allowance and state exclusions, if any, from the allowance price.) Item Price Allowances carried forward from Mini-MACC Allowance 1: Revise Elevator Specification deductive $18,000 Allowance 2: Remove Unsuitable Soils deductive $40,000 Allowance 3: Negotiated Savings Allowance deductive $75,000 MACC Allowances Allowance 1: 100% CD Set — ASI 003 — BPO 1 & BP03 ROM $255 000 Allowance 2: PSE Work at 65th $25 000 Allowance 3: Concrete Wall Change $85,000 Allowance 4: Wood Bench Allowance $10,000 Allowance 5: Traffic Si nalization $75,000 BP-11 —Electrical Allowance for all work associated with Specification Section 285005 — Fire Station Alerting $75,000 Allowance for all work associated with Specification Section 281301 — Video Surveillance System S50,000 § A.1.1.5 Assumptions, if any, on which the Total Contract Cost is based: Assumptions and Clarifications: • All clarifications and scope modifications described in Addenda 01-08 shall be incorporated into the project documents. • Construction CPM Schedule shall carry forward from the Mini-MACC as updated through the date of this contract • PSE Work at 651h allowance does not include restoration of the road surface. This allowance is intended to cover the added cost for BP-0 1, BP-03 and restoration of two concrete panels and curb at this location. • Early Electrical Allowance of $215k is being returned to the MACC budget from BP-03. • All mockups shall be in -place in lieu of any freestanding mockup requirements. • Caulking of exterior concrete to be clarified to exist only where specifically shown on landscape paving drawings. • Specification section 26 05 19 paragraph 2.1 C prohibits aluminum wire. Revise spec section 26 05 19 paragraph 2.1C to allow aluminum wire for sizes #1 AWG and larger. • Flooring surfaces shown as carpet in alternate 1 are changed to polished concrete as the base bid. Exclusions: • Building permit and fees per GCCM Matrix. • Special Inspections per GCCM Matrix. • Utility company fees and charges per GCCM Matrix. Init. AIA Document A133Tm — 2009 Exhibit A. Copyright ©1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 81 • Commissioning authority. • Professional Liability (E&O) insurance coverage. • City, County, State, PUD and PSE requirements. • Utility Connection fees and assessments per GCCM Matrix. • Gas & Water Meters. • All owner soft costs and FF&E. • Any costs associated with Owner moves. • Washington State Sales Tax. • Costs exceeding our allowances included in the Bid Packages. See listing of Allowances below. • For the alerting system, all back -end connection, setup charges, etc. are excluded. Programming, software or other setup required in order to facilitate the function of the alerting system are excluded. No offsite work or function is included in this contract. § A.1.1.6 The Total Contract Cost is based upon the following General Conditions: AIA Document A201 — 2007, General Conditions of the Contract for Construction, as modified (Table deleted) § A.1.1.7 The Total Contract Cost is based upon the following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Agreement.) Weinstein A+U, Tukwila Fire Station 52 Specifications, Construction Set, incorporated by this reference. See Attachment A for the list of Specifications. (Table deleted) § A.1.1.8 The Total Contract Cost is based upon the following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Agreement.) Weinstein A+U, Tukwila Fire Station 52 Drawings, Construction Set, incorporated by this reference. See Attachment B for the list of Drawings. (Table deleted) § A.1.1.9 The Total Contract Cost is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Agreement.) Not applicable. ARTICLE A.2 § A.2.1 Substantial Completion Dates The anticipated date of Substantial Completion for Fire Station 51 established by Amendment No. 3: May 19, 2020 The anticipated date of Substantial Completion for Fire Station 52 established by this Amendment: December 17, 2020 § A.2.2 Physical Completion Dates The anticipated date of Physical Completion for Fire Station 51 established by Amendment No. 3: May 19, 2020 The anticipated date of Physical Completion for Fire Station 52 established by this Amendment: December 17, 2020 Init. AIA Document A133T"" - 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any 4 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08129/2020, and is not for resale. 82 user Notes: (911554625) § A.2.3 Final Completion Dates The anticipated date of Final Completion for Fire Station 51 established by Amendment No. 3: June 23, 2020 The anticipated date of Final Completion for Fire Station 52 established by this Amendment: January 19, 2021 § A.2.4 Construction Schedule Construction Manager's Construction Schedule for Fire Station 52 is updated and attached as Attachment C, and incorporated herein. ARTICLE A.3 Key Personnel The following named key personnel shall remain assigned for the duration of the Project unless otherwise agreed to in writing by Owner: Project Manager: Kiel Lunsford Project Superintendent: Don Lehman Project Engineer: Alex Carey ARTICLE A.4 Additional Change to Contract Terms Payment for overhead and profit for adjustments to the Contract Sum that are based on any method other than the unit price method shall be with a Four and One -Half percent (4.5%) fee on the cost of the changed work. This change applies retroactively and applies to both Fire Station 51 and Fire Station 52. Accordingly, Section 7.5.1 of the parties' AIA Document A201— 2007, General Conditions of the Contract for Construction, is modified by this Amendment as follows: §7.5.1 For any adjustments to the Contract Sum that are based on any method other than the unit price method, the Contractor agrees to charge and accept as payment for overhead and profit, the following percentages of costs attributable to the change on Work: .1 Four and One -Half percent (4.5%) for Changes in the Work paid from Owner's contingency. .2 Zero percent (0%) for Changes in the Work paid from the MACC Contingency. .3 For additional Work ordered as described above that will be self -performed by Contractor (i.e., using its own forces) or executed by Subcontractors or Sub -subcontractors of any tier, it is agreed that the entity actually performing the Work will be permitted to charge a total of fifteen percent (15%) for overhead and profit, and upper tier Subcontractors and Contractor shall charge no more than eight percent (8%) on such Changed Work. .4 When both additions and credits are involved in any one change, the allowance for overhead and profit shall be figured on the basis of the net increase, if any. The overhead and profit percentage in this Section 7.5.1 includes reimbursement for indirect and direct costs associated with the management of the Change Work. Therefore no additional markups or direct costs will be allowed in Change Order pricing. This includes, without limitation, coordination, ordering of materials, field office and home office costs, estimating and scheduling, preparation of the change and pricing, indirect supervision and non -working foreman, safety, and supervision. Init. AIA Document A133T"' — 2009 Exhibit A. Copyright 0 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. User Notes: (911554625) 83 OWNER (Signature) (Printed name and title) CONSTRUCTION MANAGER (Signature) (Printed name and title) Init. AIA Document A133T"" — 2009 Exhibit A. Copyright© 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was t produced by AIA software at 15:16:28 ET on 10/29/2019 under Order No.6466885847 which expires on 08/29/2020, and is not for resale. 84 User Notes: (911554625) ATTACHMENT A 01 20 00 Price and Payment Procedures 2 9/13/2019 Construction Set 01 22 00 Unit Prices 2 9/13/2019 Construction Set 0123 00 Alternates 2 9/13/2019 Construction Set 1013000 Administrative Requirements 2 9/13/2019 Construction Set 014000 Quality Requirements 2 9/13/2019 Construction Set 014200 References 2 9/13/2019 Construction Set 014339 Mockups 1 9/13/2019 Construction Set 014554 Building Envelope Air Barrier Testing 2 9/13/2019 Construction Set 015000 Temporary Facilities and Controls 2 9/13/2019 Construction Set 015639 Temporary Tree and Landscape Protection 1 9/13/2019 Construction Set 015713 Temporary Erosion and Sediment Control 2 9/13/2019 Construction Set 016000 Product Requirements 2 9/13/2019 Construction Set 017700 Closeout Procedures 2 9/13/2019 Construction Set 019113 General Commissioning Requirements 2 9/13/2019 Construction Set 012100 Allowances 1 9/13/2019 Construction Set 016200 Product Options and Substitutions 0 9/13/2019 Construction Set 03 10 00 Concrete Forming and Accessories 2 9/13/2019 Construction Set 03 20 00 Concrete Reinforcing 2 9/13/2019 Construction Set 03 30 00 Cast -In -Place Concrete 3 9/13/2019 Construction Set 03 35 43 Polished Concrete Finishing 2 9/13/2019 Construction Set 03 37 13 Shotcrete 2 9/13/2019 Construction Set 04 22 00 Concrete Unit Masonry 2 9/13/2019 Construction Set 04 26 13 Masonry Veneer 2 9/13/2019 Construction Set 051200 Structural Steel Framing 2 9/13/2019 Construction Set 05 12 13 Architecturally Exposed Structural Steel Framing (AESS) 2 9/13/2019 Construction Set 053100 Steel Decking 2 9/13/2019 Construction Set 05 40 00 Cold -Formed Metal Framing 2 