HomeMy WebLinkAboutTIC 2019-12-03 Item 2A - Final Acceptance - Boeing Access Road over BNRR Bridge Rehabilitation with PCL ConstructionCity o Tukwfla Atlan
Ekberg,•
Public Works Department - Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO:
Transportation and Infrastructure Committee
FROM:
Henry Hash, Public Works Director
BY:
Adam Cox, Transportation Project Manager
CC:
Mayor Allan Ekberg
DATE:
November 27, 2019
SUBJECT: Boeing Access Road over BNRR Bridge Rehabilitation
Project No. 99410408; Contract No.17-108
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of the payment and performance bond.
BACKGROUND
The Notice to Proceed for Contract Number 17-108 with PCL Construction, LLC of Bellevue, Washington for the
Boeing Access Road over BNRR Rehabilitation Project was issued on June 23, 2016. This construction project
consisted of a seismic retrofit of the Boeing Access Road over BNRR bridge deck, traffic barriers, sidewalk widening,
concrete column jacketing, and foundation support.
DISCUSSION
The Boeing Access Road over BNRR Rehabilitation construction project was physically completed on July 18, 2019. There
were no contract disputes or claims on the project and the project was completed under budget. Since the physical
completion date, staff has been waiting for approval of all administrative obligations and payment verification items before
accepting the work as complete.
FISCAL IMPACT
The original construction budget for the Boeing Access Rd over BNRR Bridge Rehabilitation was $7,923,340.00 with a
25% contingency of $1,584,668.00. Twenty-two change orders were executed for a total of $716,587.31. The final cost
for the retrofit of the bridge, including all change orders, was $6,905,831.31. The 80% project funding was secured
through a Federal Bridge Replacement Advisory Committee (BRAC) grant. The final project expenditures are as follows:
Expenses
Construction Contract Amount $6,189,244.00
Change Order Nos. 1 to 22 716,587.31
Total Contract Amount $6,905,831.31
RECOMMENDATION
Council is being asked to formally accept the Boeing Access Road over BNRR Bridge Rehabilitation contract with PCL
Construction, LLC in the amount of $6,905,831.31 as complete, and authorize the release of the payment and
performance bond subject to standard claim and lien release procedures, and to consider this item at the December 9,
2019 Committee of the Whole and subsequent Consent Agenda at the Special Meeting immediately following that
same night.
Attachment: Notice of Completion, Contract #17-108
W1PW EngIPROJECTSVW- RW & RS Projects\Boeing Access Rd Bridge Rehab (99410408)115 project closeoutlDRAFT Info Memo for BAR Rehab Bridge closeout 12-03-19.docx
V Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Date: DRAFT Contractor's UBI Number: 601332812
Name & Mailing Address of Public Agency Department Use Only
ity o Tukwila Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number:179000208
Notice is hereby given relative to the completion of contract or project described below
Project Name
Contract Number
Job Order Contracting
Boeing Access Road Bridge Rehabiltation 99410408
117-108
❑ Yes [i(No
Description of Work Done/Include Jobsite Address(es)
Boeing Access Road Bridge Rehabilitation. Site location between 1-5 and E Marginal Way over the BNSF railroad tracks.
Seismic retrofit, deck surfacing, concrete sidewalk addition, steel work, painting, grouting, retaining wall, and earthwork.
Federally funded transportation project? V Yes ❑ No (if yes, provide Contract Bond Statement below)
Contractor's Name
E-mail Address
Affidavit ID*
PCL Construction Svc Inc.
iSeattleAccounting@pcl.com
1864804
Contractor Address
Telephone #
3650 131ST AVE SE, STE 650, BELLEVUE, WA, 98006
425-454-8020
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
❑ Retainage Bond ❑ Contract/Payment bond (valid for federally funded transportation projects)
Name:
I Bond Number:
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
6/5/2017
10/30/2017
5/6/19
07/18/2019
Were Subcontracters used on this project? If so, please complete Addendum A. Wyes ❑ No
Affidavit ID* - No L&I release will be granted until all affidavits are listed.
Contract Amount
$ 6,189,244.00
Additions +
()
$ 716,587.31
Reductions
Sub -Total
Sales Tax Rate 0
(If various rates apply, please send abreakdown)
Sales Tax Amount
$ 6,905,831.31
TOTAL $ 6 905 831.31
Liquidated Damages $
Amount Disbursed $ 6,905,831.31
Amount Retained $
NOTE: These two totals must be eaual
TOTAL $ 6,905,831.31
Comments:
No Sales tax, Rule 171.
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name: Han Kirkland
Email Address: Han. Kirkland@tukwilawa.gov
Department of Revenue Washington Sw�rouT iDelm rrmrrn of
Public Works Section Labor & Industries
(360) 704 5650 Contract Release
PWC@dor.wa.gov (855) 545-8163, option # 4
ContractRelease@LNI . WA. GOV
REV 31 0020e (10/26/15) F215-038-000 10-2014
Title: Public Works Analyst
Phone Number: 206.431.2445
IdIr Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360)902-9450
publicworks@esd.w�.gov
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
AAA Contractors Inc
602884326
825354
APPLY -A -LINE LLC
600553941
874639
BELARDE CONSTRUCTION
601114553
864072
BRAVO ENVIRONMENTAL NW INC
602946216
853211
Brundage Bone Concrete Pumping, Inc.
600630026
865895
C & P FENCING
603210811
802663
CONCO CEMENT COMPANY
601716374
865004
DIRT & AGGREGATE INTERCHNG INC
600365996
843058
DONALD B MURPHY CONTRS INC
278049134
774711
EVERGREEN CONCRETE CUTTING INC
601605667
815655
GLACIER NORTHWEST INC DBA CalPortland
601301145
HAMILTON CONST CO
409019076
859053
HAYWARD BAKER INC
601039452
818879
HOLOCENE DRILLING INC
601709741
824492
ICON MATERIALS
601006854
859017
Informed Land Survey LLC
602487061
852137
JOHN WAYNE CONSTRUCTION CO
601111682
854476
P R SYSTEMS INC
601303110
862877
PERFORMANCE ABATEMENT SRVC INC
601018806
797836
PIONEER WATERPROOFING CO INC
601417894
827719
PURCELL PAINTING & COATINGS
602440422
859927
RAINIER WELDING INC
600401555
836966
REBAR INTERNATIONAL INC
600481702
852879
SEATTLE SWEEPING INC
602025596
STORIE BARRIERS CORP
603587412
852149
Sundancer Electric Inc
603190024
845116
SUPERIOR EARTHWORKS LLC
603201394
863386
For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15) F215-038-000 10-2014 3