HomeMy WebLinkAboutPermit EL15-0274 - SABEY CORPORATION - POWER FOR SERVER CABINETSSABEY
3355 S 120 PL
EL15-0274
City of Tukwila
Department of Community Development
• 6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.Rov
ELECTRICAL PERMIT
Parcel No:
1023049082
Permit Number: EL15-0274
Address:
3355 S 120TH PL BLDG 5
Issue Date: 4/20/2015
Permit Expires On: 10/17/2015
Project Name:
SABEY
Owner:
Name:
SABEY CORPORATION
Address:
4TH FLOOR 12201 TUKWILA INTL
BLVD, SEATTLE, WA, 98168
Contact Person:
Name:
JOHN MCBRIDE
Phone: (253) 234-2853
Address:
600 WASHINGTON AVE S, KENT, WA,
98035
Contractor:
Name:
HOLMES ELECTRIC CO
Phone: (253) 479-4000
Address:
18215 OLYMPIC AVE S, TUKWILA,
WA, 98188
License No:
HOLMEEC549BH
Expiration Date:
Lender:
Name:
Address:
DESCRIPTION OF WORK:
EXTEND POWER
FROM EXISTING DISTRIBUTION SYSTEM TO NEW SERVER CABINETS.
Valuation of single family: $0.00
Fees Collected: $6,266.98
Valuation of mf/comm: $386,898.00
Type of Work:
Electrical Service Provided by: SEATTLE CITY LIGHT
Water District: 125
Sewer District: VALLEY VIEW SEWER SERVICE
Current Codes adopted by the City of Tukwila:
International Building Code Edition:
2012
National Electrical Code:
2014
International Residential Code Edition:
2012
WA Cities Electrical Code:
2014
International Mechanical Code Edition:
2012
WAC 296-4613:
2014
Uniform Plumbing Code Edition:
2012
WA State Energy Code:
2012
International Fuel Gas Code:
2012
i
1 Permit Center Authorized Signature: � `"' `� Date:
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature:
Print Name: k'� '%y4
Date: * 11,
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
<NONE>
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-93SO
2100
ELECTRICAL FINAL
7003
ROUGH -IN ELECTRICAL
7002
SERVICE
7001
UNDERGROUND/SLAB
-r�OD, �q I a-OA -+ sort
CITY OF TUKWILA
Community Development Department
Permit Center
• 6300 SouthcenterBlvd., Suite 100
Tukwila, WA 98188
http:/hvww.Tukwlla WA. P ov
Electrical Permit No. EL 15 (:) )lq
Project No.
Date Application Accepted:
Date Application Expires:
use
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
"Please Print*
SITE LOCATION p
King Co Assessor's Tax No.:
Site Address: 3 SS Sc t f t, % S% Suite Number: Floor: it rst
Tenant Name: r GE yZ-OZ COS New Tenant: .....Yes ❑..No
PROPERTY OWNER
Name: �a�ae Cc�tvs uG t 'tv
Address: I Z 2C11 T A L'tudq _-r_m 4,r v,4to rva( Blvd
City: Sea l e. State: W4
Zip: /
CONTACT PERSON - person receiving all project
communication
Name:
Address: --I Nfn ri
CO
/Q7JC S
City: l �10 State: zip: c?
Phone: 2 s - ,23 ' ZVS3Fa,.,, T_ 3 -2 3
Email:
wt e G
ELECTRICAL CONTRACTOR INFORMATION
Company Name: %6% e C-e
dric-
Address:
OAve S.
City: C State: WA_ Zip: 03S
Phone: -1-53-179-1l000 Fax: ?_S3-;-T't-;i;1OQ
Contr Reg No.:_�nL.M1EEC qzM ,Exp Date: () 31 201
Tukwila Business License No.; VLA C _ Mq � t _ d.L
Valuation of Project (contractor's bid price): $3 744 g zs
Scope of Work (please provide detailed information):e 94C veil PJOeye/` e t i CIrS�riO4,1�/e,v
545"%M 7b A.,a.J Se rue r Cab/n� 4-S'
Will service be altered? ❑ Yes No Adding more than 50 amps? Yes ❑ No
Type of Use: / t!%e4r"
Type of work:
❑ New ❑ Addition ❑ Service Change ❑ Remodel Tenant Improvement
❑ Low Voltage ❑ Generator (K Fire Alarm ❑ Telecommunication ❑ Temporary Service
Property Served by:
❑ Puget Sound Energy ® Seattle City Light
H:WpplicationsWovns-Applications On Line\2014 Applicetiom0ectrical Permit Application Revised 1-1-14.docx
Revised: January 2014
bh
Page t of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
❑ New single family dwellings...................................$152.85
(including an attached garage)
❑ Garages, pools, spas and outbuildings ........................$81.90 ea
❑ Low voltage systems
(alarm, furnace thermostat) ................................ $59.85 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑
Service change or alteration ......................................
$81.90
(no added/altered circuits)
❑
Service change with added/altered circuits.................$81.90
number of added circuits .......................
$11.55 ea
❑
Circuits added/altered without service change
...........$54.60
(up to 5 circuits)
❑
Circuits added/altered without service change
...........$54.60
(6 or more circuits) ...............................................
$7.65 ea
❑
Meter/mast repair.......................................................$68.25
❑
Low voltage systems .................................................
$59.85
(alarm, furnace thermostat)
PERMIT APPLICATION NOTES -
MULTI -FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
❑
Temporary service (residential) .................................