9/13/2019 Construction Set 05 50 00 Metal Fabrications 2 9/13/2019 Construction Set 05 51 13 Metal Pan Stairs 2 9/13/2019 Construction Set 05 73 00 Decorative Metal Railings 1 9/13/2019 Construction Set 06 10 53 Miscellaneous Rough Carpentry 2 9/13/2019 Construction Set 06 16 43 Gypsum Sheathing 2 9/13/2019 Construction Set 06 20 23 Interior Finish Carpentry 2 9/13/2019 Construction Set 06 41 16 Architectural Wood Casework 2 9/13/2019 Construction Set 06 73 00 Composite Decking 2 9/13/2019 Construction Set 071113 Bituminous Dampproofing 2 9/13/2019 Construction Set 07 14 13 Hot Fluid -Applied Rubberized Asphalt Waterproofing 2 9/13/2019 Construction Set 07 17 00 Bentonite Waterproofing 2 9/13/2019 Construction Set 07 19 00 Water Repellents 2 9/13/2019 Construction Set 072100 Thermal Insulation 2 9/13/2019 Construction Set 07 21 19 foamed -In -Place Insulation 2 9/13/2019 Construction Set 07 25 00 Weather Resistant Barriers 2 9/13/2019 Construction Set 07 42 13.13 Formed Metal Wall Panels 2 9/12/2019 Construction Set 07 46 46 Fiber -Cement Siding 2 9/13/2019 Construction Set 07 54 23 Thermoplastic-Polyolefin (TPO) Roofing 2 9/13/2019 Construction Set 07 62 00 Sheet Metal Flashing and Trim 2 9/13/2019 Construction Set 07 72 00 Roof Accessories 2 9/13/2019 Construction Set 07 84 13 Penetration Firestopping 2 9/13/2019 Construction Set 07 92 00 Joint Sealants 2 9/13/2019 Construction Set 081113 Hollow Metal Doors and Frames 2 9/13/2019 Construction Set 081416 Flush Wood Doors 2 9/13/2019 Construction Set 08 31 13 Access Doors and Frames 2 9/13/2019 Construction Set 08 36 13 Sectional Doors 2 9/13/2019 Construction Set 083713 Four -Fold Doors 2 9/13/2019 Construction Set 08 41 13 Aluminum -Framed Entrances and Storefronts 2 9/13/2019 Construction Set 08 54 13 Fiberglass Windows 2 9/13/2019 Construction Set 08 62 00 Unit Skylights 2 9/13/2019 Construction Set 08 80 00 Glazing 2 9/13/2019 Construction Set 08 83 00 Mirrors 2 9/13/2019 Construction Set 087100 Door Hardware 0 9/24/2019 ASI-003 09 22 16 Non -Structural Metal Framing 2 9/13/2019 Construction Set 09 29 00 Gypsum Board 2 9/13/2019 Construction Set 09 30 13 Ceramic Tiling 2 9/13/2019 Construction Set 1095113 Acoustical Panel Ceilings 2 9/13/2019 Construction Set 1095426 Linear Wood Ceilings 2 9/13/2019 Construction Set 09 65 13 Resilient Base and Accessories 2 9/13/2019 Construction Set 09 65 66 _ Resilient Athletic Flooring 2 9/13/2019 Construction Set 1096813 Tile Carpeting 2 9/13/2019 Construction Set 09 84 36 Sound -Absorbing Ceiling Units 2 9/13/2019 Construction Set 1019113 Exterior Painting 2 9/13/2019 Construction Set 1099123 Interior Painting 2 9/13/2019 Construction Set 09 96 00 High -Performance Coatings 2 9/13/2019 Construction Set 101100 Visual Display Units 2 9/13/2019 Construction Set 1013 23.16 Room -Identification Panel Signage 2 9/13/2019 Construction Set 10 14 19 Dimensional Letter Signage 2 9/13/2019 Construction Set 10 21 23 Cubicle Curtains and Track 2 9/13/2019 Construction Set 1102600 Wall and Door Protection 2 9/13/2019 Construction Set 10 28 00 Toilet and Bath Accessories 2 9/13/2019 Construction Set 10 44 13 Fire Protection Cabinets 2 9/13/2019 Construction Set 104416 Fire Extinguishers 2 9/13/2019 Construction Set 107516 Ground -Set Flagpoles 2 9/13/2019 Construction Set 113100 Residential Appliances 2 9/13/2019 Construction Set 1122413 Roller Window Shades 2 9/13/2019 Construction Set 12 36 16 Metal Countertops 2 9/13/2019 Construction Set 12 36 23 Plastic -Laminate Clad Countertops 1 9/13/2019 Construction Set 12 36 61.19 quartz Agglomerate Countertops 2 9/13/2019 Construction Set 12 48 13 Entrance Floor Mats and Frames 2 9/13/2019 Construction Set 12 93 00 Site Furnishings 2 9/13/2019 Construction Set 1142123 Machine Room -Less Electric Traction Passenger Elevators 3 9/13/2019 Construction Set 210500 Common Work Fire Suppression 2 9/13/2019 Construction Set 21 10 00 Fire Suppression 2 9/13/2019 Construction Set 1211316 Preaction Double Interlock Fire Suppression 2 9/13/2019 Construction Set 22 05 00 Common Work Plumbing 2 9/13/2019 Construction Set 22 07 00 Plumbing Insulation 2 9/13/2019 Construction Set 1220800 Commissioning of Plumbing 2 9/13/2019 Construction Set 22 10 00 Domestic Water Piping 2 9/13/2019 Construction Set 22 1123 Domestic Water Pumps 2 9/13/2019 Construction Set 1221316 Sanitary Waste and Vent Piping 2 9/13/2019 Construction Set 22 30 00 Plumbing Equipment 1 9/13/2019 Construction Set 22 42 00 Plumbing Fixtures 2 9/13/2019 Construction Set 1226100 Compressed Air 2 9/13/2019 Construction Set 23 05 00 Common Work HVAC 2 9/13/2019 Construction Set 23 05 48 Vibration Isolation 2 9/13/2019 Construction Set 1230593 _ Balancing 2 9/13/2019 Construction Set 23 07 00 HVAC Insulation 2 9/13/2019 Construction Set 23 08 00 Commissioning of HVAC 2 9/13/2019 Construction Set 1230923 Controls - BMS 2 9/13/2019 Construction Set 23 11 23 Natural Gas Piping 2 9/13/2019 Construction Set 23 23 00 Refrigerant Piping 2 9/13/2019 Construction Set 1233100 Air Distribution 2 9/13/2019 Construction Set 23 34 00 HVAC Equipment 2 9/13/2019 Construction Set 23 35 20 Automatic Emergency Vehicle Exhaust System 2 9/13/2019 Construction Set 1260519 Low -Voltage Cable and Terminations 2 9/13/2019 Construction Set 26 05 26 Grounding and Bonding for Electrical Systems 2 9/13/2019 Construction Set 26 05 29 Hangers and Supports for Electrical Systems 2 9/13/2019 Construction Set 1260533 Raceways and Boxes for Electrical Systems 2 9/13/2019 Construction Set 26 05 34 Raceways and Boxes for Communications Systems 2 9/13/2019 Construction Set 2605 43 Underground Raceways 2 9/13/2019 Construction Set 1260553 Identification for Electrical Systems 2 9/13/2019 Construction Set 26 05 73 Power Systems Protective Device Study 2 9/13/2019 Construction Set 26 08 00 Electrical Systems Commissioning 1 9/13/2019 Construction Set 1260923 Lighting Control 2 9/13/2019 Construction Set 26 24 16 Panelboards 2 9/13/2019 Construction Set 26 27 26 Wiring Devices 2 9/13/2019 Construction Set 1262816 Enclosed Switches and Circuit Breakers 2 9/13/2019 Construction Set 26 29 13 Motor Control 2 9/13/2019 Construction Set 26 32 13 Engine Generators 2 9/13/2019 Construction Set 1265100 Lighting 2 9/13/2019 Construction Set 26 05 00 Common Work Results 2 9/13/2019 Construction Set 2715 00 Data and Telephone Cabling System 2 9/13/2019 Construction Set 1274133 Television Distribution System 2 9/13/2019 Construction Set 27 51 23 Clock Program System 2 9/13/2019 Construction Set 28 13 01 Security Access System 2 9/13/2019 Construction Set 1282300 Video Surveillance System 2 9/13/2019 Construction Set 28 31 11 Fire Alarm System 2 9/13/2019 Construction Set 1285005 Fire Station Alerting 2 9/13/2019 Construction Set 1311000 Site Preparation 3 9/13/2019 Construction Set 312200 Earthwork 2 9/13/2019 Construction Set 3141 33 Trench Safety 2 9/13/2019 Construction Set 1321200 Flexible Paving 2 9/13/2019 Construction Set 32 12 43 Flexible Porous Pavement 2 9/13/2019 Construction Set 32 13 13 Pedestrian Concrete Paving 2 9/13/2019 Construction Set 1321723 Pavement Markings 2 9/13/2019 Construction Set 32 31 19.53 Decorative Metal Fences and Gates 2 9/13/2019 Construction Set 1328400 Planting Irrigation 2 9/13/2019 Construction Set 1329200 Turf and Grasses 2 9/13/2019 Construction Set 32 93 00 Planting 2 9/13/2019 Construction Set 32 94 00 Soil Cells 1 9/13/2019 Construction Set 1331000 Water Utilities 2 9/13/2019 Construction Set 33 30 00 Sanitary Sewer 2 9/13/2019 Construction Set 33 40 00 Storm Drainage 2 9/13/2019 Construction Set O i Do re ATTACHMENT B 91 92 G202 BUILDING CODE DIAGRAMS 1 9/12/2019 Construction Set G500 ACCESSIBILITY DIAGRAMS 2 9/12/2019 Construction Set TOPOGRAPHIC SURVE'TOPOGRAPHIC SURVEY 1 9/12/2019 Construction Set C0.1 COVER SHEET 2 9/12/2019 Construction Set C3.0 TESC AND DEMOLITION PLAN 2 9/12/2019 Construction Set C1.1 TESC AND DEMOLITION PLAN 2 9/12/2019 Construction Set C1.2 TESC AND DEMOLITION DETAILS 2 9/12/2019 Construction Set C1.3 TESC AND DEMOLITION NOTES 2 9/12/2019 Construction Set C2.0 GRADING AND DRAINAGE PLAN 4 9/12/2019 Construction Set C2.1 GRADING AND DRAINAGE PLAN 2 9/12/2019 Construction Set C2.2 DRIVEWAY PROFILE 2 9/12/2019 Construction Set C2.3 STORM PROFILE 3 9/12/2019 Construction Set C2.4 SECTIONS 3 9/12/2019 Construction Set C2.5 SECTIONS 2 9/12/2019 Construction Set C2.6 SECTIONS 2 9/12/2019 Construction Set C2.7 SECTIONS 2 9/12/2019 Construction Set C2.8 GRADING AND DRAINAGE NOTES AND DETAILS 2 9/12/2019 Construction Set FC2.9 GRADING AND DRAINAGE DETAILS 2 9/12/2019 Construction Set C2.30 GRADING AND DRAINAGE DETAILS 2 9/12/2019 Construction Set C2.11 GRADING AND DRAINAGE DETAILS 2 9/12/2019 Construction Set C3.0 PAVING AND HORIZONTAL CONTROL PLAN 2 9/12/2019 Construction Set C3.1 PAVING AND HORIZONTAL CONTROL PLAN 2 9/12/2019 Construction Set C3.2 PAVING AND HORIZONTAL CONTROL NOTES AND DETAILS 2 9/12/2019 Construction Set C3.3 PAVING AND HORIZONTAL CONTROL NOTES AND DETAILS 2 9/12/2019 Construction Set C3.4 PAVING AND HORIZONTAL CONTROL DETAILS 2 9/12/2019 Construction Set C4.0 SEWER AND WATER PLAN 3 9/12/2019 Construction Set C4.1 SEWER AND WATER PLAN 2 9/12/2019 Construction Set C4,2 SEWER PROFILE 3 9/12/2019 Construction Set C4.3 SEWER DETAILS 2 9/12/2019 