HomeMy WebLinkAboutTrans 2011-11-21 Item 2C - Grant Acceptance - Tukwila Urban Center Pedestrian-Bicycle BridgeCity of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director
DATE: November 18, 2011
SUBJECT: Tukwila Urban Center (TUC) Pedestrian /Bicvcle Bridge
Project No. 90510403
Acceptance of Federal CMAQ Grant and State Enhancement Grant
ISSUE
Accept two grants for the Tukwila Urban Center Pedestrian /Bicycle Bridge.
BACKGROUND
In May 2009, the City submitted an application for a Federal CMAQ (Congestion Mitigation and Air
Quality) grant for the Pedestrian /Bicycle Bridge project that requested $1,000,000.00. At the time,
the application was not successful, but the project was included on the PSRC Contingency List for
any additional funding (either through new federal funds being made available or awarded projects
not using all the funds). In August 2011, the PSRC Executive Board awarded Tukwila a portion of
the CMAQ grant in the amount of $750,833.00 from the Contingency List.
In July 2010, the City submitted an application to the Statewide Transportation Enhancement
Program in the amount of $500,000.00. This application was successful and a grant was awarded
with funding available in 2011.
DISCUSSION
The Statewide Transportation Enhancement Program grant of $500,000.00 does not require any City
matching funds. The Federal CMAQ grant requires a 13.5% City match, which in this case is
$117,182.00. A new CIP page is attached that adds the additional design costs while reducing the
construction budget. Park Impact fees are being collected for this pedestrian bridge and the
expected fees will now cover part of the City match for design, rather than just construction.
RECOMMENDATION
Council is being asked to formally accept these two grants; the Federal CMAQ grant of $750,833.00
and the State Transportation Enhancement grant of $500,000.00 for the TUC Pedestrian /Bicycle
Bridge and consider this item at the November 28, 2011 Committee of the Whole and subsequent
December 5, 2011 Regular Meeting.
Attachments: New Page 10, Proposed 2012 CIP
Grant Agreements
W. \PW Eng \PROJECTS\A- RW RS Projects \05 -RW03 TUC Ped Bridge \INFO MEMO 2 Grant Accept CMAQ State.docx
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2012 2017 Capital Improvement Program
'e
Z
WSr.
e rr n� „�aa 4 7
er
S
a
10
51
2012 to 2017
PROJECT:
Tukwila Urban Center Pedestrian /Bicycle Bridge Project No. 90510403
DESCRIPTION:
Construct a new pedestrian /bicycle bridge over the Green River.
Pedestrian /bicycle connection between Tukwila's Urban Center and commuter rail /Amtrak station.
JUSTIFICATION:
Supports local and regional goals and policies regarding land use and transportation in Urban Center.
Pedestrian System Report identified the optimal location for bridge crossing to be south of the Best
STATUS:
Western Hotel. Type, Size, and Location Report was completed in 2011. Council approved a design of
a twin -tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway.
MAINT. IMPACT:
To be determined.
State Enhancement design grant for $190k and Transit Oriented Development (TOD) planning grant of $55k.
COMMENT:
State Enhancement grant of $500k and Federal CMAQ grant of $750,833 for final design. Project is on Park
Impact Fee list with funding of $2 million with an 80 %/20% split.
FINANCIAL
Through Estimated
(in $000's)
2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL
EXPENSES
Design
229 30 984 390
1,633
Land (RAIV)
100
100
Const. Mgmt.
1,000
1,000
Construction
6,485
6,485
TOTAL EXPENSES
229 30 984 390 100 7,485 0 0 0
9,218
FUND SOURCES
Awarded Grant
229 30 916 321
1,496
Proposed Grant
5,200
5,200
Mitigation Actual
0
Park Impact Fees Expected 35 80 1,485
1,600
City Oper. Revenue
0 0 68 34 20 800 0 0 0
922
TOTAL SOURCES
229 30 984 390 100 7,485 0 0 0
9,218
Project Location,,
z
515E 81 �1
2012 2017 Capital Improvement Program
'e
Z
WSr.
e rr n� „�aa 4 7
er
S
a
10
51
Pugef Sound Regional Counoi
ME
August 4, 2011
The Honorable Jim Haggerton
City of Tukwila
6200 Southcenter Blvd
Tukwila, WA 98188
Dear Mayor gger on:
On behalf of the Puget Sound Regional Council, congratulations on receiving $2,000,000 for Tukwila Urban
NVi Center Access Project and $750,833 for Urban Center Pedestrian Bicycle Bridge.