S65.00
❑
Temporary service (generator) ...................................
$80.90
❑
Manufactured/mobile home service ...........................
$86.25
(excluding garage or outbuilding)
❑
Carnivals....................................................................
$80.60
Number of concessions .........................
$10.80 ea
Each ride and generator truck ...............
S 10.80 ea
***EFFECTIVE JANUARY 1, 2014.EACH
PERMIT WILL BE ASSESSED A 5%
TECHNOLOGY FEE***
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure vrill be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature: /'Y) C Date: 3/1 Ste%/ 5"
Print Name: =tJ mC 011-4164 Day Telephone:
Mailing Address: 4(Z (L4Sjntue etJ �4Ue 5 K�0� - QJ 4. 9ya3
City State Zip
H:Applications\Forms-Applications On Line\2014 Applications0ectrical Permit Application Revised 1-1-14.doex
Revised: January 2014
bh
Page 2 of 2
Date Paid: Friday, March 27, 2015
Paid By: HOLMES ELECTRIC
Pay Method: CHECK 67025
Printed: Friday, March 27, 2015 3:39 PM 1 of 1 CI? SY57EM5
DESCRIPTIONS
PermitTRAK
ACCOUNT QUANTITY
PAID
$5,758.61
EL15-0274 Address: 3355 S 120TH PL BLDG 5 Apn: 1023049082
$5,758.61
ELECTRICAL
$5,517.57
PLAN CHECK FEE
R000.345.832.00.00
0.00
$1,205.19
PERMIT FEE MULTI-FAM/COMM
R000.322.101.00.00
0.00
$4,312.38
TECHNOLOGY FEE
$241.04
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: . . 15
R000.322.900.04.00 0.00
$241.04
$5,758.61
Date Paid: Thursday, March 26, 2015
Paid By: HOLMES ELECTRIC CO
Pay Method: CHECK 67022
Printed: Thursday, March 26, 2015 3:54 PM 1 of 1
SYSTEMS
2-- 1
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 5outhcenter Blvd, #100, Tukwila. WA 98188 (206) 43-1-3674
Permit Inspection Request Line (206) 436-9350
Project:
Type of Inspection: V
Address:
Date Called:
-(
TPinstructions.
bate Wanted-:
a.m—ecial
Requester'.
Pgone No:
1 El
31 Approved per applicable codes. Corrections required prior to approval.
L-i paid at 6300 Southcenter Blvd.. Suite 100. Catt to schedule reinspection.
INSPECTION RECORD
Retain a copy with permiti o2lq I
F
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 438-9350
Project:
of InspeoTot/64-0i
Address:
Date Called:
Special Instructions:
Date Wanted. a.
/of P.M.:
Requester'.
Rone No: 7 It
1:1 Approved per applicable codes. 1:1 Corrections required prior to approval.
L—i paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
nr-VIEWED FOR
t,jMPLIANCE WITH
NFPA 70 - NEC
"@
HOLMES ELECTRIC APR 2 0 2015 PANELBOARD SCHEDULE
PROJECT: City Of Seattle wl� DATE: 19-Mar-15
PANEL: 42CB2.3A City Of Tukwila I SECTION:
LOCATION: Row BUILDING DIVISION
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK B-09
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK A-09
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.2
2.8
30
30
2.2
RACK B-08
2.8
30
30
2.2
RACK A-08
2.8
30
30
2.2
2.8
30
30
2.2
RACK B-07
2.8
30
30
2.2
RACK A-07
2.8
30
30
2.2
2.8
30
30
2.2
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83 ISPACE
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
W 1
72
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE REe
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE Mor
SPACE
SPACE
SPACE PERMIT
SPACE
SPACE I TRj7A
SPACE
SPACE
ISPACE
PHASE A LOAD (KVA) : 15.0 45.0 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 15.0 54.2 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 15.0 DEMAND (kVA)
V.