Construction Set C4.4 WATER NOTES AND DETAILS _ 2 9/12/2019 Construction Set C4.5 WATER NOTES AND DETAILS 2 9/12/2019 Construction Set SH101 SHORING GENERAL STRUCTURAL NOTES 2 9/12/2019 Construction Set SH102 STATEMENT OF SPECIAL INSPECTIONS 2 9/12/2019 Construction Set SH2O1 SHORING PLAN 2 9/12/2019 Construction Set SH2O2 RETAINING WALL PLAN 6 9/12/2019 Construction Set SH301 SHORING WALL ELEVATION & DETAILS 6 9/12/2019 Construction Set SH302 RETAINING WALL ELEVATIONS 6 9/12/2019 Construction Set SV101 GENERAL NOTES & STATEMENT OF SPECIAL INSPECTIONS 2 9/12/2019 Construction Set SV201 DETENTION VAULT PLANS 2 9/12/2019 Construction Set SV301 VAULT DETAILS 2 9/12/2019 Construction Set S301 GENERAL STRUCTURAL NOTES 2 9/12/2019 Construction Set S102 STATEMENT OF SPECIAL INSPECTIONS 2 9/12/2019 Construction Set S201N NORTH FOUNDATION PLAN 2 9/12/2019 Construction Set S201S SOUTH FOUNDATION PLAN 2 9/12/2019 Construction Set S202N NORTH LEVEL 2 FLOOR FRAMING PLAN 2 9/12/2019 Construction Set S202S SOUTH LEVEL 2 FLOOR FRAMING PLAN 2 9/12/2019 Construction Set S203N NORTH ROOF FRAMING PLAN 2 9/12/2019 Construction Set 5203S. SOUTH ROOF FRAMING PLAN 2 9/12/2019. Construction Set S301 CONCRETE DETAILS 2 9/12/2019 Construction Set S302 CONCRETE DETAILS 2 9/12/2019 Construction Set S401 TYPICAL STEEL DETAILS 2 9/12/2019 Construction Set S402 TYPICAL STEEL DETAILS 2 9/12/2019 Construction Set S403 STEEL DETAILS 2 9/12/2019 Construction Set S404 STEEL DETAILS 1 9/12/2019 Construction Set S501 LIGHT GAUGE FRAMING DETAILS 2 9/12/2019 Construction Set A001 ARCHITECTURAL FULL SITE PLAN 2 9/12/2019 Construction Set A002 ENLARGED ARCHITECTURAL SITE PLAN 2 9/12/2019 Construction Set A003 SITE UTILITIES 2 9/12/2019 Construction Set A101AN SLAB PLAN LEVEL 1 NORTH 1 9/12/2019 Construction Set A101.1S SLAB PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set A301N FLOOR PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set A101S FLOOR PLAN LEVEL 1 SOUTH 2 9/12/2019 Construction Set A102AS SLAB PLAN LEVEL 2 SOUTH 2 9/12/2019 Construction Set A102N FLOOR PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set A102S FLOOR PLAN LEVEL 2 SOUTH - BASE 2 9/12/2019 Construction Set A102S.A FLOOR PLAN LEVEL 2 SOUTH - ALT 2 9/12/2019 Construction Set 93 A103N ROOF PLAN NORTH 2 9/12/2019 Construction Set 1103S ROOF PLAN SOUTH 2 9/12/2019 Construction Set A203N RCP LEVEL 1 NORTH 2 9/12/2019 Construction Set A201S RCP LEVEL 1 SOUTH 2 9/12/2019 Construction Set A202N RCP LEVEL 2 NORTH 2 9/12/2019 Construction Set A202S RCP LEVEL 2 SOUTH - BASE 2 9/12/2019 Construction Set A202S.A RCP LEVEL 2 SOUTH - ALT 2 9/12/2019 Construction Set A301 EXTERIOR ELEVATIONS 2 9/12/2019 Construction Set A302 EXTERIOR ELEVATIONS 2 9/12/2019 Construction. Set A303 EXT DECK ELEVATIONS 2 9/12/2019 Construction Set A321 ENLARGED WALL SECTIONS - APP BAY 2 9/12/2019 Construction Set A322 ENLARGED WALL SECTIONS - BRICK 0 9/12/2019 Construction Set 3:23 ENLARGED WALL SECTIONS - DECK 2 9/12/2019 Construction Set A324 ENLARGED WALL SECTIONS 1 9/12/2019 Construction Set A325 ENLARGED WALL SECTIONS - ENTRY 1 9/12/2019 Construction Set A401 EXTERIOR VERTICAL ASSEMBLIES 2 9/12/2019 Construction Set A402 EXTERIOR HORIZONTAL ASSEMBLIES 2 9/12/2019 Construction Set A411 WINDOW SCHEDULE 2 9/12/2019 Construction Set A421 EXTERIOR PLAN DETAILS - BRICK 2 9/12/2019 Construction Set A422 EXTERIOR PLAN DETAILS - WEST 2 9/12/2019 Construction Set A423 EXTERIOR PLAN DETAILS 1 9/12/2019 Construction Set A424 EXTERIOR PLAN DETAILS 1 9/12/2019 Construction Set A450 EXTERIOR CLADDING LAYOUT 1 9/12/2019 Construction Set A451 EXTERIOR SECTION DETAILS - BRICK 1 9/12/2019 Construction Set A452 EXTERIOR SECTION DETAILS - ENTRY 2 9/12/2019 Construction Set A453 EXTERIOR SECTION DETAILS - DECK 2 9/12/2019 Construction Set A454 EXTERIOR SECTION DETAILS - NORTH WALL 2 9/12/2019 Construction Set A455 EXTERIOR SECTION DETAILS - NORTH BAR 1 9/12/2019 Construction Set A456 EXTERIOR SECTION DETAILS - APP BAY EAST 1 9/12/2019 Construction Set A457 EXTERIOR SECTION DETAILS - APP BAY WEST 1 9/12/2019 Construction Set A458 EXTERIOR SECTION DETAILS- MISC 1 9/12/2019 Construction Set A459 EXTERIOR SECTION DETAILS 1 9/12/2019 Construction Set A460 OPENING DETAILS 1 9/12/2019 Construction Set 4:61 WATERPROOFING DETAILS 1 9/12/2019 Construction Set A462 ROOF DETAILS 1 9/12/2019 Construction Set A463 DECK DETAILS 1 9/12/2019 Construction Set A501 STAIR 1 2 9/12/2019 Construction Set A502 STAIR 2 2 9/12/2019 Construction Set A503 STAIR DETAILS _ 2 9/12/2019 Construction Set A504 ELEVATOR PLANS & SECTIONS 2 9/12/2019 Construction Set A611 INTERIOR ELEVATIONS RESTROOMS 2 9/12/2019 Construction Set A612 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A613 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A614 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A615 INTERIOR ELEVATIONS APP BAY 2 9/12/2019 Construction Set A616 INTERIOR ELEVATIONS APP BAY 2 9/12/2019 Construction Set A617 INTERIOR ELEVATIONS 1 9/12/2019 Construction Set A618 INTERIOR ELEVATIONS 1 9/12/2019 Construction Set A621 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A622 INTERIOR ELEVATIONS 2 9/12/2019 Construction Set A625.A INTERIOR ELEVATIONS ALTERNATES 2 9/12/2019 Construction Set A626.A INTERIOR ELEVATIONS ALTERNATES 2 9/12/2019 Construction Set A627.A INTERIOR ELEVATIONS ALTERNATES 1 9/12/2019 Construction Set A701 INTERIOR ASSEMBLIES 2 9/12/2019 Construction Set A702 INTERIOR DETAILS 2 9/12/2019 Construction Set A703 INTERIOR DETAILS 2 9/12/2019 Construction Set A704 INTERIOR DETAILS 1 9/12/2019 Construction Set A710 INTERIOR ASSEMBLIES - RATING INFO 0 9/12/2019 Construction Set A721 MILLWORK DETAILS 1 9/12/2019 Construction Set A722 MILLWORK DETAILS 1 9/12/2019 Construction Set A901 FINISH SCHEDULE 2 9/12/2019 Construction Set A911 DOOR SCHEDULE 3 9/24/2019 ASI-003 A921 SIGNAGE 2 9/12/2019 Construction Set A922 SIGNAGE 1 9/12/2019 Construction Set E100 LEGEND, LIGHT FIXTURE SCHEDULE, ONE LINE DIAGRAM 2 9/12/2019 Construction Set E101 FULL SITE PLAN - ELECTRICAL 2 9/27/2019 ASI-004 E102 FULL SITE PLAN - ELECTRICAL - LIGHT CALC 1 9/12/2019 Construction Set E201N FLOOR PLAN LEVEL 1 NORTH - LIGHTING 2 9/12/2019 Construction Set E201S FLOOR PLAN LEVEL 1 SOUTH - LIGHTING 2 9/12/2019 Construction Set E202N FLOOR PLAN LEVEL 2 NORTH - LIGHTING 2 9/12/2019 Construction Set E202S FLOOR PLAN LEVEL 2 SOUTH - BASE - LIGHTING 2 9/12/2019 Construction Set E202S.A FLOOR PLAN LEVEL 2 SOUTH - ALT - LIGHTING 2 9/12/2019 Construction Set E301N FLOOR PLAN LEVEL 1 NORTH - POWER 2 9/12/2019 Construction Set E301S FLOOR PLAN LEVEL 1 SOUTH - POWER 2 9/12/2019 Construction Set gm E302N FLOOR PLAN LEVEL 2 NORTH - POWER 2 9/12/2019 Construction Set E302S FLOOR PLAN LEVEL 2 SOUTH - BASE - POWER 2 9/12/2019 Construction Set E302S.A FLOOR PLAN LEVEL 2 SOUTH -ALT- POWER 2 9/12/2019 Construction Set E303N ROOF PLAN NORTH - POWER 2 9/12/2019 Construction Set E303S ROOF PLAN SOUTH - POWER 2 9/12/2019 Construction Set E401N FLOOR PLAN LEVEL 1 NORTH - COMM 2 9/12/2019 Construction Set E401S FLOOR PLAN LEVEL 1 SOUTH - COMM 2 9/12/2019 Construction Set E402S FLOOR PLAN LEVEL 2 SOUTH - BASE - COMM 2 9/12/2019 Construction Set E402S.A FLOOR PLAN LEVEL 2 SOUTH - ALT - COMM .2 9/12/2019 Construction Set E403N ROOF PLAN NORTH - COMM 2 9/12/2019 Construction Set E501N FLOOR PLAN LEVEL 1 NORTH - FIRE ALARM, SECURITY, CLOCK 2 9/12/2019 Construction Set E501S FLOOR PLAN LEVEL 1 SOUTH - FIRE ALARM, SECURITY, CLOCK 2 9/12/2019 Construction Set E502N FLOOR PLAN LEVEL 2 NORTH - FIRE ALARM, SECURITY, CLOCK 2 9/12/2019 Construction Set E502S FLOOR PLAN LEVEL 2 SOUTH - BASE - FIRE ALARM, SECURITY, CLOCK 2 9/12/2019 Construction Set E502S.A FLOOR PLAN LEVEL 2 SOUTH - ALT - FIRE ALARM, SECURITY, CLOCK 2 9/12/2019 Construction Set E601N FLOOR PLAN LEVEL 1 NORTH - ALERTING SYSTEM 2 9/12/2019 Construction Set E601S FLOOR PLAN LEVEL 1 SOUTH - ALERTING SYSTEM 1 9/12/2019 Construction Set E602S FLOOR PLAN LEVEL 2 SOUTH - BASE - ALERTING SYSTEM 2 9/12/2019 Construction Set E602S.A FLOOR PLAN LEVEL 2 SOUTH -ALT-ALERTING SYSTEM 2 9/12/2019 Construction Set E701 DETAILS 2 9/12/2019 Construction Set E702 MECH SCHEDULE, LIGHTING RELAY SCHEDULE 1 9/12/2019 Construction Set E801 PANEL SCHEDULES 1 9/12/2019 Construction Set L001 SITE OVERVIEW PLAN 2 9/12/2019 Construction Set L010 TREE PROTECTION PLAN 2 9/12/2019 Construction Set L101 SITE MATERIALS AND LAYOUT PLAN 2 9/12/2019 Construction Set Lili SITE MATERIALS AND LAYOUT ENLARGEMENT PLAN 2 9/12/2019 Construction Set L211 SITE DETAILS 1 9/12/2019 Construction Set L212 SITE DETAILS 2 9/12/2019 Construction Set L213 SITE DETAILS 2 9/12/2019 Construction Set L301 IRRIGATION PLAN 1 9/12/2019 Construction Set L311 IRRIGATION DETAILS 1 9/12/2019 Construction Set L401 PLANTING PLAN 2 9/12/2019 Construction Set L411 PLANTING DETAILS 1 9/12/2019 Construction Set L412 SOIL CELL DETAILS 2 9/12/2019 Construction Set M001 ABBREVS., LEGEND, NOTES & INDEX 2 9/12/2019 Construction Set M002 MECHANICAL SCHEDULES 2 9/12/2019 Construction Set M003 MECHANICAL SCHEDULES 2 9/12/2019 Construction Set M004 MECHANICAL SCHEDULES 2 9/12/2019 Construction Set M101 _ _ MECHANICAL SITE PLAN 3 9/12/2019 Construction Set M201N MECHANICAL FOUNDATION PLAN NORTH 2 9/12/2019 Construction Set M201S