This PSRC funding was approved by our Executive Board in July. Thanks to great work by your staff
and elected leadership, these projects were identified as high priorities and rose to the top out of a pool of
many other worthy projects.
Helping communities secure federal transportation funding is one of the key roles of PSRC. We know in
these tough economic times that local governments are searching far and wide for the resources to deliver
needed transportation improvements and also grow jobs in the near tern. In 2012, PSRC will select
projects for the roughly $400 million in federal funds the region can expect to receive over the next few
years.
At every step of the way, we hope you'll call on us with questions and concerns as you look for funding
opportunities and work to iunplement your conununity's transportation, growth, and economic
development plans. You can reach us at (206) 464 -7090 or online at psrc.org.
Sincerely,
osl, Brown
Commissioner, Kitsap County
President, Puget Sound Regional Council
P.S. We're gearing up for an update of the Puget Sound region's five -year economic strategy, and there
will be many ways for you and your staff to be involved in this effort, Look for more information coming
soon and visit psrc.org/econdev /res to learn more.
101 1 Western keiw. Su.-e 500 Sea%, Washmgtor. 98104 -1035 (206) 464.7090 -FAX (206) 587 -4825 psrc.org
Alt
Washbgton State
wo Department of Transportation Local Agency Agreement Supplement
Agency Supplement Number
City of Tukwila 1
Federal Aid Project Number Agreement Number CFDA No. 20.205
STPE 1320(002) LA 6065 (Catalog of Federal Domestic Assistance)
The Local Agency desires to supplement the agreement entered into and executed on
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Project Description
Name Tukwila Urban Center Pedestrian/Bike Bridge over Green River Length not determined
Termini approximately between Baker Blvd (if extended) and Longacres Way (if extended)
Description of Work No Change
Non motorized bridge over Green River and wayfinding approach improvements along Baker Blvd to include bike lanes, trail
connector to the Interurban Trail east of West Valley Highway, and a new pedestrian signal on West Valley Highway
Reason for Supplement __11
Obligation of additional Enhancement Funds and CMAQ Funds
s
Q
AFT
Does this change require additional Right of Way or Easements? Yes No
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By By
Title Director of Highways and Local Programs
Date Executed
DOT Form 140 -041 EF
Revised 1/2007
10
Estimate of Funding
Type of Work
(t)
(3)
(4)
(5)
Previous
Supplement
Estimated Total Estimated
Agency
Estimated
Aweement/Suppl.
Proiect Funds
Funds
Federal Funds
PE
a. Agency
I 1
117,182.001
117,182.001
117,182.00
b. Other Consultant
190,000.001
500,000.001
690,000.001
680,000.00
c. Other Consultant
750,833.001
750,833.001
750,833.00
Federal Aid
Participation
d. State
10,000.00
10,000.001
20,000.00
Ratio for PE
e. Total PE Cost Estimate (a +b +c +d)
200.000.00
1,368,015.00
1,568,015.001
117,182.001
1,450,833.00
Right of Way f. Agency
1
a. Other
Federal Aid
h. Other
Participation
Ratio for RW
i. State
j. Total RM Cost Estimate (f +g +h +i) 1
1
Construction k. Contract
1
I. Other
m. Other
n. Other
o. Agency
Federal Aid
Participation
p State
1
1
Ratio for CN
a. Total CN Cost Estimate (k+l+m+n+o+D)
1
1
r. Total Proiect Cost Estimate (e+i+a)
200.000.00
1.368.015.0
1.568.01
A17,182,00
1.450.833.00
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condition
to payment of the Federal funds obligated, it accepts and will comply with the applicable provisions.
Agency Official Washington State Department of Transportation
By By
Title Director of Highways and Local Programs
Date Executed
DOT Form 140 -041 EF
Revised 1/2007
10