rmLm I J — Vey 1Y
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42BC2.3A SECTION:
LOCATION: Row B
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK B-09
2.8
30
A
B
C
A
B
1 C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.8
RACK A-09
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.8
2.8
30
30
2.8
RACK B-08
2.8
30
30
2.8
RACK A-08
2.8
30
30
2.8
2.8
30
30
2.8
RACK B-07
2.8
30
30
2.8
RACK A-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
IA
B
C
A
B
C
IA
B
C
A
B
C
A
B
C
A
B
C
g
ClSPACE
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
IA
SPACE
SPACE I
SPACE
ISPACE
PHASE A LOAD (KVA) : 16.8 50.4 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 16.8 60.6 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 16.8 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42BC2.3.B SECTION:
LOCATION: Row C
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK C-18
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK C-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-17
2.2
30
30
2.2
RACK C-07
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-16
2.2
30
30
2.2
RACK C-06
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-15
2.2
30
30
2.2
RACK C-05
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-14
2.2
30
30
2.2
RACK C-04
2.2
30
30
2.2
2.2
30
30
2.2
SPACE
30
2.2
RACK C-03
30
2.2
30
2.2
SPACE
30
2.2
RACK C-02
30
2.2
30
1 2.2
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK C-10
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C I
30
2.2
RACK C-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-09
2.2
30
SPACE
2.2
30
SPACE
2.2
30
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
I
I
ISPACE
PHASE A LOAD (KVA) : 26.4 79.2 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 26.4 95.3 CONNECTED (AMP) SEC I
PHASE C LOAD (KVA) : 26.4 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42CB2.3.B SECTION:
LOCATION: Row C
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK C-18
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK C-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-17
2.2
30
30
2.2
RACK C-07
2.2
30
30
2.2
2.2
30 1
30
2.2
RACK C-16
2.2
30
30
2.2
RACK C-06
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-15
2.2
30
30
2.2
RACK C-05
2.2
30
30
2.2
2.2
30 1
30
2.2
RACK C-14
2.2
30
30
2.2
RACK C-04
2.2
30
30
2.2
2.2
30
30
2.2
SPACE
30
2.2
RACK C-03
30
2.2
30
2.2
SPACE
30
2.2
RACK C-02
30
2.2
30
1 2.2
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK C-10
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK C-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-09
2.2
30
SPACE
2.2
30
SPACE
2.2
30
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 26.4 79.2 TOTAL LOAD (kVA) SEC 1
PHASE B LOAJ) (KVA) : 26.4 95.3 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 26.4 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42BC2.2.B SECTION:
LOCATION: Row E
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO, CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK E-18
1.9
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
IC
30
1.9
RACK E-17
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-16
1.9
30
30
1.9
RACK E-15
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-14
1.9
30
30
1.9
RACK E-14
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-13
1.9
30
30
1.9
RACK E-13
1.9
30
30
1.9
1.9
30
30
1.9
SPACE
1.9
30
30
SPACE
SPACE
1.9
30
30
SPACE
SPACE
1.9
30
30
SPACE
SPACE
1.9
30
30
SPACE
SPACE
1.9
30
30
SPACE
SPACE
1.9
30
30
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
I
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
I C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
I
I
I
ISPACE
PHASE A LOAD (KVA) : 19.8 56.5 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 18.8 68.0 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 18.8 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-16
PANEL: 42C132.2.13 SECTION:
LOCATION: Row E
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK E-18
1.9
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
Ic
30
1.9
RACK E-17
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-16
1.9
30
30
1.9
RACK E-15
1.9
30
30
1.9
1.9 1
30
30
1.9
RACK E-14
1.9
30
30
1.9
RACK E-14
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-13
1.9
30
30
1.9
RACK E-13
1.9
30
30
1.9
1.9
30
30
1.9
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
ISPARE
I
SPARE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPARE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
I C1
SPARE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
ISPARE
ISPARE
I
I
ISPARE
PHASE A LOAD (KVA) : 15.0 45.1 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 15.0 54.3 CONNECTED (AMP) SEC I
PHASE C LOAD (KVA) : 15.0 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42BC2.2A SECTION:
LOCATION: Row D
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA AIPH AIPH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK D-18
2.3
30
A
B
C
A
B
C
JA
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-08
2
4
6
g
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-17
2.3
30
30
2.3
RACK D-07
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-16
2.3
30
30
2.3
RACK D-06
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-15
2.3
30
30
2.3
RACK D-05
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-14
2.3
1 30
30
2.3
RACK D-04
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
30
2.3
RACK D-03
30
2.3
30
2.3
RACK D-10
2.3
30
30
2.3
RACK D-02
2.3
30
30
2.3
2.3
30
30
2.3
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
gI
83
RACK D-09
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 29.9 89.7 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 29.9 107.9 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 29.9 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42CB2.2A SECTION:
LOCATION: Row D
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK D-18
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-17
2.3
30
30
2.3
RACK D-07
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-16
2.3
30
30
2.3
RACK D-06
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-15
2.3
30
30
2.3
RACK D-05
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-14
2.3
30
30
2.3
RACK D-04
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
30
2.3
RACK D-03
30
2.3
30
2.3
RACK D-10
2.3
30
30
2.3
RACK D-02
2.3
30
30
2.3
2.3
30
30
2.3
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK 0-09
2.3
30
A
B
C
A
B
C
A
B
C
A
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
113
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 29.9 89.7 TOTAL LOAD (kVA) SEC I
PHASE B LOAD (KVA) : 29.9 107.9 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 29.9 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-16
PANEL: 42BC2.1.B SECTION:
LOCATION: Row H
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
IA
B
C
A
B
ClSPACE
SPACE
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
43
SPACE
IA
B
SPACE
44
46
45
SPACE
SPACE
47
SPACE
C
A
SPACE
48
50
49
SPACE
SPACE
51
SPACE
B
C
A
SPACE
52
54
56
53
SPACE
SPACE
55
SPACE
SPACE
57
SPACE
B
SPACE
58
59
SPACE
C
SPACE
60
60
SPACE
A
B
C
A
SPACE
62
64
66
68
61
SPACE
SPACE
63
SPACE
SPACE
65
SPACE
SPACE
67
SPACE
B
SPACE
70
69