MECHANICAL FOUNDATION PLAN SOUTH 2 9/12/2019 Construction Set M300 FIRE PROTECTION ABBREVS., LEGEND, NOTES, & INDEX 2 9/12/2019 Construction Set M301N FIRE PROTECTION DIAGRAM LEVEL 1 NORTH 2 9/12/2019 Construction Set M3O15 FIRE PROTECTION DIAGRAM LEVEL i SOUTH 1 9/12/2019 Construction Set M302N FIRE PROTECTION DIAGRAM LEVEL 2 NORTH 2 9/12/2019 Construction Set M302S FIRE PROTECTION LEVEL 2 SOUTH 1 9/12/2019 Construction Set M3025.A FIRE PROTECTION LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set M401N PLUMBING PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M401S PLUMBING PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M402N PLUMBING PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set M402S PLUMBING PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M402S.A PLUMBING PLAN LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set MSO1N HVAC PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M501S HVAC PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M502N HVAC PLAN LEVEL 2 NORTH 2 9/12/2019 Construction Set M5025 _ HVAC PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M502S.A HVAC PLAN LEVEL 2 SOUTH ALTERNATE 1 9/12/2019 Construction Set M503N PIPING PLAN LEVEL 1 NORTH 2 9/12/2019 Construction Set M503S PIPING PLAN LEVEL 1 SOUTH 1 9/12/2019 Construction Set M504N PIPING PLAN LEVEL NORTH 2 9/12/2019 Construction Set M504S PIPING PLAN LEVEL 2 SOUTH 1 9/12/2019 Construction Set M504S.A PIPING PLAN LEVEL 2 SOUTH ALTERNATE 2 9/12/2019 Construction Set M601N MECHANICAL ROOF PLAN NORTH 2 9/12/2019 Construction Set M601S MECHANICAL ROOF PLAN SOUTH 1 9/12/2019 Construction Set M701 MECHANICAL LARGE SCALE PLANS 1 9/12/2019 Construction Set M702 MECHANICAL DIAGRAMS 1 9/12/2019 Construction Set M703 MECHANICAL DIAGRAMS 1 9/12/2019 Construction Set M801 MECHANICAL SECTIONS 1 1 9/12/2019 Construction Set M901 MECHANICAL DETAILS 2 9/12/2019 Construction Set M902 MECHANICAL DETAILS 2 9/12/2019 Construction Set M903 MECHANICAL DETAILS 2 9/12/2019 Construction Set M904 MECHANICAL DETAILS 2 9/12/2019 Construction Set M905 MECHANICAL DETAILS 2 9/12/2019 Construction Set 95 0 ATTACHMENT C 97 Tukwila Fire Station 52 Data Date: Oct-21-19 Activity ID Activity Name Original Duration Remaining Duration Start Finish June 2019 July 2019 A I S O N D J F M April 2020 May 2020 June 2020 July 2020 A S O N D J F M 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 010111212101111121010 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 �� 19 16 .lari1p- Oct-21-19* Nov-11-19 Jan-19-21, Tukwila Fir Jan-19-21, Milestones Contract Final Comple Jarr19-21, Constncti tial Completion 4 Fral Completion ------------------------ ------------------------ A2390 City Council Approval of TCC --------- -- - City Council Approval of Phase NTP Permit Receive 1 P se II P City Council Phase it Received ----------- Appro St 1,NTP '------- al of TCC ural Steel Onske ------------------ A1410 Structural Steel Onsfte 0 0 Dec-13-19* A1390 Contract Frei Completion Date 0 0 Jarr19-21 A2430 Phase II NTP 0 0 Nov-12-19* A2400 City Council Approval of Phase 1 0 0 Jul-16-19 A A2410 Phase 1 NTP 1 0 Jul-16-19A Jul-16-19A At090 Phase II Permit Received 0 0 Sep-16-19A ZPhE1 1 A1380 Phase 1 Permit Received 1 0 Jul-16-19A JuF18 19A Construction Milestones A1000 SOG Completion ----- ----------------- b lize on site V Sep-12- Review Set 90 % CD E 1 unit et Sub m Avail ble ---- st ural StE f2e -- ---- St et 0° CD e -- el rawi airrr ----------------- rt f Wet Weather A Designfvllestone e ----------------- Released for Det VIACC Items Rele Oct-16-19A, Bid 2 - Site Concrete ---------------- 1 - Masonry -05 -Glazing B -06 - Framing & C ----------- BP-07 - Misc 3 - Flooring B -09 - Fencing & -10 - Landscaping B -11 -Electrical CM Nov-08- BP-06 - 0 CCM - 07841 BP-02 - 3213 BP-07 - 0 --------- BP-05 - B -04 - 0422 ------ BP-10 - 32 BP-09 - 32 BP-08 - 0 oil --- son ---- 1 ing ed f cka B ---- e E S 00 - Se 05 --- 92 - 00 11 - 54 OG Completion trurd ural Steel --- ---- ` --- ------ r S bmittal e Contracti ---------- clos es mi ion by - G B BP erg ncrete - Mi c BP - ----- 0 - lazing.13P.Critical so BP Critical La scapi Fe it g BP - FI oring onske ---------------- - ---------------------- ructue Topping Of -------------- ------------------------ mmmV Mar-03-2),:Procun -------------------------- B Dii ical Submittals &Long Lead Critical Submittals ------------------------- 'ti I Submittals ---------------------- Submittals Submittals ----------------- P Critical Submittals d ical Submittals P ritical Submittals -------- -• ------ ------ ----- ; --- -- --- me --- - End of Wet Weather ---- Roof Dry In - -•-------•--- -*------•--, - -- --- - ----- Vrabj catipn - ----- { t ----- „ eason Permanent Power ---- - ; -------------- ; I i I Equipment Start Start of Cornmiss ------------------ ----- Ot Substa, p orrng - ------- ----- --- --- 0 0 DeG13-19 A1070 Substantial Completion 0 0 Deo-17-20* A1080 Final Completion 0 0 Jarr19-21* A2290 End of Wet Weather Season 0 0 May-01-20* A3040 Structural Steel onsRe 0 0 Deo-12-19* A1040 Permanent Power 0 0 Jul-20-20 A1050 Equipment Start Up 0 0 Oct-22-20 ---- uildi --- -- ; ; ---------------- Dry In ' ________' F---------* ------------------------ ------------ ---------- ; t A1060 Start of Commissioning 0 0 Oct-22-20 A1030 Roof Dry In 0 0 May-1 1 -20 A1020 Building Dry In 0 0 Jun-22-20 A1010 Stricture Topping Off 0 0 Jarr20-20 Jarr20-20 A2120 Mobilize on site 5 0 Jul-16-19 A Jul-22-19 A A2130 Start of Wet Weather Season Design Milestones A1180 60% CD - Review Set 0 0 Oct-01-19A 0 0 Jul-16-19 A F9p-12-19A L601 C1 A1270 90% CD Set 0 0 Aug-23-19 A Phas --------- 1 B ---- Do P nt A1280 100%CD Set 0 0 Sep-12-19A A12420 Penult Set Submitted 0 0 Au05-19A A3050 Phase 1 Bid Documents Available 0 0 Jun-04-19A Jun-12-19A , A1290 Structural Steel Drawings Released for Detailing 01 0 1 Aug-1 6-19 A A1370 Bid Package A9560 Remaining Mini MACC Items Released for Submittals Contracting BP-01 - Earthwork & Utilities 0 0 Sep-06-19 A Jur10�- 60 0 Jun10-19A Oct-16-19A 171 0 Jun-10-19 A Jun-24-19 A P-0 --- BP -Ear - - 3 - rk -- S Utili --- ies -------- -- B --- B -0 B A9570 BP-02 - Site Concrete 19 0 Sep-06-19 A Oct-04-19 A A9580 BP-03 - Strictures 14 0 Jun-10-19 A Jun-28-19 A A9590 BP-04 - Masonry 19 0 Sep-06-19 A Oct-02-19 A A9600 BP-05 - Glazing 19 0 Sep-06-19 A Oct-09-19 A A9610 BP-06 - Framing & GWB 15 0 Sep-06-19 A Oct-10-19 A A9620 BP-07 - Msc 19 0 Sep-06-19 A Oct-1 6-19 A A9630 BP-08 - Flooring 19 0 Sep-06-19 A Oct-03-19 A A9640 BP-09 - Fencing & Gate Endosures 19 0 Sep-06-19 A Oct-10-19 A B A9650 BP-10 - Landscaping 19 0 Sep-06-19 A Oct-09-19 A A9660 I BP-11 -Electrical 19 0 Sep-06-19A I Oct-10-19A A9670 Submission A9460 MCCM 1 0 Oct-09-19 A ur25-19A Oct-21-19 Oct-09-19 A Nov-08-19 NDv-05-19 BF 1 - 31 0 -Earth vork BP - Uti ities BP-06 - 054000 - GWB BP Critical Submittals 15 12 A9514 MCCM - 078413 - MCCM Underground &Long Lead 5 2 Oct-21-19 Oct-22-19 A9428 BP-02 - 321313 - Site Concrete BP Critical Submittals 10 5 Oct-21-19 Oct-25-19 A9472 BP-07 - 061053 - Msc BP Critical Submittals 15 12 Oct-21-19 Nov-05-19 , A9456 BP-05 - 079200 - Glazing BP Critical Submittals 20 15 Oct-21-19 NDv-08-19 A9451 BP-04 - 042200 - Masonry BP Critical Submittals 10 5 Oct-21-19 Oct-25-19 A9511 BP-10 - 328400 - Landscaping BP Critical Submittals 15 10 Oct-21-19 NDv-01-19 A9508 BP-09 - 323111 - Fencing BP Critical Submittals 15 10 Oct-21-19 Nov-01-19 A9502 BP-08 - 033543 - Flooring BP Critical Submittals 15 12 Oct-21-19 Nov-05-19 A9420 BP-01 - 311000 - Earthwork BP - Utilities & Soils 5 0 1 Jun-25-19 A Jun-27-19 A Actual Work Critical Remaining Work Vmmmmm/ Summary Remaining Work ♦ ♦ Milestone Page 1 of 7 Lydig Construction - Tukwila Fire Station #52 0 O O Tukwila Fire Station 52 Data Date: Oct-21-19 Activity Name Origirol Duration Remaining Duration Start Finish June 2019 July 2019 A S O N D J F M Apr l 2020 May 2020 June 2020 July 2020 A S O N D J F M D10111213101 1 2 2 0 1 1 2 0101112 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 A9430 BP-03 - 031000 - Structural BP - Vault Precast & Shoring 5 5 25 99 0 0 0 20 Jul-16-19 A Aug-01-19 A ------------ ------------- B ------------- '7J -------------- P. 03 - 131000 -StrLctural 3 - a 4 3 - A B Sti Lid rill t Precast & - Electrical I Steel Su -- Nov- BP-06 CM - 07841 -11 - 0784 BP-07 BP-0 P-04 - 04 BP-10 - BP-09 - ----- 8 P-02 - 32 BP-08 i jr I Steel St -------- I Submittal hor erg i nfttePrep 19, 54 1 - W - El 61 07 00 84 311 13 33 rnitt c -06 841 841 -07 P4 04 -10 -09 32 1-08- bm mi ouni -ydk 00 - CM ctri 53 - 200 WE 0 - _ F Site 43 - I LC 3-1 - 05 -NCCM - E - 06 5 - 200 32E 32 313 03 al als & Long -- I Revie} GWB BP Dritical $ I BP (}ritii Nisc BF C - GlazirX I rry Bp Critical andscapi ncing �SP Corcrette ----- Roomg B Revie%k , A/E IRe 4000 - JW CAtic Iectrical BF 053 - P 79200 'r G `- - Masonry 400 - Lb rK 111 _ Fe-- -Site qto 3543 - Flo provalA12550 ad ------------------------i 8--- ' ical Submittals mittals al Submittals rRical Submittals IP Critical Submittals Submittals BP Critical Submittals ritical Submittals ------------------------- ' --- P Critical Submittals °--- Critical Submittals ew B BP Critical Submittals il Submittals Critical Submittals BP Critical Submittals azirg BP Critical Submittals ------------------------i F--- BP Critical Submittals scapirg BP Critical SubmiftIs:: ng BP Critical Submittals ----------------------------- rete BP Critical Submittals ring BP Critical Submittals Mar-03-20:P§c -06 -054000 - GWB BP C*tic9l St i B cal Submittals ructural Steel Framing Critical Submittals BP-07 - 061 t753;'.Mi ` BP-07 - 061053� Mi „ BP-07 - 061053 - Misc NP Roo --------------, Bq-05 - 079200 - so ry B Crdical submittals P-07 - 0 1053 - IlAisd OF r ` i 10 - 328 00 - Landscaping; BP; Cri ----------------------- BP-09 323111 ; Fegx n Bp ' ---------- -------- - Concre a BP Critical Submittal$ ---------------`-------- P-08. 