Loading...
HomeMy WebLinkAboutPermit EL15-1022 - ANDOVER EXECUTIVE PARK - ROOFTOP UNITS REPLACEMENTill, If 11 *4401*891MAN a LIN 01 JA m �L;l *4 0 742 INDUSTRY DR riol'iI' N0/I' it EL15-1022 City of Tukwila • Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL OTC PERMIT Parcel No: 2523049008 Permit Number: EL15-1022 Address: 742 INDUSTRY DR Issue Date: 11/20/2015 Permit Expires On: 5/18/2016 Project Name: ANDOVER EXECUTIVE PARK Owner: Name: NCWP ANDOVER EXECUTIVE PARK Address: 810 NW MARSHALLS ST #300 , PORTLAND, WA, 97209 Contact Person: Name: MARK ATCHLEY Phone: (206) 730-7353 Address: PO BOX 1165, KENT, WA, 98035 Contractor: Name: MAPLE CREST ELECTRIC INC Phone: (253) 872-4712 Address: PO BOX 1165, KENT, WA, 98035 License No: MAPLECE170JA Expiration Date: 1/31/2017 Lender: Name: Address: DESCRIPTION OF WORK: REMOVE 4 EXISTING ROOFTOP UNITS, ELECTRICAL AND SPLIT SYSTEM AND REPLACE WITH NEW ROOFTOP DISCONNECTS & GFCI RECEPTACLE Valuation of single family: $0.00 Fees Collected: $147.21 Valuation of mf/comm: $2,500.00 Type of Work: TENANT IMP Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Permit Center Authorized Sign Date: --(T I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or loca�laws regulating construction or the performance of work. I am authorized to sign and obtain this developmen permit and agree to the conditions attached to this permit. Signature: Print Name: Date: I I Ido This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'ELECTRICAL PERMIT CONDITIONS' 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department • Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http:Hwww.TukwilaWA.gov Electrical Permit No. �v,10� Project No. Date Application Accepted: Date Application Expires: _ use ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. "Please Print" SITE LOCATION Site Ten PROPERTY OWNER Name: Address: Citq— State � Zip: CONTACT PERSON — person receiving all project communication Name: Address: City: State QK Zip: M Phone: Fax: Email: King Co Assessor's Tax No.: Number: -VaQ- Floor: New Tenant: ❑ .....Yes ❑ ..No ELECTRICAL CONTRACTOR INFORMATION Company Name: � Address7�1D City: State: Zip 3S Phone: Fax: Contr Reg No.: Date: A Tukwila Business License No. u5— A` Valuation of Project (contractor's bid price): Scope of Work (please provide detailed information): �\ `\�, Will service be altered? ❑ Yes No Adding more than 50 amps? ❑ Yes No Type of Use: TTYpe of work: ❑ New ❑ Addition ❑ Service Change Remodel ❑ Tenant Improvement ❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service Property Served by: . 3L Puget Sound Energy ❑ Seattle City Light H:Wpplications\Forms-Applications On Line\2014 Applications\Electrical Permit Application Revised 1-1-14.doex Revised: January 2014 bh Page] of2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings...................................$152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings ........................ $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) ................................ $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration ...................................... $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits ................. $81.90 number of added circuits ....................... $11.55 ea ❑ Circuits added/altered without service change ........... $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change ........... $54.60 (6 or more circuits) ............................................... $7.65 ea ❑ Meter/mast repair ....................................................... $68.25 ❑ Low voltage systems ................................................. $59.85 (alarm, furnace thermostat) PERMIT APPLICATION NOTES - MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) ................................. $65.00 ❑ Temporary service (generator) ................................... $80.90 ❑ Manufactured/mobile home service ........................... $86.25 (excluding garage or outbuilding) ❑ Carnivals....................................................................$80.60 Number of concessions ......................... $10.80 ea Each ride and generator truck ............... $10.80 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND i AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Print Date: \\� Day Telephone: �s-5" %—A'A `kmk Mailing Address �'�„ ���� \� W�• ��� City State Zip HAApplications\Forms-Applications on Line\2014 ApplicationsTlectrical Permu Application Revised 1.1.14.docx Revised: January 2014 bh Page 2 of 2 DESCRIPTIONS PermitTRAK PAID $147.21 EL15-1022 Address: 742 INDUSTRY DR Apn: 2523049008 $147.21 ELECTRICAL $140.20 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $140.20 TECHNOLOGY FEE $7.01 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6704 R000.322.900.04.00 0.00 $7.01 $147.21 Date Paid: Friday, November 20, 2015 Paid By: MAPLE CREST ELECTRIC INC Pay Method: CHECK 12073 Printed: Friday, November 20, 2015 1:16 PM 1 of 1 IJt_1 WSYSTEMS 12DCity of Tukwila Allan Ekberg, Mayor Department of Community Development Jack Pace, Director .0 4/1/2016 MARK ATCHLEY PO BOX 1165 KENT, WA 98035 RE: Permit No. EL15-1022 ANDOVER EXECUTIVE PARK 742 INDUSTRY DR Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 5/18/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 5/18/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File No: EL15-1022 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 MAPLE CREST ELECTRIC INC Hone Inieio en Espanol Contact Page l of 2 Search L&I �.--� Safety Washington State Department of Labor & Industries MAPLE CREST ELECTRIC INC A-G hidex Help My Secure. L&I Claims & Insurance Workplace Rights Trades & Licensing Owner or tradesperson PO BOX 1165 KENT, WA98035 Principals 253-8724712 ATCHLEY, ALVIN L KING County ATCHLEY, EILEEN R, AGENT Doing business as MAPLE CREST ELECTRIC INC WA UBI No. Business type 601 112 230 Corporation Governing persons ALVIN L ATCHLEY EILEEN R ATCHLEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. ........ _........._......................................... Meets current requirements. License specialties GENERAL License no. MAPLECE170JA Effective -- expiration 04/01/1983— 01/31/2017 Designated administrato..r ............. Active. ATCHLEY, ALVI.N..L.. Meets current requirements. License type License no. Electrical Administrator ATCHLAL251 NN Bond DEVELOPERS SURETY & INDEM CO $4,000.00 Bond account no. 436896C Received by L&I Effective date 03/23/2001 04/01 /1997 Expiration date Until Canceled Savings, No savings accounts during the previous 6 year period. License Violations ..... .................... Infraction no. EJONVO1344 Satisfied Issue date RCW/WAC 10/01/2010 19.28.271 RCW T,vs-dqq�lq7 https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=601112230&LIC=MAPLECEI70JA&SAW= 11/20/2015