SPACE
C
A
B
SPACE
72
74
76
71
SPACE
SPACE
73
SPACE
SPACE
75
SPACE
C
SPACE
78
79
SPACE
A
A
SPACE
80
82
81
SPACE
SPACE
83
SPACE
IA
ISPACE
84
PHASE A LOAD (KVA) : 0.0
PHASE B LOAD (KVA) : 0.0
PHASE C LOAD (KVA) : 0.0
0.0 TOTAL LOAD (kVA) SEC I
0.0 CONNECTED (AMP) SEC I
DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42CB2.1.B SECTION:
LOCATION: Row G
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
I Ci
SPACE
2
4
6
S
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
43
SPACE
A
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
45
SPACE
B
SPACE
47
49
SPACE
C
SPACE
SPACE
A
SPACE
51
53
SPACE
B
SPACE
SPACE
C
SPACE
55
57
59
60
SPACE
A
SPACE
SPACE
B
SPACE
SPACE
C
SPACE
SPACE
A
SPACE
61
SPACE
B
SPACE
63
SPACE
C
SPACE
65
67
SPACE
A
SPACE
SPACE
B
SPACE
69
SPACE
C
SPACE
71
73
SPACE
A
SPACE
SPACE
B
SPACE
75
79
SPACE
C
SPACE
SPACE
A
SPACE
81
83
SPACE
A
I
ISPACE
SPACE
A
ISPACE
PHASE A LOAD (KVA) :
PHASE B LOAD (KVA) :
PHASE C LOAD (KVA) :
0.0 0.0 TOTAL LOAD (kVA) SEC 1
0.0 0.0 CONNECTED (AMP) SEC 1
0.0 DEMAND (kVA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42CB2.1.A SECTION:
LOCATION: Row F
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK F-18
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.8
RACK F-12
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-17
2.8
30
30
2.8
RACK F-11
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-16
2.8
30
30
2.8
RACK F-10
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-15
2.8
30
30
2.8
RACK F-09
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-14
2.8
30
30
2.8
RACK F-08
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-13
2.8
30
30
2.8
RACK F-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
IA
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
IB
1C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
ISPACE
PHASE A LOAD (KVA) : 33.6 100.8 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 33.6 121.3 CONNECTED (AMP) SEC I
PHASE C LOAD (KVA) : 33.6 DEMAND (k-VA)
HOLMES ELECTRIC PANELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: 42BC2.1.A SECTION:
LOCATION: Row F
AMPS: 400 PAR MAIN LUG ONLY x ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK F-18
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
ClSPACE
30
2.8
RACK F-12
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-17
2.8
30
30
2.8
RACK F-11
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-16
2.8
30
30
2.8
RACK F-10
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-15
2.8
30
30
2.8
RACK F-09
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-14
2.8
30
30
2.8
RACK F-08
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-13
2.8
30
30
2.8
RACK F-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
SPACE
SPACE
ISPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
I B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
1 82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
ISPACE
ISPACE
PHASE A LOAD (KVA) : 33.6 100.8 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 33.6 121.3 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 33.6 DEMAND (kVA)
HOLMES ELECTRIC RECEIVED 6NELBOARD SCHEDULE
rY OF T UMI-A
PROJECT: City Of Seattle DATE: 19-Mar-16
ff�I� AR 2 6 2015 _ tt�� �y
REVIEWED I"�,i;�, SECTION: ��l�tS cc)U
COMPLIANCWF, TI..;
PANEL: Row
LOCATION: RowF p�CpA 7Q `� �EN.� -�
AMPS: 400 �YYii!!�- x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 120/20 APR 2 0 2015 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 City Of T kWiln x SURFACE MOUNTED BOTTOM FEED
BUILDING DIBRK BRK LOAD VI
CKT �, ,.: -._ CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
�
-
4c
1
if
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK F-18
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
131
ClSPACE
30
2.8
RACK F-12
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-17
2.8
30
30
2.8
RACK F-11
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-16
2.8
30
30
2.8
RACK F-10
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-15
2.8
30
30
2.8
RACK F-09
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-14
2.8
30
30
2.8
RACK F-08
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-13
2.8
30
30
2.8
RACK F-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
SPACE
SPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
1C
A
B
C
A
113
C
A
B
C
A
B
C
A
B
C
A
B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
ISPACE
PHASE A LOAD (KVA) : 33.6 100.8 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 33.6 121.3 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 33.6 DEMAND (kVA)
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: FB
LOCATION: Row F
' NELBOARD SCHEDU
DATE: 19-Mar-15
SECTION:
AMPS: 400 x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK F-18
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.8
RACK F-12
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-17
2.8
30
30
2.8
RACK F-11
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-16
2.8
30
30
2.8
RACK F-10
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-15
2.8
30
30
2.8
RACK F-09
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-14
2.8
30
30
2.8
RACK F-08
2.8
30
30
2.8
2.8
30
30
2.8
RACK F-13
2.8
30
30
2.8
RACK F-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
ISPACE
SPACE
ISPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
1C
A
B
C
A
B
C
A
B
C
IA
B
C
A
B
C
A
B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
SPACE
ISPACE
PHASE A LOAD (KVA) : 33.6 100.8 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 33.6 121.3 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 33.6 DEMAND (kVA)
HOLMES ELECTRIC �NELBOARD SCHEDU
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: BA SECTION:
LOCATION: Row B
AMPS: 400 x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD
NO. CIRCUIT NAME KVA AIPH AIPH KVA CIRCUIT NAME
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACKB-09
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.8
RACKA-09
2.8
30
30
2.8
2.8
30
30
2.8
RACK B-08
2.8
30
30
2.8
RACK A-08
2.8
30
30
2.8
2.8
30
30
2.8
RACKB-07
2.8
30
30
2.8
RACKA-07
2.8
30
30
2.8
2.8
30
30
2.8
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
cl
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
SPACE
I
SPACE
PHASE A LOAD (KVA): 16.8 50.4 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 16.8 60.6 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 16.8 DEMAND (kVA)
CKT
NO.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: BB
LOCATION: Row B
AMPS: 400
VOLTS: 120/208
PHASE: 3
WIRE: 4
A.I.C.: 10
NO. CIRCUIT NAME
1
RACK B-09
3
5
7
RACK B-08
9
11
13
RACK B-07
15
17
19
SPACE
21
SPACE
23
SPACE
25
SPACE
27
SPACE
29
SPACE
31
SPACE
33
SPACE
35
SPACE
37
SPACE
39
SPACE
41
SPACE
43
SPACE
45
SPACE
47
SPACE
49
SPACE
51
SPACE
53
SPACE
55
SPACE
57
SPACE
59
SPACE
60
SPACE
61
SPACE
63
SPACE
65
SPACE
67
SPACE
69
SPACE
71
SPACE
73
SPACE
75
SPACE
79
SPACE
81
SPACE
83
ISPACE
PHASE A LOAD (KVA)
PHASE B LOAD (KVA)
PHASE C LOAD (KVA)
15.0
15.0
15.0
_ WELBOARD SCHEDULE
DATE: 19-Mar-15
SECTION:
x MAIN LUG ONLY ISO GROUND BUS
MAIN CIRCUIT BREAKER BONDED GROUND BUS
MAIN FUSE FEED THROUGH
FLUSH MOUNTED x TOP FEED
x SURFACE MOUNTED BOTTOM FEED
LOAD BRK BRK LOAD CKT
KVA A/PH A/PH KVA CIRCUIT NAME NO.