033543 _tloprirjg sm RFI 04 i j --- - --- --- --- me bmi c B c B rig Ia2 CF cal ical BP - ------ - -- ---- - - --- -- ---- --- ---- ---- - ------%- tals CaseveoA Sib ittal t --- ©oots, I'Mrie Fra „ W BP, Critical SL brnitt:Is , Metal It -------` --' upmittals :' - ubmWIs;I f ` icaj 9uI7 it�al - --- -- --- --- e S --- - - - ------------------------------------------ ----- ----------- --------- - ---- ----------- --------- - ---- ------------------- ------------f --------- mittals ------------ ---------- - ----- ------------------- ; - - - - - - - - - - - - - - - - - - - - - ------------ ----------- ----------- ----------- ------------------------ ---------------------- ------------------------ A9536 BP-11 - 078413 - Electrical Underground & Long Lead Sep-06-19 A Sep-19-19 A --- B -11 - A9565 Structural Steel Submittal Prep Aug-16-19 A Oct-15-19 A Lyd' evi A12480 BP-06 - 054000 - GWB BP Critical Submittals Jurr27-19A Nov-15-1 --- - -01 - ---- 100 BP ------------- - Earthworkf.a D3 - 031000 - -- -- t ct 5 5 Nov-06-19 Nov-12-19 A12530 MCCM - 078413 - MCCM Critical Submittals 5 1 Oct-23-19 Oct-23-19 A12540 BP-11 - 078413 - Electrical BP Critical Submittals 5 5 Oct-21-19 Oct-25-19 A12490 BP-07 - 061053 - Nisc BP Critical Submittals 5 5 Nov-06-19 Nov-12-19 A12470 BP-05 - 079200 - Glazing BP Critical Submittals 5 5 Nov-11-19 Nov-15-19 A12460 BP-04 - 042200 - Masonry BP Critical Submittals 5 5 Oct-28-19 Nov-01-19 A12520 BP-10 - 328400 - Landscaping BP Critical Submittals 5 5 Nov-04-19 Nov-08-19 A12510 BP-09 - 323111 - Fencing BP Critical Submittals 5 5 Nov-04-19 Nov-08-19 A12440 BP-02 - 321313 - Site Concrete BP Crttical Submittals 5 5 Oct-28-19 Nov-01-19 A12500 BP-08 - 033543 - Flooring BP Critical Submittals 5 5 Nov-06-19 Nov-12-19 A9575 Structural Steel Submittal LCI Review 5 0 Oct-15-19 A Oct-16-19 A A12430 BP-01 - 311000 - Earthwork BP Critical Submittals 2 0 Jurr27-19 A Jul-02-19 A A12450 BP-03 - 031000 - Structural BP Crttical Submittals 2 0 Ju131-19A Aug-01-19 A AIE Review, A12600 BP-06 - 054000 - GWB BP Critical Submittals Nov-13-19 Nov-28-19 -- -- B -0 ---- - 311 ------------- 00 - Earthvo -------- BP-03 - 0 -- -- - B C iti 1 0- MC BP M - C 11 - 10 10 A12650 MCCM - 078413 - MCCM Critical Submittals 10 10 Oct-24-19 NDv-06-19 A12660 BP-11 - 078413 -Electrical BP Critical Submittals 10 10 Oct-28-19 Nov-08-19 Simit t t tt t A12610 BP-07 - 061053 - Nisc BP Critical Submittals 10 10 Nov-13-19 Nov-28-19 A12590 BP-05 - 079200 -Glazing BP Critical Submittals 10 10 Nov-1 Dec-03-19 -0 E -0 11 t el A12580 BP-04 - 042200 - Masonry BP Critical Submittals 10 10 Nov-04-19 Nov-15-19 A12640 BP-10 - 328400 - Landscaping BP Critical Submittals 10 10 Nov-11-19 Nov-26-19 A12630 BP-09 - 323111 - Fencing BP Critical Submittals 10 10 Nov-11-19 Nov-26-19 rat Is A12560 BP-02 - 321313 - Site Concrete BP Crttical Submittals 10 10 Nov-04-19 Nov-15-19 A12620 BP-08 - 033543 - Flooring BP Critical Submittals 10 10 Nov-13-19 Nov-28-19 A9585 Structural Steel Submittal Approval 101 0 Oct-16-19A Oct-22-19A BP-01 - 311000 - Earthwork BP Critical Submittals 10 0 Ju -27-19 A Jul-11-19 A A12570 BP-03 - 031000 -Structural BP Critical Submittals 10 0 Ju130-19A Aug-22-19 A A12720 - --- BP - -- 1 - 3 ------------- 1000 - Earl -- ---- rk P ' M 78 P 413 13 - 3 - - Electrical B MCCMtni 51200 �P BP-06 - 054000 - GWB BP Critical Submittals 30 30 Nov-29-19 Jarr16-20 A12770 MCCM - 078413 - MCCM Critical Submittals 3 3 Nov-07-19 Nov-11-19 A9433 BP - 051200 -Structural Steel Framing 30 30 Oct-22-19 A Dec-03-19 - ---- i I S B I Sl Oct21-19, Ele De DV I ° Ilco to 4II BP 1 - Oj mittals -03 - 0310 iDring Pot tator Pit/ Sp ntion Vault cation & BI t week lead design A12780 BP-11 - 078413 - Electrical BP Critical Submittals 7 7 Oct-28-19 Nov-05-19 A12730 BP-07 - 061053 - Nisc BP Casework Submittals 60 60 Nov-29-19 Feb-27-20 A12800 BP-07 - 061053 - Misc BP Doors, Frames, Frame Submittal: 60 60 Nov-29-19 Feb-27-20 A12820 BP-07 - 061053 - Nisc BP Roofing 40 40 Nov-29-19 Jarr30-20 A12710 BP-05 - 079200 - Glazirg BP Critical Submittals 60 60 Dec-04-19 Nbr-03-20 P_ 4 _042200i A12700 BP-04 - 042200 - Masonry BP Critical Submittals 10 10 Nov-18-19 Dec-03-19 A12810 BP-07 - 061053 - Nisc BP CFB, Metal Panels 50 50 Nov-29-19 Feb-13-20 A12760 BP-10 - 328400 - Landscaping BP Critical Submittals 30 30 Nov-27-19 Jan-14-20 FB A12750 BP-09 - 323111 - Fencing BP Critical Submittals 40 40 Nov-27-19 Jan-28-20 P- - S ial I ad I visi k to me 2 - 321313', Wual me I ooting s- CIP n S Ste ------+-- Preclas mpacli Revi4ior RFI 03Y Its MH's A12680 BP-02 - 321313 - Site Concrete BP Critical Submittals 10 10 Nov-21-19 A Dec-03-19 A12740 BP-08 - 033543 - Flooring BP Critical Submittals 50 50 Nov-29-19 Feb-13-20 A12670 BP-01 - 311000 -Earthwork BP Critical Submittals 51 0 Jul-09-19 A At-15-19 A A12690 BP-03 - 031000 - Structural Precast 35 0 Aug-14-19 A Oct-25-19 A A12790 BP-03 - 031000 - Structural Shoring 5 0 Aug-06-19 A Aug-16-19 A BP 3-0 1 0 -St Ap rova fo dayt i SMH Ez esi n of 9 sm ent P1130 Elevator Pit/ Spread Footing Revisions- RFI 048 5 1 Oct-08-19 A Oct-21-19 P1110 Detention Vault Revisions RJR 032 5 0 Oct-09-19 A Oct-21-19 P1000 Approval for redesign of DV location & Block to CIP walls 14 0 Aug-06-19 A Aug-1 A P1010 Delay to issue of 90% CD set 5 0 Aug-16-19 A Aug-23-19 A P1020 SMH Easment 5 0 AM7-19A Aug-29-19A P1030 Pelloo 5 week lead time on SSMHs 25 0 Sep-03-19 A Oct-14-19 A S tc P1040 Shoterete wall design 5 0 Ju -11-19 A Sep30-19 A Actual Work Critical Remaining Work T1111/ Summary Remaining Work ♦ ♦ Milestone Page 2 of 7 Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Data Date: Oct-21-19 Activity Name Original Duration Remaining Duration Start Finish June 2019 July 2019 A S O N D J F M April 2020 May 2020 Jere 2020 July 2020 A I S O N D J F M 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 11 2 3 0 1 2121011 P1050 Wal # 8 RFI #25 Footing re -design & rebar delivery delay Weather Delay due to saturated native soils 15 0 0 0 0 Aug-29-19A Sep-19 A Sep-19 A Oct-04-19 A Oct-21-19 A --------- --- - - - - -- -- - - - - -- --- - - - - -- --------- S irvey PI DjEc Limi s Clear Gr it, Site & --- Dr d e Upper B Id 6 - - -- -- -- - - - -- amp Me Fend err Dish S m Iish a - -- - - - I Ro Fi ------------------------ - - - - - ------------------------------ Wa W t IFI r De rk o Fo to #25 Footi ay due to s Detention U ting at Shori Its # 7 & 8: te- RFI #( Shotcrete aterpmof t_a_II Water RougfC S Concrete port Strud Fine ring Wall #1 Concrete for Concrete: iilding Pad t to Walls #9' ate, InstallIt.& Inspect & -d t t S W RFI' 9 d ' in a Wad, -- ails I Fi de I ---- les 4 Its # Jails ubc 0 fil sign na G II #1 02 Building -Sit -- 7 for ase --- -8 #74 rad Sto & reI d ive soilg 1 #;50 , 034, P3 II # 1 **(S II # 1 & ffa arounp t -- --� BLDG & S Course: an ------ -- ackfill jSa Sewbr Ivery del , 038.1 contract to Sta.5 - BLDG for ------- e Paving urd the E -------- 'cry Se y +50 Rock Bqise - -------�-- uilding -------------- r urse ---- , ---------------- ;Arg-13-20,Cjvil, --------- - - - - - - -- ------ - - - - ----- - - - - -- ;Ar?g-13-20, Iv1ay;-July eaves --eves------' ------ Sta. 51+50 - 52+50 --- - - - - -- itz P.L. Driveway; Roadway to Sta.; 53+50 Piping aterkbinout;toSta.53+80 (stops & Strip6rr� '- ;Signage St. tot Brildirig All New Fen c4 ' Site�*rk --------------------- ------------ - - - - -- ------------ - - - - -- jQ0 Work ------------- ------- - - - - -- - - -- ------------ ---- I ---- g. ------ - - - - - -- - - - - -- - - - - - -- ------- - -- - -- --- - - - - - - - - - - - - - - - - - - - - - - - - ------------------------ ----------------------- P1060 P1070 P1090 P1100 P1120 5 5 2 Sep-23-19 A Sep-13-19 A Oct-01-19 A Rework of Detention Vault SOG Footing at Shoring Wall #1- 1 # 50 Site walls # 7 & 8 - RFI's 025, 034, 038, 038.1 5 0 0 Aug-29-19 A Aug-29-19 A Oct-15-19 A Shoring/ Shotcrete- 1 #019 5 Sep-26-19 A Sho ' rig ) U, r hot I FR I Sho 1 e fo de -odrgWaII#1 x. Bt E r d Build I r 3t all Sit ( ring I Fi aat & I.Ag C1310 C1490 C1150 C1170 C1160 C1450 C1250 C1000 C1010 C1030 C1050 C1070 C1080 C1090 C1110 C1120 C1130 C1140 C1330 C1420 C910 C920 C930 C1480 C1190 D1120 D1150 D1140 D1130 C1430 C1040 C1060 C1100 D1100 D1110 May-Ju C1180 C1200 C1210 C1220 C1230 C1240 C1370 C1380 C1390 C1400 C1440 C1470 C1460 C1270 Shotcrete Shoring wall # 1 **(Subcontract) 2 2 Nov-01-19 NOV-04-19 Waterproof Shoring Wall # 1 2 2 Oct-28-19 Oct-29-19 Install Water Main at Building & East to StaS 1+50 5 5 Oct-21-19 Oct-25-19 Rough Grade Site around the BLDG for Rock Base Course 2 2 Nov-12-19 Nov-13_19 FRPS Concrete Walls #73 15 1 Oct-03-19 A Oct-21-19 Import Structural FiII for BLDG &Site Paving 5 5 Oct-21-19 Oct-28-19 Fine Grade Base Course around the Building 2 2 Nov-12-19 NDv-13-19 Survey Project Limits and Building 3 0 Jui-22-19A Jul-23-19A Clear/Gob Site & Install TESC 10 0 Jui-22-19A Aug-02-19A Grade Upper Site (Ifo Shoring Wall #1 Piles 3 0 Aug-09-19A Aug-15-19A Build Shoring Wall #1 5 0 Aug-20-19 A Sep-04-19 A Excavate for Concrete Walls #73 2 0 Sep-05-19 A Sep30-19 A Fine Grade for Concrete Walls #73 1 0 Sep30-19 A Sep30-19 A Excavate & Lag Shoring Wall #1 3 0 Aug-26-19 A Sep-04-19 A Mass Ex. Building Pad to Subgrade 15 0 Aug-14-19 A Sep30-19 A Excavate for Concrete Walls #9 &10 2 0 Sep-09-19 A Sep-10-19 A ate Excavate, Install, Inspect & Backfill Sanitary Sewer 6 0 Sep-23-19 A Oct-1 8-19 A e, Ntal Excavate, Install, Inspect & Backfill Storm Sewer 10 0 Sep-09-19 A Sep-20-19 A cav Permanent Power Vault Set on Property and fed by PSE 38 0 AL09-19 A Oct-17-19 A F I Site i iov,Si FR Pe anent POwe ull Set on Prope and fed y PSE FRPS Concrete Site Walls # 9 & 10 5 0 Sep-23-19 A Oct-02-19 A P i ar I Corx icapi b Lig I otirx rate Site W igs Iing # 9 & 10 Nov-1 Backfill S D.V. Wa( t Mechan Set Hollow las' Stabili Detention DG SOG ---- - - - - -- - I # 19, 1 d J Gi I E re I Lai t ---- ---- & 1 )etei ide uip i lank dsaIAre9 --- --- ition Vaitt SiteAbbv i D.V. 3 --- - - ---- Move --- - - - --- ------ D.V. -- - - - - -- D.V. -- - - - - -- -------- --------'- - - - -- ---------- - - - - - ' ;; „ -- "' - - Temp Site Fencing 1 0 Jul-22-19A JuF30-19A Demolish Select Site Hardscapings 5 0 Jui31-19A Aug-13-19A Demolish and Remove Site Lighting 2 0 Aug-08-19A Aug-12-19A FRPS Footing # 9 & 10 5 0 Sep-06-19 A Sep-27-19 A 29-197 Nov-04-19 Nov-08-19 - -- -- va e & Slo iglI Gra FF a or S . SO rgrou D. V. - - - - -- - ----- Ball and Grade Site Above D.V. 5 5 FRPS D.V. Walls 10 3 Oct-21-19 Oct-23-19 Set Mecterical Equip in D.V. 1 1 Oct30-19 Oct30-19 Set Hollow Core Plants 2 2 Oct30-19 Oct31-19 Install Risers 3 3 Nov-01-19 1Install Stabilize Landscape Area Above D.V. 3 3 Nov-11-19 NDv-13-19 Excavate & Slope for Detention Vault 2 0 Aug-29-19 A Sep-06-19 A Rough Grade D.V. SOG 1 0 Sep-05-19A Sep-09-19A Fine grade D.V. SOG 1 0 Sep-09-19A Sep-10-19A rad I ing - -- - - -- -- ---- Plumbing Underground 1 0 Sep-06-19A Sep-09-19A FRPS D. V. SOG 3 0 Sep-10-19A Oct-04-19A Aug-13-20 Irstall Irrigation Sleeves 0072 2 72 MW-20 Crsfall;lni a yat� RoBdWa " ' -: m6rhoay-26-20 XQ*att Rice I ;Irjjtalj rinfitriotires, :InkapPznriai logatio I „ Install fto o - f & andcaping 2 May-22-20 May-26-20 Excavate Roadway from Sta. 51+50 - 52+50 3 3 May-01-20 May-07-20 Temp Close Cowlitz P.L. Driveway 13 13 May-07-20 M Excavate Driveway & Roadway to Sta. 53+50 5 5 May-07-20 114-20 Install Storm Strictures, Piping 3 3 May-18-20 May-21-20 Install Remaining Water Iout toSta. 53+60 3 3 19-20 May-22-20 Inigation 5 5 1 Jun02-20 Landscaping 15 15 Jun-02-20 Jun-23-20 Wheelstops & Striping 2 2 Jurr23-20 Jurr25-20 Signege 2 2 Aug-11-20 Aug-13-20 5t Irstall Gas from 65th St. to the Building 2 2 1 M ay-18-20 Install New Farce 5 5 Jurt 23-20 Jun30-20Iris Permanent Power to Bldg 5 5 May-18-20 May-25-20 peon F Wait S S o e H to Bldg avy Concrete Pa Ti West f BI FRPS Site Heavy Concrete Paving West of Bldg. 5 5 May-27-20 Jun-03-20 Actual Work Critical Remaining Work Vmm0mm/ Summary Remaining Work ♦ ♦ Milestone Page 3 of 7 Lydig Construction - Tukwila Fire Station #52 O N Tukwila Fire Station 52 Data Date: Oct-21-19 Activity Name Original Duration Remaining Duration Start Finish June 2019 July 2019 A I S O N D J F M April 2020 May 2020 June 2020 July 2020 A S O N D J F M 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 C1280 C1290 C1300 C1320 C1340 C1350 C1360 Pave P.L. Ddvevey 2 2 May-26-20 May-28-20 --------- --------- --------- ------------------------------ - ------------------------------ -- --------------------------------- r�0?0, St " '----- .I ------------------- ------- ------- r:420;20, Sup rWjjIs; III Fekt�nor ;;Palle .. PROS Fine Site Light] Dati 4 qrT LIhC P ;Fi ue --------- -------- --------- --------- -- - rstrudue 1 , heatHng (F�lort5 P.L. - CLjb radE CO rri4m lefi -I;P - - - -- - rid u e - I AMer fc r 5 &Bases -- i Aoi i --------------- - -------------- - - y ------------------- - dewalks ----------- - -------- ------ -------- - ---------- ------------ ------------ ----------- -- ter dodcwise;arbud buldirn�) JU-14-20, Qrilrling Erwelgpg ; nical Equpmerrt Roof 1 I Barrier Skin dA/3counteldbckWseamu caterclockwige proud bullc�irg) (Coulter dpc; Parnel Siding(:o Fadade I ---------- ---------- --- ------------ ---- -------------- ---- --- ------------ ---- i --- - ------------ ---- 1 � i 1 i 1 i 1 buildhx,�1 'se frbrn Grid A/3) er cl do se from griA/3) ------- ------- ------- ------- --- --- --- --- ------------------------ ------------------------ ------------------------ ------------------------ FRPS Curb & Gutter 5 5 May-18-20 May-25-20 Fine Grade for Sidewalks 2 2 May-25-20 May-27-20 Site Lighting Conduit & Bases 5 5 May-01-20 May-11-20 Data & Communication 5 5 May-01-20 May-11-20 Set Light Poles 1 May-11-20 May-12-20Set Final Paving 2 Jun-03-20 Jun-05-20 ---- - ---- -- c- 2-1 Sle ve under fol i ing I 1EP E vatefor f ing Form, Plad Fini h F R1 Install P e Inst' I Car Break Inst Va orb S;G E ge I IlaancFinish - ---- --- ;allFainfcrcirig FRP ete Fine z de I Idg Back ifil )tfo,ndationarxgiade D Form, Pla , Fi sh Irstall W3 o fing Install1stl rseof OF c- Pla Ir all ME Install Cap Install Vapor SOG Edge Install ine Gra Fortr1, PI a , Finish 4 Sleeve underfo ting ME Excavatefor f otings Form, PI ice, Finis Back fil at found --- ------------------- Install W terproo Install 1st Dourseo 3-19, l4o , NortS otings round vier orm ------ - Atalls ad to tem walls & Insuldtio U 3-19, $o and F6sl uder ro Break bai e fonln infordr� a Bldg ra Footings Stem;wa tion arb ------ -- rig & In$ul CMU ation/ 1 st pou ----- grade h SOG i SOG 2rx I to Subg Is de -------- tion -------- '-------' OG NORTH Pour SO�JTH ---------- ade ------------------ Foundation A1530 At540 At550 A2150 A2160 A2170 A2180 A2190 A2560 A2141 C1260 A2210 A2140 A2540 A2550 A2200 At28 Al 29 Al 29 At 29 At 29 C1500 A128 Al28 At28 At28 At 29 Al 28 Al28 S A1560 At 570 Al580 A2220 A1630 SOG 0j53' 38 Sep30-19A Dec-13-19 Sleeve under footing MEP 1 1 Oct-21-19 Oct-21-19 Excavate for footings 3 3 Sep30-19A Oct-23-19 Form, Place, Finish Footings 10 10 Oct-21-19 NDv-01-19 ------ Install MEP underground 12 12 Oct-28-19 NDv-12-19 Install Cap Break 2 2 Nov-18-19 NDv-19-19 IrstallVapor barrier 1 1 Nov-20-19 Nov-20-19 SOG Edge form 2 2 Nov-20-19 Nov-25-19 Place and Finish SOG 1st pour NORTH 5 5 Nov-26-19 Dec-02-19 Install Reinforcing 2 2 Nov-20-19 NDv-25-19 FRPS Concrete walls 10 10 Nov-04-19 NDv-15-19 Fine Grade Bldg Pad to Subgrade 1 1 Nov-13-19 Nov-13-19 Back fill at foundation and grade 1 1 Nov-12-19 Nov-12-19 Form, Place, Finish Stem walls 6 6 Oct-28-19 NDv-04-19 Install Waterproofing & Ireulation 3 3 Oct31-19 NDv-04-19 Irstall1stCouseofCMU 2 2 Oct31-19 Nov-01-19 ------ Place and Finish SOG 2nd Pour SOUTH 5 5 Dec-09-19 Dec-13-19 Install MEP udergroud 11 11 Nov-13-19 NDv-29-19 1retail Cap Break 2 2 Deo-03-19 Deo-04-19 1retail Vapor barrier 1 1 Deo-05-19 Deo-05-19 SOG Edge form 2 2 Dec-05-19 Dec-06-19 Install Reinforcing 2 2 Dec-05-19 Dec-06-19 Fine Grade Bldg Pad to Subgrade 1 1 Dec-02-19 Dec-02-19 Form, Place, Finish Footings 10 10 Oct-28-19 Nov-08-19 Sleeve uderfootirg MEP 1 1 Oct-24-19 Oct-24-19 Excavate for footings 3 3 Sep-19A Oct-28-19 Form, Place, Finish Stem walls 6 6 Nov-04-19 NDv-11-19 Back fill at foundation and grade 1 1 Nov-14-19 NDv-14-19 Install Waterproofing & Insulation 3 3 Nov-07-19 Nov-11-19 1nstall1stCouseofCMU 2 2 Nov-07-19 Nov-08-19 Erect Stnic Place a I II iral Steel:and deqkirj Finish SOMD FrameKxte' In Erect Stmdual Steel and decking 20 20 Dec16-19 Jan-.1 7-20 Place and Finish SOMD 2 2 Jan-23-20 Jan-24-20 Frame Exterior Walls 20 20 Jan-27-20 Feb-21-20 Install Exterior Sheathing (From GridA/3 couter dockWse ar 20 80 15 20 Feb-24-20 Mar-23-20 Mar-20 20 Install Roofing System low roof 15 May-18-20 Apr-10-20 ;; I ------- at;to Mali-18- tall offing SysCerrj I ------- " Se� Rgp Install Ro firs -------- t f Ma j-1 t - II eriorweat Fib I tail_Fla_shing ;F l stall ,e ri Install Te p , i 0 Im pll_ 0,; w to Top (e 0, �N rSF G(d r ( aWeAt g a he I ioL:BnckVen�e,n I ull ' MEP p� train. A1640 Set Roof Top t bchanical Equipment 10 10 May-05-20 May-18-20 A1720 Install Roofing System High Roof 15 15 Apr-13-20 May-01-20 A1620 Install MEP peretrations at roof 5 5 Jan 27-20 Jan 31-20 A1650 A1660 A1670 Al700 730 Facade Actual Remaining Installexteriorweatherbarrier(FromGridA/3couterdodcw 10 10 Mar-23-20 Apr-03-20 At 1retail Flashing ( From GridA/3 CoulterdockWse around bulk 10 10 Apr-06-20 Apr-1 7-20 Install exterior Insulation @ Brick Veneer (Counter dodcwise f 15 15 Apr-20-20 May-11-20 Install Temp Window Protection 10 5 Apr-27-20 May-01-20 1retail Exterior Insulation @ Metal Panel Siding ( Couter doc 5 5 May-12-20 May-18-20 55 Apr-27-20 JuF14-20 Summary Work Critical Remaining Work Work ♦ ♦ Milestone Page 4 of 7 Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Data Date: Oct-21-19 Activity Name Original Duration Remaining Duation Start Finish June 2019 July 2019 A S O N D J F M Apr l 2020 May 2020 Jule 2020 July 2020 A S O N D J F M 