2.8
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK A-09
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.8
30
30
2.2
2.8
30
30
2.2
2.8
30
30
2.2
RACK A-08
2.8
30
30
2.2
2.8
30
30
2.2
2.8
30
30
2.2
RACKA-07
2.8
30
30
2.2
2.8
30
30
2.2
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
45.0 TOTAL LOAD (kVA) SEC 1
54.2 CONNECTED (AMP) SEC 1
DEMAND (kVA)
HOLMES ELECTRIC rNELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: CA SECTION:
LOCATION: Row C
AMPS: 400 x MAIN LUG ONLY LSO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK C-18
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.2
RACK C-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-17
2.2
30
30
2.2
RACK C-07
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-16
2.2
30
30
2.2
RACK C-06
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-15
2.2
30
30
2.2
RACK C-05
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-14
2.2
30
30
2.2
RACK C-04
2.2
30
30
2.2
2.2
30
30
2.2
SPACE
30
2.2
RACK C-03
30
2.2
30
2.2
SPACE
30
2.2
RACK C-02
30
2.2
30
2.2
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK C-10
2.2
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
I C
A
B
C
A
B
C
30
2.2
RACK C-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.2
30
30
2.2
2.2
30
30
2.2
RACK C-09
2.2
30
SPACE
2.2
30
SPACE
2.2
30
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
I
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 26.4 79.2 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 26.4 95.3 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 26.4 DEMAND (kVA)
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: CB
LOCATION: Row C
AMPS: 400
VOLTS: 120/208
PHASE: 3
WIRE: 4
A.I.C.: 10
LOAD
ICKT
NO.
CIRCUIT NAME
KVA
1
RACK C-18
2.2
2.2
3
2.2
5
RACK C-17
2.2
7
2.2
9
2.2
11
RACK C-16
2.2
13
2.2
15
2.2
17
RACK C-15
2.2
19
2.2
21
2.2
23
RACK C-14
2.2
25
2.2
27
2.2
29
SPACE
31
33
35
SPACE
37
39
41
43
RACK C-10
2.2
45
2.2
47
2.2
49
RACK C-09
2.2
51
2.2
53
2.2
55
SPACE
57
SPACE
59
SPACE
60
SPACE
61
SPACE
63
SPACE
65
SPACE
67
SPACE
69
SPACE
71
SPACE
73
SPACE
75
SPACE
79
SPACE
81
SPACE
83
SPACE
PHASE A LOAD (KVA) :
26.4
PHASE B LOAD (KVA) :
26.4
PHASE C LOAD (KVA) :
26.4
v NELBOARD SCHEDULE
DATE: 19-Mar-15
SECTION:
x MAIN LUG ONLY
MAIN CIRCUIT BREAKER
MAIN FUSE
FLUSH MOUNTED
x SURFACE MOUNTED
BRK BRK
A/PH A/PH
79.2
95.3
ISO GROUND BUS
BONDED GROUND BUS
FEED THROUGH
x TOP FEED
BOTTOM FEED
LOAD
KVA CIRCUIT NAME
2.2 RACK C-08
RACK C-07
RACK C-06
RACK C-05
RACK C-04
RACK C-03
RACK C-02
RACK C-01
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
TOTAL LOAD (kVA) SEC 1
CONNECTED (AMP) SEC 1
DEMAND (kVA)
CKT
NO.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
HOLMES ELECTRIC �NELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: EA SECTION:
LOCATION: Row E
AMPS: 400 x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK E-18
1.9
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
1.9
RACK E-18
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
1.9
30
30
1.9
1.9
30
30
1.9
RACK E-17
1.9
30
30
1.9
RACK E-17
1.9
30 1
30
1.9
1.9
30
30
1.9
RACK D-14
1.9
30
30
1.9
RACK D-14
1.9
30
30
1.9
1.9
30
30
1.9
RACK D-14
1.9
30
30
1.9
RACK D-14
1.9
30
30
1.9
1.9
30
30
1.9
RACK D-13
1.9
30
30
1.9
RACK D-13
1.9
30
30
1.9
1.9
30
30
1.9
RACK D-13
1.9
30
30
1.9
RACK D-13
1.9
30
30
1.9
1.9
30
30
1.9
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
SPACE
A
B
C
A
113
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
SPACE
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 22.6 67.7 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 22.6 81.4 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 22.6 DEMAND (kVA)
HOLMES ELECTRIC ,NELBOARD SCHEDULE
PROJECT: City Of Seattle DATE: 19-Mar-15
PANEL: EB SECTION:
LOCATION: Row E
AMPS: 400 x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 120/208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK D-18
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-17
2.3
30
30
2.3
RACK D-07
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-16
2.3
30
30
2.3
RACK D-06
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-15
2.3
30
30
2.3
RACK D-05
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-14
2.3
30
30
2.3
RACK D-04
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
30
2.3
RACK D-03
30
2.3
30
2.3
RACK D-10
2.3
30
30
2.3
RACK D-02
2.3
30
30
2.3
2.3
30
30
2.3
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK D-09
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
30
2.3
RACK D-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
ISPACE
PHASE A LOAD (KVA) : 29.9 89.7 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 29.9 107.9 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 29.9 DEMAND (kVA)
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: DB
LOCATION: Row E
AMPS: 400
VOLTS: 1201208
PHASE: 3
WIRE: 4
A.I.C.: 10
CKT LOAD
NO. CIRCUIT NAME KVA
I
RACK D-18
2.3
3
2.3
5
2.3
7
RACK D-17
2.3
9
2.3
11
2.3
13
RACK D-16
2.3
15
2.3
17
2.3
19
RACK D-15
2.3
21
2.3
23
2.3
25
RACK D-14
2.3
27
2.3
29
2.3
31
SPACE
33
35
37
RACK D-10
2.3
39
2.3
41
2.3
43
RACK D-09
2.3
45
2.3
47
2.3
49
SPACE
51
SPACE
53
SPACE
55
SPACE
57
SPACE
59
SPACE
60
SPACE
61
SPACE
63
SPACE
65
SPACE
67
SPACE
69
SPACE
71
SPACE
73
SPACE
75
SPACE
79
SPACE
81
SPACE
83
ISPACE
PHASE A LOAD (KVA) : 29.9
PHASE B LOAD (KVA) : 29.9
PHASE C LOAD (KVA) : 29.9
- NELBOARD SCHEDULE '
DATE: 19-Mar-15
SECTION:
MAIN LUG ONLY
MAIN CIRCUITBREAKER
MAIN FUSE
MOUNTEDFLUSH
MOUNTEDx SURFACE
89.7
107.9
ISO GROUND BUS
BONDED GROUND BUS
FEED THROUGH
x TOP FEED
BOTTOM FEED
LOAD
KVA CIRCUIT NAME
2.3
RACK D-08
2.3
2.3
_
2.3
RACK D-07
2.3
2.3
2.3
RACK D-06
2.3
2.3
2.3
RACK D-05
2.3
2.3
2.3
RACK D-04
2.3
2.3
2.3
RACK D-03
2.3
2.3
2.3
RACK D-02
2.3
2.3
2.3
RACK D-01
2.3
2.3
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
TOTAL LOAD (kVA) SEC 1
CONNECTED (AMP) SEC 1
DEMAND (kVA)
CKT
NO.
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
HOLMES ELECTRIC
• PROJECT: City Of Seattle
PANEL: DA
LOCATION: Row D
NELBOARD SCHEDU
DATE: 19-Mar-15
dZIllocelam
Ma
AMPS: 400 x MAIN LUG ONLY ISO GROUND BUS
VOLTS: 1201208 MAIN CIRCUIT BREAKER BONDED GROUND BUS
PHASE: 3 MAIN FUSE FEED THROUGH
WIRE: 4 FLUSH MOUNTED x TOP FEED
A.I.C.: 10 x SURFACE MOUNTED BOTTOM FEED
CKT LOAD BRK BRK LOAD CKT
NO. CIRCUIT NAME KVA A/PH A/PH KVA CIRCUIT NAME NO.
I
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
RACK D-18
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
30
2.3
RACK D-08
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-17
2.3
30
30
2.3
RACK D-07
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-16
2.3
30
30
2.3
RACK D-06
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-15
2.3
30
30
2.3
RACK D-05
2.3
30
30
2.3
2.3
30
30
2.3
RACK D-14
2.3
30
30
2.3
RACK D-04
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
30
2.3
RACK D-03
30
2.3
30
2.3
RACK D-10
2.3
N30
30
2.3
RACK D-02
2.3B
30
2.3
2.3C
30
2.3
43
45
47
49
51
53
55
57
59
60
61
63
65
67
69
71
73
75
79
81
83
RACK D-09
2.3
30
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
ClSPACE
30
2.3
RACK D-01
44
46
48
50
52
54
56
58
60
62
64
66
68
70
72
74
76
78
80
82
84
2.3
30
30
2.3
2.3
30
30
2.3
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
SPACE
PHASE A LOAD (KVA) : 29.9 89.7 TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) : 29.9 107.9 CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) : 29.9 DEMAND (kVA)
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: HB
LOCATION: Row H
AMPS: 400
VOLTS: 120/208
PHASE: 3
WIRE: 4
A.I.C.: 10
&NELBOARD SCHEDULE
DATE: 19-Mar-15
SECTION:
x MAIN LUG ONLY
MAIN CIRCUIT BREAKER
MAIN FUSE
FLUSH MOUNTED
x SURFACE MOUNTED
ISO GROUND BUS
BONDED GROUND BUS
FEED THROUGH
x TOP FEED
BOTTOM FEED
CKT
LOAD BRK BRK LOAD
CKT
NO.