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 310 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 A1680 A1690 Install Brick veneer (From Grid A/3 counter clockwise around 1 30 30 10 Apr-27-20 Junr08-20 Juf1420 -------- -------- --------- --------------------------------- --------------------------------- --------------------------------- ------ ------ ------ --------------- ----------- -------------------------- -------------------------- ; ; ---------------- - --- F---------------- ---------------- - ---- F-----------' --------------- Install Pre I t ------------------ -- - ---- - Instal Pie al Install-H616Wkill.1tal/Doorframe ----------------------- I _thll h Br ck II veneer Install Exterior all Fiberglass (From Grits A/3 Meth Ppnel Wind&A and Window countbr Siding;(F; Door$ System Cockwige;atound ( m Grits �J$ m God buildir�) oouter clo�kwi N3 oouter cldckwi around around c02-2 pections ooms1 ns ing Jnits ------- slings s Locke ware Protect ishers ------- c02-2 c42-2 II OF wild buil , Inl Co 6,1 --- --- on --- , S AP's rig) ing) Eidor Finishes - nplete 8 and 136) ------------------------ ------------------------ ------------------------ eciatty ConstmctionArea F mmukcetiors Room Install Metal Panel Siding (From GridA/3 counter clockwise a 10 Jun30-20 I A2230 Irstall Exterior Windows and Doors (From Grid A/3 canter cl, 10 10 Jun-09-20 Jurr22-20 A2570 IrstallFiberglass Window System 10 10 Jurrl6-20 Jur29-20 I Al840 Hang GWB 16 16 Jun-08-20 Jur29-20 ; ----- Frdming F_ra_ jn_e" ------------ overhead MACV aIls, Soffits ar Electrical R.I. II Cover Insp iing overheac 1umbing R.I. verhead Sprridgr ig overhead F kC / Mech R.I Sprinkler R.I.@:rr ;; II --,- --8- ;'-- d coils At 5b ctiB Elgcl t FFa --- ------ I"bi @;F a)g GWB Tape GWB Pairnt GWB Mnskall EI ss Ddo aint InE I lrskall PI North t0 South) to South) to South) -------;--,---- h to Sohth? th to Sono iling ctrical I Gelling Instal 7 ch Fire xpo m m �dd al. ; / ceilif g at GIidU gdd I cejligg Ceiling Grind j Finish Ir yt rid (Ceiling < n Rjl. 1 0111ir t upe lect{ cliT il Trim Time --- - Ins a systems Ceiling systems system ajver pl+ Floors all:area 'll Epoxy Flopdng systems: t;grid / ceiling: F mall Visual Di tall Cubicle II KitchenCa Install Apr Wall Roller S rTtall Resilie c4ilings I Tdm at Exp rrj at Exposed Install CasE GWB Install Doors -------- W� IrWII Wall an Place Fire --------- FI rat Phys i ( syste 'I aea 3play ai binet lia hade Ba d Ceili work hd H ---- j Doc, oding ---- 7raini -- - ch s (S ing ( Co rical ing ( ig mi 3ming A1850 Tape GWB 15 15 Jun30-20 Juf21-20 tall A( NoO Nort ----- n No m No Al920 Paint GWB 10 10 Jul-21-20 Aug-03-20 I Al930 Irstall Ceiling Grid / ceiling systems 6 6 Aug-04-20 Aug-11-20 I Al940 Electrical R.I. at Grid / Ceiling systems 10 10 Aug-1 2-20 Aug-25-20 A1950 All ceiling grid /ceiling system cover inspections Complete 0 0 Sep-01-20 Al960 Irstall Ceiling tile 7 7 Sep-02-20 Sep-11-20 Al970 Grind / Finish Floors all areas 10 10 1 Sep-1 4-20 Sep-25-20 I A2110 Install Epoxy Flooring (Rooms126,128 and 136) 10 10 Sep-28-20 Oct-09-20 , I. prin ed et@ etg 4G Cq -- A2500 Mech R.I. at grid / Ceiling systems 10 10 Aug-14-20 Aug-27-20 A2510 Fire Sprinkler R.I. at grid /ceiling systems 10 10 Aug-1 9-20 Sep-01-20 A2520 Final Clearing 10 10 Oct-28-20 Nov-10-20 A2880 IrstallAccess Doors 2 2 Jur30-20 Jul-01-20n - ta ffirfron I t - (Fo ( I A2890 Install Visual Display Lhts 3 3 Oct-12-20 Oct-14-20 A2900 Install Cubicle Cutain 3 3 Oct-12-20 Oct-14-20 A2940 Install Kitchen Cabinets 10 10 Sep-28-20 Oct-09-20 A2950 IrstallAppliances 5 5 Oct-20-20 Oct-26-20 I A2960 Irstall Roller Shades 5 5 Oct-12-20 Oct-16-20 I A3000 Install Resilient Base 5 5 Oct-12-20 Oct-16-20 A2060 Paint exposed stmctue ceilings 10 10 Aug-04-20 Aug-1 7-20 A2480 Complete Electrical Trim at Exposed ceilings 10 10 Aug-1 8-20 Aug31-20 A2490 Complete Mech Trim at Exposed Ceilings 10 10 Aug-1 8-20 Aug31-20 I Al980 Irstall Casework/ Lockers 20 20 Sep-28-20 Oct-23-20 tall El all mbi ---- I A2000 Install Electrical Trim @ GWB 16 16 Aug-04-20 Aug-25-20 Al870 Install Doors and Hardware 5 5 Oct-12-20 Oct-1 6-20 A2460 Install MechTrim @GWB 16 16 Aug-04-20 Aug-25-20 A2470 Install Plumbing Trim 6 6 Au04-20 Aug-11-20 I A2910 Install Wall and Door Protection 5 5 Oct-12-20 Oct-16-20 A2920 Place Fire Extinguishers 5 5 Oct-19-20 Oct-23-20 Al800 Irstall Pre Framing overhead HVAC I Mach 10 10 Feb-24-20 Mar-06-20 A1810 Frame walls, Soffits and ceilings (Starting from North to Soutl 10 10 Mar-18-20 Mar31-20 Al820 Electrical Rl. At Framing (From North to South) 15 15 Apr-01-20 Apr-21-20 I Al830 All Cover Inspections Complete 0 0 Apr-21-20 A P Frar Al890 Install Pre Framing overhead Electrical 15 15 Feb-26-20 Mar-1 7-20 A1910 Plumbing RI. At Framing (From North to South) 15 15 Apr-01-20 Apr-21-20 Al 900 Irstall Pre Framing overhead Sprinkler 5 5 Feb-28-20 Mar-05-20 ---------------------- Fra ing Pre I --rami HV Fi I Al880 Irstall Pre Framing overhead Plumbing 10 10 Feb-28-20 Mar-12-20 I A2070 HVAC / Mech R.I. @ Framing (From North to South) 10 10 Apr-01-20 Apr-14-20 A2450 Fire Sprinkler R.I. @ Framing ( From North to South) 10 10 Apr-01-20 Apr-14-20 Al860 IrstallHollow Metal / Door frames 5 5 Feb-28-20 Mar-05-20 A1990 Specialty Construction Communications A2080 Irstall Floor at Phys Training Area Finishes MDF &IDF Patch Cable Completion 5 5 Sep-28-20 Oct-02-20 10 10 Aug-04-20 Aug-1 7-20 MDF IDF a4 Cabl Coriupletion ; I Ba Fa A2090 Install OF WAP's 5 5 Nov-26-20 Dec-02-20 Oct-0 ederjn Strips tall E nstall;R rigs ; ertn@a 7�0at )! Wainscot bet Base Lights / Ceili A2580 Install Sectional Doors 10 10 Jul-15-20 Ju�28 20 nstal(S�ctio �ajnt I Do rs; all 11 ; jl ali A2590 IrstallNedermanSystem 10 10 Aug-25-20 Sep-08-20 A2600 Striping 4 5 Sep-25-20 Oct-01-20 A2610 Install Epoxy Wainscot 10 10 Sep-09-20 Sep-22-20 A2620 Irstall Rubber Base 2 2 Sep-23-20 Sep-24-20 Its & I A2770 Paint Walls &Ceilings 10 10 Jul-29-20 Aug-11-204 A2630 Install Overhead Lights Calling Fans 15 15 Aug-1 8-20 Sep-08-20 Actual Work Critical Remaining Work �/ Summary Remaining Work ♦ ♦ Milestone Page 5 of 7 Lydig Construction - Tukwila Fire Station #52 O W O Tukwila Fire Station 52 Data Date: Oct-21-19 Activity I Activity Name Original Duation Remaining Duration Start Finish ure 2019 JJy 2019 A S O N D J I F M Apr l 2020 May 2020 June 2020 July 2020 A S O N D J F M 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 3 0 1 2 2 0 1 A2780 HVAC Trim Out 7 7 7 Aug-17-20 Aug-25-20 7 Aug-26-20 Sep-03-20 -------- --------- --------- --------- ------------------------ -------------------------------- -------------------------------- -------------------------------- ----- ------ ----- - ------ ------- --------------- -------------------- --------------- ---------------------- ------------------------- --------------------------- ------ d ------------------------------------------------------- ------------------------------------------------------------ Install Pre Framing ove Frame walls, EI( All I t II Pre rar HVA =1 Fi re S)di Plurn f Ins all Hollow Me Pre Framing Install Pre Framing ove F --i-------- alf Soft ctrtCa Coge ove / isle -------- it al t,; bve�x atl N N � N------- AC/ andu RI. Pt InsPE ad h RI. r RI. I. At or f ad PlyrT prink) ---- I& li 0 or I F ----------- mi s bi r - - ---- G Tape if Instal h s (Starti irg (Fro s COMPIE I ming ( ming ( (From -- -------- WB; 44ss ;frgm rri North tO M North jn f Jojth ----•---- NbrtN td Doo f Jorth to S to to So C T Plu to Sch) uth) out Soutl^ ---- ) rn:O bi' -- LA Tdm;O - ----i- Sea-2 s hin RDLt111 kc IectriGal Instill atingg Elevat r nts -------- ----"- --------- -------- -t0„ Mechani I: jjh-i� Ro han ightjrg ----•-------- ----- Nov-0'20, jal( Wall Tile :Install casev MEP trim C Install to sli Restroo Final C I Install Plu ---t-------- ; ---- ---- I Ro brk let a Roos aanin ibing ---- ------- ------ ms stroo oLrters ssode Fixtures ------ -- ---------------- -- ------------------------ ------------------------ I /B4throom --- ------------------------ Jan-11-21, Closeout -20j Commissioning anjl Corrections ---`----------------------- rt - rinal tion 1 -20' Cx Testing & Monitoring A2850 Plumbing Trim Out A2750 Harg GWB 15 15 Ain-08-20 JLrr26-20 A2760 Tape GWB 11 11 Ain-29-20 Jul-14-20 A2870 Install Access Doors 2 2 Jul-15-20 JuF16-20 A2640 Install Pre Framing overhead HVAC/ Mach 15 15 Mar-09-20 Mar-27-20 A2680 Frame walls, Soffits and ceilings (Starting from North to Soutl 10 10 Apr-13-20 Apr-24-20 A2700 Electrical Rl. At Framing (From With to South) 16 16 Apr-27-20 May-19-20 A2740 All Cover Inspections Complete 0 0 May-19-20 A2670 Install Pre Framing overhead Electrical 15 15 Mar-23-20 Apr-10-20 A2720 HVAC / Mach R.I. @ Framing (From North to South) 11 11 Apr-27-20 May-12-20 A2730 Fire SpriNder RI. @Framing (From North to South) 10 10 Apr-27-20 May 11-20 A2710 Plunbirg RI. At Framing (From North to South) 16 16 Apr-20-20 May-12-20 A2690 Irtall Hollow Metal / Doorframes 5 5 Apr-08-20 Apr-14-20 A2660 Irtall Pre Framing overhead Plumbing 10 10 Mar-25-20 Apr-07-20L=�Install A2650 Install Pre Framing overhead Spridder echanical A2790 Set HVAC Urns 51 5 Mar-23-20 Mar-27-20 Set --IVAC AC Spri I Instal Traff 2 Inst II Ele E evat 1wall pe D II 9re F rotedort ctrical rical Gear -------- o bdiding --------- Uni o kIR luiribing 20, at r F 5 5 Aug-17-20 Aug-21-20 A2800 HVAC Rxghin 5 5 Aug-24-20 Aug-28-20 A2810 SprinIder Rolghin 5 5 AL01-20 Sep-04-20 A2820 Plunbing Roughan 5 5 Sep-08-20 Sep-14-20 A2830 Electrical Rough4n 6 61 Sep-15-20 I Sep-22-20 A2840 Install Lighting 5 5 Sep-23-20 5 5 Aug-12-20 25 25 Ju1-20-20 5 5 Aug-24-20 Sep-29-20 Aug-18-20 Aug-28-20� Aug-21-20 Aug-28-20 A29901 Install Traffic Coatings A3090 Install Elevator s E IeUa vato or E EleN it Rugh In- Electrica IE va or Shaft Hang Di Elevator Shaft T. a or haft Rough In- Jul-17-20, El Install Main Elec Perm Power - WaIls Green Board GWB Walls ousekeeping Pads A3120 Elevator Fronts A2270 Frame Elevator Shaft 10 10 May-05-20 May-18-20 A3060 Elevator Shaft Rough In- Electrical 5 5 May-19-20 May-25-20 A3070 Elevator Shaft Harg Drywall 5 5 ArO6-20 Ain-22-20 A3080 Elevator Shaft Tape Drywall 10 10 Ain-23-20 Jli-07-20 A31 001 Elevator Shaft Rough In- Fire Protection roo 5 5 Jun-09-20 Jur15-20 -- , 7nr.do ------ A2010 Install Wall Tile 15 5 15 Sep-23-20 Oct-113-20 51 Oct-14-20 Oct-20-20 A2020 Iretail casevmrk / coulters A2240 MEP trim 3 3 Oct-21-20 Oct-23-20 A2250 Install toilet accessories 5 5 Oct-26-20 Oct30-20 A2530 Grind &Polish Restroom Floors 7 7 Sep-14-20 Sep-22-20 A2380 Finial Clearing 5 5 Oct-28-20 Nov-03-20 A2030 Install Plumbing Fbctures 5 5 Oct-21-20 Oct-27-20N --------- Fram Hang Tape Paint our F A2040 Irtall Main Electrical Gear 15 15 ArO8-20 Jli-09-20 A2050 Perm Power to bLikdirg 5 5 Jli-13-20 JLd-17-20 A2260 Frame Walls 1 1 Jun-10-20 Jun-10-20 A2340 Hang Green Board 1 1 Jun-11-20 Jun-11-20 A2350 Tape GWB 3 3 Jun-12-20 Jun-16-20 A2360 Paint Walls 1 1 Jlr 17-20 Jlr 17-20 A2370 Pour Housekeepirg Pads 2 2 Jun-08-20 Jun-09-20 Commissioning A1140 52 52 Sep-28-20 Dec-10-20 ----- ------------------- --------- Dec-1 Prelimirary ------ AB Rep Verifia ion Dec-1 -- ;- BLrnI P TAB ------ ----- 1 itaft Equipm in tq Point Te rxSFacturer Graphic port BA(Wmens ---- nt ng art mpl TAB Report - Preliminary 51 5 Oct-28-20 Nov-03-20 A1150 TAB AdWmerts and Corrections 10 10 Nov-04-20 Nov-17-20 A1160 TAB Report - Final 10 10 Nov-18-20 Dec-03-20 A1100 Bunp Start EgLipmert 5 5 Sep-28-20 Oct-02-20 A1110 Point to Point Testi rg 10 10 Sep-28-20 Oct-09-20 A1120 Manufacturer Start Up Verifications 10 10 Oct-02-20 Oct-15-20 A1130 GrepHc Completion 10 10 1 Oct-13-20 1 Oct-26-20 Actual Work Critical Remaining Work V1111/ Summary Remaining Work ♦ ♦ Milestone Page 6 of 7 Lydig Construction - Tukwila Fire Station #52 Tukwila Fire Station 52 Data Date: Oct-21-19 Activity I Activity Name Original Duration Remaining DurationOL��� - Start June 2019 1 July 2019 A I S O N D J F M I April 2020 1 May 2020 Jule 2020 July 2020 A S O N D J F M 0[0[11213[0[1[2[2[01111121010111I210 1 2 2 0 1 1 2 0 0 1 2 2 2 0 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 112121011111213101112121011 A1210 A1170 A1200 A1190 A1230 A1300 A1240 A1250 A1260 A1220 A1400 A1310 A1320 A1330 A1340 A1350 A1360 Cx Agent Sign Off 5 5 15 Dec-04-20 Dec-10-20 ------------------------------------------ ------------------------------------------- ----- -------------- -------------------------- ------------------------------------------------------------------ ------------------------------------------------------------------ -------------- ------------ Emerg Lig ing ------------- Electronic ndy Power ------- CxAgent jignOff fety & Security a for -------------- Deo-17-20, Inspections Mechanical (WAC) BuildingDepartment Final Inspectio pri ikler Arm i -- --- VmmmmmmmmmT Jan,11-21, Punch List Punch List �reation Pucli List Completion Duch List Back Check Punch List Sign Off Electronic Safety & Security 15 Oct-05-20 Oct-23-20 Emergency Power / Generator 5 5 Sep-28-20 Oct-02-20 Lighting 5 5 Oct-05-20 Oct-09-20 4 Jut-23-20 Dec17-20 Mechanical (WAC) 5 5 Deo-04-20 Deo-10-20 Fire Elect'ca 'Fir, Plum -------------------------- Elevator Inspection ----------------------------------------- Landscaping ---------------------------------------------------- Public Works - Street Improvements -----------------------------------------------------------------------%------------------------ Building Department Final Inspection 5 5 Deo-11-20 Deo-17-20 Fire Spr nkler 5 5 Nov-02-20 NDv-06-20 Electrical 5 5 Nov-02-20 NDv-06-20 Fire Alarm 5 5 Nov-09-20 Nov-13-20 Plumbing 5 5 Nov-02-20 Nov-06-20 Elevator Inspection 5 5 AL01-20 Sep-04-20 Landscaping 5 5 Jur23-20 Jun30-20 Public Works - Street Improvements 5 5 Jun-23-20 Jun-20 Jan-11-21 Punch List Creation 5 5 Deo-03-20 Deo-09-20 Punch List Completion 10 10 Dec10-20 Deo-23-20 Punch List Back Check 5 5 Dec28-20 Jan-04-21 Punch List Sign Off 1 51 5 Jan-05-21 Janr11-21 Actual Work Critical Remaining Work Remaining Work ♦ ♦ Milestone Viiiiiiiiiiii0mm/ Summary Page 7 of 7 Lydig Construction - Tukwila Fire Station #52 O G� 106 City Council Public Safety Committee PUBLIC SAFETY COMMITTEE Meeting Minutes November 4, 2019 - 5:30 p.m. - Hazelnut Conference Room, City Hall Councilmembers: Dennis Robertson, Chair; Kate Kruller, Zak Idan Staff: David Cline, Bruce Linton, Jay Wittwer, Rachel Bianchi, Laurel Humphrey Guests: Justine Kim, Shiels Obletz Johnsen; Steve Boldblatt, PMQA CALL TO ORDER: Chair Robertson called the meeting to order at 5:30 p.m. I. ANNOUNCEMENT II. BUSINESS AGENDA A. Resolution: Adopting 2020 State Legislative Agenda Staff is seeking Council approval of a resolution that would adopt a legislative agenda for use during the 2019 Washington State Legislative Session. The agenda includes items in the categories of Transportation & Infrastructure, Housing & Human Services, Shared Revenue, Revenue Reform, Education, and Lodging Tax Flexibility. Councilmember Idan stated that he would like to add items regarding advancing racial equity, supporting jobs and workforce development, and combating climate change. Councilmember Kruller stated the purpose of the agenda is to show state legislators what they can do to help cities and cautioned about making it too long. Chair Robertson expressed support for CM Idan's additions, and staff will draft the additional items prior to the Finance Committee discussion. Input from both committees will be presented to the Committee of the Whole. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 25, 2019 COMMITTEE OF THE WHOLE. B. Maximum Allowable Construction Cost (MACC) Fire Station 52 Staff is seeking Council approval of a contract amendment with Lydig Construction forthe final construction phase of Fire Station 52. Station 52 is currently under construction and on schedule, and the final MACC includes the remaining services and came under budget by approximately $637,000. Due to the budget savings, staff recommends building the Administrative space that was previously changed to an alternate and which came in at $845,747. The Council is asked to approve the amendment in the total cost of $16,154,260 including the Administration buildout, to spend $1,615,426 in sales tax associated with the amendment, and to spend, if needed, the full project's contingency for change orders, budgeted at up to $1,567,483, and to transfer $104,057 each from the Fire Station 51 and Justice Center budgets to cover the Ad min space buildout. Councilmember Robertson said he supports building the Administration space now as the shell was built and this is the lowest cost way to use the facility. Councilmember Idan also stated support for it as this is to serve as Fire 107 Public Safety Committee Minutes........................................................................................................................ November 4, 2019 Department headquarters. Councilmember Kruller stated she is opposed to including the alternate as it was cut out of the project to save money. MAJORITY APPROVAL WITH ROBERTSON AND IDAN IN FAVOR, KRULLER OPPOSED. FORWARD TO NOVEMBER 12, 2019 COMMITTEE OF THE WHOLE. C. Public Safety Plan Contract Amendment: Mayes Testing Engineers Staff is seeking Council approval of Amendment No. 1 to Contract 19-027 in the amount of $78,378.50 for additional construction testing and inspection services forthe Justice Center and Fire Station 52 projects. The amendment is within budget and has the approval of Mr. Goldblatt. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 18, 2019 REGULAR CONSENT AGENDA. D. Public Safety Plan Contract Amendment: SoundEarth Strategies Staff is seeking Council approval of Amendment No. 6 to Contract No. 17-167 with SoundEarth Strategies in the amount of $73,000 for additional remedial excavation, field support and tank removal activities associated with the Justice Center. The amendment is also within budget and has the approval of Mr. Goldblatt. Councilmember Kruller asked questions about the additional underground storage tanks. UNANIMOUS APPROVAL. FORWARD TO NOVEMBER 18, 2019 REGULAR CONSENT AGENDA. III. MISCELLANEOUS Chair Robertson stated thatthe next Committee meeting will include further discussion on location - based public safety data, referencing the 2017 FACETS "Fire Station Location Study" and a handout on crime around Cascade View Park that was recently handed out at the Community Development & Neighborhoods Committee. The Committee requested that the Committee work plan also be included on the next agenda. Adjourned 6:61 p.m. 61 i Committee Chair Approval