CIRCUIT NAME
KVA A/PH A/PH KVA
CIRCUIT NAME
NO.
1
SPACE
A
SPACE
2
SPACE
SPACE
3
B
4
SPACE
SPACE
5
C
6
SPACE
SPACE
7
A
8
SPACE
SPACE
9
B
10
SPACE
SPACE
11
C
12
SPACE
SPACE
13
A
14
SPACE
SPACE
15
B
16
SPACE
SPACE
17
C
18
SPACE
SPACE
19
A
20
SPACE
SPACE
21
B
22
SPACE
SPACE
23
C
24
SPACE
SPACE
25
A
26
SPACE
SPACE
27
B
28
SPACE
SPACE
29
C
30
SPACE
SPACE
31
A
32
SPACE
SPACE
33
B
34
SPACE
SPACE
35
C
36
SPACE
SPACE
37
A
38
SPACE
SPACE
39
B
40
SPACE
SPACE
41
C
42
43
SPACE
A
SPACE
44
45
SPACE
B
SPACE
46
47
SPACE
C
SPACE
48
49
SPACE
A
SPACE
50
51
SPACE
B
SPACE
52
53
SPACE
C
SPACE
54
55
SPACE
A
SPACE
56
57
SPACE
B
SPACE
58
59
SPACE
C
SPACE
60
60
SPACE
A
SPACE
62
61
SPACE
B
SPACE
64
63
SPACE
C
SPACE
66
65
SPACE
A
SPACE
68
67
SPACE
B
SPACE
70
69
SPACE
C
SPACE
72
71
SPACE
A
SPACE
74
73
SPACE
B
SPACE
76
75
SPACE
C
SPACE
78
79
SPACE
A I
SPACE
80
81
SPACE
A
SPACE
82
83
SPACE
A ISPACE
84
PHASE A LOAD (KVA) :
0.0 0.0
TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) :
0.0 0.0
CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) :
0.0
DEMAND (kVA)
HOLMES ELECTRIC
PROJECT: City Of Seattle
PANEL: HA
LOCATION: Row H
v NELBOARD SCHEDULE
DATE: 19-Mar-15
SECTION:
AMPS: 400
x MAIN LUG ONLY
ISO GROUND BUS
VOLTS: 120/208
MAIN CIRCUIT BREAKER
BONDED GROUND BUS
PHASE: 3
MAIN FUSE
FEED THROUGH
WIRE: 4
FLUSH MOUNTED
x TOP FEED
A.I.C.: 10
x SURFACE MOUNTED
BOTTOM FEED
CKT
LOAD BRK BRK LOAD
CKT
NO.
CIRCUIT NAME
KVA A/PH A/PH KVA
CIRCUIT NAME
NO.
1
SPACE
A
SPACE
2
SPACE
SPACE
3
B
4
SPACE
SPACE
5
C
6
SPACE
SPACE
7
A
8
SPACE
SPACE
9
B
10
SPACE
SPACE
11
C
12
SPACE
SPACE
13
A
14
SPACE
SPACE
15
B
16
SPACE
SPACE
17
C
18
SPACE
SPACE
19
A
20
SPACE
SPACE
21
B
22
SPACE
SPACE
23
C
24
SPACE
SPACE
25
A
26
SPACE
SPACE
27
B
28
SPACE
SPACE
29
C
30
SPACE
SPACE
31
A
32
SPACE
SPACE
33
B
34
SPACE
SPACE
35
C
36
SPACE
SPACE
37
A
38
SPACE
SPACE
39
B
40
SPACE
SPACE
41
C
42
43
SPACE
A
SPACE
44
45
SPACE
B
SPACE
46
47
SPACE
C
SPACE
48
49
SPACE
A
SPACE
50
51
SPACE
B
SPACE
52
53
SPACE
C
SPACE
54
55
SPACE
A
SPACE
56
57
SPACE
B
SPACE
58
59
SPACE
C
SPACE
60
60
SPACE
A
SPACE
62
61
SPACE
B
SPACE
64
63
SPACE
C
SPACE
66
65
SPACE
A
SPACE
68
67
SPACE
B
SPACE
70
69
SPACE
C
SPACE
72
71
SPACE
A
SPACE
74
73
SPACE
B
SPACE
76
75
SPACE
C
SPACE
78
79
SPACE
A
SPACE
80
81
SPACE
A
SPACE
82
83
SPACE
A
SPACE
84
PHASE A LOAD (KVA) :
0.0 0.0
TOTAL LOAD (kVA) SEC 1
PHASE B LOAD (KVA) :
0.0 0.0
CONNECTED (AMP) SEC 1
PHASE C LOAD (KVA) :
0.0
DEMAND (kVA)
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
April 01, 2015
JOHN MCBRIDE
600 WASHINGTON AVE S
KENT, WA 98035
RE: Correction Letter # 1
ELECTRICAL Permit Application Number EL15-0274
SABEY - 3355 S 120 PL
Dear JOHN MCBRIDE,
This letter is to inform you of corrections that must be addressed before your development permit can be approved. All
correction requests from each department must be addressed at the same time and reflected on your drawings. I have
enclosed comments from the following departments:
BUILDING DEPARTMENT: Jim Benner at 206-431-3679 if you have questions regarding these comments.
CORRECTIONS:
1). PANELS ON ONE -LINE DIAGRAM SHOWN AS PDCs
2). PANELS FB BB CB EB DB HA NOT REPRESENTED ON ONE -LINE DIAGRAM
3). PROVIDE EXISTING LOADS ON PI)Cs FEEDING PANELS
4). PANEL SCHEDULE FOR EB SHOULD REFLECT SAME AS EA
Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other
documentation.. The City requires that four (4) sets of revised plan pages, specifications and/or other documentation be
resubmitted with the appropriate revision block.
In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have
enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail
or by a messenger service.
If you have any questions, I, an be reached at 206-431-3670.
Sincerely,
Megan Parso t
Permit Technician
File No. EL15-0274
63nn Qnuth""t" Rnrrlvvr rd .Qvito.iflM • Tulneriln Wn hivrntn- QR1RR a Ph— '?nK_Qgl_aA7n a F.,,- *)nA-,4?i_2t;AS
PERMIT COORD COPY
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: EL15-0274 DATE: 04/09/15
PROJECT NAME: SABEY
SITE ADDRESS: 3355 S 120 PL
Original Plan Submittal Revision # before Permit Issued
X Response to Correction Letter # 1 Revision # after Permit Issued
DEPARTMENTS:
J P ,01NG + 11- IS
Building Division
Public Works ❑
PRELIMINARY REVIEW:
Not Applicable ❑
(no approval/review required)
REVIEWER'S INITIALS:
APPROVALS OR CORRECTIONS:
Approved ❑
Corrections Required ❑
(corrections entered in Reviews)
Notation:
REVIEWER'S INITIALS:
Fire Prevention ❑
Structural ❑
Planning Division ❑
Permit Coordinator to
DATE: 04/14/15
Structural Review Required ❑
DATE:
DUE DATE: 05/12/15
Approved with Conditions
Denied ❑
(ie: Zoning Issues)
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
PERMIT GOORD SOP .
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: EL15-0274 DATE: 3-26-15
PROJECT NAME: SABEY
SITE ADDRESS: 3355 S 120 ST
X Original Plan Submittal
Response to Correction Letter #
DEPARTMENTS:
;:5gd 0 pt(� -3� ��> is
Building Division
Revision # before Permit Issued
Revision # after Permit Issued
Fire Prevention ❑ Planning Division ❑
Public Works ❑ Structural ❑ Permit Coordinator ❑
PRELIMINARY REVIEW: DATE: 3-31-15
Not Applicable ❑ Structural Review Required ❑
(no approval/review required)
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: DUE DATE: 4-28-15
Approved ❑ Approved with Conditions ❑
Corrections Required
(corrections entered in Review )
Notation:
Denied ❑
(ie: Zoning Issues)
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: ldg Fire ❑ Ping ❑ PW ❑ Staff Initials:
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite # 100
Tukwila, Washington 98188
Phone: 206-431-3670
Web site: http://www.TukwilaWA.gov
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, eta
Date: 04/09/2015 Plan Check/Permit Number: EL15-0274
Response to Incomplete Letter #
Response to Correction Letter # *R EC E1 M
Revision # after Permit is Issued
Revision requested by a City Building Inspector or Plans Examiner APR .O 9 2015
Project Name: Sabey
Project Address: 3355 S 120 PL
Contact Person: John McBride Phone Number: (253) 234-2853
Summary of Revision:
Item 1 Updated one -line with panel designation and panel board symbol are attached.
Item 2 Updated panel schedules with panel designation to match one -line drawings.
Item 3 The PDCs are existing units with no current connected load. The new loads are as indicated on the one -line and
panels schedule attached.
Item 4 Updated panel schedules with new designations are attached.
Thank You
Sheet Number(,. E5.10
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit Center by:'�"
dEntered in Permits Plus on 6) 00 �l
H:WpplicationsTonns-Applications On Line\2010 ApplicationsW-2010 -Revision Submittal.doc
Revised: May 2011
HOLMES ELECTRIC CO
Page 1 of 2
Home. Inicio en l:,cpaudl Contact
Safety Claims & Insurance
Washington State Department of
Labor & Industries
HOLMES ELECTRIC CO
Owner or tradesperson PO BOX 338
HOLMES, MICHAEL J KENT, WA98035
253-479-4000
Principals KING County
HOLMES, MICHAEL J, PRESIDENT
RICHARDS, MICHAEL W, SECRETARY
HOLMES, JERAY A, AGENT
RICHARDS, EUGENE M
(End: 10/15/2010)
Doing business as
HOLMES ELECTRIC CO
Search L&I
A-Z Index Help My Secure L&I
Workplace Rights Trades & Licensing
WA UBI No. Business type
177 003 752 Corporation
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Electrical Contractor Active.
............_.......................................... .
Meets current requirements.
License specialties
GENERAL
License no.
HOLMEEC549BH
Effective — expiration
01108/1946-10/3112016
Designated administrator
.......
Active.
HILLMAN, ED
Meets current requirements.
License type
License no.
Master Electrician
HILLME'973KR
Bond
.................
North American Spec Ins Co
$4,000.00
Bond account no.
2192663
Received by L&I
Effective date
11/21/2014
12/0812014
Expiration date
Until Canceled
Bond history
Savings
.................
No savings accounts during the previous 6 year period.
License Violations
....... _ ..................
Infraction no.
ESHA000715 Satisfied
........................
RCW/WAC